This document provides a project description and related federal contract opportunity for road reconstruction work. The project involves reconstructing an existing asphalt roadway for 2 miles on Warren Wagon Road between mileposts 7.6 to 9.6 in Valley County, Idaho. Work includes deep patching, replacing three culverts, guardrail installation and replacement, striping, signing, and traffic control. The estimated price range is $2-3 million. The tentative completion date is fall 2020. The solicitation is a small business set-aside offered by the Federal Highway Administration under the Department of Transportation. Interested vendors must register on FBO.gov to receive notifications and access preliminary plans and additional project information. When solicitation documents are issued, they will be posted on FBO.gov.

Project Description

View the file

Other files

File Type Posted
Prelim_Letter_Warren_Wagon.pdf PDF
idvalley2108_Plans_95_-BSheetsremoved.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ID Valley 21(8), Warren Wagon Road MP 7.6 to 9.6, Valley County, Idaho.

The work consists of reconstructing the existing asphalt roadway, select areas of deep patching, replacement of three culverts, select areas of vertical alignment corrections, installation of new guardrails and the replacement of existing guardrails, striping and signing, staging and traffic control, along with other small items of work.

Project length: 2 Miles

Tentative Fixed Completion Date: Fall 2020

(Once solicitation is issued, see FAR Clause 52.211-10 for exact date.)

Estimated Price Range: $2 million to $3 million

Location: 8.4 miles North of McCall, ID.

DESCRIPTION OF WORK in US CUSTOMARY UNITS

FP-14

On e S ch ed ul e

Sc h

Na m e

DIVISION 150 – Project Requirements 152 Construction Survey & Staking (yes/no) Yes 153 Contractor Quality Control and Assurance

(yes/no) Yes 154 Contractor Sampling & Testing (yes/no) Yes 155 Schedules for Construction Contracts (construction schedules) (yes/no) Yes 157 Soil Erosion & Sediment Control (erosion control devices) LPSM 158 Watering for Dust Control Yes

DIVISION 200 – Earthwork 201 Clearing & Grubbing LPSM 203 Removal of Structures & Obstructions (structures, demolition) Removal of Pipe Culvert Removal of Sign Removal of Guardrail

3 – each 2 – each

1142 LNFT

204 Excavation & Embankment Subexcavation Select Borrow

3700 CUYD

6500 TON

On e S ch ed ul e

Sc h

Na m e

207 Earthwork Geosynthetics Seperation-Stabilization Geotextile, Type C Reinforcement Geosynthetic, Biaxial

42,700 SQYD

15,200 SQYD

DIVISION 300 – Aggregate and Base Courses 301 Untreated Aggregate Courses (crushed aggregate) 13,000 TONS 310 Cold In-Place Recycled Asphalt Base Course 5450 TONS DIVISION 400 – Asphalt Pavements & Surface Treatments 401 Asphalt Concrete Pavement By Gyratory Mix Design Method 3,400 TONS 406 Fog Seal And blotter 214 TONS

DIVISION 600 – Incidental Construction 602 Culverts & Drains (indicate one or both) Culverts Underdrain system 6-Inch Pipe

234 LNFT

300 LNFT

790 LNFT

607 Cleaning, Relaying, & Repairing Existing Drainage Structures 3 LNFT 617 Guardrail 1,040 LNFT 621 Monuments & Markers (construction survey & staking) (yes/no) No 622 Rental Equipment (yes/no) Yes 623 General Labor (yes/no) Yes 624 Topsoil (landscaping & related items) 3 ACRES 625 Turf Establishment (indicate seeding or mulching separately) 3 ACRES 634 Permanent Pavement Markings (traffic pavement markings) 42,250 LNFT 635 Temporary Traffic Control – Flagger Yes 635 Temporary Traffic Control – Pilot Car Yes 635 Temporary Traffic Control – ??? LPSM

DIVISION 200 – Earthwork
DIVISION 300 – Aggregate and Base Courses
DIVISION 400 – Asphalt Pavements & Surface Treatments

File details come from the government source that posted it. Updated .