PROJECT_DESCRIPTION.pdf
PDF 169 KB Posted
- Solicitation number
- 69056719B000022
About this file
This document contains a project description and related federal contract opportunity for road repair work on the Okanogan-Wenatchee National Forest in Washington State. The project description provides details on the scope of work, which includes installing culverts and aquatic organism pipes, rebuilding damaged road slopes, rehabilitating roadways, reconstructing ditches, and applying chip seal surfacing. The work covers approximately 1.942 miles and has an estimated price range of $1 million to $2 million. The opportunity will be solicited in fall/winter 2019 for work to be completed by fall 2020. This small business set-aside opportunity will be posted to the Federal Business Opportunities website under Solicitation Number 69056719B000022. Interested vendors should register on FBO to receive notification when the solicitation documents are released.
Project Description
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 2019-08-23_wa-ef1712303_Pre-Ad_Plans.pdf | ||
| Prelim_Letter_OKA-WEN_phase_III_pre-ad.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
WA FS ERFO 2017(1)-23(3), Okanogan-Wenatchee 2017 Repairs, Okanogan- Wenatchee National Forest, Lane, Okanogan County, Washington.
The work consists of installing culverts and aquatic organism pipes, rebuilding damaged road slopes, rehabilitating roadways, reconstructing ditches and placing aggregate and chip seal surfacing and other small items of work.
Project length: 1.942 Miles
Tentative Fixed Completion Date: Fall 2020 (Once solicitation is issued, see FAR Clause 52.211-10 for exact date.)
Estimated Price Range: Between $1 million to $2 million
Location: Winthrop, Washington
DESCRIPTION OF WORK in US CUSTOMARY UNITS
FP-14
O ne
S ch ed ul e Sc h N am e
DIVISION 150 – Project Requirements 152 Construction Survey & Staking (yes/no) Yes 153 Contractor Quality Control and Assurance
(yes/no) Yes 154 Contractor Sampling & Testing (yes/no) Yes 155 Schedules for Construction Contracts (construction schedules) (yes/no) Yes 157 Soil Erosion & Sediment Control (erosion control devices) 1,700 LNFT
DIVISION 200 – Earthwork 204 Excavation & Embankment 2100 CUYD
DIVISION 250 – Slope Reinforcement and Retaining Walls 251 Riprap 1300 CUYD
DIVISION 300 – Aggregate and Base Courses 302 Minor Crushed Aggregate 1800 CUYD 303 Road Reconditioning 8800 LNFT
DIVISION 400 – Asphalt Pavements & Surface Treatments 407 Chip Seal 5500 SQYD
O ne
S ch ed ul e Sc h N am e
DIVISION 600 – Incidental Construction 602 Culverts & Drains (indicate one or both) 700 LNFT 622 Rental Equipment (yes/no) Yes 623 General Labor (yes/no) Yes 624 Topsoil (landscaping & related items) 75 SQYD 625 Turf Establishment (indicate seeding or mulching separately) 1.0 ACRE 626 Plants, Trees, Shrubs, Vines & Groundcovers 62 EACH 635 Temporary Traffic Control – ??? 1 LPSM 647 Environmental Mitigation (Fish Passage Boulder) 51 EACH
File details come from the government source that posted it. Updated .