PROJECT_DESCRIPTION_R1.pdf

PDF 224 KB Posted

Attached to
OR FWS BKS 2016(1), Baskett Slough Headquarters Access Design
Solicitation number
69056719B000016
Issued by

About this file

This document provides a project description and related federal contract opportunity for the OR FWS BKS 2016(1), Baskett Slough Headquarters Access Design project. The project consists of grading, base, asphalt milling, asphalt paving, drainage, striping, aggregate surfacing and other minor items of work along 0.8 miles of road. Estimated costs range from $3 million to $5 million. Specific work includes clearing and grubbing, excavation and embankment, minor crushed aggregate, asphalt concrete, asphalt surface treatments, minor concrete structures, culverts and drainage. The pre-solicitation opportunity posted on SAM.gov indicates the work location as 3 miles northeast of Dallas, Oregon. It is offered as a small business set-aside with a tentative completion date of Fall 2020. The Department of Transportation Federal Highway Administration is the contracting agency.

View the file

Other files

File Type Posted
PROJECT_DESCRIPTION.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

OR FWS BKS 2016(1), Baskett Slough Headquarters Access Design

The work consists of grading, base, asphalt milling, asphalt paving, drainage, striping, aggregate surfacing and other small items of work.

Project length: 0.8 Miles

Tentative Fixed Completion Date: Winter 2019 (Once solicitation is issued, see FAR Clause 52.211-10 for exact date.)

Estimated Price Range: $3 million to $5 million

Location: 3 Miles NE of Dallas, OR.

DESCRIPTION OF WORK in US CUSTOMARY UNITS

FP-14

Sc he du le

A

DIVISION 150 – Project Requirements 152 Construction Survey & Staking (yes/no) Yes 153 Contractor Quality Control and Assurance

(yes/no) Yes 154 Contractor Sampling & Testing (yes/no) Yes 155 Schedules for Construction Contracts (construction schedules) (yes/no) Yes 157 Soil Erosion & Sediment Control Fiber Roll 975 LNFT 158 Watering for Dust Control 1 MGAL

DIVISION 200 – Earthwork 201 Clearing & Grubbing 23,750 SQYD 203 Removal of Structures & Obstructions Removal of Delineator Removal of Sign Removal of Pipe Culvert Plug, Existing Pipe Sawcutting Pavement

6 EACH

3 EACH

40 LNFT

1 EACH

2,800 LNFT

204 Excavation & Embankment Subexcavation Unclassified Borrow

1,500 CUYD

8,600 TON

205 Blasting Consultant (Consultant/Engineering Services) (yes/no) No 207 Earthwork Geosynthetics 12,450 SQYD

Sc he du le

A

DIVISION 250 – Slope Reinforcement and Retaining Walls 251 Riprap Placed Riprap, Method A, Class 2 15 CUYD

DIVISION 300 – Aggregate and Base Courses 302 Minor Crushed Aggregate Roadway Aggregate, Method 2 Roadway Aggregate, Method 2, Surface Course

5,500 TON

1,950 TON

DIVISION 400 – Asphalt Pavements & Surface Treatments 403 Asphalt Concrete 3,050 TON 411 Asphalt Prime Coat (asphalt surface treatment) 5 TON 412 Asphalt Tack Coat (asphalt surface treatment) 6 TON 413 Asphalt Pavement Milling 3,600 SQYD

DIVISION 600 – Incidental Construction 601 Minor Concrete Structures 32 CUYD 602 Culverts & Drains 18-Inch Pipe Culvert 84-Inch Pipe Culvert End Section for 18-Inch Pipe Culvert

25 LNFT

46 LNFT

1 EACH

607 Cleaning, Relaying, & Repairing Existing Drainage Structures 2 EACH 621 Monuments & Markers (construction survey & staking) (yes/no) No 622 Rental Equipment (yes/no) Yes 623 General Labor (yes/no) Yes

DIVISION 200 – Earthwork
DIVISION 250 – Slope Reinforcement and Retaining Walls
DIVISION 300 – Aggregate and Base Courses
DIVISION 400 – Asphalt Pavements & Surface Treatments