Amendment_A001.pdf
PDF 302 KB Posted
- Solicitation number
- 69056719B000005
About this file
Amendment A001
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Bid_Opening_Summary_Grant_Kohrs.pdf | ||
| Plan_Request_Form.pdf | ||
| GRKO_TopSelectBorrow.xml | XML file | |
| Plans_MT_NPS_GRKO_2018(1).pdf | ||
| GRKO_Subgrade.xml | XML file | |
| IFB_Grant_Kohrs.pdf | ||
| Sidewalk Finished.xml | XML file | |
| XML Files_MT_NPS_GRKO_2018(1).xlsx | XLSX spreadsheet | |
| Grant_Kohrs Existing_tin.xml | XML file | |
| GRKO_Finished.xml | XML file | |
| GRKO_TopAggregate.xml | XML file | |
| PROJECT_DESCRIPTION_Grant_Kohrs.pdf |
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE
N/A
PAGE
2. AMENDMENT/MODIFICATION NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE NO. 5. PROJECT NO. (If applicable)
A001 05/31/2019 N/A See Block 10
6. ISSUED BY CODE N/A 7. ADMINISTERED BY (If other than Item 6) CODE N/A
Department of Transportation Federal Highway Administration 610 East Fifth Street Vancouver WA 98661-3801
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and Zip Code) 9A. AMENDMENT OF SOLICITATION NO.
X
69056719B000005
9B. DATED (SEE ITEM 11)
05/03/2019
10A. MODIFICATION OF CONTRACT/ORDER NO.
N/A
10B. DATED (SEE ITEM 13)
CODE: N/A FACILITY CODE: N/A N/A
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
| X | The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers (__ ) is extended, ( x ) is not extended.
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
N/A
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A THIS CHANGE ORDER IS ISSUED PURSUANT TO (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN
ITEM 10A.
N/A
B THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (Such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
N/A
C THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
N/A
D OTHER (Specify type of modification and authority) N/A
E. IMPORTANT: Contractor n/a is not, n/a is required to sign this document and return n/a copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
MT NPS GRKO 2018(1), Grant Kohrs Parking Lot Rehabilitation
See page 2.
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15a. NAME AND TITLE OF SIGNER (Type or print) 15a. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
N/A
15B. CONTRACTOR/OFFEROR 15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 16C. DATE SIGNED
BY_________________________________________ BY N/A___________________________ N/A (Signature of person authorized to sign) (Signature of Contracting Officer)
NSN 7540-01-152-8070
PREVIOUS EDITION NOT USABLE
30-105 STANDARD FORM 30 (REV. 10-83)
Prescribed by GSA
FAR (48 CFR) 53.243
Amendment No. A001, dated 05/31/2019 MT NPS GRKO 2018(1) Solicitation No. 69056719B000005 Grant Kohrs Parking Lot Rehabilitation
REVISIONS ARE AS FOLLOWS:
SPECIAL CONTRACT REQUIREMENTS
Page E-15, Subsection 108.01, Commencement, Prosecution, and Completion of Work.
Deletes Subsections (c) and (d).
Page E-38, Subsection 156.07 Limitations on Construction Operations. Adds Subsections (k) and (l).
ENCLOSURES
Pages:
E-15 E-38
E-15 DIVISION 100
Special Contract Requirements Project: MT NPS GRKO 2018(1), Grant-Kohrs Parking Lot Rehabilitation
Section 108. — PROSECUTION AND PROGRESS
12/17/18– FP-14
108.01 Commencement, Prosecution, and Completion of Work. Add the following:
Furnish at least a 48-hour advanced notice before changing the current work schedule. Work schedule changes that include additional shifts require a 14-day advanced notice.
Perform work under this contract according to the following:
(a) Limit work as provided for in Sections 105, 107, and 157.
(b) Limit work as provided for in Subsection 156.07.
(c) No weekend work unless approved by the CO.
(d) No work on holiday unless approved by the CO.
108.01A Labor. (Added Subsection).
Follow the requirements of FAR Clause 52.222-6 Construction Wage Rate Requirements.
Adjacent or virtually adjacent work sites, as used in FAR Clause 52.222-6, are defined to be work sites within ½ mile of the project. Application of Construction Wage Rate Requirements (Davis- Bacon Act) for work sites beyond ½ mile of the project will be determined by the CO.
Pay rates and zone pay used in the General Wage Decision are based on the “Center of the job.”
The “Center of the job” is:
a) The geographic center of the project when construction sites are contiguous; or,
b) The geographic center of the project when construction sites are noncontiguous and separated by no more than 1-mile from edge to edge.
Construction sites that are noncontiguous and separated by greater than 1-mile will each have a separate “Center of the job” for the purposes of determining pay rates and zone pay.
The geographic center of the job site is 39 miles from the County Courthouse in Butte, MT.
108.03 Determination and Extension of Contract Time. Add the following to paragraph (c):
No adjustment in contract time or amount will be made for stop orders issued under Subsection 108.05(a) or (b), except an adjustment in contract time, as provided by FAR Clause 52.249-10 Default (Fixed-Price Construction), may be made when the Contractor is able to demonstrate that the weather was unusually severe based on the most recent 10 years of historical data.
108.04 Failure to Complete Work on Time. Delete this Subsection and substitute the following:
Revised by Amendment A001
E-38 DIVISION 150
Special Contract Requirements Project: MT NPS GRKO 2018(1), Grant-Kohrs Parking Lot Rehabilitation
Section 156. — PUBLIC TRAFFIC
09/17/18– FP14
Construction Requirements
156.04 Accommodating Traffic During Work. Add the following:
The parking lot may be closed to public access and traffic once the temporary parking/striping, bathrooms, and signage is in place and approved by the CO.
Accommodate Park staff and Park vehicles to access Park facilities during construction.
156.07 Limitations on Construction Operations. Amend as follows:
Delete paragraph (g) and substitute the following:
(g) Provide two-way radio communications between Traffic Control Supervisor, flaggers, and pilot cars. Provide two-way radio communications between flaggers, unless flaggers can see each other and communicate. Citizen band radios are not acceptable. Make radio equipment available to the CO as necessary.
Add the following:
(k) Unless otherwise approved by the CO, do not perform construction operations that interfere with public traffic within the following durations.
(1) Between 6:00 p.m. the day before a holiday and 6:00 a.m. the day after a holiday.
(2) Between 6:00 p.m. Friday and 6:00 a.m. the following Monday.
(l) For purposes of facilitating traffic, make the width not under construction available to public traffic under alternate one-way control. Furnish pilot car and driver, or flaggers, or both, as ordered by the CO, to direct traffic through sections of road under one-way control.
156.09 Traffic Control Supervisor. Add the following:
(l) Transport personnel, construction signs, barricades, drums, cones, tubular markers, and other traffic control devices.
Revised by Amendment A001