PROJECT_DESCRIPTION_Zion.pdf

PDF 17 KB Posted

Attached to
UT NPS PP ZION 2018(1), Pavement Preservation Zion
Solicitation number
69056718R000005
Issued by

View the file

Other files

File Type Posted
Plan_Request_for_Internet.pdf PDF
ut-p-zion201801plan-fp14_06-29-18_signed.pdf PDF
ZION_C6_RipReport.pdf PDF
RFP_Zion_Pavement_Peservation.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

UT NPS PP ZION 2018(1), Pavement Preservation Zion, Zion National Park, Washington County, Utah

The work consists of repaving and other small items of work.

Project length: 1.52 miles

Tentative Fixed Completion Date: Fall 2018 (Once solicitation is issued, see FAR Clause 52.211-10 for exact date.)

Estimated Price Range: $500,000 and $1,000,000

Location: 5 miles east of Springdale, UT

DESCRIPTION OF WORK in US CUSTOMARY

UNITS FP-14 Base Schedule

DIVISION 150 – Project Requirements 152 Construction Survey & Staking No 153 Contractor Quality Control and Assurance Yes 154 Contractor Sampling & Testing Yes 155 Schedules for Construction Contracts (construction schedules) Yes

DIVISION 400 – Asphalt Pavements & Surface Treatments 409 Micro Surfacing 60,000 SQYD 418 Asphalt Concrete Pavement Patching, Type 1 1,000 SQYD 418 Asphalt Concrete Pavement Patching, Type 2 900 SQYD

DIVISION 600 – Incidental Construction 622 Rental Equipment Yes 623 General Labor Yes 634 Permanent Pavement Markings (traffic pavement markings) 65,000 LNFT 634 Permanent Pavement Markings (symbols) 90 EACH 635 Temporary Traffic Control – Flagger 1,000 FXHR 635 Temporary Traffic Control (cone) 220 EACH 635 Temporary Traffic Control (temporary pavement markings) 4,900 LNFT 635 Temporary Traffic Control (construction sign) 200 SQFT 635 Temporary Traffic Control (traffic control supervisor) 30 DAY 635 Temporary Traffic Control (plastic fence) 1,200 LNFT

File details come from the government source that posted it.