INDEX TO SHEETS
INDEX TO SHEETS
G. MSE RETAINING WALL
F. EROSION/SEDIMENT CONTROL
E. TURNOUT DETAILS
D. PLAN-PROFILE
C. TYPICAL SECTION(S)
B. SUMMARIES
A. GENERAL INFORMATION
N. MATERIAL SOURCE AND STAGING AREA PLANS
M. PERMANENT TRAFFIC CONTROL PLAN
L. TEMPORARY TRAFFIC CONTROL PLAN
K. SAFETY FEATURES
J. ROCKFALL MITIGATION
I. ROCK FILL
H. DRAINAGE
SURVEY CONTROL
EXIT PAD
TEMPORARY CONSTRUCTION ENTRANCE AND
MP 213 HOLMAN CREEK STAGING AREA
MARKINGS
STD. DRWG. 634-2, LINEAR PAVEMENT
STD. DRWG. 633-50, IDAHO DELINEATORS
INSTALLATION WOOD POSTS
STD. DRWG. 633-7, PERMANENT SIGN
STRIPING AND SIGN PLAN
TABULATION OF PERMANENT TRAFFIC CONTROL
CONTROL SIGN INSTALLATION WOOD POSTS
STD. DRWG. 635-14, TEMPORARY TRAFFIC
(WITH SIGNALS)
CONTROL SINGLE LANE CLOSURE LAYOUT
STD. DRWG. 635-9, TEMPORARY TRAFFIC
(WITH FLAGGERS)
CONTROL SINGLE LANE CLOSURE LAYOUT
STD. DRWG. 635-6, TEMPORARY TRAFFIC
FOR UNMARKED PAVEMENTS
STD. DRWG. 635-3,DELINEATION AND SIGNING
BARRIER MOUNTED ROCK PROTECTION SCREEN
LANE CLOSURE DETAILS
TEMPORARY TRAFFIC CONTROL EASTBOUND
LANE CLOSURE DETAILS
TEMPORARY TRAFFIC CONTROL WESTBOUND
TEMPORARY SIGNING IDENTIFICATION
DURING CLOSURE PERIODS
TEMPORARY TRAFFIC CONTROL PLAN
DURING NON-CLOSURE PERIODS
TEMPORARY TRAFFIC CONTROL PLAN
TABULATION OF TEMPORARY TRAFFIC CONTROL
N.3
N.2
N.1
M.7
M.6
M.5
M.2-4
M.1
L.13
L.12
L.11
L.10
L.9
L.7-8
L.5-6
L.4
L.3
L.2
L.1
ROCKERY WALL 75+00 tTO 77+50
ROCKERY WALL DETAILS
MSE WALL PLAN AND PROFILE
TEMPORARY SHORING DETAIL
MSE WALL (GEOGRID) DETAILS
MSE WALL TYPICAL SECTION
TABULATION OF MSE WALL QUANTITIES
SILT FENCE DETAIL
STD. DRWG. W157-20, SEDIMENT WATTLE
CHECK DAM DETAILS
SEDIMENT CONTROL AND SEDIMENT WATTLE
EROSION/SEDIMENT CONTROL PLAN
CONTROL QUANTITIES
TABULATION OF EROSION/SEDIMENT
TURNOUT DETAIL 123+46 TO 126+75
TURNOUT DETAIL 102+30 TO 104+25
SURVEY CONTROL
PLAN AND PROFILE
TABULATION OF PLAN QUANTITIES
TURNOUT TYPICAL SECTIONS
MAINLINE TYPICAL SECTION
TABULATION OF TYPICAL SECTION QUANTITIES
SUMMARY OF QUANTITIES OPTION 3
SUMMARY OF QUANTITIES OPTION 2
SUMMARY OF QUANTITIES OPTION 1
SUMMARY OF QUANTITIES BASE SCHEDULE
VICINITY MAP
PLAN SYMBOLS AND ABBREVIATIONS
INDEX TO SHEETS
TITLE SHEET
G.27
G.26
G.5-25
G.4
G.3
G.2
G.1
F.7
F.6
F.5
F.2-4
F.1
E.2
E.1
D.8
D.2-7
D.1
C.3
C.2
C.1
B.7
B.6
B.5
B.1-4
A.4
A.3
A.2
A.1
K.4
K.3
K.2
K.1
J.16
J.15
J.12-14
J.7-11
J.2-6
J.1
I.1
H.9
H.8
H.7
H.6
H.5
H.4
H.3
H.2
H.1
A.2
STATE PROJECT
NUMBER
SHEET
ID PFH 26-1(1)
P
M
A u g u s t
U
S S u r ft
D c m y fi le s p w p r o d u c ti o n d m s if a b .d g n
M a r ti n e z
C
C o n r a d
C h e c k e d b y
D e s ig n e d b y
TYPE TANGENT TERMINAL
STD. DRWG. 617-20, G4 W-BEAM GUARDRAIL
TYPE FLARED TERMINAL
STD. DRWG. 617-19, G4 W-BEAM GUARDRAIL
PLACEMENT OF GUARDRAIL POSTS IN ROCK
WOOD POSTS
STD. DRWG. 617-10, G4 W-BEAM GUARDRAIL
ROCK BOLT DETAIL
WIRE MESH (PINNED)
DRAPED ROCKFALL PROTECTION,
WIRE MESH (CONTOURED)
DRAPED ROCKFALL PROTECTION,
ROCKFALL PROTECTION FENCE (ATTENUATOR)
ROCKFALL MITIGATION PLAN
QUANTITIES
TABULATION OF ROCKFALL MITIGATION
ROCK FILL DETAIL
TREATMENT IN CUT SLOPES
STD. DRWG. 602-6, PIPE CULVERT INLET
CULVERT BEDDING
STD. DRWG. 602-3, METAL AND PLASTIC PIPE
COUPLING BAND
STD. DRWG. 602-2, METAL PIPE CULVERT
STD. DRWG. 602-1, METAL PIPE CULVERT
CURB DRAINS
OUTLET PROTECTION AT MSE WALL DETAIL
OUTLET RIP RAP PROTECTION DETAILS
INLET PROTECTION DELAILS
TABULATION OF DRAINAGE QUANTITIES
WESTERN FEDERAL LANDS HIGHWAY DIVISION
DETAIL APPROVED FOR USE 11/2001
REVISED: 9/2005 1/2007 10/2009
W101-1
W west drwg(s).
dist.
diaph.
diag.
dia.
DHV
D exp. jt.
exc.
EW
ER
EQ or eq.
EP
emb.
elev.
El. 94.16 ft e
E expansion joint excavation edge of water edge of road equation edge of pavement embankment elevation elevation with number superelevation rate east drawing(s) distance diaphragm diagonal diameter design hourly volume diameter galv.
ga.
galvanized gage (gauge)
HW
hex.
hdwl.
high water hexagon headwall ftg.
ft3 ft2 flg.
fin.
footing cubic foot (feet) square foot flange finish jt.
ID
joint inside diameter
LW
lt. or LT
Ls
LPSM
long.
LNFT
lat.
lam.
L low water left length of spiral lump sum longitudinal linear foot (feet) latitude lamination length of curve
NC
N normal crown north
OG
OD
o. to o.
o. c.
original ground outside diameter out to out on center pvmt.
PT
PST
PSC
PS
POT
POS
POC
pl.
PI
PCS
PCC
PC
pavement point of tangent point of spiral to tangent point of spiral to curve point of tangent to spiral point on tangent point on spiral point on curve plate point of intersection point of curve to spiral point of compound curve point of curve rte.
rt. or RT reqd.
reinf.
rdwy.
R/W
R.
R route right required reinforcement roadway right-of-way range radius typ.
Ts
TS
thd.
TBM
T.
T typical tangent distance (spiraled curve) point of tangent to spiral thread temporary bench mark township tangent distance
VPI
vph
V vertical point of intersection vehicles per hour design speed yd3 yd2 cubic yard(s) square yard sym.
STS
struc.
stiff.
stgr.
std.
STA, Sta.
ST
SS
SRS
SQYD
SQFT
spa.
SLRY
shldr.
sec.
SC
SADT
S symmetrical point of spiral to tangent spiral structural stiffener stringer standard station point of spiral to tangent point of spiral to spiral (no curve) point of spiral to reverse spiral square yard square foot spacing, spaces or spaced slurry unit shoulder section point of spiral to curve seasonal average daily traffic south
CUYD
culv.
CUFT
cubic yard(s) culvert cubic foot (feet) mon.
min.
MGAL
max.
matl.
monument minimum thousand gallon maximum material
AND ABBREVIATIONS
PLAN SYMBOLS
NUMBER
SHEET
STATE
A.3
PROJECT
PFH 26-1(1)
ID
A a r c h
U
S m y fi le s p w p r o d u c ti o n d m s if a c .d g n
U.S. CUSTOMARY DETAIL
DETAIL
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
NOTE:
1.
on the appropriate plan sheet.
Other symbols used in the plans will be shown in a legend
PROPOSEDEXISTING
Trail
Lake, Pond or Reservoir; Marshland
North Arrow
Fence
Gate with Fence
Cattleguard
Guardrail
Retaining Wall
Pipe Culvert (arrow shows flow)
Pipe Culvert with End Section
Pipe Culvert with Headwall
Underdrain
Building
Riprap
N
Transition
Toe of Fill
Top of Cut
Spring or Seep
LC
Concrete Barrier
STEAM = steam, T = telephone, TV = CATV, W = water
P = power, SA = sanitary sewer, SD = storm drain, SS = storm sewer, FM = force main, FO = fiber optic, G = gas, IRR = irrigation, O = oil, BH
CP GPS
JH
TP
Material Source; Bore Hole; Test Pit
DI
Slope Stake Limits
Pipe Culvert with Drop Inlet
Miscellaneous Utility Features
UP = transformer or junction box, WF = water fountain
EM = electric meter, T = telephone pedestal, TV = CATV pedestal, Box Culvert
Section Line
Indian Reservation Boundary
Existing Roadway (Road, Paved, Gravel)
Right-of-Way Line with Monument
Delineators
Underground Utilities
Overhead/Above Ground Utilities
Permanent Easement
Construction Easement
36 31
6 1
Section Corner (Found, Projected)
36 31
6 1
SEC.
SEC.
Property Line w/Found Property Corner
400Parcel Number
Large Creek or River
EL. 1234.56
N
E
Spot Elevation; Coordinate Grid Tick
Above Ground Tank; Underground Tank
Treeline; Individual Trees
RIP
Boulder; Well; Satellite Dish; Grave
- no symbol -wall face
G G
Cooking Grate; Garbage Can; Picnic Table
Flagpole; Fire Hydrant
Gas & Water Meter; Gas & Water Valve
W W
Silt Fence
DI
Wattle
T T
Light, Support w/Anchor)
Poles (Power, Telephone, Joint Use, Ø spiral central angle diameter curve central angle total central angle appr.
AH
ADT
abut.
brg.
br.
BP
BM
BK
approach ahead average daily traffic abutment bearing bridge balance point bench mark back ctrs.
CS
cont.
constr. jt.
conn.
conc.
col.
CMP
clr.
cc or c. to c.
centers point of curve to spiral continuous construction joint connection concrete column corrugated metal pipe clear centerline center to center
M.P.
M.L.
mile post main line
National Boundary
State Boundary
County Boundary
City Boundary
Township or Range Line
National Park Boundary
National Forest Boundary
National Wildlife Refuge Boundary
BLM Lands Boundary
Section Line4
Section Line16
Section Corner (Found, Projected)4
Section Corner (Found, Projected)16
Railroad
Intermittent Drainage or Small Creek
Signs (single, double post; portable)
NO SCALE
Control Point (Terrestrial and GPS); Jump Hub
R 12 E R 13 E R 15 E R 16 E R 17 E
T 11 N
T 10 N
T 9 N
T 8 N
T 11 N
T 10 N
T 9 N
T 8 N
R 12 E R 13 E R 14 E R 15 E R 16 E R 17 E
W a r m S p r in g s C r k k r
C n a ml o HPro spe ct
Crk
Garland Crk
S w im m C r k
M a rt in C rk
P e a c h C r k
B lin d C rk
R o u g h C r k
Rough Lk
Lakes Garland
Lks Casino
S te e p C r k
B ig C a s in o C r k
L it tl e C a s in o C rk
Fou rth of J uly Crk
H w y
H w y 21 kr C kl E
Kelly Crk
C o a l
C r k
B a s in C r k
K e lly C rk krC noipmahC
Warm Crk
Yellow Belly Lk
Hell Roaring Crk k r
C koohhsiF kr C w o d ae
M krC tao G krC n orI k r
C d ekoorC Stanley
SunbeamNip and Tuck Pit
VICINITY MAP
N
Lakes Champion
Lake Sawtooth
Lake Stanley
Lake Redfish
Lake Redfish Little
Stanley
Lower
SAWTOOTH NATIONAL RECREATION AREA
29 miles
Challis m ile s
K e tc h u m
122 miles
Boise
Robinson Bar
Beach Pebble
Ketchum - Challis Highway Begin Project
Holman Creek
MP 214.5
Staging Site
115° 2’43.50"W
44°15’29.82"N 114°59’31.20"W
44°15’23.15"N
114°32’6.30"W
44°15’11.28"N
A.4
STATE PROJECT
NUMBER
SHEET
ID PFH 26-1 (1)
J u ly
I n t_ ft m y fi le s p w p r o d u c ti o n d m s if a d .d
C o n r
C h e c k e d b y
D e s ig n e d b y
114°47’30.09"W
44°15’49.10"N
Water source
Upper Harden Creek
114°31’47.44"W
44°14’59.83"N
Water Source
Holman Creek
114°41’04.47"W 44°15’13.18"N
MP 205.4
61+00
Ketchum - Challis Highway End Project
114°40’00.8"W 44°15’12.56"N
MP 206.7
127+50
0 3 6 93
Scale in Miles
1.5
Salmon River
Stanley Lake Pit
PLAN SHEET SECTION -------->> Section C Section D Section E Section F Section G Section H Section I Section J Section K Section L Section M Section N
Typical Plan Approach Erosion/ MSE Wall Drainage Rock Fill Rockfall Saftey Temporary Permanent Material
Section and Roads Sediment Slope Mitigation Features Traffic Traffic Source & BID
ITEM DESCRIPTION UNIT Profile Control Stabilization Control Control Waste Site PLAN SCHEDULE
15101-0000 MOBILIZATION LPSM ALL ALL
15201-0000 CONSTRUCTION SURVEY AND STAKING LPSM ALL ALL
15301-0010 CONTRACTOR QUALITY CONTROL AND ASSURANCE LPSM ALL ALL
15401-0000 CONTRACTOR TESTING LPSM ALL ALL
15501-0000 CONSTRUCTION SCHEDULE LPSM ALL ALL
15703-1000 SOIL EROSION CONTROL, SOIL STABILIZATION ACRE 4.6 4.6 4.6
15705-0100 SOIL EROSION CONTROL, SILT FENCE LNFT 4,270 600 4,870 5,000
15705-1500 SOIL EROSION CONTROL, SEDIMENT WATTLE LNFT 4,910 4,910 5,000
15706-1000 SOIL EROSION CONTROL, INLET PROTECTION EACH 1 1 1
15706-1600 SOIL EROSION CONTROL, STABILIZED CONSTRUCTION
ENTRANCE EACH 1 1 1
15801-0000 WATERING FOR DUST CONTROL MGAL 1,473 1,473 1,500
20101-0000 CLEARING AND GRUBBING ACRE 4.6 4.6 4.6
20301-1200 REMOVAL OF HEADWALL EACH 8 8 8
20301-1900 REMOVAL OF PIPE CULVERT EACH 5 5 5
20301-2400 REMOVAL OF SIGN EACH 4 4 4
20302-1200 REMOVAL OF GUARDRAIL LNFT 1,746 1,746 1,746
20302-1300 REMOVAL OF GUARDRAIL, CONCRETE BARRIER LNFT 191 191 191
20401-0000 ROADWAY EXCAVATION CUYD 3,060 3,060 3,400
20465-0000 CONSERVE AND PLACE BOULDER EACH 28 28 28
20466-0000 CONSERVE AND STOCKPILE TOPSOIL CUYD 307 307 307
20701-1200 EARTHWORK GEOTEXTILE, TYPE IV-A SQYD 1,241 3,092 4,333 4,500
25101-4000 PLACED RIPRAP, CLASS 4 , INLET PROTECTION CUYD 72 72 80
25101-4000 PLACED RIPRAP, CLASS 4 , OUTLET PROTECTION CUYD 454 454 500
25105-4000 KEYED RIPRAP, CLASS 4 CUYD 2,348 2,348 2,500
25210-0000 ROCKERY SQYD 190 190 190
25501-0000 MECHANICALLY STABILIZED EARTH WALL SQFT 29,629 29,629 29,629
26001-0000 ROCK BOLT LNFT 10,660 10,660 10,660
30101-4000 AGGREGATE BASE GRADING C OR D TON 11,537 11,537 12,100
SUMMARY OF QUANTITIES - BASE SCHEDULE
QUANTITIES
STATE PROJECT
PFH 26-1(1) B.1ID
c:
\m yf ile s\ pw _p ro du ct io n\ dm s4
B as e_ Su m m ar y.
xl sx
]S he et
-S ep
-2
7:
A
M C
C on ra d
8/
M
M ar ti ne z 8/
D es ig ne d by
C he ck ed b y:
NUMBER
SHEET
PLAN SHEET SECTION -------->> Section C Section D Section E Section F Section G Section H Section I Section J Section K Section L Section M Section N
Typical Plan Approach Erosion/ MSE Wall Drainage Rock Fill Rockfall Saftey Temporary Permanent Material
Section and Roads Sediment Slope Mitigation Features Traffic Traffic Source & BID
ITEM DESCRIPTION UNIT Profile Control Stabilization Control Control Waste Site PLAN SCHEDULE
40101-5600 SUPERPAVE PAVEMENT, 1/2-INCH OR 3/4-INCH
NOMINAL MAXIMUM SIZE AGGREGATE, 0.3 TO <3
MILLION ESAL , TYPE III ROUGHNESS TON 4,584 4'584 4,800
40105-3000 ANTISTRIP ADDITIVE, TYPE 3 TON 46 46 48
40401-0000 MINOR HOT ASPHALT CONCRETE , 2" COMPACTED DEPTH TON 2,150 2,150 2,300
41101-1000 PRIME COAT, GRADE CMS-2 TON 22 22 24
41105-0000 BLOTTER TON 162 162 170
41201-1000 TACK COAT GRADE CSS-1, CSS-1H, SS-1, OR SS-1H TON 13 13 14
56305-0000 ROCK STAIN SQFT 401,580 401,580 401,580
56601-0000 SHOTCRETE , SCULPTED MSE WALL FACE SQYD 2,628 2,628 2,628
56601-0000 SHOTCRETE , SHOTCRETE STAIN SQYD 2,628 2,628 2,628
60201-0800 24-INCH PIPE CULVERT LNFT 235 235 235
60202-0400 24-INCH EQUIVALENT DIAMETER ARCH OR ELLIPTICAL
PIPE CULVERT LNFT 396 396 396
60901-2300 CURB, ASPHALT, 6-INCH DEPTH LNFT 3,398 3,398 3,398
61701-2000 GUARDRAIL SYSTEM G4, TYPE 4, CLASS B WOOD
POSTS LNFT 6,287.5 6,288 6,288
61702-0600 TERMINAL SECTION, TYPE FLARED EACH 1 1 1
61702-0800 TERMINAL SECTION TYPE TANGENT EACH 1 1 1
62201-0310 DUMP TRUCK, 17 CUBIC YARD MINIMUM CAPACITY HOUR 100
62201-1100 WHEEL LOADER, 6 CUBIC YARD MINIMUM RATED
CAPACITY HOUR 100
62201-3400 HYDRAULIC EXCAVATOR, 1 CUBIC YARD MINIMUM
CAPACITY WITH THUMB ATTACHMENT HOUR 100
62301-0000 GENERAL LABOR HOUR 80
62302-0100 SPECIAL LABOR, SLOPE SCALING HOUR 189 189 189
63302-0000 SIGN SYSTEM SQFT 108. 108 108
63309-0400 DELINEATOR, TYPE 4 , (rigid steel) EACH 112 112 112
63401-0300 PAVEMENT MARKINGS, TYPE B, SOLID , YELLOW LNFT 26,600 26,600 26,600
63401-0300 PAVEMENT MARKINGS, TYPE B, SOLID , WHITE LNFT 25,552 25,552 25,552
63401-0400 PAVEMENT MARKINGS, TYPE B, BROKEN , WHITE LNFT 1,048 1,048 1,048
SUMMARY OF QUANTITIES - BASE SCHEDULE
ESTIMATED QUANTITIES
STATE PROJECT
PFH 26-1(1) B.2ID
c:
\m yf ile s\ pw _p ro du ct io n\ dm s4
B as e_ Su m m ar y.
xl sx
]S he et
2)
-S ep
-2
7:
A
M C
C on ra d
8/
M
M ar ti ne z 8/
D es ig ne d by
C he ck ed b y:
PLAN SHEET SECTION -------->> Section C Section D Section E Section F Section G Section H Section I Section J Section K Section L Section M Section N
Typical Plan Approach Erosion/ MSE Wall Drainage Rock Fill Rockfall Saftey Temporary Permanent Material
Section and Roads Sediment Slope Mitigation Features Traffic Traffic Source & BID
ITEM DESCRIPTION UNIT Profile Control Stabilization Control Control Waste Site PLAN SCHEDULE
63502-0600 TEMPORARY TRAFFIC CONTROL, BARRICADE TYPE 3 EACH 24 24 24
63502-1000 TEMPORARY TRAFFIC CONTROL, CONE, TYPE 36-INCH EACH 144 144 144
63502-1300 TEMPORARY TRAFFIC CONTROL, DRUM EACH 29 29 29
63502-1600 TEMPORARY TRAFFIC CONTROL, WARNING LIGHT TYPE B EACH 29 29 29
63502-2000 TEMPORARY TRAFFIC CONTROL, PORTABLE CHANGEABLE
MESSAGE SIGN EACH 4 4 4
63502-2100 TEMPORARY TRAFFIC CONTROL, CRASH CUSHION EACH 6 6 6
63502-2600 TEMPORARY TRAFFIC CONTROL, MOVING TEMPORARY
CRASH CUSHION EACH 20 20 20
63502-3100 TEMPORARY TRAFFIC CONTROL, TRAFFIC SIGNAL
SYSTEM EACH 1 1 1
63502-3200 TEMPORARY TRAFFIC CONTROL, RELOCATING TRAFFIC
SIGNAL SYSTEM EACH 10 10 10
63503-0400 TEMPORARY TRAFFIC CONTROL, CONCRETE BARRIER ,
(winter shutdown) LNFT 6,363 6,363.00 6,363.00
63503-0400 TEMPORARY TRAFFIC CONTROL, CONCRETE BARRIER ,
(with mounted rock protection) LNFT 3,075 3,075 3,075
63503-0500 TEMPORARY TRAFFIC CONTROL, MOVING CONCRETE
BARRIER , (winter shutdown) LNFT 19,089 19,089 19,089
63503-0500 TEMPORARY TRAFFIC CONTROL, MOVING CONCRETE
BARRIER , (with mounted rock protection) LNFT 7,164 7,164 7,164
63503-0700 TEMPORARY TRAFFIC CONTROL, PAVEMENT MARKINGS ,
TYPE B, SOLID, YELLOW LNFT 26,600 26,600 26,600
63503-0700 TEMPORARY TRAFFIC CONTROL, PAVEMENT MARKINGS ,
TYPE B, SOLID, WHITE LNFT 25,552 25,552 25,552
63503-0700 TEMPORARY TRAFFIC CONTROL, PAVEMENT MARKINGS ,
TYPE B, BROKEN, WHITE LNFT 1,048 1,048 1,048
63503-1000 TEMPORARY TRAFFIC CONTROL, PLASTIC FENCE LNFT 450 450 450
63504-1000 TEMPORARY TRAFFIC CONTROL, CONSTRUCTION SIGN SQFT 366 366 366
63506-0600 TEMPORARY TRAFFIC CONTROL, PILOT CAR HOUR 3,230 3,230 3,230
63507-0700 TEMPORARY TRAFFIC CONTROL, TRAFFIC AND SAFETY
SUPERVISOR DAY 323 323 323
63509-1000 TEMPORARY TRAFFIC CONTROL, FLAGGER FIX HR RATE 7,290 7,290 7,290
SUMMARY OF QUANTITIES - BASE SCHEDULE
ESTIMATED QUANTITIES
STATE PROJECT
PFH 26-1(1) B.3ID
c:
\m yf ile s\ pw _p ro du ct io n\ dm s4
B as e_ Su m m ar y.
xl sx
]S he et
3)
-S ep
-2
7:
A
M C
C on ra d
8/
M
M ar ti ne z 8/
D es ig ne d by
C he ck ed b y:
PLAN SHEET SECTION -------->> Section C Section D Section E Section F Section G Section H Section I Section J Section K Section L Section M Section N
Typical Plan Approach Erosion/ MSE Wall Drainage Rock Fill Rockfall Saftey Temporary Permanent Material
Section and Roads Sediment Slope Mitigation Features Traffic Traffic Source & BID
ITEM DESCRIPTION UNIT Profile Control Stabilization Control Control Waste Site PLAN SCHEDULE
65101-1000 DRAPED ROCKFALL PROTECTION, WIRE MESH
(CONTOURED) SQYD 19,722 19,722 19,722
65106-1000 ROCKFALL PROTECTION, PIN (CONTOUR ANCHORS) EACH 987 987 987
SUMMARY OF QUANTITIES - BASE SCHEDULE
ESTIMATED QUANTITIES
STATE PROJECT
PFH 26-1(1) B.4ID
c:
\m yf ile s\ pw _p ro du ct io n\ dm s4
B as e_ Su m m ar y.
xl sx
]S he et
4)
-S ep
-2
7:
A
M C
C on ra d
8/
M
M ar ti ne z 8/
D es ig ne d by
C he ck ed b y:
PLAN SHEET SECTION -------->> Section C Section D Section E Section F Section G Section Section I Section J Section K Section L Section M Section N
Typical Plan Approach Erosion/ MSE Wall Drainage Rock Fill Rockfall Saftey Temporary Permanent Material
Section and Roads Sediment Slope Mitigation Features Traffic Traffic Source & BID
ITEM DESCRIPTION UNIT Profile Control Stabilization Mitigatio Control Control Waste Site PLAN SCHEDULE
62302-0100 SPECIAL LABOR, SLOPE SCALING HOUR 15 15 15
65101-1000 DRAPED ROCKFALL PROTECTION, WIRE MESH ,
(PINNED) SQYD 3,924 3,924 3,924
65101-1000 DRAPED ROCKFALL PROTECTION, WIRE MESH ,
(CONTOURED) SQYD 2,796 2,796 2,796
65106-1000 ROCKFALL PROTECTION, PIN (CONTOUR ANCHORS) EACH 140 140 140
SUMMARY OF QUANTITIES - OPTION A
ESTIMATED QUANTITIES
STATE PROJECT
PFH 26-1(1) B.5ID
c:
\m yf ile s\ pw _p ro du ct io n\ dm s4
O pt io n-
A _S um m ar y.
xl sx
]S he et
-S ep
-2
7:
A
M C
C on ra d
8/
M
M ar ti ne z 8/
D es ig ne d by
C he ck ed b y:
PLAN SHEET SECTION -------->> Section C Section D Section E Section F Section G Section H Section I Section J Section K Section L Section M Section N
Typical Plan Approach Erosion/ MSE Wall Drainage Rock Fill Rockfall Saftey Temporary Permanent Material
Section and Roads Sediment Slope Mitigation Features Traffic Traffic Source & BID
ITEM DESCRIPTION UNIT Profile Control Stabilization Control Control Waste Site PLAN SCHEDULE
63506-0600 TEMPORARY TRAFFIC CONTROL, PILOT CAR HOUR 520 520 520
63506-0700 TEMPORARY TRAFFIC CONTROL, TRAFFIC AND SAFETY
SUMMARY OF QUANTITIES - OPTION B
ESTIMATED QUANTITIES
STATE PROJECT
PFH 26-1(1) B.6ID
M M ar ti ne z 8/
12 NUMBER
SHEET
SUPERVISOR HOUR 52 52 52
63509-1000 TEMPORARY TRAFFIC CONTROL, FLAGGER FIX HR RATE 1,560 1,560 1,560
65104-0000 ROCKFALL PROTECTION FENCE SQYD 11,843 11,843 11,843
C C on ra d
8/
C he ck ed b y:
-S ep -2
1:
P M
D es ig ne d by pw
_p ro du ct io n\ dm s4
O pt io n- B _S um m ar y.
xl sx
]S he et c:
\m yf ile s\
PLAN SHEET SECTION -------->> Section C Section D Section E Section F Section G Section H Section I Section J Section K Section L Section M Section N
Typical Plan Approach Erosion/ MSE Wall Drainage Rock Fill Rockfall Saftey Temporary Permanent Material
Section and Roads Sediment Slope Mitigation Features Traffic Traffic Source & BID
ITEM DESCRIPTION UNIT Profile Control Stabilization Control Control Waste Site PLAN SCHEDULE
65101-1000 DRAPED ROCKFALL PROTECTION, WIRE MESH ,
CONTOURED SQYD 8,800 8,800 8,800
65104-0000 ROCKFALL PROTECTION FENCE (ATTENUATOR) SQYD 3,144 3,144 3,144
65106-1000 ROCKFALL PROTECTION, PIN(CONTOUR ANCHORS) EACH 444 444 444
SUMMARY OF QUANTITIES - OPTION C
ESTIMATED QUANTITIES
STATE PROJECT
PFH 26-1(1) B.7ID
c:
\m yf ile s\ pw _p ro du ct io n\ dm s4
O pt io n-
C _S um m ar y.
xl sx
]S he et
-S ep
-2
7:
A
M C
C on ra d
8/
M
M ar ti ne z 8/
D es ig ne d by
C he ck ed b y:
ITEM NUMBER UNIT QUANTITY
20101-0000 acre 4.6
TYPICAL SECTION QUANTITIES
BASE SCHEDULE
NOTEDESCRIPTION
Clearing and grubbing
STATE PROJECT
PFH 26-1(1) C.1ID
M
M ar ti ne z 8/
12 NUMBER
SHEET
1/
30101-4000 ton 11,537
40105-3000 ton 46
40401-0000 ton 2,150
41101-1000 ton 22
41105-0000 ton 162
41201-1000 ton 13
15 lb/sqyd
1% of 40101
40101-5600
Antistrip additive, type 3
Prime coat grade CMS-2
Blotter
1.94 ton/cuyd
Tack coat grade CSS-1, CSS-1h, SS-1, SS-1h
1.97 ton/cuyd
4,584ton
Aggregate Base Grading C or D
Superpave pavement, 1/2 or 3/4-inch nominal maximum size aggregate, 0.3 to < 3 ESAL, type III roughness
Minor hot aspahlt concrete, 2" compacted depth 1.94 ton/cuyd
0.25 gal/sqyd, 240 gal/ton
0.10 gal/sqyd, 240 gal/ton
C C on ra d
6/
C he ck ed b y:
-S ep -2
1:
P M
D es ig ne d by
FOOTNOTE
1 / Includes quantities for turnouts.
\p w
_p ro du ct io n\ dm s4 if0 ca .x ls ]S he et
TABULATION OF TYPICAL
SECTION QUANTITIES
c:
\m yf s\ SECTION QUANTITIES
NO SCALE TYPICAL SECTION
MAINLINE
FOOTNOTE:
sti mil g ni r a el C
ROUNDING DETAIL
CUT SLOPE
elb air aV
2 % 2 %
Variable
1:31:3 el b ai r a V
LC
4" compacted depth placed in 2 equal lifts maximum size aggregate, 0.3 to < 3 ESAL, type III roughness
" nominal4 3" or 2
1Superpave pavement, Aggregate base grading C or D, 8" depth
MAINLINE TYPICAL SECTION
61+00 to 127+50 and reduce the front slope rounding distance proportionally.
For cut heights less than "B" reduce "B" to cut height dimension clearing limits if rounding extends beyond right-of-way boundary.
Cut details apply to all typical sections. Limit slope rounding within guardrail detail.
See sheets D.2-D.7 for guardrail locations, and Section K for plan and profile curve data.
Superelevate roadway on curves at the rate ’e’ as indicated on the
C.2
STATE PROJECT
S e p
P
M if c b .d g n
U
S S u r ft
D
M a r ti n h e c k e d b y
C
C o n r a d
D e s ig n e d b y
CL
Existing pavement
WINTER SHUTDOWN TYPICAL
Concrete barrier
Slope stake
Original groundto cover safety edge Pull aggregate base
Red top
SAFETY EDGE DETAIL
(between lifts)
Tack coat grade CSS-1, CSS-1h, SS-1, SS-1h
Point available in survey notes
Aggregate base grading C or D, 8" depth placed in 2 equal lifts type III roughness. 4" compacted depth maximum size aggregate, 0.3 to < 3 ESAL, " nominal4 3" or 2
1Superpave pavement, Profile grade See safety edge detail aggregate base course)
SS-1, SS-1h (outside 3’ of
Tack coat grade CSS-1, CSS-1h, (between lifts and outside 3’ of aggregate base course)
Tack coat grade CSS-1, CSS-1h, SS-1, SS-1h
GUARDRAIL TYPICAL DETAIL
LC
V ariable 2
1:2
Tack coat
CURB DETAIL
LC
14’
Asphalt curb, 6" depth
Saw cut concrete, 2" compacted depth
Minor hot asphalt
10’-0"
B=5’-0" 5’-0"
D
D
Shoulder
2’
Travel lane
11’
Travel lane
11’
Shoulder
2’
Traveled lane
11’
Shoulder
3’
7’
10" from exist. centerline
12’ min
CL
-2.00%
Edge of roadway
(between lifts and outside 3’ of aggregate base course) Tack coat grade CSS-1, CSS-1h, SS-1, SS-1h
4" compacted depth placed in 2 equal lifts maximum size aggregate, 0.3 to < 3 ESAL, type III roughness
" nominal4 3" or 2
1Superpave pavement, Aggregate base grading C or D, 8" depth
Variable
1:2
CL
Edge of roadway
Cross-slope
Match roadway
(between lifts and outside 3’ of aggregate base course) Tack coat grade CSS-1, CSS-1h, SS-1, SS-1h
4" compacted depth placed in 2 equal lifts maximum size aggregate, 0.3 to < 3 ESAL, type III roughness
" nominal4 3" or 2
1Superpave pavement, Aggregate base grading C or D, 8" depth
1:2 Variable
102+30 to 104+25 RT
Turnout Typical Section
123+46 to 126+75 RT
Turnout Typical Section
TYPICAL SECTIONS
TURNOUT
C.3
STATE PROJECT
S e p
P
M if c c .d g n
U
S S u r ft
D
M a r ti n e c k e d b y
C o n r s ig n e d b y
(variable)
Turnout width
(variable)
Turnout Width
28 307
20466-0000
CONSERVE AND STOCKPILE TOPSOIL
BASE SCHEDULE
BEGIN STATION END STATION
ROADWAY QUANTITIES
BASE SCHEDULE
20401-0000
ROADWAY
EXCAVATION
(CUYD)
EMBANKMENT
(CUYD)
1 /
1,0003,060
20465-0000
CONSERVE AND PLACE BOULDER
(5-7FT)
BASE SCHEDULE
QUANTITY
(CUYD)
61+00 78+00
BEGIN STATION END STATION QUANTITY
(EACH)
127+5061+00
STATE PROJECT
PFH 26-1(1) D.1ID
M
M ar ti ne z 8/
12 NUMBER
SHEET
RT
RT
GUARDRAIL QUANTITIES
BASE SCHEDULE
6,287.5
ITEM 61702-0800
TERMINAL SECTION,
TYPE TANGENT
(EACH)
ITEM 20302-1300
REMOVAL OF
GUARDRAIL,
CONCRETE BARRIER
(LNFT)
ITEM 61701-2000
GUARDRAIL SYSTEM
G4, TYPE 4, CLASS B
WOOD POST
(LNFT)
ITEM 61702-0600
TERMINAL SECTION,
TYPE FLARED
(EACH)
SIDE
ITEM 20302-1200
REMOVAL OF
GUARDRAIL
(LNFT)
61+92.5
LOCATION
61+92.5 to 124+51.69
124 51 69
C C on ra d
8/
C he ck ed b y:
RT
RT
RT
RT
1,078
6,287.5 1
63503-1000
TEMPORARY TRAFFIC CONTROL,
PLASTIC FENCE
BASE SCHEDULE
1,746 191
78+04.4 to 88+76.6
69+81.6 to 76+26.6
76+26.6 to 78+04.4 191
ITEM 60901-2300
CURB, ASPHALT, 6-INCH DEPTH
BASE SCHEDULE
TOTAL
124+51.69
-S ep -2
:4
D es ig ne d by
RT LT
RT
RT
1 / For information only
1 /
LT or RT QUANTITY
(LNFT)
72+48 to 76+56
SIDE
TOTAL 3,398
61+95.6 to 66+66 469
89+10 to 92+80 367
STATION to STATION QUANTITY
(LNFT)
BASE SCHEDULE
FOOTNOTE:
95+90 to 121+70 2,562
STATION to STATION
\p w
_p ro du ct io n\ dm s4 if0 fa .x ls ]S he et
TABULATION OF
PLAN QUANTITIES
c:
\m yf s\ PLAN QUANTITIES
P T
.4
P C
.0
,8
.8
+0.5777%
,8
.0
,8
.6
,8
.7
-0.1573% +0.6232%
-0.5830%
180’ VC
K = 231
,8
.6
150’ VC
K = 216
120’ VC
K = 163
SSD = 1528’
100’ VC
SSD = 945’
K = 83
K = 216
150’ VC
99023
CP
CP
99022
N
10-03
BH
10-04
10-05
BH
10-06
BH
10-07
BH
10-08
BH
10-02
10-01
CONNECTION TO EXISTING ROADWAY
pavement structure
See Sheet C.1 for
Tack Saw cut across pavementExisting
BEGIN PROJECT
P O
C
.0
Tangent terminal
LEGEND:
T
Line to be constructed
Profile grade
Existing ground
El= 5,876.80
E= 1,461,486.534
N= 943,870.223
R= 830.00’
T= 329.02’
L= 626.50’
D
R= 1,500.00’
T= 296.26’
L= 585.00’
D
T
Phone: 208-879-2283 rickl@srec.org
Callis, ID 83226
1140 E. Main Ave.
Mr. Rick Leuzinger
Salmon River Electric Cooperative
Power:
Phone: 208-879-2281 ron@custertel.com
Challis, ID 83226
1111S. Main Street, PO Box 324
Mr. Ron Rembelski
Custer Telephone Cooperative
Telecommunication:
UTILITY CONTACT INFORMATION
s e e d e ta il s h e e t
H .5
I n s ta ll c u r b d r a in s e e d e ta il s h e e t
H .5
I n s ta ll c u r b d r a in
S e e s h e e t
H .2 o u tl e t p r o te c ti o n a r c h p ip e c u lv e r t w it h r ip r p
I s ta ll e q u iv a le n t d ia
R e m o v e p ip e c u lv e r t
27 Section center (projected)
CUYD
EXC.
CUYD
EMB.
70+0067+5065+0062+5060+00
5860 5860
5865 5865
5870 5870
5875 5875
5880 5880
5885 5885
5890 5890
5895 5895
D.2
STATE PROJECT
NUMBER
SHEET
ID PFH 26-1(1)
A u g u s t
U
S S u r ft m y fi le s p w p r o d u c ti o n d m s if fa .d g n
M
M a r ti n e z
C
C o n r a d
C h e c k e d b y
D e s ig n e d b y
61+00
KETCHUM-CHALLIS HIGHWAY
ID PFH 26-1(1)
Rock Fill, see sheet I.1
61+43 to 61+55
MSE Wall, see sheets G.1-23
62+50 to 71+00, Rt Asphalt curb Rt, see detail sheet C.1
61+95.6 to 66+66 Guardrail Rt, see sheets K.1-2
61+92.5 to 124+51.69
N
P C
C
.0
PT
8+
.1
PC
9+
.7
Profile grade
Existing ground
10-09
BH
Line to be constructed
CP
99021
GPS
GPS
N
+0.1107%
,8
.3
-0.1321%
,8
.9
150’ VC
K = 115
,8
.9
+0.0123%
-1.2969%
SSD = 4499’
110’ VC
K = 453
SSD = 1001’
K = 129
150’ VC
62+50 to 71+00
D
T= 289.82’
R= 314.00’
L= 468.10’ e= 0.060 traffic control,plastic fence
Install Temporary
MSE Wall, see sheets G.1-23
Do not disturb p r o te c ti o n s e e S h e e t
H .2 p ip e c u lv e r t w it h r ip r a p o u tl e t
I n s ta ll e q u iv a le n t d ia a r
CUYD
EXC.
CUYD
EMB.
80+0077+5075+0072+5070+00
5855 5855
5860 5860
5865 5865
5870 5870
5875 5875
5880 5880
5885 5885
5890 5890
5895 5895
D.3
STATE PROJECT
u g u s t
U
S S u r ft m y fi le s p w p r o d u c ti o n d m s if fb .d
M a r ti n
C o n r a d
C h e c k e d b y
D e s ig n e d b y
Rock Fill, see sheet I.1
71+00 to 71+25 Rock Fill, see sheet I.1
73+00 to 74+56.84
Rock Fill, see sheet I.1
77+80 to 78+00
MSE Wall, see sheets G.1-23
78+00 to 88+56, RT
Guardrail Rt, see sheets K.1-2
61+92.5 to 124.55.7
Rockery wall LT, see sheets G.25-26
75+00 to 77+50
S E
C . 2
P C
.7
P T
.4
P C
.6
P T
.3
P C
.2
P T
.6
P C
.8
P T
.8
N
Line to be constructed
,8
.9
-0.3992%
50’ VC
K = 121 8
,8
.6
-1.0803%
125’ VC
K = 136
-0.1611% -0.4816%
-1.5528%
165’ VC
K = 133
,8
.7
-0.3077%
125’ VC
K = 115
SSD = 1053’
-1.3965%
SSD = 2647’
Profile grade
Existing ground
D
R= 1,375.00’
T= 258.81’
L= 511.63’ e= 0.058
D
R= 1,204.00’
T= 68.42’
L= 136.69’ e= 0.060
R= 1,100.00’
T= 119.16’
L= 237.39’ e= 0.060
D
D
R= 2,175.00’
T= 124.63’
L= 248.98’ e= 0.048
10-10
BH
CP
99020
CP
99019
10-11
BH
10-12
BH
10-13
BH
10-14
BH
10-15
BH
,8
.5
SSD = 1624’
80’ VC
K = 117
,8
.3
,8
.9
125’ VC
K = 117
SSD = 1070’
SSD = 3401’
K = 218
70’ VC
see Sheet H.2.4 with riprap inlet and outlet protection.
Place 24" pipe culvert culvert.
Remove existing pipe
90+75 s e e S h e e t
H .5
I n s ta ll c u r b d r a in s e e S h e e t
H .2 a n d o u tl e t p r o te c ti o n p ip e c u lv e r t w it h r ip r a p i n le t
P la c e e q u iv a le n t d ia a r c h
S h e e t
H .2 p r o te c ti o n s e e in le t a n d o u tl e t c u lv e r t w it h r ip r p
I s ta ll e q u iv a le n t d ia a r c h p ip s e e S h e e t
H .2 a n d o u tl e t p r o te c ti o n p ip e c u lv e r t w it h r ip r a p i n le t
P la c e e q u iv a le n t d ia a r c h c u lv e r t.
R e m o v e e x is ti n g p ip
44 1 39 4 32
CUYD
EXC.
CUYD
EMB.
95+00 92+5090+00 87+5085+00 82+5080+00
5850 5850
5855 5855
5860 5860
5865 5865
5870 5870
5875 5875
5880 5880
5885 5885
5890 5890
D.4
STATE PROJECT
A u g u s t
U
S S u r ft m y fi le s p w p r o d u c ti o n d m s if fc .d g n
M
M a r ti n e z
C
C o n r a d
C h e c k e d b y
D e s ig n e d b y
Guardrail Rt, see sheets K.1-2
61+92.5 to 124+51.69
Asphalt curb Rt, see detail sheet C.1
89+10 to 92+80
MSE Wall, see sheets G.1-23
78+00 to 88+56, RT
MSE Wall, see sheets G.1-23
89+30 to 93+58, RT
MSE Wall, see sheets G.1-23
94+30 to 95+70, RT
Rock Fill, see sheet I.1
88+56 to 89+30
Rock Fill, see sheet I.1
93+58 to 94+30
5 P
T
.8
P C
.1
P T
.3
P C
.9
P T .8
N
D
R= 681.00’
T= 362.29’
L= 665.90’ e= 0.060
R= 2,179.00’
T= 119.22’
L= 238.20’ e= 0.048
D
PC 109+81.55
10-16
BH
Construct turnout, see Sheet E.1
Line to be constructed
Profile grade
Existing ground
10-17
BH
10-15
BH
MW
MW 2221
GPS
-1.3965%
-0.6944%
85’ VC
K = 121 9
,8
.3
,8
.4
-1.3493% 5 ,8
.8
-1.3515%
,8
.5
-0.5655%
,8
.2
-1.1452%
-0.3719%
75’ VC
K = 115
SSD = 1685’
115’ VC
K = 118
150’ VC
K = 153
SSD = 1177’
K = 382
300’ VC
70’ VC
K = 121
SSD = 1896’
,8
.6
R e m o v e e x is ti n g p ip e c u lv e r t
99018
CP
s e e S h e e t
H .2 p r o te c ti o n w it h r ip r a p i n le t a n d o u tl e t
P la c e p ip e c u lv e r t s e e S h e e t
H .2 r ip r a p o u tl e t p r o te c ti o n p ip e c u lv e r t w it h e q u iv a le n t d ia m e te r
P la c e s e e d e ta il s h e e t
H .5
I n s ta ll c u r b d r a in s e e d e ta il s h e e t
H .5
I n s ta ll c u r b d r a in s e e S h e e t
H .2 o u tl e t p r o te c ti o n w it h r ip r a p i n le t a ia a r c h p ip e c u lv e r t
P la c e e q u iv a le n t p r o te c ti o n s e e S h e e t
H .2 w it h r ip r a p i n le t a n d o u tl e t
P la c e p ip e c u lv e r t
R e m o v e e x is ti n g p ip e c u lv e r t s e e S h e e t
H .2 p r o te c ti o n a n d o u tl e t w it h r ip r a p i n le t a r c h p ip e c u lv e r t e q u iv a le n t d ia c u lv e r t.
P la c e
R m o v e e x is ti n g p ip e
31 4 285
CUYD
EXC.
CUYD
EMB.
110+00107+50105+00102+50100+0097+5095+00
5835 5835
5840 5840
5845 5845
5850 5850
5855 5855
5860 5860
5865 5865
5870 5870
5875 5875
D.5
STATE PROJECT
A u g u s t
U
S S u r ft m y fi le s p w p r o d u c ti o n d m s if fd .d
M a r ti n
C o n r a d
C h e c k e d b y
D e s ig n e d b y
MSE Wall, see sheets G.1-23
99+70 to 102+05, Rt
MSE Wall, see sheets G.1-23
107+50 to 110+04, Rt
Rock Fill, see sheet I.1
106+50 to 107+50
Rock Fill, see sheet I.1
95+70 to 96+96
95+90 to 121+70 - Asphalt curb Rt, see detail sheet C.1
61+92.5 to 124+55.7 - Guardrail Rt, see sheets K.1-2
Rock Fill, see sheet I.1
98+20 to 99+70
MSE Wall, see sheets G.1-23
96+96 to 98+20, RT
MSE Wall, see sheets G.1-23
94+30 to 95+70, RT
.5
P T
.8
P C
.4
P T
.9
P C
.7
10-18
BH 10-19
BH10-20
BH
10-21
BH 10-22
BH
10-23
BH
10-24
MW
CP
99017
N
D
R= 1,060.00’
T= 234.51’
L= 461.59’ e= 0.060
,8
.2
+3.5
7%
500’ VC
K = 97
Profile grade
Existing ground
F Flared terminal
LEGEND:
D
R= 1,493.00’
T= 307.38’
L= 606.29’ e= 0.056
SSD = 2575’
K = 118
50’ VC
,8
.8
-1.5684%
-1.1452%
R e m o v e e x is ti n g p ip e c u lv e r t p ip e c u lv e r t
R e m o v e e x is ti n g p ip e c u lv e r t
R e m o v e e x is ti n g
R= 1,596.00’
T= 193.07’
L= 384.26’ e= 0.056
D
CP
99016
Line to be constructed
Construct turnout, see Sheet E.4
F s e e S h e e t
H .2 p r o te c ti o n w it h r ip r a p i n le t a n d o u tl e t
P la c e d ia p ip e c u lv e r t s e e d e ta il s h e e t
H .5
I n s ta ll c u r b d r a in s e e S h e e t
H .2 in le t a n d o u tl e t p r o te c ti o n a r c h p ip e c u lv e r t w it h r ip r a p
P la c e e q u iv a le n t d ia c u lv e r t
R e m o v e e x is ti n g p ip e s e e S h e e t
H .2 w it h r ip r a p i n le t a n d o u tl e t p r o te c ti o n
P la c e d ia p ip e c u lv e r t
R e m o v e e x is ti n g p ip e c u lv e r t
18 958
CUYD
EXC.
CUYD
EMB.
125+00122+50120+00117+50115+00112+50110+00
5820 5820
5825 5825
5830 5830
5835 5835
5840 5840
5845 5845
5850 5850
5855 5855
5860 5860
D.6
STATE PROJECT
A u g u s t
U
S S u r ft m y fi le s p w p r o d u c ti o n d m s if fe .d g n
M
M a r te n
C o n r
C h e c k e d b y
D e s ig n e d b y
MSE Wall, see sheets G.1-23
112+00 to 118+60, Rt
Rock Fill, see sheet I.1
110+50 to 112+00
Rock Fill, see sheet I.1
118+60 to 119+00
MSE Wall, see sheets G.1-23
120+30 to 123+25, Rt
Asphalt curb Rt, see detail sheet C.1
95+90 to 121+70 Guardrail Rt, see sheets K.1-2
61+92.5 to 124+55.7
,8
.2
470’ VC
K = 130
SSD = 532’
-0.0449%
+3.5
7%
Profile grade
Existing ground see Sheet E.2
Construct turnout, D
R= 1,493.00’
T= 307.38’
L= 606.29’
END PROJECT
Line to be constructed e= 0.058
El=5,858.59
E= 1,466,120.563
N= 943,769.641
P O
C
N
CUYD
EXC.
CUYD
EMB.
130 127+50 125
5830 5830
5835 5835
5840 5840
5845 5845
5850 5850
5855 5855
5860 5860
5865 5865
5870 5870
D.7
STATE PROJECT
A u g u s t
U
S S u r ft m y fi le s p w p r o d u c ti o n d m s if ff .d g n
M
M a r te n
C o n r
C h e c k e d b y
D e s ig n e d b y
127+50
KETCHUM-CHALLIS HIGHWAY
ID PFH 26-1(1)
GPK FILE DATED April 22, 2010
PROJECT (GROUND) COORDINATES GEO COORDINATES
POINT
NUMBER NORTH EAST ELEVATION LATITUDE LONGITUDE ELLIPSOID
HEIGHT DESCRIPTION
9801 943361.569 1475112.214 5784.253 44°15'09.236976 N 114°37'57.263253 W 5743.4624 1/2" IR w/YPC
9802 944402.860 1473740.695 5811.725 44°15'19.411835 N 114°38'16.212165 W 5770.8921 1/2" IR w/YPC
9804 944498.624 1464017.505 5855.987 44°15'19.589787 N 114°40'29.776543 W 5814.957 1/2" IR w/YPC
PROJECT : Dog1 DATE OF FIELD WORK : March 2010 DATE OF FINAL ADJUSTMENT : April 20, 2010
PROJECT UNITS : US Survey Feet COORDINATE SYSTEM : State plane Coordinates SCALED TO GROUND VERTICAL DATUM : Elevations established through differential leveling holding elevation at CP 9801
STATE PROJECT
PFH 26-1(1) D.8ID
G ob le
4/
10 NUMBER
SHEET
9805 942583.037 1462243.997 5879.800 44°15'00.534652 N 114°40'53.918197 W 5838.7761 1/2" IR w/YPC
9806 945725.017 1459351.850 5953.094 44°15'31.312931 N 114°41'34.003886 W 5911.9586 1/2" IR w/YPC
9807 946385.190 1457238.323 5900.776 44°15'37.652959 N 114°42'03.113237 W 5859.5789 1/2" IR w/YPC
9808 942624.742 1462333.159 5877.705 44°15'00.953665 N 114°40'52.698366 W 5836.6813 1/2" IR w/YPC
10001 943390.774 1475691.283 5784.412 44°15'09.569254 N 114°37'49.312825 W 5743.6344 5/8" IR w/FHWA alum cap
10002 942588.847 1469491.297 5839.587 44°15'01.173925 N 114°39'14.381783 W 5798.6949 5/8" IR w/FHWA alum cap
99001 943541.545 1474804.440 5772.299 44°15'10.990267 N 114°38'01.509611 W 5731.4982 1/2" IR w/YPC
99002 943860.270 1474579.200 5761.005 44°15'14.119541 N 114°38'04.637141 W 5720.1982 1/2" IR w/YPC
99003 944257.569 1474459.815 5762.476 44°15'18.032559 N 114°38'06.319148 W 5721.6588 1/2" IR w/YPC
99004 944502.533 1474106.128 5785.796 44°15'20.423802 N 114°38'11.203331 W 5744.9697 1/2" IR w/YPC
99005 944100.029 1473379.443 5812.946 44°15'16.394557 N 114°38'21.141820 W 5772.1095 1/2" IR w/YPC
99006 943642.308 1472574.863 5818.647 44°15'11.813957 N 114°38'32.143886 W 5777.8001 1/2" IR w/YPC
D av ie s
4/
C he ck ed b y:
99007 943211.908 1471822.062 5818.767 44°15'07.506796 N 114°38'42.437271 W 5777.9108 1/2" IR w/YPC
99008 943070.919 1471350.878 5817.381 44°15'06.078357 N 114°38'48.893649 W 5776.518 1/2" IR w/YPC
99009 942883.863 1470695.704 5811.821 44°15'04.180686 N 114°38'57.871980 W 5770.9482 1/2" IR w/YPC
99010 942564.216 1470204.922 5818.404 44°15'00.986766 N 114°39'04.577866 W 5777.5245 1/2" IR w/YPC Note:
99011 942649.093 1468929.552 5859.390 44°15'01.724428 N 114°39'22.103640 W 5818.4874 1/2" IR w/YPC
99012 942801.171 1468383.591 5866.107 44°15'03.182594 N 114°39'29.618851 W 5825.1913 1/2" IR w/YPC
99013 943113.533 1467606.055 5863.532 44°15'06.204540 N 114°39'40.332497 W 5822.5937 1/2" IR w/YPC
99014 943438.064 1466841.827 5857.606 44°15'09.347397 N 114°39'50.865014 W 5816.6485 1/2" IR w/YPC
99015 943814.609 1466003.990 5856.613 44°15'12.997556 N 114°40'02.414671 W 5815.6322 1/2" IR w/YPC
99016 944303.705 1465449.811 5837.473 44°15'17.781335 N 114°40'10.081179 W 5796.4723 1/2" IR w/YPC
99017 944597.205 1464751.486 5847.129 44°15'20.622415 N 114°40'19.705999 W 5806.1088 1/2" IR w/YPC
99018 944157.435 1463671.479 5861.426 44°15'16.193492 N 114°40'34.490805 W 5820.396 1/2" IR w/YPC
99019 943514 546 1463172 864 5869 661 44°15'09 806352 N 114°40'41 266517 W 5828 6339 1/2" IR w/YPC
State Plane coords were scaled to project datum using an average datum adjustment factor of 1.0002959676 To scale coordinates to Idaho Central State plane add 0.0 to the northing and 0.0 to the easting.Then multiply by the average combined scale factor of .99970412 ee t
-M ar -2
4:
P M
D es ig ne d by
99019 943514.546 1463172.864 5869.661 44 15 09.806352 N 114 40 41.266517 W 5828.6339 1/2 IR w/YPC
99020 942990.065 1462814.676 5874.070 44°15'04.599490 N 114°40'46.126580 W 5833.0467 1/2" IR w/YPC
99021 942688.596 1461942.297 5879.299 44°15'01.551973 N 114°40'58.073882 W 5838.266 1/2" IR w/YPC
99022 943213.918 1461673.415 5878.742 44°15'06.715807 N 114°41'01.826906 W 5837.709 1/2" IR w/YPC
99023 943788.424 1461508.368 5875.620 44°15'12.373692 N 114°41'04.159559 W 5834.57 1/2" IR w/YPC
99024 944186.177 1461133.876 5872.725 44°15'16.269410 N 114°41'09.348869 W 5831.6586 1/2" IR w/YPC
99025 944520.747 1460584.618 5871.759 44°15'19.526875 N 114°41'16.931614 W 5830.6766 1/2" IR w/YPC
99026 945005.767 1460056.064 5903.532 44°15'24.271139 N 114°41'24.247562 W 5862.4265 1/2" IR w/YPC
99027 945519.392 1459776.413 5945.651 44°15'29.318355 N 114°41'28.148202 W 5904.5291 1/2" IR w/YPC
99028 945808.783 1458801.358 5957.991 44°15'32.093927 N 114°41'41.575324 W 5916.839 1/2" IR w/YPC
99029 945891.036 1458522.263 5949.495 44°15'32.882578 N 114°41'45.418645 W 5908.3366 1/2" IR w/YPC
99030 946108.135 1458213.414 5931.030 44°15'34.999878 N 114°41'49.686420 W 5889.8592 1/2" IR w/YPC
99031 946273.173 1457901.894 5916.356 44°15'36.602971 N 114°41'53.984897 W 5875.1748 1/2" IR w/YPC
\p w
_p ro du ct io n\ dm s4
ID
_P
FH
_2 6-
1( 1)
_g ro un d co nt ro l s he et
.x ls
]S h
SURVEY CONTROL
c:
\m yf ile s\
SURVEY CONTROL
582058205820
58255825
58355835
58455845
55855
58655865 shoulder
Normal paved
102+30 to 104+25
TURNOUT DETAIL
R3
GPS
N
Edge of roadway
NOTE
See turnout typical section sheet C.3 for pavement structure.
4 5
R1
R2 R4
R5
R ty p
R ty p
R
E.1
STATE PROJECT
A u g u s t
U
S S u r ft m y fi le s p w p r o d u c ti o n d m s if ic .d
M a r ti n
C o n r
C h e c k e d b y
D e s ig n e d b y
C
M P O
U T
L E
T
5820 5825
58655865
5880 5880
Normal paved shoulder
TURNOUT DETAIL
123+46 to 126+75
R3
99015
GPS
N
Edge of roadway
NOTE
See turnout typical section sheet C.3 for pavement structure.
R1
R2 R4
R5
4 5
R
E.2
STATE PROJECT
J u n e
U
S S u r ft m y fi le s p w p r o d u c ti o n d m s if id .d
M a r ti n
C o n r
C h e c k e d b y
D e s ig n e d b y
57’
13’
15801-0000 mgal 1,473
15703-1000 Soil erosion control, soil stabilization acre 4.6
UNIT
Watering for dust control
ITEM NUMBER DESCRIPTION QUANTITY
EROSION/SEDIMENT CONTROL MEASURES
BASE SCHEDULE
STATE PROJECT
PFH 26-1(1) F.1ID
D
C he ck er
NUMBER
SHEET
ITEM 15705-0100
SOIL EROSION CONTROL,
SILT FENCE
TEMPORARY EROSION/SEDIMENT CONTROL QUANTITIES
BASE SCHEDULE
QUANTITY
(LNFT)
ITEM 15705-1500
SOIL EROSION CONTROL,
SEDIMENT WATTLE
LOCATION
RIGHT
QUANTITY
(LNFT)
LOCATION
LEFT
LOCATION
RIGHT
QUANTITY
(LNFT)
C C on ra d
7/
C he ck e
INLET
860 60 150
1,120 60 750
460 60 110
150 60 90
130 60 130
240 60 160
300 60 560
690 60 240
320 60 180
60 500
60109+21 83
123+25 to 127+50
112+10 to 118+60
107+50 to 110+00
120+29 to 123+25
95+25
101+10
89+30 to 93+58
78+00 to 88+56
62+50 to 71+00 67+78
6082+05
96+96 to 98+20
99+70 to 101+90
94+30 to 95+70
89+00
90+75
CHECKDAM
73+68
95+70 to 96+96
6096+00
86+95 60
61+00 to 62+50
88+56 to 89+30
71+00 to 78+00
93+58 to 94+30
110+00 to 112+10
60 98+20 to 99+70
101+90 to 107+50
118+60 to 120+29
104+96.32
107+67.08
-A ug -2
:5
D es ig ne d by
60 NOTE:
4,270 1,020 2,870
1. See sheet F.2-F.7 for location of erosion control items.
118+38 60
110+88.75
120+19 60
4,910
109+21.83
TOTALS
1,020
4,270
60119+00
111+64
SUBTOTALS
\p w
_p ro du ct io n\ dm s4 if0 qa .x ls ]S he et
TABULATION OF
EROSION/SEDIMENT
c:
\m yf ile s\
O O /
CONTROL QUANTITIES
58305830
5830 5830
30 5830
583558355835
584058405840
58455845
58455845
58505850
585558555855
58655865
58705870
58755875
58755875
5880 5880
5890 5890
5895 5895
5895 5895
5900 5900
5910 5910
5915 5915
15 5915
5920 5920
20 5920 59
5925 5925
5930 5930
5935 5935
5935 5935
5935 59
0 5940
50 5950
5960 5960
5970 5970
5975 5975
5975 5975
5980 5980
5980 5980
5985 5985
5990 5990
5995 5995
6000 6000
6005 6005
6005 6005
5 6005
6010 6010
6010 6010
10 6010
601060 15 6015
60156
6020 6020
6025 6025
5 602
6030 6030
5 6035
6040 60
5 6055
6055606
6060 606
5 60
6075 60
6085 6085
5 5815
58205820
55825
582558
25 5825 5825
58305830
0 5830
58755875
5890 5890
5895 58
5900 5900
00 5900
5915 5915
5920 59
25 5925
35 59
5940 5
0 59
45 5945
50 59
0 59
5990 59
5 6
6065 6065
6070 6070
6075 6075
0 6
90 6
6100 6100
0 61
6105 6105
05 6105
61106
0 6120
6140 61
5 6145
6150 61
06155
606165
61706175
6190 6190
6195 6195620 0 620
0 8
61+00 TO 90+00
PLAN
EROSION/SEDIMENT CONTROL
see sheets F.7
Silt fence see sheets F.5-6
Sediment wattle see sheets F.5-6
Sediment wattle see sheets F.7
Silt fence see sheets F.7
Silt fence
N
N see sheets F.5-6
Sediment wattle
Do not disturb
Do not disturb see sheet F.5 for details
Install inlet protection see sheet F.5 for details
Install inlet protection see sheet F.5 for details
Install inlet protection
Construction limits
Construction limits
Construction limits
Construction limits see sheet F.5 for details
Install inlet protection see sheet F.5 for details
Install inlet protection
F.2
STATE PROJECT
J u ly
U
S S u r ft m y fi le s p w p r o d u c ti o n d m s if q b .d
C h e c k e d b y
D e s ig n e d b y see sheet F.5 for details
Install sediment wattle check dams see sheet F.5 for detailscheck dams
Install sediment wattle see sheet F.5 for details
Install sediment wattle check dams see sheet F.5 for details
Install sediment wattle check dams
BEGIN PROJECT
61+00
KETCHUM-CHALLIS HIGHWAY
ID PFH 26-1(1)
El=5,876.80
E= 1,461,486.534
N= 943,870.223
5 5805
55805
5 5810
58105810
58105810
5810 58
15581558
5815 5815
58205820
58205820
58205820
0 5820
5 5
5825 5825
58355835
5835 583
58405840
58455845
58455845
58455845
58505850
585058
58555855
586058
586558655865
586558
58705870
587558755875
5880 5880 5880
0 5880
5880 58
5890 5890 5890
5895 5895
5895 589 5 5895
5895 5895
5900 5900
5900 5900 590
5905 5905
5905 5905
5910 591
10 5910
15 591
5915 5915
5920 5920
5925 59
5 5925
0 5930
5935 5935
5935 5935
5940 5940
5940 5
5945 594
5945 5
5 5945
5945 5
0 59
5955 5955
5960 5960
0 597
5975 59
5980 5980
0 5980
5990 5990
5995 5995
5995 5
6005 6005
6005 6
6010 6
6035 6035
0 60
6055 6
6075 6
60856090
6095 6095
6115 6
6115 6
25 61
0 61
6165 6
5805 5805
05840
58455845
5850 5
05850
58555855
55855
58605860
5870587
755875
5 5885
5885 5885
5890 5890
5895 5895
10 5910
5910 5910
5915 5915
5 5915
5920 59
5925 592
5945 5945
5955 5955
5960 59
6000 6000
10 6010
6040 6
5 6045
P C
.2
P T
.6
P C
.8
P T
.8
P C
.1
P T
.3
P C
.9
P T
.8
P C
.5
P T
.8
P C
.4
90+00 TO 120+00
PLAN
EROSION/SEDIMENT CONTROL
see sheets F.7
Silt fence see sheets F.7
Silt fence see sheets F.7
Silt fence see sheets F.7
Silt fence see sheets F.7
Silt fence see sheets F.5-6
Sediment wattle
N
N see sheets F.5-6
Sediment wattle see sheets F.5-6
Sediment wattle see sheets F.5-6
Sediment wattle see sheets F.5-6
Sediment wattle see sheet F.5 for details
Install inlet protection see sheet F.5 for details
Install inlet protection see sheet F.5 for details
Install inlet protection see sheet F.5 for details
Install inlet protection see sheet F.5 for details
Install inlet protection see sheet F.5 for details
Install inlet protection see sheet F.5 for details
Install inlet protection see sheet F.5 for details
Install inlet protection see sheets F.5-6
Sediment wattle see sheets F.5-6
Sediment wattle
Construction limits
Construction limits
Construction limits
Construction limits
F.3
STATE PROJECT
u ly
U
S S u r ft m y fi le s p w p r o d u c ti o n d m s if q c .d
C h e c k e d b y
D e s ig n e d b y see sheet F.5 for details
Install straw wattle checkdams see sheet F.5 for details
Install straw wattle checkdams see sheet F.5 for details
Install straw wattle checkdams see sheet F.5 for details
Install straw wattle checkdams checkdams see sheet F.5 for details
Install straw wattle checkdams see sheet F.5 for details
Install straw wattle checkdams see sheet F.5 for details
Install straw wattle see sheet F.5 for details
Install inlet protection checkdams see sheet F.5 for details
Install straw wattle checkdams see sheet F.5 for details
Install straw wattle checkdams see sheet F.5 for details
Install straw wattle
95 5795
10 5815
05860
58655865
5880 5880
5890 5890
15 5915
5930 59
35 593
5 595
0 59
40 2
120+00 TO 127+50
PLAN
EROSION/SEDIMENT CONTROL
P O
C
See sheet F.7
Silt fence
See sheet F.5-6
Sediment wattle
N
Construction limits
Construction limits see sheet F.5 for details
Install inlet protection
F.4
STATE PROJECT
u ly
U
S S u r ft m y fi le s p w p r o d u c ti o n d m s if q d .d
C h e c k e d b y
D e s ig n e d b y see sheet F.5 for details
Install sediment wattle checkdam
END PROJECT
127+50
KETCHUM-CHALLIS HIGHWAY
ID PFH 26-1(1)
El=5,858.59
E= 1,466,120.563
N= 943,769.641
O SCALEN
Toe of fill
LC
FOOTNOTE:
TYPICAL SEDIMENT CONTROL AT FILL SLOPES
Toe of fill
Edge of roadway
Flow Flow
Roadway centerline
TYPICAL SEDIMENT CONTROL AT CULVERT INLET
F.5
STATE PROJECT
NUMBER
SHEET
ID PFH 26-1(1)
A u g
A
M if q f.
d g n
U
S S u r ft e c k e d b y
C o n r s ig n e d b y
WATTLE CHECKDAM DETAIL
AND SEDIMENT
SEDIMENT CONTROL
checkdam
Sediment wattle wattle
Place sediment
Place sediment wattle pipe culverts.
Extend placement of sediment wattle around the top of in ditch line or at toe of slope
Center sediment wattle check dam
Flow checkdam
Sediment wattle
See detail A
Ditch line
DETAIL A
3’ (typ.)
Varies, see Sheet F.2-4
5’ (typ.)
WESTERN FEDERAL LANDS HIGHWAY DIVISION
DETAIL APPROVED FOR USE 9/2007
REVISED:
Drive stakes at each end and at 4’ spacing
(ft)
(ft)
SEDIMENT WATTLE
W157-20
Excavate trench 2"
1" x 1" Wood stake
NUMBER
SHEET
STATE
F.6
PROJECT
A p r il
U m y fi le s p w p r o d u c ti o n d m s if q e .d g n
U.S. CUSTOMARY DETAIL
DETAIL
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
NOTE:
NO SCALE
Flow direction to end, without overlapping the ends
Abut adjacent wattles tightly, end
Install wattles snugly into trench.
water from flowing around the wattle
Provide sufficient length to prevent soil to ground level
Backfilled and compacted
Fl ow conditions.
Use drainage ditch installation only in low flow permanent installations.
wattle while staking. Live stakes may be used for until wattle is secure to slope. Do not crush
T o e o f fi ll s lo p e
Existing ground
Slope
Sediment wattle
Stagger joints (typ.)
Sediment wattle
Existing ground (typ.)
Step 2: Backfill soil against wattles
ELEVATION
PLAN
ELEVATION
Direction of runoff Fi ll slo pe
Flow for each wattle
Stakes requiredWattle length
PLAN
Spacing Slope
WATTLE SPACING
STAKES REQUIRED
and install wattles
Step 1: Excavate trench disturbed areas
Runoff from
1:1
1:2
1:3
1:4 or flatter as specified in plans
Direction of runof f from distur bed area s
2.
1.
along contours.
Install wattles
PROPERLY STAKED AND ENTRENCHED WATTLE
WATTLE STAKING DETAIL
DRAINAGE DITCH INSTALLATION
INSTALLATION BEYOND TOE OF SLOPE
INSTALLATION ALONG SLOPES
Stake and entrench wattle larger than wattle
3’ min.
3’ min. or t o m in
M in
3" to 5" sp ac in g ch ar t
S ee w at tl
NOTE:
ELEVATION
PLAN
POST AND GEOTEXTILE INSTALLATION DETAIL
SILT FENCE INSTALLATION AT TOE OF FILL
Flow
Fi ll slo pe
Flow
T o e o f s lo p e
Flow
Limits of clearing
Geotextile, type V-A
Support mesh
Steel or wood post
Backfilled and compacted soil
(undisturbed)
Existing ground
3.
2.
1.
F.7
STATE PROJECT
ID PFH 26-1(1)
u g u s t
U
S S u r ft m y fi le s p w p r o d u c ti o n d m s if q h .d
C h e c k e d b y
D e s ig n e d b y
SILT FENCE DETAIL
6 ft. (max.) spacing without support.
10 ft. (max.) spacing with fence support.
around the ends.
of silt fence upgrade to prevent water from running
Install silt fence along ground contours. Curve ends does not slide down, supporting posts.
types must ensure silt fence remains attached to, and recommendations for installation procedures. All dimensions are satisfied. Follow manufacturer’s type V-B) will be allowed as long as specified
Alternate preassembled silt fence options (geotextile, Varies
Varies fo r s p a c in g
S e e n o te
WALL QUANTITIES
BASE SCHEDULE
STATE PROJECT
PFH 26-1(1) G.1ID
M
M ar te ne z
8/
12 NUMBER
SHEET
62+50 71+00 853 RT 6,103 537 537 2,908 2,793 154
78+00 88+56 1,065 RT 7,998 712 712 3,428 3,395 223
89+30 93+58 425 RT 3,725 344 344 1,992 1,906 112
94+30 95+70 141 RT 1,005 89 89 452 434 37
96+96 98+20 123 RT 961 87 87 1,998 455 26
99+70 101+90 220 RT 1,871 172 172 887 891 49
ITEM 56601-0000
SHOTCRETE,
SHOTCRETE STAIN
(SQYD)
LENGTH
(FT)
ITEM 25501-1000
MECHANICALLY
STABILIZED
EARTH WALL,
WELDED WIRE FACE
(SQFT)
STRUCTURAL
EXCAVATION
(CUYD)
SELECT
GRANULAR
BACKFILL
(CUYD)
LOCATION SIDE
ITEM 25210-0000
ROCKERY
(SQYD)
BASE SCHEDULE
ITEM 56601-0000
SHOTCRETE,
SCULPTED MSE WALL
FACE
(SQYD)
CONSERVED
EXCAVATION
(CUYD)
REMARKS
See sheets G.2- G.25 for details
ROCK
(CUYD)
(FOR INFORMATION ONLY)
C C on ra d
6/
C he ck ed b y:
107+50 110+00 247 RT 1,659 144 144 827 766 58
112+00 118+60 654 RT 4,362 376 376 2,024 1,988 140
120+30 123+25 295 RT 1,945 167 167 842 844 60
75+00 77+50 234 LT 190 658 30 381 345
190 29,629 2,628 2,628 16,015 13,500 1,240 345TOTALS
See sheets G.26- G.27 for details
-S ep -2
9:
A M
D es ig ne d by
\p w _p ro du ct io n\ dm s4
W al l_ Q ua nt iti es
.x ls
]G .1
M S E
Q ua nt it ie s
TABULATION OF
WALL
c:
\m yf ile s\
WALL
QUANTITIES
TYPICAL SECTION
MSE WALL
Geotextile, type 1-A
Shotcrete facing, thickness varies
1:2
:1 w a ll e x ca v a tio n slo p e
TYPICAL SECTION
MSE WALL
See detail sheet G.3 reinforcement
Geogrid
18" welded wire facing form elevation
Top of wall granular backfill
Select
CL
MSE DRAIN DETAIL
Geogrid reinforcement See detail sheet G.3
See detail this sheet
MSE drain
Geotextile lap (typ.)
9"
Geotextile, type 1-A (non woven)
(12" minus)
Conserved excavation m in e m b e d m e n t shown in cross sections Toe of wall location
4’ geogrid lap
Reinforcment length, L
2% min
4" preforated drain pipe
(non woven) Geotextile, type 1-A reinforcement
Geogrid backfill Granular granular backfill Select facing Shotcrete of 2’ overlap of geotextile type 1-A, provide minimum Geotextile non-woven at outlet Install rodent guard
NOTE:
FOOTNOTE:
9. Maximum reinforcement…