03c_Statement of Work (SOW) TRACEN CM Potable Water.pdf
PDF 365 KB Posted
- Attached to
- Testing of USCG TRACEN Cape May Potable Water
- Solicitation number
- 67100PR270000313
- Issued by
- Not on record
About this file
This is a Statement of Work (SOW) for monthly potable water testing services at the U.S. Coast Guard Training Center (TRACEN) Cape May in New Jersey.
The Contractor shall provide all labor, supervision, equipment, sample containers, preservatives, transportation, laboratory analysis, and documentation to perform monthly potable-water sampling and testing. Services include collection of samples from the designated sampling point downstream of the TRACEN Cape May water tower, laboratory analysis using an NJDEP-certified laboratory for six parameters (total coliform, E. coli, free available chlorine residual, pH, turbidity, and total trihalomethanes), and submission of analytical results to the Government Technical Representative (GTR). Sampling must be coordinated with the GTR at least five business days in advance. The Contractor must use specific analytical methods: NEMI Method SM9223B for total coliform and E. coli, SM4500-Cl-G for free available chlorine residual, EPA Method 524.2 for total trihalomethanes, EPA Method 180.1 for turbidity, and an applicable approved method for pH. Laboratory reports and chain-of-custody documentation must be delivered electronically within twenty-one calendar days after each monthly sample collection. The Contractor must notify the GTR by telephone and email within one business day of receiving any E. coli-positive results or laboratory results requiring immediate notification.
The contract includes a one-year base period (December 1, 2026 through November 30, 2027) with four one-year option periods extending through November 30, 2031. The primary place of performance is the Contractor's facilities with frequent visits to TRACEN Cape May. Contractor employees must work generally between 0730 and 1600 EST, Monday through Friday, except Federal holidays, though occasional work outside normal business hours may be required. The Government will furnish no resources; the Contractor must provide all facilities, materials, and equipment necessary. No classified information access is required, and no travel is required under this contract.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PR # 67100PR270000133
STATEMENT OF WORK
LAST UPDATED: 11/18/2026 PAGE 1/5
STATEMENT OF WORK (SOW)
FOR
Testing of TRACEN Cape May Potable Water
1.0 GENERAL
1.1 BACKGROUND
The U.S. Coast Guard Training Center (TRACEN) Cape May, located at 1 Munro Avenue, Cape May, New Jersey 08204, operates a Coast Guard-owned potable-water system that stores approximately 300,000 gallons of water supplied by the City of Cape May and distributes it throughout the installation. Reliable sampling, laboratory testing, and reporting are needed to monitor water quality and support safe drinking-water requirements for enlisted recruits, active-duty personnel, civilian employees, residents, and other authorized users.
1.2 SCOPE
The Contractor shall provide all labor, supervision, equipment, sample containers, preservatives, transportation, laboratory analysis, and documentation required to perform monthly potable-water sampling and testing at TRACEN Cape May.
Services shall include collection of potable-water samples from the sampling location designated by the Government; laboratory analysis for total coliform, Escherichia coli (E. coli), free available chlorine residual, pH, turbidity, and total trihalomethanes (TTHMs); and submission of analytical results to the Government.
1.3 OBJECTIVE
The objective of this requirement is to obtain reliable monthly potable-water test results for water supplied by the TRACEN Cape May water tower. The Contractor shall collect and test samples in accordance with the methods identified in this SOW and provide timely documentation of all analytical results and any identified deficiencies.
1.4 APPLICABLE DOCUMENTS
1.4.1 Compliance Documents
COMDTINST M5100.47D, Safety and Environmental Health Manual
1.4.2 Reference Documents
The following documents may be helpful to the Contractor in performing the work described in this document:
CGTTP-4-11.10 Water Supply and Wastewater Disposal
2.0 SPECIFIC REQUIREMENTS/TASKS
2.1 TASK ONE. Monthly Potable-Water Sampling and Testing
The Contractor shall collect and analyze potable-water samples once each calendar month during the period of performance. Sampling and testing shall be performed in accordance with applicable U.S. Coast Guard, Environmental Protection Agency (EPA), New Jersey Department of Environmental Protection (NJDEP), and laboratory requirements.
LAST UPDATED: 11/18/2026 PAGE 2/5
2.1.1 Sample Collection Requirements
The Contractor shall collect potable-water samples from the first accessible potable-water sampling point downstream of the TRACEN Cape May water tower, or from another sampling location designated by the Government Technical Representative (GTR).
The Contractor shall:
Coordinate sampling dates with the GTR at least five (5) business days before the planned sampling date, unless otherwise agreed by the GTR;
Provide all required sample containers, preservatives, equipment, chain-of-custody forms, and transportation;
Collect sufficient sample volume and number of samples to complete all testing required by this SOW;
Collect, preserve, handle, and transport samples in accordance with the applicable analytical-method requirements;
Record the sample collection date, time, location, and name of the individual collecting the sample; and
Perform field measurements at the sampling location when required by the applicable test method.
2.1.2 Analytical Requirements
The Contractor shall analyze the collected samples using an NJDEP-certified laboratory. The Contractor shall use the following methods, as applicable:
Parameter Required Method Required Reporting Unit Total Coliform NEMI Method SM9223B #/100 mL E. coli NEMI Method SM9223B #/100 mL Free Available Chlorine Residual SM4500-Cl-G mg/L Total Trihalomethanes EPA Method 524.2 µg/L or mg/L Turbidity EPA Method 180.1 NTU pH Applicable approved method Standard Units (S.U.)
The Contractor shall report individual trihalomethane results, when available, and the calculated total trihalomethane concentration.
2.1.3 Documentation and Reporting
Within twenty-one (21) calendar days after each monthly sample collection, the Contractor shall provide the GTR with an electronic copy of the laboratory analytical report and associated chain-of-custody documentation.
The laboratory analytical report shall include, at a minimum:
Date and time of sample collection;
Sampling location;
Date samples were received by the laboratory;
Analytical method used for each parameter;
Analytical result and reporting unit for each parameter;
Laboratory reporting limit or detection limit, as applicable;
Any laboratory qualifier, deviation, or data limitation affecting the result;
LAST UPDATED: 11/18/2026 PAGE 3/5
Laboratory name and NJDEP certification information; and Name of the individual or individuals who collected the samples.
2.1.4 Performance Standards
The following performance standards apply:
The Contractor shall collect and test potable-water samples at least once each calendar month during the period of performance.
The Contractor shall coordinate each monthly sampling event with the GTR at least five
(5) business days in advance, unless otherwise agreed by the GTR.
The Contractor shall use an NJDEP-certified laboratory for all required laboratory analyses.
The Contractor shall perform testing using the methods identified in Section 2.1.2.
The Contractor shall submit the required laboratory report and chain-of-custody documentation within twenty-one (21) calendar days after sample collection.
The Contractor shall notify the GTR by telephone and electronic mail within one (1) business day after receipt of any result indicating the detection of E. coli or any result identified by the laboratory as requiring immediate notification or corrective action.
3.0 CONTRACTOR PERSONNEL
3.1 QUALIFIED PERSONNEL
The Contractor must provide qualified personnel to perform all requirements specified in this
SOW.
3.2 EMPLOYEE IDENTIFICATION
3.2.1 Contractor employees visiting Government facilities must wear an identification badge that, at a minimum, displays the Contractor name, the employee’s photo, name, clearance-level and badge expiration date. Visiting Contractor employees must comply with all Government escort rules and requirements. All Contractor employees must identify themselves as Contractors when their status is not readily apparent and display all identification and visitor badges in plain view above the waist at all times.
3.2.2 Contractor employees working on-site at Government facilities must wear a Government issued identification badge. All Contractor employees must identify themselves as Contractors when their status is not readily apparent (in meetings, when answering Government telephones, in e-mail messages, etc.) and display the Government issued badge in plain view above the waist at all times.
3.3 EMPLOYEE CONDUCT
Contractor’s employees must comply with all applicable Government regulations, policies and procedures (e.g., fire, safety, sanitation, environmental protection, security, “off limits” areas, wearing of parts of DHS uniforms, and possession of weapons) when visiting or working at Government facilities. The Contractor must ensure Contractor employees present a professional appearance at all times and that their conduct must not reflect discredit on the United States or the Department of Homeland Security. The Project Manager must ensure
LAST UPDATED: 11/18/2026 PAGE 4/5
Contractor employees understand and abide by Department of Homeland Security established rules, regulations and policies concerning safety and security.
3.4 REMOVING EMPLOYEES FOR MISCONDUCT OR SECURITY REASONS
The Government may, at its sole discretion (via the Contracting Officer*), direct the Contractor to remove any Contractor employee from DHS facilities for misconduct or security reasons.
Removal does not relieve the Contractor of the responsibility to continue providing the services required under the contract. The Contracting Officer will provide the Contractor with a written explanation to support any request to remove an employee.
4.0 OTHER APPLICABLE CONDITIONS
4.1 SECURITY
Contractor access to classified information is not currently required under this SOW.
4.2 PERIOD OF PERFORMANCE
The period of performance for this contract is a one-year base period with four one-year option periods as follows:
Base Period Dec 1, 2026 through Nov 30, 2027 Option Period One Dec 1, 2027 through Nov 30, 2028 Option Period Two Dec 1, 2028 through Nov 30, 2029 Option Period Three Dec 1, 2029 through Nov 30, 2030 Option Period Four Dec 1, 2030 through Nov 30, 2031
4.3 PLACE OF PERFORMANCE
The primary place of performance will be the Contractor’s facilities with frequent visits to the United States Coast Guard at 1 Munro Ave, Cape May, NJ, 08204.
4.4 HOURS OF OPERATION
Contractor employees must generally perform all work between the hours of 0730 and 1600 EST, Monday through Friday (except Federal holidays). However, there may be occasions when Contractor employees must be required to work other than normal business hours, including weekends and holidays, to fulfill requirements under this SOW.
4.5 TRAVEL
Contractor travel must not be required for this requirement.
4.6 GENERAL REPORT REQUIREMENTS
The Contractor must provide all written reports in electronic format with read/write capability using applications that are compatible with DHS workstations (Microsoft Office Applications).
5.0 GOVERNMENT FURNISHED RESOURCES :
The Government will not furnish any resources to the Contractor in support of this contract.
LAST UPDATED: 11/18/2026 PAGE 5/5
6.0 CONTRACTOR FURNISHED PROPERTY
The Contractor must furnish all facilities, materials, equipment and services necessary to fulfill the requirements of this contract, except for the Government Furnished Resources if specified in SOW 2.0 and SOW 5.0.
7.0 GOVERNMENT ACCEPTANCE PERIOD
The Government Technical Representative (GTR) will review deliverables prior to acceptance and provide the contractor with an e-mail that provides documented reasons for non-acceptance. If the deliverable is acceptable, the GTR will send an e-mail to the Contractor notifying it that the deliverable has been accepted.
7.1 The GTR will have the right to reject or require correction of any deficiencies found in the deliverables that are contrary to the information contained in the Contractor’s accepted proposal. In the event of a rejected deliverable, the Contractor will be notified in writing by the GTR of the specific reasons for rejection. The Contractor may have an opportunity to correct the rejected deliverable and return it per delivery instructions.
7.2 The GTR will have 05 business days to review deliverables and make comments. The Contractor must have 05 business days to make corrections and redeliver.
7.3 All other review times and schedules for deliverables must be agreed upon by the parties based on the final approved Project Plan. The Contractor must be responsible for timely delivery to Government personnel in the agreed upon review chain, at each stage of the review.
The Contractor must work with personnel reviewing the deliverables to assure that the established schedule is maintained.
File details come from the government source that posted it. Updated .