This is a Statement of Work (SOW) for monthly preventive maintenance services on fitness equipment at the U.S. Coast Guard Training Center Cape May gymnasium in Cape May, New Jersey.

The Contractor shall perform preventive maintenance on 219 fitness equipment items once per calendar month during the period of performance. Equipment includes 136 Life Fitness spin bikes, 18 weight stack machines, 11 plate loaded machines, 10 ellipticals, 9 Life Fitness treadmills, 7 rowers, 7 Woodway treadmills, 5 bikes, 4 assault bikes, 4 Versa Climbers, 3 cable machines, 2 step mills, 2 Jacobs Ladders, and 1 SkiErg. Preventive maintenance actions include inspecting safety and functional components for wear and damage, verifying amperage draw on motorized equipment, cleaning and lubricating guide rods and lubrication points, inspecting cables and belts, tightening accessible hardware, and performing diagnostic checks. The Contractor shall use original equipment manufacturer (OEM) recommended procedures and accepted commercial industry standards. Services shall be performed Monday through Friday, excluding Federal holidays, between 0900 and 1400 Eastern Time, with coordination required at least five business days in advance. The base period runs April 1, 2027 through March 31, 2028, with four optional one-year periods extending through March 31, 2032. The Contractor must submit a Monthly Preventive Maintenance Report and Service Log within three business days after each visit, documenting all work completed and identifying any deficiencies, out-of-service equipment, or recommended corrective maintenance outside the contract scope. The Contractor furnishes all labor, supervision, tools, materials, equipment, and transportation; the Government provides facility and equipment access only.

View the file

Other files

File Type Posted
7m_Wage Determination.pdf PDF
12a_Provisions and Clauses.pdf PDF
12a_Solicitation-Commercial-Products-Services.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SOLICITATION NO. 67100PR270000152

Page 1 of 4 Dated 11-16-2026

U.S. COAST GUARD TRAINING CENTER CAPE MAY

STATEMENT OF WORK

FITNESS EQUIPMENT MONTHLY PREVENTIVE MAINTENANCE

1.0 GENERAL

1.1 Background

U.S. Coast Guard Training Center (TRACEN) Cape May operates a gymnasium in Building 269 at 1 Munro

Avenue, Cape May, New Jersey 08204. The gymnasium supports physical training and readiness activities for enlisted recruits and other authorized users. Reliable, properly maintained fitness equipment supports safe facility operations and mission readiness.

1.2 Scope

The Contractor shall furnish all labor, supervision, tools, materials, equipment, transportation, and incidental services necessary to perform scheduled monthly preventive maintenance on every fitness equipment item identified in Section 2.3. This requirement is limited to scheduled preventive maintenance and associated reporting. Unscheduled repairs, emergency service, replacement parts, and corrective maintenance beyond the preventive-maintenance actions expressly stated in this SOW are outside the scope of this contract.

1.3 Objective

The objective is to complete monthly preventive maintenance for all listed equipment, identify safety or operational deficiencies, and provide the Government with a complete report of work performed and deficiencies observed.

1.4 Applicable Standards

The Contractor shall perform preventive maintenance in accordance with the applicable original equipment manufacturer (OEM) recommended procedures and accepted commercial industry standards for fitness equipment. Where OEM procedures are not available to the Contractor, the Contractor shall use accepted commercial industry practices appropriate to the equipment type and document that fact in the Monthly

Preventive Maintenance Report and Service Log.

1.5 Site Visit

A site visit may be made available as stated in the solicitation. Offerors are responsible for examining the equipment, site conditions, access conditions, and other factors necessary to prepare an FFP quotation or proposal.

2.0 SPECIFIC REQUIREMENTS

2.1 Task One - Monthly Preventive Maintenance

Once during each calendar month of the period of performance, the Contractor shall perform preventive maintenance on every item listed in Section 2.3. The Contractor shall determine the number, qualifications, and supervision of its personnel and the methods used to perform the work, provided the Contractor meets all contract requirements and performance standards.

At a minimum, the Contractor shall perform the following preventive-maintenance actions, as applicable to the equipment type and OEM procedures:

• Inspect safety and functional components for proper operation, wear, damage, and secure attachment.

• Verify amperage draw on motorized equipment, when applicable.

• Inspect and clean motor, lower control board, and power-entry areas on motorized equipment, when applicable and accessible without disassembly beyond normal preventive maintenance.

• Perform diagnostic checks and calibration necessary to restore proper operation when the condition can be corrected through the preventive-maintenance actions within this SOW.

• Clean and lubricate guide rods and other manufacturer-identified lubrication points, as applicable.

Page 2 of 4 Dated 11-16-2026

• Inspect cables, belts, pulleys, chains, and related components for wear, fraying, damage, alignment, or improper tension.

• Tighten accessible hardware as appropriate and consistent with OEM procedures.

• Leave the equipment and immediate work area in a safe condition at the conclusion of each visit.

2.2 Scheduling and Coordination

The Contractor shall propose a service date for each monthly visit and coordinate access with the GTR by electronic mail at least five business days before the proposed visit. Preventive-maintenance services shall normally be performed Monday through Friday, excluding Federal holidays, between 0900 and 1400 Eastern

Time. The Contractor and GTR may agree in writing to an alternate performance time when needed to minimize disruption to gym operations. Coordination with the GTR does not authorize a change to the contract scope, price, period of performance, or other contract term.

2.3 Equipment Inventory

The Contractor shall perform the required monthly preventive maintenance on the following 219 equipment items:

Item Equipment Description Brand Quantity

0001 Treadmills Life Fitness 9

0002 Rowers Concept 2 Power Erg 7

0003 Bikes Life Fitness 5

0004 Spin Bikes Life Fitness 136

0005 Ellipticals Life Fitness, Hammer Strength, Green Series, Sole 10

0006 Assault Bikes Rogue, Assault Fitness 4

0007 Step Mills Pro Maxima, Life Fitness 2

0008 Weight Stack Machines Cybex, Life Fitness, Pro Maxima 18

0009 Plate Loaded Machines Hammer Strength, Magnum, Life Fitness, Ab Coaster 11

0010 Cable Machines Life Fitness 3

0011 Woodway Treadmills Woodway, Assault Fitness 7

0012 SkiErg Concept 2 SkiErg 1

0013 Versa Climbers SM Sport Versa Climber 4

0014 Jacobs Ladders Jacobs Ladder 2

Total 219

2.4 Performance Standards

1. All 219 listed equipment items shall receive preventive maintenance at least once during each calendar month of the period of performance.

2. The Contractor shall document each equipment item serviced in the Monthly Preventive Maintenance

Report and Service Log.

3. If the Contractor identifies a condition that renders equipment unsafe or non-operational, the Contractor shall immediately place an "Out of Service" tag on the equipment, when permitted by site conditions, and notify the GTR by electronic mail no later than one business day after discovery. The notice shall identify the equipment, describe the observed condition, and state whether the equipment was tagged.

4. The Contractor shall identify corrective maintenance, repairs, emergency service, or replacement parts that are outside the scope of this SOW. The Contractor shall not perform out-of-scope work without written authorization from the Contracting Officer.

Page 3 of 4 Dated 11-16-2026

5. The Contractor shall complete and submit the Monthly Preventive Maintenance Report and Service Log within three business days after each monthly visit.

6. The Contractor shall correct, at no additional cost, any deficiency in the preventive-maintenance service or report that is attributable to the Contractor and identified during Government review.

3.0 CONTRACTOR RESPONSIBILITIES

3.1 Qualified Personnel and Contractor Control

The Contractor shall provide personnel with the technical knowledge, skills, and experience necessary to perform the required preventive maintenance in accordance with OEM procedures and accepted commercial industry standards. The Contractor is responsible for selecting, supervising, directing, and controlling its employees and subcontractors. Government personnel will communicate required results, access needs, safety requirements, and acceptance determinations, but will not supervise or control

Contractor personnel.

3.2 Contractor Point of Contact

The Contractor shall designate a qualified point of contact and at least one alternate authorized to communicate with the Contracting Officer and GTR on matters related to contract performance. The

Contractor shall provide the names, telephone numbers, and electronic-mail addresses for these individuals at award and shall notify the GTR and Contracting Officer of changes within five business days. The

Contractor shall respond to GTR requests for routine performance coordination within two business days.

3.3 Employee Identification and Access

Contractor employees entering Government facilities shall comply with installation access, identification, escort, safety, and conduct requirements. Contractor employees shall display identification that identifies the

Contractor and the employee while performing on site, unless the Government directs otherwise for security or safety reasons.

4.0 OTHER APPLICABLE CONDITIONS

4.1 Security

Access to classified information is not required for performance under this SOW. The Contractor shall comply with all applicable installation access and security procedures.

4.2 Period of Performance

Period Start Date End Date

Base Period 1 April 2027 31 March 2028

Option Period One 1 April 2028 31 March 2029

Option Period Two 1 April 2029 31 March 2030

Option Period Three 1 April 2030 31 March 2031

Option Period Four 1 April 2031 31 March 2032

4.3 Place of Performance

U.S. Coast Guard Training Center Cape May, Gymnasium, Building 269, 1 Munro Avenue, Cape May, New

Jersey 08204.

4.4 Government Furnished Resources

The Government will not furnish property, equipment, materials, tools, transportation, or other resources to support performance, except reasonable access to the Government facility and equipment identified in

Section 2.3. The Government will identify the GTR after award.

Page 4 of 4 Dated 11-16-2026

4.5 Contractor Furnished Property

The Contractor shall furnish all facilities, materials, equipment, tools, transportation, supervision, and services necessary to perform the contract, except for Government facility and equipment access described in Section 4.4.

5.0 GOVERNMENT TECHNICAL REPRESENTATIVE

The GTR will serve as the Government point of contact for routine technical coordination, facility access, receipt of required reports, and confirmation that deliverables conform to this SOW. The GTR is not authorized to modify the contract; direct out-of-scope work; change the scope, price, period of performance, or terms and conditions; or otherwise bind the Government. Only the Contracting Officer may modify the contract or authorize out-of-scope work.

6.0 INSPECTION AND ACCEPTANCE

The GTR will review each Monthly Preventive Maintenance Report and Service Log and verify that the required monthly preventive maintenance was completed for all listed equipment. The Government will provide acceptance or written notice of deficiencies within three business days after receipt of a complete report. If the Government identifies a deficiency attributable to the Contractor, the Contractor shall correct the deficiency and resubmit the report within three business days after notification, unless the Contracting

Officer approves another schedule.

The monthly FFP unit is acceptable when the Government accepts the monthly preventive-maintenance service and the associated Monthly Preventive Maintenance Report and Service Log. The Contractor may submit its invoice after acceptance of the monthly FFP unit, in accordance with the invoicing instructions in the contract.

7.0 DELIVERABLES

Item SOW Ref. Deliverable Due Date Distributi on

1 2.1 through 2.4 Monthly Preventive Maintenance Report and Service Log

Within 3 business days after each monthly visit GTR

7.1 Monthly Preventive Maintenance Report and Service Log Content

The report and service log shall be submitted electronically in a format compatible with Government workstations and shall include:

• Contract number, period of performance, service date, and contractor point of contact.

• A list of every equipment item serviced, identified by the inventory item number in Section 2.3, with the preventive-maintenance actions completed.

• Identification and description of each observed deficiency, including the equipment item number, safety or operational impact, and whether the item was tagged "Out of Service."

• Identification of any recommended corrective maintenance, repair, emergency service, or replacement part that is outside the scope of this SOW.

• A statement that the Contractor completed the required monthly preventive maintenance for all listed equipment, or a clear explanation of any item not serviced and the proposed corrective schedule.