This is a Statement of Work for Project 662-23-111 at the San Francisco VA Medical Center. The project requires a qualified General Contractor to repair and weatherize the single elevator in Parking Structure 211 and construct a vestibule to prevent future deterioration. The work scope is fully defined in attached construction documents, which include a combined drawing set, project specifications, and original construction documents for Parking Structure 211. The exterior construction work is located entirely within the footprint of Parking Structure 211.

The contract performance period is 180 calendar days. The contractor must use construction management software—either the government-provided Submittal Exchange platform or an alternative acceptable platform established by the awardee—and the government will grant access to all parties associated with the General Contractor as requested. The contractor is required to generate a Master Project Schedule that complies with VAAR 852.232-71, demonstrating critical path analysis, float identification, and costs organized by definable feature of work to enable timely and accurate progress payments.

View the file

Other files

File Type Posted
36C26126Q0458.docx DOCX document
662-23-111 Specifications_DRAFT.pdf PDF
662-23-111 Drawings_DRAFT.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

San Francisco VA Medical Center

4150 Clement St

San Francisco, CA 94121

Project: 662-23-111, Repair and Weatherize Parking Structure 211 Elevator

Statement of Work

The San Francisco VA Medical Center requires the services of a qualified General Contractor to construct Project 662-23-111, Repair and Weatherize Parking Structure 211 Elevator.

The general scope of this requirement is to refurbish the single elevator from effects of weather and to construct a vestibule to limit further future deterioration. The nature and requirements of this construction are fully exhibited in the attached Construction Documents which include the following:

Bid Documents - Combined Drawing Set – This comprises the full drawing set as a single file.

Bid Documents - Specifications – This contains the entire project specification

Parking Structure 211 - Original Construction Documents

The exterior area of construction is located entirely within the footprint of Parking Structure 211.

Construction Management software is to be used in the completion of this requirement and will be provided by the government absent an established and acceptable platform utilized by the awardee. The software currently in use is Submittal Exchange. The government will grant access to all parties associated with the General Contractor as requested by the GC project manager.

The period of performance for this action is 180 calendar days. The contractor generated Master

Project Schedule shall meet the requirements of VAAR 852.232-71 to demonstrate critical path, identify float, and indicate costs by definable feature of work to facilitate timely and accurate progress payments.