658-24-102 B2 AHUs - BID Drawings.pdf
PDF 26 MB Posted
- Attached to
- Z2DA--658-24-102 Replace Building 2 AHUs
- Solicitation number
- 36C24626Q0665
About this file
This is a set of bid drawings for construction services related to Project 658-24-102, Replace Building 2 Air Handlers at Salem VA Medical Center located at 1970 Roanoke Blvd, Salem, VA 24153. The drawings include architectural, mechanical, electrical, fire alarm, and fire suppression plans prepared by Charlotte Engineers, LLP and Guidon Design Inc. The project involves replacing air handling units (AHUs) in Building 2 and includes selective demolition, renovation work on basement and first floor areas, and installation of new mechanical, electrical, fire protection, and plumbing systems. Construction is divided into two phases with specific phasing plans for basement Area A, basement Area B, and the first floor. The drawings establish fire safety requirements including temporary 1-hour fire-rated smoke barrier wall construction per NFPA 241, temporary infection control barrier walls, and infection control protocols appropriate for a healthcare facility with high patient risk classification and Type C construction activity infection risk.
The bid documents include detailed reflected ceiling plans, life safety plans, demolition plans for both acoustic and gypsum board ceilings, mechanical sequences of operations for new AHUs, fire alarm system design with addressable devices and notification appliances, fire suppression modifications, plumbing system changes, and electrical work including new lighting, power distribution, and fire alarm integration. Infection control requirements mandate temporary barriers, restricted construction hours (5:00 PM to 5:00 AM for above-ceiling work), maintained exit access during business hours, protective materials for transported items, designated waste disposal routes, and coordination with facility infection control representatives. The project requires compliance with multiple codes and standards including NFPA 101 (Life Safety Code), NFPA 72 (Fire Alarm Code), NFPA 99 (Healthcare Facilities Code), NFPA 241 (Construction Safety), ADA standards, and VA-specific fire protection and seismic design requirements. The contractor is responsible for full coordination of all trades, verification of field dimensions, protection of adjacent areas, and maintaining equivalent fire protection during system impairments.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C24626Q0665 0001.docx | DOCX document | |
| 658-24-102 B2 AHUs - BID Specifications.pdf | ||
| 36C24626Q0665.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ROANOKE
BOONES MILL
BEDFORD
TROUTVILLE
CHRISTIANSBURG
ROUTE 42
ROUTE 81
ROUTE 460
ROUTE 221
ROUTE 220
ROUTE 460
P A
TR
IO
TS
B
LV
D
PATRIO
TS C
IR
P A T R
IO
T S C
IR
ROANOKE BLVD
G A R
D E N
S Q
ROANOKE B
LVD
BUILDING
CONTRACT OFFICER REPRESENTATIVE DATE
CHIEF OF ENGINEERING DATE
INTERIOR DESIGNER DATE
DEPARTMENT HEAD DATE
CONTRACTING OFFICER DATE LEAD USER SIGNATURE DATE
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
Consultant:
NOT F
OR
CONSTRUCTIO
N
A u to d e s k D o c s
/2
.1
V A
S a le m
A H
U R e p la c e m e n t-
C h a rl o tt e
E n g in e e rs
/2 -0
A v
.r v t
/1 /2
:4
:4
P
M
GI000
COVER SHEET
CHARLOTTE ENGINEERS, LLP
5838 MONROE ROAD
CHARLOTTE, NC 28212
GUIDON
1221 N. PENNSYLVANIA STREET
INDIANAPOLIS, IN 46202
REPLACE BUILDING 2 AIR
HANDLERS
1970 ROANOKE BLVD, SALEM VA 24153
658-24-102
12/03/2025 AO LS
658-24-102
REPLACE BUILDING 2 AIR HANDLERS
SALEM VA MEDICAL CENTER
1970 ROANOKE BLVD, SALEM VA 24153
BID DOCUMENTS
BID DOCUMENTS
FULLY SPRINKLERED
SHEET INDEX
SHEET NUMBER SHEET NAME
GI000 COVER SHEET
GC101 BASEMENT FLOOR PHASING PLAN
GC102 FIRST FLOOR PHASING PLAN
GI101 BASEMENT FLOOR LIFE SAFETY
GI102 FIRST FLOOR LIFE SAFETY
AD111 BASEMENT REFLECTED CEILING DEMOLITION PLAN
AD112 BASEMENT REFLECTED CEILING DEMOLITION PLAN
AD113 FIRST FLOOR REFLECTED CEILING DEMOLITION PLAN
AE001 ARCHITECTURAL SYMBOLS AND ABBREVIATIONS
AE111 BASEMENT FLOOR REFLECTED CEILING PLAN
AE112 BASEMENT FLOOR REFLECTED CEILING PLAN
AE113 FIRST FLOOR REFLECTED CEILING PLAN
FA001 FIRE ALARM - SYMBOLS, NOTES, AND DRAWING INDEX
FA002 FIRE ALARM - INPUT/OUTPUT MATRIX & MISCEL. REQUMTS
FA003 FIRE ALARM - DETAILS
FA100 FIRE ALARM - NEW WORK - BASEMENT - AREA A
FA101 FIRE ALARM - NEW WORK - BASEMENT - AREA B
FA200 FIRE ALARM - NEW WORK - FIRST FLOOR
FX001 FIRE SUPPRESSION - SYMBOLS, NOTES, AND DRAWING INDEX
FX002 FIRE SUPPRESSION - IMPAIR., REQMTS, & FLOW TEST
FX003 FIRE SUPPRESSION - DETAILS
FX100 FIRE SUPPRESSION - DEMOLITION - BASEMENT - AREA A
FX101 FIRE SUPPRESSION - DEMOLITION - BASEMENT - AREA B
FX102 FIRE SUPPRESSION - NEW WORK - BASEMENT - AREA A
FX103 FIRE SUPPRESSION - NEW WORK - BASEMENT - AREA B
FX104 FIRE SUPPRESSION - DESIGN CRITERIA - BASEMENT - AREA A
FX105 FIRE SUPPRESSION - DESIGN CRITERIA - BASEMENT - AREA B
FX200 FIRE SUPPRESSION - DEMOLITION - FIRST FLOOR
FX201 FIRE SUPPRESSION - NEW WORK - FIRST FLOOR
FX202 FIRE SUPPRESSION - DESIGN CRITERIA - FIRST FLOOR
PP100 PLUMBING - DEMOLITION AND NEW WORK - BASEMENT - AREA A
PP101 PLUMBING - DEMOLITION AND NEW WORK - BASEMENT - AREA B
PP102 PLUMBING - DEMOLITION AND NEW WORK - FIRST FLOOR
M001 MECHANICAL - SYMBOLS, NOTES, AND DRAWING INDEX
M002 MECHANICAL - DETAILS
M003 MECHANICAL - SCHEDULES
M004 MECHANICAL - AHU SCHEDULES
M005 MECHANICAL - 2-AHU-9 SEQUENCE OF OPERATIONS
M006 MECHANICAL - 2-AHU-10 SEQUENCE OF OPERATIONS
M007 MECHANICAL - TERMINAL UNIT & EXHAUST FAN SEQUENCE OF
OPERATIONS
MH101A MECHANICAL - PHASE 1A - BASEMENT - AREA A
MD101B MECHANICAL - PHASE 1B DEMOLITION - BASEMENT - DUCTWORK - AREA A
MD102B MECHANICAL - PHASE 1B DEMOLITION - BASEMENT - PIPING - AREA A
MH101C MECHANICAL - PHASE 1C NEW WORK - BASEMENT - DUCTWORK - AREA A
MP101C MECHANICAL - PHASE 1C NEW WORK - BASEMENT - PIPING - AREA A
MH201A MECHANICAL - PHASE 2A - AREA B
MD201B MECHANICAL - PHASE 2B DEMOLITION - BASEMENT - DUCTWORK - AREA B
MD202B MECHANICAL - PHASE 2B DEMOLITION - BASEMENT - PIPING - AREA B
MD211B MECHANICAL - PHASE 2B DEMOLITION - FIRST FLOOR - DUCTWORK
MD212B MECHANICAL - PHASE 2B DEMOLITION - FIRST FLOOR - PIPING
MH201C MECHANICAL - PHASE 2C NEW WORK - BASEMENT - DUCTWORK - AREA B
MH211C MECHANICAL - PHASE 2C NEW WORK - FIRST FLOOR - DUCTWORK
MP202C MECHANICAL - PHASE 2C NEW WORK - BASEMENT - PIPING - AREA B
MP212C MECHANICAL - PHASE 2C NEW WORK - FIRST FLOOR - PIPING
MD201D MECHANICAL - PHASE 2D DEMOLITION - AREA B
E001 ELECTRICAL - SYMBOLS, NOTES, AND DRAWING INDEX
E002 ELECTRICAL - DETAILS
E003 ELECTRICAL - POWER RISER DIAGRAM AND SCHEDULES
E004 ELECTRICAL - BASEMENT - PHASING PLAN
E005 ELECTRICAL - FIRST FLOOR - PHASING PLAN
ED100A ELECTRICAL - DEMOLITION - BASEMENT - AREA A
ED100B ELECTRICAL - DEMOLITION - BASEMENT - AREA B
ED200 ELECTRICAL - DEMOLITION - FIRST FLOOR
EL100A ELECTRICAL - NEW WORK - BASEMENT - LIGHTING - AREA A
EL100B ELECTRICAL - NEW WORK - BASEMENT - LIGHTING - AREA B
EL200 ELECTRICAL - NEW WORK - FIRST FLOOR - LIGHTING
EP100A ELECTRICAL - NEW WORK - BASEMENT - POWER - AREA A
EP100B ELECTRICAL - NEW WORK - BASEMENT - POWER - AREA B
EP100C ELECTRICAL - NEW WORK - BASEMENT - POWER - ENLARGED VIEWS
EP200 ELECTRICAL - NEW WORK - FIRST FLOOR - POWER
Contact:Contact: Contact:
CHARLOTTE ENGINEERS
Name: AVERY STANLEY
MECHANICAL ENGINEER
MECHANICAL,
ELECTRICAL &
PLUMBING
SALEM VA MEDICAL CENTER
TODD CARROLL
HEALTHCARE ENGINEER
1970 Roanoke Blvd. , Salem, VA 24153 p: 540. 982. 2463 X 2546 e: todd.carroll2@va.gov
OWNER
GUIDON DESIGN INC.
Name: ADAM ORGZEWALLA
PROJECT ARCHITECT
1221 North Pennsylvania Street Indianapolis, IN 46202 p: 317.800.6388 x 103 e: aogrzewalla@guidon.com
ARCHITECT
Contact:
CHARLOTTE ENGINEERS
Name: AVERY STANLEY
PROJECT MANAGER
5838 Monroe Road Charlotte, NC 28212 p: 704.531.3000 x 106 e: acallahan@charlotteengineers.com
PROJECT MANAGER
AREA MAP
CAMPUS MAP
N
N
5838 Monroe Road Charlotte, NC 28212 p: 704.531.3000 x 106 e: acallahan@charlotteengineers.com
Revisions: Date:
CONSTRUCTION ACTIVITY - INFECTION RISK: TYPE C
PATIENT RISK GROUP: HIGH
CLASS OF PRECAUTION MATRIX: IV
1. PROVIDE TEMPORARY 1 HR FIRE RATED SMOKE BARRIER WALL
CONSTRUCTION PER NFPA 241. REFER TO DETAIL 2/GC101.
2. PROVIDE TEMPORARY INFECTION CONTROL CONSTRUCTION DOOR WITH
CARD READER ACCESS. REFER TO ELEVATION 4/GC101.
3. PROVIDE TEMPORARY INFECTION CONTROL BARRIER WALL CONSTRUCTION.
REFER TO DETAIL 3/GC101.
4. PROVIDE TEMPORARY INFECTION CONTROL PLASTIC BARRIER WALL
CONSTRUCTION. REFER TO SPECIFICATION FOR ADDITIONAL INFORMATION.
A. REFER TO LIST OF REQUIRED INFECTION CONTROL PRECAUTIONS OUTLINED
BY CLASS IN SPECIFICATION 010110 AND ADDITIONAL INFORMATION.
B. REFER TO DRAWINGS, SPECIFICATIONS AND DOOR HARDWARE SCHEDULE
FOR ADDITIONAL INFORMATION.
C. PROJECT SHALL BE COMPLETED IN 2 PHASES.
D. COORDINATE FULL SCOPE OF WORK WITH ENGINEERING DRAWINGS AND
FIELD VERIFICATION. CONTRACTOR IS RESPONSIBLE FOR SCOPE OF ABOVE
CEILING WORK REQUIRED ABOVE AND BELOW THE FLOOR PLATE OF THE
PROJECT BOUNDARY.
E. COORDINATE LOCATION OF TEMPORARY INFECTION CONTROL (IC) BARRIER
WALL CONSTRUCTION AND INFECTION CONTROL (IC) MEASURES WITH COR
AND PATIENT SAFETY/ INFECTION CONTROL REPRESENTATIVE. TEMPORARY
IC BARRIER WALL CONSTRUCTION LOCATIONS IN DRAWINGS ARE
APPROXIMATE. CONTRACTOR SHALL PROVIDE DRAWING TO COR AND
PATIENT SAFETY/ INFECTION CONTROL REPRESENTATIVE ONCE ICRA
PROTOCOLS AND PLAN IS APPROVED.
F. SCHEDULE AND TIME OF CONSTRUCTION WORK TO BE APPROVED BY COR
AND NURSING STAFF BEFORE CONSTRUCTION MAY BEGIN. PROVIDE
PHASING INFORMATION FOR ABOVE CEILING WORK IN THE CONTRACTOR
PROVIDED CMP SCHEDULE FOR WORK ALSO REQUIRED ABOVE AND BELOW
THE FLOOR PLATE OF THE PROJECT BOUNDARY.
G. ABOVE CEILING WORK SHALL TAKE PLACE BETWEEN THE HOURS OF 5:00 PM
AND 5:00 AM. IN AREAS THAT REQUIRE ABOVE CEILING WORK WHERE
CEILINGS ARE TO REMAIN, CEILING TILES SHALL BE REMOVED AND STORED
IN A SAFE MANOR UNTIL CEILING TILES CAN BE REINSTALLED. DAMAGED
AND BROKEN CEILING TILES SHALL BE REPLACED BY CONTRACTOR.
H. EXIT/ACCESS FOR ADJACENT OPERATIONAL AREAS SHALL BE MAINTAINED
DURING NORMAL BUSINESS HOURS. SEE SPECIFICATION FOR HOURS OF
OPERATION.
I. WORK REQUIRING VIBRATION OR LOAD NOISE SHALL TAKE PLACE BETWEEN
THE HOURS OF 5:00 PM AND 5:00 AM. EVERY EFFORT SHALL BE MADE TO
KEEP NOISE AND VIBRATION TO A MINIMUM.
J. PROVIDE THE FOLLOWING INFECTION CONTROL MEASURES, A 24"X36"
STICKY WALK OFF MAT AND HAND SANITIZER AT EACH TEMPORARY DOOR
LOCATION. MAT SHALL BE REPLACED OR CLEANED AS NECESSARY
K. PROVIDE THE VA AND OSHA REQUIRED TEMPORARY SIGNAGE AT EACH
TEMPORARY DOOR LOCATION.
L. CONTRACTOR SHALL SUPPLY SPILL KIT. SPILL KIT TO INCLUDE SHOP VAC,
MULTI-PURPOSE SPILL CONTROL SORBENTS TO ABSORB NON AGGRESSIVE
LIQUIDS UP TO 30 GALLONS.
M. ALL NEW MATERIAL MOVED THROUGH THE FACILITY SHALL BE COVERED
WITH 4 MIL. POLY SHEET.
N. ALL DEMOLITION MATERIAL SHALL BE REMOVED FROM THE PROJECT
BOUNDARY THROUGH THE FACILITY TO DUMPSTER ALONG VA APPROVED
ROUTE IN ENCLOSED DUMPSTER CART DESIGNED FOR SUCH PURPOSED
WITH A LID.
O. ALL MATERIAL, DEBRIS AND HAZARDOUS MATERIALS SHALL BE PROPERLY
STORED IN DESIGNATED AREAS AND APPROVED CONTAINERS. FLAMMABLE
MATERIALS SHALL NOT BE STORED IN THE FACILITY.
P. PROVIDE CONTAINMENT CART FOR ABOVE CEILING ACCESS OUTSIDE
PROJECT BOUNDARY.
INFECTION CONTROL PLAN NOTES
INFECTION CONTROL GENERAL NOTES
INFECTION CONTROL PROJECT INFORMATION
REC THERAPY
OFFICE
OFFICE
MUSIC THERAPY RM
OFFICE
Room
STORAGE
L8
DIALYSIS STORAGE
LINEN
LOCKERS
9B
STAFF LOUNGE
9A
RESTROOM
8B
RESTROOM
8A
WAITING ROOM
B-B5
CUBICALS
PASSAGE
B-B7
SVC. BAY
OFFICE
SUPV. ADMISS
OFFICE
OFFICE
20A
STORAGE ARCHIVE
FIRE RISER ROOM
21A
UTILITY
SVC. BAY
LCSW OFFICE
CALL CENTER RM
OFFICE
23A
ELECTRICAL
MUSIC THERAPY
31A
STORAGE
TOILET
CORRIDOR
CB-6
MRI WAITING
Room
PHASE 1 PHASE 2
UTS VNML ODCB E RQPG H K
W XA I J
F
LOCKER
28B
CORRIDOR
CB-3
CORRIDOR
CB-6
PROVIDE
CONSTRUCTION
FENCING TO SECURE
AIR HANDLER
PROPOSED LOCATION
OF TEMPORARY AIR
HANDLER.
PROVIDE
CONSTRUCTION
FENCING TO SECURE
AIR HANDLER
PROPOSED LOCATION
OF TEMPORARY AIR
HANDLER.
Room
1-188
Room
1-189
Room
1-190
Room
1-191 Room
1-192
Room
1-194
Room
1-196
STAIR 3
31B
STORAGE
8A
TELECOM
ELECTRICAL
2B
STAIR 2
2A
ELEVATOR
STAIR 1
1A
TRASH RM
MAIN TEL. COM
MAIN EL RM
ELECTRICAL
ELEVATOR MACHINE
ROOM
EMERG. GEN
37A
CORRIDOR
CB-3
Room
1-141
Room
1-149
Room
1-150
CONTINUOUS FIRESAFE SEALANT
TOP AND BOTTOM, & BOTH SIDES
3 1/2" SOUND ATTENUATION BATT.
5/8" TYPE X GYPSUM BOARD, BOTH SIDES
3 5/8" METAL STUD @ 16" O.C. WITH
RUNNER CHANNELS ALONG TOP
AND BOTTOM
CONSTRUCTION
SIDE
PUBLIC
SIDE
6 MIL. FIRE RETARDANT VISQUEEN
MEMBRANE. CONTINUOUSLY ADHERE
TO THE STRUCTURAL DECK ABOVE AND
TO THE FLOOR BELOW WITH TAPE.
UNDERSIDE OF STRUCTURAL DECK
UL LISTING: U465
COORDINATE WITH EXISTING CEILING
TEMPORARY IC BARRIER WALL
CONSTRUCTION (DUST WALL)
5/8" TYPE X GYP BD
3 5/8" STEEL STUDS @ 16" O.C.
BEAD OF CONT. SEALANT
6-MIL FIRE RETARDANT POLY INTERIOR SIDE
CEILING
2" DEEP LEG 3 5/8" STEEL SLIP TRACK
3 5/8" STEEL STUD TRACK
6" M
IN
CONTINUOUSLY ADHERE 6-MIL. FIRE
RETARDANT POLY TO DECK WITH TAPE
CONTINUOUSLY ADHERE FIRE RETARDANT
POLY TO FLOOR WITH TAPE
EXISTING DECK
CONSTRUCTION
SIDE
OCCUPIED
SIDE
PUBLIC
SIDE
1 HOUR FIRE RATED METAL DOOR ASSEMBLY
AND FRAME WITH SEALS, CARD READER OR
CONTRACTOR CORE PER OWNER'S
PREFERENCE, HARDWARE AND CLOSER
AIR PRESSURE MONITOR
HAND SANITIZER
SEAL ALL EDGES WITH TAPE
SEAL ALL EDGES WITH TAPE
REFER TO TEMPORARY BARRIER TYPE FOR
REQUIRED CONDITION TO STRUCTURE ABOVE
VA / OSHA TEMPORARY SIGNAGE
3 HR FIRE RATED
2 HR FIRE RATED
1 HR FIRE RATED
1 HR SMOKE BARRIER
SMOKE PARTITION
2 HR SMOKE BARRIER
WALL RATING LEGEND
N
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
Consultant:
NOT F
OR
CONSTRUCTIO
N
KEY PLAN
BA
BASEMENT
A u to d e s k D o c s
/2
.1
V A
S a le m
A H
U R e p la c e m e n t-
C h a rl o tt e
E n g in e e rs
/2 -0
A v
.r v t
/1 /2
:4
:5
P
M
GC101
BASEMENT FLOOR PHASING PLAN
CHARLOTTE ENGINEERS, LLP
5838 MONROE ROAD
CHARLOTTE, NC 28212
GUIDON
1221 N. PENNSYLVANIA STREET
INDIANAPOLIS, IN 46202
REPLACE BUILDING 2 AIR
HANDLERS
1970 ROANOKE BLVD, SALEM VA 24153
658-24-102
12/03/2025 AO LS
BID DOCUMENTS
FULLY SPRINKLERED
SCALE: 3/32" = 1'-0"GC101
1 BASEMENT FLOOR - PHASING PLAN
SCALE: 1 1/2" = 1'-0"GC101
TEMPORARY 1 HR FIRE RATED SMOKE BARRIER
WALL CONSTRUCTION NFPA 241
SCALE: 1 1/2" = 1'-0"GC101
3 TEMPORARY INFECTION CONTROL BARRIER WALL CONSTRUCTION
SCALE: 1/4" = 1'-0"GC101
4 TEMPORARY WALL CONSTRUCTION ELEVATION
Revisions: Date:
CONSTRUCTION ACTIVITY - INFECTION RISK: TYPE C
PATIENT RISK GROUP: HIGH
CLASS OF PRECAUTION MATRIX: IV
1. PROVIDE TEMPORARY 1 HR FIRE RATED SMOKE BARRIER WALL
CONSTRUCTION PER NFPA 241. REFER TO DETAIL 2/GC101.
2. PROVIDE TEMPORARY INFECTION CONTROL CONSTRUCTION DOOR WITH
CARD READER ACCESS. REFER TO ELEVATION 4/GC101.
3. PROVIDE TEMPORARY INFECTION CONTROL BARRIER WALL CONSTRUCTION.
REFER TO DETAIL 3/GC101.
4. PROVIDE TEMPORARY INFECTION CONTROL PLASTIC BARRIER WALL
CONSTRUCTION. REFER TO SPECIFICATION FOR ADDITIONAL INFORMATION.
A. REFER TO LIST OF REQUIRED INFECTION CONTROL PRECAUTIONS OUTLINED
BY CLASS IN SPECIFICATION 010110 AND ADDITIONAL INFORMATION.
B. REFER TO DRAWINGS, SPECIFICATIONS AND DOOR HARDWARE SCHEDULE
FOR ADDITIONAL INFORMATION.
C. PROJECT SHALL BE COMPLETED IN 2 PHASES.
D. COORDINATE FULL SCOPE OF WORK WITH ENGINEERING DRAWINGS AND
FIELD VERIFICATION. CONTRACTOR IS RESPONSIBLE FOR SCOPE OF ABOVE
CEILING WORK REQUIRED ABOVE AND BELOW THE FLOOR PLATE OF THE
PROJECT BOUNDARY.
E. COORDINATE LOCATION OF TEMPORARY INFECTION CONTROL (IC) BARRIER
WALL CONSTRUCTION AND INFECTION CONTROL (IC) MEASURES WITH COR
AND PATIENT SAFETY/ INFECTION CONTROL REPRESENTATIVE. TEMPORARY
IC BARRIER WALL CONSTRUCTION LOCATIONS IN DRAWINGS ARE
APPROXIMATE. CONTRACTOR SHALL PROVIDE DRAWING TO COR AND
PATIENT SAFETY/ INFECTION CONTROL REPRESENTATIVE ONCE ICRA
PROTOCOLS AND PLAN IS APPROVED.
F. SCHEDULE AND TIME OF CONSTRUCTION WORK TO BE APPROVED BY COR
AND NURSING STAFF BEFORE CONSTRUCTION MAY BEGIN. PROVIDE
PHASING INFORMATION FOR ABOVE CEILING WORK IN THE CONTRACTOR
PROVIDED CMP SCHEDULE FOR WORK ALSO REQUIRED ABOVE AND BELOW
THE FLOOR PLATE OF THE PROJECT BOUNDARY.
G. ABOVE CEILING WORK SHALL TAKE PLACE BETWEEN THE HOURS OF 5:00 PM
AND 5:00 AM. IN AREAS THAT REQUIRE ABOVE CEILING WORK WHERE
CEILINGS ARE TO REMAIN, CEILING TILES SHALL BE REMOVED AND STORED
IN A SAFE MANOR UNTIL CEILING TILES CAN BE REINSTALLED. DAMAGED
AND BROKEN CEILING TILES SHALL BE REPLACED BY CONTRACTOR.
H. EXIT/ACCESS FOR ADJACENT OPERATIONAL AREAS SHALL BE MAINTAINED
DURING NORMAL BUSINESS HOURS. SEE SPECIFICATION FOR HOURS OF
OPERATION.
I. WORK REQUIRING VIBRATION OR LOAD NOISE SHALL TAKE PLACE BETWEEN
THE HOURS OF 5:00 PM AND 5:00 AM. EVERY EFFORT SHALL BE MADE TO
KEEP NOISE AND VIBRATION TO A MINIMUM.
J. PROVIDE THE FOLLOWING INFECTION CONTROL MEASURES, A 24"X36"
STICKY WALK OFF MAT AND HAND SANITIZER AT EACH TEMPORARY DOOR
LOCATION. MAT SHALL BE REPLACED OR CLEANED AS NECESSARY
K. PROVIDE THE VA AND OSHA REQUIRED TEMPORARY SIGNAGE AT EACH
TEMPORARY DOOR LOCATION.
L. CONTRACTOR SHALL SUPPLY SPILL KIT. SPILL KIT TO INCLUDE SHOP VAC,
MULTI-PURPOSE SPILL CONTROL SORBENTS TO ABSORB NON AGGRESSIVE
LIQUIDS UP TO 30 GALLONS.
M. ALL NEW MATERIAL MOVED THROUGH THE FACILITY SHALL BE COVERED
WITH 4 MIL. POLY SHEET.
N. ALL DEMOLITION MATERIAL SHALL BE REMOVED FROM THE PROJECT
BOUNDARY THROUGH THE FACILITY TO DUMPSTER ALONG VA APPROVED
ROUTE IN ENCLOSED DUMPSTER CART DESIGNED FOR SUCH PURPOSED
WITH A LID.
O. ALL MATERIAL, DEBRIS AND HAZARDOUS MATERIALS SHALL BE PROPERLY
STORED IN DESIGNATED AREAS AND APPROVED CONTAINERS. FLAMMABLE
MATERIALS SHALL NOT BE STORED IN THE FACILITY.
P. PROVIDE CONTAINMENT CART FOR ABOVE CEILING ACCESS OUTSIDE
PROJECT BOUNDARY.
INFECTION CONTROL PLAN NOTES
INFECTION CONTROL GENERAL NOTES
INFECTION CONTROL PROJECT INFORMATION
PRINTING
102A
ELECTRICAL
104A
STORAGE
CODING/DATA
OFFICE
EQUIP ROOM
OFFICE
TELECOMMUNICATION
125A
RELEASE OF INFOR.
OFFICE
ASST CHIEF
124A
CHIEF
124B
CORRIDOR
C1-9
LOBBY
C1-20
PHASE 2
UTS VNML O RQPK
W XI J
OFFICE
124C
3 HR FIRE RATED
2 HR FIRE RATED
1 HR FIRE RATED
1 HR SMOKE BARRIER
SMOKE PARTITION
2 HR SMOKE BARRIER
WALL RATING LEGEND
N
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
Consultant:
NOT F
OR
CONSTRUCTIO
N
KEY PLAN
BA
FIRST FLOOR
A u to d e s k D o c s
/2
.1
V A
S a le m
A H
U R e p la c e m e n t-
C h a rl o tt e
E n g in e e rs
/2 -0
A v
.r v t
/1 /2
:4
:5
P
M
GC102
FIRST FLOOR PHASING PLAN
CHARLOTTE ENGINEERS, LLP
5838 MONROE ROAD
CHARLOTTE, NC 28212
GUIDON
1221 N. PENNSYLVANIA STREET
INDIANAPOLIS, IN 46202
REPLACE BUILDING 2 AIR
HANDLERS
1970 ROANOKE BLVD, SALEM VA 24153
658-24-102
12/03/2025 AO LS
BID DOCUMENTS
FULLY SPRINKLERED
SCALE: 3/32" = 1'-0"GC102
1 FIRST FLOOR - PHASING PLAN
Revisions: Date:
2 2
UTS VNML ODCB E RQPG H K
W XA I J
F
REC THERAPY
OFFICE
OFFICE
MUSIC THERAPY RM
CORRIDOR
CB-3
OFFICE
Room
STORAGE
L8
DIALYSIS STORAGE
LINEN
LOCKERS
9B
STAFF LOUNGE
9A
RESTROOM
8B
RESTROOM
8A
WAITING ROOM
B-B5
CUBICALS
PASSAGE
B-B7
SVC. BAY
OFFICE
SUPV. ADMISS
OFFICE
OFFICE
20A
STORAGE ARCHIVE
21 FIRE RISER ROOM
21A
UTILITY
SVC. BAY
LCSW OFFICE
CALL CENTER RM
OFFICE
23A
ELECTRICAL
MUSIC THERAPY
31A
STORAGE
TOILET
CORRIDOR
CB-6
MRI WAITING
Room
28 LOCKER
28B
Room
1-188
Room
1-189
Room
1-190
Room
1-191 Room
1-192
Room
1-194
Room
1-196
STAIR 3
31B
STORAGE
8A
ELEVATOR
ELECTRICAL
ELEVATOR MACHINE
ROOM
STAIR 1
1A
TRASH RM
MAIN TEL. COM
MAIN EL RM
EMERG. GEN
37A
STAIR 2
2A2B
ELECTRICAL
TELECOM
Room
1-150
Room
1-149
Room
1-141
Room
1-139
Room
1-140
Room
1-138
3 HR FIRE RATED
2 HR FIRE RATED
1 HR FIRE RATED
1 HR SMOKE BARRIER
SMOKE PARTITION
2 HR SMOKE BARRIER
WALL RATING LEGEND
N
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
Consultant:
NOT F
OR
CONSTRUCTIO
N
KEY PLAN
BA
BASEMENT
A u to d e s k D o c s
/2
.1
V A
S a le m
A H
U R e p la c e m e n t-
C h a rl o tt e
E n g in e e rs
/2 -0
A v
.r v t
/1 /2
:4
:5
P
M
GI101
BASEMENT FLOOR LIFE SAFETY
CHARLOTTE ENGINEERS, LLP
5838 MONROE ROAD
CHARLOTTE, NC 28212
GUIDON
1221 N. PENNSYLVANIA STREET
INDIANAPOLIS, IN 46202
REPLACE BUILDING 2 AIR
HANDLERS
1970 ROANOKE BLVD, SALEM VA 24153
658-24-102
12/03/2025 AO LS
BID DOCUMENTS
FULLY SPRINKLERED
SCALE: 3/32" = 1'-0"GI101
1 BASEMENT FLOOR - LIFE SAFETY
UTS VNML O RQPG H K
WI J
F
PRINTING
102A
ELECTRICAL
104A
STORAGE
CODING/DATA
OFFICE
EQUIP ROOM
OFFICE
TELECOMMUNICATION
125A
RELEASE OF INFOR.
OFFICE
ASST CHIEF
124A
CHIEF
124B
CORRIDOR
C1-9
LOBBY
C1-20
OFFICE
124C
CORRIDOR
3 HR FIRE RATED
2 HR FIRE RATED
1 HR FIRE RATED
1 HR SMOKE BARRIER
SMOKE PARTITION
2 HR SMOKE BARRIER
WALL RATING LEGEND
N
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
Consultant:
NOT F
OR
CONSTRUCTIO
N
KEY PLAN
BA
FIRST FLOOR
A u to d e s k D o c s
/2
.1
V A
S a le m
A H
U R e p la c e m e n t-
C h a rl o tt e
E n g in e e rs
/2 -0
A v
.r v t
/1 /2
:4
:5
P
M
GI102
FIRST FLOOR LIFE SAFETY
CHARLOTTE ENGINEERS, LLP
5838 MONROE ROAD
CHARLOTTE, NC 28212
GUIDON
1221 N. PENNSYLVANIA STREET
INDIANAPOLIS, IN 46202
REPLACE BUILDING 2 AIR
HANDLERS
1970 ROANOKE BLVD, SALEM VA 24153
658-24-102
12/03/2025 AO LS
BID DOCUMENTS
FULLY SPRINKLERED
SCALE: 3/32" = 1'-0"GI102
1 FIRST FLOOR - LIFE SAFETY PLAN
A. COORDINATE DEMOLITION WITH NEW CONSTRUCTION. ALL DEMOLITION AND
REPAIR NECESSARY TO COMPLETE NEW AND REMODEL CONSTRUCTION
SHALL BE PROVIDED. CONTRACTOR SHALL REMOVE EXISTING
IMPROVEMENTS WHETHER OR NOT SPECIFICALLY INDICATED ON THE
DRAWINGS TO FACILITATE THE COMPLETION OF ALL REQUIRED WORK.
CONTRACTOR SHALL VISIT THE SITE AND VERIFY ALL QUANTITIES AND
ITEMS REQUIRED TO BE REMOVED.
B. REFER TO ARCHITECTURAL SYMBOLS ON SHEET AE001 FOR DEMOLITION
SYSTEMS AND DRAWING NOMENCLATURE.
C. EXISTING STRUCTURE WITHIN THE PROJECT BOUNDARY SHALL REMAIN
UNLESS OTHERWISE NOTED.
D. SURFACES TO BE CUT AND CONDITIONS UNDER WHICH CUTTING IS TO BE
PREFORMED SHALL BE REVIEWED BY CONTRACTOR PRIOR TO CUTTING TO
VERIFY NO UNSAFE OR UNSATISFACTORY CONDITIONS EXIST. SUCH
CONDITIONS SHALL BE RECTIFIED BEFORE WORK MAY PROCEED.
E. EXTENTS OF DEMOLITION SHALL BE COORDINATE WITH THE REFLECTED
CEILING PLAN AD111 AND ENGINEERING DRAWINGS FOR ADDITIONAL
INFORMATION.
F. DIMENSIONS SHOWN FOR EXISTING CONSTRUCTION TO BE DEMOLISHED
ARE APPROXIMATE AND ARE INTENDED TO GIVE A GENERAL SCOPE OF
WORK TO BE REMOVED OR TEMPORARILY REMOVED TO ACCOMMODATE
NEW CONSTRUCTION. COORDINATE DEMOLITION WORK WITH DESIGN
INTENT OF NEW CONSTRUCTION TO PROVIDE ADEQUATE AREA FOR THIS
WORK.
G. CONTRACTORS SHALL REMOVE INDICATED DEMOLITION OF CONSTRUCTION
ASSEMBLIES IN THEIR ENTIRETY, UNLESS OTHER WISE NOTED, TO
ACCOMMODATE NEW CONSTRUCTION.
H. MAKE ALL DEMOLITION CLEAN AND COMPLETE IN A MANNER TO RECEIVE
NEW FINISHES. DEMOLITION SHOULD BE PERFORMED IN A MANNER SUCH
THAT THE CONTRACTOR CAN SEAMLESSLY PATCH NEW WORK TO BE
SMOOTH AND UNDETECTABLE.
I. ABOVE CEILING WORK WHERE CEILINGS ARE TO REMAIN, CEILING TILES
SHALL BE REMOVED AND STORED IN A SAFE MANNER UNTIL CEILING TILES
CAN BE REINSTALLED. DAMAGED AND BROKEN CEILING TILES SHALL BE
REPLACED BY CONTRACTOR. GYPSUM BOARD CEILINGS SHALL BE PATCHED
AND PAINTED TO SEAMLESSLY MATCH EXISTING CEILING COLOR
FOLLOWING ABOVE CEILING DEMOLITION ACTIVITY. THIS SHALL INCLUDE
REPAIR TO THE CEILING GRID, SUSPENSION SYSTEM AND ALL ASSOCIATED
ASSEMBLIES AS WELL AS THE REPLACEMENT OF DAMAGED CEILING
PANELS, WITHIN AND BEYOND PROJECT LIMITS.
J. COORDINATE FULL SCOPE OF DEMOLITION WORK WITH ENGINEERING AND
VENDOR DRAWINGS.
K. REMOVE CEILING MOUNTED EQUIPMENT AND HANGER ASSEMBLIES IN
THEIR ENTIRETY, SUCH AS CUBICLE CURTAIN AND IV TRACKS, MONITOR AND
TV MOUNTS, AND OTHER SIMILAR MEDICAL EQUIPMENT.
DEMOLITION GENERAL NOTES
REC THERAPY
OFFICE
OFFICE
MUSIC THERAPY RM
CORRIDOR
CB-3
OFFICE
Room
STORAGE
L8
DIALYSIS STORAGE
LOCKERS
9B
STAFF LOUNGE
9A
RESTROOM
8B
RESTROOM
8A
WAITING ROOM
B-B5
PASSAGE
B-B7
SVC. BAY
OFFICE
SUPV. ADMISS
OFFICE
20 OFFICE
20A
STORAGE ARCHIVE
/1 AD112
B 8' - 0" B 7' - 10"
B 7' - 9"
B 7' - 9" B 7' - 8"
B 7' - 7"
B 7' - 10"
B 7' - 10"
B 7' - 10"
C 7' - 6"
B 7' - 10"
A 7' - 10"
A 7' - 10"
A 7' - 11"
A 7' - 11"
C 9' - 0"
A 7' - 11"
A 7' - 11"
A 7' - 10"
A 8' - 0" A 8' - 0" A 8' - 0"
B 8' - 0"
A 8' - 0"
C 9' - 0"
A 8' - 0"
CORRIDOR
CB-3
PASSAGE
B-B7
CUBICALS
C 9' - 0"
C 7' - 6"
C 7' - 10"
MLDCB E G H K
A I J
F
A 7' - 3"
C 7' - 10"
C 7' - 10"
C 7' - 6"
C 9' - 1"
C 9' - 1"
C 9' - 1"
C 9' - 3" C 9' - 1"
C 7' - 2"
A 7' - 3"
C 7' - 2"
C 7' - 2"
A 7' - 4"
C 9' - 0"
B 7' - 2"
LINEN
REC THERAPY
REC THERAPY
Room
1-138
Room
1-140
Room
1-139
Room
1-141
Room
1-149
Room
1-150
STAIR 2
2A
2B
TELECOM
ELECTRICAL
STAIR 1
1A
TRASH RM
MAIN TEL. COM
MAIN EL RM
1. REMOVE ACOUSTIC PANEL CEILING ASSEMBLY IN ITS ENTIRETY.
2. PATIENT LIFT TO REMAIN IN PLACE CONTRACTOR TO PROTECT DURING
DEMOLITION.
3. MODIFY EXISTING WINDOW TO ALLOW TEMPORARY DUCTWORK ACCESS.
WINDOW TO BE RETURNED TO FULLY FUNCTIONING AT PHASE COMPLETION.
DEMOLITION PLAN NOTES
REFLECTED CEILING TYPE LEGEND
TYPE GRAPHIC DESCRIPTION
A
B
2x4 ACOUSTICAL CEILING TILE (AT-3)
2x2 ACOUSTICAL CEILING TILE c
GYPSUM CEILING
3 HR FIRE RATED
2 HR FIRE RATED
1 HR FIRE RATED
1 HR SMOKE BARRIER
SMOKE PARTITION
2 HR SMOKE BARRIER
WALL RATING LEGEND
N
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
Consultant:
NOT F
OR
CONSTRUCTIO
N
KEY PLAN
BA
BASEMENT
A u to d e s k D o c s
/2
.1
V A
S a le m
A H
U R e p la c e m e n t-
C h a rl o tt e
E n g in e e rs
/2 -0
A v
.r v t
/1 /2
:4
:5
P
M
AD111
BASEMENT REFLECTED CEILING
DEMOLITION PLANCHARLOTTE ENGINEERS, LLP
5838 MONROE ROAD
CHARLOTTE, NC 28212
GUIDON
1221 N. PENNSYLVANIA STREET
INDIANAPOLIS, IN 46202
REPLACE BUILDING 2 AIR
HANDLERS
1970 ROANOKE BLVD, SALEM VA 24153
658-24-102
12/03/2025 AO LS
BID DOCUMENTS
FULLY SPRINKLERED
SCALE: 1/8" = 1'-0"AD111
1 BASEMENT FLOOR CEILING DEMOLITION PLAN - AREA A
A. COORDINATE DEMOLITION WITH NEW CONSTRUCTION. ALL DEMOLITION AND
REPAIR NECESSARY TO COMPLETE NEW AND REMODEL CONSTRUCTION
SHALL BE PROVIDED. CONTRACTOR SHALL REMOVE EXISTING
IMPROVEMENTS WHETHER OR NOT SPECIFICALLY INDICATED ON THE
DRAWINGS TO FACILITATE THE COMPLETION OF ALL REQUIRED WORK.
CONTRACTOR SHALL VISIT THE SITE AND VERIFY ALL QUANTITIES AND
ITEMS REQUIRED TO BE REMOVED.
B. REFER TO ARCHITECTURAL SYMBOLS ON SHEET AE001 FOR DEMOLITION
SYSTEMS AND DRAWING NOMENCLATURE.
C. EXISTING STRUCTURE WITHIN THE PROJECT BOUNDARY SHALL REMAIN
UNLESS OTHERWISE NOTED.
D. SURFACES TO BE CUT AND CONDITIONS UNDER WHICH CUTTING IS TO BE
PREFORMED SHALL BE REVIEWED BY CONTRACTOR PRIOR TO CUTTING TO
VERIFY NO UNSAFE OR UNSATISFACTORY CONDITIONS EXIST. SUCH
CONDITIONS SHALL BE RECTIFIED BEFORE WORK MAY PROCEED.
E. EXTENTS OF DEMOLITION SHALL BE COORDINATE WITH THE REFLECTED
CEILING PLAN AD111 AND ENGINEERING DRAWINGS FOR ADDITIONAL
INFORMATION.
F. DIMENSIONS SHOWN FOR EXISTING CONSTRUCTION TO BE DEMOLISHED
ARE APPROXIMATE AND ARE INTENDED TO GIVE A GENERAL SCOPE OF
WORK TO BE REMOVED OR TEMPORARILY REMOVED TO ACCOMMODATE
NEW CONSTRUCTION. COORDINATE DEMOLITION WORK WITH DESIGN
INTENT OF NEW CONSTRUCTION TO PROVIDE ADEQUATE AREA FOR THIS
WORK.
G. CONTRACTORS SHALL REMOVE INDICATED DEMOLITION OF CONSTRUCTION
ASSEMBLIES IN THEIR ENTIRETY, UNLESS OTHER WISE NOTED, TO
ACCOMMODATE NEW CONSTRUCTION.
H. MAKE ALL DEMOLITION CLEAN AND COMPLETE IN A MANNER TO RECEIVE
NEW FINISHES. DEMOLITION SHOULD BE PERFORMED IN A MANNER SUCH
THAT THE CONTRACTOR CAN SEAMLESSLY PATCH NEW WORK TO BE
SMOOTH AND UNDETECTABLE.
I. ABOVE CEILING WORK WHERE CEILINGS ARE TO REMAIN, CEILING TILES
SHALL BE REMOVED AND STORED IN A SAFE MANNER UNTIL CEILING TILES
CAN BE REINSTALLED. DAMAGED AND BROKEN CEILING TILES SHALL BE
REPLACED BY CONTRACTOR. GYPSUM BOARD CEILINGS SHALL BE PATCHED
AND PAINTED TO SEAMLESSLY MATCH EXISTING CEILING COLOR
FOLLOWING ABOVE CEILING DEMOLITION ACTIVITY. THIS SHALL INCLUDE
REPAIR TO THE CEILING GRID, SUSPENSION SYSTEM AND ALL ASSOCIATED
ASSEMBLIES AS WELL AS THE REPLACEMENT OF DAMAGED CEILING
PANELS, WITHIN AND BEYOND PROJECT LIMITS.
J. COORDINATE FULL SCOPE OF DEMOLITION WORK WITH ENGINEERING AND
VENDOR DRAWINGS.
K. REMOVE CEILING MOUNTED EQUIPMENT AND HANGER ASSEMBLIES IN
THEIR ENTIRETY, SUCH AS CUBICLE CURTAIN AND IV TRACKS, MONITOR AND
TV MOUNTS, AND OTHER SIMILAR MEDICAL EQUIPMENT.
DEMOLITION GENERAL NOTES
STORAGE ARCHIVE
UTILITY
SVC. BAY
LCSW OFFICE
CALL CENTER RM
OFFICE
23A
ELECTRICAL
MUSIC THERAPY
31A
STORAGE
TOILET
CORRIDOR
CB-6
MRI WAITING
Room
/1 AD111
A 8' - 0"
A 8' - 0"
A 7' - 10"
A 8' - 1"
A 8' - 0"
A 8' - 0"
B 7' - 5"
B 8' - 0"
B 8' - 0"
B 7' - 10" B 8' - 0" B 8' - 0"
LOCKER
28B
B 7' - 6"
UTS VN O RQP
W X
B 7' - 4"
Room
B 8' - 0"
Room
1-188
Room
1-189 Room
1-190
Room
1-191
Room
1-192
Room
1-196
Room
1-194
ELEVATOR
ELECTRICAL
ELEVATOR MACHINE
ROOM
EMERG. GEN
37A
STAIR 3
31B
1. REMOVE ACOUSTIC PANEL CEILING ASSEMBLY IN ITS ENTIRETY.
2. PATIENT LIFT TO REMAIN IN PLACE CONTRACTOR TO PROTECT DURING
DEMOLITION.
3. MODIFY EXISTING WINDOW TO ALLOW TEMPORARY DUCTWORK ACCESS.
WINDOW TO BE RETURNED TO FULLY FUNCTIONING AT PHASE COMPLETION.
DEMOLITION PLAN NOTES
REFLECTED CEILING TYPE LEGEND
TYPE GRAPHIC DESCRIPTION
A
B
2x4 ACOUSTICAL CEILING TILE (AT-3)
2x2 ACOUSTICAL CEILING TILE c
GYPSUM CEILING
3 HR FIRE RATED
2 HR FIRE RATED
1 HR FIRE RATED
1 HR SMOKE BARRIER
SMOKE PARTITION
2 HR SMOKE BARRIER
WALL RATING LEGEND
N
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
Consultant:
NOT F
OR
CONSTRUCTIO
N
KEY PLAN
BA
BASEMENT
A u to d e s k D o c s
/2
.1
V A
S a le m
A H
U R e p la c e m e n t-
C h a rl o tt e
E n g in e e rs
/2 -0
A v
.r v t
/1 /2
:4
:5
P
M
AD112
BASEMENT REFLECTED CEILING
DEMOLITION PLANCHARLOTTE ENGINEERS, LLP
5838 MONROE ROAD
CHARLOTTE, NC 28212
GUIDON
1221 N. PENNSYLVANIA STREET
INDIANAPOLIS, IN 46202
REPLACE BUILDING 2 AIR
HANDLERS
1970 ROANOKE BLVD, SALEM VA 24153
658-24-102
12/03/2025 AO LS
BID DOCUMENTS
FULLY SPRINKLERED
SCALE: 1/8" = 1'-0"AD112
1 BASEMENT FLOOR CEILING DEMOLITION PLAN - AREA B
PRINTING
102A
ELECTRICAL
104A
STORAGE
CODING/DATA
OFFICE
EQUIP ROOM
OFFICE
ASST CHIEF
124ACHIEF
124B
CORRIDOR
C1-9
A 8' - 11"
A 8' - 11"
C 9' - 9"C 9' - 9"
A 9' - 9"
A 8' - 11"
A 9' - 9"
A 8' - 11"
A 9' - 0"
A 9' - 0" A 9' - 0"
A 8' - 11"
A 8' - 0"
A 10' - 0"
RELEASE OF INFOR.
OFFICE
A 8' - 11"
A 9' - 0"
UTS VNML O RQPK
W XI J
LOBBY
C1-20
OFFICE
124C
A 9' - 0"
A. COORDINATE DEMOLITION WITH NEW CONSTRUCTION. ALL DEMOLITION AND
REPAIR NECESSARY TO COMPLETE NEW AND REMODEL CONSTRUCTION
SHALL BE PROVIDED. CONTRACTOR SHALL REMOVE EXISTING
IMPROVEMENTS WHETHER OR NOT SPECIFICALLY INDICATED ON THE
DRAWINGS TO FACILITATE THE COMPLETION OF ALL REQUIRED WORK.
CONTRACTOR SHALL VISIT THE SITE AND VERIFY ALL QUANTITIES AND
ITEMS REQUIRED TO BE REMOVED.
B. REFER TO ARCHITECTURAL SYMBOLS ON SHEET AE001 FOR DEMOLITION
SYSTEMS AND DRAWING NOMENCLATURE.
C. EXISTING STRUCTURE WITHIN THE PROJECT BOUNDARY SHALL REMAIN
UNLESS OTHERWISE NOTED.
D. SURFACES TO BE CUT AND CONDITIONS UNDER WHICH CUTTING IS TO BE
PREFORMED SHALL BE REVIEWED BY CONTRACTOR PRIOR TO CUTTING TO
VERIFY NO UNSAFE OR UNSATISFACTORY CONDITIONS EXIST. SUCH
CONDITIONS SHALL BE RECTIFIED BEFORE WORK MAY PROCEED.
E. EXTENTS OF DEMOLITION SHALL BE COORDINATE WITH THE REFLECTED
CEILING PLAN AD111 AND ENGINEERING DRAWINGS FOR ADDITIONAL
INFORMATION.
F. DIMENSIONS SHOWN FOR EXISTING CONSTRUCTION TO BE DEMOLISHED
ARE APPROXIMATE AND ARE INTENDED TO GIVE A GENERAL SCOPE OF
WORK TO BE REMOVED OR TEMPORARILY REMOVED TO ACCOMMODATE
NEW CONSTRUCTION. COORDINATE DEMOLITION WORK WITH DESIGN
INTENT OF NEW CONSTRUCTION TO PROVIDE ADEQUATE AREA FOR THIS
WORK.
G. CONTRACTORS SHALL REMOVE INDICATED DEMOLITION OF CONSTRUCTION
ASSEMBLIES IN THEIR ENTIRETY, UNLESS OTHER WISE NOTED, TO
ACCOMMODATE NEW CONSTRUCTION.
H. MAKE ALL DEMOLITION CLEAN AND COMPLETE IN A MANNER TO RECEIVE
NEW FINISHES. DEMOLITION SHOULD BE PERFORMED IN A MANNER SUCH
THAT THE CONTRACTOR CAN SEAMLESSLY PATCH NEW WORK TO BE
SMOOTH AND UNDETECTABLE.
I. ABOVE CEILING WORK WHERE CEILINGS ARE TO REMAIN, CEILING TILES
SHALL BE REMOVED AND STORED IN A SAFE MANNER UNTIL CEILING TILES
CAN BE REINSTALLED. DAMAGED AND BROKEN CEILING TILES SHALL BE
REPLACED BY CONTRACTOR. GYPSUM BOARD CEILINGS SHALL BE PATCHED
AND PAINTED TO SEAMLESSLY MATCH EXISTING CEILING COLOR
FOLLOWING ABOVE CEILING DEMOLITION ACTIVITY. THIS SHALL INCLUDE
REPAIR TO THE CEILING GRID, SUSPENSION SYSTEM AND ALL ASSOCIATED
ASSEMBLIES AS WELL AS THE REPLACEMENT OF DAMAGED CEILING
PANELS, WITHIN AND BEYOND PROJECT LIMITS.
J. COORDINATE FULL SCOPE OF DEMOLITION WORK WITH ENGINEERING AND
VENDOR DRAWINGS.
K. REMOVE CEILING MOUNTED EQUIPMENT AND HANGER ASSEMBLIES IN
THEIR ENTIRETY, SUCH AS CUBICLE CURTAIN AND IV TRACKS, MONITOR AND
TV MOUNTS, AND OTHER SIMILAR MEDICAL EQUIPMENT.
DEMOLITION GENERAL NOTES
1. REMOVE ACOUSTIC PANEL CEILING ASSEMBLY IN ITS ENTIRETY.
2. PATIENT LIFT TO REMAIN IN PLACE CONTRACTOR TO PROTECT DURING
DEMOLITION.
3. MODIFY EXISTING WINDOW TO ALLOW TEMPORARY DUCTWORK ACCESS.
WINDOW TO BE RETURNED TO FULLY FUNCTIONING AT PHASE COMPLETION.
DEMOLITION PLAN NOTES
REFLECTED CEILING TYPE LEGEND
TYPE GRAPHIC DESCRIPTION
A
B
2x4 ACOUSTICAL CEILING TILE (AT-3)
2x2 ACOUSTICAL CEILING TILE c
GYPSUM CEILING
3 HR FIRE RATED
2 HR FIRE RATED
1 HR FIRE RATED
1 HR SMOKE BARRIER
SMOKE PARTITION
2 HR SMOKE BARRIER
WALL RATING LEGEND
N
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
Consultant:
NOT F
OR
CONSTRUCTIO
N
KEY PLAN
BA
FIRST FLOOR
A u to d e s k D o c s
/2
.1
V A
S a le m
A H
U R e p la c e m e n t-
C h a rl o tt e
E n g in e e rs
/2 -0
A v
.r v t
/1 /2
:4
:5
P
M
AD113
FIRST FLOOR REFLECTED
CEILING DEMOLITION PLANCHARLOTTE ENGINEERS, LLP
5838 MONROE ROAD
CHARLOTTE, NC 28212
GUIDON
1221 N. PENNSYLVANIA STREET
INDIANAPOLIS, IN 46202
REPLACE BUILDING 2 AIR
HANDLERS
1970 ROANOKE BLVD, SALEM VA 24153
658-24-102
12/03/2025 AO LS
BID DOCUMENTS
FULLY SPRINKLERED
SCALE: 1/8" = 1'-0"AD113
1 FIRST FLOOR CEILING DEMOLITION PLAN
SECTION REFERENCE
DRAWING NUMBER
SHEET LOCATION
DRAWING NUMBER
SHEET
LOCATION
DETAIL REFERENCE
OBJECT
REFERENCED
OBJECT
REFERENCED
X
XXXX
X
XXXX
1 VIEW NAME
SCALE: 1/8" = 1'-0"A101
VIEW TITLE
N
NORTH ARROW
EXTENT OF REVISION
REVISION SET
BEYOND PROJECT BOUNDARY, NIC
DETAIL/DRAWING SCALE
TITLE OF DETAIL/DRAWING
DETAIL/DRAWING NUMBER
SHEET NUMBER
X
X
XXXX
SHEET LOCATION
VIEW NUMBER
X X
X
SHEET LOCATION
VIEW NUMBER
XXXX
BUILDING SECTION REFERENCE
DRAWING NUMBER
SHEET LOCATION
BUILDING X
XXXX
X
XXXX
ELEVATION REFERENCES
NEW WALL
WALL TO BE
REMOVED
S3A.G
INDICATES STRUCTURAL MATERIAL
INDICATES NOMINAL SIZE
INDICATES STRUCTURE AND FINISH HEIGHTS
INDICATES QUALIFER
EXISTING WALL TO
REMAIN
ROOM
ROOM TAG
NEW DOOR
EXISTING DOOR
DEMOLISHED DOOR
REVISION TO PLAN CALLOUT
WALLS
DOOR TAG
KEY NOTE TAGS
WALL TAG : REFER TO WALL LEGEND FOR MORE INFORMATION
DOORS
PT-1
A
T
FINISH INDICATION
FRAME / WINDOW
GLAZING1
1 PLAN NOTE
1 DEMOLITION NOTE
ALTERNATE/BID DEDUCT ITEM
KEY NOTE SYMBOLS
ARCHITECTURAL SYMBOLS
ICRA WALL ICRA DOOR
1. THE CONTRACT DOCUMENT DRAWINGS HAVE BEEN PREPARED USING REVIT®
SOFTWARE IN A MICROSOFT WINDOWS ENVIRONMENT. A BUILDING INFORMATION
MODEL (BIM) HAS BEEN DEVELOPED FOR DESIGN COMMUNICATION. THE MODEL
DOES NOT CONTAIN COMPLETE INFORMATION FOR USE IN COST ESTIMATING,
SYSTEMS PERFORMANCE, COORDINATION, SCHEDULING, OR FACILITIES
MANAGEMENT.
2. THE CONTRACT DOCUMENT DRAWINGS HAVE BEEN PREPARED USING THE
CONSTRUCTION SPECIFICATIONS INSTITUTE'S UNIFORM DRAWING SYSTEM AND THE
NATIONAL CAD STANDARD AS GUIDES.
3. DISCREPANCIES IN THE CONTRACT DOCUMENTS SHALL BE IMMEDIATELY BROUGHT
TO THE ATTENTION OF THE ARCHITECT AND OWNER’S REPRESENTATIVE/COR.
CONTRACTOR SHALL PROVIDE THE HIGHER GRADE OF QUALITY AND/OR GREATER
QUANTITY OF WORK WHEN BIDDING IF A CLARIFICATION CAN NOT BE OBTAINED BY
THE BID DUE DATE.
4. CONTRACTOR IS RESPONSIBLE FOR COORDINATING SCOPE OF WORK WITH
OWNER’S REPRESENTATIVE/COR AND VARIOUS FACILITY PERSONNEL INVOLVED
WITH UTILITY SHUT DOWN, INFECTION CONTROLS, OCCUPANT/EMPLOYEE SAFETY,
ACCESS CONTROL, ETC.
5. ANY INDICATION OF PROJECT LIMITS OR BOUNDARY OF DEMARCATION ARE SHOWN
FOR THE CONVENIENCE OF THE CONTRACTOR, THE FULL SCOPE OF THE PROJECT
LIMIT OF BOUNDARY REQUIRES COORDINATION WITH THE DESIGN SCOPE OF WORK
AND ACCESS TO EXISTING UTILITIES FOR TIE IN.
6. DRAWINGS ARE PREPARED FROM FIELD VERIFICATION, EXISTING FACILITY DRAWING
BASE FILES, AND USING DIMENSIONS, CONFIGURATIONS AND DETAILS OF SPECIFIC
MANUFACTURERS AS A BASIS OF DESIGN. CONTRACTOR IS RESPONSIBLE FOR
VERIFICATION OF ACTUAL DIMENSIONS, THE COORDINATION OF THE DETAILS WITH
THE PRODUCTS WHICH ARE PROVIDED PER THE SCOPE OF THE SPECIFICATIONS
AND THE SURROUNDING CONSTRUCTION. CONTRACTOR SHALL VERIFY DIMENSIONS,
ROUGH-IN DIMENSIONS, CONNECTIONS, AND OVERALL INSTALLATION
REQUIREMENTS.
7. CONTRACTOR IS RESPONSIBLE FOR THE COMPLETION OF THE ENTIRE SCOPE OF
WORK OUTLINED IN THE CONTRACT DOCUMENTS. CONTRACTOR IS RESPONSIBLE
FOR THE COORDINATION OF ALL SUB-CONTRACTORS AND THE SCOPE OF WORK
THEY PROVIDE. SUB-CONTRACTORS ARE RESPONSIBLE FOR THEIR FULL SCOPE OF
WORK WITHIN THE CONTRACT DOCUMENTS, TRADES ARE NOT SEGMENTED TO ONLY
CERTAIN SHEETS AND SPECIFICATIONS, CROSS COORDINATION IS REQUIRED.
8. CONTRACTOR AND SUB-CONTRACTORS ARE BOTH RESPONSIBLE FOR
UNDERSTANDING INFORMATION OUTLINED IN THE SPECIFICATIONS, KEY NOTES,
GENERAL NOTES, LEGEND, CODES, ETC., PROVIDED IN THE CONTRACT DOCUMENTS.
9. CONTRACTOR AND SUB-CONTRACTORS ARE BOTH RESPONSIBLE FOR PROVIDING
AND MAINTAINING SMOKE/FIRE RATINGS OF NEW CONSTRUCTION AND EXISTING
CONSTRUCTION AS INDICATED ON DRAWINGS. THIS INCLUDES PATCHING
PENETRATIONS IN SHAFTS, WALLS, SLABS AND ROOF. ONLY U.L. APPROVED
METHODS, MATERIALS AND INSTALLATION ARE ACCEPTABLE.
10. MECHANICAL, PLUMBING, FIRE PROTECTION AND ELECTRICAL DRAWINGS SHOW
INFORMATION IN A DIAGRAMMATIC FASHION WITHOUT DIMENSIONING. THE GENERAL
CONTRACTOR IS TO COORDINATE THE LOCATIONS OF ALL MECHANICAL, PLUMBING
AND ELECTRICAL EQUIPMENT WITH RESPECT TO THE ARCHITECTURAL AND
STRUCTURAL DETAILING OF SHAFTS, CHASES, CEILING CONSTRUCTION, ETC.
11. CONTRACTOR IS RESPONSIBLE FOR VERIFYING DIMENSIONS IDENTIFIED AND NOT
IDENTIFIED IN THE CONTRACT DOCUMENTS WITH THE EXISTING AND NEW
CONSTRUCTION ELEMENTS. CONTRACTOR IS RESPONSIBLE FOR VERIFICATION
BETWEEN THE CONTRACT DOCUMENTS, INSTALLED AND UNINSTALLED
CONSTRUCTION BEFORE THE ORDERING OF MATERIALS AND EQUIPMENT. NOTIFY
ARCHITECT AND OWNER’S REPRESENTATIVE/COR OF ANY DISCREPANCIES OR
MISSING DIMENSIONS.
12. DO NOT SCALE THE DRAWINGS. DRAWING SCALES AS INDICATED ARE FOR GENERAL
ORIENTATION AND CONTEXT ONLY.
13. THE TERM "ALIGN" MEANS TO INSTALL DIFFERENT/SIMILAR COMPONENTS OF
CONSTRUCTION TO PROVIDE A FLUSH FINISH SURFACE.
14. ALL DIMENSIONS INDICATED ARE TO FACE OF EXISTING MEMBERS, FACE OF NEW
STRUCTURAL MEMBERS, FACE OF NEW MASONRY, FACE OF NEW STUDS OR COLUMN
GRID LINES UNLESS NOTED OTHERWISE.
15. FLOOR ELEVATION // 100’-0”// IS EQUAL TO THE FINISH FLOOR SLAB OF THE EXISTING
SLAB FLOOR CONSTRUCTION UNLESS OTHERWISE NOTED.
16. ROUGH OPENINGS SHALL ALLOW FOR SHIM SPACE.
17. CONTRACTOR TO PROVIDE WORK WHERE DETAILS AND NOTES ARE IDENTIFIED AS
“TYPICAL” OR “SIMILAR” EACH INSTANCE THAT IS THE SAME IN NATURE TO THE
DETAIL, AREA, OR ITEM REFERENCED.
18. PROVIDED WORK SHALL BE FURNISHED AND INSTALLED BY THE CONTRACTOR.
CONTRACTOR IS RESPONSIBLE FOR COORDINATION OF DELIVERY, MOUNTING,
INSTALLATION, NECESSARY BLOCKING AND ROUGH-IN.
19. INSTALLED WORK IS THE CONTRACTOR INSTALLING OWNER FURNISHED MATERIALS
AND EQUIPMENT. CONTRACTOR IS RESPONSIBLE FOR COORDINATION OF MATERIAL
DELIVERY, MOUNTING, INSTALLATION AND ROUGH IN.
20. FURNISHED WORK IS THE CONTRACTOR FURNISHING THE MATERIALS AND
EQUIPMENT TO THE OWNER. CONTRACTOR IS RESPONSIBLE FOR COORDINATION OF
DELIVERY AND ROUGH-IN.
21. ALL PROVIDED WORK SHALL BE WITH NEW MATERIALS UNLESS SPECIFICALLY
CALLED OUT AS SALVAGED OR RELOCATED WITHIN THE CONTRACT DOCUMENTS.
22. ALL PERSONS DIRECTLY OR INDIRECTLY ASSOCIATED WITH THE PROJECT SHALL BE
FAMILIAR WITH THE RULES AND REGULATIONS OF THE OCCUPATIONAL SAFETY AND
HEALTH ACT, AND IMPLEMENT THOSE RULES AS THEY APPLY TO THIS PROJECT.
23. THE CONTRACTOR SHALL BE RESPONSIBLE FOR LOCATING AND PROTECTING ALL
UTILITY LINES. LOCATIONS SHOWN ARE APPROXIMATE. REPAIR ALL DAMAGE TO
UTILITY LINES CAUSED BY CONSTRUCTION OPERATIONS AT NO COST TO THE
OWNER.
24. CONTRACTOR SHALL BE RESPONSIBLE FOR ALL TEMPORARY BRACING AND SHORING
REQUIRED DURING CONSTRUCTION.
25. CONTRACTOR SHALL BE RESPONSIBLE FOR PROTECTING ADJACENT
CONSTRUCTION, FINISHES, EQUIPMENT, AND TRAVEL ROUTE TO AND FROM THE
CONSTRUCTION SITE. ANY DAMAGE OR UNACCEPTABLE WEAR BY THE
CONSTRUCTION TEAM SHALL BE REPAIRED/REPLACED BY THE CONTRACTOR AT NO
COST TO THE OWNER.
26. IN THE CASE OF CONFLICTS OR DISCREPANCIES WITHIN OR AMONG THE CONTRACT
DRAWINGS, THE BETTER QUALITY, MORE STRINGENT REQUIREMENTS OR GREATER
QUALITY OF WORK, AS DETERMINED BY THE COR, SHALL BE PROVIDED.
27. CONTRACTOR IS RESPONSIBLE FOR PROVIDING AND COORDINATING HARDWARE,
ACCESS CONTROL AND AUTOMATIC OPERATORS ARE PROVIDED WITH COMPLETE
AND COMPATIBLE SYSTEMS REQUIRED FOR THEIR OPERATION. REFER TO DOOR
HARDWARE SCHEDULE, HARDWARE SPECIFICATIONS, AUTOMATIC OPERATOR
SPECIFICATIONS, ACCESS CONTROL SPECIFICATIONS AND ELECTRICAL DRAWINGS.
CONSTRUCTION GENERAL NOTES
AFF ABOVE FINISHED FLOOR
CL CENTER LINE
CMU CONCRETE MASONRY UNIT
DN DOWN
FE FIRE EXTINGUISHER
FOF FACE OF FINISH
FOM FACE OF MASONRY
FOS FACE OF SLAB OR FACE OF STUD
N NORTH
NA NOT APPLICABLE
OPP OPPOSITE
STC SOUND TRANSMISSION CLASS
STOR STORAGE
TOB TOP OF BEAM
TOM TOP OF MASONRY
TOS TOP OF STEEL
ARCHITECTURAL ABBREVIATIONS
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
Consultant:
NOT F
OR
CONSTRUCTIO
N
A u to d e s k D o c s
/2
.1
V A
S a le m
A H
U R e p la c e m e n t-
C h a rl o tt e
E n g in e e rs
/2 -0
A v
.r v t
/1 /2
:4
:5
P
M
AE001
ARCHITECTURAL SYMBOLS AND
ABBREVIATIONSCHARLOTTE ENGINEERS, LLP
5838 MONROE ROAD
CHARLOTTE, NC 28212
GUIDON
1221 N. PENNSYLVANIA STREET
INDIANAPOLIS, IN 46202
REPLACE BUILDING 2 AIR
HANDLERS
1970 ROANOKE BLVD, SALEM VA 24153
658-24-102
12/03/2025 AO LS
BID DOCUMENTS
FULLY SPRINKLERED
A. THE ARCHITECTURAL REFLECTED CEILING PLAN SHALL GOVERN THE
LAYOUT OF ALL CEILING ELEMENTS, HEIGHTS AND/OR PENETRATIONS.
COORDINATION OF THE ARCHITECTURAL AND ENGINEERING ELEMENTS ARE
THE RESPONSIBILITY OF THE CONTRACTOR. THE CONTRACTOR IS TO
VERIFY FIELD CONDITIONS AND REPORTS ANY DISCREPANCIES TO
ARCHITECT AND COR.
B. SHOWN SIZES OF MECHANICAL, ELECTRICAL AND PLUMBING EQUIPMENT
ARE FOR REFERENCE ONLY. REFER TO ENGINEERING PLANS FOR
ADDITIONAL INFORMATION. COORDINATE SCOPE OF WORK WITH
ENGINEERING DRAWINGS, UNLESS OTHERWISE NOTED.
C. ACOUSTIC PANEL CEILING SHALL BE CENTERED IN THE ROOM AND
INSTALLED TO ELIMINATE NARROW CUT STRIPS OF PANELS ALONG THE
EDGES OF WALLS AND BULKHEADS, UNLESS OTHERWISE NOTED.
COORDINATE WITH THE LIGHTING LAYOUT. THE LIGHTING SHALL BE
CENTERED IN ROOMS.
D. CEILING MOUNTED ITEMS (SPRINKLER HEADS, MOUNTING DEVICES, ETC.)
SHALL BE CENTERED IN THE CEILING PANELS UNLESS NOTED OTHERWISE.
E. ABOVE CEILING WORK REQUIRED BEYOND THE SCOPE OF THE WORK SHALL
BE COORDINATED WITH PATIENT SAFETY, INFECTION CONTROL, AND COR.
F. CEILING TILE REMOVED IN ORDER TO COMPLETE ABOVE CEILING WORK
SHALL BE STORED IN A SAFE DRY LOCATION. DAMAGED OR BROKEN
CEILING TILES SHALL BE REPLACED. DRYWALL CEILINGS SHALL BE
PATCHED, PREPPED AND NEW FINISH APPLIED TO MATCH EXISTING.
G. REFER TO FINISHES SHEETS AND SPECIFICATIONS FOR INFORMATION ON
GYPSUM BOARD PAINT FINISH.
H. WHERE NEW CEILINGS ARE INSTALLED AND SPRINKLERS ARE EXISTING TO
REMAIN, SPRINKLERS SHALL BE ADJUSTED TO NEW CEILING HEIGHTS,
WHEN APPLICABLE.
REFLECTED CLNG. GENERAL NOTES
REFLECTED CEILING TYPE LEGEND
TYPE GRAPHIC DESCRIPTION
A
B
2x4 ACOUSTICAL CEILING TILE (AT-3)
2x2 ACOUSTICAL CEILING TILE c
GYPSUM CEILING
/1 AE112
B 8' - 0" B 7' - 10"
B 7' - 9"
B 7' - 9"
B 7' - 8"
B 7' - 7"
B 7' - 10"
B 7' - 10"
B 7' - 10"
C 7' - 6"
B 7' - 10"
A 7' - 10"
A 7' - 10"
A 7' - 11"
A 7' - 11"
C 9' - 0"
A 7' - 11"
A 7' - 11"
A 7' - 10"
A 8' - 0"
A 8' - 0" A 8' - 0" B 8' - 0"
A 8' - 0"
C 9' - 0"
A 8' - 0"
C 9' - 0"
C 9' - 0"
B 7' - 2"
MLDCB E G H K
A I J
F
C 7' - 10"
C 7' - 10"
MUSIC THERAPY RM
OFFICE
OFFICE
OFFICE
REC THERAPY
REC THERAPY
REC THERAPY
OFFICE
OFFICE
SUPV. ADMISS
OFFICE
OFFICE
20A
STORAGE ARCHIVE
SVC. BAY
OFFICE
PASSAGE
B-B7
PASSAGE
B-B7
WAITING ROOM
WAITING ROOM
WAITING ROOM
Room
RESTROOM
8B
STAFF LOUNGE
9A
LOCKERS
9B
STORAGE
L8
DIALYSIS STORAGE
CORRIDOR
Room
LINEN
C 7' - 2"
C 7' - 2"
A 7' - 4"
A 7' - 3"
A 7' - 3"
Room
1-138
Room
1-140
Room
1-139
Room
1-141
Room
1-149
Room
1-150
2B
STAIR 2
2A
TELECOM
ELECTRICAL
STAIR 1
1A
TRASH RM
MAIN TEL. COM
MAIN EL RM
3 HR FIRE RATED
2 HR FIRE RATED
1 HR FIRE RATED
1 HR SMOKE BARRIER
SMOKE PARTITION
2 HR SMOKE BARRIER
WALL RATING LEGEND
N
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
Consultant:
NOT F
OR
CONSTRUCTIO
N
KEY PLAN
BA
BASEMENT
A u to d e s k D o c s
/2
.1
V A
S a le m
A H
U R e p la c e m e n t-
C h a rl o tt e
E n g in e e rs
/2 -0
A v
.r v t
/1 /2
:4
:0
P
M
AE111
BASEMENT FLOOR REFLECTED
CEILING PLANCHARLOTTE ENGINEERS, LLP
5838 MONROE ROAD
CHARLOTTE, NC 28212
GUIDON
1221 N. PENNSYLVANIA STREET
INDIANAPOLIS, IN 46202
REPLACE BUILDING 2 AIR
HANDLERS
1970 ROANOKE BLVD, SALEM VA 24153
658-24-102
12/03/2025 AO LS
BID DOCUMENTS
FULLY SPRINKLERED
SCALE: 1/8" = 1'-0"AE111
1 BASEMENT FLOOR - EXISTING CEILING CONDITIONS - AREA A
COORDINATION OF THE ARCHITECTURAL AND ENGINEERING ELEMENTS ARE
THE RESPONSIBILITY OF THE CONTRACTOR. THE CONTRACTOR IS TO
VERIFY FIELD CONDITIONS AND REPORTS ANY DISCREPANCIES TO
ARCHITECT AND COR.
B. SHOWN SIZES OF MECHANICAL, ELECTRICAL AND PLUMBING EQUIPMENT
ARE FOR REFERENCE ONLY. REFER TO ENGINEERING PLANS FOR
ADDITIONAL INFORMATION. COORDINATE SCOPE OF WORK WITH
ENGINEERING DRAWINGS, UNLESS OTHERWISE NOTED.
C. ACOUSTIC PANEL CEILING SHALL BE CENTERED IN THE ROOM AND
INSTALLED TO ELIMINATE NARROW CUT STRIPS OF PANELS ALONG THE
EDGES OF WALLS AND BULKHEADS, UNLESS OTHERWISE NOTED.
COORDINATE WITH THE LIGHTING LAYOUT. THE LIGHTING SHALL BE
CENTERED IN ROOMS.
D. CEILING MOUNTED ITEMS (SPRINKLER HEADS, MOUNTING DEVICES, ETC.)
SHALL BE CENTERED IN THE CEILING PANELS UNLESS NOTED OTHERWISE.
E. ABOVE CEILING WORK REQUIRED BEYOND THE SCOPE OF THE WORK SHALL
BE COORDINATED WITH PATIENT SAFETY, INFECTION CONTROL, AND COR.
F. CEILING TILE REMOVED IN ORDER TO COMPLETE ABOVE CEILING WORK
SHALL BE STORED IN A SAFE DRY LOCATION. DAMAGED OR BROKEN
CEILING TILES SHALL BE REPLACED. DRYWALL CEILINGS SHALL BE
PATCHED, PREPPED AND NEW FINISH APPLIED TO MATCH EXISTING.
G. REFER TO FINISHES SHEETS AND SPECIFICATIONS FOR INFORMATION ON
GYPSUM BOARD PAINT FINISH.
H. WHERE NEW CEILINGS ARE INSTALLED AND SPRINKLERS ARE EXISTING TO
REMAIN, SPRINKLERS SHALL BE ADJUSTED TO NEW CEILING HEIGHTS,
WHEN APPLICABLE.
REFLECTED CLNG. GENERAL NOTES
REFLECTED CEILING TYPE LEGEND
TYPE GRAPHIC DESCRIPTION
A
B
2x4 ACOUSTICAL CEILING TILE (AT-3)
2x2 ACOUSTICAL CEILING TILE c
GYPSUM CEILING
/1 AE111
A 8' - 0"
A 8' - 0" A 7' - 10"
A 8' - 1"
A 8' - 0"
A 8' - 0"
B 8' - 0"
B 8' - 0"
UTS VN O RQP
W X
A 8' - 0"
B 7' - 6"
B 8' - 0"
OFFICE
23A
ELECTRICAL
IT
MRI WAITING
LOCKER
28B
Room
CALL CENTER RM
LCSW OFFICE
FIRE RISER ROOM
21A
STORAGE ARCHIVE
CORRIDOR
CB-6
UTILITY
SVC. BAY
Room
Room
Room
MUSIC THERAPY
31A
STORAGE
Room
1-188
Room
1-189 Room
1-190
Room
1-191 Room
1-192
Room
1-194
Room
1-196
STAIR 3
31B
STORAGE
215ELEVATOR
ELECTRICAL
ELEVATOR MACHINE
ROOM
EMERG. GEN
37A
3 HR FIRE RATED
2 HR FIRE RATED
1 HR FIRE RATED
1 HR SMOKE BARRIER
SMOKE PARTITION
2 HR SMOKE BARRIER
WALL RATING LEGEND
N
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
Consultant:
NOT F
OR
CONSTRUCTIO
N
KEY PLAN
BA
BASEMENT
A u to d e s k D o c s
/2
.1
V A
S a le m
A H
U R e p la c e m e n t-
C h a rl o tt e
E n g in e e rs
/2 -0
A v
.r v t
/1 /2
:4
:0
P
M
AE112
BASEMENT FLOOR REFLECTED
CEILING PLANCHARLOTTE ENGINEERS, LLP
5838 MONROE ROAD
CHARLOTTE, NC 28212
GUIDON
1221 N. PENNSYLVANIA STREET
INDIANAPOLIS, IN 46202
REPLACE BUILDING 2 AIR
HANDLERS
1970 ROANOKE BLVD, SALEM VA 24153
658-24-102
12/03/2025 AO LS
BID DOCUMENTS
FULLY SPRINKLERED
SCALE: 1/8" = 1'-0"AE112
1 BASEMENT FLOOR - EXISTING CEILING CONDITIONS - AREA B
COORDINATION OF THE ARCHITECTURAL AND ENGINEERING ELEMENTS ARE
THE RESPONSIBILITY OF THE CONTRACTOR. THE CONTRACTOR IS TO
VERIFY FIELD CONDITIONS AND REPORTS ANY DISCREPANCIES TO
ARCHITECT AND COR.
B. SHOWN SIZES OF MECHANICAL, ELECTRICAL AND PLUMBING EQUIPMENT
ARE FOR REFERENCE ONLY. REFER TO ENGINEERING PLANS FOR
ADDITIONAL INFORMATION. COORDINATE SCOPE OF WORK WITH
ENGINEERING DRAWINGS, UNLESS OTHERWISE NOTED.
C. ACOUSTIC PANEL CEILING SHALL BE CENTERED IN THE ROOM AND
INSTALLED TO ELIMINATE NARROW CUT STRIPS OF PANELS ALONG THE
EDGES OF WALLS AND BULKHEADS, UNLESS OTHERWISE NOTED.
COORDINATE WITH THE LIGHTING LAYOUT. THE LIGHTING SHALL BE
CENTERED IN ROOMS.
D. CEILING MOUNTED ITEMS (SPRINKLER HEADS, MOUNTING DEVICES, ETC.)
SHALL BE CENTERED IN THE CEILING PANELS UNLESS NOTED OTHERWISE.
E. ABOVE CEILING WORK REQUIRED BEYOND THE SCOPE OF THE WORK SHALL
BE COORDINATED WITH PATIENT SAFETY, INFECTION CONTROL, AND COR.
F. CEILING TILE REMOVED IN ORDER TO COMPLETE ABOVE CEILING WORK
SHALL BE STORED IN A SAFE DRY LOCATION. DAMAGED OR BROKEN
CEILING TILES SHALL BE REPLACED. DRYWALL CEILINGS SHALL BE
PATCHED, PREPPED AND NEW FINISH APPLIED TO MATCH EXISTING.
G. REFER TO FINISHES SHEETS AND SPECIFICATIONS FOR INFORMATION ON
GYPSUM BOARD PAINT FINISH.
H. WHERE NEW CEILINGS ARE INSTALLED AND SPRINKLERS ARE EXISTING TO
REMAIN, SPRINKLERS SHALL BE ADJUSTED TO NEW CEILING HEIGHTS,
WHEN APPLICABLE.
REFLECTED CLNG. GENERAL NOTES
REFLECTED CEILING TYPE LEGEND
TYPE GRAPHIC DESCRIPTION
A
B
2x4 ACOUSTICAL CEILING TILE (AT-3)
2x2 ACOUSTICAL CEILING TILE c
GYPSUM CEILINGA 8' - 11" A 8' - 11"
C 9' - 9"C 9' - 9"
A 9' - 9"
A 8' - 11"
A 9' - 9"
A 8' - 11"
A 9' - 0"
A 9' - 0" A 9' - 0"
A 8' - 11"
A 8' - 0"
A 10' - 0"
UTS VNML O RQPK
W XI J
A 8' - 11"
A 9' - 0"
A 9' - 0"
A 8' - 0"
CODING/DATA
PRINTING
102A
STORAGE
OFFICE
ELECTRICAL
104A
CORRIDOR
C1-09
CORRIDOR
EQUIP ROOM
OFFICE
RELEASE OF INFOR.
Room
OFFICE
124C
ASST CHIEF
124A
CHIEF
124B
TELECOMMUNICATION
125A
LOBBY
C1-20
3 HR FIRE RATED
2 HR FIRE RATED
1 HR FIRE RATED
1 HR SMOKE BARRIER
SMOKE PARTITION
2 HR SMOKE BARRIER
WALL RATING LEGEND
N
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
Consultant:
NOT F
OR
CONSTRUCTIO
N
KEY PLAN
BA
FIRST FLOOR
A u to d e s k D o c s
/2
.1
V A
S a le m
A H
U R e p la c e m e n t-
C h a rl o tt e
E n g in e e rs
/2 -0
A v
.r v t
/1 /2
:4
:0
P
M
AE113
FIRST FLOOR REFLECTED
CEILING PLANCHARLOTTE ENGINEERS, LLP
5838 MONROE ROAD
CHARLOTTE, NC 28212
GUIDON
1221 N. PENNSYLVANIA STREET
INDIANAPOLIS, IN 46202
REPLACE BUILDING 2 AIR
HANDLERS
1970 ROANOKE BLVD, SALEM VA 24153
658-24-102
12/03/2025 AO LS
BID DOCUMENTS
FULLY SPRINKLERED
SCALE: 1/8" = 1'-0"AE113
1 FIRST FLOOR - EXISTING CEILING CONDITIONS
C
RI
DESIGN CODES, STANDARDS AND PARTIES OF REFERENCE
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
THE FOLLOWING PUBLICATIONS AND AUTHORITIES HAVING JURISDICTION SHALL BE REFERENCED
FOR THE DESIGN OF THE FIRE PROTECTION SYSTEM ON THIS PROJECT:
ANSI, A117.1 STANDARD, ACCESSIBLE AND USABLE BUILDINGS AND FACILITIES. 2017 EDITION
WITH SUPPLEMENT 1 VERSION 2024
NFPA 10 - STANDARD FOR PORTABLE FIRE EXTINGUISHERS, 2022 EDITION
NFPA 70 - NATIONAL ELECTRIC CODE, 2023 EDITION
NFPA 72 - NATIONAL FIRE ALARM & SIGNALING CODE, 2025 EDITION
NFPA 99 - HEALTH CARE FACILITIES CODE, 2024 EDITION
NFPA 101 - LIFE SAFETY CODE. 2024 EDITION
NFPA 170 - LIFE SAFETY CODE, 2024 EDITION
NFPA 241 - STANDARD FOR SAFEGUARDING CONSTRUCTION, ALTERNATION AND DEMOLITION
OPERATIONS, 2022 EDITION
VA FIRE PROTECTION DESIGN MANUAL, NOVEMBER 1, 2023, NINTH EDITION
VA SEISMIC DESIGN REQUIREMENTS, REVISED JULY 1, 2023 EDITION
VA FIRE SAFETY
FIRE ALARM INSPECTION NOTE:
1.
2.
A CONTRACTOR SHALL PROVIDE THE ENGINEER…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .