Text version
LOCATION MAP
N
BUILDING 01VICINITY MAP
Contact:
GUIDON DESIGN INC.
Mark VanderWoude
STRUCTURAL
ENGINEER
OWNER ARCHITECT
905 North Capitol Avenue Suite 100 Indianapolis, IN 46204 p: 312.800.6388 x 119 e: mvanderwoude@guidondesign.com
Contact: Contact:
VA ST. LOUIS HEALTH CARE
SYSTEM,
JOHN COCHRAN DIVISION
Chad Markus
Project COR
915 N. Grand Blvd.
St. Louis, MO 63106 p: 314.652.4100 x 58724 e: chad.markus@va.gov
GUIDON DESIGN INC.
David Vallandingham
Architect
905 North Capitol Avenue Suite 100 Indianapolis, IN 46204 p: 317.800.6388 x 130 e: dvallandingham@guidondesign.com
Contact:
CMTA CONSULTING ENGINEERS
Chris Kelting
MECHANICAL,
PLUMBING,
FIRE PROTECTION
903 Spring Street Jeffersonville, IN 47130 p: 812.725.8383 e: ckelting@cmta.com
Contact:
CMTA CONSULTING ENGINEERS
Steve Moore
ELECTRICAL
903 Spring Street Jeffersonville, IN 47130 p: 812.725.8383 e: smoore@cmta.com
Contact:
TTL ASSOCIATES, INC.
Sara Vogelpohl, CIH
INDUSTRIAL
HYGIENIST
63 Ginguite Trail Southern Shores, NC 27949 p: 419.214.5090
SHEET
NUMBER SHEET NAME
GENERAL
1-5-GI-000 COVER SHEET
1-5-GI-101 4TH FLOOR COMPOSITE LIFE SAFETY PLAN
1-5-GI-102 4TH FLOOR PARTIAL LIFE SAFETY PLAN
1-5-GI-103 CONSTRUCTION INFECTION CONTROL DETAILS
1-5-GI-104 4TH FLOOR INFECTION CONTROL / PHASING PLAN - PHASE 5
1-5-GI-105 BID ALTERNATES
1-5-HA-101 4TH FLOOR HAZARDOUS MATERIALS PLAN - PHASE 5
STRUCTURAL
1-5-S-001 STRUCTURAL FRAMING NOTES, SYMBOLS ABBREVIATIONS AND TYPICAL DETAILS
1-5-S-101 STRUCTURAL ENLARGED 5TH, 6TH, & 7TH FLOOR & ROOF FRAMING PLANS
1-5-S-501 STRUCTURAL FRAMING SECTIONS & DETAILS
ARCHITECTURAL
1-5-AD-101 PARTIAL 4TH FLOOR DEMOLITION PLAN - PHASE 5
1-5-AS-001 GENERAL INFORMATION - PHASE 5
1-5-AS-002 ARCHITECTURAL WALL PARTITIONS SECTIONS AND DETAILS
1-5-AS-101 4TH FLOOR DIMENSION PLAN - PHASE 5
1-5-AS-102 4TH FLOOR ENLARGED PLAN - PHASE 5
1-5-AS-103 PENTHOUSE ROOF PLAN - PHASE 5
1-5-AS-111 ENLARGED 4TH FLOOR REFLECTED CEILING PLAN - PHASE 5
1-5-AS-501 BUILDING LEAD LINING DETAILS
1-5-AS-601 OPENING SCHEDULE - PHASE 5
1-5-AS-801 INTERIOR ELEVATIONS
1-5-AS-802 INTERIOR ELEVATIONS
1-5-AS-803 CASEWORK DETAILS
1-5-AF-101 PARTIAL 4TH FLOOR FINISH PLAN & SCHEDULES - PHASE 5
1-5-AF-601 PARTIAL 4TH FLOOR FINISH AND EQUIPMENT SCHEDULES AND SIGNAGE - PHASE 5
1-5-AQ-101 OVERALL 4TH FLOOR O.R. SUITE EQUIPMENT PLAN
FIRE PROTECTION
1-5-F-001 FIRE PROTECTION NOTES, ABBREVIATIONS AND SYMBOLS
1-5-F-101 4TH FLOOR PLANS - FIRE PROTECTION
PLUMBING
1-5-P-001 PLUMBING & MEDICAL GAS NOTES, ABBREV. AND SYMBOLS
1-5-PL-101 3RD FLOOR PLUMBING PLAN - WASTE AND VENT
1-5-PL-102 3RD FLOOR PLUMBING PLAN - WASTE AND VENT
1-5-PL-201 3RD FLOOR PLUMBING PLAN - DOMESTIC WATER
1-5-PL-202 4TH FLOOR PLUMBING PLAN - DOMESTIC WATER
1-5-PP-101 4TH FLOOR PLAN - MEDICAL GAS
MECHANICAL
1-5-M-001 MECHANICAL NOTES, ABBREVIATIONS & SYMBOLS
1-5-M-101 4TH FLOOR PLAN - MECHANICAL DUCTWORK
1-5-M-102 MECHANICAL 4TH FLOOR PIPING DEMOLITION & RENOVATION PLANS
1-5-M-103 5TH FLOOR INTERSTITIAL DUCTWORK PLAN
1-5-M-104 MECHANICAL 5TH FLOOR INTERSTITIAL PIPING DEMOLITION & RENOVATION PLANS
1-5-M-105 MECHANICAL 5TH, 6TH & 7TH FLOOR DEMOLITION & RENOVATION PLANS
1-5-M-501 MECHANICAL DETAILS
1-5-M-502 MECHANICAL DETAILS
1-5-M-503 MECHANICAL CONTROL DIAGRAMS AND POINTS LISTS
1-5-M-601 MECHANICAL SCHEDULES
ELECTRICAL
1-5-E-001 ELECTRICAL LEGEND AND GENERAL NOTES
1-5-E-002 LIGHT FIXTURE SCHEDULE AND NOTES
1-5-ED-201 PARTIAL FOURTH FLOOR DEMOLITION PLAN - LIGHTING
1-5-ED-202 PARTIAL FOURTH FLOOR PLAN DEMOLITION PLAN - POWER
1-5-ED-203 PARTIAL FLOURTH FLOOR DEMOLITION PLAN SYSTEMS
1-5-ED-204 PARTIAL FIFTH FLOOR DEMOLITION PLAN POWER & SYSTEMS
1-5-EL-300 PARTIAL FOURTH FLOOR PLAN - LIGHTING
1-5-EP-401 PARTIAL FOURTH FLOOR PLAN - POWER
1-5-EP-402 PARTIAL FIFTH FLOOR PLAN - POWER & SYSTEMS
1-5-ET-500 PARTIAL FOURTH FLOOR PLAN - SYSTEMS
1-5-E-601 OR-5 & OR-6 ENLARGED PLANS - POWER AND SYSTEMS
1-5-E-602 OR-7, OR-8 & OR-9 ENLARGED PLANS - POWER AND SYSTEMS
1-5-E-701 ELECTRICAL DETAILS
1-5-E-702 ELECTRICAL DETAILS
1-5-E-800 PARTIAL ELECTRICAL ONE-LINE DIAGRAMS
1-5-E-902 ELECTRICAL ISOLATED POWER SCHEDULES AND DETAILS
e: svogelpohl@ttlassoc.com
Joel Farmer
Project Manager p: 317.800.6388 x 146 e: jfarmer@guidondesign.com th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t o n e e ig h th in c h o n e fo o t
1 2 3 4 5 6 7 8 9
A
B
C
D
E
F
1 2 3 4 5 6 7 8 9
A
B
C
D
E
F
Veterans Health
Administration
VA FORM 08-6231
Drawing Title Project Title
Location
Date Checked Drawn
Project Number
Building Number
Drawing Number
CONSULTANTS:
Drawing # of
657-18-113JCRENOVATE OPERATING ROOMS AND
SUPPORT SPACES - PHASE 5
10/12/2018
VA Health Care System Approval:
100% CONSTRUCTION DOCUMENTS
Revision: Date:
ARCHITECT/ENGINEER:
JOHN COCHRAN DIVISION
915 NORTH GRAND BLVD - ST. LOUIS, MO 63106
A/E:
GUIDON DESIGN INC.
905 N. CAPITOL AVE. SUITE 100 | INDIANAPOLIS, IN. 46204
317.800.6388 | WWW.GUIDONDESIGN.COM
SUSTAINABLE ARCHITECTURE + ENGINEERING
PROJECT LEAD
Architect, Structural Engineer, Civil Engineer
Consultant:
/1
/2
:1 :4
P
M
1-5-GI-000
COVER SHEET
DAVJDF
CMTA CONSULTING ENGINEERS
903 SPRING STREET
JEFFERSONVILLE, IN 47130
812.725.8383
1 59
U.S. DEPARTMENT OF VETERANS AFFAIRS
VA ST. LOUIS HEATH CARE SYSTEM
VA PROJECT NUMBER: 657-18-113JC
GUIDON DESIGN PROJECT NO: 18.1019.01
JOHN COCHRAN DIVISION
RENOVATE OPERATING
ROOMS AND SUPPORT
SPACES - PHASE 5
DRAWING INDEX
OVERALL CAMPUS SITE PLAN, BUILDING NUMBER, AND PROJECT LOCATOR
FD
GENERAL
OR - 5
D416
VEST./
SCRUB
D416A
ORTHO OR
- 9
D425
GENERAL
OR - 6
D417
SOILED
UTILITY
D418
EQUIP.
ALCOVE
D424
VEST./
SCRUB
D425A
E
SMOKE COMPARTMENT
22,334 SF
SMOKE COMPARTMENT
7,830 SF
SMOKE COMPARTMENT
13,289 SF
SMOKE COMPARTMENT
6,577 SF
7,830 SF ADJUSTED / 7,830 SF EXISTING
SMOKE COMPARTMENT
11,750 SF
11,750 SF ADJUSTED / 11,750 SF EXISTING
6,577 SF ADJUSTED / 6,577 SF EXISTING
13,289 SF ADJUSTED / 13,289 SF EXISTING
22,334 SF ADJUSTED / 22,352 SF EXISTING
SMOKE COMPARTMENT
6,630 SF
6,630 SF ADJUSTED / 6,630 SF EXISTING
AETC / ONCOLOGY
PRE-OP / POST-OP / OUTPATIENT
PHARMACY / LOCKERS / PUBLIC
SURGERY
EXAM / ON-CALL
SICU
ELEVATOR A
ELEVATOR B
VEST./
SCRUB
D423A
CORRIDOR
H425
CORRIDOR
H424
VEST./
SCRUB
D417A
EQUIP.
STORAGE
D415
CLEAN
CORE
D441
FULL
TANKS
D427
CLEAN
CORE
CORR.
H428
EQUIP.
STORAGE
D419
269 SF
EQUIP.
STORAGE
D421
103 SF
VEST./
SCRUB
D420A
79 SF
ROBOT
STORAGE
D417B
208 SF
EQUIP.
STORAGE
D428
FEC
FEC
FEC
FEC
FEC
FEC
FEC
FEC
FEC
FEC
FEC
FEC
FEC
FEC
FEC
FEC
PHASE 5
PROJECT
LIMITS
PHASE 5
PROJECT
LIMITS
NEURO (CARDIAC
ORTHO) OR - 7
D420
CARDIAC OR -8
D423
COORIDOR
H426
EMPTY TANKS
D426
EQUIP. STORAGE
D422
WORK
STATION
B432
MED
A442A
CLEAN
A443B
BED 1
A443B1
BED 2
A443B2
BED 3
A443B3
P.T.
A443A
BED 4
A440B4
BED 5
A440B3
BED 6
A440B2
BED 7
A440B1
CLERK
A440A
PRE - OP
A443
HAC
A443D
NOUR
A441
NURSE
STATION
A442
POST - OP
A440 SURGERY
WAITING
A400
PUBLIC
TOILET
A444
HAC STOR
A443C
CORRIDOR
H407
CONSULT
A436A
CORRIDOR
H403
PHARMACY
EQUIP.
B435
MED GAS
ROOM
A445
EXAM
A401
EXAM
A402LAB
A435
WAITING
CONSULT
A436
T.
A435A
UNIT DOSE
DISPENSING
B404
HAC
B403
I.V. PREP
B402
STERILE
B401
CORRIDOR
H408
ELEVATOR
LOBBY
H406
CORRIDOR
A439
CLOSET
A442C
CORRIDOR
H409
CORRIDOR
H414
CORRIDOR
H414
FE
CLOSET ELEC.
B436
DATA
B437
CONTROL
ROOM
B439
HAC
B440
MEDS
SOILED
CART
HOLD /
SOULED
HOLDING
B452
CORRIDOR
H410
ELEC.
CLOSET
B453
CLOSET
B451
RESTRICTED
CORRIDOR
B450
RESTRICTED
CORRIDOR
H411
SCRUB
SINK
B448
EYE ROOM
B449
CLEAN
ROOM
SPECIAL
PROC.
B447
SCRUB
SINK
B446
LAPAROSKOPY
B445
C-ARM
ALCOVE
SCRUB
SINK
B444
SUB-STERILE
ROOM
B445A
MOVABLE
STORAGE
B442
NEURO /
ORTHO
B443
UTILITY
B443A
TOILET
MALE
B424
TOILET
FEMALE
B423
CORRIDOR
H412
STERILE
VENDOR /
SUPPLIES
B434LIBRARY
B433
PHARMACY
STAFF
B421
PROCUREMENT
B422
FILES
B420
PHARMACY
CLINIC
B419
MALE
LOCKERS
B430
FEMALE
LOCKERS
B431
MALE
T / S
B429A
VESTIBULE
B429
VESTIBULE
B428
FEMALE
T / S
B428A
LOUNGE
B425
DATA
B427
ELEC
B426
CORRIDOR
H423
CODE ANALYSIS LEGEND
TOTAL OCCUPANCY
FEC
EXIT
OCCUPANCY LOAD FACTOR
EXITS REQUIRED
SQUARE FOOTAGE
OCCUPANCY TYPE
EGRESS EXIT SIGNAGE
FIRE EXTINGUISHER CABINET
DIAGONAL DISTANCE
EXIT SEPARATION DISTANCE
EGRESS PATH
2 HR - FIRE SEPARATION
1 HR - FIRE SEPARATION
SMOKE RESISTIVE HAZARDOUS AREA
B
1500 SF
REFER TO VA MANUAL PG-18-3 FOR ADDITIONAL CODES, STANDARDS, GUIDELINES AND
REGULATIONS, BELOW LISTING IS NOT COMPREHENSIVE.
ICC, INTERNATIONAL BUILDING CODES, 2018 EDITION (IBC)
ASCE-07-10
ACI 318-11
ACI 530-11
AISC 341-10
AISC 360-10
PCI MNL 120-10, DESIGN HANDBOOK
NFPA 10, STANDARD FOR PORTABLE FIRE EXTINGUISHERS, 2013 EDITION
NFPA 13, STANDARD FOR THE INSTALLATION OF SPRINKLER SYSTEMS, 2016 EDITION
NFPA 14, STANDARD FOR THE INSTALLATION OF STANDPIPE AND HOSE SYSTEM, 2016
EDITION
NFPA 20, STANDARD FOR THE INSTALLATION OF STATIONARY PUMPS FOR FIRE
PROTECTION, 2016 EDITION
NFPA 24, STANDARD FOR THE INSTALLATION OF PRIVATE FIRE SERVICE MAINS AND
THEIR APPURTENANCE, 2016 EDITION.
NFPA 54 NATIONAL FUEL GAS CODE, 2015 EDITION
NFPA 70, NATIONAL ELECTRIC CODE, 2014 EDITION
NFPA 72, NATIONAL FIRE ALARM CODE, 2016 EDITION
NFPA 75, STANDARD FOR THE PROTECTION OF ELECTRICAL COMPUTER/DATA
PROCESSING EQUIPMENT, 2017 EDITION
NFPA 77, RECOMMENDED PRACTICE ON STATIC ELECTRICITY, 2014 EDITION
NFPA 80, STANDARD FOR FIRE DOORS AND FIRE WINDOWS, 2016 EDITION
NFPA 90A, STANDARD FOR THE INSTALLATION OF AIR-CONDITIONING AND VENTILATING
SYSTEMS, 2015 EDITION.
NFPA 92, STANDARD FOR SMOKE CONTROL SYSTEMS, 2015 EDITION
NFPA 99, STANDARD FOR HEALTHCARE FACILITIES, 2015 EDITION
NFPA,99B, STANDARD FOR HYPOBARIC FACILITIES, 2015 EDITION
NFPA 101, LIFE SAFETY CODE, 2015 EDITION
NFPA 110, STANDARD FOR EMERGENCY AND STANDBY POWER SYSTEMS
NFPA 220, STANDARD TYPES OF BUILDING CONSTRUCTION, 2015 EDITION.
NFPA 780, STANDARD FOR INSTALLATION OF LIGHTING PROTECTION SYSTEMS, 2017
EDITION
NFPA 54 TYPE 2 CLOTHES DRYER UL 705 DEDPY, 2015 EDITION
MOST RECENT EDITION OF NFPA NATIONAL FIRE CODES WITH THE EXCEPTION OF NFPA
5000 AND NFPA 900
// ASHRAE 90.1-2016 HVAC SYSTEMS //
// ASHRAE 189.1 -2014 STANDARD FOR THE DESIGN OF HIGH PERFORMANCE GREEN
BUILDINGS //
// ASHRAE 180 - 2012 VENTILATION FOR HEALTH CARE FACILITIES //
// ASHRAE 62.1 - 2016 VENTILATION FOR ACCEPTABLE INDOOR AIR QUALITY //
// ASHRAE 1.1 - 2007 HVAC & R TECHNICAL REQUIREMENTS FOR COMMISSIONING
PROCESS //
// ASHRAE 0 - 2013 COMMISSIONING PROCESS //
// ASHRAE 55- 2013 THERMAL ENVIRONMENTAL CONDITIONS FOR HUMAN OCCUPANCY //
// ASHRAE 15 – 2013 SAFETY STANDARD FOR REFRIGERATION SYSTEMS //
ANSI A117.1-2009 STANDARD ON ACCESSIBLE & USABLE BUILDINGS AND FACILITIES
2010 ADA STANDARDS FOR ACCESSIBLE DESIGN
OCCUPATIONAL, SAFETY AND HEALTH ADMINISTRATION (OSHA) STANDARDS
ENERGY POLICY ACT OF 2005 (EPACT)
EXECUTIVE ORDER 13423: STRENGTHENING FEDERAL ENVIRONMENTAL, ENERGY, AND
TRANSPORTATION MANAGEMENT.
2014 FG GUIDELINES FOR HEALTHCARE FACILITIES
VA DIRECTIVES, DESIGN MANUALS, MASTER SPECIFICATIONS, VA NATIONAL CAD
STANDARD APPLICATION GUIDE, AND OTHER GUIDANCE ON THE TECHNICAL
INFORMATION LIBRARY (TIL) (HTTP://WWW.CFM.VA.GOV/TIL/).
VA MENTAL HEALTH FACILITIES DESIGN GUIDE, DECEMBER 2010 (REV. 08/01/2014)
VA BARRIER FREE DESIGN GUIDE PG-18-13, ABAAS
ARCHITECTURAL, AUGUST 1, 2014
ASBESTOS ABATEMENT, JULY 2011
CMP SCHEDULE AND RISK MANAGEMENT, VOL. 1 & 2, DECEMBER 2012
ELECTRICAL, DECEMBER 2015
ENERGY SUSTAINABILITY, MAY 2014
EQUIPMENT, JANUARY 2006
ESTIMATING, MARCH 8, 2011
NFPA INTERIM GUIDANCE FOR PROJECTS, PG-18-17, SEPTEMBER 30, 2010
FIRE PROTECTION, SEVENTH EDITION REVISED DECEMBER 2015
HVAC FOR NEW, REPLACEMENT, ADD. AND REN. OF EXIST. CA FACILITIES, MARCH 2011
INTERIOR DESIGN, MAY 2008
PHYSICAL SECURITY DESIGN MANUAL, JANUARY 2015
PLUMBING, NOVEMBER 2014
STRUCTURAL, FEBRUARY 1, 2014
WAY FINDING AND SIGNAGE, INTERIOR, DECEMBER 2012
SEISMIC DESIGN REQUIREMENTS, H-18-8, AUGUST 2013
ENVIRONMENTAL PLANNING GUIDANCE PG-18-17 NEPA INTERIM GUIDELINES FOR
PROJECTS SEPTEMBER 30, 2010
ELEVATOR DESIGN MANUAL, AUGUST 2016
EPA GUIDELINES CHECKLIST
VA DESIGN MANUALS PG-18-10:
GOVERNING CODES:
GENERAL
OR - 2
D408
PRE-INDUCTION
D407
VEST. /
SCRUB
D408A
HAC
D409
ANESTHESIA
WORK
SUPPLY
D406
EQUIPMENT
D402C
VEST./
SCRUB
D402A
BI-PLANE
HYBRID
OR #1
D402
CC HAC
D403
S.S.
D404
CONTROL
ROOM
D402B
CORRIDOR
H422
CORRIDOR
H423
CORRIDOR
H421
CLEAN
CORE
CORRIDOR
H427B
GENERAL
OR - 4
D414
VEST./
SCRUB
D412A
SOILED
UTILITY
D413
VEST./
SCRUB
D414A
UROLOGY
OR - 10
D439
PPE
ALCOVE
D440
NURSING
OFFICE (3)
D438
NURSE
EDUCATOR
D435
ANESTHESIA
OFFICE (2)
D434
PHONE
D433
CONTROL
OFFICE (2)
D401
UROLOGY
EQUIP.
D441B VEST./
SCRUB
D439A
ANESTHESIA
OFFICE (3)
D432
NURSE
MANAGER
D431
OFFICE
D430
BIO-MED
REPAIR
D429
BIO-MED
CLEAN
D428
SOILED
DUMB
WAITER
D452A
CLOSET
A438E
MECH.
A438
STORAGE
A437
BREAK
ROOM
A476
PRE-EVALUATION
A446
STAFF
TOILET
A447
DOCUMENTATION
A448
NURSE
STATION
A449
ICE
MAKER
A476A
ELEVATOR
LOBBY
H419
CLEAN
DUMB
WAITER
D458
COMPOUND
B416
DRUG
INFO
B412
BREAK
ROOM
B413
COMPOUND
FE
CLOSET
A436E
ELEC
A436D
CLOSET
A436C
STAIR 1
S401
ELEC.
A436B
TOILET
A434A
AETC
NURSE
MANAGER
A434
HEM/ONC
CHECK-IN
A433
DIETICIAN
A432
STAIR 2
S402
BATH
A431A
CHIEF
HEM/ONC
A431
MED I
A430
BATH
A429A
MECHANICAL
A430B
MED II
A429
MICU /
MOD
A428
BATH
A427A
MED I
A427
SURG II
A426
BATH
A425C
BATH
A425B
SURG I
A425
MED II
A424
BATH
A421
MED II
A423
EXAM
A422
CORRIDOR
H402
BATH
A421B
LAV.
A421A
EXAM
A421
SOILED
UTILITY
A419
STORAGE
A420
CLEAN
LINEN
A418
CLIEN
LINEN
A418A
LODGER
A417
TOILET
A416A
CAPD
CLINIC
A416
EXAM
A415
TOILET
A414A
EXAM
A414
EXAM
A413
TOILET
A412A
EXAM
A412
?ELEC
A419A
EXAM
A411
TOILET
A410A
EXAM
A410
EXAM
A409
TOILET
A408A
EXAM
A408
ONCOLOGY
TRIAGE
A407
TOILET
A407A
I MED
CONSENT
A406
NOUR.
A405
STORAGE
A404
HAC
A403
STAIR 3
S403
STAIR 4
S404
HOUSEKEEPING
A475
CLEAN
LINEN
A474
NOURISHMENT
A473
TOILET
A472A
PATIENT
BED
A472
CLOSET
A471A
PATIENT
BED
A471
PATIENT
BED
A470
CLOSET
A469A
PATIENT
BED
A469
PATIENT
BED
A468
CLOSET
A467A
PATIENT
BED
A467
PATIENT
BED
A466
CLOSET
A465A
PATIENT
BED
A465
PATIENT
BED
A464
CLOSET
A463A
PATIENT
BED
A463
PATIENT
BED
A462
CLOSET
A462A
PATIENT
BED
A461LOGISTICS
SUPPLY
A460
SOILED
UTILITY
A459
CLEAN
UTILITY
A458
23 HOUR
OBSERVATION
A456
CHEMOTHERAPY
TREATMENT
A455
TOILET
MALE
A454
?ELEC.
A454A
?STORAGE
WARD
SUPPLY
A452
?BATH
A453
STAIR 5
S405
OFFICE
A450
CORRIDOR
H405
CORRIDOR
H404
CLOSET
A461A
F.E.
CLOSET
A451
?MEDICATION
STORAGE
B417
?DRUG
RECEIVING
B405
?I.V. AD
MIXTURE
B415
MANAGER
PHARMACY
B411
PHARMACIST
B410
VAULT
B409
?OUTPATIENT
B406A
?REF
STORAGE
B414
CLOSET
A458A
CLOSET
B405B
STAIR 6
S406
STAIR 9
S409
STAIR 8
S408
STAIR 7
S407
LINEN
SHAFT
D458A
CORRIDOR
H405
TOILET
A406A
ELEC.
D463A
594 SF
BI- PLANE
HYBRID
OR - 3
D422
272 SF
CONTROL
ROOM
D424
590 SF
OR - 01
D420
HAC
C436B
CLEAN
SUPPLIES
C418
S.T.
C417
SECRETARY
C423
SOILED
UTILITY
C416
PACU #4
C425D
PACU #3
C425C
PACU #2
C425B
PACU #1
C425A
PACU
C425
PACU #8
C430
PACU #7
C429 SOILED
C431
CLEAN
SUPPLIES
C432
HAC
C436A
BREAK
ROOM
C421
OFFICE
C422
SICU
WAITING
C402
MEDS
C420
PACU #10
C435
PACU #6
C428
P.T.
C426
SICU #11
C403
CONSULT
C401
PACU /
SICU
CLEAN
C437
MEDS
C433
SICU
H415
PACU #5
C427
PACU #9
C434
NOUR.
C425E
ANTE
ROOM
C404
ELEVATOR
LOBBY
H418
CORRIDOR
H414
CORRIDOR
H416
SICU #1
C414
SICU #2
C413
SICU #3
C412
SICU #4
C411
SICU #5
C410
SICU #6
C409
SICU #8
C407
SICU #9
C406
INFECTION
ISOLATION
SICU #10
C405
CORRIDOR
H421
NURSE
WORK
AREA
C419
SICU #7
C408
PHASE 5
SCALE: 1/16" = 1'-0"1-5-GI-101
1 4TH FLOOR COMPOSITE LIFE SAFETY PLAN - PHASE 5 SCALE: 1" = 80'-0"
KEY PLAN - PHASE 5
N
N th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t o n e e ig h th in c h o n e fo o t
1 2 3 4 5 6 7 8 9
A
B
C
D
E
F
1 2 3 4 5 6 7 8 9
A
B
C
D
E
F
Veterans Health
Administration
VA FORM 08-6231
Drawing Title Project Title
Location
Date Checked Drawn
Project Number
Building Number
Drawing Number
CONSULTANTS:
Drawing # of
657-18-113JCRENOVATE OPERATING ROOMS AND
SUPPORT SPACES - PHASE 5
10/12/2018
VA Health Care System Approval:
100% CONSTRUCTION DOCUMENTS
Revision: Date:
ARCHITECT/ENGINEER:
JOHN COCHRAN DIVISION
915 NORTH GRAND BLVD - ST. LOUIS, MO 63106
A/E:
GUIDON DESIGN INC.
905 N. CAPITOL AVE. SUITE 100 | INDIANAPOLIS, IN. 46204
317.800.6388 | WWW.GUIDONDESIGN.COM
SUSTAINABLE ARCHITECTURE + ENGINEERING
PROJECT LEAD
Architect, Structural Engineer, Civil Engineer
Consultant:
/1
/2
:1 :0
P
M
1-5-GI-101
4TH FLOOR COMPOSITE LIFE SAFETY
PLAN
KJHJDF
CMTA CONSULTING ENGINEERS
903 SPRING STREET
JEFFERSONVILLE, IN 47130
812.725.8383
2 59
OR - 5
D416
VEST./ SCRUB
D416A
ORTHO OR - 9
D425
GENERAL OR
- 6
D417
SOILED
UTILITY
D418
EQUIP.
ALCOVE
D424
VEST./ SCRUB
D425A
PHASE 5
PROJECT
LIMITS
PHASE 5
PROJECT
LIMITS
VEST./ SCRUB
D417A
VEST./ SCRUB
D423A
CORRIDOR
H425
CORRIDOR
H424
FULL TANKS
D427
EQUIP.
STORAGE
D415
CLEAN CORE
D441
CLEAN CORE
CORR.
H428
EQUIP.
STORAGE
D419
EQUIP.
STORAGE
D421
VEST./ SCRUB
D420A
ROBOT
STORAGE
D417B
EQUIP.
STORAGE
D428
FEC
FEC
FEC
FEC
FEC
FEC
FEC
FEC
FEC
FEC
EXIT
EXIT
EXIT
EXIT
EXIT
CARDIAC OR
-8
D423
NEURO
(CARDIAC
ORTHO) OR -
D420
EMPTY
TANKS
D426
EQUIP.
STORAGE
D422
CLEAN CORE
D441
MAX TRAVEL DISTANCE = 157' - 7"
GENERAL
OR - 4
D414
VEST./ SCRUB
D412A
SOILED UTILITY
D413
VEST./ SCRUB
D414A
UROLOGY
OR - 10
D439
PPE ALCOVE
D440
NURSING
OFFICE (3)
D438
NURSE
EDUCATOR
D435
ANESTHESIA
OFFICE (2)
D434
PHONE
D433
CONTROL
OFFICE (2)
D401
UROLOGY
EQUIP.
D441B
VEST./ SCRUB
D439A
ANESTHESIA
OFFICE (3)
D432
NURSE
MANAGER
D431
OFFICE
D430
BIO-MED
REPAIR
D429
BIO-MED
CLEAN
D428
DATA
B427
CODE ANALYSIS LEGEND
TOTAL OCCUPANCY
FEC
EXIT
OCCUPANCY LOAD FACTOR
EXITS REQUIRED
SQUARE FOOTAGE
OCCUPANCY TYPE
EGRESS EXIT SIGNAGE
FIRE EXTINGUISHER CABINET
DIAGONAL DISTANCE
EXIT SEPARATION DISTANCE
EGRESS PATH
2 HR - FIRE SEPARATION
1 HR - FIRE SEPARATION
SMOKE RESISTIVE HAZARDOUS AREA
B
1500 SF
REFER TO VA MANUAL PG-18-3 FOR ADDITIONAL CODES, STANDARDS, GUIDELINES AND
REGULATIONS, BELOW LISTING IS NOT COMPREHENSIVE.
ICC, INTERNATIONAL BUILDING CODES, 2018 EDITION (IBC)
ASCE-07-10
ACI 318-11
ACI 530-11
AISC 341-10
AISC 360-10
PCI MNL 120-10, DESIGN HANDBOOK
NFPA 10, STANDARD FOR PORTABLE FIRE EXTINGUISHERS, 2013 EDITION
NFPA 13, STANDARD FOR THE INSTALLATION OF SPRINKLER SYSTEMS, 2016 EDITION
NFPA 14, STANDARD FOR THE INSTALLATION OF STANDPIPE AND HOSE SYSTEM, 2016
EDITION
NFPA 20, STANDARD FOR THE INSTALLATION OF STATIONARY PUMPS FOR FIRE
PROTECTION, 2016 EDITION
NFPA 24, STANDARD FOR THE INSTALLATION OF PRIVATE FIRE SERVICE MAINS AND
THEIR APPURTENANCE, 2016 EDITION.
NFPA 54 NATIONAL FUEL GAS CODE, 2015 EDITION
NFPA 70, NATIONAL ELECTRIC CODE, 2014 EDITION
NFPA 72, NATIONAL FIRE ALARM CODE, 2016 EDITION
NFPA 75, STANDARD FOR THE PROTECTION OF ELECTRICAL COMPUTER/DATA
PROCESSING EQUIPMENT, 2017 EDITION
NFPA 77, RECOMMENDED PRACTICE ON STATIC ELECTRICITY, 2014 EDITION
NFPA 80, STANDARD FOR FIRE DOORS AND FIRE WINDOWS, 2016 EDITION
NFPA 90A, STANDARD FOR THE INSTALLATION OF AIR-CONDITIONING AND VENTILATING
SYSTEMS, 2015 EDITION.
NFPA 92, STANDARD FOR SMOKE CONTROL SYSTEMS, 2015 EDITION
NFPA 99, STANDARD FOR HEALTHCARE FACILITIES, 2015 EDITION
NFPA,99B, STANDARD FOR HYPOBARIC FACILITIES, 2015 EDITION
NFPA 101, LIFE SAFETY CODE, 2015 EDITION
NFPA 110, STANDARD FOR EMERGENCY AND STANDBY POWER SYSTEMS
NFPA 220, STANDARD TYPES OF BUILDING CONSTRUCTION, 2015 EDITION.
NFPA 780, STANDARD FOR INSTALLATION OF LIGHTING PROTECTION SYSTEMS, 2017
EDITION
NFPA 54 TYPE 2 CLOTHES DRYER UL 705 DEDPY, 2015 EDITION
MOST RECENT EDITION OF NFPA NATIONAL FIRE CODES WITH THE EXCEPTION OF NFPA
5000 AND NFPA 900
// ASHRAE 90.1-2016 HVAC SYSTEMS //
// ASHRAE 189.1 -2014 STANDARD FOR THE DESIGN OF HIGH PERFORMANCE GREEN
BUILDINGS //
// ASHRAE 180 - 2012 VENTILATION FOR HEALTH CARE FACILITIES //
// ASHRAE 62.1 - 2016 VENTILATION FOR ACCEPTABLE INDOOR AIR QUALITY //
// ASHRAE 1.1 - 2007 HVAC & R TECHNICAL REQUIREMENTS FOR COMMISSIONING
PROCESS //
// ASHRAE 0 - 2013 COMMISSIONING PROCESS //
// ASHRAE 55- 2013 THERMAL ENVIRONMENTAL CONDITIONS FOR HUMAN OCCUPANCY //
// ASHRAE 15 – 2013 SAFETY STANDARD FOR REFRIGERATION SYSTEMS //
ANSI A117.1-2009 STANDARD ON ACCESSIBLE & USABLE BUILDINGS AND FACILITIES
2010 ADA STANDARDS FOR ACCESSIBLE DESIGN
OCCUPATIONAL, SAFETY AND HEALTH ADMINISTRATION (OSHA) STANDARDS
ENERGY POLICY ACT OF 2005 (EPACT)
EXECUTIVE ORDER 13423: STRENGTHENING FEDERAL ENVIRONMENTAL, ENERGY, AND
TRANSPORTATION MANAGEMENT.
2014 FG GUIDELINES FOR HEALTHCARE FACILITIES
VA DIRECTIVES, DESIGN MANUALS, MASTER SPECIFICATIONS, VA NATIONAL CAD
STANDARD APPLICATION GUIDE, AND OTHER GUIDANCE ON THE TECHNICAL
INFORMATION LIBRARY (TIL) (HTTP://WWW.CFM.VA.GOV/TIL/).
VA MENTAL HEALTH FACILITIES DESIGN GUIDE, DECEMBER 2010 (REV. 08/01/2014)
VA BARRIER FREE DESIGN GUIDE PG-18-13, ABAAS
ARCHITECTURAL, AUGUST 1, 2014
ASBESTOS ABATEMENT, JULY 2011
CMP SCHEDULE AND RISK MANAGEMENT, VOL. 1 & 2, DECEMBER 2012
ELECTRICAL, DECEMBER 2015
ENERGY SUSTAINABILITY, MAY 2014
EQUIPMENT, JANUARY 2006
ESTIMATING, MARCH 8, 2011
NFPA INTERIM GUIDANCE FOR PROJECTS, PG-18-17, SEPTEMBER 30, 2010
FIRE PROTECTION, SEVENTH EDITION REVISED DECEMBER 2015
HVAC FOR NEW, REPLACEMENT, ADD. AND REN. OF EXIST. CA FACILITIES, MARCH 2011
INTERIOR DESIGN, MAY 2008
PHYSICAL SECURITY DESIGN MANUAL, JANUARY 2015
PLUMBING, NOVEMBER 2014
STRUCTURAL, FEBRUARY 1, 2014
WAY FINDING AND SIGNAGE, INTERIOR, DECEMBER 2012
SEISMIC DESIGN REQUIREMENTS, H-18-8, AUGUST 2013
ENVIRONMENTAL PLANNING GUIDANCE PG-18-17 NEPA INTERIM GUIDELINES FOR
PROJECTS SEPTEMBER 30, 2010
ELEVATOR DESIGN MANUAL, AUGUST 2016
EPA GUIDELINES CHECKLIST
VA DESIGN MANUALS PG-18-10:
GOVERNING CODES:
GENERAL
OR - 2
D408
PRE-INDUCTION
D407
VEST. / SCRUB
D408A
HAC
D409
ANESTHESIA
WORK SUPPLY
D406
EQUIPMENT
D402C
VEST./ SCRUB
D402A
BI-PLANE
HYBRID OR #1
D402
CC HAC
D403 S.S.
D404
CONTROL
ROOM
D402B
CORRIDOR
H422
CORRIDOR
H423
CORRIDOR
H421
CLEAN CORE
CORRIDOR
H427B
PHASE 5
SOILED DUMB
WAITER
D452A
CLEAN DUMB
WAITER
D458
STAIR 6
S406
STAIR 9
S409
BI- PLANE
HYBRID OR - 3
D422
CONTROL
ROOM
D424
SCALE: 1/8" = 1'-0"1-5-GI-102
1 4TH FLOOR PARTIAL LIFE SAFETY PLAN - PHASE 5
N SCALE: 1" = 80'-0"
KEY PLAN - PHASE 5
N th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t o n e e ig h th in c h o n e fo o t
1 2 3 4 5 6 7 8 9
A
B
C
D
E
F
1 2 3 4 5 6 7 8 9
A
B
C
D
E
F
Veterans Health
Administration
VA FORM 08-6231
Drawing Title Project Title
Location
Date Checked Drawn
Project Number
Building Number
Drawing Number
CONSULTANTS:
Drawing # of
657-18-113JCRENOVATE OPERATING ROOMS AND
SUPPORT SPACES - PHASE 5
10/12/2018
VA Health Care System Approval:
100% CONSTRUCTION DOCUMENTS
Revision: Date:
ARCHITECT/ENGINEER:
JOHN COCHRAN DIVISION
915 NORTH GRAND BLVD - ST. LOUIS, MO 63106
A/E:
GUIDON DESIGN INC.
905 N. CAPITOL AVE. SUITE 100 | INDIANAPOLIS, IN. 46204
317.800.6388 | WWW.GUIDONDESIGN.COM
SUSTAINABLE ARCHITECTURE + ENGINEERING
PROJECT LEAD
Architect, Structural Engineer, Civil Engineer
Consultant:
/1
/2
:1 :0
P
M
1-5-GI-102
4TH FLOOR PARTIAL LIFE SAFETY PLAN
KJHJDF
CMTA CONSULTING ENGINEERS
903 SPRING STREET
JEFFERSONVILLE, IN 47130
3 59
PUBLIC
SIDE
1 HOUR FIRE RATED METAL DOOR ASSEMBLY
AND FRAME WITH SEALS, CARD READER,
HARDWARE AND CLOSER
TRIATEK MONITOR
HAND SANITIZER
SEAL ALL EDGES WITH TAPE
SEAL ALL EDGES WITH TAPE
REFER TO TEMPORARY BARRIER TYPE
FOR REQUIRED CONDITION TO
STRUCTURE ABOVE
VA / OSHA TEMPORARY SIGNAGE
CONTINUOUS FIRESAFE SEALANT
TOP AND BOTTOM, & BOTH SIDES
3 1/2" SOUND ATTENUATION
BATT.
5/8" TYPE X GYPSUM BOARD, BOTH
SIDES
3 5/8" METAL STUD @ 16" O.C.
WITH RUNNER CHANNELS ALONG
TOP AND BOTTOM
CONSTRUCTION
SIDE
PUBLIC
SIDE
6 MIL. FIRE RETARDANT VISQUEEN
MEMBRANE. CONTINUOUSLY
ADHERE TO THE STRUCTURAL DECK
ABOVE AND TO THE FLOOR BELOW
WITH TAPE.
UNDERSIDE OF STRUCTURAL DECK
UL LISTING:
U465
COORDINATE WITH EXISTING
CEILING
EXISTING GWB TO REMAIN -
CONTRACTOR TO INSPECT
FOR DAMAGES/
PENETRATIONS AND REPAIR/
SEAL PENETRATIONS AS
REQUIRED
E
X
IS
T
IN
G G
W B
V
IF
/8
G W
B I
N F
IL
L
V
IF
HOSPITAL AREA
(NON CONSTRUCTION SIDE)
TOOL
TOOLS THAT CREATE
DUST WHEN USED MUST
BE TYPE THAT CONNECT
DIRECTLY TO SHOP VAC
HOSE
HEPA
SHOP
VAC
NEG. AIR
MACHINE
AIR
FLOW
OUT TO
WINDOW
REMOVE LIGHT OR
ACCESS PANEL &
SEAL AROUND
DUCT TO MAINTAIN
PRESSURE
DIFFERENTIAL
IN
F
E C
T
IO
N C
O N
T R
O L
T E
M P
O R
A R
Y B
A R
R
IE
R P
E R
EXISTING GWB TO REMAIN -
CONTRACTOR TO INSPECT FOR
DAMAGES/PENETRATIONS AND
REPAIR/SEAL PENETRATIONS AS
REQUIRED
CONSTRUCTION
SIDE
PUBLIC
SIDE
6 MIL. FIRE RETARDANT VISQUEEN
MEMBRANE. CONTINUOUSLY ADHERE
TO THE STRUCTURAL DECK ABOVE AND
TO THE FLOOR BELOW WITH TAPE.
UNDERSIDE OF STRUCTURAL DECK
UL LISTING:
U448
1 5/8" METAL STUD @ 24" O.C. WITH RUNNER
CHANNELS ALONG TOP AND BOTTOM
5/8" TYPE X GYPSUM BOARD, BOTH SIDES
PROVIDE FIRECAULK AT GYPSUM
BOARD JOINT
COPE GWB TIGHT TO THE STRUCTURE
AND FIRECAULK - TYP.
2 1/2" METAL STUD @ 24" O.C. WITH RUNNER
CHANNELS ALONG TOP AND BOTTOM
MIN. 1 1/2" MINERAL WOOL BATT
INSULATION
TEMPORARY IC BARRIER WALL
CONSTRUCTION (DUST WALL)
5/8" TYPE X GYP BD
3 5/8" STEEL STUDS @ 16"
O.C.
BEAD OF CONT. SEALANT
6-MIL FIRE RETARDANT POLY
INTERIOR SIDE
CEILING, RE: RCP SHEETS
2" DEEP LEG 3 5/8" STEEL SLIP TRACK
3 5/8" STEEL STUD TRACK
4" M
IN
CONTINUOUSLY ADHERE 6-MIL. FIRE
RETARDANT POLY TO DECK WITH TAPE
CONTINUOUSLY ADHERE FIRE RETARDANT
POLY TO FLOOR WITH TAPE
EXISTING DECK
CONSTRUCTION
SIDE
OCCUPIED
SIDE
TEMPORARY IC BARRIER WALL
CONSTRUCTION (DUST WALL)
EXISTING GWB TO REMAIN -
CONTRACTOR TO INSPECT
FOR
DAMAGES/PENETRATIONS
AND REPAIR/SEAL
PENETRATIONS AS REQUIRED
CONTINUOUSLY ADHERE 6-MIL. FIRE
RETARDANT POLY INTERIOR OR EXTERIOR
SIDE. IF EXTERIOR, REPLACE REGULARLY
TO ENSURE INTEGRITY OF BARRIER AND
PREVENT DEBRIS CONTAMINATION.
PROVIDE MEMBRANE ON INSIDE OF
GYPSUM BOARD ABOVE CEILING.
EXISTING DECK
CONSTRUCTION
SIDE
OCCUPIED
SIDE
3 5/8" STEEL STUDS @ 16" O.C.
3 5/8" STEEL STUD TRACK
2" DEEP LEG 3 5/8" STEEL SLIP TRACK
INFECTION CONTROL: PRECAUTION CLASS IV
TYPE OF CONSTRUCTION ACTIVITY: "D"
MAJOR DEMOLITION AND CONSTRUCTION PROJECTS INCLUDING, BUT NOT LIMITED
TO:
- ACTIVITIES WHICH REQUIRE CONSECUTIVE WORK SHIFTS
- REQUIRES HEAVY DEMOLITION OR REMOVAL OF A COMPLETE BUILDING /
CABLING SYSTEM
- NEW CONSTRUCTION OR RENOVATION OVER 3 DAYS DURATION
POPULATION AND GEOGRAPHIC PATIENT RISK GROUP: "IV - HIGHEST RISK"
- SURGICAL UNITS
INFECTION CONTROL RISK ASSESSMENT NOTES
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
13.
14.
ISOLATE HVAC SYSTEM IN AREA WHERE WORK IS BEING DONETO PREVENT
CONTAMINATION OF DUCT SYSTEM.
COMPLETE ALL CRITICAL BARRIERS I.E. SHEETROCK, PLYWOOD, PLASTIC, TO
SEAL AREA FROM NON-WORK AREA OR IMPLEMENT CONTROL CUBE METHOD
(CART WITH PLASTIC AND SEALED CONNECTION WORK SITE WITH HEPA
VACUUM FOR VACUUMING PRIOR TO EXIT) BEFORE CONSTRUCTION BEGINS.
MAINTAIN NEGATIVE AIR PRESSURE WITHIN WORK SITE UTILIZING HEPA
EQUIPPED AIR FILTRATION UNITS.
SEAL HOLES, PIPES, CONDUITS, AND PUNCTURES APPROPRIATELY.
CONSTRUCT ANTEROOM AND REQUIRE ALL PERSONNEL TO PASS THROUGH
THIS ROOM SO THEY CAN BE VACUUMED USING A HEPA VACUUM CLEANER
BEFORE LEAVING WORK SITE OR THEY CAN WEAR CLOTH OR PAPER
COVERALLS THAT ARE REMOVED EACH TIME THEY LEAVE THE WORK SITE.
ALL PERSONNEL ENTERING WORK SITE ARE REQUIRED TO WEAR SHOE
COVERS. SHOE COVERS MUST BE CHANGED EACH TIME THE WORKER EXITS
THE WORK AREA.
DO NOT REMOVE BARRIERS FROM WORK AREA UNTIL COMPLETED PROJECT
IS INSPECTED BY THE OWNER'S SAFETY DEPARTMENT AND INFECTION
CONTROL DEPARTMENT AND THOROUGHLY CLEANED BY THE OWNER'S
ENVIRONMENTAL SERVICES DEPARTMENT.
REMOVE BARRIER MATERIAL CAREFULLY TO MINIMIZE SPREADING OF DIRT
AND DEBRIS ASSOCIATED WITH CONSTRUCTION.
CONTAIN CONSTRUCTION WASTE BEFORE TRANSPORT IN TIGHTLY COVERED
CONTAINERS.
COVER TRANSPORT RECEPTACLES OR CARTS. TAPE COVERING UNLESS
SOLID LID.
VACUUM WORK AREA WITH HEPA FILTERED VACUUMS.
WET MOP AREA WITH DISINFECTANT.
REMOVE ISOLATION OF HVAC SYSTEM IN AREAS WHERE WORK IS BEING
PERFORMED.
CONTRACTOR TO BE IN FULL TYVEK SUITS WHEN PERFORMING WORK IN
CERTAIN AREAS AS IDENTIFIED BY THE CONTRACT DOCUMENTS AND THE VA
COR.
SCALE: 1/2" = 1'-0"1-5-GI-103
2 CONSTRUCTION DOOR WALL ELEVATION
SCALE: 1 1/2" = 1'-0"1-5-GI-103
4 NFPA 241 CONSTRUCTION AND INFECTION CONTROL BARRIER
SCALE: 3/4" = 1'-0"1-5-GI-103
1 DETAIL - EXTEND EXISTING PARTITION FOR CONSTRUCTION
SCALE: 1 1/2" = 1'-0"1-5-GI-103
3 NFPA 241 CONSTRUCTION AND INFECTION CONTROL BARRIER EXTENDED TO DECK
SCALE: 1 1/2" = 1'-0"1-5-GI-103
6 TEMPORARY INFECTION CONTROL WALL CONSTRUCTION
SCALE: 1 1/2" = 1'-0"1-5-GI-103
5 TEMPORARY INFECTION CONTROL WALL CONSTRUCTION EXTENDED TO DECK
th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t o n e e ig h th in c h o n e fo o t
1 2 3 4 5 6 7 8 9
A
B
C
D
E
F
1 2 3 4 5 6 7 8 9
A
B
C
D
E
F
Veterans Health
Administration
VA FORM 08-6231
Drawing Title Project Title
Location
Date Checked Drawn
Project Number
Building Number
Drawing Number
CONSULTANTS:
Drawing # of
657-18-113JCRENOVATE OPERATING ROOMS AND
SUPPORT SPACES - PHASE 5
10/12/2018
VA Health Care System Approval:
100% CONSTRUCTION DOCUMENTS
Revision: Date:
ARCHITECT/ENGINEER:
JOHN COCHRAN DIVISION
915 NORTH GRAND BLVD - ST. LOUIS, MO 63106
A/E:
GUIDON DESIGN INC.
905 N. CAPITOL AVE. SUITE 100 | INDIANAPOLIS, IN. 46204
317.800.6388 | WWW.GUIDONDESIGN.COM
SUSTAINABLE ARCHITECTURE + ENGINEERING
PROJECT LEAD
Architect, Structural Engineer, Civil Engineer
Consultant:
/1
/2
:1 :1
P
M
1-5-GI-103
CONSTRUCTION INFECTION CONTROL
DETAILS
DAVJDF
CMTA CONSULTING ENGINEERS
903 SPRING STREET
JEFFERSONVILLE, IN 47130
4 59
TEMPORARY
WALLS TO BE
REMOVED AND
ERECTED
DAILY FOR
SEQUENCE "C"
ONLY
CONSTRUCTION
ACCESS
VEST./
SCRUB
NEPTUNE
SOILED
UTILITY
VEST./
SCRUB
EQUIP.
STORAGE
VEST./
SCRUB
DAVINCI
EQUIPMENT
EQUIPMENT ALCOVE
VEST./
SCRUB
ORTHO
OR - 9
NEURO
CARDIAC
ORTHO OR - 7
CARDIAC
OR - 8
GENERAL
OR - 6
GENERAL
OR - 5
EQUIP.
STORAGE
VEST./
SCRUB
VA
ACCESS
SEQUENCE "B"
ANTEROOM AND
SEQUENCE "C"
EQUIPMENT
ALCOVE
EQUIP.
STORAGE
EQUIP.
STORAGE
EQUIPMENT
ALCOVE
PHASE 5
PROJECT
LIMITS
PHASE 5
PROJECT
LIMITS
D
IR
E C
T
IO
N O
F P
U L
L
IN
G
N E
G A
T
IV
E A
IR
CONSTRUCTION
ACCESS FOR
SEQUENCE A
ANTEROOM FOR
SEQUENCE A
TEMPORARY WALLS
TO BE ERECTED
AND REMOVED
DAILY FOR
SEQUENCE "C"
ONLY
TEMPORARY
CONSTRUCTION BARRIER
WALL.
VA TO HAVE
ACCESS TO
THIS CORRIDOR
DURING THE
DAY
TEMPORARY CONSTRUCTION
BARRIER WALL.
TEMPORARY
CONSTRUCTION BARRIER
WALL.
TEMPORARY CONSTRUCTION
BARRIER WALL.
TEMPORARY WALLS TO BE
ERECTED AND REMOVED
DAILY TO CREATE AN
ANTEROOM FOR THIS
PORTION OF SEQUENCE
"C"
PHASING LEGEND
SEQUENCE A
SEQUENCE B
SEQUENCE C
CONSTRUCTION PHASING PLAN - PHASE 5
SEQUENCE A - C DESCRIPTIONS
ALL WORK WITHIN THIS PROJECT IS DEFINED AS PROJECT RENOVATE OPERATING
ROOMS AND SUPPORT SPACES AND IS PHASE 5 OF THE OVERALL FOURTH FLOOR
RENOVATION.
SEQUENCE A:
ALL WORK WITHIN SEQUENCE A IS TO BE PERFORMED BETWEEN THE HOURS OF
5:00PM AND 5:00AM MONDAY THROUGH FRIDAY AND ANYTIME DURING WEEKENDS.
DEMOLISH THE ELECTRICAL CLOSET IN THE CLEAN CORE AND RENOVATE INTO
CLEAN CORE SPACE. CONSTRUCT A TEMPORARY CONSTRUCTION BARRIER AROUND
WORK AREA. THE WORK IN THIS SEQUENCE MUST BE PERFORMED AT NIGHT AND ON
THE WEEKEND. ENSURE THE NEGATIVE AIR IS BEING PULLED OUT OF THIS SPACE
FROM THE LARGER CONSTRUCTION AREA AS OPPOSED TO PUSHED FROM THE
SPACE. THIS WORK SHOULD BE DONE EXPEDITIOUSLY AS TO REDUCE THE AMOUNT
OF TIME CONSTRUCTION IS TAKING PLACE WITHIN THE ACTIVE CLEAN CORE. THIS
AREA MUST BE DELIVERED TO THE VA AS COMPLETE AT THE END OF THIS
SEQUENCE.
SEQUENCE B:
ALL WORK WITHIN SEQUENCE "B" IS TO BE PERFORMED BETWEEN THE HOURS OF
5:00PM AND 5:00AM MONDAY THROUGH FRIDAY AND ANYTIME DURING WEEKENDS.
SEQUENCE B WILL BE TO RENOVATE A MAJORITY OF THE WORK OCCURRING IN
PHASE 5. ERECT OR EXTEND ALL CONSTRUCTION AND INFECTION CONTROL
BARRIERS AS DESCRIBED ON 1-5-GI-104.
VA COR TO APPROVE COMPLETION OF ALL WORK WITHIN SEQUENCE B BEFORE
CONTRACTOR CAN PROGRESS. ONCE VA APPROVAL IS GIVEN, TEMPORARY
CONSTRUCTION BARRIERS NOT REQUIRED FOR SEQUENCE C AND BEYOND CAN BE
REMOVED.
SEQUENCE C:
ALL WORK WITHIN SEQUENCE "C" IS TO BE PERFORMED BETWEEN THE HOURS OF
5:00PM AND 5:00AM MONDAY THROUGH FRIDAY AND ANYTIME DURING WEEKENDS.
SEQUENCE "C" SERVES TO RENOVATE THE NORTHEAST CORRIDOR THAT HAS BEEN
ACCESSED BY THE VA DURING SEQUENCE "A" AND "B". THIS SEQUENCE SHOULD BE
PERFORMED EXPEDITIOUSLY AS TO REDUCE THE AMOUNT OF TIME CONSTRUCTION
IS OCCURRING DURING THIS CORRIDOR AS IT WILL STILL BE ACCESSED BY THE VA
DURING THE DAY. SEQUENCE C WILL ALSO INCLUDE FINISHING THE SEQUENCE "B"
ANTEROOM WHICH INCLUDES THE EQUIPMENT STORAGE ROOM FOR OR-9 AND THE
TANK STORAGE ROOMS AS CONSTRUCTION BACKS OUT OF THE SPACE AND
CONSTRUCTION ACCESS IS NO LONGER NEEDED IN THE AREA COMPLETED IN
SEQUENCE B.
AT END OF SEQUENCE "C", CONTRACTOR TO REMOVE ALL TEMPORARY INFECTION
CONTROL MEASURES AND READY ALL SPACES FOR VA OCCUPANCY.
INFECTION CONTROL: PRECAUTION CLASS IV
TYPE OF CONSTRUCTION ACTIVITY: "D"
MAJOR DEMOLITION AND CONSTRUCTION PROJECTS INCLUDING, BUT NOT LIMITED
TO:
- ACTIVITIES WHICH REQUIRE CONSECUTIVE WORK SHIFTS
- REQUIRES HEAVY DEMOLITION OR REMOVAL OF A COMPLETE BUILDING /
CABLING SYSTEM
- NEW CONSTRUCTION OR RENOVATION OVER 3 DAYS DURATION
POPULATION AND GEOGRAPHIC PATIENT RISK GROUP: "IV - HIGHEST RISK"
- SURGICAL UNITS
INFECTION CONTROL RISK ASSESSMENT NOTES
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
13.
14.
ISOLATE HVAC SYSTEM IN AREA WHERE WORK IS BEING DONETO PREVENT
CONTAMINATION OF DUCT SYSTEM.
COMPLETE ALL CRITICAL BARRIERS I.E. SHEETROCK, PLYWOOD, PLASTIC, TO
SEAL AREA FROM NON-WORK AREA OR IMPLEMENT CONTROL CUBE METHOD
(CART WITH PLASTIC AND SEALED CONNECTION WORK SITE WITH HEPA
VACUUM FOR VACUUMING PRIOR TO EXIT) BEFORE CONSTRUCTION BEGINS.
MAINTAIN NEGATIVE AIR PRESSURE WITHIN WORK SITE UTILIZING HEPA
EQUIPPED AIR FILTRATION UNITS.
SEAL HOLES, PIPES, CONDUITS, AND PUNCTURES APPROPRIATELY.
CONSTRUCT ANTEROOM AND REQUIRE ALL PERSONNEL TO PASS THROUGH
THIS ROOM SO THEY CAN BE VACUUMED USING A HEPA VACUUM CLEANER
BEFORE LEAVING WORK SITE OR THEY CAN WEAR CLOTH OR PAPER
COVERALLS THAT ARE REMOVED EACH TIME THEY LEAVE THE WORK SITE.
ALL PERSONNEL ENTERING WORK SITE ARE REQUIRED TO WEAR SHOE
COVERS. SHOE COVERS MUST BE CHANGED EACH TIME THE WORKER EXITS
THE WORK AREA.
DO NOT REMOVE BARRIERS FROM WORK AREA UNTIL COMPLETED PROJECT
IS INSPECTED BY THE OWNER'S SAFETY DEPARTMENT AND INFECTION
CONTROL DEPARTMENT AND THOROUGHLY CLEANED BY THE OWNER'S
ENVIRONMENTAL SERVICES DEPARTMENT.
REMOVE BARRIER MATERIAL CAREFULLY TO MINIMIZE SPREADING OF DIRT
AND DEBRIS ASSOCIATED WITH CONSTRUCTION.
CONTAIN CONSTRUCTION WASTE BEFORE TRANSPORT IN TIGHTLY COVERED
CONTAINERS.
COVER TRANSPORT RECEPTACLES OR CARTS. TAPE COVERING UNLESS
SOLID LID.
VACUUM WORK AREA WITH HEPA FILTERED VACUUMS.
WET MOP AREA WITH DISINFECTANT.
REMOVE ISOLATION OF HVAC SYSTEM IN AREAS WHERE WORK IS BEING
PERFORMED.
CONTRACTOR TO BE IN FULL TYVEK SUITS WHEN PERFORMING WORK IN
CERTAIN AREAS AS IDENTIFIED BY THE CONTRACT DOCUMENTS AND THE VA
COR.
PHASE 5
SCALE: 1/8" = 1'-0"1-5-GI-104
1 4TH FLOOR INFECTION CONTROL PLAN - PHASE 5 SCALE: 1" = 80'-0"
KEY PLAN - PHASE 5
N
N th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t o n e e ig h th in c h o n e fo o t
1 2 3 4 5 6 7 8 9
A
B
C
D
E
F
1 2 3 4 5 6 7 8 9
A
B
C
D
E
F
Veterans Health
Administration
VA FORM 08-6231
Drawing Title Project Title
Location
Date Checked Drawn
Project Number
Building Number
Drawing Number
CONSULTANTS:
Drawing # of
657-18-113JCRENOVATE OPERATING ROOMS AND
SUPPORT SPACES - PHASE 5
10/12/2018
VA Health Care System Approval:
100% CONSTRUCTION DOCUMENTS
Revision: Date:
ARCHITECT/ENGINEER:
JOHN COCHRAN DIVISION
915 NORTH GRAND BLVD - ST. LOUIS, MO 63106
A/E:
GUIDON DESIGN INC.
905 N. CAPITOL AVE. SUITE 100 | INDIANAPOLIS, IN. 46204
317.800.6388 | WWW.GUIDONDESIGN.COM
SUSTAINABLE ARCHITECTURE + ENGINEERING
PROJECT LEAD
Architect, Structural Engineer, Civil Engineer
Consultant:
/1
/2
:1 :1
P
M
1-5-GI-104
4TH FLOOR INFECTION CONTROL /
PHASING PLAN - PHASE 5
DAVJDF
CMTA CONSULTING ENGINEERS
903 SPRING STREET
JEFFERSONVILLE, IN 47130
5 59
OR - 5
D416
VEST./ SCRUB
D416A
ORTHO OR - 9
D425
GENERAL OR -
D417
SOILED UTILITY
D418
EQUIP.
ALCOVE
D424
VEST./ SCRUB
D425A
PHASE 5
PROJECT LIMITS
PHASE 5
PROJECT LIMITS
FULL TANKS
D427
VEST./ SCRUB
D423A
CLEAN CORE
CORR.
H428
CLEAN CORE
D441
CORRIDOR
H425
COORIDOR
H426
EQUIP.
STORAGE
D415
CORRIDOR
H424
VEST./ SCRUB
D417A
MATCH LINE MATCH LINE
EQUIP.
STORAGE
D419
PHASE 5
PROJECT LIMITS
A-1
CORRIDOR
H424
EQUIP.
STORAGE
D421
ROBOT
STORAGE
D417B
VEST./ SCRUB
D420A
EQUIP.
STORAGE
D428
EQUIP.
STORAGE
D422
CARDIAC OR -8
D423
NEURO
(CARDIAC
ORTHO) OR - 7
D420
EMPTY TANKS
D426
PHASE 5 - BID ALTERNATES
BID ALTERNATES REFLECTED ON THIS DRAWING INCLUDE BID ITEMS 1 - 3
BID ALTERNATE 1:
GENERAL OR-5
Do not provide mechanical, electrical, and plumbing work in the General OR-5. Omit all finish work within the General OR-5 beyond gypsum board walls and mudded seams. Do not provide integrated ceiling system and all corresponding structural work within General OR-5.
BID ALTERNATE 2:
CARDIAC OR-8
Do not provide mechanical, electrical, and plumbing work in the Cardiac OR-8. Omit all finish work within the Cardiac OR-8 beyond gypsum board walls and mudded seams. Do not provide integrated ceiling system and all corresponding structural work within the Cardiac OR-8.
BID ALTERNATE 3:
ORTHO OR-9
Do not provide mechanical, electrical, and plumbing work in the Ortho OR-9. Omit all finish work within the Ortho OR-9 beyond gypsum board walls and mudded seams. Do not provide integrated ceiling system and all corresponding structural work within the Ortho OR-9.
SCALE: 3/16" = 1'-0"1-5-GI-105
1 ENLARGED 4TH FLOOR PLAN - PHASE 5 BID ALTERNATES
th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t o n e e ig h th in c h o n e fo o t
1 2 3 4 5 6 7 8 9
A
B
C
D
E
F
1 2 3 4 5 6 7 8 9
A
B
C
D
E
F
Veterans Health
Administration
VA FORM 08-6231
Drawing Title Project Title
Location
Date Checked Drawn
Project Number
Building Number
Drawing Number
CONSULTANTS:
Drawing # of
657-18-113JCRENOVATE OPERATING ROOMS AND
SUPPORT SPACES - PHASE 5
10/12/2018
VA Health Care System Approval:
100% CONSTRUCTION DOCUMENTS
Revision: Date:
ARCHITECT/ENGINEER:
JOHN COCHRAN DIVISION
915 NORTH GRAND BLVD - ST. LOUIS, MO 63106
A/E:
GUIDON DESIGN INC.
905 N. CAPITOL AVE. SUITE 100 | INDIANAPOLIS, IN. 46204
317.800.6388 | WWW.GUIDONDESIGN.COM
SUSTAINABLE ARCHITECTURE + ENGINEERING
PROJECT LEAD
Architect, Structural Engineer, Civil Engineer
Consultant:
/1
/2
:1 :2
P
M
1-5-GI-105
BID ALTERNATES
DAVJDF
CMTA CONSULTING ENGINEERS
903 SPRING STREET
JEFFERSONVILLE, IN 47130
6 59
REMEDIATION GENERAL NOTES
A
B
C
D
E
F
G
H
I
J
K
L
THE SCOPE OF THE LEAD RELATED WORK CONSISTS OF REMOVING LEAD-
CONTAINING GREY METAL DOOR FRAMES AND LEAD SHIELDING WITHIN THE
PROJECT LIMITS. ALL WORK SHALL BE CONDUCTED IN ACCORDANCE WITH
ALL FEDERAL, STATE AND LOCAL REGULATIONS AND THE CONTRACT
SPECIFICATIONS.
THE SCOPE OF THE MOLD RELATED WORK CONSISTS OF REMOVING
UNDERLYING WALL BOARD FROM THE WALLS WITH CERAMIC TILE, WATER
STAINED PIPE INSULATION AND A THOROUGH CLEANING OF ALL REMAINING
SURFACES USING AN EPA APPROVED ANTI-MICROBIAL SOLUTION.
THE SCOPE OF ASBESTOS RELATED WORK CONSISTS OF REMOVING
FLOORING IN THE CORRIDOR BETWEEN OR-8 AND OR-9. ALL WORK SHALL
BE IN ACCORDANCE WITH FEDERAL, STATE, AND LOCAL REGULATIONS AND
THE CONTRACT SPECIFICATIONS.
ALL ABATEMENT WORK SHALL BE CONDUCTED DURING NORMAL BUSINESS
HOURS (7 AM TO 5 PM) MONDAY - FRIDAY EXCLUDING FEDERAL HOLIDAYS.
ANY CHANGE IN THE WORK SCHEDULE MUST BE APPROVED IN WRITING BY
THE VA COR AND THE VPIH.
THE ABATEMENT CONTRACTOR SHALL SUBMIT A DETAILED WORK PLAN AND
ABATEMENT SCHEDULE WITH THE REQUIRED SUBMITTALS. ANY CHANGES
TO THE PROCEDURES, CONTAINMENT LIMITS AND PHASING SHALL BE
SUBMITTED TO THE VA COR AND VPIH FOR APPROVAL.
THE LOCATIONS AND QUANTITIES ARE ESTIMATES ONLY AND SHALL BE
FIELD VERIFIED BY THE ABATEMENT CONTRACTOR. THE LIMITS OF
REMOVAL SHALL BE VERIFIED WITH THE VA COR AND VPIH.
THE EXTENT OF THE POTENTIAL MOLD GROWTH SHALL BE FIELD VERIFIED
WITH SELECTIVE DEMOLITION TECHNIQUES, AS ALLOWABLE, ONCE THE
CONSTRUCTION BARRIERS AND NEGATIVE PRESSURE ARE IN PLACE.
ALL LOADOUT PROCEDURES SHALL BE COORDINATED WITH THE VA COR
AND VPIH.
AN ATTACHED OR REMOTE 3-STAGE DECONTAMINATION UNIT SHALL BE
UTILIZED FOR THE LEAD ABATEMENT. IF A REMOTE DECONTAMINATION
UNIT IS UTILIZED, WORKERS WILL BE REQUIRED TO WEAR TWO DISPOSIBLE
SUITS AND A 1-STAGE POP-UP CHAMBER MUST BE ATTACHED TO THE
CONTAINMENTS TO ALLOW FOR WORKERS TO HEPA VACUUM THEMSELVES
OFF AND REMOVE ONE OF THE DISPOSIBLE SUITS PRIOR TO PROGRESSING
TO THE REMOTE DECONTAMINATION UNIT.
THE LOCATIONS OF ABATEMENT DECONTAMINATION UNITS AND WASTE
DISPOSAL CONTAINERS SHALL BE FIELD VERIFIED WITH THE VA COR AND
THE VPIH.
ALL PERIMETER AIR MONITORING AND CLEARANCE SAMPLING SHALL BE
CONDUCTED BY THE VPIH. ALL OSHA PERSONNEL MONITORING SHALL BE
CONDUCTED BY THE CPIH.
SEE DEMOLITION DRAWINGS FOR TEMPORARY PARTITION AND INFECTION
CONTROL DETAILS.
REMEDIATION GENERAL NOTES
L1
L2
L3
L4
L5
REMOVE FLOOR SHEETING WITH POTENTIAL BACTERIA CONTAMINATION
USING MANUAL REMOVAL METHODS INSIDE A NEGATIVE PRESSURE
CONTAINMENT. ALL REMAINING SURFACES SHALL BE CLEANED USING AN
EPA APPROVED ANTI-MICROBIAL SOLUTION.
- OR-9: 300 SF OF FLOOR SHEETING
- OR-10: 300 SF OF FLOOR SHEETING
REMOVE DRYWALL AND LEAD SHIELDING FRO PERIMETER WALLS IN OR-4, 7,
8, 9, AND 10 USING MANUAL REMOVAL METHODS INSIDE A NEGATIVE
PRESSURE CONTAINMENT.
- OR-4: 550 SF OF DRYWALL AND LEAD SHIELDING (REMAINING PERIMETER
WALLS)
- OR-7: 1,200 SF OF DRYWALL AND LEAD SHIELDING
- OR-8: 1,200 SF OF DRYWALL AND LEAD SHIELDING
- OR-9: 800 SF OF DRYWALL AND LEAD SHIELDING
- OR-10: 800 SF OF DRYWALL AND LEAD SHIELDING
REMOVE DOORS AND WINDOWS WITH LEAD SHIELDING USING DISMANTLING
TECHNIQUES INSIDE A NEGATIVE PRESSURE CONTAINMENT.
- OR-4: 3 DOORS, 1 WINDOW
- OR-7: 6 DOORS, 2 WINDOWS
- OR-8: 6 DOORS, 2 WINDOWS
- OR-9: 5 DOORS, 2 WINDOWS
- OR-10: 5 DOORS, 1 WINDOW
REMOVE 12" X 12" BEIGE AND GREY FLOOR TILE AND ASSOCIATED MASTIC.
- CORRIDOR BETWEEN OR-9 AND OR-10: 75 SF OF FLOOR TILE AND MASTIC.
REMOVE LEAD-CONTAINING METAL DOOR FRAMES.
LEAD AND MOLD REMEDIATION LEGEND
REMOVE WALLS WITH EITHER LEAD CONTAINING CERAMIC TILE OR
LEAD SHIELDING AS INDICATED IN THE KEYNOTES.
REMOVE FLORO SHEETING WITH POTENTIAL BACTERIA GROWTH AS
INDICATED IN THE KEYNOTES.
REMOVE 12" X 12" BEIGE AND GREY FLOOR TILE AND MASTIC
PHASE 5
E
B"
C"
D"
E"
F"
G"
S"
R"
P"
14" 13" 12" 11" 10" 8.9" 8" 7" 6"
N9"
G.8
PHASE 5
PROJECT
LIMITS
PHASE 5
PROJECT
LIMITS
PHASE 5
PROJECT LIMITS
L1
L3
L3
L2
L3
L3
L3
L3
L3
L4
L3
L3
L3
L2
L5
L1
LIMITS OF NEGATIVE
PRESSURE CONTAINMENT
LIMITS OF NEGATIVE
PRESSURE CONTAINMENT
LIMITS OF NEGATIVE
PRESSURE CONTAINMENT
L3
L3
L3 L3
L3
L3
L3
L5
L2
L3
L3
L3
L3
L3
L3
L3
L2
L5
L5 L5
L5 L5
L5
L5
L5
L5
L5
L3 L3
L3
L2 SOILED DUMB
WAITER
D452A
OR - 10
D452
SUB STERILE
D450
SCRUB
D451
CORRIDOR
D449
OR - 09
D448
CORRIDOR
H428
SCRUB
D440
CORRIDOR
H429
CORRIDOR
H429A
CORRIDOR
H431
ELEC.
D463A
CORRIDOR
H432
SCRUB
D430A
OR - 06
D430
SUB STERILE
D429A
OR - 05
D429 SCRUB
D428A
SCRUB
D432A
OR - 07
D432
STEAM
STERILE
D437
ROOM
D434
DARK ROOM
D435
X-RAY
CONTROL
D433
OR - 08
D439
SUB STERILE
D438
CLEAN DUMB
WAITER
D458
CORRIDOR
H425
STAIR 9
S409
STAIR 8
S408
SCALE: 1" = 80'-0"
KEY PLAN - PHASE 5
N th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t o n e e ig h th in c h o n e fo o t
1 2 3 4 5 6 7 8 9
A
B
C
D
E
F
1 2 3 4 5 6 7 8 9
A
B
C
D
E
F
Veterans Health
Administration
VA FORM 08-6231
Drawing Title Project Title
Location
Date Checked Drawn
Project Number
Building Number
Drawing Number
CONSULTANTS:
Drawing # of
657-18-113JCRENOVATE OPERATING ROOMS AND
SUPPORT SPACES - PHASE 5
10/12/2018
VA Health Care System Approval:
100% CONSTRUCTION DOCUMENTS
Revision: Date:
ARCHITECT/ENGINEER:
JOHN COCHRAN DIVISION
915 NORTH GRAND BLVD - ST. LOUIS, MO 63106
A/E:
GUIDON DESIGN INC.
905 N. CAPITOL AVE. SUITE 100 | INDIANAPOLIS, IN. 46204
317.800.6388 | WWW.GUIDONDESIGN.COM
SUSTAINABLE ARCHITECTURE + ENGINEERING
PROJECT LEAD
Architect, Structural Engineer, Civil Engineer
Consultant:
/1
/2
:1 :2
P
M
1-5-HA-101
4TH FLOOR HAZARDOUS MATERIALS
PLAN - PHASE 5
DAVJDF
CMTA CONSULTING ENGINEERS
903 SPRING STREET
JEFFERSONVILLE, IN 47130
812.725.8383
7 59
SCALE: 1/8" = 1'-0"1-5-HA-101
1 4TH FLOOR HAZARDOUS MATERIALS PLAN - PHASE 5
BRAND NAME OR EQUAL: NAME BRANDS USED ON THE
DRAWINGS ARE NOT MEANT TO BE RESTRICTIVE, BUT ONLY
TO INDICATE A BRAND THAT REFLECTS THE
CHARACTERISTICS AND LEVEL OF QUALITY THAT WILL
SATISFY THE GOVERNMENT'S NEEDS. THE SALIENT
PHYSICAL, FUNCTIONAL, OR PERFORMANCE
CHARACTERISTICS THAT EQUAL PRODUCTS MUST MEET
ARE IDENTIFIED IN THE SPECIFICATIONS AND DRAWINGS.
DESIGN CRITERIA:
1. CODES AND STANDARDS:
2009 IBC
2. DESIGN LOADS:
LIVE LOADS:
FLOOR:
1950's ADDITION:
- LEVEL 2 ASSUMED ORIGINAL LIVE LOAD: 50 PSF
- LEVEL 3 ASSUMED ORIGINAL LIVE LOAD: 50 PSF
- LEVEL 4 ASSUMED ORIGINAL LIVE LOAD: 50 PSF
- LEVEL 5 ASSUMED ORIGINAL LIVE LOAD: 50 PSF
ROOF:
MINIMUM LIVE LOAD: 20 P.S.F. PLUS ALLOWANCE FOR DRIFTED SNOW
GROUND SNOW LOAD: Pg = 20 P.S.F SNOW EXPOSURE FACTOR: Ce = 0.9
SNOW LOAD IMPORTANCE FACTOR: 1.2
SNOW THERMAL FACTOR: Ct = 1.0
DEAD LOADS:
1950's ADDITION:
- LEVEL 2 ASSUMED ORIGINAL DEAD LOAD: 15 PSF
- LEVEL 3 ASSUMED ORIGINAL DEAD LOAD: 15 PSF
- LEVEL 4 ASSUMED ORIGINAL DEAD LOAD: 15 PSF
- LEVEL 5 ASSUMED ORIGINAL DEAD LOAD: 15 PSF
FLOOR:
SLAB DEAD LOAD = 55 P.S.F.
ROOF:
SLAB DEAD LOAD = 55 P.S.F.
EQUIPMENT:
BOOM = 2020 LBS (LL)
CEILING = 3000 LBS (DL)
GENERAL NOTES
1. CONCRETE SHALL HAVE A 28-DAY COMPRESSIVE STRENGTH AND DENSITY, IN
ACCORDANCE WITH THE FOLLOWING:
STRENGTH DENSITY WATER/ SACKS OF CEMENT
P.S.I. P.C.F CEMENT RATIO PER YARD
FILL SLABS: 3000 145 0.45 5 1/2 MINIMUM
2. REINFORCING SHALL CONFORM TO A.S.T.M. A615, GR. 60, INCLUDING TIES AND
STIRRUPS.
3. WELDED WIRE FABRIC SHALL CONFORM TO A.S.T.M. A185.
4. MINIMUM CONCRETE COVER, UNLESS NOTED OTHERWISE:
A. FORMED SURFACES NOT EXPOSED TO EARTH OR WEATHER:
1. SLABS: 3/4 IN.
5. REFER TO SPECS FOR CONCRETE FINISHES.
6. MECHANICAL, PLUMBING, AND ELECTRICAL DRAWINGS SHALL BE REFERRED TO FOR
DRAINS, SLEEVES, OUTLET BOXES, CONDUIT, ANCHORS, ETC. THE VARIOUS TRADES
ARE RESPONSIBLE FOR PLACING THEIR ITEMS.
7. LAP SPLICES SHALL BE IN ACCORDANCE WITH THE FOLLOWING TABLE, UNLESS NOTED
OTHERWISE. WHERE CLASSES ARE NOT CALLED OUT ON DRAWINGS, USE CLASS "B"
SPLICES. SPLICES f'c = 4000 P.S.I., fy = 60,000 P.S.I.
NOTES:
1. TABLES ARE BASED ON C.R.S.I. CATEGORIES 4 AND 6. WHERE
MINIMUM SPACING IS 6 BAR DIAMETERS CENTER TO CENTER AND
WHERE MINIMUM CONCRETE COVER IS ONE BAR DIAMETER USE
CATEGORY 6 FOR LONGITUDINAL BARS IN BEAM, COLUMNS AND
INNER LAYER OF WALL OR SLABS; USE CATEGORY 4 FOR ALL
OTHER BARS.
2. ALL SPLICES TO BE CLASS "B" TENSION SPLICE UNLESS
OTHERWISE NOTED.
8. EXPANSION BOLTS:
UNLESS NOTED OTHERWISE, EXPANSION BOLTS SHALL HAVE THE FOLLOWING MINIMUM
SERVICE LOAD CAPACITIES WHEN DRILLED INTO CONCRETE WITH A MINIMUM DESIGN
STRENGTH OF 4000 P.S.I. SERVICE LOAD CAPACITIES SHALL PROVIDE FOR A MINIMUM FACTOR
OF SAFETY = 4. (SEE SPECIFICATIONS)
DIAMETER SHEAR TENSION
1/2" 3020 LBS. 2440 LBS.
3/4" 7325 LBS 5285 LBS.
TENSION LAP SPLICE FOR TOP BARS, * GRADE 60
CLASS A, B, LAP SPLICE LENGTH (INCHES)
f'c = 3,000 P.S.I.
CLASS
BAR
SIZE
#3 - 16
#4 - 22
*"TOP BARS" ARE DEFINED AS ANY BAR WITH MORE THAN 12" OF
CONCRETE CAST BELOW THE BAR.
CATEGORY 6 4 6
A B A B
4 6 4 6
A B
4 6 4 6
21 14 18 13 16
28 19 24 17 22
TENSION LAP SPLICE FOR TOP BARS, * GRADE 60
CLASS A, B, LAP SPLICE LENGTH (INCHES)
CLASS
BAR
SIZE
#3 - 13
#4 - 17
CATEGORY 6 4 6
A B A B
4 6 4 6
A B
4 6 4 6
16 12 16 12 16
22 15 19 13 17
COMPRESSION LAP SCHD.
LAP LENGTH (INCHES)
f'c = 3,000 P.S.I.
OR GREATER
BAR SIZE
#3
#4
30 db
CONCRETE
f'c = 4,000 P.S.I. f'c = 5,000 P.S.I.
f'c = 3,000 P.S.I. f'c = 4,000 P.S.I. f'c = 5,000 P.S.I.
STRUCTURAL STEEL:
1. STEEL SHALL CONFORM TO THE FOLLOWING GRADES:
ALL ANGLE, BASE CHANNEL PLATES, CONN. PLATES (U.N.O.): A36 (FY=36)
2. ALL STRUCTURAL STEEL SHALL BE DETAILED, FABRICATED AND ERECTED IN
ACCORDANCE WITH THE LATEST A.I.S.C. CODE OF STANDARD PRACTICE, EXCEPT
AS MODIFIED IN THESE NOTES AND THE PROJECT SPECIFICATIONS.
3. CONNECTION DESIGN FORCES:
A. BEAMS, GREATER OF:
1. 55% OF TOTAL ALLOWABLE UNIFORM LOAD CAPACITY FROM THE
LATEST EDITION A.I.S.C TABLES FOR ALLOWABLE LOADS ON BEAMS,
Wc/L
2. 10 KIPS
4. THE MINIMUM PLATE THICKNESS SHALL BE 3/8".
5. BOLTED CONNECTIONS:
A. MINIMUM BOLT DIAMETER = 3/4"
B. ALL OTHER BOLTED CONNECTIONS SHALL BE BEARING TYPE USING A325N
OR A490N BOLTS. OVERSIZED HOLES AND LONG-SLOTTED HOLES ARE NOT
ALLOWED UNLESS SHOWN ON THE DRAWINGS.
C. PROTRUDING BOLT HEADS, SHAFTS OR NUTS SHALL NOT EXTEND INTO NOR
PROHIBIT THE APPLICATION OF ARCHITECTURAL FINISHES AND THEY SHALL
NOT EXTEND INTO NOR PROHIBIT THE PLACEMENT OF STEEL DECKING TO
THE CORRECT LINE AND ELEVATION.
D. SHOP DRAWINGS SHALL INDICATE THE TYPE OF BOLT USED IN EACH
CONNECTION AND THE ALLOWABLE VALUES USED FOR THE VARIOUS BOLT
TYPES.
6. WELDED CONNECTIONS:
A. WELDS ARE CONTINUOUS UNLESS NOTED OTHERWISE.
B. ALL FILLET WELDS: A.I.S.C. MINIMUM BUT NOT LESS THAN 1/8" UNLESS
NOTED OTHERWISE.
C. ALL WELDING SHALL BE IN ACCORDANCE WITH THE LATEST "STRUCTURAL
WELDING CODE" (A.W.S. D1.1) PUBLISHED BY THE AMERICAN WELDING
SOCIETY. ELECTRODES FOR WELDING SHALL COMPLY WITH THE LATEST
REQUIREMENTS OF TABLE 4.1.1 OF (A.W.S. D1.1).
7. NO CHANGE IN SIZE OR POSITION OF THE STRUCTURAL ELEMENTS SHALL BE MADE
OF HOLES, SLOTS, CUTS, ETC., AND ARE NOT PERMITTED THROUGH ANY MEMBER
UNLESS THEY ARE DETAILED ON THE APPROVED SHOP DRAWINGS.
8. FABRICATE ALL BEAMS WITH THE MILL CAMBER UP.
EXISTING CONDITIONS:
1. THE CONTRACTOR SHALL FIELD VERIFY ALL EXISTING CONDITIONS, SUCH AS DIMENSIONS, ELEVATIONS, CONFIGURATION, AND DETAILS OF EXISTING STRUCTURES AND CONDITIONS
WHERE THEY AFFECT NEW CONSTRUCTION. NOTIFY COR IMMEDIATELY IF ANY DEVIATIONS
FROM ANTICIPATED CONDITIONS ARE DISCOVERED.
2. COORDINATION W/ COMPLETE SET OF CONTRACT DOCUMENTS: THE CONTRACT DOCUMENTS
ARE ONE COMPLETE, COMPREHENSIVE AND INCLUSIVE DOCUMENT CONSISTING OF THE
AGGREGATE COLLECTION OF DRAWINGS AND SPECIFICATIONS FOR ALL OF THE DISCIPLINES'
DIVISIONS (E.G. STRUCTURAL, MECHANICAL, PLUMBING, ELECTRICAL, ETC.). NO SINGLE
DISCIPLINE DIVISION IS AUTONOMOUS NOR DOES IT STAND-ALONE FROM ANY OR ALL OTHER
DISCIPLINE DIVISIONS.
3. VERIFY ALL DIMENSIONS, ELEVATIONS, DEPRESSIONS, INSERTS, EMBEDDED ITEMS.
EQUIPMENT PADS AND SUPPORTS, OPENINGS, DETAILS, AND CONDITIONS BY CROSS-
REFERENCING ALL OTHER DISCIPLINE DRAWINGS, PARTICULARLY MECHANICAL, ELECTRICAL,
AND PLUMBING SECTIONS.
4. SEE ALL OTHER DISCIPLINE DRAWINGS FOR DIMENSIONS NOT SHOWN ON STRUCTURAL
DRAWINGS. UNLESS NOTED ON CONTRACT DOCUMENTS.
5. STRUCTURAL DRAWINGS DO NOT SHOW ALL REQUIRED OPENINGS THROUGH STRUCTURAL
MEMBERS. NO OPENING SHALL BE MADE IN ANY STRUCTURAL MEMBER.
6. NOTES REGARDING USE OF DRAWINGS: DRAWING SCALES ARE NOTED FOR REFERENCE ONLY.
NOT ALL ITEMS ARE DRAWN TO SCALE, AND DRAWINGS SHOULD NOT BE SCALED TO OBTAIN
DIMENSIONS OR ELEVATIONS NOT INDICATED.
7. OPENINGS 4" DIA. OR LESS MAY BE CORE DRILLED. USE A REBAR LOCATOR PRIOR TO DRILLING.
DO NOT CUT EXISTING REBAR. REBAR LOCATOR MUST BE CAPABLE OF DETECTING LOCATION
& SIZE OF REBAR IN A SLAB 6" THICK OR GREATER. MUST BE ABLE TO DISCERN BETWEEN ELEC.
CONDUIT & REBAR.
8. FOR PATCHING OF EXISTING OPENINGS SEE DETAILS ON SHEET 1-1S-001. FOR BIDDING
PURPOSES THE CONTRACTOR SHALL INCLUDE THE PATCHING OF EXISTING CONCRETE
HOLES IN THE 4TH FLOOR SLAB AND 5TH FLOOR SLAB (4TH FLOOR CEILING). ASSUME 8 HOLES LESS THAN 40 sq. in AND 8 HOLES BETWEEN 40 AND 80 sq. in. LOCATIONS WILL NOT BE KNOWN
UNTIL CEILINGS AND UTILITIES ARE DEMOLISHED.
9.