6533 Lift Station and SSL Bid Sheet.xlsx

XLSX spreadsheet 13 KB Posted

Attached to
Sewer service with lift station, Okmulgee, OK
Solicitation number
246-24-Q-0123
Issued by

About this file

This document appears to be a Request for Quotes (RFQ) for a sewer service project with a lift station in Okmulgee, Oklahoma. The contractor shall furnish and install a sewer system and lift station as specified in the statement of work. The procurement is a 100% Indian-owned set-aside under NAICS code 237110 with a size standard of $45 million. The period of performance is 60 calendar days from the notice to proceed. Key details include:

The project includes installing 4" PVC sewer service line, 4" two-way cleanout, 70-gallon lift station with grinder pump, 2" HDPE pressure sewer service line, and 3" HDPE casing pipe. The estimated total project cost is provided in the attached bid sheet.

Quotes are due by June 24, 2024 COB CST and will be evaluated on an acceptable/non-acceptable basis. Award will be made to the responsible, responsive offeror with the lowest reasonable price that meets all technical specifications. A site visit is scheduled for June 4, 2024, and questions are due by June 11, 2024. Bid bond, performance, and payment bonds are required.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

IGCE

Okmulgee OEH&E Field Office
1908 East 10th Street Okmulgee, OK 74447
SR 6533 & OK21-W53
EstimatedUnitTotal
ItemDescriptionQuantityUnitCostCost
Schedule A - Sewer Service Line and Sewer Lift Station
1Pump and Abandon Existing Septic Tank1LS
2F & I 4" SCH 40 PVC Sewer Service Line and Fittings5LF
3F & I 4" Two-Way Cleanout with Plug and Adapter1EA
4F & I 70 Gallon Lift Station with Grinder Pump1EA
5F & I 2" SDR 9 HDPE Pressure Sewer Service Line and Fittings350LF
6F & I 3" SDR 9 HDPE Casing Pipe with Tracer Wire350LF
7F & I Tap on Sewer Main1LS
8F & I Street Cut and Asphalt Repair1LS
9City Permits & Inspection Fees1LS
Total Project Cost
Date of Estimate:
NOTE: Bidder must bid on all items of all schedules to be considered
responsive for award.

File details come from the government source that posted it. Updated .