This is a proposal document and bidding requirements for a maintenance contract issued by the Texas Department of Transportation (TxDOT) for crack sealing work on Interstate 35 and other roadways in Webb County and seven surrounding counties (Dimmit, Duval, Kinney, La Salle, Maverick, Val Verde, and Zavala). The project, identified as Control 6499-01-001 and Project RMC - A00220139, involves cleaning and crack sealing on various roadway sections within the specified counties. The contract is for 95 working days, with time charges beginning when work starts or on November 1, 2026, whichever occurs first. Bidders must submit proposals by the specified letting date, acknowledge receipt of all five addenda issued for this project, and provide a proposal guaranty of $12,000.00 in the form of a cashier's check, teller's check, official check, bank money order, or bid bond. The primary bid item is Joint/Crack Seal (Rubber-Asphalt) with an approximate quantity of 1,023.940 linear miles, along with related traffic control items including mobilization, barricades, signs, traffic handling, portable changeable message signs, truck-mounted attenuators, and one-way traffic control pilot car services.

Bidders must submit completed Bidders Questionnaires at least ten days prior to the letting date, unless currently prequalified through audited financial statements. Unit prices must be submitted for each line item according to standard specifications or special provisions. Crack seal work is restricted to ambient temperatures between 45 and 65 degrees Fahrenheit and requires complete lane closures with a maximum of 2 miles per closure and minimum 2-mile passing zones between multiple locations. Class-B crack sealant is specified with material testing required at a minimum frequency of one sample per truckload or one 50-pound box per 100,000 pounds maximum. The contractor must maintain an email address for correspondence, arrange a pre-work meeting with TxDOT representatives, and coordinate with designated maintenance supervisors in each of the eight counties. Contractors are required to comply with E-Verify employment eligibility verification, nondiscrimination requirements, and various state certifications regarding conflicts of interest, boycotts of Israel and energy companies, and compliance with foreign adversary prohibitions.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Control 6499-01-001 Project RMC - A00220139 Highway IH 35 County WEBB

ADDENDUM ACKNOWLEDGMENT

Each bidder is required to acknowledge receipt of an addendum issued for a specific project. This page is provided for the purpose of acknowledging an addendum.

FAILURE TO ACKNOWLEDGE RECEIPT OF AN ADDENDUM WILL RESULT IN THE BID NOT

BEING READ.

In order to properly acknowledge an addendum, place a mark in the box next to the respective addendum.

ADDENDUM NO. 1

ADDENDUM NO. 2

ADDENDUM NO. 3

ADDENDUM NO. 4

ADDENDUM NO. 5

In addition, the bidder by affixing their signature to the signature page of the proposal is acknowledging that they have taken the addendum(s) into consideration when preparing their bid and that the information contained in the addendum will be included in the contract, if awarded by the Commission or other designees.

1-1

This page intentionally left blank.

Project RMC - A00220139 Highway IH 35 County WEBB

PROPOSAL TO THE TEXAS

TRANSPORTATION COMMISSION

2024 SPECIFICATIONS

Work Consisting of CRACK SEAL

WEBB COUNTY, TEXAS

The quantities in the proposal are approximate. The quantities of work and materials may be increased or decreased as considered necessary to complete the work as planned and contemplated.

This project is to be completed in 95 working days and will be accepted when fully completed and finished to the satisfaction of the Executive Director or designee.

Provide a proposal guaranty in the form of a Cashier’s Check, Teller’s Check (including an Official Check) or Bank Money Order on a State or National Bank or Savings and Loan Association, or State or Federally chartered Credit Union made payable to the Texas Transportation Commission in the following amount:

TWELVE THOUSAND AND 00/100 (Dollars) ( $12,000.00)

A bid bond may be used as the required proposal guaranty. The bond form may be detached from the proposal for completion. The proposal may not be disassembled to remove the bond form. The bond must be in accordance with Item 2 of the specifications.

Any addenda issued amending this proposal and/or the plans that have been acknowledged by the bidder, become part of this proposal.

By signing the proposal the bidder certifies:

1. the only persons or parties interested in this proposal are those named and the bidder has not directly or indirectly participated in collusion, entered into an agreement or otherwise taken any action in restraint of free competitive bidding in connection with the above captioned project.

2. in the event of the award of a contract, the organization represented will secure bonds for the full amount of the contract.

3. the signatory represents and warrants that they are an authorized signatory for the organization for which the bid is submitted and they have full and complete authority to submit this bid on behalf of their firm.

4. that the certifications and representations contained in the proposal are true and accurate and the bidder intends the proposal to be taken as a genuine government record.

• Signed: **

(1) (2) (3) Print Name:

(1) (2) (3) Title:

(1) (2) (3) Company:

(1) (2) (3)

• Signatures to comply with Item 2 of the specifications.

**Note: Complete (1) for single venture, through (2) for joint venture and through (3) for triple venture.

* When the working days field contains an asterisk (*) refer to the Special Provisions and General Notes.

NOTICE TO CONTRACTORS

FOR THIS PROJECT THE AUDITED FINANCIAL PREQUALIFICATION

REQUIREMENT IS WAIVED. ANY CONTRACTOR INTENDING TO BID ON THIS

WORK MUST SUBMIT A COMPLETED “BIDDERS QUESTIONNAIRE”, WITH ANY

ADDITIONAL INFORMATION REQUESTED IN THAT FORM, AT LEAST TEN DAYS

PRIOR TO THE LETTING DATE.

CONTRACTORS THAT ARE CURRENTLY PREQUALIFIED BASED ON AN

AUDITED FINANCIAL STATEMENT DO NOT NEED TO SUBMIT A “BIDDERS

QUESTIONAIRE” SINCE THE NECESSARY INFORMATION IS CONTAINED IN THE

AUDITED PREQUALIFICATION DOCUMENTS.

UNIT PRICES MUST BE SUBMITTED IN ACCORDANCE WITH ITEM 2 OF

THE STANDARD SPECIFICATIONS OR SPECIAL PROVISION TO ITEM 2 FOR

EACH ITEM LISTED IN THIS PROPOSAL.

TEXAS DEPARTMENT OF TRANSPORTATION

BID BOND

KNOW ALL PERSONS BY THESE PRESENTS,

That we, (Contractor Name)

Hereinafter called the Principal, and (Surety Name) a corporation or firm duly authorized to transact surety business in the State of Texas, hereinafter called the Surety, are held and firmly bound unto the Texas Department of Transportation, hereinafter called the Obligee, in the sum of not less than two percent (2%) of the department’s engineer’s estimate, rounded to the nearest one thousand dollars, not to exceed one hundred thousand dollars ($100,000) as a proposal guaranty (amount displayed on the cover of the proposal), the payment of which sum will and truly be made, the said Principal and the said Surety, bind ourselves, our heirs, executors, administrators, successors and assigns, jointly and severally, firmly by these presents.

WHEREAS, the principal has submitted a bid for the following project identified as:

Control 6499-01-001

Project RMC - A00220139

Highway IH 35

County WEBB

NOW, THEREFORE, if the Obligee shall award the Contract to the Principal and the Principal shall enter into the Contract in writing with the Obligee in accordance with the terms of such bid, then this bond shall be null and void. If in the event of failure of the Principal to execute such Contract in accordance with the terms of such bid, this bond shall become the property of the Obligee, without recourse of the Principal and/or Surety, not as a penalty but as liquidated damages.

Signed this Day of 20

By:

(Contractor/Principal Name)

(Signature and Title of Authorized Signatory for Contractor/Principal)

*By:

(Surety Name)

(Signature of Attorney-in-Fact) Impressed

*Attach Power of attorney (Surety) for Attorney-in-Fact Surety Seal Only

This form may be removed from the proposal

BIDDER’S CHECK RETURN

IMPORTANT

The space provided for the return address must be completed to facilitate the return of your bidder’s check. Care must be taken to provide a legible, accurate, and complete return address, including zip code. A copy of this sheet should be used for each different return address.

NOTE

Successful bidders will receive their guaranty checks with the executed contract.

RETURN BIDDERS CHECK TO (PLEASE PRINT):

Control 6499-01-001 Project RMC - A00220139 Highway IH 35 County WEBB

IMPORTANT

PLEASE RETURN THIS SHEET IN ITS ENTIRETY

Please acknowledge receipt of this check(s) at your earliest convenience by signing below in longhand, in ink, and returning this acknowledgement in the enclosed self-addressed envelope.

Check Received By: Date:

Title:

For (Contractor's Name):

Project: County:

NOTICE TO THE BIDDER

In the space provided below, please enter your total bid amount for this project. Only this figure will be read publicly by the Department at the public bid opening.

It is understood and agreed by the bidder in signing this proposal that the total bid amount entered below is not binding on either the bidder or the Department. It is further agreed that the official total bid amount for this proposal will be determined by multiplying the unit bid prices for each pay item by the respective estimated quantities shown in this proposal and then totaling all of the extended amounts.

Total Bid Amount

Control Project Highway County

ALT ITEM DESC SP Bid Item Description Unit Quantity Bid Price Amount Seq

Signed ____________________________________________ Title ____________________________________________ Date ____________________________________________

Additional Signature for Joint Venture:

Signed ____________________________________________ Title ____________________________________________ Date ____________________________________________

Total Bid Amount _______$2,664.00________

EXAMPLE OF BID PRICES SUBMITTED BY COMPUTER PRINTOUT

0001-03-030

STP 2000(938)HES

SH 20

EL PASO

104 509 REMOV CONC (SDWLK) SY 266.400 $10.000 $2,664.00 1

EXAMPLE EXAMPLE EXAMPLE EXAMPLE

EXAMPLES

BID PRICES SUBMITTED BY HAND WRITTEN FORMAT

Unit price for each plant in place

249 014 FLEX BASE(DEL)(DENSCOT)(TY A GR4 CL2) TON 56,787.00 14

ALT

ITEM-CODE

ITEM

NO

DESC

NO

S.P.

NO.

UNIT BID PRICE ONLY

WRITTEN IN WORDS UNIT

APPROX

QUANTITIES

DEPT

USE

ONLY

190 026 RED OAK 1 1/2” - 1 3/4” GAL BB EA 9.000 1

DLRS

CENTS

DLRS

CENTS

Unit price for each ton of Flexible Base

430 001 001 CL A CONC FOR EXT STR (CULV) CY 45.000 27

Unit price for each cubic yard of Concrete

DLRS

CENTS

610 007 001 RDWY ILL ASSEM(TY ST 50T-8-8)(.4 KW)S EA 13.000 7

Unit price of each Roadway Illumination Assembly

DLRS

CENTS

EXAMPLE EXAMPLE EXAMPLE EXAMPLE

RMC - A00220139

Proposal Sheet

WEBB FORM 234-B I-61-5M

TxDOT PROJECT

COUNTY

ALT

ITEM-CODE

UNIT BID PRICE ONLY.

WRITTEN IN WORDS UNIT APPROX

QUANTITIES

DEPT

USE

ONLY

ITEM

NO.

DESC

CODE

S.P.

No.

500 7001

MOBILIZATION

LS 1.000 1 DOLLARS

and CENTS

502 7001

BARRICADES, SIGNS AND TRAFFIC

HANDLING

MO 5.000 2 DOLLARS

and CENTS

503 7002

PORTABLE CHANGEABLE MESSAGE SIGN

EA 2.000 3 DOLLARS

and CENTS

505 7001

TMA (STATIONARY)

DAY 75.000 4 DOLLARS

and CENTS

510 7002

ONE-WAY TRAF CONT (PILOT CAR)

HR 300.000 5 DOLLARS

and CENTS

712 7001

JT / CRCK SEAL (RUBBER - ASPHALT)

LMI 1,023.940 6 DOLLARS

and CENTS

CERTIFICATION OF INTEREST IN OTHER BID

PROPOSALS FOR THIS WORK

By signing this proposal, the bidding firm and the signer certify that the following information, as indicated by checking “Yes” or “No” below, is true, accurate, and complete.

A. Quotation(s) have been issued in this firm's name to other firm(s) interested in this work for consideration for performing a portion of this work.

________ YES

________ NO

B. If this proposal is the low bid, the bidder agrees to provide the following information prior to award of the contract.

1. Identify firms which bid as a prime contractor and from which the bidder received quotations for work on this project.

2. Identify all the firms which bid as a prime contractor to which the bidder gave quotations for work on this project.

ENGINEER SEAL

Project RMC - A00220139

Highway IH 35 County WEBB

The enclosed Texas Department of Transportation Specifications, Special Specifications, Special Provisions, General Notes and Specification Data in this document have been selected by me, or under my responsible supervision as being applicable to this project.

Alteration of a sealed document without proper notification to the responsible engineer is an offense under the Texas Engineering Practice Act.

The seal appearing on this document was authorized by:

Dennice Lizette Garza P.E.

May 22, 2026

Seal Applies to CSJ(s):

All CSJs within the Contract

114212

Dennice Lizette Garza

Project Number: 6499-01-001

County: WEBB, ETC. Control: 6499-01-001

Highway: IH 35, ETC.

GENERAL NOTES:

This routine maintenance contract is for Cleaning and Crack Sealing on various sections of roadways within Dimmit, Duval, Kinney, La Salle, Maverick, Val Verde, Webb, and Zavala Counties.

Contractor questions on this project are to be addressed to the following individual(s):

Vanessa Rosales-Herrera, P.E. - Vanessa.rosales@txdot.gov

Dennice Garza, P.E. - Dennice.Garza@txdot.gov

Irazema Cavazos - Irazema.cavazos@txdot.gov

Angel Alejo - Angel.alejo@txdot.gov

Questions may be submitted via the Letting Pre-Bid Q&A web page. This webpage can be accessed from the Notice to Contractors dashboard located at the following address:

https://tableau.txdot.gov/views/ProjectInformationDashboard/NoticetoContractors

All contractor questions will be reviewed by the Engineer. All questions and any corresponding responses that are generated will be posted through the same Letting Pre-Bid Q&A webpage.

The Letting Pre-Bid Q&A webpage for each project can be accessed by using the dashboard to navigate to the project you are interested in by scrolling or filtering the dashboard using the controls on the left. Hover over the blue hyperlink for the project you want to view the Q&A for and click on the link in the window that pops up.

Provide and maintain an e-mail address for receipt of any correspondence throughout the term of this contract.

Arrange a Pre-work Meeting between representatives of the State and the Contractor prior to beginning work. Outline the proposed work and submit plans for performing the work while providing safe passage of traffic at all times. Access to the TxDOT Maintenance yard is available during normal working hours only.

Time charges will start when work begins or on November 1, 2026; whichever occurs first.

The approximate quantities determined for this project are for information only and are not to be considered as actual quantities. Contractors are hereby instructed to assure

Project Number: 6499-01-001 Sheet 3 themselves of the actual conditions of the work area before bidding. Overruns/underruns of estimated quantities will not be considered as a basis for a claim.

Visit the sites to examine the work areas and meet with the maintenance supervisor on any areas in question. Carefully examine the specifications and secure from the State any additional information, if necessary, that may be essential for a clear and full understanding of the work.

The Contractor must realize that each contract is separate from other contracts. In the event, the Contractor is awarded multiple contracts, they shall be sufficiently staffed to concurrently pursue required operations on any or all contracts they may have at the same time.

Crack seal work shall be performed only when the ambient temperature is between 45 degrees and 65 degrees Fahrenheit. Unless otherwise authorized by the Engineer.

TxDOT will measure lane miles sealed and document the actual hours traffic control vehicles were used for pavement crack seal application operation as shown on the standard(s). No standby hours will be paid for traffic control vehicles driving to different locations or waiting to perform actual crack sealing on pavement.

Remove materials or debris within the construction limits not incorporated in the project.

This work will not be paid for directly but will be subsidiary to pertinent bid items.

Repair and/or replace damaged rails, signposts, etc., caused by the Contractor’s actions during the performance of work. Complete repairs within a time limit as determined by the Engineer.

SUPERVISION:

Prior to beginning work each day, meet with the respective Maintenance Supervisor. Discuss times, places, Contractor inspections and all other issues of the day or topics as directed by the Engineer.

The Maintenance Supervisor contacts for this contract are:

Kinney County Maverick County Brandon Baxter Charles Fite 918 East Military Highway 2440 Main St.

Brackettville, TX 78832 Eagle Pass, TX 78852 (830)563-2326 (830)773-2617 bandon.baxter@txdot.gov charles.fite@txdot.gov

Val Verde County Dimmit County Francis “Tony” Schell Juan D. Moreno 319 E. Gibbs St. 2001 N. First St.

Del Rio, TX 78840 Carrizo Springs, TX 78834 (830)775-2440 (830)876-2535 francis.a.schell@txdot.gov juan.d.moreno@txdot.gov

La Salle County Zavala County Pedro “Pete” Garza Arnulfo Longoria

900 E. FM 468 544 W US 57

Cotulla, TX 78014 La Pryor, TX 78872 (830)879-7000 (830)365-4211 pedro.g.garza@txdot.gov arnulfo.longoria@txdot.gov

Duval County Webb County Servando Casas Jose Magaña 5143 S. SH 16 @ County Road 329 1817 Bob Bullock Loop Freer, TX 78357 Laredo, Texas 78043 (361)394-6771 (956) 712-7714 servando.casas@txdot.gov jose.magana@txdot.gov

Employees are required to wear proper safety equipment. Contractor is responsible for supplying proper safety equipment for employees.

Report and deliver all lost and found items to the Engineer.

ITEM 3 – DEFINITIONS

National Holidays. January 1, Eastern weekend, the last Monday in May, July 4, the first Monday in September, the fourth Thursday in November, December 24, and December 25.

Roadway closures during these key dates and/or special events are prohibited.

ITEM 7 – LEGAL RELATIONS AND RESPONSIBILITIES

Contractor Responsible Person and Alternate. Designate in writing a Contractor’s Responsible Person (CRP) and an alternate to be the representative of the Contractor who is responsible for taking or directing corrective measures regarding the traffic control. The CRP or alternate must be accessible by telephone 24 hr. per day and able to respond when notified.

Project Number: 6499-01-001 Sheet 4

This employee will be located within one (1) hour of traveling time to the project site.

Notify the Engineer in writing of the name, address, and telephone number of this employee. Furnish this information to local law enforcement officials.

ITEM 8 – PROSECUTION AND PROGRESS

Before starting work, provide a sequence of work and estimated progress schedule meeting the requirements of Section8.5.2, “Progress Schedule.”

No closures will be allowed on the weekends which include the following holidays:

January 1, the last Monday in May, July 4, the first Monday in September, the fourth Thursday in November, December 25 and Easter weekend.

ITEM 9 – MEASUREMENT AND PAYMENT

For payment through TxDOT state force account method, complete the weekly tracking forms provided by the department and submit invoices that agree with the tracking form for payment at the end of each month approved services were provided.

ITEM 502 - BARRICADE, SIGNS, AND TRAFFIC HANDLING

Notify the Engineer at least two weeks prior to a proposed traffic pattern change(s) that will require a revision to traffic signals. This is required to provide the State/City time to perform a traffic study, determine the new signal timing and phasing settings that need to be implemented with the traffic change.

Each sign will have two safety flags attached to it at all times. It will not be permissible to hang or lean these signs on or against the State's sign posts, guardrails, bridge rail, etc. All sign stands and safety flags will be provided by the contractor.

When advanced warning flashing arrow panel(s) is/are specified, maintain one standby unit in good condition at the job site ready for immediate use.

Provide shadow vehicles equipped with Truck Mounted Attenuators (TMA) as shown on Traffic Control Plan (TCP) standards.

Lane closures will be required for all crack seal operations. Limit lane closures to a maximum of 2 miles. If more than one lane closure location is desired, provide a minimum of a 2-mile passing zone between locations. Provide a separate sign set up for each location. If a lane closure has to be cancelled due to weather or other unforeseen circumstances, immediately notify the inspector, and reschedule the lane closure as necessary.

Ensure equipment not in use, stockpile aggregate, and other working materials:

Are a minimum of 30 feet from the edge of the travel lane;

Do not obstruct traffic or sight distance;

Do not interfere with the access from abutting property; or Do not interfere with roadway drainage.

Erect signs in locations not obstructing the traveling public’s view of the normal roadway signing or necessary sight distance at intersections and curves.

During the holiday time frame of December 21st through January 1st, every effort should be taken to ensure that all travel lanes remain open where possible.

The Contractor Force Account “Safety Contingency” that has been established for this project is intended to be utilized for work zone enhancements, to improve the effectiveness of the Traffic Control Plan, that could not be foreseen in the project planning and design stage. These enhancements will be mutually agreed upon by the Engineer and the Contractor’s Responsible Person based on weekly or more frequent traffic management reviews on the project. The Engineer may choose to use existing bid items if it does not slow the implementation of enhancement.

Furnish and install all signs, barricades and other incidentals necessary for the proper traffic control, in accordance with part VI of the “Texas Manual on Uniform Traffic Control Devices for Streets and Highways” and in accordance with the standard plan sheets. All equipment, elements, and personnel shown on traffic control standards are required for lane closures, including TMAS. Additional devices may be needed to supplement these requirements. All warning signs shall be factory made and in satisfactory condition.

Series 3 TCP Standard (Mobile Operations) shall not be used for crack seal operations.

ITEM 503 – PORTABLE CHANGEABLE MESSAGED SIGN

Provide 2 electronic portable message signs for the duration of the project. Provide backups and keep operational and available on the jobsite at all times during traffic control operations. The electronic portable changeable message signs will be made available for utilization for the entire duration of the project, including all alternative locations.

Project Number: 6499-01-001 Sheet 5

ITEM 505 – TRUCK MOUNTED ATTENUATOR (TMA) AND TRAILER

Provide 01 Truck Mounted Attenuators as required by the Engineer. Provide backup and always keep operational and available on the jobsite at all times during traffic control operations. The Truck Mounted Attenuator will be made available for utilization for the entire duration of the project, including all alternative locations.

ITEM 712 JOINT/ CRACK SEAL (RUBBER ASPHALT)

Class-B crack sealant shall be used for all locations. Refer to the 2024 Standard Specifications for additional information.

Material testing is required with a minimum frequency of one sample per truckload or one 50-pound box per maximum of 100,000 pounds. The Contractor is responsible that all material used in this contract be approved and certified by the Materials & Test Section. A listing of state approved material producers is available on the Department’s website.

The Contractor shall clean and seal all visible cracks as per Item 712.4 Work Methods.

Demonstration of crack cleaning methods and pace of sealing operation shall be approved by the State prior to start of daily operations.

Each crack seal operation shall have its own approved source to clean visible cracks.

All necessary material, equipment and all incidentals will be supplied by the contractor and purchased on the open market.

All crack sealing operations will require complete lane closures to allow Hot Pour material enough time to set as approved by the Engineer. Set time will vary depending on the temperature to prevent tracking of Hot Pour material.

Class "B" Materials will be required for this project. See Table 16 under Item 300, "Asphalts, Oils and Emulsions" for additional information.

In addition to the site-specific locations included in the plans, callout locations may be requested. The additional locations will be provided at the pre-work meeting.

GENERAL :

THE ABOVE-LISTED SPECIFICATIONS ITEMS ARE THOSE UNDER WHICH

PAYMENT IS TO BE MADE. THESE, TOGETHER WITH SUCH OTHER PERTINENT

ITEMS, IF ANY, AS MAY BE REFERRED TO IN THE ABOVE-LISTED

SPECIFICATION ITEMS, AND INCLUDING THE SPECIAL PROVISIONS LISTED

ABOVE, CONSTITUTE THE COMPLETE SPECIFICATIONS FOR THIS PROJECT.

Control : 6499-01-001 Project : RMC - A00220139

WEBB

IH 35Highway :

County :

TEXAS DEPARTMENT OF TRANSPORTATION

GOVERNING SPECIFICATIONS AND SPECIAL PROVISIONS

ALL SPECIFICATIONS AND SPECIAL PROVISIONS APPLICABLE TO THIS PROJECT ARE

IDENTIFIED AS FOLLOWS:

SPECIAL PROVISIONS :

SPECIAL PROVISIONS WILL GOVERN AND TAKE PRECEDENCE OVER

THE SPECIFICATIONS ENUMERATED HEREON WHEREVER IN

CONFLICT THEREWITH.

SPECIAL SPECIFICATIONS :

STANDARD SPECIFICATIONS:

MOBILIZATIONITEM 500

BARRICADES, SIGNS, AND TRAFFIC HANDLING(503) (505) (510) ITEM 502

PORTABLE CHANGEABLE MESSAGE SIGNITEM 503

TRUCK-MOUNTED ATTENUATOR (TMA) AND TRAILER ATTENUATOR (TA)ITEM 505

ONE-WAY TRAFFIC CONTROLITEM 510

CLEANING AND SEALING JOINTS AND CRACKS (ASPHALT PAVEMENT)(300)

(341) (721)

ITEM 712

ITEMS 1-9 INCL., GENERAL REQUIREMENTS AND COVENANTS

ADOPTED BY THE TEXAS DEPARTMENT OF TRANSPORTATION

SEPTEMBER 1, 2024.

STANDARD SPECIFICATIONS ARE INCORPORATED INTO THE

CONTRACT BY REFERENCE.

"NONDISCRIMINATION" (000---001) SPECIAL PROVISION

"CERTIFICATE OF INTERESTED PARTIES (FORM 1295)" (000---017) SPECIAL PROVISION

"SCHEDULE OF LIQUIDATED DAMAGES" (000---031) SPECIAL PROVISION

"NOTICE OF CONTRACTOR PERFORMANCE EVALUATIONS" (000---

125)

SPECIAL PROVISION

(002---003) SPECIAL PROVISION TO ITEM 002

(003---006) SPECIAL PROVISION TO ITEM 003

(007---001) SPECIAL PROVISION TO ITEM 007

(009---002) SPECIAL PROVISION TO ITEM 009

(300---003) SPECIAL PROVISION TO ITEM 300

CHILD SUPPORT STATEMENT

Under section 231.006, Family Code, the vendor or applicant certifies that the individual or business entity named in this contract, bid, or application is not ineligible to receive the specified grant, loan, or payment and acknowledges that this contract may be terminated and payment may be withheld if this certification is inaccurate.

CONFLICT OF INTEREST CERTIFICATION

Pursuant to Texas Government Code Section 2261.252(b), the Department is prohibited from entering into contracts in which Department officers and employees have a financial interest.

By signing the Contract, the Contractor certifies that it is not prohibited from entering into a Contract with the Department as a result of a financial interest as defined under Texas Government Code Section 2261.252(b), and that it will exercise reasonable care and diligence to prevent any actions or conditions that could result in a conflict of interest with the Department.

The Contractor also certifies that none of the following individuals, nor any of their family members within the second degree of affinity or consanguinity, owns 1% or more interest or has a financial interest as defined under Texas Government Code Section 2261.252(b) in the Contractor:

Any member of the Texas Transportation Commission; and The Department’s Executive Director, General Counsel, Chief of Procurement and Field Support

Operations, Director of Procurement, and Director of Contract Services.

Violation of this certification may result in action by the Department.

E-VERIFY CERTIFICATION

Pursuant to Texas Transportation Code §223.051, all TxDOT contracts for construction, maintenance, or improvement of a highway must include a provision requiring Contractors and subcontractors to use the U.S. Department of Homeland Security’s E-Verify system to determine employment eligibility. By signing the contract, the Contractor certifies that prior to the award of the Contract:

the Contractor has registered with and will, to the extent permitted by law, utilize the United States Department of Homeland Security’s E-Verify system during the term of the Contract to determine the eligibility of all persons hired to perform duties within Texas during the term of the agreement; and the Contractor will require that all subcontractors also register with and, to the extent permitted by law, utilize the United States Department of Homeland Security’s E-Verify system during the term of the subcontract to determine the eligibility of all persons hired to perform duties within Texas during the term of the agreement.

Violation of this requirement constitutes a material breach of the Contract, subjects a subcontractor to removal from the Contract, and subjects the Contractor or subcontractors to possible sanctions in accordance with Title 43, Texas Administrative Code, Chapter 10, Subchapter F, “Sanctions and Suspension for Ethical Violations by Entities Doing Business with the Department.”

_BPSDocName 1-1

Certification Regarding Disclosure of Public Information Pursuant to Subchapter J, Chapter 552, Texas Government Code, contractors executing a contract with a governmental body that results in the expenditure of at least $1 million in public funds must:

1) preserve all contracting information* as provided by the records retention requirements applicable to Texas Department of Transportation (TxDOT) for the duration of the contract,

2) on request of TxDOT, promptly provide any contracting information related to the contract that is in the custody or possession of the entity, and

3) on completion of the contract, either:

A. provide, at no cost to TxDOT, all contracting information related to the contract that is in the custody or possession of the entity, or B. preserve the contracting information related to the contract as provided by the records retention requirements applicable to TxDOT

The requirements of Subchapter J, Chapter 552, Government Code, may apply to this contract, and the contractor or vendor agrees that the contract can be terminated if the contractor or vendor knowingly or intentionally fails to comply with a requirement of that subchapter.

By entering into Contract, the Contractor agrees to:

• provide, or make available, to TxDOT and any authorized governmental investigating or auditing agency all records, including electronic and payment records related to the contract, for the same period provided by the records retention schedule applicable to TxDOT, and

• ensure that all subcontracts include a clause requiring the same.

* As defined in Government Code §552.003, “Contracting information” means the following information maintained by a governmental body or sent between a governmental body and a vendor, contractor, potential vendor, or potential contractor:

1) information in a voucher or contract relating to the receipt or expenditure of public funds by a governmental body;

2) solicitation or bid documents relating to a contract with a governmental body;

3) communications sent between a governmental body and a vendor, contractor, potential vendor, or potential contractor during the solicitation, evaluation, or negotiation of a contract;

4) documents, including bid tabulations, showing the criteria by which a governmental body evaluates each vendor, contractor, potential vendor, or potential contractor responding to a solicitation and, if applicable, an explanation of why the vendor or contractor was selected; and

5) communications and other information sent between a governmental body and a vendor or contractor related to the performance of a final contract with the governmental body or work performed on behalf of the governmental body.

CERTIFICATION TO NOT BOYCOTT ISRAEL

Pursuant to Texas Government Code §2271.002, the Department must include a provision requiring a written verification affirming that the Contractor does not boycott Israel, as defined in Government Code §808.001, and will not boycott Israel during the term of the contract. This provision applies to a contract that:

1) is with a Contractor that is not a sole proprietorship,

2) is with a Contractor with 10 or more full-time employees, and

3) has a value of $100,000 or more.

By signing the contract, the Contractor certifies that it does not boycott Israel and will not boycott Israel during the term of this contract. “Boycott” means refusing to deal with, terminating business activities with, or otherwise taking any action that is intended to penalize, inflict economic harm on, or limit commercial relations specifically with Israel, or with a person or entity doing business in Israel or in an Israeli-controlled territory, but does not include an action made for ordinary business purposes.

CERTIFICATION TO NOT BOYCOTT ENERGY COMPANIES

Pursuant to Texas Government Code §2274.002, the Department must include a provision requiring a written verification affirming that the Contractor does not boycott energy companies, as defined in Government Code §809.001, and will not boycott energy companies during the term of the contract. This provision applies to a contract that:

1) is with a Contractor that is not a sole proprietorship,

2) is with a Contractor with 10 or more full-time employees, and

3) has a value of $100,000 or more.

By signing the contract, the Contractor certifies that it does not boycott energy companies and will not boycott energy companies during the term of this contract. “Boycott” means taking any action that is intended to penalize, inflict economic harm on, or limit commercial relations with a company because the company: (1) engages in the exploration, production, utilization, transportation, sale, or manufacturing of fossil fuel-based energy and does not commit or pledge to meet environmental standards beyond applicable federal and state law; or (2) does business with a company described by (1).

CERTIFICATION TO NOT DISCRIMINATE AGAINST

FIREARM ENTITIES OR FIREARM TRADE ASSOCIATIONS

Pursuant to Texas Government Code §2274.002, the Department must include a provision requiring a written verification affirming that the Contractor:

1) does not have a practice, policy, guidance, or directive that discriminates against a firearm entity or firearm trade association, as defined in Government Code §2274.001, and

2) will not discriminate against a firearm entity or firearm trade association during the term of the contract.

This provision applies to a contract that:

1) is with a Contractor that is not a sole proprietorship,

2) is with a Contractor with 10 or more full-time employees, and

3) has a value of $100,000 or more.

By signing the contract, the Contractor certifies that it does not discriminate against a firearm entity or firearm trade association as described and will not do so during the term of this contract. "Discriminate against a firearm entity or firearm trade association" means, with respect to the entity or association, to:

(1) refuse to engage in the trade of any goods or services with the entity or association based solely on its status as a firearm entity or firearm trade association; (2) refrain from continuing an existing business relationship with the entity or association based solely on its status as a firearm entity or firearm trade association; or (3) terminate an existing business relationship with the entity or association based solely on its status as a firearm entity or firearm trade association. "Discriminate against a firearm entity or firearm trade association" does not include: (1) the established policies of a merchant, retail seller, or platform that restrict or prohibit the listing or selling of ammunition, firearms, or firearm accessories; (2) a company’s refusal to engage in the trade of any goods or services, decision to refrain from continuing an existing business relationship, or decision to terminate an existing business relationship to comply with federal, state, or local law, policy, or regulations or a directive by a regulatory agency, or for any traditional business reason that is specific to the customer or potential customer and not based solely on an entity ’s or association’s status as a firearm entity or firearm trade association.

FOREIGN ADVERSARIES REQUIREMENTS

Pursuant to Executive Order No. GA-48 relating to the hardening of state government, TxDOT must require any company that submits a bid or proposal with respect to a contract for goods or services to the Department to certify that the company, and, if applicable, any of its holding companies or subsidiaries, is not:

A. Listed in Section 889 of the 2019 National Defense Authorization Act (NDAA); or

B. Listed in section 1260H of the 2021 NDAA; or

C. Owned by the government of a country on the U.S. Department of Commerce foreign adversaries list under 15 C.F.R. 791.4; or

D. Controlled by any governing or regulatory body located in a country on the U.S. Department of Commerce’s foreign adversaries list under 15 C.F.R. 791.4.

By signing this proposal, the Contractor certifies that neither it nor any affiliated entities are:

• Listed in Section 889 of the 2019 NDAA;

• Listed in Section 1260H of the 2021 NDAA;

• Owned by the government of a country listed under 15 C.F.R. 791.4; or

• Controlled by any governing or regulatory body located in a country listed under 15 C.F.R.

791.4

Prohibited Activities by Contractors and Vendors

Pursuant to Texas Government Code 2261.302, a state agency contractor, subcontractor, or vendor responding to a contract solicitation may not directly or indirectly:

(1.) engage in surveillance targeting:

(a.) a member of the state legislature or a person employed to support the state legislature in any capacity, (b.) a family member of a person described in subsection (a), (c.) a state agency employee, or (d.) an individual making a complaint or raising concerns regarding state agency operations or contracting;

(2.) engage in an act of intimidation, coercion, extortion, undue influence, or other similar conduct intended to influence, silence, or retaliate against a person described in subsection (1) above, or;

(3.) use private or confidential information to manipulate or influence a state contracting decision or proceeding.

By signing this proposal, the bidder certifies that it will not engage in surveillance targeting or an act of intimidation, coercion, extortion, undue influence, or other similar conduct intended to influence, silence, or retaliate against a member of the state legislature, a person employed to support the state legislature in any capacity, a family member of an aforementioned person, a state agency employee, or an individual making a complaint or raising concerns regarding state agency operations or contracting.

Furthermore, the bidder certifies that it will not use private or confidential information to manipulate or influence a state contracting decision or proceeding.

2024 Specifications 000-001

1 06-23 Statewide

Special Provision to Item 000

Nondiscrimination

1. DESCRIPTION

All recipients of federal financial assistance are required to comply with various nondiscrimination laws, including Title VI of the Civil Rights Act of 1964, as amended (Title VI). Title VI forbids discrimination against anyone in the United States on the grounds of race, color, or national origin by any agency receiving federal funds.

The Texas Department of Transportation, as a recipient of federal financial assistance, and under Title VI and related statutes, ensures that no person will on the grounds of race, religion (where the primary objective of the financial assistance is to provide employment in accordance with 42 USC 2000d-3), color, national origin, sex, age, or disability be excluded from participation in, be denied the benefits of, or otherwise be subjected to discrimination under any Department programs or activities.

2. DEFINITION OF TERMS

Where the term “Contractor” appears in the following six nondiscrimination clauses, the term “Contractor” is understood to include all parties to Contracts or agreements with the Department.

3. NONDISCRIMINATION PROVISIONS

During the performance of this Contract, the Contractor agrees as follows.

3.1. Compliance with Regulations. The Contractor must comply with the Regulations pertinent to nondiscrimination in federally assisted programs of the United States Department of Transportation 49 CFR 21, as they may be amended from time to time, (hereinafter referred to as the Regulations), which are herein incorporated by reference and made a part of this Contract.

3.2. Nondiscrimination. The Contractor, regarding the work performed during the Contract, must not discriminate on the grounds of race, color, or national origin in the selection and retention of subcontractors, including procurements of materials and leases of equipment. The Contractor must not participate either directly or indirectly in the discrimination prohibited by Section 21.5 of the Regulations, including employment practices when the Contract covers a program set forth in Appendix B of the Regulations.

3.3. Solicitations for Subcontracts, Including Procurements of Materials and Equipment. In all solicitations either by competitive bidding or negotiation made by the Contractor for work to be performed under a subcontract, including procurements of materials or leases of equipment, the Contractor must notify each potential subcontractor or supplier of the Contractor’s obligations under this Contract and the Regulations relative to nondiscrimination on the grounds of race, color, or national origin.

3.4. Information and Reports. The Contractor must provide all information and reports required by the Regulations or directives issued pursuant thereto, and must permit access to its books, records, accounts, other sources of information, and facilities as may be determined by the Recipient or the Department to be pertinent to ascertain compliance with such Regulations, orders, and instructions. Where any information required of a Contractor is in the exclusive possession of another who fails or refuses to furnish this information, the Contractor must so certify to the Recipient, or the Department as appropriate, and must set forth what efforts it has made to obtain the information.

3.5. Sanctions for Noncompliance. In the event of the Contractor’s noncompliance with the nondiscrimination provisions of this Contract, the Recipient must impose such Contract sanctions as it or the Department may

2024 Specifications 000-001

2 06-23 Statewide determine to be appropriate, including, but not limited to actions defined in Article 7.1., “Ethics,” or Article 5.1., “Authority of Engineer.”

3.6. Incorporation of Provisions. The Contractor must include the provisions of Sections 3.1–3.6 in every subcontract, including procurements of materials and leases of equipment, unless exempt by the Regulations or directives issued pursuant thereto. The Contractor must take such action with respect to any subcontract or procurement as the Recipient or the Department may direct as a means of enforcing such provisions, including sanctions for noncompliance: Provided, however, that, in the event a Contractor becomes involved in, or is threatened with, litigation with a subcontractor or supplier as a result of such direction, the Contractor may request the Recipient to enter into such litigation to protect the interests of the Recipient, and, in addition, the Contractor may request the United States to enter into such litigation to protect the interests of the United States.

2024 Specifications 000-017

1 - 1 07-23

Special Provision 000 Certificate of Interested Parties (Form 1295)

Submit Form 1295, “Certificate of Interested Parties,” in the following instances:

at Contract execution for Contracts awarded by the Commission, at Contract execution for Contracts awarded by the District Engineer or Chief Engineer with an award amount of $1 million or more, at any time an existing Contract awarded by the District Engineer or Chief Engineer increases in value to $1 million or more because of changes in the Contract, at any time there is an increase of $1 million or more to an existing Contract (e.g., change orders, extensions, and renewals), and at any time there is a change to the information in Form 1295, when the form was filed for an existing Contract.

Form 1295 and instructions for completing and filing the form are available on the Texas Ethics Commission website.

2024 Specifications 000-031

1 - 1 09-24

Schedule of Liquidated Damages

For Dollar Amount of Original Contract Dollar Amount of Daily Contract Administration Liquidated Damages per Working Day

From More Than To and including

0 1,000,000 760

1,000,000 3,000,000 968

3,000,000 5,000,000 1107

5,000,000 15,000,000 1527

15,000,000 25,000,000 2095

25,000,000 50,000,000 3072

50,000,000 Over 50,000,000 5093

In addition to the amount shown in Table 1, the Liquidated Damages will be increased by the amount shown in Item 8 “Prosecution and Progress,” of the General Notes for Road User Cost (RUC), when applicable.

2024 Specifications 000-125

1 - 2 09-25

Notice of Contractor Performance Evaluations

1. GENERAL

In accordance with Texas Transportation Code §223.012, the Engineer will evaluate Contractor performance based on quality, safety, and timeliness of the project.

2. DEFINITIONS

2.1. Project Recovery Plan (PRP). A formal, enforceable plan developed by the Contractor, in consultation with the District, that documents the cause of noted quality, safety, and timeliness issues and specifies how the Contractor proposes to correct project-specific performance deficiencies.

In accordance with 43 TAC §9.23, the District will request a PRP if the Contractor’s performance on a project is below the Department’s acceptable standards and will monitor the Contractor’s compliance with the established plan.

2.2. Corrective Action Plan (CAP). A formal, enforceable plan developed by the Contractor and proposed for adoption by the Construction Division or Maintenance Division, that documents the cause of noted quality, safety, and timeliness issues and specifies how the Contractor proposes to correct statewide performance deficiencies.

3. CONTRACTOR EVALUATIONS

In accordance with 43 TAC §9.23, the Engineer will schedule evaluations at the following intervals, at minimum:

◼ interim evaluations at or within 30 days after the anniversary of the date work began under the Contract, for Contracts extending beyond 1 yr. and

◼ final evaluation, upon project closeout.

In case of a takeover agreement, neither the Surety nor its performing Contractor will be evaluated.

In addition to regularly scheduled evaluations, the Engineer may schedule an interim evaluation at any time to formally communicate issues with quality, safety, or timeliness. Upon request, work with the Engineer to develop a PRP to document expectations for correcting deficiencies.

Comply with the PRP as directed. Failure to comply with the PRP may result in additional remedial actions available to the Engineer under Item 5, “Control of the Work.” Failure to meet a PRP to the Engineer’s satisfaction may result in immediate referral to the Performance Review Committee for consideration of further action against the Contractor.

The Engineer will consider and document any events outside the Contractor’s control that contributed to the failure to meet performance standards or comply with a PRP, including consideration of enough time.

Follow the escalation ladder if there is a disagreement regarding an evaluation or disposition of a PRP. The Contractor may submit additional documentation pertaining to the dispute. The District Engineer’s decision on a Contractor’s evaluation score and recommendation of action required in a PRP or follow-up for noncompliance is final.

2024 Specifications 000-125

2 - 2 09-25 Statewide

4. DIVISION OVERSIGHT

Upon request of the Construction Division or Maintenance Division, develop and submit for Division approval a proposed CAP to document expectations for correcting deficiencies in the performance of projects statewide.

Comply with the CAP as directed. The CAP may be modified at any time up to completion or resolution after written approval of the premise of change from the Division. Failure to meet an adopted or revised adopted CAP to the Division’s satisfaction within 120 days will result in immediate referral to the Performance Review Committee for consideration of further action against the Contractor.

The Division will consider and document any events outside the Contractor’s control that contributed to the failure to meet performance standards or comply with a CAP, including consideration of enough time and associated costs as appropriate.

5. PERFORMANCE REVIEW COMMITTEE

The Performance Review Committee, in accordance with 43 TAC §9.24, will review at minimum all final evaluations, history of compliance with PRPs, any adopted CAPs including agreed modifications, any information about events outside a Contractor’s control contributing to the Contractor’s performance, and any documentation submitted by the Contractor and may recommend one or more of the following actions:

◼ take no action, ◼ reduce the Contractor’s bidding capacity, ◼ prohibit the Contractor from bidding on one or more projects, ◼ immediately suspend the Contractor from bidding for a specified period of time, by reducing the

Contractor’s bidding capacity to zero, or ◼ prohibit the Contractor from being awarded a Contract on which they are the apparent low bidder.

If the Performance Review Committee determines that one or more actions listed above is appropriate, the Committee may recommend that the action or actions also be taken against an entity that the Committee determines, in accordance with 43 TAC §9.27 (relating to Affiliated Entities), is affiliated with the Contractor.

The Deputy Executive Director will determine any further action against the Contractor.

6. APPEALS PROCESS

In accordance with 43 TAC §9.25, the Contractor may appeal remedial actions determined by the Deputy Executive Director.

2024 Specifications 002-003

1 - 1 09-25

Special Provision to Item 2

Instructions to Bidders

Item 2, “Instructions to Bidders” of the Standard Specifications is amended with respect to the clauses cited below. No other clauses or requirements of this Item are waived or changed.

Article 7., “Nonresponsive Bid,” is voided and replaced by the following.

The Department will not accept a nonresponsive bid. A bid that has one or more of the deficiencies listed below is considered nonresponsive:

the bid was not in the hands of the Letting Official at the time and location specified in the advertisement, a proposal form was submitted for the same project by a Bidder or Bidders and one or more of its partners or affiliates, unless the Executive Director has granted an affiliation exception under 43 TAC § 9.12, the Bidder was not authorized to receive a proposal form under Article 2.3., “Issuing Proposal Forms,” the Bidder failed to acknowledge receipt of all addenda issued, the proposal form was signed by a person who was not authorized to bind the Bidder or Bidders, the proposal guaranty did not comply with the requirements contained in this Item, the bid was in a form other than the official proposal form issued by the Department, the Bidder modified the bid in a manner that altered the conditions or requirements for work as stated in the proposal form, the Bidder bid more than the maximum or less than the minimum number of allowable working days shown on the plans when working days was an item, a typed proposal form does not contain the information in the format shown on the “Example of Bid Prices Submitted by

Computer Printout” on the proposal form, the Bidder did not meet the requirements of the technical qualification, the Bidder failed to submit a DBE commitment as specified in Article 2.14., “Disadvantaged Business Enterprise (DBE),” the Bidder failed to participate in the DHS E-Verify system as specified in Article 2.15., “Department of Homeland Security

(DHS) E-Verify System,” or the apparent low…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .