646-101.MEP.20260728 - GI-000 - COVER SHEET.pdf
PDF 2 MB Posted
- Solicitation number
- Not on record
About this file
This is a cover sheet for bid documents for a federal construction project at the Pittsburgh Veterans Affairs Medical Center (VAMC). The project, titled "Pittsburgh VAMC UD SPS AHU & RO Upgrade" (Project Number 646-21-101), involves upgrades to Air Handling Units (AHU) and Reverse Osmosis (RO) systems at the facility located at University Drive C, Pittsburgh, PA 15240. The U.S. Department of Veterans Affairs, Office of Construction and Facilities Management, is the federal agency overseeing this fully sprinklered project.
The bid documents are prepared by Specialized Engineering Solutions (SES Project 22164.001) serving as the consultant and Mott MacDonald Architects P.C. as the Architect/Engineer of Record. The cover sheet references a comprehensive set of design and construction documents organized into multiple categories including General, Structural, Architectural, Interior Design, Fire Protection, Plumbing, Mechanical, and Electrical systems. The documents detail phased construction work across four phases with specific plans for demolition, new installations, equipment layouts, and system upgrades. The bid set was issued as an amendment on July 28, 2026, with the original cover sheet dated November 7, 2025. The documents utilize standard VA Form 08-6231 and are drawn from Autodesk project files referencing the MEP (Mechanical, Electrical, Plumbing) systems for the upgrade project.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet Number Sheet Name
General
GI-000 COVER SHEET
GI-002 GENERAL NOTES, SYMBOLS, ABBREVIATIONS, & CODE DATA
GI-003 ICRA ASSESSMENT
GI-101 LIFE SAFETY PLAN
GI-102 GROUND FLOOR PHASING PLAN - PHASE 1
GI-103 GROUND FLOOR PHASING PLAN - PHASE 2
GI-104 GROUND FLOOR PHASING PLAN - PHASE 3
GI-105 GROUND FLOOR PHASING PLAN - PHASE 4
GI-106 ENLARGED PHASING PLANS AREA 1 & 2 - PHASE 1
GI-107 ENLARGED PHASING PLANS AREA 1 & 3 - PHASE 1
GI-108 PHASING SCHEDULES & DETAILS
Structural
S-101 OVERALL GROUND FLOOR PLAN
Architectural
AE-513 ROOF DETAILS
AE-601 DOOR SCHEDULE, WALL TYPES, AND DETAILS
AE-701 OVERALL GROUND FLOOR - SIGNAGE PLAN
AE-702 SIGN DETAILS
Interior Design
IN-101 OVERALL GROUND FLOOR FINISH PLAN
IN-401 ENLARGED FINISH PLAN - A1
IN-402 ENLARGED FINISH PLAN - A2
IN-403 ENLARGED PLANS & ELEVATIONS
IN-404 SPS LOCKERS/SHOWER ROOM PLANS & ELEVATIONS
IN-405 ENLARGED LOGISTICS LOCKERS
IN-601 FINISH SCHEDULES AND DETAILS
Fire Protection
FPD-101 FIRE PROTECTION GROUND FLOOR - DEMO.
FP-101 FIRE PROTECTION GROUND FLOOR - NEW
Plumbing
AD-101 GROUND FLOOR DEMOLITION PLAN
AD-102 GROUND FLOOR DEMOLITION RCP
AD-103 ROOF PLAN (PARTIAL) - DEMOLITION
AE-100 OVERALL GROUND FLOOR PLAN - ROOM AREAS
AE-101 OVERALL GROUND FLOOR PLAN
AC-101 OVERALL GROUND FLOOR RCP
AE-102 ROOF PLAN (PARTIAL)
AE-211 BUILDING SECTIONS
AE-241 PLAN DETAILS
AE-261 ENLARGED DETAILS
AE-301 WALL TYPES
AE-401 ENLARGED GROUND FLOOR PLAN - A1
AE-402 ENLARGED GROUND FLOOR PLAN - A2
AC-401 ENLARGED GROUND FLOOR RCP - A1
AC-402 ENLARGED GROUND FLOOR RCP - A2
AE-411
ENLARGED EQUIPMENT LAYOUT PLAN (LOGISTICS)
AE-412 EQUIPMENT ELEVATIONS
AE-511 ROOFING SYSTEM BASIS OF DESIGN
AE-512 ROOF DETAILS
P-500 PLUMBING DETAILS
P-501 PLUMBING DETAILS
P-600 PLUMBING SCHEDULES
Plumbing - Reverse Osmosis
PJ-201 REVERSE OSMOSIS
PJ-202 REVERSE OSMOSIS
Mechanical
M-000 MECHANICAL SYMBOLS AND ABBREVIATIONS
MD-10G.1.TLS1 GROUND LEVEL - MECHANICAL DEMOLITION - PHASE 1 - TEMPORARY LOGISTICS STORAGE #1
MD-10G.1.TLS2 GROUND LEVEL - MECHANICAL DEMOLITION - PHASE 1 - TEMPORARY LOGISTICS STORAGE #2
MD-10G.2.A2 GROUND LEVEL - MECHANICAL DEMOLITION - PHASE 2 - AREA A2 & LOADING DOCK AREA
MD-10G.3.A1 GROUND LEVEL - MECHANICAL DEMOLITION - PHASE 3 - AREA A1
MD-102.3 SECOND LEVEL -MECHANICAL DEMOLITION - PHASE 3
MD-104.3 ROOF LEVEL PLAN - MECHANICAL DEMOLITION - PHASE 3
MH-20G.2.TLS1 GROUND LEVEL - DUCTWORK - PHASE 2 - TEMPORARY LOGISTICS STORAGE #1
MH-20G.2.TLS2 GROUND LEVEL - DUCTWORK - PHASE 2 - TEMPORARY LOGISTICS STORAGE #2
MH-20G.3.A2 GROUND LEVEL - DUCTWORK - PHASE 3 - AREA A2
P-000 PLUMBING SYMBOLS AND ABBREVIATIONS
PD-10B.2.A2 BASEMENT LEVEL - PLUMBING DEMOLITION - PHASE 2
PD-10B.3.A1 BASEMENT LEVEL - PLUMBING - DEMOLITION - PHASE 3 - AREA A1
PD-10G.2.A2 GROUND LEVEL - PLUMBING DEMOLITION - PHASE 2 - AREA A2
PD-10G.3.A1 GROUND LEVEL - PLUMBING DEMOLITION - PHASE 3 - AREA A1
PD-104.3 ROOF LEVEL PLAN - PLUMBING DEMOLITION - PHASE 3 - OVERALL
PP-20B.3.A1 BASEMENT LEVEL - PLUMBING PIPING - PHASE 3 - AREA A1
PP-20B.3.A2 BASEMENT LEVEL - PLUMBING PIPING - PHASE 3 - AREA A2
PP-20G.3.A2 GROUND LEVEL - PLUMBING PIPING - PHASE 3 - AREA A2
PP-20G.4.A1 GROUND LEVEL - PLUMBING PIPING - PHASE 4 - AREA A1
PW-20B.3.A2 BASEMENT LEVEL - PLUMBING DRAINAGE - PHASE 3 - AREA A2
PW-20B.4.A1 BASEMENT LEVEL - PLUMBING DRAINAGE - PHASE 4 - AREA A1
PW-20G.3.A2 GROUND LEVEL - PLUMBING DRAINAGE - PHASE 3 - AREA A2
PW-20G.4.A1 GROUND LEVEL - PLUMBING DRAINAGE - PHASE 4 - AREA A1
PW-202 ROOF LEVEL PLAN - PLUMBING DRAINAGE - PHASE 3
P-400 RO WATER RISER DIAGRAM - PHASE 3 - AREA A2
P-401 DOM WATER AND INSTRUMENT AIR RISER DIAGRAM - PHASE 3 - AREA A2
P-403 WASTE AND VENT RISER DIAGRAM - PHASE 3 - AREA A2
P-405 WASTE, VENT AND WATER RISER DIAGRAMS - PHASE 4 - AREA A1
EP-20G.2.TLS2 GROUND LEVEL - POWER - PHASE 2 - TEMPORARY LOGISTICS STORAGE #2
EP-20G.3.A2 GROUND LEVEL - POWER - PHASE 3 - AREA A2
EP-20G.4.A1 GROUND LEVEL - POWER - PHASE 4 - AREA A1
EP-202.3 SECOND LEVEL - POWER - PHASE 3
EP-206.1 PENTHOUSE ROOF LEVEL - POWER - PHASE 3
ET-20G.2.TLS1 GROUND LEVEL - LOW VOLTAGE - PHASE 2 - TEMPORARY LOGISTICS STORAGE #1
ET-20G.2.TLS2 GROUND LEVEL - LOW VOLTAGE - PHASE 2 - TEMPORARY LOGISTICS STORAGE #2
ET-20G.3.A2 GROUND LEVEL - LOW VOLTAGE - PHASE 3 - AREA A2
ET-20G.4.A1 GROUND LEVEL - LOW VOLTAGE - PHASE 4 - AREA A1
E-500 ONE-LINE DIAGRAM
E-600 ELECTRICAL DETAILS
E-601 ELECTRICAL DETAILS
E-700 ELECTRICAL SCHEDULES
E-701 ELECTRICAL PANEL SCHEDULES
E-702 ELECTRICAL PANEL SCHEDULES
E-703 ELECTRICAL PANEL SCHEDULES
MH-20G.3.A4 GROUND LEVEL - DUCTWORK - PHASE 3 - LOADING DOCK AREA
MH-20G.4.A1 GROUND LEVEL - DUCTWORK - PHASE 4 - AREA A1
MH-202.3 SECOND LEVEL - DUCTWORK - PHASE 3
MP-20G.2.TLS1 GROUND LEVEL - HYDRONIC PIPING - PHASE 2 - TEMPORARY LOGISTICS STORAGE #1
MP-20G.3.A2 GROUND LEVEL - HYDRONIC PIPING - PHASE 3 - AREA A2
MP-20G.4.A1 GROUND LEVEL - HYDRONIC PIPING - PHASE 4 - AREA A1
MP-202.3 SECOND LEVEL - HYDRONIC PIPING - PHASE 3
MP-203.3 THIRD LEVEL -HYDRONIC PIPING -PHASE 3
MP-203.4 ROOF LEVEL -HYDRONIC PIPING -PHASE 3
M-300 DUCTWORK AND PIPING - PHASE 3 - WEST ELEVATIONS
M-303 MECHANICAL ROOM ELEVATIONS - PHASE 3 - 2ND FLOOR MECHANICAL ROOM
M-304 DUCTWORK - PHASE 3 - NORTH ELEVATIONS
M-400 MECHANICAL SCHEMATICS
M-500 MECHANICAL DETAILS
M-501 MECHANICAL DETAILS
M-600 MECHANICAL SCHEDULES
M-601 MECHANICAL SCHEDULES
M-700 MECHANICAL CONTROLS
M-701 MECHANICAL CONTROLS
M-702 MECHANICAL CONTROLS
Electrical
E-000 ELECTRICAL SYMBOLS AND ABBREVIATIONS
E-001 ELECTRICAL SYMBOLS AND ABBREVIATIONS
ED-10G.1.TLS1 GROUND LEVEL - ELECTRICAL DEMOLITION - PHASE 1 - TEMPORARY LOGISTICS STORAGE #1
ED-10G.1.TLS2 GROUND LEVEL - ELECTRICAL DEMOLITION - PHASE 1 - TEMPORARY LOGISTICS STORAGE #2
ED-10G.2.A2 GROUND LEVEL - ELECTRICAL DEMOLITION - PHASE 2 - AREA A2
ED-10G.3.A1 GROUND LEVEL - ELECTRICAL DEMOLITION - PHASE 3 - AREA A1
EL-20G.2.TLS1 GROUND LEVEL - LIGHTING - PHASE 2 - TEMPORARY LOGISTICS STORAGE #1
EL-20G.2.TLS2 GROUND LEVEL - LIGHTING - PHASE 2 - TEMPORARY LOGISTICS STORAGE #2
EL-20G.3.A2 GROUND LEVEL - LIGHTING - PHASE 3 - AREA A2
EL-20G.3.A4 GROUND LEVEL - LIGHTING - PHASE 3 - LOADING DOCK AREA
EL-20G.4.A1 GROUND LEVEL - LIGHTING - PHASE 4 - AREA A1
EJ-20G.2.TLS1 GROUND LEVEL - LIGHTING CONTROL - PHASE 2 - TEMPORARY LOGISTICS STORAGE #1
EJ-20G.2.TLS2 GROUND LEVEL - LIGHTING CONTROL - PHASE 2 - TEMPORARY LOGISTICS STORAGE #2
EJ-20G.3.A2 GROUND LEVEL - LIGHTING CONTROL - PHASE 3 - AREA A2
EJ-20G.4.A1 GROUND LEVEL - LIGHTING CONTROL - PHASE 4 - AREA A1
EP-20G.2.TLS1 GROUND LEVEL - POWER - PHASE 2 - TEMPORARY LOGISTICS STORAGE #1
Sheet Number Sheet Name
AE-410
ENLARGED EQUIPMENT LAYOUT PLAN
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
BID DOCUMENTS
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
1300 Baxter St.
Suite 230 Charlotte, NC 28204 Phone: 704.348.3097 www.specializedeng.com
SES Project : 22164.001
MOTT MACDONALD
ARCHITECTS P.C.
111 WOOD AVENUE SOUTH
SUITE 102
ISELIN, NJ, 08830-4112 U.S.A.
11-07-2025
A u to d e s k D o c s /2
.0
V A
P it ts b u rg
S P
S A
H U a n d
R O
U p g ra d e s /6
-1
.M
E P
.2
.r v t
-0
-3
:4
:3
A M
GI-000
COVER SHEET UD SPS AHU & RO UPGRADE,
PITTSBURGH VAMC
University Drive C, Pittsburgh, PA 15240
646-21-101
11/07/2025 JLN AEA
646-21-101
PITTSBURGH VAMC UD SPS AHU & RO UPGRADE
U.S. Department of Veterans Affairs
University Drive C, Pittsburgh, PA 15240
Revisions: Date:
BID SET - AMENDMENT-1 07/28/26
| Sheets |
| GI-000 - COVER SHEET |
File details come from the government source that posted it. Updated .