This document outlines a federal construction contract solicitation to replace the roof of Building 200 at the Northport Veterans Affairs Medical Center. The solicitation number is 36C24220B0057 and seeks to furnish all necessary professional construction services and materials to complete the roof replacement project according to provided drawings and specifications. The project completion deadline is 365 calendar days from the notice to proceed. The pre-bid site visit is scheduled for the week of August 17th and questions regarding the solicitation are due by August 26th. The bid opening will be held on September 10th at the James J. Peters VA Medical Center. This procurement is set aside for Veteran Owned Small Businesses and has an estimated value between $2,000,000 to $5,000,000. The soliciting agency is the Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 2.

View the file

Other files

File Type Posted
36C24220B0057 0001.docx DOCX document
36C24220B0057_1.docx DOCX document
623-16-104 NP Roof BID Specs.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DETAIL_TITLE

DEPARTMENT OF VETERANS AFFAIRS

ROOF REPLACEMENT AT THE NORTHPORT VAMC

G-001

TITLE SHEET

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Fi le

P at h 6/

/2

:3

9:

P M

100% BID PACKAGEOffice of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

Asbestos Abatement Consultants:

Project Director

12 MAY 2020 RD TRBRevisions: Date:

632-16-104

79 MIDDLEVILLE RD, NORTHPORT, NY 11768

ROOF REPLACEMENT

AT THE NORTHPORT VAMC

THINKFORM DESIGN ARCHITECT LLC

38 EAST BROAD STREET

HOPEWELL, NJ 08525

T:855.821.0274 F:609.644.4397 Russell DiNardo, AIA NY 031521-1

EGAN ENVIRONMENTAL CONSULTING, INC.

14 HIGH STREET

MAHWAH, NEW JERSEY 07430

P: 201.848.7790

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text

SHEET NUMBER

AutoCAD SHX Text

SECTION SHEET NUMBER

AutoCAD SHX Text

INTERIOR ELEVATIONS

AutoCAD SHX Text

BUILDING ELEVATION SHEET NUMBER

AutoCAD SHX Text N

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text E

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text W

AutoCAD SHX Text S

AutoCAD SHX Text

DETAIL SHEET NUMBER

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text

DETAIL NUMBER SHEET NUMBER

AutoCAD SHX Text

PARTITION TYPE

AutoCAD SHX Text

XX

AutoCAD SHX Text X

AutoCAD SHX Text

TITLE

AutoCAD SHX Text X

AutoCAD SHX Text

WINDOW TYPE

AutoCAD SHX Text

REVISIONS

AutoCAD SHX Text

ROOM NAME ROOM NUMBER

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

KEYED NOTE

AutoCAD SHX Text

DATUM LINE

AutoCAD SHX Text

DOOR NUMBER

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

SHEET

AutoCAD SHX Text

SCALE

AutoCAD SHX Text GENERAL: G-001 - TITLE SHEET - TITLE SHEET TITLE SHEET G-002 - NOTES, STAGING & ABBREVIATIONS - NOTES, STAGING & ABBREVIATIONS NOTES, STAGING & ABBREVIATIONS ASBESTOS H-101 - ASBESTOS ABATEMENT ROOF PLAN - ASBESTOS ABATEMENT ROOF PLAN ASBESTOS ABATEMENT ROOF PLAN ARCHITECTURAL: A-101 - FIRST FLOOR EXISTING ROOF DEMOLITION PLAN - FIRST FLOOR EXISTING ROOF DEMOLITION PLAN FIRST FLOOR EXISTING ROOF DEMOLITION PLAN A-102 - FOURTH FLOOR & PENTHOUSE EXISTING ROOF DEMOLITION PLAN - FOURTH FLOOR & PENTHOUSE EXISTING ROOF DEMOLITION PLAN FOURTH FLOOR & PENTHOUSE EXISTING ROOF DEMOLITION PLAN A-103 - PARTIAL FIRST FLOOR ROOF PLAN - PARTIAL FIRST FLOOR ROOF PLAN PARTIAL FIRST FLOOR ROOF PLAN A-104 - PARTIAL FIRST FLOOR ROOF PLAN - PARTIAL FIRST FLOOR ROOF PLAN PARTIAL FIRST FLOOR ROOF PLAN A-105 - PARTIAL FOURTH FLOOR & PENTHOUSE ROOF PLAN - PARTIAL FOURTH FLOOR & PENTHOUSE ROOF PLAN PARTIAL FOURTH FLOOR & PENTHOUSE ROOF PLAN A-106 - PARTIAL FOURTH FLOOR ROOF PLAN - PARTIAL FOURTH FLOOR ROOF PLAN PARTIAL FOURTH FLOOR ROOF PLAN A-501 - ROOF DETAILS - ROOF DETAILS ROOF DETAILS A-502 - ROOF DETAILS- ROOF DETAILSROOF DETAILS

AutoCAD SHX Text

79 MIDDLEVILLE ROAD, NORTHPORT, NEW YORK 11768

AutoCAD SHX Text PROJECT No. 632-16-104

AutoCAD SHX Text

79 MIDDLEVILLE ROAD NORTHPORT, NEW YORK

AutoCAD SHX Text N

AutoCAD SHX Text

AREA OF PROJECT

AutoCAD SHX Text

FACILITY MAP

AutoCAD SHX Text

NO SCALE

AutoCAD SHX Text

SYMBOLS

AutoCAD SHX Text

KEY MAP: BUILDING 200, ROOF PLAN

AutoCAD SHX Text

NO SCALE

AutoCAD SHX Text

HATCHED AREAS = ROOF REPLACEMENT

AutoCAD SHX Text

DRAWING LIST

AutoCAD SHX Text N

AutoCAD SHX Text

CAMPUS ENTRANCE

AutoCAD SHX Text

HOSPITAL ADDITION (NIC)

AutoCAD SHX Text

SIDE ENTRANCE ROOF (NIC)

AutoCAD SHX Text

AMBULANCE ENTRANCE ROOF (NIC)

AutoCAD SHX Text

PENTHOUSE ROOF

AutoCAD SHX Text

4TH ROOF NE TOWER

AutoCAD SHX Text

4TH ROOF NW TOWER

AutoCAD SHX Text

4TH ROOF SE TOWER

AutoCAD SHX Text

4TH ROOF SW TOWER

AutoCAD SHX Text

1ST ROOF NORTH

AutoCAD SHX Text

1ST ROOF WEST

AutoCAD SHX Text

1ST ROOF EAST

AutoCAD SHX Text

1ST ROOF SOUTH

AutoCAD SHX Text

INTENSIVE CARE UNIT ROOF (NIC)

AutoCAD SHX Text

BUILDING 200 NORTHPORT VAMC

AutoCAD SHX Text

SMOKING AREA ROOF (NIC)

AutoCAD SHX Text

BUILDING 200

AutoCAD SHX Text

AERIAL IMAGE FROM BING.COM

AutoCAD SHX Text

AERIAL IMAGE FROM BING.COM

CAMPUS SITE PLAN - PARTIAL

G-002

NOTES, STAGING

& ABBREVIATIONS

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Fi le

P at h 6/

/2

:3

9:

P M

100% BID PACKAGEOffice of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

Asbestos Abatement Consultants:

Project Director

12 MAY 2020 RD TRBRevisions: Date:

632-16-104

79 MIDDLEVILLE RD, NORTHPORT, NY 11768

ROOF REPLACEMENT

AT THE NORTHPORT VAMC

THINKFORM DESIGN ARCHITECT LLC

38 EAST BROAD STREET

HOPEWELL, NJ 08525

T:855.821.0274 F:609.644.4397 Russell DiNardo, AIA NY 031521-1

EGAN ENVIRONMENTAL CONSULTING, INC.

14 HIGH STREET

MAHWAH, NEW JERSEY 07430

P: 201.848.7790

AutoCAD SHX Text

4TH FL ROOF NW TOWER

AutoCAD SHX Text

CONTRACTOR STAGING AREA

AutoCAD SHX Text

1ST FL ROOF SOUTH

AutoCAD SHX Text

4TH FL ROOF NW TOWER

AutoCAD SHX Text

4TH FL ROOF NW TOWER

AutoCAD SHX Text

4TH FL ROOF NW TOWER

AutoCAD SHX Text

INTENSIVE CARE ROOF (NIC)

AutoCAD SHX Text

PENTHOUSE ROOF

AutoCAD SHX Text

1ST FL ROOF WEST

AutoCAD SHX Text

1ST FL ROOF EAST

AutoCAD SHX Text

1ST FL ROOF NORTH

AutoCAD SHX Text

(NIC)

AutoCAD SHX Text

(NIC)

AutoCAD SHX Text

HOSPITAL ADDITION (NIC)

AutoCAD SHX Text

BUILDING 200 NORTHPORT VAMC

AutoCAD SHX Text STAGING AREA TO INCLUDE STAIR SCAFFOLDING ACCESS TO ROOF, WASTE DISPOSAL & CHUTE, AND MATERIAL HOIST. STAGING AREA TO BE FENCED AND SECURED.

AutoCAD SHX Text

SIDEWALK SHEDDING

AutoCAD SHX Text

SIDEWALK SHEDDING

AutoCAD SHX Text

EXIST LOADING DOCK ROOF

AutoCAD SHX Text SHADED AREA INDICATED ZONES OF ROOF REPLACEMENT OF THE 1ST FLOOR ROOF, THE 4TH FLOOR ROOF AND THE PENTHOUSE ROOF

AutoCAD SHX Text

CONTRACTOR ACCESS TO STAGING AREA

AutoCAD SHX Text

SIDEWALK SHEDDING

AutoCAD SHX Text

EXTEND SIDEWALK SHEDDING TO PROTECT GLASS ROOF

AutoCAD SHX Text

SIDEWALK SHEDDING

AutoCAD SHX Text A LABEL CLASS A DOOR CLASS A DOOR A/C AIR CONDITION AIR CONDITION A/E ARCHITECT/ENGINEER ARCHITECT/ENGINEER ABV ABOVE ABOVE ACT ACOUSTICAL CEILING TILE ACOUSTICAL CEILING TILE AD AREA DRAIN AREA DRAIN ADH ADHESIVE ADHESIVE ADJ ADJACENT ADJACENT ADMIN ADMINISTRATION ADMINISTRATION AFC ABOVE FINISHED COUNTER ABOVE FINISHED COUNTER AFF ABOVE FINISHED FLOOR ABOVE FINISHED FLOOR AHU AIR HANDLING UNIT AIR HANDLING UNIT ALT ALTERNATE ALTERNATE ALUM ALUMINUM ALUMINUM APPROX APPROXIMATE APPROXIMATE ARCH ARCHITECT ARCHITECT ASB ASBESTOS ASBESTOS ASPH ASPHALT ASPHALT ASSN ASSOCIATION ASSOCIATION AUTO AUTOMATIC AUTOMATIC AUX AUXILIARY AUXILIARY BAT BATTEN BATTEN BD BOARD BOARD BEV BEVEL BEVEL BKG BACKING BACKING BLDG BUILDING BUILDING BOT BOTTOM BOTTOM BTWN BETWEEN BETWEEN C TO C CENTER TO CENTER CENTER TO CENTER CAB CABINET CABINET CONC CONCRETE CONCRETE CIR CIRCLE CIRCLE CL CENTER LINE CENTER LINE CLDG CLADDING CLADDING CLG CEILING CEILING CLG HT CEILING HEIGHT CEILING HEIGHT CLR CLEAR CLEAR CMU CONCRETE MASONRY UNIT CONCRETE MASONRY UNIT CNTR COUNTER COUNTER COL COLUMN COLUMN CONC FLR CONCRETE FLOOR CONCRETE FLOOR CONSTR CONSTRUCTION CONSTRUCTION CONT CONTINUE CONTINUE COORD COORDINATE COORDINATE CPT CARPET CARPET CSWK CASEWORK CASEWORK CT CERAMIC TILE CERAMIC TILE CTRL CONTROL CONTROL DAT DATUM DATUM DC DIRECT CURRENT DIRECT CURRENT DEG DEGREE DEGREE DEL DELETE DELETE DEMO DEMOLITION DEMOLITION DEPT DEPARTMENT DEPARTMENT DTL DETAIL DETAIL DIFF DIFFERENCE DIFFERENCE DIM DIMENSION DIMENSION DIR DIRECTION DIRECTION DR DOOR, OR DRAIN DOOR, OR DRAIN DR OPNG DOOR OPENING DOOR OPENING E.J. EXPANSION JOINT EXPANSION JOINT EL ELEVATION ELEVATION ELEC ELECTRIC ELECTRIC ELEV ELEVATOR ELEVATOR EMER EMERGENCY EMERGENCY ENGR ENGINEER ENGINEER EQ EQUAL EQUAL EQUIP EQUIPMENT EQUIPMENT EQUIV EQUIVALENT EQUIVALENT ESP ESPECIALLY ESPECIALLY EXIST EXISTING EXISTING FA FIRE ALARM FIRE ALARM FAS FASCIA FASCIA FD FLOOR DRAIN FLOOR DRAIN FE FIRE EXTINGUISHER FIRE EXTINGUISHER FEC FIRE EXTINGUISHER CABINET FIRE EXTINGUISHER CABINET FIN FLR FINISH FLOOR FINISH FLOOR FIXT FIXTURE FIXTURE FLR FLOOR FLOOR FP FIRE PROTECTION OR FIREPROOF FIRE PROTECTION OR FIREPROOF FRZ FREEZER FREEZER FT FEET OR FOOT FEET OR FOOT FURN FURNISH OR FURNITURE FURNISH OR FURNITURE GA GAGE OR GYPSUM ASSOCIATION GAGE OR GYPSUM ASSOCIATION GAL GALLON GALLON GALV GALVANIC OR GALVANIZED GALVANIC OR GALVANIZED GB GRAB BAR GRAB BAR GC GENERAL CONTRACTOR GENERAL CONTRACTOR GEN GENERAL OR GENERATOR GENERAL OR GENERATOR GL GLASS GLASS GLU LAM GLUED LAMINATED WOOD GLUED LAMINATED WOOD GT GROUT GROUT GYP GYPSUM GYPSUM GYP BD GYPSUM BOARD GYPSUM BOARD HB HOSE BIBB HOSE BIBB HC HOLLOW CORE HOLLOW CORE HDWD HARDWOOD HARDWOOD HM HOLLOW METAL HOLLOW METAL HT HEIGHT HEIGHT HVAC HEATING, VENTILATING, HEATING, VENTILATING, AND AIR CONDITIONING ID IDENTIFICATION IDENTIFICATION ILLUM ILLUMINATION ILLUMINATION INCL INCLUDED INCLUDED INFO INFORMATION INFORMATION INSUL INSULATION INSULATION INT INTERIOR INTERIOR JAN JANITOR JANITOR J-BOX JUNCTION BOX JUNCTION BOX LAB LABORATORY LABORATORY LAM LAMINATE LAMINATE LAV LAVATORY LAVATORY LDR LEADER LEADER LED LIGHT EMITTING DIODE LIGHT EMITTING DIODE LT LIGHT LIGHT LVD LOUVERED LOUVERED LVR LOUVER LOUVER LYR LAYER LAYER

AutoCAD SHX Text MAINT MAINTENANCE MAINTENANCE MATL MATERIAL MATERIAL MAX MAXIMUM MAXIMUM MECH MECHANICAL MECHANICAL MEMO MEMORANDUM MEMORANDUM MEZZ MEZZANINE MEZZANINE MID MIDDLE MIDDLE MIRR MIRROR MIRROR MISC MISCELLANEOUS MISCELLANEOUS MLDG MOLDING (MOULDING) MOLDING (MOULDING) MLWK MILLWORK MILLWORK MO MASONRY OPENING MASONRY OPENING MTL METAL METAL MULL MULLION MULLION NA NOT APPLICABLE NOT APPLICABLE NAT NATURAL NATURAL NIC NOT IN CONTRACT NOT IN CONTRACT NO NUMBER NUMBER NOM NOMINAL NOMINAL NUM NUMERAL NUMERAL OC ON CENTER ON CENTER OCC OCCUPY OCCUPY OFF OFFICE OFFICE OPNG OPENING OPENING OPP OPPOSITE OPPOSITE OSHA OCCUPATIONAL SAFETY AND OCCUPATIONAL SAFETY AND HEALTH ADMINSTRATION OZ OUNCE OUNCE PART PARTIAL PARTIAL PAT PATTERN PATTERN PEN PENETRATE PENETRATE PERF PERFORATED PERFORATED PERP PERPENDICULAR PERPENDICULAR PLAS PLASTER OR PLASTIC PLASTER OR PLASTIC PLBG PLUMBING PLUMBING PLYWD PLYWOOD PLYWOOD PNL PANEL PANEL PRCST PRECAST PRECAST PREFAB PREFABRICATE PREFABRICATE PRELIM PRELIMINARY PRELIMINARY PREP PREPARATION PREPARATION PREV PREVIOUS PREVIOUS PROP PROPERTY PROPERTY PTD PAINTED PAINTED PVC POLYVINYL CHLORIDE (PLASTIC) POLYVINYL CHLORIDE (PLASTIC) QA QUALITY ASSURANCE QUALITY ASSURANCE QC QUALITY CONTROL QUALITY CONTROL QT QUARRY TILE QUARRY TILE QTB QUARRY TILE BASE QUARRY TILE BASE QTR QUARTER QUARTER QTY QUANTITY QUANTITY R RADIUS OR RISER RADIUS OR RISER RAD RADIATOR RADIATOR RB RESILIENT BASE OR RUBBER RESILIENT BASE OR RUBBER BASE RBR RUBBER RUBBER RCP REFLECTED CEILING PLAN REFLECTED CEILING PLAN RCVR RECEIVER RECEIVER RD ROAD OR ROOF DRAIN ROAD OR ROOF DRAIN REC RECESSED RECESSED RECT RECTANGLE RECTANGLE REF REFERENCE OR REFRIGERATOR REFERENCE OR REFRIGERATOR REINF REINFORCE REINFORCE REQ REQUIRE REQUIRE REQD REQUIRED REQUIRED RESIL RESILIENT RESILIENT RET RETURN RETURN REV REVISION REVISION RM ROOM ROOM RND ROUND ROUND RO ROUGH OPENING ROUGH OPENING SALV SALVAGE SALVAGE SBSTR SUBSTRATE SUBSTRATE SCHED SCHEDULE SCHEDULE SCHEM SCHEMATIC SCHEMATIC SECT SECTION SECTION SEP SEPARATE SEPARATE SF SQUARE FOOT (FEET) SQUARE FOOT (FEET) SLNT SEALANT SEALANT SMK SMOKE SMOKE SPEC SPECIFICATION SPECIFICATION SPKLR SPRINKLER SPRINKLER SPLY SUPPLY SUPPLY SQ SQUARE SQUARE SS STAINLESS STEEL STAINLESS STEEL STD STANDARD STANDARD STOR STORAGE STORAGE STR STRINGERS STRINGERS STRUCT STRUCTURAL STRUCTURAL SURF SURFACE SURFACE SUSP SUSPEND SUSPEND SYS SYSTEM SYSTEM T&G TONGUE AND GROOVE TONGUE AND GROOVE TECH TECHNICAL TECHNICAL TEL TELEPHONE TELEPHONE TEMP TEMPERATURE OR TEMPORARY TEMPERATURE OR TEMPORARY THK THICKNESS THICKNESS THRU THROUGH THROUGH TMPD TEMPERED TEMPERED TO TOP OF ___ TOP OF ___ TRANS TRANSOM TRANSOM TRTD TREATED TREATED TYP TYPICAL TYPICAL U HEAT TRANSFER COEFFICIENT HEAT TRANSFER COEFFICIENT UPS UNINTERRUPTIBLE POWER UNINTERRUPTIBLE POWER SUPPLY UTIL UTILITY UTILITY UV ULTRAVIOLET ULTRAVIOLET VAC VACUUM VACUUM VAR VARIES VARIES VCT VINYL COMPOSITION TILE VINYL COMPOSITION TILE VENT VENTILATION VENTILATION VERT VERTICAL VERTICAL VEST VESTIBULE VESTIBULE VIF VERIFY IN FIELD VERIFY IN FIELD VOL VOLUME VOLUME W/ WITH WITH W/O WITHOUT WITHOUT WD WOOD WOOD WSCT WAINSCOT WAINSCOT WT WEIGHT WEIGHT

AutoCAD SHX Text

ABBREVIATIONS

AutoCAD SHX Text

AutoCAD SHX Text G-002

AutoCAD SHX Text

APPROX 1/64" = 1'-0"

AutoCAD SHX Text N

AutoCAD SHX Text A. CONTRACTOR SHALL CONFORM TO ALL THE DEPARTMENT OF VETERANS AFFAIRS ADOPTED CODES AND STANDARDS. CONTRACTOR SHALL CONFORM TO ALL THE DEPARTMENT OF VETERANS AFFAIRS ADOPTED CODES AND STANDARDS. 1 OCCUPATIONAL, SAFETY AND HEALTH ADMINISTRATION (OSHA) STANDARDS OCCUPATIONAL, SAFETY AND HEALTH ADMINISTRATION (OSHA) STANDARDS 2 NFPA 101 LIFE SAFETY CODE NFPA 101 LIFE SAFETY CODE 3 NFPA NATIONAL FIRE CODE WITH THE EXCEPTION OF NFPA 5000 AND NFPA 900 NFPA NATIONAL FIRE CODE WITH THE EXCEPTION OF NFPA 5000 AND NFPA 900 4 VA SEISMIC DESIGN REQUIREMENTS, H-18-8 VA SEISMIC DESIGN REQUIREMENTS, H-18-8 5 NATIONAL ELECTRIC CODE (NEC) NATIONAL ELECTRIC CODE (NEC) 6 INTERNATIONAL PLUMBING CODE (IPC) INTERNATIONAL PLUMBING CODE (IPC) 7 VA DIRECTIVES & DESIGN MANUALS VA DIRECTIVES & DESIGN MANUALS B. THE CONSTRUCTION CLASSIFICATION IS TYPE II (222) THE CONSTRUCTION CLASSIFICATION IS TYPE II (222) C. NFPA 101: CHAPTER 19, EXISTING HEALTH CARE OCCUPANCIES NFPA 101: CHAPTER 19, EXISTING HEALTH CARE OCCUPANCIES 1. 19.1.1.4.4 CONSTRUCTION, REPAIR & IMPROVEMENT OPERATIONS - SEE 4.6.10 2. 4.6.10.1 BLDGS OR PORTIONS OF BLDGS SHALL BE PERMITTED TO BE OCCUPIED DURING CONSTRUCTION, REPAIR, ALTERATIONS ONLY WHERE REQUIRED MEANS OF EGRESS AND REQUIRED FIRE PROTECTION FEATURES ARE IN PLACE AND CONTINUOUSLY MAINTAINED FOR THE PORTION OCCUPIED OR WHERE ALTERNATIVE LIFE SAFETY MEASURES ACCEPTABLE TO THE AUTHORITY HAVING JURISDICTION ARE IN PLACE. 3. 4.6.10.3 FLAMMABLE OR EXPLOSIVE SUBSTANCES OR EQUIPMENT FOR REPAIRS OR ALTERATIONS SHALL BE PERMITTED IN A BLDG WHILE THE BLDG IS OCCUPIED IF THE CONDITION OF USE AND SAFEGUARDS PROVIDED DO NOT CREATE ANY ADDITIONAL DANGER OR IMPEDIMENT TO EGRESS BEYOND THE NORMALLY PERMISSIBLE CONDITIONS IN THE BLDG. D. THE CONTRACTOR SHALL VERIFY ALL EXISTING CONDITIONS IN THE FIELD. THE CONTRACTOR SHALL REPORT ANY AND THE CONTRACTOR SHALL VERIFY ALL EXISTING CONDITIONS IN THE FIELD. THE CONTRACTOR SHALL REPORT ANY AND ALL DISCREPANCIES TO THE VA PROJECT REPRESENTATIVE. E. THE HOSPITAL REMAINS IN OPERATION 24HRS/DAY - SERVICES ARE NOT TO BE INTERRUPTED WITHOUT 48HR THE HOSPITAL REMAINS IN OPERATION 24HRS/DAY - SERVICES ARE NOT TO BE INTERRUPTED WITHOUT 48HR NOTIFICATION, COORDINATION AND APPROVAL FROM VA PROJECT REPRESENTATIVE. F. CONTRACTOR TO VERIFY THAT THE PROPOSED WORK DOES NOT INHIBIT OR COMPROMISE THE INTEGRITY OF THE CONTRACTOR TO VERIFY THAT THE PROPOSED WORK DOES NOT INHIBIT OR COMPROMISE THE INTEGRITY OF THE BUILDING'S STRUCTURAL SYSTEM THROUGHOUT THE DURATION OF THE PROJECT. G. CONTRACTOR SHALL VERIFY THAT THE PROPOSED WORK DOES NOT INTERFERE WITH OR COMPROMISE THE INTEGRITY CONTRACTOR SHALL VERIFY THAT THE PROPOSED WORK DOES NOT INTERFERE WITH OR COMPROMISE THE INTEGRITY OF THE BUILDING'S HVAC SYSTEM, ROOF DRAINAGE SYSTEM, OR MECHANICAL EQUIPMENT THROUGHOUT THE DURATION THE PROJECT. CONTRACTOR IS TO TAKE APPROPRIATE PRECAUTIONS NOT TO CIRCULATE DUST AND FUMES, ETC. THROUGHOUT THE BUILDING BY WAY OF THE HVAC SYSTEM. H. CONTRACTOR SHALL VERIFY THAT THE PROPOSED WORK DOES NOT INHIBIT OR COMPROMISE THE INTEGRITY OF THE CONTRACTOR SHALL VERIFY THAT THE PROPOSED WORK DOES NOT INHIBIT OR COMPROMISE THE INTEGRITY OF THE BUILDING'S ELECTRICAL SYSTEM THROUGHOUT THE DURATION OF THE PROJECT. J. PROTECT ALL CONSTRUCTION TO REMAIN FROM DAMAGE DURING REMOVAL OF ADJACENT CONSTRUCTION. PROTECT ALL CONSTRUCTION TO REMAIN FROM DAMAGE DURING REMOVAL OF ADJACENT CONSTRUCTION. REPAIR/REPLACE CONSTRUCTION TO REMAIN THAT WAS DAMAGED DURING DEMOLITION TO MATCH THE QUALITY OF THE NEW WORK. K. THE ARCHITECTURAL DRAWINGS SHOW PRINCIPAL AREAS WHERE WORK MUST BE ACCOMPLISHED UNDER THIS THE ARCHITECTURAL DRAWINGS SHOW PRINCIPAL AREAS WHERE WORK MUST BE ACCOMPLISHED UNDER THIS CONTRACT. INCIDENTAL WORK MAY ALSO BE NECESSARY IN AREAS NOT SHOWN ON THE ARCHITECTURAL DRAWINGS DUE TO CHANGES AFFECTING EXISTING ELECTRICAL, MECHANICAL OR OTHER SYSTEMS. SUCH INCIDENTAL WORK IS ALSO A PART OF THE CONTRACT. CONTRACTOR SHALL INSPECT THOSE AREAS AND ASCERTAIN WORK NEEDED AND DO THAT WORK IN ACCORDANCE WITH THE CONTRACT REQUIREMENTS AND AT NO ADDITIONAL COST TO THE OWNER. L. DO NOT DRILL OR CUT EXISTING FLOOR JOISTS, BEAMS, COLUMNS OR OTHER STRUCTURAL ELEMENTS UNLESS DO NOT DRILL OR CUT EXISTING FLOOR JOISTS, BEAMS, COLUMNS OR OTHER STRUCTURAL ELEMENTS UNLESS SPECIFICALLY NOTED. M. CONTRACTOR SHALL COORDINATE WITH VA FOR ANY LIFTING ACTIVITIES REQUIRED TO MOVE MATERIALS TO THE ROOFS. CONTRACTOR SHALL COORDINATE WITH VA FOR ANY LIFTING ACTIVITIES REQUIRED TO MOVE MATERIALS TO THE ROOFS. N. USE OF GASOLINE POWERED TOOLS WHILE ON THE ROOF IS PROHIBITED. CONTRACTOR TO COORDINATE WITH THE USE OF GASOLINE POWERED TOOLS WHILE ON THE ROOF IS PROHIBITED. CONTRACTOR TO COORDINATE WITH THE VA POWER REQUIREMENTS FOR ALL ELECTRIC POWERED TOOLS. O. CONTRACTOR SHALL KEEP THE SITE CLEAN AT ALL TIMES AND COORDINATE TRASH REMOVAL WITH THE VA. CONTRACTOR SHALL KEEP THE SITE CLEAN AT ALL TIMES AND COORDINATE TRASH REMOVAL WITH THE VA. P. TEMPORARY CONTINUOUS CONSTRUCTION FENCING MUST BE IN PLACE AROUND THE DESIGNATED STAGING AREA PRIOR TEMPORARY CONTINUOUS CONSTRUCTION FENCING MUST BE IN PLACE AROUND THE DESIGNATED STAGING AREA PRIOR TO THE START OF ANY WORK. GC TO COORDINATE LOCATION WITH THE VA.

AutoCAD SHX Text

CODE & GENERAL NOTES

AutoCAD SHX Text

1. CONTRACTOR SHALL PROVIDE CONSTRUCTION FENCING AND OTHER PROTECTIVE MEASURES NECESSARY TO PROTECT CONTRACTOR SHALL PROVIDE CONSTRUCTION FENCING AND OTHER PROTECTIVE MEASURES NECESSARY TO PROTECT EXISTING CONDITIONS AND TO PREVENT UNAUTHORIZED ENTRY INTO POTENTIAL FALL ZONE. 2. CONTRACTOR SHALL COMPLY WITH ALL REGULATIONS CONCERNING FALL PROTECTION TO ENSURE SAFETY FOR ALL CONTRACTOR SHALL COMPLY WITH ALL REGULATIONS CONCERNING FALL PROTECTION TO ENSURE SAFETY FOR ALL WORKERS, THE GENERAL PUBLIC AND THE SURROUNDING ENVIRONMENT. CONTRACTOR SHALL TAKE MEASURES TO ENSURE SAFETY AT THE SITE 24/7 FOR THE ENTIRE DURATION OF CONSTRUCTION. 2A. EACH EMPLOYEE MORE THAN 6' ABOVE A LOWER LEVEL SHALL BE PROTECTED FROM FALLS BY GUARDRAILS, A SAFETY NET SYSTEM OR A FALL ARREST SYSTEM. FALL ARREST SYSTEM INCLUDES HARNESSES, COMPONENTS OF THE HARNESS/BELT SUCH AS DEE-RINGS, AND SNAP HOOKS, LIFELINES, AND ANCHORAGE POINTS. 2B. WORK INCLUDES THE TEMPORARY REMOVAL OF EXISTING GUARDRAILS FROM THE 4TH FLOOR ROOF AND PENTHOUSE FOR INSTALLATION OF NEW ROOFING. CONTRACTOR SHALL BE AWARE OF ADDED RISK AND SHALL ENSURE WORKERS ABIDE BY ALL REGULATIONS AND SAFETY REQUIREMENTS. 2C. CONTRACTOR TO PROVIDE OSHA COMPLIANT SAFETY/FALL PROTECTION PLAN FOR VA APPROVAL PRIOR TO ANY CONTRACTOR TO PROVIDE OSHA COMPLIANT SAFETY/FALL PROTECTION PLAN FOR VA APPROVAL PRIOR TO ANY WORK. 3. CONTRACTOR IS REQUIRED TO PROVIDE SCAFFOLDING STAIR TOWERS FOR ACCESS TO AND FROM THE 1ST FLOOR CONTRACTOR IS REQUIRED TO PROVIDE SCAFFOLDING STAIR TOWERS FOR ACCESS TO AND FROM THE 1ST FLOOR ROOF AND THE 4TH FLOOR ROOFS. THE PENTHOUSE ROOF MAY BE ACCESS FROM THE PENTHOUSE VIA THE 4TH FLOOR ROOFS. INTERIOR HOSPITAL STAIR TOWERS ARE OFF LIMITS TO THE CONTRACTOR AND ALL CONSTRUCTION WORKERS. 4. A DISPOSAL CHUTE SHALL BE ERECTED TO DIRECT WASTE TO A WASTE CONTAINER TO BE LOCATED ON THE EAST A DISPOSAL CHUTE SHALL BE ERECTED TO DIRECT WASTE TO A WASTE CONTAINER TO BE LOCATED ON THE EAST SIDE OF THE HOSPITAL (SEE ADJACENT PLAN). FINAL LOCATION TO BE COORDINATED WITH THE VA. 5. CONTRACTOR SHALL RESTORE/REPAIR ANY AREA DAMAGED BY CONSTRUCTION BACK TO ORIGINAL CONDITIONS PRIOR CONTRACTOR SHALL RESTORE/REPAIR ANY AREA DAMAGED BY CONSTRUCTION BACK TO ORIGINAL CONDITIONS PRIOR TO PROJECT COMPLETION. 6. CONTRACTOR SHALL BE RESPONSIBLE FOR INSTALLING SIDEWALK SHEDDING AND SAFETY NETTING PRIOR TO THE CONTRACTOR SHALL BE RESPONSIBLE FOR INSTALLING SIDEWALK SHEDDING AND SAFETY NETTING PRIOR TO THE COMMENCEMENT OF DEMOLITION AND SHALL NOT BE REMOVED UNTIL THE EXTERIOR WORK IS COMPLETED AND ALL CHUTES, SCAFFOLDS, TEMPORARY STAIRS AND HOISTING EQUIPMENT HAVE BEEN DISMANTLED AND REMOVED FROM THE SITE. CONTRACTOR TO SUBMIT PLAN INDICATING PEDESTRIAN BARRICADES TO REDIRECT PATIENTS, VISITORS, EMPLOYEES, ETC. DURING SCAFFOLDING ERECTION AND REMOVAL. 7. CONTRACTOR SHALL BE REQUIRED TO SUBMIT SIGNED AND SEALED ENGINEERED SHOP DRAWINGS FOR THE CONTRACTOR SHALL BE REQUIRED TO SUBMIT SIGNED AND SEALED ENGINEERED SHOP DRAWINGS FOR THE SHEDDING. SHEDDING SHALL BE CONSTRUCTED TO CARRY A LIVE LOAD OF AT LEAST 300LBS/SQ FT. ANY ITEMS PLACED ON OR ATTACHED TO THE SHED SHALL BE CONSIDERED IN THE DESIGN OF THE SIDEWALK SHED. 8. CONTRACTOR SHALL CONSTRUCT THE SIDEWALK SHEDDING OUT OF WOOD, STEEL OR OTHER MATERIALS POSSESSING CONTRACTOR SHALL CONSTRUCT THE SIDEWALK SHEDDING OUT OF WOOD, STEEL OR OTHER MATERIALS POSSESSING EQUIVALENT OR GREATER STRENGTH AND SUITABILITY. 8A. VERTICAL MEMBERS AND BEAMS SHALL BE ADEQUATELY BRACED AND CONNECTED TO PREVENT DISPLACEMENT OR DISTORTION OF THE FRAMEWORK. 8B. VERTICAL MEMBERS OF SHEDDING SHALL BE PLUMB, WITH A TOLERANCE OF L/100, WITH L MEASURED AS THE DISTANCE FROM THE GROUND TO THE FIRST X-BRACE OR BOTTOM OF BEAM. 8C. VERTICAL MEMBERS PLACED ON THE SIDEWALK SHALL NOT BE PLACED CLOSER THAN 18" TO THE FACE OF THE CURBLINE. 8D. VERTICAL MEMBERS SHALL BE PLACED AT LEAST 7' FROM THE EDGE OF A CURB CUT OR VEHICULAR ACCESS POINT. IF NECESSARY TO BE PLACED CLOSE, VERTICAL MEMBERS SHALL BE PROTECTED AGAINST DISPLACEMENT BY VEHICLES OR SHALL BE IDENTIFIED WITH HIGH VISIBILITY MARKINGS. 9. IF THE CONTRACTOR CHOOSES TO INSTALL SAFETY NETTING AS PART OF THEIR SAFETY PLAN, NETTING SHALL BE IF THE CONTRACTOR CHOOSES TO INSTALL SAFETY NETTING AS PART OF THEIR SAFETY PLAN, NETTING SHALL BE DESIGNED AND TESTED TO MEET OR EXCEED ANSI A10.11. CONTRACTOR WILL BE REQUIRED TO PROVIDE SHOP DRAWINGS INDICATING ANCHORAGE AND COMPONENT DETAILS. 10. CONTRACTOR TO PROVIDE SUBMITTAL FOR SCAFFOLDING, TRASH CHUTE, PERIMETER FENCING, DUMPSTER LOCATIONS CONTRACTOR TO PROVIDE SUBMITTAL FOR SCAFFOLDING, TRASH CHUTE, PERIMETER FENCING, DUMPSTER LOCATIONS AND TRAILER FOR VA APPROVAL. 11. CONTRACTOR SHALL PROVIDE PROTECTION TO ALL EXPOSED AREAS FROM INCLEMENT WEATHER DURING ENTIRE CONTRACTOR SHALL PROVIDE PROTECTION TO ALL EXPOSED AREAS FROM INCLEMENT WEATHER DURING ENTIRE DURATION OF CONSTRUCTION. 12. CONTRACTOR TO IMPLEMENT DUST CONTROL MEASURES DURING CONSTRUCTION. CONTRACTOR TO IMPLEMENT DUST CONTROL MEASURES DURING CONSTRUCTION. 13. NORMAL CONSTRUCTION WORK HOURS AT THE VAMC ARE 8:00AM TO 4:30PM, MONDAY TO FRIDAY, EXCLUDING NORMAL CONSTRUCTION WORK HOURS AT THE VAMC ARE 8:00AM TO 4:30PM, MONDAY TO FRIDAY, EXCLUDING FEDERAL HOLIDAYS. CONTRACTOR TO OBTAIN WRITTEN CONSENT FROM VA COR IF WORK IS TO BE PERFORMED AT TIMES OTHER THAN NORMAL WORKING HOURS. ANY CHANGE IN WORK SCHEDULE REQUIRED TO BE AT NO EXPENSE TO THE GOVERNMENT. 14. IN THE EVENT THAT NOISE DISRUPTS THE MEDICAL CENTER OPERATIONS, THE CONTRACTOR SHALL STOP THE WORK IN THE EVENT THAT NOISE DISRUPTS THE MEDICAL CENTER OPERATIONS, THE CONTRACTOR SHALL STOP THE WORK IMMEDIATELY AS DIRECTED BY THE VA COR AND WILL WORK DURING THE HOURS THAT HAVE THE LEAST IMPACT ON THE PATIENT AND THE STAFF AT NO ADDITIONAL COST TO THE GOVERNMENT. 15. CONTRACTOR SHALL CONTACT THE VA COR AND SUBMIT AN RFI FOR ANY UNFORESEEN CONDITIONS OR OTHER CONTRACTOR SHALL CONTACT THE VA COR AND SUBMIT AN RFI FOR ANY UNFORESEEN CONDITIONS OR OTHER CAUSE THAT NECESSITATES DEVIATION FROM THE CONTRACT DOCUMENTS. 16. CONTRACTOR SHALL MAINTAIN A CLEAN AND ORDERLY WORK SITE. ALL TRASH AND DEMOLISHED MATERIALS SHALL CONTRACTOR SHALL MAINTAIN A CLEAN AND ORDERLY WORK SITE. ALL TRASH AND DEMOLISHED MATERIALS SHALL BE REMOVED PROMPTLY FROM THE SITE. 17. ANY DISMANTLING, DEMOLITION, OR REMOVAL OF IMPROVEMENT, THE CONTRACTOR SHALL PROVIDE APPROPRIATE ANY DISMANTLING, DEMOLITION, OR REMOVAL OF IMPROVEMENT, THE CONTRACTOR SHALL PROVIDE APPROPRIATE SAFETY BARRICADES (ORANGE FENCING), SIGNS, AND SIGNAL LIGHTS; COMPLY WITH OSHA STANDARDS AND ENSURE ANY ADDITIONAL MEASURE THE CONTRACTING OFFICER DETERMINES TO BE REASONABLY NECESSARY.

GENERAL SITE NOTES

Asbestos-Containing Materials Quantity Table

Location Material Quantity

ASBESTOS ABATEMENT SYMBOLS LEGEND:

GENERAL NOTES:

1. Asbestos abatement shall be performed in accordance with the specification and applicable regulations. Personnel holding current New York State Department of Labor (NYSDOL) asbestos handler's certificates shall perform the work. Additionally, the Contractor must employ NYSDOL certified supervisors to be on the work site for all abatement activities. The contractor must be currently licensed by the NYSDOL. All certificates and licenses are to be readily available for verification by the Veterans Affairs Medical Center.

2. Contractor is responsible for removal and disposal of all asbestos-containing materials and asbestos-contaminated materials within the specified areas.

3. Contractor is responsible for verification of all quantities of asbestos-containing materials.

4. Contractor is responsible for precleaning any existing asbestos contamination, dust and debris within the removal areas.

5. Contractor is responsible for maintaining the integrity of building finishes. The contractor shall repair any and all damages caused by abatement activities or his personnel.

6. Contractor is solely responsible for all means, methods, techniques, sequences and procedures and for coordinating all portions of the scope of work under this contract.

7. Work will be phased to accommodate the VAMC facility requirements. Work hours will be from 6am to 2pm. This will allow the roofing contractor time each day to install the new roof.

All scheduling is to be coordinated and in agreement with the architect, consultant and VAMC.

ASBESTOS ABATEMENT NOTES:

1. The Contractor is to remove the ACM's in accordance with New York State Department of Labor

(NYSDOL) Industrial Code Rule 56 (12 NYCRR Part 56), the VAMC specification and applicable federal regulations (USEPA and OSHA). Where there is an overlap the most stringent regulation shall apply.

2. The 4th floor roofs of Building 200 are being removed and replaced. Asbestos has been identified in the roof flashing (ACM's) of those roofs. This ACM must be removed so that the new roofs can be installed.

3. Asbestos roof flashing is present on or around the roof drains, masonry, parapets, stanchions, dunnage, roof curbs, exhaust ducts, vent pipes, HVAC equipment pads, roof hatches, mechanical equipment, structural members, electrical equipment, pitch pockets, patches and repairs. Asbestos roof flashing must be removed from these materials and where ever else it is encountered. The roofing abatement shall include the removal and disposal of all layers of roof flashing including insulation. The roof flashing shall be removed down to the structural substrate.

4. Roof flashing removal shall be performed in accordance with 12 NYCRR Part 56 Section 56-11.6 (Exterior Project Removal of Non-friable ACM Roofing). The asbestos abatement contractor shall coordinate his work with the general contractor so that the building is not left open to water damage and inclement weather. The work area shall be an area demarcated with “Danger-Asbestos” signs and red warning tape placed at a minimum distance of 25' in every direction. Only certified workers and authorized visitors shall be permitted in the work area during asbestos abatement activities.

Asbestos abatement activities and general contracting work shall not be permitted to occur at the same time in an asbestos abatement work area. Simultaneous general contracting work shall occur at least 25' away from the asbestos abatement work on the outside of the building.

5. Outdoor work areas shall not require clearance air samples. The outdoor work areas will be considered abated when there is no visible debris or dust remaining and the VPIH has performed a successful visual inspection.

5. The contractor shall locate his remote personnel and waste decontamination unit(s) on the 4th floor roofs. The waste dumpster shall be located in the loading dock parking lot.

6. The contractor shall be responsible for any and all damages resulting from asbestos abatement activities.

7. All utilities, mechanical systems and piping shall be locked out and tagged before the contractor is to begin abatement activities. Mechanical and electrical systems, which cannot be locked out and tagged, shall be protected and supported throughout asbestos abatement activities. There is limited electrical service on the roof which is not adequate for this project. The contractor must provide a generator for all his electricity requirements.

8. The asbestos contractor shall file a courtesy notification for the roof removal work as a large project with the New York State Department of Labor.

9. The contractor shall comply with all regulations concerning OSHA fall protection. Additionally, the contractor is further advised that there is a limited parapet on the roofs.

10. HVAC intakes and exhaust, vents and drains that can not be shutoff or sealed with two (2) layers of 6-mil plastic sheeting must be extended using an airtight rigid sheathing to a minimum height of ten feet (10') above the work area during roof abatement.

11. The contractor will be required to provide a scaffolding stair tower for access to and from the roof work areas. The contractor shall not be allowed to use the stairs or elevators of Building 200 for access to the roof. Additionally, the passenger and freight elevators will not be available to the contractor for use on this project.

1 1

4TH FLOOR ROOF-ASBESTOS ABATEMENT PLAN:

KEY MAP - BLDG 200, VAMC NORTHPORT

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Fi le

P at h 6/

/2

:3

9:

P M

100% BID PACKAGEOffice of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

Asbestos Abatement Consultant:

Project Director

12 MAY 2020 TGE EDSRevisions: Date:

632-16-104

79 MIDDLEVILLE RD, NORTHPORT, NY 11768

ROOF REPLACEMENT

AT THE NORTHPORT VAMC

THINKFORM DESIGN ARCHITECT LLC

38 EAST BROAD STREET

HOPEWELL, NJ 08525

T:855.821.0274 F:609.644.4397 Russell DiNardo, AIA NY 031521-1

EGAN ENVIRONMENTAL CONSULTING, INC.

14 HIGH STREET

MAHWAH, NEW JERSEY 07430

P: 914.320.7924 H-101

4th FLOOR ROOF

ASBESTOS ABATEMENT PLAN

AutoCAD SHX Text

4TH FLOOR WEST LINK ROOF

AutoCAD SHX Text

ROOF FLASHING

AutoCAD SHX Text 385 S.F.

AutoCAD SHX Text

4TH FLOOR EAST LINK ROOF

AutoCAD SHX Text

ROOF FLASHING

AutoCAD SHX Text 330 S.F.

AutoCAD SHX Text

4TH FLOOR NORTHWEST TOWER ROOF

AutoCAD SHX Text

ROOF FLASHING

AutoCAD SHX Text 1,850 S.F.

AutoCAD SHX Text

4TH FLOOR SOUTHWEST TOWER ROOF

AutoCAD SHX Text

ROOF FLASHING

AutoCAD SHX Text 1,900 S.F.

AutoCAD SHX Text

4TH FLOOR NORTHEAST TOWER ROOF

AutoCAD SHX Text

ROOF FLASHING

AutoCAD SHX Text 2,100 S.F.

AutoCAD SHX Text

4TH FLOOR SOUTHEAST TOWER ROOF

AutoCAD SHX Text

ROOF FLASHING

AutoCAD SHX Text 1,750 S.F.

AutoCAD SHX Text

ROOF FLASHING TO BE REMOVED.

AutoCAD SHX Text Scale: 1/16" = 1'-0" " = 1'-0"

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text Q

AutoCAD SHX Text P

AutoCAD SHX Text N

AutoCAD SHX Text M

AutoCAD SHX Text L

AutoCAD SHX Text K

AutoCAD SHX Text J

AutoCAD SHX Text H

AutoCAD SHX Text G

AutoCAD SHX Text F

AutoCAD SHX Text E

AutoCAD SHX Text D

AutoCAD SHX Text C

AutoCAD SHX Text

NO SCALE

AutoCAD SHX Text N

AutoCAD SHX Text

4 ROOF NW TOWER

AutoCAD SHX Text

4 ROOF NE TOWER

AutoCAD SHX Text

4 ROOF SW TOWER

AutoCAD SHX Text

4 ROOF SE TOWER

AutoCAD SHX Text

PENTHOUSE ROOF

AutoCAD SHX Text

1 ROOF WEST

AutoCAD SHX Text

1 ROOF NORTH

AutoCAD SHX Text

1 ROOF EAST

AutoCAD SHX Text

1 ROOF SOUTH

AutoCAD SHX Text

INTENSIVE CARE (NIC)

AutoCAD SHX Text

AMB (NIC)

AutoCAD SHX Text

(NIC)

ENTRY ADDITION (NIC)

FIRST FLOOR EXISTING ROOF PLAN DEMO

SOUTH ROOF CENTER - LOOKING EAST WEST C ROOF - LOOKING WEST WEST B ROOF - LOOKING EAST WEST A ROOF - LOOKING NORTH NORTH B ROOF - LOOKING EAST EAST A ROOF - LOOKING NORTH

A-101

FIRST FLOOR EXISTING ROOF

DEMOLITION PLAN

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Fi le

P at h 6/

/2

:3

9:

P M

100% BID PACKAGEOffice of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

Asbestos Abatement Consultants:

Project Director

12 MAY 2020 RD TRBRevisions: Date:

632-16-104

79 MIDDLEVILLE RD, NORTHPORT, NY 11768

ROOF REPLACEMENT

AT THE NORTHPORT VAMC

THINKFORM DESIGN ARCHITECT LLC

38 EAST BROAD STREET

HOPEWELL, NJ 08525

T:855.821.0274 F:609.644.4397 Russell DiNardo, AIA NY 031521-1

EGAN ENVIRONMENTAL CONSULTING, INC.

14 HIGH STREET

MAHWAH, NEW JERSEY 07430

P: 201.848.7790

KEY MAP - BLDG 200, VAMC NORTHPORT

AutoCAD SHX Text K

AutoCAD SHX Text H

AutoCAD SHX Text J

AutoCAD SHX Text G

AutoCAD SHX Text E

AutoCAD SHX Text

AutoCAD SHX Text D

AutoCAD SHX Text C

AutoCAD SHX Text B

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

1 ROOF SOUTH A

AutoCAD SHX Text

1 ROOF EAST B

AutoCAD SHX Text

1 ROOF WEST C

AutoCAD SHX Text

1 ROOF WEST B

AutoCAD SHX Text

1 ROOF EAST A

AutoCAD SHX Text

1 ROOF NORTH A

AutoCAD SHX Text

1 ROOF NORTH C

AutoCAD SHX Text

1 ROOF SOUTH C

AutoCAD SHX Text

1 ROOF WEST A

AutoCAD SHX Text

SMOKING ROOF (NIC)

AutoCAD SHX Text

HOSPITAL ADDITION EXISTING SKYLIGHTS (NIC)

AutoCAD SHX Text ROOF MEMBRANE TEARS VISIBLE AT CURB FLASHING. EXISTING INTENSIVE CARE ROOF IS N.I.C. - HOWEVER, THE FIRST 24" ALONG CURB EDGE TO MAIN HOSPITAL WILL BE USED FOR REPAIRING TORN MEMBRANE.

AutoCAD SHX Text

HOSPITAL ADDITION EXISTING ROOF (NIC)

AutoCAD SHX Text

HOSPITAL EXISTING SIDE ENTRY ROOF (NIC)

AutoCAD SHX Text

EXISTING AMBULANCE ENTRY BLDG ROOF (NIC)

AutoCAD SHX Text

ALL EXIST SKYLIGHT RAILINGS LAYING ON THE ROOF TO BE REMOVED -SEE 6/A101

AutoCAD SHX Text

ROOF RECESSED -29" FROM MAIN LEVEL

AutoCAD SHX Text

EXPANSION JOINT TO BE REPLACED, TYP

AutoCAD SHX Text

AREA OF PARTIALLY COMPLETED ROOFING PROJECT N.I.C.

AutoCAD SHX Text

RAISED PLATFORM & EQUIPMENT

AutoCAD SHX Text

RAISED PLATFORM & EQUIPMENT

AutoCAD SHX Text

PLUMBING VENT, TYP

AutoCAD SHX Text

ROOF DRAINS TO BE REPLACED, TYP

AutoCAD SHX Text V

AutoCAD SHX Text V

AutoCAD SHX Text V

AutoCAD SHX Text V

AutoCAD SHX Text V

AutoCAD SHX Text V

AutoCAD SHX Text V

AutoCAD SHX Text V

AutoCAD SHX Text V

AutoCAD SHX Text V

AutoCAD SHX Text V

AutoCAD SHX Text V

AutoCAD SHX Text V

AutoCAD SHX Text V

AutoCAD SHX Text

AutoCAD SHX Text R

AutoCAD SHX Text Q

AutoCAD SHX Text P

AutoCAD SHX Text N

AutoCAD SHX Text M

AutoCAD SHX Text L

AutoCAD SHX Text F

AutoCAD SHX Text

1 ROOF NORTH B

AutoCAD SHX Text

AutoCAD SHX Text

1 ROOF SOUTH B

AutoCAD SHX Text

1 ROOF EAST C

AutoCAD SHX Text V

AutoCAD SHX Text

EXPANSION JOINT TO BE REPLACED, TYP

AutoCAD SHX Text

LINE OF EXISTING LIGHTWEIGHT CONC SLOPED TO DRAIN, TYP

AutoCAD SHX Text

AREA DIVIDER ROOF CURB TO BE REPLACED, TYP

AutoCAD SHX Text V

AutoCAD SHX Text V

AutoCAD SHX Text V

AutoCAD SHX Text

LINE OF RAISED PLATFORM & EQUIPMENT

AutoCAD SHX Text V

AutoCAD SHX Text V

AutoCAD SHX Text V

AutoCAD SHX Text

VENT STACK

AutoCAD SHX Text

AREAS OF LIGHTWEIGHT CONC (LWC) TO BE REMOVED, TYP - SEE NOTE 4

AutoCAD SHX Text

PERIMETER METAL EDGE TO BE REPLACED, TYP

AutoCAD SHX Text

EXISTING THRU-WALL FLASHING TO REMAIN, TYP -SEE DETAIL 10/A-501

AutoCAD SHX Text

ROOF DRAINS TO BE REPLACED, TYP

AutoCAD SHX Text

LINE OF EXISTING LIGHTWEIGHT CONC SLOPED TO DRAIN, TYP

AutoCAD SHX Text

PLUMBING VENT, TYP

AutoCAD SHX Text

AREA DIVIDER ROOF CURB TO BE REPLACED, TYP

AutoCAD SHX Text

MECH EQUIPMENT & CURB, TYP

AutoCAD SHX Text

AREAS OF LIGHTWEIGHT CONC (LWC) TO BE REMOVED - SEE NOTE 4

AutoCAD SHX Text

PERIMETER METAL EDGE TO BE REPLACED, TYP

AutoCAD SHX Text

EXISTING THRU-WALL FLASHING TO REMAIN, TYP SEE DETAIL 10/A-501

AutoCAD SHX Text

ALL EXISTING ROOFING AND INSULATION TO BE REMOVED AND REPLACED, TYP - SEE NOTE 3

AutoCAD SHX Text

ALL EXISTING ROOFING AND INSULATION TO BE REMOVED AND REPLACED, TYP - SEE NOTE 3

AutoCAD SHX Text V

AutoCAD SHX Text V

AutoCAD SHX Text

PIPING SUPPORTS, TYP

AutoCAD SHX Text

LINE OF EQUIPMENT/PIPING ABOVE, TYP

AutoCAD SHX Text

PIPING SUPPORTS, TYP

AutoCAD SHX Text

LINE OF EQUIPMENT/PIPING ABOVE, TYP

AutoCAD SHX Text A-101

AutoCAD SHX Text

AutoCAD SHX Text A-101

AutoCAD SHX Text

AutoCAD SHX Text A-101

AutoCAD SHX Text

AutoCAD SHX Text A-101

AutoCAD SHX Text

AutoCAD SHX Text A-101

AutoCAD SHX Text

AutoCAD SHX Text A-101

AutoCAD SHX Text

AutoCAD SHX Text

REPLACE EXISTING GUARDRAIL SYSTEM W/NEW - SEE A-103

AutoCAD SHX Text

GR

AutoCAD SHX Text EXISTING PITCH POCKET EXISTING VENT EXISTING MECH EQUIPMENT & CURB EXISTING VENTILATOR EXISTING LIGHTNING CABLE GROUND EXISTING ROOF DRAIN & EXIST LIGHTWEIGHT PERLITE CONC SLOPED TO DRAIN (DRAIN TO BE REPLACED) AREA OF WET INSULATION PER INFRARED SCAN (SEE INCLUDED REPORT) & AREA OF LIGHTWEIGHT PERLITE CONC TO BE REMOVED PROPOSED AREA BEYOND WET INSULATION TO BE INCLUDED IN THE LIGHTWEIGHT PERLITE CONC REMOVAL

AutoCAD SHX Text V

AutoCAD SHX Text

AutoCAD SHX Text A-101

AutoCAD SHX Text 1/16" = 1'-0"

AutoCAD SHX Text N

AutoCAD SHX Text

AutoCAD SHX Text A-101

AutoCAD SHX Text

NO SCALE

AutoCAD SHX Text

AutoCAD SHX Text A-101

AutoCAD SHX Text

NO SCALE

AutoCAD SHX Text

AutoCAD SHX Text A-101

AutoCAD SHX Text

NO SCALE

AutoCAD SHX Text

AutoCAD SHX Text A-101

AutoCAD SHX Text

NO SCALE

AutoCAD SHX Text

AutoCAD SHX Text A-101

AutoCAD SHX Text

NO SCALE

AutoCAD SHX Text

AutoCAD SHX Text A-101

AutoCAD SHX Text

NO SCALE

AutoCAD SHX Text 1 NORTH A 2,405 SF 2,405 SF SF 1 NORTH B 4,445 SF 4,445 SF SF 1 NORTH C 2,405 SF 2,405 SF SF 1 EAST A 4,665 SF 4,665 SF SF 1 EAST B 4,355 SF 4,355 SF SF 1 EAST C 4,635 SF 4,635 SF SF 1 SOUTH A 2,325 SF 2,325 SF SF 1 SOUTH B 4,420 SF 4,420 SF SF 1 SOUTH C 2,325 SF 2,325 SF SF 1 WEST A 4,665 SF 4,665 SF SF 1 WEST B 2,500 SF 2,500 SF SF 1 WEST C 4,635 SF 4,635 SF SF TOTAL 43,780 SF43,780 SFSF

AutoCAD SHX Text

FIRST FLOOR ROOF AREAS

AutoCAD SHX Text ROOF AREAS LISTED ARE APPROXIMATE. CONTRACTOR RESPONSIBLE FOR VERIFYING ACTUAL AREAS

AutoCAD SHX Text

NOTES

AutoCAD SHX Text

1. EXISTING ROOF CONSTRUCTION: CONCRETE STRUCTURAL SLAB W/ LIGHTWEIGHT PERLITE CONCRETE TOPPING SLOPED TO DRAIN. 3"TH POLYISOCYANURATE INSULATION BOARD W/ 3-PLY BUILT-UP ROOFING W/ GLAZE COAT AND ALUMINIZED ASPHALT COATING. 2. EXISTING EQUIPMENT, VENTS AND DRAINS SHOWN (AT APPROXIMATE LOCATIONS) AT TIME OF DOCUMENTATION. CONTRACTOR TO FIELD VERIFY AND NOTE ANY CHANGES PRIOR TO CONSTRUCTION START. 3. EXISTING BUILT-UP ROOFING & INSULATION BOARD DOWN TO THE LIGHTWEIGHT SLOPED CONCRETE TO BE FULLY REMOVED AND REPLACED WITH NEW ROOFING. DEMOLITION TO INCLUDE BUILT UP ROOFING SYSTEM IN ITS ENTIRETY, ALL INSULATION BOARD, ALL ROOF DRAINS, ALL ROOFTOP EXPANSION JOINTS, ALL ROOFTOP AREA DIVIDERS, ALL ROOFTOP PERIMETER EDGE FLASHING, AND ALL EQUIPMENT CURB FLASHING. SEE DWG'S A-501 & A-502 FOR DETAILS OF PROPOSED NEW DETAILS TO COORDINATE EXTENT OF DEMOLITION. 4. SLOPED TO DRAIN LIGHTWEIGHT PERLITE CONCRETE TO BE DEMOLISHED IN SELECT AREAS SHOWN ON THE ROOF PLANS (APPROX 16,305 SF OF FIRST FLOOR ROOF AREA SHOWN). PRIOR TO THE LIGHTWEIGHT CONC DEMOLITION, GC TO CONDUCT NEW ROOF INFRARED SCAN (SEE SPECS) TO CONFIRM WET AREAS AND PULL TEST TO BE CONDUCTED TO FINALIZE DEMOLITION AREA SCOPE. EXISTING LIGHTWEIGHT CONC THAT PASSES PULL TESTS WILL RESULT IN A SMALLER AREA REQUIRED TO BE DEMOLISHED. GC TO COORDINATE WITH VA COR. 5. GC TO PROVIDE DEMOLITION AND ROOF REPLACEMENT PHASING SCHEDULE FOR VA APPROVAL.

AutoCAD SHX Text

SYMBOL KEY

AutoCAD SHX Text

NO SCALE

AutoCAD SHX Text N

AutoCAD SHX Text

4 ROOF NW TOWER

AutoCAD SHX Text

4 ROOF NE TOWER

AutoCAD SHX Text

4 ROOF SW TOWER

AutoCAD SHX Text

4 ROOF SE TOWER

AutoCAD SHX Text

PENTHOUSE ROOF

AutoCAD SHX Text

1 ROOF WEST

AutoCAD SHX Text

1 ROOF NORTH

AutoCAD SHX Text

1 ROOF EAST

AutoCAD SHX Text

1 ROOF SOUTH

AutoCAD SHX Text

INTENSIVE CARE (NIC)

AutoCAD SHX Text

AMB (NIC)

AutoCAD SHX Text

(NIC)

4TH FL & PENTHOUSE EXIST ROOF PLAN DEMO

SW TOWER - LOOKING NORTH NW TOWER - LOOKING SOUTH NE TOWER - LOOKING NORTH EAST LINK - LOOKING SOUTH SE TOWER - LOOKING WEST PENTHOUSE - LOOKING SW

A-102

FOURTH FLOOR & PENTHOUSE

EXISTING ROOF DEMOLITION PLAN

KEY MAP - BLDG 200, VAMC NORTHPORT

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Fi le

P at h 6/

/2

:3

9:

P M

100% BID PACKAGEOffice of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

Asbestos Abatement Consultants:

Project Director

12 MAY 2020 RD TRBRevisions: Date:

632-16-104

79 MIDDLEVILLE RD, NORTHPORT, NY 11768

ROOF REPLACEMENT

AT THE NORTHPORT VAMC

THINKFORM DESIGN ARCHITECT LLC

38 EAST BROAD STREET

HOPEWELL, NJ 08525

T:855.821.0274 F:609.644.4397 Russell DiNardo, AIA NY 031521-1

EGAN ENVIRONMENTAL CONSULTING, INC.

14 HIGH STREET

MAHWAH, NEW JERSEY 07430

P: 201.848.7790

PENTHOUSE - LOOKING NE

AutoCAD SHX Text

AutoCAD SHX Text Q

AutoCAD SHX Text P

AutoCAD SHX Text N

AutoCAD SHX Text M

AutoCAD SHX Text L

AutoCAD SHX Text K

AutoCAD SHX Text J

AutoCAD SHX Text H

AutoCAD SHX Text G

AutoCAD SHX Text F

AutoCAD SHX Text E

AutoCAD SHX Text D

AutoCAD SHX Text C

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text A-102

AutoCAD SHX Text

AutoCAD SHX Text A-102

AutoCAD SHX Text

AutoCAD SHX Text A-102

AutoCAD SHX Text

AutoCAD SHX Text A-102

AutoCAD SHX Text

AutoCAD SHX Text A-102

AutoCAD SHX Text

AutoCAD SHX Text A-102

AutoCAD SHX Text

AutoCAD SHX Text

NORTHWEST TOWER

AutoCAD SHX Text

NORTHEAST TOWER

AutoCAD SHX Text

WEST LINK

AutoCAD SHX Text

EAST LINK

AutoCAD SHX Text

SOUTHWEST TOWER

AutoCAD SHX Text

SOUTHEAST TOWER

AutoCAD SHX Text

PENTHOUSE

AutoCAD SHX Text

ROOF 1 BELOW - SEE A-101

AutoCAD SHX Text

ROOF 1 BELOW - SEE A-101

AutoCAD SHX Text

ROOF 1 BELOW - SEE A-101

AutoCAD SHX Text

ROOF 1 BELOW - SEE A-101

AutoCAD SHX Text

EXPANSION JOINT TO BE REPLACED

AutoCAD SHX Text

MECH EQUIPMENT & CURB, TYP.

AutoCAD SHX Text

PLUMBING VENT, TYP.

AutoCAD SHX Text

ROOF DRAIN TO BE REPLACED, TYP.

AutoCAD SHX Text

LINE OF EXISTING LIGHTWEIGHT CONC SLOPED TO DRAIN, TYP

AutoCAD SHX Text AT THE TIME OF THE SURVEY, NEW PENTHOUSE COOLING EQUIPMENT AND PIPING WAS BEING INSTALLED. DRAWING MAY NOT ACCURATELY REFLECT FINAL CONFIGURATION - GC TO FIELD VERIFY

AutoCAD SHX Text

PIPE RAILING

AutoCAD SHX Text

PRECAST COPING

AutoCAD SHX Text

MASONRY WALL

AutoCAD SHX Text RAISED MTL ROOF EDGE COPING TO BE REPLACED & PIPE RAIL GUARDRAIL SALVAGED FOR RE-USE - TYP ALL SIDES OF 4TH FLOOR ROOFING

AutoCAD SHX Text

RAISED EQUIP DUCTWORK

AutoCAD SHX Text

REMOVE ABANDONED PIPING - INFILL NEW VOIDS TO MATCH ADJACENT

AutoCAD SHX Text

RAISED EQUIPMENT PAD

AutoCAD SHX Text

RAISED EQUIPMENT DUCTWORK - SEE 5/A-102

AutoCAD SHX Text

FLOATING STAIRS SET ON PRECAST PAVERS

AutoCAD SHX Text

RAISED EQUIP DUCTWORK

AutoCAD SHX Text

AHU

AutoCAD SHX Text

AHU E9

AutoCAD SHX Text

AHU E8

AutoCAD SHX Text

VENT STACK

AutoCAD SHX Text

PE5

AutoCAD SHX Text

PE6

AutoCAD SHX Text

PE7

AutoCAD SHX Text

AHU

AutoCAD SHX Text

AHU 22

AutoCAD SHX Text E27

AutoCAD SHX Text E25

AutoCAD SHX Text E23

AutoCAD SHX Text E21

AutoCAD SHX Text E26

AutoCAD SHX Text E24

AutoCAD SHX Text E22

AutoCAD SHX Text E28

AutoCAD SHX Text E30

AutoCAD SHX Text

AHU

AutoCAD SHX Text

PE12

AutoCAD SHX Text

PE11

AutoCAD SHX Text E29

AutoCAD SHX Text

AHU 33

AutoCAD SHX Text

AHU

AutoCAD SHX Text

VENT STACK

AutoCAD SHX Text

AHU

AutoCAD SHX Text

PE

AutoCAD SHX Text

PE

AutoCAD SHX Text

CONDENSER

AutoCAD SHX Text

PE3

AutoCAD SHX Text E7

AutoCAD SHX Text E6

AutoCAD SHX Text

PE13

AutoCAD SHX Text

AHU 21

AutoCAD SHX Text

EF 2

AutoCAD SHX Text

EF 1

AutoCAD SHX Text

AHU

AutoCAD SHX Text

AHU

AutoCAD SHX Text E5

AutoCAD SHX Text

PE2

AutoCAD SHX Text E1

AutoCAD SHX Text

PE

AutoCAD SHX Text

PE

AutoCAD SHX Text

AHU

AutoCAD SHX Text E3

AutoCAD SHX Text

AHU

AutoCAD SHX Text V

AutoCAD SHX Text V

AutoCAD SHX Text V

AutoCAD SHX Text V

AutoCAD SHX Text V

AutoCAD SHX Text V

AutoCAD SHX Text V

AutoCAD SHX Text V

AutoCAD SHX Text V

AutoCAD SHX Text V

AutoCAD SHX Text V

AutoCAD SHX Text V

AutoCAD SHX Text V

AutoCAD SHX Text V

AutoCAD SHX Text V

AutoCAD SHX Text V

AutoCAD SHX Text V

AutoCAD SHX Text V

AutoCAD SHX Text V

AutoCAD SHX Text V

AutoCAD SHX Text V

AutoCAD SHX Text V

AutoCAD SHX Text V

AutoCAD SHX Text V

AutoCAD SHX Text V

AutoCAD SHX Text V

AutoCAD SHX Text V

AutoCAD SHX Text V

AutoCAD SHX Text V

AutoCAD SHX Text V

AutoCAD SHX Text V

AutoCAD SHX Text V

AutoCAD SHX Text V

AutoCAD SHX Text V

AutoCAD SHX Text V

AutoCAD SHX Text V

AutoCAD SHX Text V

AutoCAD SHX Text V

AutoCAD SHX Text V

AutoCAD SHX Text

PE4

AutoCAD SHX Text E17

AutoCAD SHX Text E18

AutoCAD SHX Text E19

AutoCAD SHX Text E20

AutoCAD SHX Text

PE9

AutoCAD SHX Text

PE10

AutoCAD SHX Text

AHU

AutoCAD SHX Text

PE8

AutoCAD SHX Text E14

AutoCAD SHX Text E15

AutoCAD SHX Text E16

AutoCAD SHX Text E10

AutoCAD SHX Text E11

AutoCAD SHX Text E12

AutoCAD SHX Text V

AutoCAD SHX Text

AHU

AutoCAD SHX Text

AHU

AutoCAD SHX Text

AHU

AutoCAD SHX Text

GR

AutoCAD SHX Text

GR

AutoCAD SHX Text

GR

AutoCAD SHX Text

GR

AutoCAD SHX Text

GR

AutoCAD SHX Text

GR

AutoCAD SHX Text

GR

AutoCAD SHX Text

GR

AutoCAD SHX Text

GR

AutoCAD SHX Text

GR

AutoCAD SHX Text

GR

AutoCAD SHX Text

GR

AutoCAD SHX Text

GR

AutoCAD SHX Text

GR

AutoCAD SHX Text

GR

AutoCAD SHX Text

ROOF HATCH

AutoCAD SHX Text

ROOF DRAINS TO BE REPLACED, TYP.

AutoCAD SHX Text

LINE OF EXISTING LIGHTWEIGHT CONC SLOPED TO DRAIN, TYP

AutoCAD SHX Text

PLUMBING VENT, TYP.

AutoCAD SHX Text

AREA DIVIDER ROOF CURB TO BE REPLACED, TYP.

AutoCAD SHX Text

MECH EQUIPMENT & CURB, TYP.

AutoCAD SHX Text

AREAS OF LIGHTWEIGHT CONC (LWC) TO BE REMOVED - SEE NOTE 4

AutoCAD SHX Text FOURTH LEVEL ROOF PERIMETER METAL EDGE TO BE REPLACED & RAILINGS SALVAGED FOR RE-USE, TYP

AutoCAD SHX Text

EXISTING THRU-WALL FLASHING TO REMAIN, TYP. SEE DETAIL 10/A-501

AutoCAD SHX Text ALL EXISTING ROOFING AND INSULATION TO BE REMOVED AND REPLACED, TYP. - SEE NOTE 3

AutoCAD SHX Text ALL EXISTING ROOFING AND INSULATION TO BE REMOVED AND REPLACED, TYP. - SEE NOTE 3

AutoCAD SHX Text

REMOVE ABANDONED CURBS AND PITCH POCKETS. INFILL NEW VOIDS TO MATCH ADJACENT

AutoCAD SHX Text REMOVE ABANDONED CURBS, SUPPORTS AND PITCH POCKETS, TYP. INFILL NEW VOIDS TO MATCH ADJACENT

AutoCAD SHX Text

AREAS OF LIGHTWEIGHT CONC (LWC) TO BE REMOVED, TYP - SEE NOTE 4

AutoCAD SHX Text A-102

AutoCAD SHX Text

AutoCAD SHX Text

AHU

AutoCAD SHX Text

AHU

AutoCAD SHX Text V

AutoCAD SHX Text

GR

AutoCAD SHX Text EXISTING PITCH POCKET EXISTING VENT EXISTING MECH EQUIPMENT & CURB EXISTING VENTILATOR EXISTING LIGHTNING CABLE GROUND EXISTING ROOF DRAIN & EXIST LIGHTWEIGHT PERLITE CONC SLOPED TO DRAIN (DRAIN TO BE REPLACED) AREA OF WET INSULATION PER INFRARED SCAN (SEE INCLUDED REPORT) & AREA OF LIGHTWEIGHT PERLITE CONC TO BE REMOVED PROPOSED AREA BEYOND WET INSULATION TO BE INCLUDED IN THE LIGHTWEIGHT PERLITE CONC REMOVAL

AutoCAD SHX Text

AutoCAD SHX Text A-102

AutoCAD SHX Text 1/16" = 1'-0"

AutoCAD SHX Text N

AutoCAD SHX Text

AutoCAD SHX Text A-102

AutoCAD SHX Text

NO SCALE

AutoCAD SHX Text

AutoCAD SHX Text A-102

AutoCAD SHX Text

NO SCALE

AutoCAD SHX Text

AutoCAD SHX Text A-102

AutoCAD SHX Text

NO SCALE

AutoCAD SHX Text

AutoCAD SHX Text A-102

AutoCAD SHX Text

NO SCALE

AutoCAD SHX Text

AutoCAD SHX Text A-102

AutoCAD SHX Text

NO SCALE

AutoCAD SHX Text

AutoCAD SHX Text A-102

AutoCAD SHX Text

NO SCALE

AutoCAD SHX Text NORTHWEST TOWER 9,780 SF 9,780 SF SF NORTHEAST TOWER 9,780 SF 9,780 SF SF WEST LINK 935 SF 935 SF SF EAST LINK 935 SF 935 SF SF SOUTHWEST TOWER 9,780 SF 9,780 SF SF SOUTHEAST TOWER 9,780 SF 9,780 SF SF PENTHOUSE 4,055 SF 4,055 SF SF TOTAL 45,045 SF45,045 SFSF

AutoCAD SHX Text

FOURTH FLOOR ROOF & PENTHOUSE AREAS

AutoCAD SHX Text ROOF AREAS LISTED ARE APPROXIMATE. CONTRACTOR RESPONSIBLE FOR VERIFYING ACTUAL AREAS

AutoCAD SHX Text

NOTES

AutoCAD SHX Text

SYMBOL KEY

AutoCAD SHX Text

1. EXISTING ROOF CONSTRUCTION: CONCRETE STRUCTURAL SLAB W/ LIGHTWEIGHT PERLITE CONCRETE TOPPING SLOPED TO DRAIN. 3"TH POLYISOCYANURATE INSULATION BOARD W/ 3-PLY BUILT-UP ROOFING W/ GLAZE COAT AND ALUMINIZED ASPHALT COATING. 2. EXISTING EQUIPMENT, VENTS AND DRAINS SHOWN (AT APPROXIMATE LOCATIONS) AT TIME OF DOCUMENTATION. CONTRACTOR TO FIELD VERIFY AND NOTE ANY CHANGES PRIOR TO CONSTRUCTION START. 3. EXISTING BUILT-UP ROOFING & INSULATION BOARD DOWN TO THE LIGHTWEIGHT SLOPED CONCRETE TO BE FULLY REMOVED AND REPLACED WITH NEW ROOFING. DEMOLITION TO INCLUDE BUILT UP ROOFING SYSTEM IN ITS ENTIRETY, ALL INSULATION BOARD, ALL ROOF DRAINS, ALL ROOFTOP EXPANSION JOINTS, ALL ROOFTOP AREA DIVIDERS, ALL ROOFTOP PERIMETER EDGE FLASHING, AND ALL EQUIPMENT CURB FLASHING. SEE DWG'S A-501 & A-502 FOR DETAILS OF PROPOSED NEW DETAILS TO COORDINATE EXTENT OF DEMOLITION, 4. SLOPED TO DRAIN LIGHTWEIGHT PERLITE CONCRETE TO BE DEMOLISHED IN SELECT AREAS SHOWN ON THE ROOF PLANS (APPROX 16,305 SF OF FIRST FLOOR ROOF AREA SHOWN). PRIOR TO THE LIGHTWEIGHT CONC DEMOLITION, GC TO CONDUCT NEW ROOF INFRARED SCAN (SEE SPECS) TO CONFIRM WET AREAS AND PULL TEST TO BE CONDUCTED TO FINALIZE DEMOLITION AREA SCOPE. EXISTING LIGHTWEIGHT CONC THAT PASSES PULL TESTS WILL RESULT IN A SMALLER AREA REQUIRED TO BE DEMOLISHED. GC TO COORDINATE WITH VA COR. 5. GC TO PROVIDE DEMOLITION AND ROOF REPLACEMENT PHASING SCHEDULE FOR VA APPROVAL.

AutoCAD SHX Text

NO SCALE

AutoCAD SHX Text N

AutoCAD SHX Text

4 ROOF NW TOWER

AutoCAD SHX Text

4 ROOF NE TOWER

AutoCAD SHX Text

4 ROOF SW TOWER

AutoCAD SHX Text

4 ROOF SE TOWER

AutoCAD SHX Text

PENTHOUSE ROOF

AutoCAD SHX Text

1 ROOF WEST

AutoCAD SHX Text

1 ROOF NORTH

AutoCAD SHX Text

1 ROOF EAST

AutoCAD SHX Text

1 ROOF SOUTH

AutoCAD SHX Text

INTENSIVE CARE (NIC)

AutoCAD SHX Text

AMB (NIC)

AutoCAD SHX Text

(NIC)

AutoCAD SHX Text

ENTRY ADDITION (NIC)

AutoCAD SHX Text

AutoCAD SHX Text A-102

NO SCALE

PARTIAL FIRST FLOOR ROOF PLAN

A-103

PARTIAL FIRST FLOOR

ROOF PLAN

KEY MAP - BLDG 200, VAMC NORTHPORT

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawi…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .