620-23-102 - 100 Construction Drawings.pdf
PDF 46 MB Posted
- Solicitation number
- 36C24226B0020
About this file
These are construction drawings for the repaving of Parking Lot G at the Montrose Veterans Affairs Medical Center (VAMC) located at 2094 Albany Post Rd, Montrose, NY 10548. The project (Contract Number: 36C24222R0111, Project Number: 620-23-102) involves full-depth pavement reconstruction, including concrete curbs, sidewalks, ADA ramps, site lighting, drainage improvements, and landscaping.
Key technical specifications include a 10-inch NYSDOT Type 2 stone subbase, 3-inch asphalt concrete binder course, and 1.5-inch asphalt concrete top course. The project also incorporates erosion control measures, bioretention areas, and stormwater management. The drawings, prepared by Acela Architects + Engineers, detail site grading, utility modifications, electrical infrastructure, and specific construction requirements such as traffic management, safety protocols, and environmental compliance. The professional engineer of record is Christopher Geary (PE #099085), with the project issued on 08/29/2024.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
VA U.S. Department of Veterans Affairs
LIST OF DRAWINGS
PROJECT CONTACT DIRECTORY
LOCATION MAP
CONTRACT OFFICER CONTRACTING OFFICER
REPRESENTATIVE (COR)
CIVIL ENGINEERS
APPROVALS
Approved by Medical Center Director Approved by Director of Facility Management Service
Approved by Project COR Approved by Medical Director
Approved by Infection Control Approved by Safety Officer
Approved by Project CO
Approved by
PROJECT INFORMATION
PAVE LOT 'G'
AT
MONTROSE VA MEDICAL CENTER
PROJECT NUMBER: 620-23-102
CONTRACT NUMBER: 36C24222R0111
2094 ALBANY POST RD, MONTROSE, NY 10548
SCALE: 1" = 2,000'
SOURCE: USGS MONTROSE, NY QUAD MAP
PROJECT
LOCATION
N.T.S.
SOURCE: GOOGLE MAPS
I HEREBY CERTIFY THAT ALL INFORMATION INDICATED ON THIS
DRAWING WAS OBTAINED OR VERIFIED BY ACTUAL
MEASUREMENTS IN THE FIELD, AND THAT EVERY EFFORT HAS
BEEN MADE TO FURNISH COMPLETE AND ACCURATE
INFORMATION.
Christopher Geary, P.E. PA #099085
PROFESSIONAL ENGINEER'S CERTIFICATION
Leon Shurp (COR) (914)-737-4400 ext. 202147
Daniel M. Barone (CO) (914)-737-4400 ext. 202046 acela architects + engineers, pc 2633 Moravian Avenue Allentown, PA 18103
Christopher Geary, PE (610)-365-4023 cgeary@acela-ae.com
PE# 099085
08/29/2024 RCG
Montrose VA Medical Center Montrose, NY
620-23-102 Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
Project Director
Revisions: Date: Dwg. of
JMS
Christopher W. Geary
CH
RI
ST
OPHER WILLIAM GEARY
099085
S
T A T E OF NEW Y O
R K
L IC
ENSED PROFESSIONAL ENGI
NE
ER
SHEET LIST TABLE
SHEET
NUMBER DRAWING N0. SHEET TITLE
GENERAL
GI 1 1 OF 14 TITLE SHEET
GI 2 2 OF 14 GENERAL NOTES SHEET
GC 1 3 OF 14 MAINTENANCE & PROTECTION OF TRAFFIC PLAN
GC 2 4 OF 14 EROSION & SEDIMENTATION POLLUTION CONTROL PLAN
GR 1 5 OF 14 CORE BORING PLAN
CIVIL
CD 1 6 OF 14 EXISTING FEATURES & DEMOLITION PLAN
CS 1 7 OF 14 LAYOUT PLAN
CG 1 8 OF 14 GRADING & UTILITY PLAN
CN 1 9 OF 14 EROSION & SEDIMENTATION POLLUTION CONTROL DETAILS
CN 2 10 OF 14 CONSTRUCTION DETAILS
CN 3 11 OF 14 CONSTRUCTION DETAILS
CN 4 12 OF 14 CONSTRUCTION DETAILS
ELECTRICAL
ES 1 13 OF 14 ELECTRICAL SITE PLAN & LIGHTING
ES 2 14 OF 14 ELECTRICAL SITE SCHEDULE
EXISTING CONDITIONS NOTES
1. THE EXISTING FEATURES PLAN INFORMATION SHOWN IN THIS PLAN SET ARE BASED ON AN ON THE GROUND
FIELD SURVEY BY ACELA ARCHITECTS + ENGINEERS, PC. DURING JUNE 2023. AREAS SHOWN OUTSIDE THE SCOPE OF WORK ARE BASED ON DRAWINGS PROVIDED BY THE DEPARTMENT OF VETERAN AFFAIRS.
2. IT IS ASSUMED ONLY THOSE ITEMS VISIBLE ON THE GROUND AT THE TIME OF SURVEY WERE LOCATED AND SHOWN ON THIS PLAN. ACELA ARCHITECTS + ENGINEERS, PC. CONTRACTED A SUBSURFACE UTILITY COMPANY TO LOCATE UNDERGROUND UTILITIES. THE UTILITIES SHOWN HEREON ARE A RESULT OF SURFACE AND SUBSURFACE INVESTIGATION. CONTRACTORS AND OTHER USERS OF THIS PLAN ARE RESPONSIBLE FOR VERIFICATION AND LOCATION OF ALL UTILITIES PRIOR TO CONSTRUCTION WORK AT LOCATIONS SHOWN HEREON. ACELA ARCHITECTS + ENGINEERS, P.C. ASSUMES NO LIABILITY TO DAMAGE TO ANY EXISTING UTILITY DURING CONSTRUCTION. THE CONTRACTOR SHALL BE RESPONSIBLE TO REPAIR
ANY DAMAGE THAT MAY OCCUR DURING CONSTRUCTION.
3. THE SURVEY IS BASED ON NEW YORK STATE PLANE COORDINATE SYSTEM.
DEMOLITION NOTES
1. PERFORM DEMOLITION IN SUCH MANNER AS TO ELIMINATE HAZARDS TO PERSONS AND PROPERTY; TO
MINIMIZE NOISE; TO MINIMIZE INTERFERENCE WITH USE OF ADJACENT AREAS, UTILITIES AND STRUCTURES OR INTERRUPTION OF USE OF SUCH UTILITIES; AND TO PROVIDE FREE PASSAGE TO AND FROM SUCH
ADJACENT AREAS OF STRUCTURES.
2. PROVIDE SAFEGUARDS, INCLUDING WARNING SIGNS, BARRICADES, TEMPORARY FENCES, WARNING LIGHTS, AND OTHER SIMILAR ITEMS THAT ARE REQUIRED FOR PROTECTION OF ALL PERSONNEL DURING
DEMOLITION AND REMOVAL OPERATIONS.
3. MAINTAIN FENCES, BARRICADES, LIGHTS AND OTHER SIMILAR ITEMS AROUND EXPOSED EXCAVATIONS
UNTIL SUCH EXCAVATIONS HAVE BEEN COMPLETELY FILLED.
4. PREVENT SPREAD OF FLYING PARTICLES AND DUST. SPRINKLE RUBBISH AND DEBRIS WITH WATER TO KEEP DUST TO A MINIMUM. DO NOT USE WATER IF IT RESULTS IN HAZARDOUS OR OBJECTIONABLE CONDITION
SUCH AS, BUT NOT LIMITED TO; ICE, FLOODING OR POLLUTION.
5. BEFORE BEGINNING ANY DEMOLITION WORK, THE CONTRACTOR SHALL SURVEY THE SITE AND EXAMINE THE DRAWINGS AND SPECIFICATIONS TO DETERMINE THE EXTENT OF THE WORK. THE CONTRACTOR SHALL TAKE NECESSARY PRECAUTIONS TO AVOID DAMAGES TO EXISTING ITEMS TO REMAIN IN PLACE, TO BE REUSED, OR TO REMAIN THE PROPERTY OF THE MEDICAL CENTER; ANY DAMAGED ITEMS SHALL BE REPAIRED OR REPLACED AS APPROVED BY THE CONTRACTING OFFICER REPRESENTATIVE (COR). THE
CONTRACTOR SHALL COORDINATE THE WORK WITH ALL OTHER WORK AND SHALL CONSTRUCT AND
MAINTAIN SHORING, BRACING, AND SUPPORTS AS REQUIRED. THE CONTRACTOR SHALL ENSURE THAT
STRUCTURAL ELEMENTS ARE NOT OVERLOADED AND SHALL BE RESPONSIBLE FOR INCREASING
STRUCTURAL SUPPORTS OR ADDING NEW SUPPORTS AS MAY BE REQUIRED AS A RESULT OF ANY CUTTING, REMOVAL, OR DEMOLITION WORK PERFORMED.
6. DEMOLISH AND REMOVE OUTSIDE UTILITY SERVICE LINES SHOWN TO BE REMOVED.
7. REMOVE ABANDONED OUTSIDE UTILITY LINES THAT WOULD INTERFERE WITH INSTALLATION OF NEW
UTILITY LINES AND NEW CONSTRUCTION.
8. ALL WASTE DEBRIS, UNSUITABLE, AND EXCESS MATERIAL SHALL BE REMOVED FROM THE SITE AND LAWFULLY DISPOSED OF. DEBRIS, INCLUDING BRICK, CONCRETE STONE, METALS AND SIMILAR MATERIALS SHALL BECOME PROPERTY OF THE CONTRACTOR AND SHALL BE DISPOSED OF BY THE CONTRACTOR DAILY, OFF THE MEDICAL CENTER PROPERTY TO AVOID ACCUMULATION AT THE DEMOLITION SITE. MATERIALS THAT CANNOT BE REMOVED DAILY SHALL BE STORED IN AREAS SPECIFIED BY THE CONTRACTING OFFICERS REPRESENTATIVE. CONTRACTOR SHALL NOTIFY ENGINEER AND COR IMMEDIATELY IF MATERIALS UNCOVERED DURING ANY PART OF THE WORK APPEAR TO BE CONTAMINATED. ALL LOCAL, STATE AND
FEDERAL LAWS SHALL PREVAIL IN THE EVENT OF CONTAMINATED MATERIALS.
9. BREAK UP CONCRETE SLABS BELOW GRADE THAT DO NOT REQUIRE REMOVAL FROM PRESENT LOCATION INTO PIECES NOT EXCEEDING 24 INCHES (600 MM) SQUARE TO PERMIT DRAINAGE. CONTRACTOR SHALL DISPOSE OF DEBRIS IN COMPLIANCE WITH APPLICABLE FEDERAL, STATE AND LOCAL PERMITS, RULES
AND/OR REGULATIONS.
10. AS PART OF THE PROPOSED WORK, ANY DAMAGE TO THE EXISTING CURB SHALL BE CORRECTED BY THE
CONTRACTOR TO THE SATISFACTION OF THE COR.
11. ANY SIDEWALK, ON THESE PLANS, THAT IS SHOWN TO BE REMOVED OR REPLACED SHALL BE REMOVED TO
THE NEAREST EXISTING SIDEWALK JOINT.
12. THE CONTRACTOR IS RESPONSIBLE FOR PROTECTING AND MAINTAINING ALL TREES AND LIGHT POLES
SURROUNDING THE PARKING LOTS AND ROADWAY. ANY SUCH FEATURES DAMAGED DURING
CONSTRUCTION SHALL BE REMOVED AND REPLACED AT THE CONTRACTOR'S EXPENSE.
CONCRETE REPAIR NOTES
1. EXPANSION JOINTS SHALL BE INSTALLED WHENEVER CONCRETE IS PLACED AGAINST ROADWAY PAVEMENT, PARKING LOTS, EXISTING CONCRETE, BUILDINGS, OR STRUCTURES AND PER VA REQUIREMENTS. SPACING
OF ALL SIDEWALK JOINTS SHALL BE PER THE CONCRETE SIDEWALK JOINT SPACING DETAIL.
2. CONCRETE SHALL BE FINISHED BY MEANS OF A FLOAT, STEEL TROWELED AND BROOMED WITH A FINE
BRUSH IN A TRANSVERSE DIRECTION, UNLESS STATED OTHERWISE ON THE PLANS.
3. THE CONTRACTOR SHALL BE RESPONSIBLE TO REPAIR ANY DAMAGED ASPHALT ADJACENT TO THE AREA OF CONSTRUCTION ASSOCIATED WITH REPAIR AND/OR REPLACEMENT OF EXISTING SIDEWALK AND/OR STAIRS
TO THE SATISFACTION OF THE COR.
4. THE CONTRACTOR SHALL BE RESPONSIBLE FOR SPREADING TOPSOIL, SEEDING AND STABILIZING ANY DAMAGED OR UNVEGETATED PERVIOUS AREA ADJACENT TO THE AREA OF CONSTRUCTION ASSOCIATED
WITH REPAIR AND/OR REPLACEMENT OF EXISTING SIDEWALK.
5. POSITIVE DRAINAGE SHALL BE PROVIDED ALONG ALL SIDEWALKS. SIDEWALK CONSTRUCTION AND REPAIR
SHALL BE COMPLETED IN A MANNER TO PREVENT LOW POINTS AND STANDING WATER.
PAVEMENT RECONSTRUCTION NOTES
1. ALL WASTE, DEBRIS, UNSUITABLE, AND EXCESS MATERIAL SHALL BE REMOVED FROM THE SITE AND
LAWFULLY DISPOSED OF.
2. SAWCUT PAVEMENT TO A DEPTH OF 2" WHERE MILLING OPERATIONS ABUT BITUMINOUS PAVEMENT TO REMAIN. SEAL JOINT WITH 12" WIDE ASPHALT SEALANT. REFER TO SAW CUT DETAIL FOR MORE
INFORMATION.
3. A RECLAIMED BASE MAY BE UTILIZED, WHERE A PROFESSIONAL GEOTECHNICAL ENGINEER LICENSED IN NEW YORK RETAINED BY THE CONTRACTOR APPROVES THE SOIL, IN THE AREAS WHERE EXISTING
PAVEMENT IS TO BE RECONSTRUCTED. THE RECLAMATION SHALL MEET THE MINIMUM
REQUIREMENTS AND CROSS SECTION OF THE FULL DEPTH CONSTRUCTION. IF THE EXISTING CROSS SECTION DOES NOT PROVIDE ADEQUATE DEPTH OR MATERIAL FOR RECLAMATION, NEW MATERIAL
SHALL BE IMPORTED. ANY RECLAIMED MATERIAL SHALL BE APPROVED PRIOR TO REUSE.
4. POOR IN-SITU SOIL THAT IS DEEMED UNSUITABLE, BY THE THIRD PARTY PROFESSIONAL
GEOTECHNICAL ENGINEER LICENSED IN NEW YORK RETAINED BY THE CONTRACTOR, FOR USE AS
PAVING SUBGRADE SHALL BE OVER-EXCAVATED AND REPLACED WITH HIGHER QUALITY
LOAD-BEARING FILL AS DIRECTED BY THE PROFESSIONAL GEOTECHNICAL ENGINEER.
5. PAVEMENT RECONSTRUCTION AND ASSOCIATED IMPROVEMENTS SHALL BE STAGED TO MINIMIZE
DISRUPTION TO THE MEDICAL FACILITY. STAGING AREAS AND EQUIPMENT STORAGE SHALL BE
COORDINATED WITH THE CONTRACTING OFFICERS REPRESENTATIVE (COR).
6. REPAIR DAMAGED CURB AS INDICATED, OR AS NECESSARY IF ADDITIONAL DAMAGE OCCURS DURING
CONSTRUCTION.
7. ALL PAVEMENT MARKINGS AND ROAD SIGNS TO BE IN ACCORDANCE WITH THE CURRENT EDITION OF
THE MANUAL FOR UNIFORM TRAFFIC CONTROL DEVICES (MUTCD) AND THE NEW YORK STATE
SUPPLEMENT TO THE MANUAL ON UNIFORM TRAFFIC CONTROL DEVICES.
8. AFTER THE INSTALLATION OF THE BINDER COURSE WITHIN EACH PHASE, AND NO SOONER THAN 24 HOURS AFTER THE ASPHALT HAS BEEN INSTALLED, THE CONTRACTOR SHALL BE RESPONSIBLE FOR INSTALLING TEMPORARY PAVEMENT MARKINGS, PRIOR TO THE AREA BEING OPENED FOR GENERAL PARKING. THE CONTRACTOR SHALL UTILIZE A PAINT EQUIVALENT TO THAT OF THE PERMANENT PAINT
MARKINGS ON THE BINDER COURSE., UNLESS OTHERWISE AGREED TO BY THE CONTRACTING
OFFICER.
9. AFTER THE INSTALLATION OF THE WEARING COURSE, AND NO SOONER THAN 24 HOURS AFTER THE
ASPHALT HAS BEEN INSTALLED, THE CONTRACTOR SHALL BE RESPONSIBLE FOR PROVIDING
TEMPORARY PAVEMENT MARKINGS TO CLEARLY IDENTIFY PARKING STALLS AND DRIVE AISLES. THE
TEMPORARY PAVEMENT MARKINGS MAY NEED TO BE SUPPLEMENTED WITH TRAFFIC CONES,
BARRELS, SIGNAGE, ETC. THESE TEMPORARY PAVEMENT MARKINGS ARE NOT INTENDED TO BE THE
PERMANENT PAVEMENT MARKINGS. ADEQUACY OF THE TEMPORARY PAVEMENT MARKINGS AND
APPURTENANCES SHALL BE DETERMINED BY THE COR AND IMPROVED OR MODIFIED AS REQUESTED AT NO COST TO THE GOVERNMENT. PERMANENT PAVEMENT MARKINGS SHALL BE INSTALLED NO LESS THAN 14 DAYS AFTER FINAL WEARING COURSE INSTALLATION, OR GREATER IF RECOMMENDED BY THE MANUFACTURER. PAVEMENT MARKINGS SHALL NOT BE INSTALLED DURING NORMAL BUSINESS HOURS (0700H-1600H, MONDAY THRU FRIDAY, EXCLUSIVE TO HOLIDAYS) UNLESS OTHERWISE APPROVED BY
THE CONTRACTING OFFICER.
UTILITY NOTES
1. KEEP HYDRANTS CLEAR AND ACCESSIBLE AT ALL TIMES. PROHIBIT DEBRIS FROM ACCUMULATING
WITHIN A RADIUS OF 15 FT (4500 MM) OF FIRE HYDRANTS.
2. THE LOCATIONS, SIZES, AND TYPES OF EXISTING UTILITIES ARE SHOWN AS AN APPROXIMATE
REPRESENTATION ONLY. THE OWNER OR ITS REPRESENTATIVE(S), HAVE NOT INDEPENDENTLY
VERIFIED THE INFORMATION AS SHOWN ON THE PLANS. THE UTILITY INFORMATION SHOWN DOES NOT GUARANTEE THE ACTUAL EXISTENCE, SERVICEABILITY, OR OTHER DATA CONCERNING THE UTILITIES, NOR DOES IT GUARANTEE AGAINST THE POSSIBILITY THAT ADDITIONAL UTILITIES MAY BE PRESENT
THAT ARE NOT SHOWN ON THE PLANS. PRIOR TO ORDERING MATERIALS AND BEGINNING
CONSTRUCTION, THE CONTRACTOR SHALL VERIFY AND DETERMINE THE EXACT LOCATIONS, SIZES AND ELEVATIONS OF THE POINTS OF CONNECTION TO THE EXISTING UTILITIES AND SHALL CONFIRM THAT THERE ARE NO INTERFERENCES WITH EXISTING UTILITIES AND THE PROPOSED UTILITY ROUTES, INCLUDING ROUTES WITHIN THE PUBLIC RIGHTS OF WAY.
3. THE CONTRACTOR SHALL VERIFY DIMENSIONS OF STORM INLET BOXES PRIOR TO ORDERING GRADE
ADJUSTMENT RINGS OR TOP UNITS.
4. WHERE AN EXISTING UTILITY IS FOUND TO CONFLICT WITH THE PROPOSED WORK, OR EXISTING
CONDITIONS DIFFER FROM THOSE SHOWN SUCH THAT THE WORK CANNOT BE COMPLETED AS
INTENDED, THE LOCATION, ELEVATION, AND SIZE OF THE UTILITY SHALL BE ACCURATELY DETERMINED WITHOUT DELAY BY THE CONTRACTOR AND THE INFORMATION SHALL BE FURNISHED IN WRITING BY
THE CONTRACTOR TO THE ENGINEER, CONTRACTING OFFICER, AND CONTRACTING OFFICER'S
REPRESENTATIVE FOR THE RESOLUTION OF THE CONFLICT. THE CONTRACTORS FAILURE TO NOTIFY PRIOR TO PERFORMING ADDITIONAL WORK RELEASES OWNER FROM OBLIGATIONS FOR ADDITIONAL
PAYMENTS WHICH OTHERWISE MAY BE WARRANTED TO RESOLVE THE CONFLICT.
5. ANY EXISTING UTILITY, SUCH AS BUT NOT LIMITED TO STRUCTURES, PIPES, VALVES, POLES, AND GUY WIRES, IN CONFLICT WITH ANY IMPROVEMENTS SHALL BE ADJUSTED AS REQUIRED, INCLUDING BOTH
HORIZONTAL AND VERTICAL CONFLICTS.
6. RIM ELEVATIONS FOR DRAINAGE AND SEWER MANHOLES, WATER VALVE COVERS, GAS GATES, ELECTRIC AND TELEPHONE PULL BOXES, AND OTHER SUCH ITEMS, ARE APPROXIMATE AND SHALL BE
SET/RESET AS FOLLOWS:
A. PAVEMENTS AND CONCRETE SURFACES: FLUSH
B. ALL SURFACES ALONG ACCESSIBLE ROUTES: FLUSH
C. LANDSCAPE OR LOAM AND SEED AREAS: ONE INCH ABOVE SURROUNDING AREA AND TAPER EARTH
TO THE RIM ELEVATION.
7. ANY EXISTING UTILITY STRUCTURE, BOX OR POLE IN HORIZONTAL CONFLICT WITH ANY PAVEMENT
RECONSTRUCTION AND/OR WIDENING SHALL BE RELOCATED.
8. IMMEDIATELY PRIOR TO THE END OF CONSTRUCTION OR ACCEPTANCE BY THE COR, THE
CONTRACTOR SHALL INSPECT ALL CATCH BASINS AND DRAINAGE MANHOLES WITHIN AND
DOWNSTREAM OF THE LIMITS OF WORK. PIPES AND STRUCTURES SHALL BE CLEANED AND FLUSHED
AS NECESSARY.
9. THE CONTRACTOR SHALL WORK WITH THE COR AND VA STAFF TO VERIFY EXISTING CONDITIONS OF ELECTRICAL SYSTEMS BEING SPLICED TO WITH PROPOSED LIGHTING. WIRE SIZES AND BREAKER
SIZES SHALL BE VERIFIED PRIOR TO ANY WORK TO ENSURE ACCURACY WITH THE PLAN. THE
CONTRACTOR SHALL PROVIDE LARGER WIRE SIZES WHERE NECESSARY TO SPLICE TO EXISTING
CIRCUITS.
10. PROPOSED STORMWATER PIPE LENGTHS ARE SHOWN FROM CENTER OF STRUCTURE TO CENTER OF
STRUCTURE.
11. SEAL BETWEEN CONCRETE STRUCTURES WITH BUTYL RUBBER SEALANT MEETING ASTM C-990-91.
12. THE CONTRACTOR SHALL BE RESPONSIBLE FOR VERIFYING ALL EXISTING UTILITIES. EXISTING UTILITIES DETERMINED TO BE PREVIOUSLY ABANDONED SHALL BE DISCUSSED WITH THE COR IF THE UTILITY SHALL REMAIN IN PLACE OR BE REMOVED, UNLESS OTHERWISE SHOWN ON THE PLANS. ANY UTILITY UNABLE TO BE PREVIOUSLY VERIFIED, INCLUDING ANY "LOST SIGNAL" UTILITY, SHALL BE FURTHER INVESTIGATED BY THE CONTRACTOR AND DISCUSSED WITH THE COR PRIOR TO ANY UTILITY
DISRUPTION AND/OR REMOVAL.
13. ALL STRUCTURE PENETRATIONS SHALL BE PRECAST OPENINGS. NO FIELD CUTTING FOR OPENINGS IS PERMITTED UNLESS APPROVED BY THE COR. THE CONTRACTOR SHALL SUBMIT SHOP DRAWINGS TO
THE COR FOR APPROVAL OF EACH STRUCTURE PRIOR TO ORDERING.
GENERAL NOTES
1. THESE PLANS ARE FOR THE RECONSTRUCTION OF PARKING LOT "G" AND CONSTRUCTION OF NEW SIDEALK AND SITE
LIGHTING. THE CONTRACTOR SHALL COORDINATE CONSTRUCTION WITH THE VAMC.
2. THE CONTRACTOR SHALL REFER TO THE SPECIFICATIONS PREPARED FOR MONTROSE PAVE LOT G, PREPARED BY
ACELA ARCHITECTS + ENGINEERS, P.C.
3. THE CONTRACTOR SHALL NOTIFY "NEW YORK 811" (1-800-272-4480) AT LEAST 72 HOURS PRIOR TO EXCAVATION.
4. THE CONTRACTOR SHALL BE RESPONSIBLE FOR SITE SECURITY AND JOB SAFETY. CONSTRUCTION ACTIVITIES SHALL BE IN ACCORDANCE WITH OSHA STANDARDS, STATE AND LOCAL REQUIREMENTS. THE CONTRACTOR SHALL PROVIDE FENCING OR BARRIERS AROUND THE ENTIRE WORK AREA. THE CONTRACTOR SHALL NOT BEGIN WORK UNTIL THE SITE
SAFETY PLAN HAS BEEN APPROVED BY THE VA'S SAFETY OFFICER.
5. UPON AWARD OF CONTRACT, THE CONTRACTOR SHALL MAKE NECESSARY CONSTRUCTION NOTIFICATIONS, APPLY FOR AND OBTAIN NECESSARY PERMITS, PAY FEES, AND POST BONDS ASSOCIATED WITH THE WORK INDICATED WITHIN THE CONSTRUCTION PLANS, SPECIFICATIONS AND CONTRACT DOCUMENTS. THE CONTRACTOR SHALL NOT COMMENCE CONSTRUCTION NOR CLOSE OR OBSTRUCT ROADWAYS, SIDEWALKS AND/OR FIRE HYDRANTS WITHOUT APPROPRIATE
PERMITS AND/OR PERMISSIONS.
6. TRAFFIC SIGNAGE (TEMPORARY AND PERMANENT) SHALL CONFORM TO THE MANUAL OF UNIFORM TRAFFIC CONTROL DEVICES(MUTCD) FOR ALL LOCAL RIGHTS OF WAY AND BE IN ACCORDANCE WITH TRAFFIC MANAGEMENT PLANS. THE TRAFFIC MANAGEMENT PLANS SHALL BE PART OF THE SITE SAFETY PLANS AND SHALL BE APPROVED BY THE VA'S
SAFETY OFFICER.
7. AREAS OUTSIDE THE LIMITS OF PROPOSED WORK THAT BECOME DISTURBED BY THE CONTRACTORS OPERATIONS SHALL BE RESTORED BY THE CONTRACTOR TO ITS ORIGINAL CONDITION AT THE CONTRACTOR'S EXPENSE.
8. VEGETATED AREAS DISTURBED DURING CONSTRUCTION SHALL RECEIVE A MINIMUM OF SIX (6) INCHES OF TOPSOIL.
THESE AREAS SHALL BE IMMEDIATELY SEEDED AND STABILIZED.
9. DAMAGE TO SURFACE FEATURES, SUBSURFACE FEATURES AND SUBSURFACE INFRASTRUCTURE RESULTING FROM CONSTRUCTION LOADS SHALL BE REPAIRED BY THE CONTRACTOR AT NO ADDITIONAL COST TO THE OWNER.
10. THE CONTRACTOR SHALL CONTROL STORMWATER RUNOFF DURING CONSTRUCTION TO PREVENT ADVERSE IMPACTS TO OFF-SITE AREAS, AND SHALL BE RESPONSIBLE TO REPAIR RESULTING DAMAGES, IF ANY, AT NO COST TO OWNER.
11. THE CONTRACTOR IS REQUIRED TO BACKFILL TRENCHES OR SECURE WITH METAL PLATES DAILY. NO OPEN TRENCHES
SHALL BE LEFT UNATTENDED OR OUTSIDE OF THE PROTECTED WORK AREA.
12. THE CONTRACTOR SHALL VERIFY THE PROPOSED LAYOUT WITH ITS RELATIONSHIP TO THE EXISTING SITE SURVEY. THE CONTRACTOR SHALL ALSO VERIFY ALL DIMENSIONS, SITE CONDITIONS, AND MATERIAL SPECIFICATIONS AND SHALL NOTIFY THE OWNER AND ENGINEER OF ANY DISCREPANCIES BEFORE COMMENCING OR PROCEEDING WITH WORK.
13. THE ENGINEER SHALL NOT HAVE CONTROL OR CHARGE OF AND SHALL NOT BE RESPONSIBLE FOR CONSTRUCTION MEANS, METHODS, TECHNIQUES, SEQUENCE ON PROCEDURE, OR FOR SAFETY PRECAUTIONS AND PROGRAMS IN CONNECTION WITH WORK, ALL OF WHICH SHALL BE THE SOLE RESPONSIBILITY OF THE CONTRACTOR. METHODS AND MATERIALS USED IN THE CONSTRUCTION OF IMPROVEMENTS FOR THIS PROJECT SHALL CONFORM TO THE CURRENT CONSTRUCTION STANDARDS AND SPECIFICATIONS OF THE NEW YORK DEPARTMENT OF TRANSPORTATION.
14. MATERIALS WHICH COULD BE A POTENTIAL SOURCE OF STORMWATER POLLUTION, SUCH AS GASOLINE, DIESEL FUEL, HYDRAULIC OIL, ETC., SHALL BE STORED AT THE END OF EACH DAY IN A STORAGE TRAILER OR COVERED LOCATION, OR TAKEN OFF-SITE AND PROPERLY DISPOSED. ALL TYPES OF WASTE GENERATED AT THIS SITE SHALL BE DISPOSED OF IN
A MANNER CONSISTENT WITH APPLICABLE REGULATIONS.
15. THE CONTRACTOR SHALL NOTIFY OPERATORS WHO MAINTAIN UNDERGROUND UTILITY LINES IN THE AREA OF PROPOSED EXCAVATION AT LEAST TWO WORKING DAYS, BUT NOT MORE THAN TEN WORKING DAYS, PRIOR TO COMMENCEMENT OF EXCAVATION OR DEMOLITION. ALL WATER, GAS, SEWER, ELECTRIC AND OTHER UTILITIES SHALL BE MAINTAINED AT ALL
TIMES DURING CONSTRUCTION.
16. THE CONTRACTOR SHALL BE RESPONSIBLE FOR REPLACING, WITH MATCHING MATERIALS, ANY PAVEMENT, WALKS, CURBS, ETC. THAT MUST BE CUT OR THAT ARE DAMAGED DURING CONSTRUCTION TO THE SATISFACTION OF THE COR.
17. AN APPROVED SET OF PLANS, SPECIFICATIONS AND ALL APPLICABLE PERMITS MUST BE AVAILABLE AT THE
CONSTRUCTION SITE.
18. THE CONTRACTOR AGREES THAT HE/SHE SHALL ASSUME SOLE AND COMPLETE RESPONSIBILITY FOR JOB SITE CONDITIONS DURING THE COURSE OF CONSTRUCTION OF THIS PROJECT, INCLUDING SAFETY OF ALL PERSONS AND PROPERTY; THAT THIS REQUIREMENT SHALL APPLY CONTINUOUSLY AND NOT BE LIMITED TO NORMAL WORKING HOURS;
AND THAT THE CONTRACTOR SHALL DEFEND, INDEMNIFY AND HOLD THE OWNER AND THE ENGINEER HARMLESS FROM ANY AND ALL LIABILITY, REAL AND ALLEGED, IN CONNECTION WITH THE PERFORMANCE OF WORK ON THIS PROJECT, EXCEPTING LIABILITY ARISING FROM "THE SOLE NEGLIGENCE OF THE OWNER OR THE ENGINEER." THE CONTRACTOR IS RESPONSIBLE FOR INSTALLING A PROTECTIVE BARRIER AROUND THE SITE PRIOR TO AND MAINTAINED DURING
CONSTRUCTION.
19. ALL CONSTRUCTION SHALL BE IN ACCORDANCE WITH THE APPROVED PLANS AND SPECIFICATIONS ISSUED BY ACELA ARCHITECTS + ENGINEERS P.C. ANY DEVIATIONS FROM THESE DOCUMENTS SHALL REQUIRE NOTIFICATION TO THE ENGINEER PRIOR TO THE COMMENCEMENT OF/OR CONSTRUCTION OF ANY CHANGE. WITHOUT NOTIFICATION TO THE ENGINEER, THE CONTRACTOR WILL BE WORKING AT HIS/HER OWN RISK. ANY WORK INSTALLED IN CONFLICT WITH THE CONTRACT DRAWINGS, CODE REQUIREMENTS OR MANUFACTURER REQUIREMENTS WITHOUT THE PRIOR APPROVAL OF
THE COR AND THE ENGINEER SHALL BE CORRECTED AT THE CONTRACTORS EXPENSE.
20. ALL CONSTRUCTION ACTIVITIES SHALL BE COORDINATED WITH THE COR AT LEAST 72 HOURS PRIOR TO THE START OF
THE CONSTRUCTION ACTIVITY.
21. THE CONTRACTOR SHALL MAINTAIN UPDATED RECORD DOCUMENTS OF CONSTRUCTION CHANGES ("AS-BUILT DRAWINGS") AND SHALL PROVIDE SAID DOCUMENTATION TO THE ENGINEER UPON COMPLETION OF CONSTRUCTION IN BOTH DIGITAL AND HARD COPY FORMATS. AS BUILT DRAWINGS SHALL BE UPDATED AS CONSTRUCTION PROGRESSES.
RECORD DOCUMENTS SHALL ARTICULATE WHERE ACTUAL INSTALLATION OF WORK, PRODUCTS AND/OR SYSTEMS VARY FROM THE DESIGN INTENT EXPRESSED/SPECIFIED IN THE CONTRACTOR DOCUMENTS. **NO EXCEPTION ALLOWED**. THE UPDATED ON-SITE DRAWINGS SHALL BE MADE AVAILABLE TO THE COR AND/OR DESIGN ENGINEER UPON REASONABLE
REQUEST.
22. ANY SINKHOLE ENCOUNTERED HAS TO BE REPAIRED PER PLAN APPROVED BY THE COR FROM THE PROFESSIONAL
GEOTECHNICAL ENGINEER LICENSED IN NEW YORK RETAINED BY THE CONTRACTOR.
EROSION CONTROL NOTES
1. CONTRACTOR SHALL PERFORM ALL WORK IN ACCORDANCE WITH THE CONSTRUCTION & EROSION AND SEDIMENTATION
POLLUTION CONTROL PLAN (ENS) PREPARED FOR THE PROJECT.
2. PRIOR TO STARTING ANY WORK ON THE SITE, THE CONTRACTOR SHALL NOTIFY THE COR AND SHALL INSTALL EROSION
CONTROL MEASURES AS SHOWN ON THE APPROVED PLANS.
3. THE CONTRACTOR SHALL INSPECT AND MAINTAIN EROSION CONTROL MEASURES DAILY, REMOVE SEDIMENT ON A WEEKLY BASIS AND WITHIN TWELVE HOURS AFTER EACH STORM EVENT, AND DISPOSE OF SEDIMENT. SEDIMENT SHALL
BE REMOVED FROM THE SITE OR PLACED ON THE SITE AS DIRECTED BY THE COR.
4. THE CONTRACTOR SHALL BE FULLY RESPONSIBLE TO CONTROL CONSTRUCTION SUCH THAT SEDIMENTATION SHALL NOT AFFECT REGULATORY PROTECTED AREAS, WHETHER SUCH SEDIMENTATION IS CAUSED BY WATER, WIND, OR
DIRECT DEPOSIT.
5. THE CONTRACTOR SHALL PERFORM CONSTRUCTION SEQUENCING SUCH THAT EARTH MATERIALS ARE EXPOSED FOR A MINIMUM TIME BEFORE THEY ARE COVERED, SEEDED, OR OTHERWISE STABILIZED TO PREVENT EROSION.
6. THE CONTRACTOR SHALL INSTALL PROTECTIVE MEASURES TO PREVENT DEBRIS AND/OR SEDIMENT FROM ENTERING DRAINAGE CATCH BASINS AND PIPES. UPON COMPLETION OF CONSTRUCTION AND ESTABLISHMENT OR PERMANENT GROUND COVER, THE CONTRACTOR SHALL REMOVE AND DISPOSE OF EROSION CONTROL MEASURES AND REMOVE ANY
DEBRIS AND/OR SEDIMENT FROM ALL DRAINAGE INFRASTRUCTURE.
7. IT SHALL BE THE CONTRACTORS RESPONSIBILITY TO CONTROL DUST AND TAKE ALL NECESSARY MEASURES TO ENSURE ALL ROADS ARE MAINTAINED IN A DUST FREE CONDITION AT ALL TIMES THROUGHOUT THE DURATION OF THE PROJECT.
REPETITIVE TREATMENTS SHOULD BE APPLIED AS NECESSARY.
8. PERMANENT VEGETATIVE COVER SHALL BE INSTALLED TO ALL DISTURBED AREAS THAT HAVE REACHED FINISHED GRADE AS SOON AS POSSIBLE, BUT NOT MORE THAN FOURTEEN (14) DAYS AFTER THE CONSTRUCTION ACTIVITY IN ANY GIVEN AREA HAS PERMANENTLY CEASED. THE RECOMMENDED PERMANENT SEEDING DATES ARE APRIL 1 TO JUNE 15
AND AUGUST 15 TO OCTOBER 1.
9. TEMPORARY VEGETATIVE COVER SHALL BE APPLIED TO ANY DISTURBED AREAS (INCLUDING SOIL STOCKPILE AREAS) THAT HAVE NOT YET REACHED FINISHED GRADE AS SOON AS POSSIBLE, BUT NOT MORE THAN FOURTEEN (14) DAYS AFTER THE CONSTRUCTION ACTIVITY IN THAT AREA HAS TEMPORARILY CEASED, UNLESS THE ACTIVITY IS TO RESUME WITHIN TWENTY-ONE (21) DAYS. THE RECOMMENDED TEMPORARY SEEDING DATES ARE MARCH 1 TO JUNE 15 AND
AUGUST 15 TO OCTOBER 1.
10. AREAS WHICH HAVE BEEN TEMPORARILY OR PERMANENTLY SEEDED SHOULD BE MULCHED IMMEDIATELY FOLLOWING SEEDING IN ADDITION TO AREAS WHICH CANNOT BE SEEDED WITHIN THE RECOMMENDED SEEDING DATES AND ANY SOIL STOCKPILE AREAS. TEMPORARY MULCHING SHOULD BE PERFORMED AS SOON AS POSSIBLE, BUT NOT MORE THAN FOURTEEN (14) DAYS AFTER THE CONSTRUCTION ACTIVITY IN THAT AREA HAS TEMPORARILY CEASED UNLESS THE ACTIVITY IS TO RESUME WITHIN TWENTY-ONE (21) DAYS. STRAW OR HAY MULCH, WOOD FIBER MULCH, AND HYDROMULCH ARE RECOMMENDED. THE MATERIALS USED IN MULCHING SHALL CONFORM TO THE REQUIREMENTS LISTED IN THE NEW YORK STATE STANDARDS AND SPECIFICATIONS FOR EROSION AND SEDIMENTATION CONTROL.
11. ALL MULCHES MUST BE INSPECTED PERIODICALLY, IN PARTICULAR AFTER RAIN EVENTS, TO CHECK FOR EROSION.
WHERE EROSION IS OBSERVED, ADDITIONAL MULCH MUST BE APPLIED. IF NETTING IS USED, THE NET SHOULD BE INSPECTED AFTER RAIN EVENTS FOR DISLOCATION OR FAILURE. IF WASHOUTS OR BREAKAGE OCCUR, THE NET MUST BE REINSTALLED AS NECESSARY AFTER REPAIRING DAMAGE TO SLOPE. INSPECTIONS SHOULD TAKE PLACE UNTIL VEGETATIVE COVER IS FIRMLY ESTABLISHED. VEGETATION IS CONSIDERED TO BE FIRMLY ESTABLISHED AT A MINIMUM HEIGHT OF THREE (3) INCHES. ANY EXISTING OR PROPOSED CATCH BASINS THAT MAY BE SUBJECT TO SEDIMENTATION PROCESSES SHALL HAVE INLET PROTECTION INSTALLED TO PREVENT SEDIMENT FROM ENTERING THE PROPOSED STORM DRAINAGE SYSTEM PRIOR TO PERMANENT STABILIZATION OF THE DISTURBED SITE. THE PROPER INLET PROTECTION DEVICES SHALL BE INSTALLED WHERE STORMWATER CATCH BASINS ARE TO BE MADE OPERATIONAL
BEFORE PERMANENT STABILIZATION OF ANY DISTURBED DRAINAGE AREA.
12. THE CONTRACTOR SHALL RESTORE DISTURBED AREAS AS CLOSELY AS POSSIBLE. AREAS DAMAGED DURING CONSTRUCTION SHALL BE RESODDED, RESEEDED, OR OTHERWISE RESTORED TO THEIR ORIGINAL STATE. TREES AND
OTHER EXISTING VEGETATION SHALL BE RETAINED WHEREVER FEASIBLE.
13. THE CONTRACTOR SHALL PREVENT DUST, SEDIMENT AND DEBRIS FROM EXITING THE SITE AND SHALL BE RESPONSIBLE
FOR CLEANUP, REPAIRS AND CORRECTIVE ACTION IF NECESSARY.
14. ALL EXISTING AND PROPOSED CATCH BASINS SHALL RECEIVE INLET PROTECTION. AN APPROPRIATE INLET PROTECTION
OPTION SHALL BE SELECTED BASED ON LOCATION AND TRIBUTARY AREA.
15. PERIMETER CONTROL SHALL BE INSTALLED DOWNSLOPE OF ALL DISTURBANCE. AN APPROPRIATE OPTION FOR PERIMETER CONTROL SHALL BE SELECTED BASED ON LOCATION AND UPSLOPE DISTURBANCE. COMPOST FILTER SOCK
AND SILT FENCE ARE VIABLE OPTIONS FOR PERIMETER CONTROL.
16. ALL DISTURBED SLOPES OF 3:1 OR STEEPER SHALL RECEIVE EROSION CONTROL MATTING AND BE IMMEDIATELY
STABILIZED.
17. ALL EXISTING AND PROPOSED CATCH BASINS SHALL BE CLEANED OUT BY THE CONTRACTOR AT THE END OF
CONSTRUCTION.
18. A CONCRETE TRUCK WASHOUT SHALL BE PROVIDED AT A LOCATION AGREED UPON BY THE COR AND CONTRACTOR.
19. EROSION CONTROL FEATURES HAVE BEEN INCORPORATED IN TO THE PHASING PLANS.
ELECTRICAL NOTES
1. LOCATIONS OF UNDERGROUND ELECTRIC ARE APPROXIMATE ONLY. THE CONTRACTOR SHALL BE RESPONSIBLE FOR FIELD VERIFYING LOCATIONS PRIOR TO ANY REMOVAL AND/OR RELOCATION. ANY DISRUPTION TO AN EXISTING ELECTRICAL CIRCUIT SHALL BE APPROVED BY THE COR PRIOR TO DISRUPTION. ANY DISCREPANCY ON THE PLAN REGARDING SUBSURFACE UTILITIES SHALL BE REPORTED TO THE COR. IT IS POSSIBLE THAT A SINGLE ELECTRIC LINE , AS SHOWN ON THE PLANS, COULD REPRESENT MULTIPLE LINES, ALSO, THESE LINES MAY BE ACTIVE OR ABANDONED.
THE CONTRACTOR SHALL VERIFY PRIOR TO REMOVAL AND/OR RELOCATION. CONTRACTOR IS RESPONSIBLE FOR
ADJUSTMENTS AS NECESSARY TO MATCH FIELD CONDITIONS.
2. CONTRACTOR SHALL REMOVE ALL ABANDONED LINES. PRIOR TO REMOVAL THE CONTRACTOR SHALL COORDINATE WITH
COR.
3. THE MINIMUM 90-DEGREE BEND RADIUS FOR CONDUIT IS 6 TIMES THE INTERNAL DIAMETER OF THE CONDUIT. CONDUITS ENTERING A VAULT MUST ENTER THE BODY OF THE VAULT. CONDUITS MUST NEVER ENTER THE TRAFFIC RING.CONDUITS MUST MAINTAIN A 12 INCH SEPARATION FROM OTHER CONDUITS (ELEC., GAS, ETC.)
4. INSTALL PULL CORDS IN ALL CONDUIT. WHEN PULLING CABLE IN CONDUIT INSTALL A PULL CORD WITH THE CABLE SO
ADDITIONAL CABLE CAN BE INSTALLED LATER IF NEEDED.
5. ALL PROPOSED CONDUITS SHALL BE 1” C PVC UNLESS OTHERWISE NOTED. ANY CONDUIT THAT IS EXPOSED OR ENCASED IN CONCRETE, AS WELL AS ALL JUMPERS FROM HANDHOLES TO LIGHT POLES, SHALL BE GALVANIZED STEEL.
FUSIBLE LINKS SHALL BE INSTALLED FROM HANDHOLES TO LIGHT POLES. #3 AWG WIRES SHALL BE PROTECTED BY #4
AWG FUSIBLE LINKS.
TRAFFIC MANAGEMENT NOTES
1. THE CONTRACTOR SHALL MAINTAIN A MINIMUM OF ONE MOVING LANE ALONG ROADWAYS
AT ALL TIMES, EXCEPT WHERE STATED ON THE PHASING PLAN, OR IF GIVEN PERMISSION
BY THE VAMC AND CONTRACTING OFFICERS REPRESENTATIVE.
2. THE CONTRACTOR SHALL PROVIDE ALL SIGNAGE, BARRICADES, CAUTION TAPE, CONES
AND BARRELS REQUIRED TO FACILITATE A SAFE LANE OR SIDEWALK CLOSURE.
3. PEDESTRIAN ACCESS SHALL BE MAINTAINED AND MANAGED DURING SIDEWALK AND
CROSSWALK CLOSURES.
4. ACCESS TO ALL ROADWAYS, DRIVEWAYS AND LOADING RAMPS SHALL BE MAINTAINED
DAILY AFTER CONSTRUCTION ACTIVITIES HAVE CONCLUDED.
5. THE CONTRACTOR SHALL COORDINATE ANY ROADWAY, PARKING LOT, DRIVEWAY AND/OR
SIDEWALK CLOSURES WITH THE VAMC PRIOR TO PERFORMING WORK.
6. ANY SIGNAGE TO BE REMOVED DUE TO CONSTRUCTION SHALL BE PLACED IN A
TEMPORARY CONDITION AT THE SAME LOCATION IF WARRANTED OR AT A RELOCATED
LOCATION. DO NOT REMOVE TEMPORARY SIGNAGE UNTIL A REPLACEMENT IS AVAILABLE
AND INSTALLED.
LAYOUT AND MATERIALS NOTES
1. PRIOR TO START OF CONSTRUCTION, THE CONTRACTOR SHALL VERIFY EXISTING
PAVEMENT, WALKWAY AND BUILDING ELEVATIONS AT INTERFACE WITH PROPOSED
PAVEMENTS AND WALKWAYS, AS WELL AS EXISTING GROUND ELEVATIONS ADJACENT TO
MANHOLES AND DRAINAGE STRUCTURES TO ASSURE PROPER TRANSITIONS BETWEEN
EXISTING AND PROPOSED FACILITIES.
2. SYMBOLS AND LEGENDS OF PROJECT FEATURES ARE GRAPHIC REPRESENTATIONS AND
ARE NOT NECESSARILY SCALED TO THEIR ACTUAL DIMENSIONS OR LOCATIONS ON THE
DRAWINGS. THE CONTRACTOR SHALL REFER TO THE DETAIL SHEET DIMENSIONS,
MANUFACTURER'S LITERATURE, SHOP DRAWINGS AND FIELD MEASUREMENTS OF
SUPPLIED PRODUCTS FOR LAYOUT OF THE PROJECT FEATURES.
3. THE CONTRACTOR SHALL NOT RELY SOLELY ON ELECTRONIC VERSIONS OF PLANS,
SPECIFICATIONS, AND DATA FILES THAT ARE OBTAINED FROM THE DESIGNERS, BUT SHALL
FIELD VERIFY LOCATION OF PROJECT FEATURES.
4. THE CONTRACTOR SHALL PROVIDE LINE ITEM COST FOR ADDITIONAL 25 C.Y. OF ROCK
EXCAVATION AND DISPOSAL.
5. THE CONTRACTOR SHALL PROVIDE UNIT PRICE FOR ROCK EXCAVATION AND DISPOSAL.
6. PROPRIETARY PRODUCTS OR ASSEMBLIES UTILIZED AS "BASIS OF DESIGN":
- ON OCCASION, THE DRAWINGS MAY REFER TO A SINGLE PROPRIETARY PRODUCT
OR ASSEMBLY. WHEN THIS OCCURS, THE PRODUCT OR ASSEMBLY ILLUSTRATED BY
THE DRAWINGS IS THE "BASIS OF DESIGN" PRODUCT OR ASSEMBLY.
- THE DIMENSIONS, MOUNTING HEIGHTS, CLEARANCES, AND ACCESS REQUIREMENTS
OF SPECIFIED PRODUCTS AND ASSEMBLIES OTHER THAN THE "BASIS OF DESIGN"
MAY VARY FROM THAT SHOWN BY THE DRAWINGS.
- THE CONTRACTOR MAY UTILIZE ANY OTHER SPECIFIED PRODUCT OR ASSEMBLY IN
LIEU OF THE "BASIS OF DESIGN" PRODUCT OR ASSEMBLY, AS APPROVED BY THE
COR. HOWEVER, THE CONTRACTOR IS RESPONSIBLE (AT NO ADDITIONAL EXPENSE
TO THE OWNER) FOR ALL COORDINATION AND REVISIONS TO DIMENSIONS AND/OR
DETAILS NECESSARY TO ACHIEVE THE SAME FUNCTIONAL AND AESTHETIC DESIGN
INTENT AS ILLUSTRATED BY THE "BASIS OF DESIGN" SHOWN BY THE CONTRACT
DOCUMENTS.
GENERAL PHASING NOTES
1. THE CONTRACTOR SHALL BE AWARE THAT THE CAMPUS IS A FUNCTIONING HOSPITAL AND
SHALL WORK WITH THE VA AND COR THROUGHOUT CONSTRUCTION TO ENSURE THAT THE
CAMPUS IS ABLE TO FUNCTION AS INTENDED. THE CONTRACTOR MUST NOTIFY THE COR
BEFORE CLOSURE OF ANY PARKING LOTS, ROADS, DRIVEWAYS AND SIDEWALKS. FULL
CLOSURES OF ROADWAYS AND PARKING LOTS WILL NOT BE PERMITTED, UNLESS
OTHERWISE APPROVED BY THE COR.
2. CONTRACTOR STAGING FOR ALL PHASES SHALL BE LOCATED WITHIN EACH PHASE, OR AS
DIRECTED BY THE COR. THE LOCATION IS SHOWN ON EROSION AND SEDIMENTATION
CONTROL PLANS, HOWEVER THE EXACT LOCATION AND EXTENT SHALL BE COORDINATED
WITH THE COR PRIOR TO CONSTRUCTION.
3. THE CONTRACTOR IS RESPONSIBLE FOR PROVIDING ALL TRAFFIC CONTROL STRUCTURES
AND PERSONNEL REQUIRED FOR LANE OR SIDEWALK CLOSURES. LOCATION OF SUCH
TRAFFIC CONTROL DEVICES SHALL BE COORDINATED WITH THE COR BEFORE CLOSURE.
OVERNIGHT CLOSURES REQUIRE SIGNS WITH FLASHING LIGHTS.
4. SUB PHASES WITHIN EACH PHASE SHALL BE APPROVED BY THE COR PRIOR TO
CONSTRUCTION.
5. THE CONTRACTOR SHALL BE RESPONSIBLE FOR TYING THE ENDS OF EACH PHASE BACK
TO EXISTING CONDITIONS TO ENSURE A SAFE TRANSITION BETWEEN PHASES. BEFORE
COMPLETION OF EACH PHASE THE CONTRACTOR SHALL OBTAIN APPROVAL FROM THE
COR AND COMPLETE ANY REQUIRED TRANSITION WORK.
6. THE CONTRACTOR SHALL PROVIDE THE COR WITH A SITE SAFETY PLAN PRIOR TO
CONSTRUCTION.
7. CONSTRUCTION FENCING SHALL BE INSTALLED BEFORE THE START OF EACH PHASE.
PE# 099085
08/29/2024 RCG
Montrose VA Medical Center Montrose, NY
620-23-102 Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
Project Director
Revisions: Date: Dwg. of
JMS
Christopher W. Geary
CH
RI
ST
OPHER WILLIAM GEARY
099085
S
T A T E OF NEW Y O
RK
L IC
ENSED PROFESSIONAL ENGI
NE
ER
DT10
DT6
X X X X X X X X X X X X
X X X X X
X
X X
X
XX
BUS SHELTER
BLDG 5
DY/4"
CONC. SIDEWALK
RET. W
ALL
TRANSFORMER
LP #1
DY/4"
DY/4"
BLDG 6
BLDG.
ACCESS
TANK 10A DISIEL
CHAINLINK FENCE
PRE-TREATMENT
GRAVEL DIAPHRAGM
FILTRATION BIORETENTION
AREA (NYSDEC F-5)
PRE-TREATMENT
GRAVEL DIAPHRAGM
PE# 099085
08/29/2024 RCG
Montrose VA Medical Center Montrose, NY
620-23-102 Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
Project Director
Revisions: Date: Dwg. of
JMS
Christopher W. Geary
CH
RI
ST
OPHER WILLIAM GEARY
099085
S
T A T E OF NEW Y O
RK
L IC
ENSED PROFESSIONAL ENGI
NE
ER
SCALE: 1"=30'
60'30'0'
30"x24"
(MOUNTED ON TYPE III
BARRICADE)
30"x24"
(MOUNTED
ON TYPE III
BARRICADE)
W20-1 36"x36"
(MOUNTED
ON TYPE III
BARRICADE)
G20-2 18"x36"
(MOUNTED
ON TYPE III
BARRICADE)
R9-9 24"x12"
(MOUNTED ON TYPE III
BARRICADE)
R9-9 24"x12"
(MOUNTED ON TYPE III
BARRICADE)
R9-9 24"x12"
(MOUNTED ON TYPE III
BARRICADE)
R9-9 24"x12"
(MOUNTED ON TYPE III
BARRICADE)
R9-9 24"x12"
(MOUNTED ON TYPE III
BARRICADE)
CONSTRUCTION NOTES:
1. THE SCOPE OF WORK INCLUDES THE RECONSTRUCTION AND CONFIGURATION OF
PARKING LOT G . THIS PHASE INCLUDES FULL-DEPTH PAVEMENT, CONCRETE CURB,
CONCRETE SIDEWALKS, ADA RAMPS, PAVING MARKINGS, SITE LIGHTING, AND DRAINAGE
IMPROVEMENTS.
2. THE CONTRACTOR SHALL COORDINATE WITH THE COR FOR TRAFFIC PATTERNS WHEN
WORKING ON THE RECONSTRUCTION OF THE PARKING LOT.
3. THE CONTRACTOR SHALL PROVIDE TRAFFIC SIGNALS ALERTING DRIVERS SHALL BE
PROVIDED AS PER NYSDOT REQUIREMENTS.
4. MAINTENANCE AND PROTECTION OF TRAFFIC SHALL BE IN ACCORDANCE WITH THE
MANUAL OF UNIFORM TRAFFIC CONTROL DEVICES (MUTCD) - PART VI: "STANDARDS AND
GUIDES FOR TEMPORARY TRAFFIC CONTROL.".
5. TRAFFIC SAFETY SIGNS SHALL BE PLACED PRIOR TO THE START OF CONSTRUCTION.
6. SIDEWALKS SHOULD NOT BE CLOSED FOR PROLONGED TIMES. ALL WORK SHALL BE
COMPLETED BY PROVIDING TEMPORARY ALTERNATES OR IN OFF HOURS AND
WEEKENDS. THE CLOSURE OF SIDEWALKS SHALL BE COORDINATED AND APPROVED BY
THE COR 14 DAYS PRIOR TO PLANNED CLOSURE.
7. THE CONTRACTOR MUST PROVIDE SUB-PHASE COORDINATION DRAWINGS INDICATING
HOW TO MINIMIZE THE IMPACT AND DURATION OF CLOSURES. PLANS SHALL BE
COORDINATED AND APPROVED BY THE COR 14 DAYS PRIOR TO THE PLANNED CLOSURE.
W20-1 36"x36"
(MOUNTED
ON TYPE III
BARRICADE)
M4-8 24"x12"
(MOUNTED
ON TYPE III
BARRICADE)
36"x36"
(MOUNTED
ON TYPE III
BARRICADE)
30"x24"
(MOUNTED ON TYPE III
BARRICADE)
G20-2 18"x36"
(MOUNTED
ON TYPE III
BARRICADE)30"x24"
(MOUNTED
ON TYPE III
BARRICADE)
M4-8 24"x12"
(MOUNTED
ON TYPE III
BARRICADE)
36"x36"
(MOUNTED
ON TYPE III
BARRICADE)
30"x24"
(MOUNTED ON TYPE III
BARRICADE)
SITE SYMBOLS - TRAFFIC
TRAFFIC SIGNAGE
LIMIT OF CONSTRUCTION PHASE
CONSTRUCTION FENCING
EMPLOYEE AND PATIENT CIRCULATION
PARKING LOT I (FORMALLY KNOWN AS PARKING LOT "G") RECONSTRUCTION
SCALE 1"=30'
KEY MAP
1"=800'
VEHICULAR LANDING
CONCRETE (SEE DETAIL)
STEPS
U /E
U /E
U /E
U /E
U/E U/E U/E U/E
116 117
PROP. DOGHOUSE DMH/CS
TOP GRATE (OVERFLOW): 110.5
UNDERDRAIN INLET(S) INV: 107.0
6" P
ER
F.
P
VC
U .D
6" P
ER
F.
P
VC
U .D x
INV.107.5
x
INV.107.5
PRE-TREATMENT
GRAVEL DIAPHRAGM
FILTRATION BIORETENTION
AREA (NYSDEC F-5)
PRE-TREATMENT
GRAVEL DIAPHRAGM
x
INV.107
x
INV.107REPUTED LOCATION
OF EXISTING DRAIN
G R
AS
S
FI
LT
ER
S
TR
IP
G R
AS
S
FI
LT
ER
S
TR
IP
G R
AS
S
FI
LT
ER
S
TR
IP
0 11
1 11
DT10
DT6
X X X X X X X X X X X X X X X X X X X
X X X X X X X
X
X
X
X
X
X
X
XX
X
BUS SHELTER
SAWCUT
BLDG 5
W/4"
DY/4"
CONC. SIDEWALK
RET. W
ALL
TRANSFORMER
LP #1
DY/4"
DY/4"
BLDG 6
BLDG.
ACCESS
SMH
RIM: 112.29
CB-2
TG: 111.48
INV: 107.53
CB-1
TG: 112.46
INV: 109.81
EMH
RIM: 116.36
SMH
RIM: 110.32
TANK 10A DISIEL
CHAINLINK FENCE
SAWCUT
CMP STORM PIPE
APPROX. 6FT. IN
LENGTH
STORM PIPE
IP
IP
SCALE: 1"=20'
40'20'0'
PE# 099085
08/29/2024 RCG
Montrose VA Medical Center Montrose, NY
620-23-102 Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
Project Director
Revisions: Date: Dwg. of
JMS
Christopher W. Geary
CH
RI
ST
OPHER WILLIAM GEARY
099085
S
T A T E OF NEW Y O
RK
L IC
ENSED PROFESSIONAL ENGI
NE
ER
SITE SYMBOLS - GENERAL
BENCHMARK #1: SANITARY MANHOLE AT THE NORTHERN
SIDE OF BUILDING 5 & 6 , CLOSEST TO PARKING LOT G
DRIVEWAY ELEV.112.29
DRAWING BLOCK TITLE WITH GRAPHIC SCALE
(SHOWN HALF ACTUAL SIZE)
PLAN
DIMENSION
A
SITE SYMBOLS - CONCRETE/MASONRY
SITE SYMBOLS - UTILITIES
NOTE:
VERTICAL TEXT INDICATES PROPOSED FEATURES (PROP.)
SLANTED TEXT INDICATES EXISTING FEATURES (EX.)
STORM SEWER LINE
UTILITY, UTILITY POLE (UP)
UTILITY, WATER MANHOLE (WMH)W
UTILITY, ELECTRICAL MANHOLE (EMH)E
SIGN
WATER LINE
EDGE OF PAVEMENT
CURB LINE
MINOR CONTOUR
MAJOR CONTOUR
SITE SYMBOLS - EXISTING
TREES - DECIDUOUS (DECID.)
DRAINAGE CATCH BASIN (CB)
DETAIL NUMBER
DETAIL SHEET
SITE SYMBOLS - ABBREVIATIONS
ELECTRIC LINE
APPROX APPROXIMATELY
BLDG BUILDING
CIP CAST IRON PIPE
CO CLEANOUT
CONC CONCRETE
CPP CORRUGATED HIGH DENSITY POLYETHYLENE PIPE
DIP DUCTILE IRON PIPE
DS DOWN SPOUT
EB ELECTRIC BOX
ELEC ELECTRIC
EOP EDGE OF PAVEMENT
GOVT GOVERNMENT
GV GAS VALVE
HDPE HIGH DENSITY POLY ETHYLENE
INV STORMWATER PIPE END
JB JUNCTION BOX
LF LINEAR FEET
MH MANHOLE
PLCC PLAIN CEMENT CONCRETE
PVC POLYVINYL CHLORIDE
RCP REINFORCED-CONCRETE PIPE
RCCP REINFORCED CONCRETE CYLINDER PIPE
RCEP REINFORCED CONCRETE ELLIPTICAL PIPE
RET RETAINING
SAN CO SANITARY CLEANOUT
SF SQUARE FEET
SLCPP SMOOTH-LINED CORRUGATED POLYETHYLENE PIPE
TC TERRA COTTA STORM PIPE
TELE TELEPHONE
TEMP TEMPORARY
TRANS. TRANSFORMER
TYP TYPICAL
U.D. UNDERDRAIN
VCP VITRIFIED CLAY PIPE
W/4" 4" WIDE WHITE PAINT LINE
Y/4" 4" WIDE YELLOW PAINT LINE
DRAINAGE MANHOLE (DMH)D
GAS VALVE (GV)
HYDRANT, FIRE (FH)
UTILITY, SANITARY MANHOLE - (SSWR-MH)S
WATER VALVE (WV)
COMMUNICATION LINE
GAS LINE
SANITARY SEWER LINE
STEAM LINE
TELEPHONE LINE
UNKNOWN LINE
CENTERLINE
CHAINLINK FENCE
NRCS SOIL LINE
VEGETATION
BOLLARD LIGHTS
LIGHT POST (LP)
BOLLARD
TREE - CONIFEROUS (CONF.)
CONCRETE
APPROXIMATE PROPERTY LINE
UTILITY, COMMUNICATION MANHOLE (CMH)C
UTILITY, TELEPHONE MANHOLE (TMH)T
UTILITY, STEAM MANHOLE (STM-MH)ST
CHILLED WATER LINE RETURN
CHILLED WATER LINE SUPPLY
FLAG POLE
FA FIRE ALARM LINE
U/T
WTR
SAN
GAS
U/E
ROCK CONSTRUCTION ENTRANCE RCE
EROSION AND SEDIMENT CONTROL MEASURES LEGEND
SILT FENCE
STAGING, SANITARY FACILITIES &
LAYDOWN AREA
SA
EXISTING FEATURES TO BE REMOVED IN RED
TOPSOIL STOCKPILE TS
1. THE CONTRACTOR SHALL LOCATE AND VERIFY IN THE FIELD ALL UTILITIES - GAS, WATER, ELECTRICAL BEFORE THE
START OF CONSTRUCTION. CONTRACTOR SHALL CALL CODE 753 (FORMERLY CODE 53).
2. EROSION CONTROL MEASURES, INCLUDING SILT FENCE, SHALL BE REQUIRED AS DIRECTED BY THE VILLAGE.
3. ALL PROPERTY DISTURBED IN THE R.O.W. OR ON PRIVATE LANDS, SHALL BE RESTORED TO NEW CONDITIONS.
4. THE CONTRACTOR SHALL BE RESPONSIBLE FOR ALL APPLICATIONS AND PERMITS REQUIRED FOR CONSTRUCTION.
5. UNDERGROUND GAS AND ELECTRIC SHALL BE AS REQUIRED BY THE TOWN AND CON EDISON.
6. ALL DRAINAGE STRUCTURES WITHIN PAVED AREAS MUST BE ABLE TO WITHSTAND H-20 LOADING.
7. STUMPS FROM THE CLEARING OPERATION SHALL BE REMOVED FROM SITE AND DISPOSED OF IN A LEGAL MANNER.
8. DISTURBED AREAS SHALL BE PROTECTED AT ALL TIMES TO CONTROL SEDIMENT TRANSPORT BEYOND THE LIMIT OF
WORK.
9. DISTURBED AREAS SHALL BE TREATED WITH WATER DURING EXCAVATION, OR APPROVED ALTERNATIVE, TO CONTROL
THE DUST.
10. EXISTING DRAINAGE PATTERNS ARE NOT AFFECTED BY THE PROPOSED WORK.
11. THE PROPOSED STOMWATER DISCHARGE POINT IS NEXT TO AN EXISTING INLET. NO CHANGES HAS BEEN MADE TO THE
DISCHARGE POINT.
12. THIS SITE IS LOCATED IN "ZONE X AREA OF MINIMAL FLOOD HAZARD", AS IDENTIFIED ON FEMA MAP E MAP PANEL # 36119C0106F
CONSTRUCTION NOTES:
SA
TS
RCE
KEY MAP
1"=800'
PROJECT
LOCATION
SOIL CHART
TYPE DESCRIPTION HYDROLOGIC GROUP
UC
UDORTHENTS, WET
SUBSTRATUM, 0% TO 5%
SLOPES
NONE
UIC
URBAN LAND,
CHARLTON-CHATFIELD,
COMPLEX, ROLLING VERY
ROCKY, 2% TO 15% SLOPES
B
LIMIT OF DISTURBANCE
UIC
UC
1. EROSION CONTROL MEASURES SHALL BE INSTALLED PRIOR TO THE START OF CONSTRUCTION AND MAINTAINED IN
EFFECTIVE CONDITION THROUGHOUT THE CONSTRUCTION PERIOD.
2. ALL EROSION AND SEDIMENTATION CONTROL MEASURES AND PROCEDURES SHALL APPLY WITH STANDARDS AND
SPECIFICATIONS OF THE VILLAGE OF MONTROSE.
3. PRIOR TO ANY EXCAVATION, SILT FENCE SHALL BE INSTALLED AT THE APPROPRIATE LOCATIONS NOTED ON EROSION CONTROL PLAN. SILT FENCING SHALL BE INSTALLED AS DIRECTED BY THE OWNER'S REPRESENTATIVE IN THE FIELD AND INSTALLED AS PER THE INSTRUCTIONS OF THE MANUFACTURER. ADDITIONAL SILT FEN MAY BE PLACED BY THE OWNER'S REPRESENTATIVE IN THE FIELD. SILT FENCING SHALL BE MAINTAINED IN OPERABLE CONDITION AND SHALL
NOT BE REMOVED UNTIL DISTURBED AREAS ARE THOROUGHLY STABILIZED.
4. ALL FINISHED SLOPES AND ALL ROUGH CUT SLOPES TO REMAIN OPEN FOR EXTENDED PERIODS IMMEDIATELY TOPSOIL, SEED WITH MIXTURE OF PERENNIAL RYE GRASS ANNUAL RYE GRASS AND WINTER RYE AND MULCH WITH 6" OF HAY.
5. ALL SLOPES CONSTRUCTED WITH FILL MATERIAL AND ALL SLOPES WITH GRADE 3:1 OR STEEPER SHALL BE TOPSOILED, SEEDED, MULCH AND STABILIZED WITH STAKED JUTE NETTING, UNLESS OTHERWISE NOTED.
6. ALL AREAS OF DISTURBED SOIL SHALL BE STABILIZED. IN ADDITION TO ALL SPECIFIED AND LOCATED EROSION CONTROL DEVICES, THE CONTRACTOR SHALL TAKE ALL STEPS PRUDENT AND NECESSARY TO STABILIZE THE SITE AT ALL TIMES.
7. DO NOT STOCKPILE MATERIALS ON STEEP SLOPES, IN DRAINAGE SWALES OR IN WETLANDS AREAS. SURROUND ALL
STOCKPILE AREAS WITH SILT GREEN AND SEED THEM WITH ANNUAL RYE GRASS.
8. ALL CATCH BASINS ARE TO BE PROTECTED WITH HAYBALE FILTERS THROUGHOUT THE CONSTRUCTION PERIOD AND
UNTIL ALL DISTURBED AREAS ARE THOROUGHLY STABILIZED.
9. HAYBALES SHALL BE USED AT THE TOPS AND TOES OF SLOPES, AS NECESSARY, TO COLLECT SILT AND DIVERT FLOWS.
AS NECESSARY, TO COLLECT SILT AND DIVERT FLOWS. SILT SCREENS WILL BE USED IN AREAS OF UNCONCENTRATED FLOWS TO COLLECT SILT. HAYBALES AND SILT SCREEN ON PLANS MAY BE AUGMENT IN THE FIELD AS NECESSARY.
10. UTILITY LINE EXCAVATED MATERIAL SHALL BE TEMPORARILY STOCKPILED ON HIGH SIDE OF EXCAVATION SO RUNOFF IS DIRECTED AWAY FROM TRENCH, AFTER BACK-FILLING, ARE IS TO BE TOPSOILED, SEEDED, AND MULCH.
11. ALL EROSION AND SEDIMENT CONTROL MEASURES SHALL BE INSPECTED IMMEDIATELY AFTER EACH RAINFALL AND AT LEAST DAILY DURING PROLONGED RAINFALL. ANY REQUIRED REPAIRS SHALL BE MADE IMMEDIATELY.
12. SEDIMENT DEPOSIT SHALL BE REMOVED WHEN THEY REACH APPROXIMATELY ONE-HALF THE HEIGHT OF THE BARRIER.
SEDIMENT SHALL BE DISPOSED OF IN A MANNER THAT DOES NOT RESULT IN ADDITIONAL EROSION OR POLLUTION.
13. INSTALL GRAVEL BED AT CONSTRUCTION ENTRANCE TO SERVE AS ANTI-TRACKING PAD. GRAVEL BED TO BE 2" DIAMETER CRUSHED STONE 6" DEEP, OVER GEOTEXTILE SUPPORT FABRIC. ANTI-TRACKING PADS TO MEASURE 30' (MIN)
LENGTH BY THE ROAD WIDTH.
EROSION CONTROL NOTES:
SCALE: 1" = 2,000'
SOURCE: USGS MONTROSE, NY QUAD MAP
LIMIT OF DISTURBANCE: 0.88 ACRES
TOPSOIL SHALL BE PLACED ACROSS
DISTURBED AREA AT A MINIMUM
THICKNESS OF 4 INCHES
SEE PLAN SHEET CN 1 FOR ADDITIONAL
NOTES AND DETAILS
IPINLET FILTER
1. PROVIDE SILT SACKS IN THE FIRST DOWN GRADIENT CATCH BASINS WITHIN THE SITE.
2. OBTAIN ALL PLAN APPROVALS AND OTHER APPLICABLE PERMITS.
3. FLAG THE WORK LIMITS AND MARK TREES AND BUFFER AREAS FOR PROTECTION.
4. HOLD A PRE-CONSTRUCTION CONFERENCE AT LEAST ONE WEEK PRIOR TO THE START OF CONSTRUCTION.
5. INSTALL SILT FENCE BARRIERS AT LOCATIONS INDICATED ON THE CONSTRUCTION DRAWINGS AND CONSTRUCT
STABILIZED CONSTRUCTION ENTRANCE.
6. INSTALL SILT SACKS IN EXISTING CATCH BASIN STRUCTURES AND MAINTAIN.
7. CLEAR AND GRUB ALL AREAS ASSOCIATED WITH THE CONSTRUCTION AREA.
8. PROVIDE CRUSHED STONE IN PROPOSED ROAD BED TO REDUCE SILT LEAVING THE SITE.
9. CONSTRUCT THE STORMWATER SYSTEM AS SOON AS PRACTICABLE AFTER THE PROPOSED LOCATIONS HAVE BEEN
CLEARED.
10. DIRECT RUNOFF TO TEMPORARY SEDIMENT SETTLING AREAS. NO STORMWATER SHALL BE ALLOWED TO DISCHARGE TO
THE DRAINAGE SYSTEM UNTIL ALL TRIBUTARY AREAS ARE FULLY STABILIZED.
11. ROUGH GRADE THE AREA. EXCAVATE CRUSHED STONE AND SUBSOIL FROM CUT AND FILL AREAS AND STOCKPILE.
CONSIDERATION SHOULD BE GIVEN TO LOCATING STOCKPILES ON THE UPHILL SIDE OF DISTURBED AREAS, WHERE
POSSIBLE, TO ACT AS TEMPORARY DIVERSIONS.
12. AFTER THE SITE IS STABILIZED, REMOVE ALL TEMPORARY MEASURES AND INSTALL PERMANENT VEGETATION ON DISTURBED AREAS. ADEQUATE GROWTH FOR STABILIZATION IS DEFINED AS VEGETATION COVERING 75% OR MORE OF
THE GROUND SURFACE.
13. ESTIMATED TIME BEFORE FINAL STABILIZATION IS 6-10 MONTHS FOR THE CONSTRUCTION OF THE PARKING LOT.
CONSTRUCTION SEQUENCE:
THIS OPERATION AND MAINTENANCE PLAN SHALL BE PERFORMED BY THE GENERAL CONTRACTOR DURING CONSTRUCTION OPERATIONS AND BY THE OWNER ONCE THE FACILITIES ARE COMPLETED AND PUT INTO OPERATION:
PERSONNEL ASSOCIATED WITH THE CONSTRUCTION OF THIS PROJECT SHALL BE INFORMED THAT THE MAINTENANCE OF SILTATION CONTROLS TAKES PRECEDENCE OVER NORMAL CONSTRUCTION ACTIVITIES. ADJACENT PROPERTIES AND
STREETS SHALL BE PROTECTED FROM EROSION OR SILTATION CONDITIONS.
INSPECTION AND MAINTENANCE, AS OUTLINED HEREIN, SHALL BE PERFORMED FOUR TIMES WITHIN THE FIRST YEAR OF OPERATION. THENCE, INSPECTIONS AND MAINTENANCE SHALL BE CONDUCTED ON A SEMIANNUAL BASIS(2 TIMES A YR.) AND
AFTER ALL LARGE STORMS. AN INSPECTION REPORT SHALL BE MAINTAINED.
ACCUMULATED DEBRIS IN CATCH BASINS, WATER QUALITY INLETS, OIL/WATER SEPARATORS AND LEACHING BASINS SHALL BE REMOVED BEFORE IT EXCEEDS 2 FEET IN DEPTH AND DISPOSED OF PROPERLY. BROKEN OR DAMAGED GAS TRAPS/
HOODS SHALL BE IMMEDIATELY REPAIRED OR REPLACED TO ENSURE ADEQUATE FUNCTION.
A VISUAL INSPECTION SHALL BE MADE AT ALL ACCESS MANHOLES, CATCH BASINS, WATER QUALITY INLETS, OIL/WATER SEPARATORS, LEACHING BASINS, PIPES AND DRAINAGE CHANNELS FOR THE ENTIRE STORM DRAINAGE SYSTEM. THE GENERAL CONDITION OF THESE STRUCTURES SHOULD BE REVIEWED AND ACCUMULATED DEBRIS SHALL BE REMOVED. THE CONDITION OF ALL OUTLETS SHALL BE NOTED AND A DESCRIPTION OF THE DRAINAGE STRUCTURES SHALL BE INCLUDED IN THE REPORT. DELETERIOUS MATERIALS SHALL BE REMOVED FROM THESE STRUCTURES AND THE DRAINAGE CHANNELS IN
ORDER FOR THE SYSTEM TO FUNCTION PROPERLY.
ALL OUTLETS, DRAINING CHANNELS, AND SLOPES SHALL BE KEPT STABILIZED. ANY EROSION SHALL BE REPAIRED
IMMEDIATELY.
ACCUMULATED SEDIMENT SHALL BE REMOVED FROM THE SWM BASIN BEFORE IT EXCEEDS 1' IN DEPTH, OR AT LEAST ONCE EVERY 5 YEARS. THE LOW FLOW OUTLET SHALL BE CLEANED AND INSPECTED FOR PROPER FUNCTIONING. ALL DEBRIS OR DELETERIOUS MATERIAL SHALL BE REMOVED FROM OUTLET STRUCTURE AND OUT FALL PLUNGE POOL. BASIN SLOPES SHALL BE MAINTAINED WITH A GRASS STAND OF AT LEAST 3". GRASS SHALL BE MOVED AT LEAST TWICE A YEAR AND CLIPPINGS SHALL NOT BE LEFT IN BASIN. ANY TREES OR OTHER WOODY VEGETATION GROWING IN EMBANKMENTS OR NEAR
CONTROL STRUCTURE SHALL BE REMOVED.
THE FOLLOWING MINIMUM INFORMATION SHALL BE RECORDED:
* DATE OF INSPECTION
* GENERAL CONDITION OF THE ENTIRE SYSTEM
* CORRECTIVE MAINTENANCE ACTIONS TAKEN TO ENSURE ADEQUATE FUNCTION AND WHEN PERFORMED.
* A COPY OF THESE INSPECTION REPORTS SHALL BE FURNISHED TO THE APPROPRIATE AGENCY UPON REQUEST.
OPERATION/MAINTENANCE PLAN:
LP1
FH
DT10
DT6
WV
X X X X X X X X X X X X X X X X X X X
X X X X X X X
X
X
X
X
X
X
X
XX
X
BUS SHELTER
W/4"
BIT. PAVE
DY/4"
CONC. SIDEWALK
RET. W
ALL
LP #1
DY/4"
DY/4"
PARKING LOT G
CHAINLINK FENCE
CORE 1
(TOTAL DEPTH=9.75")
N.T.S.
2.25" WEARING 1.75" WEARING
CORE 2
(TOTAL DEPTH=9.00")
N.T.S.
CORE 3
(TOTAL DEPTH=8.25")
N.T.S.
CORE 4
(TOTAL DEPTH=7.75")
N.T.S.
3.75" WEARING
6.00"+ STONE
3.00" WEARING
6.00"+ STONE 6.00"+ STONE 6.00"+ STONE 30" SOIL
PERCOLATION TEST
(TOTAL DEPTH=30")
N.T.S.
ROCKS
PE# 099085
08/29/2024 RCG
Montrose VA Medical Center Montrose, NY
620-23-102 Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
Project Director
Revisions: Date: Dwg. of
JMS
Christopher W. Geary
CH
RI
ST
OPHER WILLIAM GEARY
099085
S
T A T E OF NEW Y O
RK
L IC
ENSED PROFESSIONAL ENGI
NE
ER
SITE SYMBOLS - GENERAL
BENCHMARK #1: SANITARY MANHOLE AT THE NORTHERN
SIDE OF BUILDING 5 & 6 , CLOSEST TO PARKING LOT G
DRIVEWAY ELEV.112.29
DRAWING BLOCK TITLE WITH GRAPHIC SCALE
(SHOWN HALF ACTUAL SIZE)
PLAN
DIMENSION
A
SITE SYMBOLS - CONCRETE/MASONRY
SITE SYMBOLS - UTILITIES
NOTE:
VERTICAL TEXT INDICATES PROPOSED FEATURES (PROP.)
SLANTED TEXT INDICATES EXISTING FEATURES (EX.)
STORM SEWER LINE
UTILITY, UTILITY POLE (UP)
UTILITY, WATER MANHOLE (WMH)W
UTILITY, ELECTRICAL MANHOLE (EMH)E
SIGN
WATER LINE
EDGE OF PAVEMENT
CURB LINE
MINOR CONTOUR
MAJOR CONTOUR
SITE SYMBOLS - EXISTING
TREES - DECIDUOUS (DECID.)
DRAINAGE CATCH BASIN (CB)
DETAIL NUMBER
DETAIL SHEET
SITE SYMBOLS - ABBREVIATIONS
ELECTRIC LINE
APPROX APPROXIMATELY
BLDG BUILDING
CIP CAST IRON PIPE
CO CLEANOUT
CONC CONCRETE
CPP CORRUGATED HIGH DENSITY POLYETHYLENE PIPE
DIP DUCTILE IRON PIPE
DS DOWN SPOUT
EB ELECTRIC BOX
ELEC ELECTRIC
EOP EDGE OF PAVEMENT
GOVT GOVERNMENT
GV GAS VALVE
HDPE HIGH DENSITY POLY ETHYLENE
INV STORMWATER PIPE END
JB JUNCTION BOX
LF LINEAR FEET
MH MANHOLE
PLCC PLAIN CEMENT CONCRETE
PVC POLYVINYL CHLORIDE
RCP REINFORCED-CONCRETE PIPE
RCCP REINFORCED CONCRETE CYLINDER PIPE
RCEP REINFORCED CONCRETE ELLIPTICAL PIPE
RET RETAINING
SAN CO SANITARY CLEANOUT
SF SQUARE FEET
SLCPP SMOOTH-LINED CORRUGATED POLYETHYLENE PIPE
TC TERRA COTTA STORM PIPE
TELE TELEPHONE
TEMP TEMPORARY
TRANS. TRANSFORMER
TYP TYPICAL
U.D. UNDERDRAIN
VCP VITRIFIED CLAY PIPE
W/4" 4" WIDE WHITE PAINT LINE
Y/4" 4" WIDE YELLOW PAINT LINE
DRAINAGE MANHOLE (DMH)D
GAS VALVE (GV)
HYDRANT, FIRE (FH)
UTILITY, SANITARY MANHOLE - (SSWR-MH)S
W…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .