Responses to Questions on RFP-617-09-009.pdf

PDF 69 KB Posted

Attached to
Northern Uganda Development of Enhanced Local Governance, Infrastructure and Livelihoods (NUDEIL) Program.
Solicitation number
617-09-009
Issued by

About this file

Amendment No. 1 - Responses to Questions/Clarifications

View the file

Other files

File Type Posted
J A_13-34.approved_(1).pdf PDF
LCP.pdf PDF
NUDEIL RFP 617-09-009.doc DOC document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

5. PROJECT NO.

CODE

7. ADMINISTERED BY

2. AMENDMENT/MODIFICATION NO.

CODE

6. ISSUED BY

8. NAME AND ADDRESS OF CONTRACTOR

4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE

9A. AMENDMENT OF SOLICITATION NO.

9B. DATED

PAGE OF PAGES

10A. MODIFICATION OF CONTRACT/ORDER NO.

10B. DATED

BPA NO. 1. CONTRACT ID CODE

FACILITY CODECODE

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

E. IMPORTANT:

is extended,

(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR AC- KNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.

12. ACCOUNTING AND APPROPRIATION DATA

(REV. 10-83)

is required to sign this document and return ___________ copies to the issuing office.is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.

15C. DATE SIGNED

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER

BY

Contractor

16C. DATE SIGNED

14. DESCRIPTION OF AMENDMENT/MODIFICATION

16B. UNITED STATES OF AMERICA

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER 16A. NAME AND TITLE OF CONTRACTING OFFICER

15B. CONTRACTOR/OFFEROR

STANDARD FORM 30 STANDARD FORM 30

(Type or print) (Type or print)

(Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

(No., street, county, State and ZIP Code)

(If other than Item 6)

(Specify type of modification and authority)

(such as changes in paying office, appropriation date, etc.)

(If required)

(If applicable)

(SEE ITEM 11)

(SEE ITEM 13)

(X)

(X)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

(Signature of person authorized to sign) (Signature of Contracting Officer)

1 10

01 06-19-2009

ACQUISITION AND ASSISTANCE OFFICE

USAID/UGANDA

2190 KAMPALA PLACE

WASHINGTON DC 20521-2190

TO ALL OFFERORS/BIDDERS

RFP-617-09-009

REF: USAID RFP-617-09-009; NORTHERN UGANDA DEVELOPMENT OF ENHANCED LOCAL GOVERNANCE INFRASTRUCTURE

AND LIVELIHOODS PROJECT

THIS AMENDMENT NUMBER 01 IS ISSUED TO RESPOND TO QUESTIONS RAISED BY INTERESTED PARTIES REGARDING THE

REFERENCED RFP. PLEASE SEE CONTINUATION PAGES FOR RESPONSES.

BRUCE MCFARLAND

CONTRACTING OFFICER

Responses to clarification questions received from potential offerors USAID/Uganda Request for Proposal (RFP) No. 617-09-009: Northern Uganda Development of Enhanced Local Governance Infrastructure and Livelihoods (NUDEIL) Project

Question 1: Please clarify from Section C2 and C3: Is the SPU (Sector Program Assistance) funding included in the $9.5 million.

USAID Response: No portion of the sector program assistance (SPA) funding is available under this contract. As briefly outlined in the scope of work – this is a mechanism whereby funding will be transferred directly to the Government of Uganda (GOU) to implement projects. The USAID contractor will only provided technical assistance and support under this program. The GOU will be responsible for implementing small infrastructure projects using SPA funding.

Question 2: Please clarify from Section C2 and C3: Can USAID please clarify what proportion of funds from the $9.5 million is available for Technical Assistance

USAID Response: The majority of funds for program are dedicated to the technical assistance portion of this program as this is the major project activity under this contract. This includes embedded staff in the district offices, training, and outreach activities.

Question 3: Does USAID intend to issue a one week extension on submission for NUDEILL project proposals?

USAID Response: No.

Question 4: Can USAID please clarify the mechanism for the SPA funds and how they will impact the contractor under the NUDEIL program? Will the contractor be responsible for or assist with processing of invoices and payments under the SPA? What will be the reporting requirements, if any, for the contractor with respect to the expenditure of the SPA funds? What will be the mechanism for drawdown of the funds?

USAID Response: Again the SPA funding mechanism is a direct funding mechanism between the US Government and the Ugandan government. The mechanism itself is not the responsibility of the USAID contractor and will not financially impact the USAID contractor. However, as the capacity of the district governments in Northern Uganda is at a level which only met the minimum requirements for management of US government funds, USAID determined that providing a support contractor to provide training and support for the financial management processes, meet US government reporting requirements, and technical monitor implementation of small infrastructure projects in the field was necessary. USAID's current experience working with District Engineering offices shows they have neither the staff nor the resources to assess new projects in a timely manner or monitor ongoing projects in the field. Therefore providing “surge” capacity in the area of engineering was deemed necessary to ensure that projects could be implemented in a timely manner and to a standard acceptable to USAID.

There are no official financial reporting requirements for the contractor related to SPA funding. The contractor will be required to track and monitor the levels of funding in the accounts including: commitments against tenders; dispersed amounts; rate of use; percentage of funds for each component (roads, boreholes, and schools.)

The Contractor will liaise regularly with the USAID/NUDEIL management team to ensure that call-forwards in funding occur before final expenditure of funds. USAID will manage the call-forwards of funds and the relationship with the Ministry of Finance. The contractor will be responsible for developing a database of SPA projects alongside the district governments that will allow USAID and the central Ugandan government authorities to track progress on SPA projects. This will include – at a minimum – project GPS coordinates, regular updates on project progress, general data related to the type of project and its location, etc. This is considered part of providing support to the district governments through this support contract as well as helping them build the capacity to track and monitor development projects. This is mentioned in section E of the Scope of Work.

The mechanism for drawing down funds is a release of funds directly to the GOU from the US Treasury. Funding will be released in tranches as requested by the USAID program manger for NUDEIL located in Gulu and approved by the USAID Mission in Kampala. The program manager's recommendation for release of tranches of funding will be based on the planning process for NUDEIL projects developed by the district governments alongside the USAID contractor, the working relationship with the District Government, and the working relationship with the USAID contractor and their team who will be aware of the progress of NUDEIL projects being implemented and the capacity of the district governments to manage additional funds and new project activities. It is not expected that funding will be released frequently – but rather in larger amounts based on a planning process for project implementation developed with the District Government, the USAID project manager in Gulu, and the USAID contractor. It is anticipated that this will occur between two and three times a year.

The USAID contractor should consider themselves part of the USAID Gulu team, working closely with the USAID NUDEIL program manager and the Gulu office director to ensure the success of the overall NUDEIL program for the GOU.

Question 5: Can USAID please clarify how the targets for the infrastructure construction (5,000 km of roads, 500 boreholes, and 25 schools) are distributed across the four districts? Are these targets for all four districts or for two districts only?

USAID Response: These are illustrative targets for all 4 districts. However, it is recognized that these targets may change based on the district development planning process as well as the priorities of the subcounties and communities which the Districts decide to target under the program. This is why the quick turn around assessment and planning processes with the District governments will be an essential part of the start up of the program.

Question 6: Is planning already underway for the infrastructure? Has any design work been completed? Has a District Development Plan been completed for any of the Districts? Can USAID provide indication as to when they are expected to be completed? What role does NUDEIL have in the preparation of the “District Development Plan”?

USAID Response: Each district has a district development plan in place. However, as can be expected these documents are a start – al wish list – versus a fully developed plan. Developing mutually agreed upon targets, a community consultation process, and the Memorandums of Understanding for project identification will be important to ensuring success for NUDEIL.

NUDEIL has no formal role in preparation of the district development plans – but the NUDEIL contractor and USAID have a role in coordination with the district government on their development priorities and also participating in updates to the plan. Coordination with other donors implementing infrastructure projects in these districts will also be essential. Mission Management is interested in determining how USAID programming contributes to the District Development Plans, thus the successful offeror might consider including this as a bullet point in their regular reporting to the COTR.

Initial discussions between USAID and Gulu district have begun regarding possible pilot projects under the initial phases of NUDEIL. These are all road repair projects.

There are existing standard government designs for schools, clinics, and latrines. The contractor will need to ensure that these designs are appropriate for the needs of the communities and meet basic health and safety standards. This includes earthquake safety standards due to the sub-soil. For vertical structures handicap accessibility is a requirement. The designs need to be reviewed. USAID has some experience with this already through other programs which can be shared with the successful offeror for NUDEIL.

Question 7: Who will be the final decision making authority on design of infrastructure projects? Are there any engineering standards in place for the construction of the infrastructure? If not, is the contractor expected to develop design standards?

As described above the GOU has standard designs and technically the District Engineer is the final authority on design. However, the district political and administrative authorities have the right to review all projects. There are minimum standards in Uganda for design and construction. USAID accepts these standards with some modifications – for example USAID requires handicap access for all public vertical structures and building design must be reviewed against seismic requirements for the area. All structures to be built or rehabilitated under this program are simple, one story structures. The point of the program is employment of local people and use of local labor and local construction practices is encouraged where-ever technically possible. The USAID contractor may be required to advise the districts on best practices for cash for work activities or for ensuring the contractors implementing projects are hiring laborers from the benefiting communities as this is a major objective of the program.

Question 8: Who is responsible for the final certification of the A&E works – the district governments or the contractor? What are the provisions for indentifying the contractor and the A&E subcontractor under the NUDEIL program against liabilities arising from certification of the A&E works under the program?

USAID Response: The final certification of the projects is the responsibility of the district government.

However, the USAID/Contractor will provide a certificate for all completed projects that environmental compliance has been met. This certificate will be attached to final vouchers and will be required for payment.

The USAID contractor is the eyes and ears of USAID monitoring these projects and reporting on the progress of implementation. USAID expects that this support contractor will be the technical arm of USAID's staff for this program in the field and will work alongside the USAID NUDEIL program manager, Mission Engineer, and the USAID Gulu Office Director on the day to day issues related to the program. As such the contractor will serve as a technical advisor to USAID -providing regular assessments regarding the capacity of the District governments to implement this program and to maintain the GOU's minimum standards for construction.

Question 9: Section L.8 (b) of the RFP (page 68) lists biodata sheets as one of the items that should be included as attachments to the Technical Proposal. Please confirm that biodata sheets should only be submitted with the Cost Proposal.

USAID Response: Please submit with the Cost Proposal.

Question 10: Please confirm that items such as a transmittal letter and letters of commitment from subcontractors will not count against the 30-page limit for the technical proposal.

USAID Response: These should be submitted as annexes to the technical proposal and will not count against the 30-page limit.

Question 11: Can USAID provide additional guidance on what is expected in the Human Resources Management Matrix annex and, if possible, provide an illustrative example and/or template.

USAID Response: This can be submitted in a chart or matrix form. There is no template – but a standard office organizational chart is acceptable. The contractor should simply outline the roles of key personnel and lines of supervision either in an organizational chart or in a matrix.

Question 12: On page 13, Section C.5.1.B.1 references Memorandums of Understanding, will the Memorandums of Understanding to be established between the District Governments and USAID focus on the SPA financing mechanism?

USAID Response: USAID is negotiating a central agreement with the Government of Uganda regarding the SPA funding mechanism. The key provisions of the MOU with the district governments will relate to the working relationship between USAID, the USAID contractor, and the District Government (including the ability to embed staff within the District Governments and provision of office space for these staff). Also important will be outlining the project prioritization process, community targeting, and community outreach process. The relevance between the MOU and the SPA is the fact that the timing, progress and quality of projects will determine when additional funds are released to the GOU to continue projects. Release of funds is linked to the progress of projects on the ground. Therefore minimal levels of planning will be required by each district across the three years of the program. There will be safe-guards in the central agreement and MOU that will trigger if corruption at any level is found.

Question 13: On page 13, Section C.5.1.B.3 references contracting and financial assessments, would USAID share the initial host-country contracting and financial assessments with Offerors at this time?

USAID Response: No. Available information will be shared with the successful offeror. What is available is very basic at this time and not really relevant to contractor proposals.

Question 14: On page 13, Section C.5.1.B.4 references the completion of a baseline survey within 90 days of award. Is this baseline survey intended to provide information on the state of infrastructure to be developed, the capacity of the target district government agencies, or both?

USAID Response: No this is a baseline survey for the USAID support contractor to be used in the development of a performance management plan. As such this relates to the general capacity of the governments this contractor will support and the overall benefit of the program to the citizens of the districts. Baseline data that can be tracked and monitored that benefits USAID in understanding the overall impact of the NUDEIL program is encouraged. Coordination with the USAID contractor responsible for technical support for the Mission's country strategy (UMEMS) is encouraged.

This baseline does not relate to infrastructure projects to be implemented under NUDEIL. A general infrastructure survey is not expected as part of this deliverable.

Question 15: On page 15, Section C.5.2.A. references environmental assessments. Will a programmatic EIS apply to the project or will individual statements be required?

USAID Response: It is anticipated that a programmatic EIS is expected, not individual statements.

However, the Regional Environmental Officer has the final determination.

Question 16: On page 22, Section F.3 references place of performance being principally in Uganda. Does USAID foresee the contractor having to work in other neighboring countries?

USAID Response: No.

Question 17: On pages 31-37, Section H does not reference permission for a 6-day work week for ST consultants. Is a 6-day work week allowed for short-term consultants while in the field?

USAID Response: A 6 day workweek is authorized for international consultants and with approval of the COTR – Ugandan or regional consultants.

Question 18: On page 70, Section L.8.4(a) requests that past performance references be submitted using a matrix. Should the past performance matrix be supplemented with past performance references in short form in the annex, or will just the matrix suffice?

USAID Response: Please follow the instructions provided. The matrix will suffice.

Question 19: On page 70, Section L.8.4(a) refers to the five to ten required past performance references. Is this a total for all contractor and sub-contractors (providing at least 20% of the labor) combined or is it five to ten references for the contractor and five to ten for each sub-contractor?

USAID Response: Five to ten in total.

Question 20: On page 71, Section L.8.4(a) references providing any final or interim NIH reports. Should these NIH reports correspond to the contracts in the matrix and how many should be submitted?

USAID Response: Yes, the contracts listed in the matrix. All that apply.

Question 21: On page 72, Section L.9(b)(2)(A) references biodatas for all long-term and short-term consultants except local administrative support staff. Would biodatas for long-term expatriate, third country nationals, and local personnel suffice?

USAID Response: Yes.

Question 22: On page 74, Section L.9(d) and (e) references submitting policies and procedures and evidence of responsibility “upon receiving a specific request from the contracting officer.” Does this mean that these should not be included within the proposal until asked for?

USAID Response: The RFP instructions are clear. Please do not submit until asked for.

Question 23: Please confirm that offeror may submit non-key personnel CVs in an annex to the technical proposal.

USAID Response: Yes. Please submit all relevant CVs.

Question 24: Page 68, part (b) states that the offeror must submit bio data sheets as an annex to the technical proposal. Since these contain cost information, can the offeror include them as an annex to the cost proposal and not the technical proposal?

USAID Response: Please refer to response under Qn. 9.

Question 25: In the list of attachments on page 68, part (b), please clarify that the human resource management matrix is the same as an organization chart.

USAID Response: Yes, they are the same thing.

Question 26: Page 68, part (b) states that the offeror must submit “past performance report forms.” Are these report forms the same document as the Contractor Performance Reports, as referred to in Section 4 (Past Performance), Part C?

USAID Response: Yes.

Question 27: For the Evaluation Criteria, will USAID assign point values to the different factors, Technical Approach, Management and Institutional Capacity, and Key Personnel?

USAID Response: No, but the relative importance of each factor is identified in the RFP.

Question 28: Will USAID allow non-exclusive agreements with a proposed subcontractor (i.e. the A&E firm)?

In other words, could one subcontractor appear in multiple proposals?

USAID Response: Yes.

Question 29: After contract award, is the prime contractor permitted to bring on additional subcontractors not named in the proposal?

USAID Response: Yes.

Question 30: Per the RFP, VAT expenses are not allowable costs. Will the USAID Mission acquire VAT exemption certificates for the prime and sub-contractors?

USAID Response: The VAT reimbursement system in Uganda is under review. Currently, VAT claims are reimbursed through the Mission, but this may change in the near future. The successful offeror will be briefed at the post award conference.

Question 31: What steps, if any, can USAID take to assist the contractor in getting a VAT reimbursement?

USAID Response: See response to Question 30.

Question 32: Where will the weekly meetings with the contractor, USAID COTR, and Mission Engineer, referred to on page 16, Section C, point 2, take place?

USAID Response: This will be coordinated with the successful offeror after award. However, the most likely location would be in Gulu.

Question 33: Given that the district salary scale often is too low to attract and retain qualified individuals and achieve levels of performance required competition among donor-funded initiatives and private contractors for qualified technical staff eager to live and work in northern Uganda, will USAID consider wages outside the Districts salary scale?

USAID Response: USAID and its contractors currently offer the best salaries available in Uganda – particularly in northern Uganda. Therefore this type of request will be considered only in the most extreme cases.

The reason for attempting to hold the hiring scale for embedded technical staff to the District scale is to encourage post-project hiring of staff into available government positions and thus encourage sustainability. Furthermore, USAID hopes to avoid wage inflation which is not sustainable in the region. However, cases will be considered by the COTR as brought forward by the successful offeror.

Question 34: We note that Section C.5.1 outlines anticipated result targets of 5,000 kilometers of rural roads 500 boreholes, water systems, and/or shallow wells, 25 primary schools rehabilitations (including classrooms, teacher housing units, and latrines) and 80 rural clinic facilities rehabilitations (including necessary staff housing, etc). These targets seem inconsistent with the anticipated allocation of SPA funds as outlined in Section C.3 which states “community and district roads (approximately 90% of SPA funds); water points (no less than 5% of SPA funds); infrastructure support to schools (no less than 5% of SPA); and clinics. The clinics component will be “activated” if funding becomes available under the SPA.” Please clarify.

USAID Response: Again, please note that the USAID contractor will not be responsible for construction of any small infrastructure under this contract. All infrastructure will be constructed by the GOU district governments.

The figures outlined in the scope of work are illustrative. The District Governments will be responsible for determining their priorities according to their district development plans and community outreach and consultation processes to be implemented through NUDEIL. The USAID contractor will be an integral part of designing this process and supporting it – but it will be a local government process based on their priorities. The USAID funding does have some restrictions – related to the type of funding provided through the program which will be part of the planning process and MOU negotiations. The successful offeror will be fully briefed on these issues. Please note the balance of proposed funding in the proposal.

Question 35: What is the value of the sector assistance package to be handled through the Sector Program Assistance (SPA) Mechanism?

USAID Response: $50 million over three years. The clinic portion is still un-funded.

Question 36: Are all the fiscal safeguards in place to account for funds above the District level, or will the contractor be required to ensure accountability for all SPA funds in the commercial bank identified by USAID at the national level?

USAID Response: The USAID contractor in conjunction with the USAID NUDEIL management team will track the funds. The contractor is not responsible for actual funds if they go missing. However, the contract should consider a system to monitor that the tenders, implementation both in wages and materials, and bank account are accounted for at all times. This district has the responsibility to track the funds. However, the USAID contractor will be responsible for working with the District Government to build their capacity to manage the funds and also to understand and meet USAID financial reporting requirements. The role of the A&E firm is oversight of tenders, administration, capacity building, and ensuring corruption is minimized or none exsistant.

Question 37: The RFP mentions in several places that the contractor will be required to provide equipment (Contractor specific tasks 5e, 7, and 12). Are funds for this equipment to be included in the contractor’s budget or is this equipment to be procured with SPA funds (with contractor and USAID approvals as required)

USAID Response: Under the contract the USAID contractor will be required to provide a minimum of $500,000 in equipment to district governments. The USAID COTR (the NUDEIL Program Manager) will be responsible for reviewing and approving equipment packages – and when necessary the USAID Contracting Officer.

This equipment will not be funded using SPA funds. This equipment is to be funded and purchased under the USAID support contract.

Question 38: If funds for this equipment are to be include in the contractor’s budget, can you provide a plug figure for budget purposes to cover anticipated District level equipment needs. We note that identification of equipment needs is part of the contractor responsibility (Contractor Specific Task 5a), so budgeting for these, as yet, unspecified needs will be difficult.

USAID Response: As described above a minimum of $500,000 is expected to be budgeted for this purchase.

Question 39: Section C.5.2.C states “With 3 to 5 engineers in 2 to 4 District Engineering Offices over the life of the contract”. Please clarify, for budgetary purposes, the number and duration for this engineering cadre, which could be interpreted to be as few as 3 (in two District Engineering Offices) to 20 (in 4 District Engineering Offices).

USAID Response: The final needs in this section will be determined in the initial stages of the program assessment on the ground in the initial weeks of the program with the successful offeror. However, at a minimum the contractor should expect to embed one engineer in each of 4 district engineering offices over the life of the project. Surge capacity for engineering should be expected as the GOU actually breaks ground on projects. Field monitoring support and design support is expected to be necessary to provide needed support to the district governments.

Question 40: Section L.8.3 states among the desired qualifications a Masters Degree in Education. We do not see this degree as particularly relevant to the NUDEIL project as described in the Scope of work. Please clarify if this is, indeed, among the desired qualifications for key staff.

USAID Response: This is not a priority requirement for the program – but whatever the educational qualifications of proposed staff we expect high quality staff. Offerors should not feel limited by the requirements

– but should recognize the need to put together a high energy, high quality team that is ready to work closely with USAID's office in Gulu.

Question 41: Section L.8.4 a Past Performance states that “Offerors shall provide the following information regarding its past or current performance: (1) name of the organization; (2) project name; (3) project description; (4) contract performance period; (5) contract amount; and (6) technical contact person and telephone number”, and include “a past performance matrix containing this information”. Please confirm that this means that Offerors are not to include Contractor Performance Short Forms, but are to present this information in a matrix only.

USAID Response: Please refer to response under Qn. 26.

Question 42: RFP section L.8.b states ”Items such as graphs, charts, cover pages, dividers, table of contents, and attachments (i.e. key personnel resumes, tables summarizing qualifications of proposed personnel, personnel statements of availability, bio data sheets, organizational structure and human resource management matrix, work plan, past performance summary table and or past performance report forms) are not included in the 30-page limitation. All these should be included as annexes to the technical proposal.” May such items as full page graphics and charts relevant to describing the technical approach be included within the 30 page technical proposal on un-numbered pages?

USAID Response: No, they should be part of the numbered pages if incorporated as part of the proposal itself.

Question 43: In RFP Section E.4 on page 21 the RFP says, "The Contractor shall review the current applicable USAID NUDEIL results indicators, results frameworks or statements, identify new or refine existing and illustrative indicators to measure results, collect baseline data, and establish actual targets based." Can USAID provide the “current applicable USAID NUDEIL results indicators, results frameworks or statements” that are referenced in this sentence?

USAID Response: The data are not presently available. Development of a PMP – to include the items noted above will be part of the responsibility of the successful offeror alongside the NUDEIL program manager.

USAID/Uganda has a contractor that will assist the successful offeror to develop their PMP.

Question 44: Page 13: Paragraph 3 states that USAID has completed initial host-country contracting and financial assessments. Can USAID provide these assessments to offerors?

USAID Response: They are not relevant to offerors at this time. The internal documents lay out basic requirments to strengthen financial systems at the district level. They will be shared with the successful offeror.

The successful offeror will liaise with USAID/Uganda’s Financial Management Office and Acquisition and Assistance Office as part of their start-up process.

Question 45: Page 16: In co-locating project engineers in district-level engineering and public works departments, will office and support expenses be borne by the NUDEIL project budget or does USAID envision this to be a Government contribution?

USAID Response: We are expecting that the Government will be able to contribute physical space – although even this may be challenging for some of the target districts. This has already been discussed with district governments but will be formalized in the MOU process. The condition of offered office space may be a challenge and repairs and rehabilitation as well as furnishing may be required to make offered space workable.

Question 46: Maintenance Service Development, page.15, cites the need to provide consultation services under the warranty period. What is the standard warranty period, and what are liabilities and responsibilities for the Contractor and sub-contractor? Also, who will cover costs for repairs/corrections during the warranty period?

USAID Response: The warranty and maintenance costs are the responsibility of the district governments.

It is expected that all warranty periods for NUDEIL projects will have expired prior to the end of the NUDEIL program. Planning for project implementation with the district governments should include forward thinking through the end of the life of project to incorporate project close outs and warranty periods.

The Contractor will be expected to work with the Districts to improve their maintenance systems and provide information to USAID Kampala if district budget allocations are sufficient to cover long-term maintenance.

Question 47: Could the Mission please provide us with the District wage guidelines?

USAID Response: This information should be available from the Districts.

Question 48: Could the Mission please provide us with the current Local Wage Compensation plan (FSN Scale)?

USAID Response: Attached.

Question 49: Could the Mission please let us know if there is any surplus equipment available for this project?

USAID Response: There’s no available equipment for this project.

Question 50: On occasion, some electronically submitted proposals have not resulted in a system generated acknowledgement of receipt. How do we confirm that our submittal has been received by the Mission?

USAID Response: Please include a sentence requesting confirmation in your e-mail to the receiving office.