Statement of Work - Sectional Garage Door
View the file
Other files
| File | Type | Posted |
|---|---|---|
| SOW_Earle_Alteration-Rolling_Garage_Door_Replacement.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
U.S. Department of Homeland Security/ FEMA Region II
| 1 World Trade Center, 52nd Floor |
| New York, New York 10007. |
RFP 70FBR218Q00000028
Statement of Work - CLIN 0001 – Warehouse Sectional Garage Door Redesign and Replace
Statement of Work 70FBR218Q00000028 Warehouse Sectional Door Redesign and Replace Work
1. Introduction This requirement is to redesign and replace the commercial warehouse sectional door to accommodate and maintain a safe FEMA workspace environment for staff and truck drivers working and servicing Building C-54 at Naval Weapons Station EARLE, in Colts Neck, NJ.
2. Instructions to bidders A. Bidders are requested to submit an estimate for work as described in the “Statement of Work” (SOW) below. The estimate shall include the cost of all labor, materials, equipment rentals, etc. as required to complete all work as described in the "Statement of Work" or as reasonably inferred.
B. Bidders are to provide the Past Performance Questionnaire that is included to three (3) present or former clients. The client is to email the completed questionnaire to the Contracting Officer Lindsay Goldsmith lindsay.goldsmith@fema.dhs.gov . Past Performance questionnaires will not be accepted if sent by the bidder.
C. Before submitting a proposal, maximum of ten (10 pages), and drawings. Should bidders find discrepancies in or omissions from the scope of work listed below, bidder shall notify the contracting officer, who will send written instruction to all bidders regarding this discrepancy or omission via email
D. The contractor is to submit a schedule outlining all tasks and dates for project completion.
E. The contractor is to submit product data and finish samples for approval prior to application or purchase.
F. Location
| The work is located at: | Naval Weapons Station Earle |
| 201 New Jersey Route 34, Bldg. C-54, | |
| Colts Neck, NJ 07722 |
Please Note: Security Information for NWS Earle:
Naval Weapons Station Earle’s security performs a background check on all personnel entering the Naval Base. Driver’s must be U.S. citizens and are required to present a valid driver’s license, vehicle registration, and proof of insurance. All vehicles, exterior and interior, will be thoroughly inspected by base security.
G. Proposal shall be submitted electronically, referencing solicitation # 61019NWSE-GD to Contracting Officer Lindsay Goldsmith lindsay.goldsmith@fema.dhs.gov
Bidders shall prepare a breakdown of costs by trades following industry standard CSI format. This should be in a clear and concise form, permitting ease of discussion. THE CONTRACTOR SHALL PROVIDE AN ALL INCLUSIVE (EQUIPMENT, SUPPLIES AND LABOR) FOR ADDITIONAL WORK AS REQUIRED AND AT LOCATIONS REQUESTED BY FEMA.
H. All bidders shall use the Service Contract Act wage determination No.: 2005-2351 for Monmouth County, NJ. The McNamara-O’Hara Service Contract Act requires contractors and subcontractors performing services on prime contracts in excess of $2,500 to pay service employees in various classes no less than the wage rates and fringe benefits found prevailing in the locality, or the rates (including prospective increases) contained in a predecessor contractor's collective bargaining agreement. The Department of Labor issues wage determinations on a contract-by-contract basis in response to specific requests from contracting agencies. These determinations are incorporated into the contract.
SUMMARY
PART 1 GENERAL
1.1 DESCRIPTION:
A. This section specifies electrically operated sectional overhead steel doors.
1.2 MANUFACTURER'S AND INSTALLER'S QUALIFICATIONS:
A. Manufacturer's with three (3) years’ experience in providing items of type specified. Submit manufacturer qualifications.
1.3 SUBMITTALS:
| A. | Submit SHOP DRAWINGS, PRODUCT DATA, AND SAMPLES. |
| B. | Shop Drawings: |
| 1. | Details of construction, accessories and hardware, electrical and mechanical items, supporting brackets for motors, location, and ratings of motors, and safety devices. |
| 2. | Wiring diagrams for motors and controls, including wiring diagram for door, showing electrical interlock for motor with manually operated dead lock. |
| C. | Manufacturer's Literature and Data: |
| 3. | Maintenance instructions, parts list. |
PART 2 PRODUCTS
2.1 MATERIALS:
| A. | Steel: ASTM A653/A653M for forming operations. ASTM A36/A36M for structural sections. |
| B. | Hard Drawn Spring wire: ASTM A227/A227M. |
| C. | Weather-strips, Gaskets, and Thermal Breaks: |
| 1. | Neoprene, EPDM, PVC, silicone rubber, or other low conductance material. |
| 2. | Standard with door manufacturer. |
2.3 FABRICATION:
| A. | Tracks: |
| 1. | Manufacturer's standard, formed of galvanized steel. |
2. Track Configuration: Standard-lift track.
| B. | Hardware: |
| 1. | Manufacturers standard hinges, brackets, rollers, locking devices and other hardware required for a complete installation. |
| 2. | Hinges and Roller Brackets: Minimum of 2.38 mm (13 gage) galvanized steel. |
5. Weatherseals: Manufacturer’s standard fitted around entire perimeter of door. Provide combination bottom weatherseal and sensor edge.
2.4 ELECTRIC MOTOR OPERATORS:
| A. | Complete with electric motor, machine cut reduction gears, steel chain and sprockets, magnetic brake, overload protection, brackets, wall mount push button controls, limit switches, magnetic reversing contactor, and other accessories necessary for proper operation, including emergency manual actuator. |
| B. | Motors: |
| 1. | NEMA MG 1, maximum operation 3600 rpm. |
| 2. | Suitable for operation on power current of the characteristics indicated on the electrical construction documents. |
| C. | Controls: |
| 1. | Control enclosures: |
a. Interior-Mounted Units: Full-guarded, surface-mounted, heavy-duty type, with general-purpose NEMA ICS 6, Type 1 enclosure.
| 2. | Control switches: |
| a. | Three push button type on interior, unless noted to be key activated. |
| b. | Buttons marked, OPEN, CLOSE and STOP. |
| c. | The OPEN and STOP buttons: Momentary pressure or contact type. |
| d. | The CLOSE button: Constant pressure type. |
| e. | Provide key activated switch on exterior requiring constant pressure to operate. |
| f. | Limit switches: Manufacturers standard, position of switches readily adjustable. |
| 4. | Operation: |
| a. | Open door upon activation of OPEN button. |
| b. | Close door only when constant key pressure applied to CLOSE button. |
| c. | When the door is in motion, and the STOP button is pressed, door is to stop instantly and remain in the stop position; from stop position, door may be operated in either direction by OPEN or CLOSE button. |
| d. | Limit switches automatically stop doors at their fully open and closed positions. |
| 6. | Provide push buttons with guards to prevent accidental operation. |
| 7. | Transformer: |
| a. | Provide control transformer in power circuits to reduce the voltage on control circuits to 120 volts or less. |
| b. | Conform to NEMA ST 20. |
| 8. | Electrical Components: Conform to NFPA 70. |
| 9. | Safety Device: |
| a. | Provide bottom door edge weather-strip safety device to immediately stop and reverse the door closing to full open position upon contact with an obstruction in compliance with UL 325. Door is to open upon failure of device, component of device or component of control system. |
| b. | The door closing circuit is to be electrically locked out and door to remain capable of manual operation until the failure or damage has been corrected. |
| c. | Do not use safety device as a limit switch. |
| d. | Safety Device Connecting Cable to Motor: Flexible type SO cable, with spring loaded automatic take up reel or equivalent device, as required for proper operation of the doors. |
2.5 FINISHES:
| A. | Steel: |
| 1. | Comply with NAAMM’s AMP 500-06 Metal Finishes Manual for recommendations for applying and designating finishes. |
| 2. | Clean surfaces free of scale, rust, oil and grease. |
| 3. | Galvanized steel: Apply phosphate treatment. |
| 4. | Apply shop prime coat of corrosion inhibitive paint on exposed surfaces after fabrication that is compatible with field applied finishes. |
| 5. | Do not paint track, rollers, hinges, or locks. |
PART 3 EXECUTION
3.1 INSTALLATION:
| A. | Install in accordance with manufacturer's instructions. |
| B. | Locate anchors and inserts for tracks, brackets, motors, switches, hardware, and other accessories in accordance with approved shop drawings. |
| C. | Attach tracks to adjoining construction with not less than 9 mm (3/8 inch) diameter bolts, spaced near each end and not over 610 mm (24 inches) apart. |
| D. | Locate control switches not less than 1219 mm (4 feet) or more than 1372 mm (4 feet 6 inches) above finished floor. |
| E. | Lubricate, adjust and demonstrate door to operate freely. |
| F. | Upon completion, leave door openings weathertight and doors free from warp, twists, or distortion. |