Appendix H Applicable Prep Instructions Technology Readiness Levels (applicable to Demos Risk Reduction).pdf

PDF 101 KB Posted

Attached to
Advanced Reactor Demonstration
Opportunity number
DE-FOA-0002271
Issued by

About this file

H

View the file

Other files

File Type Posted
APPENDIX M Applications Prep Instructions Resume Template Amend 000003 (applicable to Demos, Risk Reduction. ARC-20).pdf PDF
Appendix K Application Prep Instructions FOCI template Amend 000003 (applicable to Demos, Risk Reduction, ARC-20).pdf PDF
Advanced Reactor Demonstration Program FOA Amendment 000003 Summary of Changes.pdf PDF
Advanced Reactor Demonstration Program FOA Amendment 000003.pdf PDF
Appendix Q Info Award Terms and Conditions Amend 000002 (applicable to ARC-20).pdf PDF
Appendix P Info Award Terms and Conditions Amend 000002 (applicable to Risk Reduction).pdf PDF
Appendix O Info Award T&Cs Amend 000002 (appl to Demos).pdf PDF
APPENDIX M Applications Prep Instructions Resume Template Amend 000002 (applicable to Demos, Risk Reduction. ARC-20).pdf PDF
Appendix I Application Prep Instruct Risk Register and Risk Managment Amend 000002 (applicable to Demos Risk Reduction ARC-20).pdf PDF
APPENDIX G Application Prep Instructions - Budget Prep Instructions Amend 000002 (applicablee to Demos Risk Reduction ARC-20).pdf PDF
Appendix F Application Prep Instructions Waiver Request non US Work Amend 000002 (applicable to Demos Risk Reduction ARC-20).pdf PDF
Appendix B - Info Demos Statement of Substantial Involvement Amend 000002 (applicable to Demos).pdf PDF
Advanced Reactor Demonstration Program FOA Amendment 000002.pdf PDF
Advanced Reactor Demonstration Program FOA Amendment 000002 Summary of Changes.pdf PDF
Appendix Q Info Award Terms and Conditions Amend 000001 (applicable to ARC-20).pdf PDF
Appendix P Info Award Terms and Conditions Amend 000001 (applicable to Risk Reduction).pdf PDF
Appendix O Info Award Terms and Conditions Amend 000001 (applicable to Demos).pdf PDF
APPENDIX M Applications Prep Instructions Resume Template Amend 000001 (applicable to Demos, Risk Reduction. ARC-20).pdf PDF
APPENDIX L Applications Prep Instructions Business Plan Template Amend 000001 (applicable to Demos Risk Reduction).pdf PDF
APPENDIX J App Prep Instructions Project Management Plan Amend 000001 (applicable to Demos and Risk Reduction).pdf PDF
APPENDIX H APPLICABLE PREP INSTRUCTIONS TRLs Amend 000001 (applicable to Demos, Risk Reduction and ARC20).pdf PDF
APPENDIX G Application Prep Instructions - Budget Prep Instructions Amend 000001 (applicablee to Demos Risk Reduction ARC-20).pdf PDF
ARD FOA Amend 000001 continuation pages - summary of changes.pdf PDF
Advanced Reactor Demonstration Program FOA Amendment 000001 6-22-2020.pdf PDF
Advanced Reactor Demonstration Program FOA.pdf PDF
Appendix S - Info Reporting Requirements Checklist (applicable to Demos) continuation sheet.pdf PDF
Appendix X - Data Management Plan Applications Instructions (applicable to Demos, Risk Reduction and ARC20).pdf PDF
Appendix W Info DOE COVID-19 Financial Assistance Guidance (applicable to Demos, Risk Reduction, ARC-20).pdf PDF
Appendix V Info COVID-19 OMB Memo M-20-17 (applicable to Demos, Risk Reduction, ARC-20).pdf PDF
Appendix U Info Reporting Requirements Checklist (applicable to ARC-20).pdf PDF
Appendix T Info Reporting Requirements Checklist (applicable to Risk Reduction).pdf PDF
Appendix S - Info Reporting Requirements Checklist (applicable to Demos).pdf PDF
APPENDIX R Info Intellectual Property Provisions for Awards (applicable to Demos Risk Reduction ARC-20).pdf PDF
Appendix Q Info Award Terms and Conditions (applicable to ARC-20).pdf PDF
Appendix P Info Award Terms and Conditions (applicable to Risk Reduction).pdf PDF
Appendix O Info Award Terms and Conditions (applicable to Demos).pdf PDF
APPENDIX N Applications Prep Instructions Past Performance Information Template (applicable to Demos, Risk Reduction, ARC-20).pdf PDF
APPENDIX M Applications Prep Instructions Resume Template (applicable to Demos, Risk Reduction. ARC-20).pdf PDF
APPENDIX L Applications Prep Instructions Business Plan Template (applicable to Demos Risk Reduction).pdf PDF
Appendix K Application Prep Instructions FOCI template (applicable to Demos, Risk Reduction, ARC-20).pdf PDF
Appendix J Application Prep Instructions Project Management Plan (applicable to Demos Risk Reduction).pdf PDF
Appendix I Application Prep Instruct Risk Register and Risk Managment (applicable to Demos Risk Reduction ARC-20).pdf PDF
APPENDIX G Application Prep Instructions - Budget Prep Instructions (applicable to Demos Risk Reduction ARC-20).pdf PDF
Appendix F Application Prep Instructions Waiver Request non US Work (applicable to Demos Risk Reduction ARC-20).pdf PDF
Appendix E Info Document Understanding Cost Sharing (applicable to Demos Risk Reduction ARC-20).pdf PDF
Appendix D Info ARC-20 Statement of Substantial Involvement (applicable to ARC-20).pdf PDF
Appendix C Info Risk Reduction Statement of Substantial Involvement (applicable to Risk Reduction).pdf PDF
Appendix B - Info Demos Statement of Substantial Involvement (applicable to Demos).pdf PDF
APPENDIX A – Info HALEU INFORMATION (applicable to Demos, Risk Reduction ARC-20).pdf PDF
Show all 49

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Funding Opportunity Number: DE-FOA-0002271

APPENDIX H - TECHNOLOGY READINESS LEVELS

Reference: DOE Guide 413.3-4 - U.S. Department of Energy Technology Readiness Assessment Guide Relative Level of Technology Development

Technology Readiness

Level

TRL

Definition

Description

System Operations

TRL 9 Actual system operated over the full range of expected mission conditions.

The technology is in its final form and operated under the full range of operating mission conditions. Examples include using the actual system with the full range of wastes in hot operations.

System Commissioning

TRL 8 Actual system completed and qualified through test and demonstration.

The technology has been proven to work in its final form and under expected conditions. In almost all cases, this TRL represents the end of true system development. Examples include developmental testing and evaluation of the system with actual waste in hot commissioning.

Supporting information includes operational procedures that are virtually complete. An Operational Readiness Review (ORR) has been successfully completed prior to the start of hot testing.

TRL 7 Full-scale, similar (prototypical) system demonstrated in relevant environment

This represents a major step up from TRL 6, requiring demonstration of an actual system prototype in a relevant environment. Examples include testing full-scale prototype in the field with a range of simulants in cold commissioning1. Supporting information includes results from the full-scale testing and analysis of the differences between the test environment, and analysis of what the experimental results mean for the eventual operating system/environment. Final design is virtually complete.

Technology Demonstration

TRL 6 Engineering/pilot-scale, similar (prototypical) system validation in relevant environment

Engineering-scale models or prototypes are tested in a relevant environment. This represents a major step up in a technology’s demonstrated readiness. Examples include testing an engineering scale prototypical system with a range of simulants.1 Supporting information includes results from the engineering scale testing and analysis of the differences between the engineering scale, prototypical system/environment, and analysis of what the experimental results mean for the eventual operating system/environment. TRL 6 begins true engineering development of the technology as an operational system.

The major difference between TRL 5 and 6 is the step up from laboratory scale to engineering scale and the determination of scaling factors that will enable design of the operating system. The prototype should be capable of performing all the functions that will be required of the operational system. The operating environment for the testing should closely represent the actual operating environment.

Technology Development

TRL 5 Laboratory scale, similar system validation in relevant environment

The basic technological components are integrated so that the system configuration is similar to (matches) the final application in almost all respects. Examples include testing a high-fidelity, laboratory scale system in a simulated environment with a range of simulants1 and actual waste2. Supporting information includes results from the laboratory scale testing, analysis of the differences between the laboratory and eventual operating system/environment, and analysis of what the experimental results mean for the eventual operating system/environment. The major difference between TRL 4 and 5 is the increase in the fidelity of the system and environment to the actual application. The system tested is almost prototypical.

Funding Opportunity Number: DE-FOA-0002271

Relative Level of Technology Development

Technology Readiness

Level

TRL

Definition

Description

Technology Development

TRL 4 Component and/or system validation in laboratory environment

The basic technological components are integrated to establish that the pieces will work together. This is relatively "low fidelity" compared with the eventual system. Examples include integration of ad hoc hardware in a laboratory and testing with a range of simulants and small scale tests on actual waste2. Supporting information includes the results of the integrated experiments and estimates of how the experimental components and experimental test results differ from the expected system performance goals. TRL 4-6 represent the bridge from scientific research to engineering. TRL 4 is the first step in determining whether the individual components will work together as a system. The laboratory system will probably be a mix of on hand equipment and a few special purpose components that may require special handling, calibration, or alignment to get them to function.

Research to Prove Feasibility

TRL 3 Analytical and experimental critical function and/or characteristic proof of concept

Active research and development (R&D) is initiated. This includes analytical studies and laboratory-scale studies to physically validate the analytical predictions of separate elements of the technology.

Examples include components that are not yet integrated, or representative tested with simulants.1 Supporting information includes results of laboratory tests performed to measure parameters of interest and comparison to analytical predictions for critical subsystems. At TRL 3 the work has moved beyond the paper phase to experimental work that verifies that the concept works as expected on simulants.

Components of the technology are validated, but there is no attempt to integrate the components into a complete system. Modeling and simulation may be used to complement physical experiments.

TRL 2 Technology concept and/or application formulated

Once basic principles are observed, practical applications can be invented. Applications are speculative, and there may be no proof or detailed analysis to support the assumptions. Examples are still limited to analytic studies.

Supporting information includes publications or other references that outline the application being considered and that provide analysis to support the concept. The step up from TRL 1 to TRL 2 moves the ideas from pure to applied research. Most of the work is analytical or paper studies with the emphasis on understanding the science better.

Experimental work is designed to corroborate the basic scientific observations made during TRL 1 work.

Basic Technology Research

TRL 1 Basic principles observed and reported

This is the lowest level of technology readiness. Scientific research begins to be translated into applied R&D. Examples might include paper studies of a technology’s basic properties or experimental work that consists mainly of observations of the physical world. Supporting Information includes published research or other references that identify the principles that underlie the technology.

APPENDIX H - TECHNOLOGY READINESS LEVELS

File details come from the government source that posted it.