605B7600016 PROJECT MANUAL Fair Hill Jockey Restroom 10.27.pdf

PDF 213 KB Posted

Attached to
Fair Hill Jockey Restroom HVAC Installation
Solicitation number
BPM059580
Issued by
Cecil County, Edgemont CDP, Maryland

About this file

This Project Manual is a technical document related to the Fair Hill Jockey Restroom HVAC Installation project, a state and local contract opportunity issued by the State of Maryland for work to be performed at 350 Ranger Skinner Drive within the N.R.M.A in Elkton, Maryland. The project requires the contractor to provide all labor, equipment, materials, supplies, insurance, and related services necessary to design, build, and install new mini-split HVAC systems in the Women's and Men's Restrooms and Jockey Dressing Room at the specified location. The manual serves as the primary technical guide for bidders and contractors detailing the scope of work, design specifications, installation requirements, and performance standards for the HVAC system installation.

The document establishes the technical framework and construction standards that contractors must follow to complete the project successfully. The manual contains detailed specifications for the mini-split HVAC systems, site conditions, material requirements, and quality standards necessary for project completion. Contractors responding to this opportunity should reference this manual in conjunction with the project's bidding documents to ensure full understanding of all technical requirements, including system specifications, installation procedures, testing protocols, and acceptance criteria for the HVAC systems to be installed in the three designated areas at the facility.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PROJECT MANUAL

HVAC Installations for Racetrack Restrooms and Jockey Dressing Rooms

Fair Hill N.R.M.A.

350 Ranger Skinner Drive

Elkton, MD 21921 Cecil County

Project # EC26-09043-28

October 27, 2026

For the State of Maryland Department of Natural Resources

Engineering and Construction Division Josh Kurtz, Department Secretary

State of Maryland Board of Public Works Wes Moore, Governor

Brooke E. Lierman, Comptroller Dereck E. Davis, Treasurer

TABLE OF CONTENTS

I. Detailed Specifications A. Scope B. Contractor Qualifications C. Site Inspection D. Schedule of Work E. Standards and Codes F. Materials and Supplies G. Method of Work H. Warranty and Guarantee I. General Requirements

II. Alternates, Unit Prices, and Allowances A. Alternates B. Unit Prices C. Allowances

III. Drawings & Attachments

I. DETAILED SPECIFICATIONS

A. SCOPE:

1. This project consists of the Contractor providing all labor, equipment, materials, supplies, insurance, etc., necessary to (1) design, build, and install new mini-split HVAC systems;

in the Women’s and Men’s Restrooms and Jockey Dressings Rooms at 350 Ranger Skinner Drive within the Fair Hill N.R.M.A. in Elkton, MD 21921.

2. The project includes, but is not limited to the following:

a. Design, build, and install new mini-split heat-pump systems (optimal cooling;

low-ambient heating) for Buildings 1 and 2 containing the women’s and men’s restrooms, jockey dressing rooms, and two-story office area. Prepare drafted shop drawings and ACCA Manual J calculations detailing the HVAC designs under the supervision of a Maryland licensed Professional Engineer.

1) New HVAC systems shall be complete installations to include all duct work; air handlers; compressors; electric whips; refrigerant lines;

refrigerant line insulation; refrigerant line covers; condensate drains;

blowers; evaporator coils; digital thermostat/controllers; and wiring from the newly installed panels to the new units.

2) The new units shall be the following:

i. Women’s Building (Building 1): One outdoor unit; one ducted concealed indoor unit to serve the Women’s Jockey Dressing Room and Family Restroom; one ductless ceiling mounted unit to serve the Women’s Restroom.

ii. Men’s Building (Building 2): One outdoor unit; one ducted concealed indoor unit to serve the Men’s Restroom and adjacent Accessible Bathroom; one ductless ceiling mounted unit to serve the Men’s Jockey Dressing Room.

iii. Office Spaces (Building 1, adjacent to Family Restrooms and

Mechanical Room): One outdoor unit; two wall mounted indoor units, one on each of Floors 1 and 2.

iv. The systems in the restroom, dressing room, and shower spaces are primarily for cooling and humidity reduction but will need to provide light heating during the winter to maintain a setback/freeze-protection setpoint of 50 degrees F.

v. Refer to the Basis-of-Design systems herein and the construction drawings for areas of the spaces to be served.

3) Install three new 4” thick concrete pads with 4” of compacted #57 stone base, properly sized to fit the new outdoor units. Outdoor units shall include an offset stand to separate the new pad from the bottom of the units.

4) Install three ducted exhaust fans: one in front of the showers in the

Women’s Jockey Dressing Room of Building 1; one in front of the showers in the Men’s Jockey Dressing Room in Building 2; and one in the Janitor’s Closet in Building 2. Installation shall be complete with all necessary components for proper working order to include outdoor venting and wiring from the new electrical panels to the new units.

5) Prepare a Owner’s Manual consisting of the shop drawings; ACCA

Manual J calculations forming the bases for the designs; as-built drawings;

product cut sheets & brochures; installation instructions; and maintenance & service manuals for all HVAC products and systems.

6) Clean up and all construction debris from the job site and properly dispose off of State Property.

NOTE: The accuracy of all applicable dimensions and quantities associated with the work is the responsibility of the Contractor. All information is to be confirmed to the Contractor’s satisfaction prior to bidding. The State will not be held responsible for the Contractor’s failure to do so.

B. QUALIFICATIONS OF THE CONTRACTOR:

1. The Contractor shall be licensed in the State of Maryland as a General Contractor to perform work associated with this project.

2. The Contractor shall have a minimum of three (3) years’ experience performing similar construction projects. Upon request, the Contractor shall supply a list of other similar, completed projects to the DNR Procurement Officer for review.

3. The Contractor shall employ a HVAC contractor licensed in Cecil County, MD to perform specified work.

4. The Contractor shall employ an Electrical contractor licensed in Cecil County MD perform all electrical work.

C. SITE VISIT:

1. All prospective bidders are encouraged to attend the Pre-bid conference meeting and familiarize themselves with the requirements for the project. Failure to attend the Pre-bid conference meeting, or visit the site, will not relieve the successful bidder from complying with the requirements of these specifications at no additional cost to the State.

2. No allowance will be made for errors on the Contractors part for failure to take into consideration any conditions or circumstances existing at the site which might affect the specified work.

3. Prior to any site visit (other than the Pre-Bid Conference), contact the Fair Hill NRMA Facility Manager, Chris Grieco, (410) 398-1246 to arrange for access to the project site.

D. SCHEDULE OF WORK

1. Work shall be scheduled through and approved by the DNR Project Manager and Facility

Manager. The Contractor shall perform all work Monday through Friday during the normal working hours of 8:00 am to 4:30 pm. unless approved by Project Manager in writing.

2. The Contractor shall notify the DNR Project Manager seven (7) days prior to his start of work. He shall coordinate with the DNR Project Managers and Facility Manager the dates of the Work Initiation Conference, the work, and any closures required.

3. All work shall be completed within 90 calendar days of the notice to proceed.

E. STANDARDS AND CODES:

1. All work shall be performed in a top-quality workmanship manner in accordance with the standards of the trade.

2. The Contractor shall comply with OSHA (Occupational Safety and Health

Administration) and MOSHA (Maryland Occupational Safety and Health Administration) regulations regarding construction safety and health standards throughout the duration of the Project.

3. All work shall be performed in accordance with the applicable code requirements and standards as defined by the Maryland Building Codes Administration “Model Performance Code” (MPC), which adopts the following Maryland and International Code Council documents:

2018 International Building Code (IBC) 2018 International Residential Code (IRC) 2018 International Plumbing Code (IPC) 2018 International Mechanical Code (IMC) 2018 International Energy Conservation Code (IECC) 2017 National Fire Code (NFPA 70) 2012 International Green Construction Code (IGCC) Maryland Accessibility Code (MAC), And the following project-specific organizations shall be incorporated into these specifications to ensure industry standard materials, assembly, and workmanship:

American Concrete Institute (ACI) American Lumber Standard Committee, Inc. (ALSC) American National Standards Institute (AWI)

Architectural Woodwork Institute (AWI) American Welding Society (AWS) American Society for Testing Materials International (ASTM) Copper Development Council (CDA) Concrete Reinforcing Steel Institute (CRSI) Master Painters Institute (MPI) National Association of Architectural Metal Manufacturers (NAAMM) National Lumber Grades Authority (NLGA) National Roofing Contractors Association (NRCA) National Ready Mixed Concrete Association (NRMCA) National Stone, Sand & Gravel Association (NSSGA) Southern Pine Inspection Bureau (SPIB) Sealant, Waterproofing, & Restoration Institute (SWRI) Tile Roofing Institute (TRI)

4. All work shall be performed in accordance with the Environmental Protection Agency

(EPA) and the Maryland Department of the Environment (MDE).

5. All work must be installed according to the manufacturers’ written instructions.

6. The Contractor shall obtain a third-party electrical inspection from a non-governmental inspection agency approved by the State Fire Marshal’s office. Upon completion of the project, the Contractor shall provide an approved electrical inspection certificate for all electric work performed.

F. MATERIALS AND SUPPLIES:

1. General:

a. All materials shall be as specified or approved equal by the DNR Project Manager. In the event the Contractor would like to substitute materials other than those that have been specified, the Contractor shall submit to the DNR Project Manager all pertinent data to determine the or-equal status. This material shall be submitted to the DNR Project Manager a minimum of ten (10) days prior to the bid opening. The DNR Project Manager shall notify the Contractor within five (5) days as to the or-equal status.

b. All materials shall be new and where applicable shall be delivered to the job site with labels intact and legible.

c. The Contractor shall be responsible for the coordination, off-loading and proper storage of all materials and supplies up until the time of final inspection.

d. Materials shall be stored in a safe area out of the way of traffic. Any on-site storage location shall be approved by the Facility Manager prior to the storage of any materials on-site. All materials shall be stored up off the ground surface and should be protected from the weather with a waterproof covering. Any special storage instruction required by the material manufacture shall be performed by the Contractor as if specified herein.

e. Any materials or supplies, which have not been specifically mentioned, but are necessary for the complete, safe and satisfactory completion of the project, shall be provided by the Contractor as if specified herein.

f. All electrical and mechanical fixtures, devices, wiring, etc. shall be UL Listed.

2. Basis-of-Design Products and Systems; Product Standards.

a. Mini-split Air Conditioning Systems (Basis-of-Design or approved equal):

1) Outdoor Units shall be:

i. All Restrooms and Jockey Dressing & Shower Rooms: Mitsubishi

SUZ-AA18NLHZ H2i Series Outdoor Unit or approved equal.

ii. Stacked Office Areas: Mitsubishi MXZ-2D20NL.

ii. Concrete Pads: Shall be premixed concrete rated at SHA MIX #3, 3,500 psi, as specified in the latest edition of the State Highway Administration Standard Specifications for Construction Materials.

iii. Concrete pad sub-base shall be SHA approved # 57 stone or approved equal.

2) Indoor Units shall be:

i. Women's Jockey Dressing & Shower Room – Mitsubishi SEZ-

AD18NL Low-Static, Horizontal Ducted Indoor Unit or approved equal.

ii. Women's Restroom – Mitsubishi SLZ-AF12NL Ceiling-Cassette (Four-Way) Indoor Unit or approved equal.

iii. Men’s Restroom - Mitsubishi SEZ-AD18NL Low-Static, Horizontal Ducted Indoor Unit or approved equal.

iv. Men's Jockey Dressing & Shower Room – Mitsubishi MLZ- KX09NL Long, Narrow Ceiling-Cassette (One-Way) Indoor Unit or approved equal.

v. Stacked Office Areas (Building 1) – Mitsubishi MSZ-FS06NA for Wall Mounted Indoor Unit on Floor 1; MSZ-FS09NA Unit on Floor 2; or approved equals.

3) Ceiling Grilles shall be:

i. Women’s Restroom Ceiling Cassette Indoor Unit shall be

Mitsubishi SLP-18FAU or approved equal.

ii. Ceiling Grille for Men’s Jockey Dressing & Shower Room Ceiling Cassette Indoor Unit shall be Mitsubishi MLP-449WU or approved equal.

4) Refrigerant Lineset Covers: Shall RectorSeal Fortress® Lineset Covers in

White color.

5) New Breakers shall be properly sized, QO-type standard breakers and AFCI breakers as needed by design.

6) Conductors shall be type THHW or approved equal, copper conductor wire, color coded per NEC requirements. Conductor size shall be determined by the load requirements.

7) Above grade conduit shall be PVC Schedule 80.

8) General wiring shall be U.L. listed, copper conductor cable, properly sized and color coded in accordance with NEC 2012 requirements. Wiring to be Romex (NC) type, with a minimum wire size of 12 AWG copper conductors or approved equal.

9) Interior Rough boxes shall be U.L. listed for use with MC cable, and shall be of proper material, size and depth in accordance with NEC 2008 requirements.

10) All dedicated receptacles shall be per NEC. Code.

11) Wireless Thermostat Controller shall be Mitsubishi Kumo Touch Wireless Thermostat Kit, Model Number MHK2. One each for Women’s and Men’s Restrooms; One each for the Women’s and Men’s Jockey Dressing Rooms; in locked access panels in Maintenance Room and Janitor’s Closet.

i. Provide remote room-temperature sensors in the conditioned spaces communicating with the remote thermostat controllers.

ii. Provide with all remaining and necessary wireless receiver kits.

12) Port Adapter size: 1/2" x 3/8" Mitsubishi PAC-SK88RJ-E or approved equal.

13) Piping Size Estimated Lengths: 1/4 -140 lf; 1/2 -35 lf; 3/8 -105 lf.

b. Sizing Parameters for Surge Use of Facilities: As an aid in sizing the HVAC system, use the peak occupant loads in the table below.

Room Toilets Urinals Lavatories Showers Peak

Simultaneous Occupants

Men’s Room 5 4 5 n/a 14 people (9 using fixtures + 5 washing hands/waiting)

Women’s Room

9 n/a 5 n/a 14 people (9 using fixtures + 5 washing hands/waiting)

Totals During Events

14 4 10 n/a 28 people concurrent peak

Jockey Use at Conclusion of Events

Men’s Jockey Dressing & Shower Room

2 1 2 2 7 people (5 using fixtures + 2 washing hands

Women’s Jockey Dressing & Shower Room

2 n/a 2 2 6 people (4 using fixtures + 2 washing hands

Totals After Events

4 1 4 4 13 people concurrent peak

c. Exhaust Fan Units for Shower Areas shall be Panasonic WhisperCeiling® DC

Ventilation Fan, rated at 150 CFM with ECM Motor; Model # FV-1115VQ1.

1) Equip with Ceiling-mounted, Occupancy Sensor with Timed Run-on

Delays. Fans automatically start upon detected occupancy.

2) Configure for fans to remain on for an adjustable post-occupancy delay of at least 30 minutes.

3) Provide local disconnecting means as required by Code.

G. METHOD OF WORK:

1. General:

a. All work shall be as called for in these written specifications.

b. The Contractor shall coordinate all work with the various trades and material suppliers in order to complete the project expeditiously and within the time limits of the contract. The sequence of events shall be left up to the Contractor.

c. All work shall be performed in the best and most professional manner possible by mechanics skilled in their respective trades.

d. All work shall be performed to minimize disruption to facility operations. It is understood that the Contractor shall maintain accessibility throughout the project.

e. The Contractor shall provide and install adequate barricades, signs, etc., necessary to ensure public safety as approved by the Facility Manager.

f. The Contractor shall adhere to OSHA/MOSHA regulations throughout the project to ensure the safety of his/her employees, state employees, and the public.

g. The Contractor shall maintain the work site(s) in a safe, neat and orderly manner throughout the entire project. The Contractor shall take steps to prevent the accumulation of debris at the job site(s).

h. Any work that has not been specifically mentioned but is reasonably implied and is necessary for the safe and the satisfactory completion of the project, shall be performed by the Contractor as if specified herein.

i. Where applicable, all materials and supplies shall be installed in accordance with the manufacturer’s written instructions as if specified herein.

2. Execution Specifics:

a. Installation shall take place only after product submittals and shop drawings have been reviewed and approved by DNR. Shop drawings for the HVAC and wiring shall be prepared under the supervision Maryland licensed Professional Engineer and Master Electrician.

b. It shall be the responsibility of the Contractor to determine the most efficient way for the routing of the new ductwork, refrigerant lines and wiring.

c. It shall be the responsibility of the Contractor to coordinate with the work of others, including DNR’s In-house Construction Crew and the Contractors responsible for installing plumbing fixtures and toilet accessories and the wall and ceiling finishes.

d. All existing interior ceiling, wall and floor finishes shall be protected from damage. If any cutting of finishes is necessary during the work of this contract, notify the contractors responsible for installing those finishes in advance.

e. New electrical wiring for the HVAC and lighting systems will overlap the electrical work of others. Coordinate with DNR’s In-house Construction Crew and the DNR electrician responsible for installing the electrical service panels and power wiring and devices.

f. Coordinate with DNR’s In-house Construction Crew for access to concealed and semi-concealed spaces and rooms.

g. Exterior refrigerant linesets shall be covered for their full extent by the specified weather resistant PVC, UV stabilized & fire-resistant covers.

h. All mechanical appliance and lighting circuits not protected by GFCI breakers must be protected by an AFCI breaker in accordance with NEC Code Requirements.

f. Remove and properly dispose of excess materials and debris off State property.

H. WARRANTY AND GUARANTEE:

1. The Contractor shall fully guarantee the work covered under this contract for a period of two (2) years from the date of acceptance and against defects in materials and workmanship.

2. Any defects found within the two (2) year warranty period shall be promptly repaired or replaced by the Contractor at no additional cost to the State.

3. The Contractor shall provide the DNR Project Managers all manufacturers’ warranties, guarantees, owner’s manuals, etc., related to this project. All information shall be neatly complied and be submitted to the DNR Project Managers at the time of the Substantial Completion.

I. GENERAL REQUIREMENTS:

1. The Maryland Dept. of Natural Resources “Instructions to Bidder for Construction

Projects” and “General Conditions” are hereby made part of these specifications.

2. All work shall be coordinated with the Facility Manager and DNR Project Managers during the work initiation meeting.

3. The complete project is subject to the inspection and approval of the Facility Managers and the DNR Project Managers.

4. Deviation from the manufacturer's instructions or this specification will not be acceptable.

5. The Contractor shall take all necessary precautions and measures to protect all properties from damage. He shall repair all damage caused by his operation to all public and private property including roads, walks, curbs, utilities, trees, shrubs, plantings, etc., and leave the property in good condition and/or at least equivalent to the condition found.

6. The Contractor shall make his own arrangements to acquire any temporary utility service which he requires to perform this contract. Any expenses incurred must be paid by the Contractor.

II. ALTERNATES, UNIT PRICES AND ALLOWANCES

A. ADD ALTERNATES:

None

B. UNIT PRICES:

C. Allowances:

NOTE: The Contractor shall incorporate all costs associated with transportation, fuel, maintenance on equipment, employee salary, benefits, overhead, profit, etc., in the Unit Price. Units Prices will be used to increase/decrease the contract price based on actual quantities installed, in accordance with the Instructions to Bidders for Construction Projects (3.B.3)

III. DRAWINGS AND ATTACHMENTS

Abbreviated Set:

CS Cover Sheet A-1 Building 1: New Women’s & Family Restrooms; New Women’s Jockey

Dressing Room A-2 Building 2: New Men’s Restroom & Janitor’s Closet; New Men’s Jockey

Dressing Room A-3A Dimensioned Wall Locations Plans A-3B Partition Types and Details A-3C Partition Types and Details A-4A Room Floor Areas (including Offices) A-4C Reflected Ceiling Plans A-4D Electrical Outlet Plans A-5 Building 1 – Interior Elevations A-6 Building 2 – Interior Elevations

I. DETAILED SPECIFICATIONS
A. SCOPE:
a. Design, build, and install new mini-split heat-pump systems (optimal cooling; low-ambient heating) for Buildings 1 and 2 containing the women’s and men’s restrooms, jockey dressing rooms, and two-story office area. Prepare drafted shop drawings and...
1) New HVAC systems shall be complete installations to include all duct work; air handlers; compressors; electric whips; refrigerant lines; refrigerant line insulation; refrigerant line covers; condensate drains; blowers; evaporator coils; digital the...
2) The new units shall be the following:
i. Women’s Building (Building 1): One outdoor unit; one ducted concealed indoor unit to serve the Women’s Jockey Dressing Room and Family Restroom; one ductless ceiling mounted unit to serve the Women’s Restroom.
ii. Men’s Building (Building 2): One outdoor unit; one ducted concealed indoor unit to serve the Men’s Restroom and adjacent Accessible Bathroom; one ductless ceiling mounted unit to serve the Men’s Jockey Dressing Room.
iii. Office Spaces (Building 1, adjacent to Family Restrooms and Mechanical Room): One outdoor unit; two wall mounted indoor units, one on each of Floors 1 and 2.
iv. The systems in the restroom, dressing room, and shower spaces are primarily for cooling and humidity reduction but will need to provide light heating during the winter to maintain a setback/freeze-protection setpoint of 50 degrees F.
v. Refer to the Basis-of-Design systems herein and the construction drawings for areas of the spaces to be served.
3) Install three new 4” thick concrete pads with 4” of compacted #57 stone base, properly sized to fit the new outdoor units. Outdoor units shall include an offset stand to separate the new pad from the bottom of the units.
4) Install three ducted exhaust fans: one in front of the showers in the Women’s Jockey Dressing Room of Building 1; one in front of the showers in the Men’s Jockey Dressing Room in Building 2; and one in the Janitor’s Closet in Building 2. Installati...
5) Prepare a Owner’s Manual consisting of the shop drawings; ACCA Manual J calculations forming the bases for the designs; as-built drawings; product cut sheets & brochures; installation instructions; and maintenance & service manuals for all HVAC pro...
6) Clean up and all construction debris from the job site and properly dispose off of State Property.
B. QUALIFICATIONS OF THE CONTRACTOR:
1. The Contractor shall be licensed in the State of Maryland as a General Contractor to perform work associated with this project.
2. The Contractor shall have a minimum of three (3) years’ experience performing similar construction projects. Upon request, the Contractor shall supply a list of other similar, completed projects to the DNR Procurement Officer for review.
3. The Contractor shall employ a HVAC contractor licensed in Cecil County, MD to perform specified work.
4. The Contractor shall employ an Electrical contractor licensed in Cecil County MD perform all electrical work.
C. SITE VISIT:
1. All prospective bidders are encouraged to attend the Pre-bid conference meeting and familiarize themselves with the requirements for the project. Failure to attend the Pre-bid conference meeting, or visit the site, will not relieve the successful b...
2. No allowance will be made for errors on the Contractors part for failure to take into consideration any conditions or circumstances existing at the site which might affect the specified work.
3. Prior to any site visit (other than the Pre-Bid Conference), contact the Fair Hill NRMA Facility Manager, Chris Grieco, (410) 398-1246 to arrange for access to the project site.
D. SCHEDULE OF WORK
American Concrete Institute (ACI)
American Lumber Standard Committee, Inc. (ALSC)
American National Standards Institute (AWI)
Architectural Woodwork Institute (AWI)
American Welding Society (AWS)
American Society for Testing Materials International (ASTM)
Copper Development Council (CDA)
Concrete Reinforcing Steel Institute (CRSI)
Master Painters Institute (MPI)
National Association of Architectural Metal Manufacturers (NAAMM)
National Lumber Grades Authority (NLGA)
National Roofing Contractors Association (NRCA)
National Ready Mixed Concrete Association (NRMCA)
National Stone, Sand & Gravel Association (NSSGA)
Southern Pine Inspection Bureau (SPIB)
Sealant, Waterproofing, & Restoration Institute (SWRI)
Tile Roofing Institute (TRI)
4. All work shall be performed in accordance with the Environmental Protection Agency (EPA) and the Maryland Department of the Environment (MDE).
5. All work must be installed according to the manufacturers’ written instructions.
6. The Contractor shall obtain a third-party electrical inspection from a non-governmental inspection agency approved by the State Fire Marshal’s office. Upon completion of the project, the Contractor shall provide an approved electrical inspection ce...
F. MATERIALS AND SUPPLIES:
1. General:
a. All materials shall be as specified or approved equal by the DNR Project Manager. In the event the Contractor would like to substitute materials other than those that have been specified, the Contractor shall submit to the DNR Project Manager all p...
b. All materials shall be new and where applicable shall be delivered to the job site with labels intact and legible.
c. The Contractor shall be responsible for the coordination, off-loading and proper storage of all materials and supplies up until the time of final inspection.
d. Materials shall be stored in a safe area out of the way of traffic. Any on-site storage location shall be approved by the Facility Manager prior to the storage of any materials on-site. All materials shall be stored up off the ground surface and s...
e. Any materials or supplies, which have not been specifically mentioned, but are necessary for the complete, safe and satisfactory completion of the project, shall be provided by the Contractor as if specified herein.
f. All electrical and mechanical fixtures, devices, wiring, etc. shall be UL Listed.
1. General:
a. All work shall be as called for in these written specifications.
b. The Contractor shall coordinate all work with the various trades and material suppliers in order to complete the project expeditiously and within the time limits of the contract. The sequence of events shall be left up to the Contractor.
c. All work shall be performed in the best and most professional manner possible by mechanics skilled in their respective trades.
d. All work shall be performed to minimize disruption to facility operations. It is understood that the Contractor shall maintain accessibility throughout the project.
e. The Contractor shall provide and install adequate barricades, signs, etc., necessary to ensure public safety as approved by the Facility Manager.
f. The Contractor shall adhere to OSHA/MOSHA regulations throughout the project to ensure the safety of his/her employees, state employees, and the public.
g. The Contractor shall maintain the work site(s) in a safe, neat and orderly manner throughout the entire project. The Contractor shall take steps to prevent the accumulation of debris at the job site(s).
h. Any work that has not been specifically mentioned but is reasonably implied and is necessary for the safe and the satisfactory completion of the project, shall be performed by the Contractor as if specified herein.
i. Where applicable, all materials and supplies shall be installed in accordance with the manufacturer’s written instructions as if specified herein.
2. Execution Specifics:
a. Installation shall take place only after product submittals and shop drawings have been reviewed and approved by DNR. Shop drawings for the HVAC and wiring shall be prepared under the supervision Maryland licensed Professional Engineer and Master ...
b. It shall be the responsibility of the Contractor to determine the most efficient way for the routing of the new ductwork, refrigerant lines and wiring.
c. It shall be the responsibility of the Contractor to coordinate with the work of others, including DNR’s In-house Construction Crew and the Contractors responsible for installing plumbing fixtures and toilet accessories and the wall and ceiling fini...
d. All existing interior ceiling, wall and floor finishes shall be protected from damage. If any cutting of finishes is necessary during the work of this contract, notify the contractors responsible for installing those finishes in advance.
e. New electrical wiring for the HVAC and lighting systems will overlap the electrical work of others. Coordinate with DNR’s In-house Construction Crew and the DNR electrician responsible for installing the electrical service panels and power wiring a...
f. Coordinate with DNR’s In-house Construction Crew for access to concealed and semi-concealed spaces and rooms.
g. Exterior refrigerant linesets shall be covered for their full extent by the specified weather resistant PVC, UV stabilized & fire-resistant covers.
h. All mechanical appliance and lighting circuits not protected by GFCI breakers must be protected by an AFCI breaker in accordance with NEC Code Requirements.
f. Remove and properly dispose of excess materials and debris off State property.
H. WARRANTY AND GUARANTEE:
A. ADD ALTERNATES:
None
B. UNIT PRICES:
C. Allowances:
None