6-SECTION 00 42 43 - PROPOSAL FORM.pdf

PDF 190 KB Posted

Attached to
ITB - Re-Bid Athletic Field Improvements at Rockwood, Rolling Hills, Northwest Community and Gateway Parks
Solicitation number
27-0018
Issued by
Tarrant County, Fort Worth City, Texas

About this file

This is a bid proposal form for the City of Fort Worth's re-bid athletic field improvements project, which encompasses work at four parks: Rockwood Park, Rolling Hills Soccer Complex, Northwest Community Park, and Gateway Park. The base bid includes four main units of work: Unit 1 focuses on Rockwood Park Field No. 4 improvements with sod turf grass removal and replacement, infield mix removal and installation, base and home plate equipment, irrigation improvements, and electrical improvements; Unit 2 addresses Rolling Hills Soccer Complex improvements with similar turf and infield work; Unit 3 covers Northwest Community Park improvements including the installation of four shade structures; and Unit 4 encompasses Gateway Park improvements. The project includes five alternate bid units (Units 5-8) for additional Rockwood Park field improvements and Unit 9 consisting of allowance bid items totaling $185,000.00 across all four parks. Specific quantities are provided for each line item, including sod removal and replacement measured in square yards, infield mix work, equipment installations as lump sums, and shade structures counted by unit.

The proposal form provides a structure for bidders to enter unit prices and calculate total bid values for each line item, with subtotals established for each unit and final totals for base bid and alternate bid components. The allowance items in Unit 9 are pre-priced at specified amounts, ranging from $1,000.00 to $15,000.00 per allowance across the four parks. No specific contract term, renewal options, response deadlines, or award dates are indicated on this form. The document follows the City of Fort Worth's Standard Construction Specification Documents format and does not identify any set-asides, incumbent contractors, or specific funding sources within the proposal form itself.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

00 42 43

BID PROPOSAL

1-01 Remove & Replace Block Sod Turf Grass 32 92 23 SY 50 1-02 Remove Existing Infield Mix 3" Depth 32 11 23 SY 1,490 1-03 Install Pro Play Classic Infield Clay Mix 3" Depth 32 11 23 SY 1,685 1-04 Install 5' Wide Block Sod Turf Strip 32 92 23 SY 205

1-05 Purchase and Installation of a set of base anchors and plugs, home plate and a pitching rubber. 11 67 13 LS 1

1-06 Irrigation Improvements 32 80 00 LS 1 1-07 Electrical Improvements 26 56 68 SF LS 1

2-01 Electrical Improvements 26 56 68 SF LS 1

3-01 Install Shade Structure 99 99 00 EA 4

4-01 Remove & Replace Block Sod Turf Grass 32 92 23 SY 800 4-02 Remove Existing Infield Mix 3" Depth 32 11 23 SY 9,895 4-03 Install Pro Play Classic Infield Clay Mix 3" Depth 32 11 23 SY 9,890 4-04 Install 5' Wide Block Sod Turf Strip 32 92 23 SY 800

4-05 Purchase and Installation of a set of base anchors and plugs, home plate and a pitching rubber. LS 1

4-06 Irrigation Improvements 32 80 00 LS 1 4-07 Electrical Improvements 26 56 68 SF LS 1

Sub-Total Unit 3 -

UNIT 4 - GATEWAY PARK IMPROVEMENTS (SEE PLAN SHEETS 5-14)

Sub-Total Unit 4 -

UNIT 2 - ROLLING HILLS SOCCER COMPLEX IMPROVEMENTS (SEE PLAN SHEETS 15-16)

Sub-Total Unit 2 -

UNIT 3 - NORTHWEST COMMUNITY PARK IMPROVEMENTS (SEE PLAN SHEETS 23-24)

SECTION 00 42 43

PROPOSAL FORM

Description

Project Item Information Bidder's Proposal

UNIT PRICE BID Bidder's Application

Specification Section No.

Bid Quantity Unit Price Bid ValueBidlist Item

No.

UNIT 1 - ROCKWOOD PARK IMPROVEMENTS FIELD NO. 4 (SEE PLAN SHEETS 17-22)

Unit of Measure

BASE BID

Sub-Total Unit 1 -

CITY OF FORT WORTH

STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS

Revised 9/19/2025 00 41 00 Bid Proposal Workbook_CPN. 105169 105170 105868_unlocked.xlsx

SECTION 00 42 43

PROPOSAL FORM

Description

Project Item Information Bidder's Proposal

UNIT PRICE BID Bidder's Application

Specification Section No.

Bid Quantity Unit Price Bid ValueBidlist Item

No.

Unit of

Measure

5-01 Purchase and Installation of Light Poles including pole, fixture, and foundation 26 56 00 LS 1

5-02 Purchase and Installation of branch circuit to Light Pole including (3) #10s, 1" PVC Conduit. 26 05 33 LS 1

5-03 Trenching for proposed 1" PVC conduit 31 00 00 LS 1

6-01 Remove & Replace Block Sod Turf Grass (Gate Area) 32 92 23 SY 100 6-02 Remove Existing Infield Mix 3" Depth 32 11 23 SY 9,318 6-03 Install Pro Play Classic Infield Clay Mix 3" Depth 32 11 23 SY 9,318 6-04 Install 5' Wide Block Sod Turf Strip (Infield Strip) 32 92 23 SY 150

6-05 Purchase and Installation of a set of base anchors and plugs, home plate and a pitching rubber. 11 67 13 LS 1

7-01 Remove & Replace Block Sod Turf Grass (Maintenance Gate Area) 32 92 23 SY 100

7-02 Remove Existing Infield Mix 3" Depth 32 11 23 SY 9,050 7-03 Install Pro Play Classic Infield Clay Mix 3" Depth 32 11 23 SY 9,050 7-04 Install 5' Wide Block Sod Turf Strip (Infield Strip) 32 92 23 SY 150

7-05 Purchase and Installation of a set of base anchors and plugs, home plate and a pitching rubber. 11 67 13 LS 1

8-01 Remove & Replace Block Sod Turf Grass (Maintenance Gate Area) 32 92 23 SY 440

8-02 Remove Existing Infield Mix 3" Depth 32 11 23 SY 8,505 8-03 Install Pro Play Classic Infield Clay Mix 3" Depth 32 11 23 SY 8,505 8-04 Install 5' Wide Block Sod Turf Strip (Infield Strip) 32 92 23 SY 150

8-05 Purchase and Installation of a set of base anchors and plugs, home plate and a pitching rubber. 11 67 13 LS 1

Sub-Total Unit 5 -

ALTERNATE BID

UNIT 5 - ALTERNATE - ROCKWOOD PARK IMPROVEMENTS (SEE PLAN SHEETS 17-22)

UNIT 6 - ALTERNATE - ROCKWOOD PARK IMPROVEMENTS FIELD NO. 1

Sub-Total Unit 6 -

UNIT 7 - ALTERNATE - ROCKWOOD PARK IMPROVEMENTS FIELD NO. 2

Sub-Total Unit 7 -

UNIT 8 - ALTERNATE - ROCKWOOD PARK IMPROVEMENTS FIELD NO. 3

Sub-Total Unit 8 -

CITY OF FORT WORTH

SECTION 00 42 43

PROPOSAL FORM

Description

Project Item Information Bidder's Proposal

UNIT PRICE BID Bidder's Application

Specification Section No.

Bid Quantity Unit Price Bid ValueBidlist Item

No.

Unit of

Measure

9-01 Rockwood Park Allowance LS 1 $1,000.00 $1,000.00 9-02 Rockwood Park Allowance LS 1 $2,500.00 $2,500.00 9-03 Rockwood Park Allowance LS 1 $5,000.00 $5,000.00 9-04 Rockwood Park Allowance LS 1 $7,500.00 $7,500.00 9-05 Rockwood Park Allowance LS 1 $9,000.00 $9,000.00 9-06 Rockwood Park Allowance LS 1 $10,000.00 $10,000.00 9-07 Rockwood Park Allowance LS 1 $15,000.00 $15,000.00 9-08 Rolling Hills Park Allowance LS 1 $1,000.00 $1,000.00 9-09 Rolling Hills Park Allowance LS 1 $2,500.00 $2,500.00 9-10 Rolling Hills Park Allowance LS 1 $5,000.00 $5,000.00 9-11 Rolling Hills Park Allowance LS 1 $7,500.00 $7,500.00 9-12 Rolling Hills Park Allowance LS 1 $9,000.00 $9,000.00 9-13 Rolling Hills Park Allowance LS 1 $10,000.00 $10,000.00 9-14 Rolling Hills Park Allowance LS 1 $15,000.00 $15,000.00 9-15 Northwest Community Park Allowance LS 1 $2,500.00 $2,500.00 9-16 Northwest Community Park Allowance LS 1 $7,500.00 $7,500.00 9-17 Northwest Community Park Allowance LS 1 $10,000.00 $10,000.00 9-18 Northwest Community Park Allowance LS 1 $15,000.00 $15,000.00 9-19 Gateway Park Allowance LS 1 $1,000.00 $1,000.00 9-20 Gateway Park Allowance LS 1 $2,500.00 $2,500.00 9-21 Gateway Park Allowance LS 1 $5,000.00 $5,000.00 9-22 Gateway Park Allowance LS 1 $7,500.00 $7,500.00 9-23 Gateway Park Allowance LS 1 $9,000.00 $9,000.00 9-24 Gateway Park Allowance LS 1 $10,000.00 $10,000.00 9-25 Gateway Park Allowance LS 1 $15,000.00 $15,000.00

$185,000.00Sub-Total Unit 10 -

UNIT 9 - ALTERNATE - ALLOWANCE BID ITEMS

CITY OF FORT WORTH

SECTION 00 42 43

PROPOSAL FORM

Description

Project Item Information Bidder's Proposal

UNIT PRICE BID Bidder's Application

Specification Section No.

Bid Quantity Unit Price Bid ValueBidlist Item

No.

Unit of

Measure

9 $185,000.00

$185,000.00

11 $185,000.00

$185,000.00

UNIT 5 - ALTERNATE ROCKWOOD PARK IMPROVEMENTS

UNIT 6 - ALTERNATE ROCKWOOD PARK IMPROVEMENTS FIELD NO. 1

UNIT 7 - ALTERNATE ROCKWOOD PARK IMPROVEMENTS FIELD NO. 2

TOTAL BID -

UNIT 8 - ALTERNATE ROCKWOOD PARK IMPROVEMENTS FIELD NO. 3

UNIT 9 - ALTERNATE ALLOWANCE BID ITEMS

ALTERNATE BID-Totals -

BASE BID TOTALS

ALTERNATE BID TOTALS

UNIT 2 - ROLLING HILLS SOCCER COMPLEX IMPROVEMENTS

UNIT 3 - NORTHWEST COMMUNITY PARK IMPROVEMENTS

UNIT 4 - GATEWAY PARK IMPROVEMENTS

BASE BID-Totals -

ALTERNATE BID

Bid Summary

BASE BID

UNIT 1 - ROCKWOOD PARK IMPROVEMENTS FIELD NO. 4

END OF SECTION

CITY OF FORT WORTH

00 42 43

File details come from the government source that posted it. Updated .