This is an architectural drawing and project specification document for Harris Health's radiographic X-ray room renovation project at the Gulfgate Health Center, located at 7550 Office City Drive, Houston, Texas 77012. The project scope involves a minor renovation of a single radiology room with replacement of medical equipment, affecting approximately 280 square feet of the facility's total 33,925 square feet. The work is classified as an Alteration—Level 2 under the 2021 International Existing Building Code and must comply with the 2021 International Building Code, 2021 International Fire Code, 2023 National Electric Code, and other applicable Houston municipal codes including 2012 Texas Accessibility Standards. The project maintains the existing occupancy type (Type B) and does not increase occupant load or require egress modifications. The document was issued for invitation for bids/public comments (IFBPC) on October 13, 2025. Design consultants include Infrastructure Associates, Inc. for structural engineering, Dally + Associates, Inc. for general construction, and an MEP engineer from AutoArch.
The project specification establishes detailed requirements for structural steel conforming to ASTM standards, welding specifications complying with American Welding Society standards, and comprehensive demolition and construction protocols requiring contractor responsibility for structural connections, shop drawing submissions, and coordination with mechanical, electrical, and plumbing trades. Special inspections are required for high-strength bolting, welding of structural steel, and full penetration groove welds. All existing accessibility requirements must be maintained or improved, and the work includes provisions for new electrical, mechanical, and plumbing equipment installations compliant with applicable code sections. The estimated project budget is $850,000, and the document emphasizes that contractors must field-verify all conditions and dimensions, coordinate with other trades, and obtain architect approval for any deviations from the drawings and specifications.
View the file
Other files
Show all 16
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
MEP Engineer www.autoarch.net
(713) 952 - 3366
Structural Engineer
Issued For: IFBPC October 13, 2025
HH ACS CLINICS RADIOLOGY
7550 Office City Dr Houston, TX 77012
INFRASTRUCTURE ASSOCIATES, INC.
(713) 622-0120
GULFGATE HEALTH CENTER
DALLY + ASSOCIATES, INC.
(713) 337-8881
COURTYARD
G403
G402
G404
G405G406
G401
G409A
G409
G410
G408 G407
G400
G411
G412
G416
G413
G415
G414
G280C G280B
G280A
G280
G282B
G282A
G282 G281A
G281B
G281
G260L
G260R
G261AG261B
G262
G261
G263
G266
G267
G264 G268
G247
G242
G246 G245
G244
G248 G249
G243 G241
G240
G250
G101C
G320
G376
G360 G361
G370
G375 G374 G373 G372
G369
G368
G367 G366
G365 G364G363G362
G356
G355 G354 G353
G341 G340
G342 G343 G344 G345
G346
G352 G351
G350
G347 G348 G349
G336 G335 G334 G333
G332 G331
G330
G321
G322 G323 G324 G325 G326 G327 G328 G329
G316
G315 G314 G313 G312
G311 G310
G301
G300B G302 G303 G304 G305 G306 G307 G308
G309
G300A
G121
G120
G122
G113A
G115A
G116 G117
G118
G119
G114A
G101
G113
G114
G105
G106 G107
G108
G109
G110
G111
G112A
G112
G104
G105A
G100
G102 G103
G200
G101B
G101A
G300
G230
G232
G233
G220
G226
G234
G234A
G231
G221
G225
G224
G222
G22?
G211 G210
G208 G206 G204
G202
G202
G218
G216
G209 G207 G205
G212
G214
G213
G215
G217
MED DIRECTOR
OFFICE
NURSE SUP
OFFICE
PHYSICIAN
LIBRARY
CLEAN
HOLDING
SOILED
UTILITY
JAN
DR LOUNGE
STAFF
LOUNGE
MECH
STAFF
TLT
STAFF
TLT
CORRIDOR
ELEC
TELE
CENTRAL
STORES
BIO-
HAZARD
EQUIP
STORAGE
BLOOD
DRAW
BLOOD
DRAW
BLOOD
DRAW
PVT
CIRC
STORAGE
OFFICE
LABORATORY
TOILET
TOILET
WAITING
RECEPTION
LABORATORY
RECEPTION
RADIOLOGY
DRESSDRESS
ULTRASOUND
PVT
CIRC
OFFICE
FILM
PROCESS
OFFICE
RADIOLOGY CLASSROOM
PROCEDURES
PVT
CIRC
EXAM EXAM
NURSE
STATION
EXAM EXAM
TOILET JAN
WAITING
CORRIDOR
VENDING
WAITING
NURSE
STATION
WAITING PVT
CIRC
SPECIAL
PROCEDURES
EXAM EXAM EXAM EXAM
PHYSICIAN
WORK
SUB-
STATION
EXAM
EXAM
EXAM
EXAMEXAMTOILET
NURSE
STATION EXAM EXAM EXAM
PVT
CIRC
WAITING
TOILET
EXAM EXAM EXAM
EXAM
SUB-
STATION EXAM
PROCEDURES
EXAM SUB-
STATION
PHYSICIAN
WORK
NURSE
STATION EXAM EXAM EXAM
SUB-
STATION
EXAM
PROCEDURES
PVT
CIRC
TOILET EXAM EXAM EXAM EXAM EXAM SUB-
STATION
PHYSICIAN
WORK
NURSE
STATION EXAM EXAM EXAM
SUB-
STATION EXAM
PROCEDURES
PVT
CIRC
ILL
WAITING
TOILET
EXAM EXAM EXAM EXAM EXAM SUB-
STATION
PHYSICIAN
WORK
OB CENTERING
PROGRAM
ADMIN
CONFERENCE
OFFICE
MANAGER
VOLUNTEER COORD
TELEMEDICINE
ELEC
PVT
CIRC
WORK
ROOM
OFFICE
CLINIC
DIRECTOR
NURSE
MANAGER
OFFICE
CORRIDOR
ACS CRN OFFICE
OFFICE
PATIENT EDUCATION
OFFICE
CASE MGR.
OFFICE BEHAVIORAL
HEALTH
BEHAVIORAL
HEALTH
STOR
OFFICE
TOILET
WAITING
PVT
CIRC
RETINAL
CAMERA
STORAGE
VESTIBULE
F TOILET M TOILET
WAITING
SECURITY
LOBBY/
INFO
WAITING
WAITING
REGISTRATION
CASHIER
WAITING
CORRIDOR
HEALTH INFO
MANAGEMENT
OFFICE
VESTIBULE
PHARMACY
SUPERVISOR
STORAGE
CONSULT
VEST
OFFICE OFFICE
EXAM EXAM EXAM
NURSE
STATION
NURSE
STATION
PATIENT
TOILET
EXAM
EQUIP
ROOM
PREP
ROOM
ALCOVE
AREA
PHYS
WORKROOM
EXAM
OFFICE
EXAM
CLEAN
SUPPLY
N a rc o ti c s
Drug Storage
Work Area 2
Precription Pick-Up
24x48 return
BBF
Dispensing Islands
HOUSTON
KATY
SUGAR
LANDROSENBERG
BAYTOWN
GALVESTON
THE WOODLANDS
SITE LOCATION
APPLICABLE CODES (CITY OF HOUSTON, 2020)
2021 INTERNATIONAL BUILDING CODE (WITH COH AMENDMENTS)
2021 INTERNATIONAL FIRE CODE (WITH COH AMENDMENTS)
2021 EXISTING BUILDING CODE (WITH COH AMENDMENTS)
2023 NATIONAL ELECTRIC CODE (NEC)
2021 UNIFORM MECHANICAL CODE (UMC, WITH COH AMENDMENTS)
2021 UNIFORM PLUMBING CODE (UPC, WITH COH AMENDMENTS)
2021 IECC COMMERCIAL PROVISIONS WITH COH AMENDMENTS
2012 TEXAS ACCESSIBILITY STANDARDS.
CODE REQUIREMENTS
I: SCOPE DEFINITION:
A: THE PROJECT SHALL BE CONSTRUCTED AS ALTERATION - LEVEL 2, DEFINED BY THE 2021
INTERNATIONAL EXISTING BUILDING CODE (IEBC) SECTION 603, AND GOVERNED BY
CHAPTERS 8 OF THE IEBC, AND INDICATED CHAPTERS OF THE 2021 INTERNATIONAL
BUILDING CODE (IBC).
II: EXISTING BUILDING REQUIREMENTS:
A: EXISTING ACCESSIBILITY REQUIREMENTS SHALL NOT BE LESSENED BY THE WORK OF THIS
PROJECT. NEW WORK WILL MEET THE REQUIREMENTS OF THE CURRENT (2012) TEXAS
ACCESSIBILITY STANDARDS.
B: THERE ARE NO AREAS WHERE ACCESSIBILITY REQUIREMENTS HAVE BEEN DEEMED
TECHNICALLY INFEASIBLE.
C: NEWLY INSTALLED ELECTRICAL EQUIPMENT WILL COMPLY WITH THE REQUIREMENTS OF
SECTION 806 OF THE 2021 INTERNATIONAL EXISTING BUILDING CODE (IEBC).
D: NEWLY INSTALLED MECHANICAL EQUIPMENT WILL COMPLY WITH THE REQUIREMENTS OF
SECTION 807 OF THE 2021 INTERNATIONAL EXISTING BUILDING CODE (IEBC).
E: NEWLY INSTALLED PLUMBING EQUIPMENT WILL COMPLY WITH THE REQUIREMENTS OF
SECTION 808 OF THE 2021 INTERNATIONAL EXISTING BUILDING CODE (IEBC).
F: EXISTING BUILDING IS NOT SPRINKLERED. THE WORK WILL HAVE NO EFFECT ON
EXISTING RATINGS.
E: EGRESS WILL COMPLY WITH THE REQUIREMENTS OF THE 2021 IBC AS INDICATED BELOW.
THE PROJECT DOES NOT QUALIFY AS A SINGLE-EXIT BUILDING; NOR WILL THE WORK
REQUIRE EGRESS TO INCLUDE A FIRE ESCAPE AS ALLOWED IN THE 2021 IEBC.
III: FINISH REQUIREMENTS:
A: ALL WALL AND CEILING FINISHES ON CORRIDORS AND ENCLOSED SPACES WITHIN THE
SCOPE OF WORK SHALL BE CLASS 'B' IN ACCORDANCE WITH 2021 IBC TABLE 803.13.
B: ALL FLOOR FINISHES WITHIN THE SCOPE OF WORK SHALL BE TYPE I OR TYPE II IN
ACCORDANCE WITH 2021 IBC SECTION 804
C: DUE TO EXISTING TYPE II CONSTRUCTION OF SHELL, 2021 IBC SECTION 805 FOR
COMBUSTIBLE MATERIALS IS IN EFFECT.
IV: EGRESS:
1: MAXIMUM EGRESS TRAVEL DISTANCES (CHAPTER 10, 2021 IBC)
• MAX OCCUPANT LOAD OF SINGLE EXIT SPACE: 49 (TABLE 1006.2.1, 2021 IBC)
• MAX COMMON PATH OF TRAVEL: 100' (TABLE 1006.2.1, 2021 IBC)
• MAX EXIT TRAVEL DISTANCE: 300' (TABLE 1017.2, 2021 IBC)
2: NO RATINGS ARE REQUIRED ON CORRIDORS DUE TO SPRINKLER SYSTEM, RE: TABLE
1020.2, 2021 IBC.
3: THE FUNCTION OF THE SPACE REMAINS AND NO SQUARE FOOTAGE IS ADDED.
THEREFORE, THE OCCUPANT LOAD OF THE SPACE IS NOT INCREASED BY THE WORK
PROPOSED; HENCE FURTHER OCCUPANT LOAD CALCULATIONS HAVE NOT BEEN PROVIDED.
NOTE: PROJECT DOES NOT INCLUDE ANY SITE WORK.
PROJECT INFORMATION
PROJECT LOCATION: 7550 OFFICE CITY DR
HOUSTON, TX 77012
PROJECT SCOPE: MINOR RENOVATION OF RADIOLOGY ROOM AND REPLACEMENT OF MEDICAL
EQUIPMENT
BUILDING FLOORS: 1 FLOORS
FLOOR AREAS:
BUILDING TOTAL: 33,925 sf
AREA OF SCOPE : 280 sf
SPRINKLERED: 100%
OCCUPANCY TYPE: B
EXISTING II-B
CONSTRUCTION Note: Existing Floors, Columns, Shafts, and Chases, are Unaffected by TYPE: this Project. Exterior walls are unaffected.
TDLR No. TABS2026003503
PROJECT SITE
SCOPE OF AREA
BUILDINGBLDG.
SHEATHINGSHEATH.
STRUCTURAL
SQUARE
TONGUE & GROOVE
TOP OF DRAIN
WEATHERPROOF
WELDED WIRE FABRIC
TOP OF CURB/CONCRETE
SPECIFICATIONS
W.W.F.
T.D.
T & G
TYP.
W.P.
W/
T.O.
T.O.C.
STL.
STRUCT.
SQ.
SIM.
SPECS.
TYPICAL
WITH
TOP OF
STEEL
SIMILAR
HOUR
H.M.
HR.
HOLLOW METAL
POUNDS
MAXIMUM
MOUNTED
MINIMUM
ON CENTER
OPPOSITE
NUMBER
HEATING VENTILATING & AIR CONDITIONING
OUTSIDE DIMENSION
MISCELLANEOUS
MASONRY OPENING
NOT IN CONTRACT
NOT TO SCALE
INSIDE DIMENSION
MANUFACTURER
REQUIRED
PLYWOOD
ROUGH OPENING
POUNDS PER SQUARE FOOT
POUNDS PER SQUARE INCH
REFER TO, REFERENCE FROM
ORIENTED STRAND BOARD
N.I.C.
O.S.B.
RE:
REQ'D
R.O.
P.S.F
P.S.I
PLYWD.
O.C.
O.D.
OPP.
NO.
NTS
MAX.
MISC.
MTL.
MT'D.
M.O.
MIN.
MFR.
I.D.
LBS.
IN.
H.V.A.C.
HT.
METAL
INCH
HEIGHT
COLUMN
CENTER LINE
CONTINUOUS
CYLINDER
DIAMETER
CONCRETE
ELEVATION
FINISHED
EXTERIOR INSULATION
FIRE-RETARDENT WOOD TREATMENT
DOCUMENTS/DRAWINGS
FLOOR DRAIN
FACE OF MASONRY
FACE OF CURB/CONCRETE
EXTERIOR SPECIAL COATING
CONCRETE MASONRY UNITS
CUBIC FEET PER MINUTE
GRADE LEVEL
GYPSUM BOARD
GALVANIZED IRON OR STEEL
GALVANIZED
E.S.C.
FR-S
G.I.
GYP. BD.
G.L.
GALV.
GA.
FIN.
F.O.M.
FLR.
FT.
F.O.C.
F.D.
GAUGE
FLOOR
FEET
CYL.
EA.
E.I.F.S.
ELEV.
DOCS.
CMU
COL.
CONT.
CONC.
CFM
LC
EACH
ABOVE FINISHED FLOOR
ALUMINUM
A.F.F.
ALUM.
& FINISH SYSTEM
COLD FORMED METAL FRAMINGCFMF
All Contractors and Bidders Must Read the Entirety of the Written Specifications and Drawings Contained in the Contract Documents.
This Set of Contract Documents includes both Technical Specifications and Drawings.
The Installation / Application Information Herein is not to be considered complete unless all of the sheets listed in the index are present.
These Contract Documents are the Diagrammatic Expression of the Architect's Design Intentions. Contractors Shall Never Scale the Documents for Measurements used in Construction.
Architect is Responsible Only for those Underground Utilities and Tie-In Locations that Appear Accurately on the County's Record Drawings. Any Deviation from these Records Shall be Independently Verified and Located by the General Contractor.
These Contract Documents are the Instrument of Services Rendered, and Shall Remain the Property of the Architect whether the Project For Which they are Made is Executed or Not. Any Use of these Construction Documents for Purposes other than the Execution of This Project, without the Architect's Consent, is Prohibited.
Any Unauthorized Use of these Contract Documents is at the Sole Risk of the User.
Only the Most Current Signed and Sealed Drawings and Specifications Shall Be Used for Bidding, Permitting, and Construction Purposes.
The Drawings Indicate the Overall Design Intent, as well as Dimension and Quantity of Building Materials, Products, and Components to be Placed or Installed.
The Specifications Contain Bidding and Procedural Information, as well as Quality, Preparation, and Installation Requirements for Building Materials, Products, or Components that are being Placed or Installed.
All Work Required to Complete the Project, Including Work Not Specified or Indicated in these Documents but Necessary for the Project's Completion, shall meet General Professional Standards, Applicable Codes and Regulations, and Manufacturer's Recommendations - in cases of conflict between these requirements, the more stringent requirements shall be applied.
Contractor shall Field Verify All Conditions and Dimensions, with Special Attention Given to Building Location, Grid Line, and Structural Dimensions.
All Contractors shall Coordinate their Work with that of other Contractors working on Site, and shall comport themselves in a Professional Manner. Concerns shall be brought to the attention of the General Contractor. The General Contractor shall be responsible for the Coordination of Subcontractors Work, in Accordance with these Contract Documents.
Contractor Shall Notify the Architect of any Discrepancies between Drawings, Specifications, and Site Conditions immediately upon their discovery.
All Contractors Working on this Project Must Abide by All Applicable Federal, State, and Local Codes and Ordinances, as well as the Requirements of the Development in which the Project is Located. Any conflicting Requirements, or Requests for Interpretation of Requirements, shall be called to the Architect's Attention Prior to the Start of Work.
Deviations from the Drawings and Specifiations are Prohibited without Express Written Approval of the Architect.
All Controls shall be mounted at 42" Above Finished Floor, Unless Indicated Otherwise.
A separate Book Spec is part of these Contract Documents. The Contract Documents are not to be considered complete unless the Book Spec is included.
06/A2.10
A
TRUE NORTHNORTH
/A .0
NORTH ARROW
Each drawing is numbered preceding the drawing title.
In this example, drawing "1" represents the first drawing on a sheet of the architectural discipline, an "ELEVATION". Followed by a description, "AT NEW OFFICE 100", and drawing scale " 1/8" = 1'-0":
Drawing Number
Drawing Title
Each sheet is numbered as illustrated above.
In this example the sheet title is "Floor Plan" and the sheet number is "A2.00"
SECTION DETAIL
ENLARGED DETAIL
PARTITION TYPE
COLUMN GRID LINE
DOOR NUMBER KEY
WINDOW TYPE KEY
A
001A
A 2.00
FLOOR PLAN
SCALE: 1/8" : 1'-0"
ELEVATION01
02/A6.02
05/A5.10
05/A8.03
BUILDING SECTION
WALL SECTION
BUILDING ELEVATION
05/A8.03
INTERIOR ELEVATION
A
FIRE RATED NOT RATED
Earth
Concrete
Brick
SECTIONS & PLAN DETAILS
Concrete Masonry Units (CMU)
Dimensional Wood
Blocking
Finished Wood
Thermal Batt Insulation
Sound Attenuation Batts (SABs)
Rigid Insulation
Continuous
PLANS
Plywood
Vinyl Composition Tile
(VCT)
Luxury Vinyl Tile (LVT)
Carpet (CPT) or
ELEVATIONS
Vertical, Flat Vertical, Ribbed
Horizontal, Flat Horizontal, Ribbed
Metal Wall Panels
Aluminum Composite Material (ACM) Panels
Plaster or Stucco
Brick
Glazing
Drawing Title
Drawing Number
Approved By
Checked By
Drawn By
Project Number
CONSULTANTS:
KEY PLAN
TRUE NORTH PLAN NORTH
MEP ENGINEER
6200 Savoy, Suite 100 Houston, TX 77036 t (713) 952-3366 f (713) 952 5002 www.autoarch.net
STRUCTURAL ENGINEER
7550 Office City Dr Houston, TX 77012
HH ACS CLINICS
RADIOLOGY
Author
Checker
Approver
A0.00
PROJECT
INFORMATION
INFRASTRUCTURE ASSOCIATES, INC.
(713) 622-0120
GULFGATE
HEALTH CENTER
DALLY + ASSOCIATES, INC.
(713) 337-8881
PROJECT INFORMATION
Scale: NTS03
CODE INFORMATION
Scale: NTS01
SHEET INDEX
Scale: NTS04
Scale:nts06 PROJECT VICINITYPROJECT LOCATION Scale: NTS11
Scale: 1/16" = 1'-0"18 KEYPLAN
ABBREVIATIONS LEGEND
Scale: NTS16SYMBOLS LEGEND
Scale: NTS21
GRAPHICS LEGEND
Scale: NTS17 CONTRACTING NOTES
Scale: NTS12
SHEET # DRAWING TITLE IF
B
P C
GENERAL
1 --- COVER SHEET ●
2 A0.00 PROJECT INFORMATION ●
3 A0.01 ACCESSIBILITY INFORMATION ●
STRUCTURAL
1 S101 GENERAL STRUCTURAL CRITERIA ●
2 S201 EXISTING FRAMING PLAN & DETAILS ●
ARCHITECTURAL
1 A2.00 FLOOR PLANS & RCPs ●
2 A2.01 FINISH PLAN AND MILLWORK ●
MECHANICAL
1 M1-00 NOTES AND LEGEND ●
2 M2-00 HVAC PLANS AND DETAILS ●
ELECTRICAL
1 E1-00 NOTES AND LEGEND ●
2 E1-01 PANEL SCHEDULES AND DETAILS ●
3 E2-00 FLOOR PLANS - ELECTRICAL ●
PLUMBING
1 P1-00 NOTES AND LEGEND ●
2 P2-00 FLOOR PLAN - PLUMBING ●
TECHNOLOGY
1 T0.01 TECHNOLOGY ●
EQUIPMENT
XX PHILIP DRAWINGS (FOR REFERNCE ONLY) ●
NOTE: THIS PROJECT IS LIMITED TO THE RENOVATION OF A SINGLE
ROOM, MAINTAINING THE CURRENT USE AND FUNCTION.
CONSEQUENTLY, THERE IS NO ALTERATION TO THE OCCUPANCY TYPE
OR OCCUPANT LOAD. AS SUCH, EGRESS CALCULATIONS ARE NOT
INCLUDED IN THIS SUBMISSION.
# Date ISSUED FOR
10/13/2025 IFBPC
Drawing Title
Drawing Number
Approved By
Checked By
Drawn By
Project Number
CONSULTANTS:
KEY PLAN
TRUE NORTH PLAN NORTH
MEP ENGINEER
6200 Savoy, Suite 100 Houston, TX 77036 t (713) 952-3366 f (713) 952 5002 www.autoarch.net
STRUCTURAL ENGINEER
7550 Office City Dr Houston, TX 77012
HH ACS CLINICS
RADIOLOGY
Author
Checker
Approver
A0.01
ACCESSIBILITY
INFORMATION
INFRASTRUCTURE ASSOCIATES, INC.
(713) 622-0120
GULFGATE
HEALTH CENTER
DALLY + ASSOCIATES, INC.
(713) 337-8881
ACCESSIBILITY INFORMATION
Scale: NTS11
STRUCTURAL STEEL
A. ROLLED SHAPES:
1. ALL STRUCTURAL STEEL FOR ALL THE HORIZONTAL FRAMING MEMBER SHALL CONFORM
TO ASTM A992, GRADE 50, UNLESS OTHERWISE NOTED.
2. ALL STRUCTURAL STEEL FOR HOLLOW STRUCTURAL SECTIONS SHALL CONFORM TO ASTM
A500, GRADE B WITH A MINIMUM YIELD OF 46 KSI, UNLESS OTHERWISE NOTED.
3. ALL STRUCTURAL STEEL FOR PIPE SHALL CONFORM TO ASTM A53, TYPE E OR S, GRADE B, UNLESS OTHERWISE NOTED.
4. ALL STRUCTURAL STEEL FOR ANGLES, PLATES AND MISCELLANEOUS STEEL SHALL
CONFORM TO ASTM A36, UNLESS OTHERWISE NOTED.
5. ALL EXPOSED STEEL TO BE HOT DIPPED GALVANIZED.
B. CONNECTIONS:
1. THE DESIGN OF STRUCTURAL STEEL CONNECTIONS IS THE RESPONSIBILITY OF THE
CONTRACTOR AND THE STEEL FABRICATOR. THE DESIGN OF THE CONNECTION SHALL BE
PERFORMED BY A REGISTERED PROFESSIONAL ENGINEER EMPLOYED BY THE STEEL
FABRICATOR REGISTERED, IN THE JURISDICTION THAT THE PROJECT IS BEING
CONSTRUCTED. THE DETAILS AND CALCULATIONS SHALL INCLUDE, BUT NOT LIMITED TO,
THE FOLLOWING:
• ALL WELD SIZES AND LENGTHS
• ALL BOLT SIZES, LOCATIONS, QUANTITIES AND GRADES
• ALL PLATE AND ANGLE SIZES, THICKNESS AND DIMENSIONS
• ALL WORK POINT LOCATIONS AND RELATED INFORMATION.
2. PROVIDE STANDARD BOLTED CONNECTIONS CONFORMING TO AISC BOLTED
CONNECTIONS, USING ASTM A325 OR A490 BOLTS, FOR THE BEAM END SHEARS INDICATED
IN THE DOCUMENTS. PROVIDE MINIMUM OF TWO BOLTS FOR ALL CONNECTIONS.
3. ALL WELDED CONNECTIONS SHALL CONFORM TO AWS UNLESS OTHERWISE NOTED.
4. SURVEY ALL PLANS, DETAILS, SECTIONS, SCHEDULES AND SPECIFICATIONS FOR SPECIAL
CONNECTIONS.
5. UNLESS OTHERWISE NOTED AND/OR SPECIFIED, ALL BEAM CONNECTIONS SHALL BE
DESIGNED TO SUPPORT 1/2 THE TOTAL UNIFORM LOAD FOR THE APPLICABLE MEMBER SIZE
AND SPAN AS DETERMINED BY THE TABLES FOR ALLOWABLE UNIFORM LOADS ON BEAM IN
THE AMERICAN INSTITUTE OF STEEL CONSTRUCTION MANUAL (ASD)
6. WHERE BEAMS ARE TO RECEIVE HEADED SHEAR CONNECTORS, DESIGN THOSE BEAM
CONNECTIONS FOR THE REACTION SHOWN. IF REACTIONS ARE NOT SHOWN, DESIGN THE
CONNECTIONS TO SUPPORT 40 PERCENT OF THE MAXIMUM WEB SHEAR, V, FOR THE
APPLICABLE MEMBER SIZE AS DETERMINED BY THE TABLES FOR ALLOWABLE UNIFORM
LOADS ON BEAMS IN THE AMERICAN INSTITUTE OF STEEL CONSTRUCTION MANUAL.
7. MOMENT CONNECTIONS SHOWN SHALL BE DESIGNED TO FULLY DEVELOP THE SECTION IN
FLEXURE AND TO SUPPORT 1/2 THE TOTAL UNIFORM LOAD FOR SHEAR AS DESCRIBED IN
NOTE 5 ABOVE.
8. WHERE FILLET WELD IS NOT SHOWN ON DETAIL, ITS SIZE SHALL BE ASSUMED TO BE THE
PLATE THICKNESS OF THE THINNEST PIECE MINUS 1/16"
C. WELDS:
1. CONFORM TO "CODE FOR WELDING IN BUILDING CONSTRUCTION" BY THE AMERICAN
WELDING SOCIETY, LATEST EDITION.
2. WELDS ON INDICATED ON DRAWINGS ARE TO BE FILLET ALL AROUND AS PRESCRIBED BY
AISC SPECIFICATION, PROVIDE WELDING OF CONTINUOUS MEMBERS OF 2 INCHES OF 3/16"
INCH FILLET STITCH WELDS AT 12 INCHES OC, STAGGERED EACH SIDE, UNLESS
OTHERWISE NOTED.
3. FIELD PAINT ALL WELDS W/ "GALVILITE" BY Z.R.C. OR APPROVED EQUAL ARC WELDING
ELECTRODES.
4. METAL DECK - E60XX
5. STRUCTURAL STUDS - E6022 OR E6011, 3/32" RODS.
6. ALL OTHER - E70XX LOW HYDROGEN, 250 DEGREE MIN. OVEN TEMP.
7. SIZE - ALL FILLETS ARE 1/16" LESS THAN MINIMUM THICKNESS TO BE WELDED.
8. PROVIDE ULTRASONIC INSPECTION BY THE TESTING LABORATORY FOR ALL WELDS
INDICATED AS PENETRATION WELDS.
A. CONDUCT DEMOLITION OPERATIONS IN EXTREMELY CAREFUL MANNER IN ORDER TO PREVENT
ANY DAMAGES TO ALL EXISTING CONSTRUCTION AND TO MINIMIZE INTERFERENCE WITH
ADJACENT **STRUCTURES**
B. PREVENT THE MOVEMENT, SETTLEMENT, DAMAGE OR INJURY TO ADJACENT STRUCTURES,
PROVIDE & PLACE BRACING OR SHORING & BE RESPONSIBLE FOR THE SAFETY AND SUPPORT
OF THE ADJACENT STRUCTURES, ASSUME FULL LIABILITY FOR SUCH MOVEMENT,
SETTLEMENT, DAMAGE, OR INJURY.
C. CEASE OPERATIONS & NOTIFY THE ARCHITECT/ENGINEER IMMEDIATELY IF SAFETY ADJACENT
STRUCTURES APPEARS TO BE ENDANGERED. TAKE PRECAUTIONS TO SUPPORT EXISTING
STRUCTURES PROPERLY. DO NOT RESUME OPERATIONS UNTIL THE FULL SAFETY IS
RESTORED.
D. DEMOLISH INDICATED STRUCTURES & APPURTENANCE IN AN ORDERLY AND CAREFUL
MANNER.
E. PERFORM DEMOLITION IN ACCORDANCE WITH THE APPLICABLE AUTHORITIES HAVING
JURISDICTION.
F. REPAIR ANY DEMOLITION PERFORMED IN EXCESS OF THAT INDICATED, AT NO COST TO THE
OWNER OR THE ARCHITECT/ENGINEER.
G. REPAIR DAMAGE TO ADJACENT STRUCTURES CAUSED AS THE RESULT OF THIS WORK AT NO
COST TO THE OWNER OF THE ARCHITECT/ENGINEER.
DEMOLITION
A. CONSTRUCTION METHODS, PROCEDURES AND SEQUENCES ARE THE RESPONSIBILITY OF THE
CONTRACTOR AND THE CONTRACTOR SHALL TAKE ALL THE NECESSARY MEANS TO MAINTAIN
AND PROTECT THE STRUCTURAL INTEGRITY OF ALL CONSTRUCTION AT ALL STAGES.
B. ALL PROPOSED SUBSTITUTIONS MUST BE EQUAL OR BETTER AND SHALL BE REVIEWED BY THE
ARCHITECT/ENGINEER PRIOR TO ANY PERTINENT WORK AND PRIOR TO THE AWARD OF THE
CONTRACT.
C. NOT ALL OPENINGS AND OTHER COMPONENTS THAT ARE REQUIRED HAVE BEEN SHOWN IN
THE STRUCTURAL DRAWINGS. COORDINATE WITH THE ARCHITECTURAL, MECHANICAL,
PLUMBING AND ELECTRICAL DRAWINGS AND VERIFY THE LOCATIONS AND SIZES OF ALL
CHASES, INSERTS, OPENINGS, SLEEVES, FINISHES, DEPRESSIONS, PADS AND OTHER PROJECT
REQUIREMENTS. FLOOR PLAN WILL BE FURNISHED FOR THAT PURPOSE.
D. THE CONTRACTOR IS RESPONSIBLE FOR REVIEWING THE MECHANICAL, ELECTRICAL,
PLUMBING AND ARCHITECTURAL DRAWINGS TO DETERMINE WHERE OPENINGS ARE REQUIRED
IN REINFORCED CONCRETE BEAMS, SLABS AND WALLS.
E. THE CONTRACTOR SHALL SUBMIT SHOP DRAWINGS, DETAILING ALL THE OPENINGS,
INCLUDING ADDED REINFORCEMENT AS SHOWN ON THE TYPICAL WALL, SLAB AND BEAM
OPENING DETAILS FOR REVIEW.
F. ADDITIONAL REINFORCEMENT ABOVE THAT SHOWN IN THE TYPICAL SLAB AND BEAM OPENING
DETAILS MAY BE REQUIRED AND WILL BE REVIEWED ON THE SHOP DRAWINGS.
G. USE THE MANUFACTURER'S CERTIFIED DRAWINGS AND SPECIFICATIONS FOR THE EQUIPMENT
ANCHORAGE AND DETAILS.
H. ALL CONSTRUCTION JOINTS SHOWN ON THE STRUCTURAL DRAWINGS SHALL BE
INCORPORATED INTO THE STRUCTURE. ADDITIONAL CONSTRUCTION JOINTS TO FACILITATE
CONSTRUCTION SHALL BE LOCATED AND DETAILED ON THE SHOP DRAWINGS FOR REVIEW.
I. HORIZONTAL CONSTRUCTION JOINTS SHALL NOT BE PERMITTED IN BEAMS UNLESS SHOWN ON
THE STRUCTURAL DRAWINGS.
J. ALL CONSTRUCTION AND CONTROL JOINTS FOR BEAMS WHICH ARE EXPOSED TO VIEW ARE TO
BE LOCATED TO COINCIDE WITH THE ARCHITECTURAL RUSTICATION JOINTS AS SHOWN ON
THE BUILDING ELEVATION SHEETS OR AS REVIEWED IN WRITING.
K. SHOP DRAWINGS:
1. THE TERM "SHOP DRAWINGS" INCLUDES FABRICATION, MANUFACTURING, ERECTION AND
SETTING DRAWINGS, BROCHURES, CERTIFICATES, AND PRODUCT DATA DESCRIBING
MATERIALS AND EQUIPMENT. SHOP DRAWINGS SHALL INCLUDE ALL PERTINENT
INFORMATION REQUIRED FOR THE ENGINEER TO FULLY EVALUATE THE MATERIALS BEING
REPRESENTED BY THE SUBMITTAL INCLUDING THE PHYSICAL PROPERTIES, DIMENSIONS,
LOCATIONS AND METHOD OF INSTALLATION.
2. SHOP DRAWINGS WILL BEAR THE REVIEW STAMP OF THE CONTRACTOR INDICATING THAT
HE HAS REVIEWED THE DRAWINGS FOR CONFORMANCE WITH THE CONTRACT
DOCUMENTS; COORDINATED ITEMS INCLUDED IN THE SUBMITTAL WITH RELATED ITEMS;
AND VERIFIED AND COORDINATED DIMENSIONS.
3. REPRODUCTIONS OF THE ENGINEERING DRAWINGS WILL NOT BE ACCEPTABLE AS SHOP
DRAWINGS.
4. ANY SHOP DRAWING NOT CONFORMING TO THESE REQUIREMENTS WILL BE CAUSE FOR
REJECTION AND WILL BE RETURNED WITHOUT ANY FURTHER ACTION.
5. STRUCTURAL SUBMITTALS REQUIRED FOR APPROVAL INCLUDE, BUT ARE NOT LIMITED TO:
• UNISTRUT FRAMING
• MISC. STEEL FABRICATIONS
6. DELEGATED STRUCTURAL DESIGN OF COMPONENTS:
• SEE APPLICABLE SECTIONS OF GENERAL NOTES FOR THE APPROPRIATE DESIGN
RESPONSIBILITIES OF THE SUPPLIER AND IT'S LICENSED ENGINEER.
L. THESE NOTES APPLY TO STRUCTURAL DOCUMENTS SEALED BY THE STRUCTURAL ENGINEER
AND ARE INTENDED TO BE COMPLEMENTARY TO AND USED IN CONJUNCTION WITH THE PLANS
AND SPECIFICATIONS, INCLUDING THOSE PREPARED BY OTHER DISCIPLINES. CONTRACTOR
SHALL REPORT ANY DISCREPANCIES TO THE ARCHITECT/STRUCTURAL ENGINEER
IMMEDIATELY. ANY SUCH DISCREPANCIES SHALL BE RESOLVED TO THE MORE STRINGENT
REQUIREMENTS, UNLESS OTHERWISE AUTHORIZED BY THE STRUCTURAL ENGINEER.
M. ANY DISCREPANCIES ON THE STRUCTURAL DOCUMENTS SHALL BE IMMEDIATELY BROUGHT TO
THE ATTENTION OF THE ARCHITECT/STRUCTURAL ENGINEER PRIOR TO SUBMISSION OF BIDS
OR PROPOSALS, OR IF NOT REASONABLE DISCERNABLE DURING PREPARATION OF BIDS AND
PROPOSALS, BEFORE COMMENCING THE WORK IN QUESTIONS. NO FIELD CHANGES OR
DEVIATIONS FROM THE DESIGN ARE TO BE MADE WITHOUT PRIOR WRITTEN APPROVAL OF THE
ARCHITECT AND/OR STRUCTURAL ENGINEER. NO CHANGE ORDER CONSIDERATION WILL BE
GIVEN TO CHANGES FOR WHICH THE ARCHITECT AND/OR ENGINEER WERE NOT CONTACTED
PRIOR TO CONSTRUCTION OF THE AFFECTED ITEM.
N. CONTRACTOR SHALL VERIFY ALL DIMENSIONS AND CONSTRUCTION, INCLUDING EXISTING
WORK, PRIOR TO COMMENCING WORK. ANY DISCREPANCIES SHALL BE REPORT IMMEDIATELY
TO THE ARCHITECT/STRUCTURAL ENGINEER.
GENERAL NOTES FOR CONSTRUCTION
INDEPENDENT TESTING LABORATORY &
SPECIAL INSPECTIONS
A. EMPLOYMENT OF A TESTING LABORATORY IN NO WAY RELIEVES THE CONTRACTOR OF ANY
OBLIGATION TOPERFORM WORK IN ACCORDANCE WITH THE CONTRACT DOCUMENTS.
B. CONTRACTOR RESPONSIBILITIES:
1. DELIVER TO LABORATORY AT DESIGNATED LOCATION ADEQUATE SAMPLES OF MATERIALS
PROPOSED TO BE USED WHICH REQUIRE TESTING, TOGETHER WITH PROPOSED MIX
DESIGNS.
2. COOPERATE WITH LABORATORY PERSONNEL AND PROVIDE ACCESS TO WORK AND TO
MANUFACTURER'S FACILITIES.
3. PROVIDE INCIDENTAL LABOR AND FACILITIES TO PROVIDE ACCESS TO WORK TO BE
TESTED, TO OBTAIN AND HANDLE SAMPLES AT THE SITE OR AT SOURCE OF PRODUCTS TO
BE TESTED, TO FACILITATE TEST AND INSPECTIONS AND FOR STORAGE AND CURING OF
TEST SAMPLES.
4. NOTIFY LABORATORY OF MATERIAL SOURCES AND FURNISH NECESSARY QUANTITIES OF
REPRESENTATIVE SAMPLES OF MATERIALS PROPOSED FOR USE WHICH ARE REQUIRED
TO BE TESTED.
5. NOTIFY ARCHITECT AND LABORATORY 24 HOURS PRIOR TO EXPECTED TIME FOR
OPERATIONS REQUIRING INSPECTION AND TESTING SERVICES.
6. ADVISE LABORATORY IN A TIMELY FASHION TO COMPLETE REQUIRED INSPECTION AND
TESTING PRIOR TO SUBSEQUENT WORK BEING PERFORMED.
7. PAY FOR ALL SUBSEQUENT RE-TESTING OF PRODUCTS OR SYSTEMS FOUND TO BE
DEFECTIVE OR OTHERWISE NOT IN ACCORDANCE WITH SPECIFICATION REQUIREMENTS.
REMOVE REJECTED PRODUCTS AND REPLACE WITH PRODUCTS OF SPECIFIED QUALITY.
C. SPECIAL INSPECTIONS:
1. THE OWNER SHALL EMPLOY ONE OR MORE SPECIAL INSPECTOR(S) TO PROVIDE
INSPECTIONS DURING CONSTRUCTION ON THE TYPES OF CONSTRUCTION LISTED IN THIS
SECTIONS. HE SPECIAL INSPECTOR SHALL BE A QUALIFIED PERSON WHO SHALL
DEMONSTRATE COMPETENCE TO THE INSPECTIONS BEING PERFORMED TO THE
SATISFACTION OF THE ENGINEER OF RECORD AND THE BUILDING OFFICIAL.THE SPECIAL
INSPECTOR SHALL HAVE EXPERIENCE WITH AT LEAST FIVE OTHER PROJECTS SIMILAR IN
NATURE.
2. THE PURPOSE OF THE INSPECTIONS SHALL BE TO ENFORCE COMPLIANCE WITH THE
CONSTRUCTION DRAWINGS, SPECIFICATIONS, GEOTECHNICAL REPORT AND THE
INTERNATIONAL BUILDING CODE, SECTION 1704.
3. THE FOLLOWING ITEMS REQUIRE INSPECTION BY THE SPECIAL INSPECTOR:
REFERENCE STANDARD FREQUENCY
NOTES:
• ADDITIONAL TESTS AT THE CONTRACTOR'S EXPENSE WILL BE PERFORMED TO DETERMINE COMPLIANCE OF
REPLACED OR ADDITIONAL WORK WITH SPECIFIED REQUIREMENTS.
• CORRECT DEFICIENCIES IN WORK THAT TEST REPORTS AND INSPECTIONS INDICATE DO NOT COMPLY WITH
THE CONTRACT DOCUMENTS.
• PROVIDE THE ENGINEER OF RECORD (EOR) COPIES OF ALL SPECIAL INSPECTIONS SO A SPECIAL
INSPECTIONS REPORT CAN BE PREPARED FOR OBTAINING A CERTIFICATE OF OCCUPANCY.
HIGH STRENGTH BOLTING
BEARING TYPE CONNECTIONS
SLIP CRITICAL CONNECTIONS
WELDING OF STRUCTURAL STEEL
FULL PENETRATION GROOVE WELDS
MULTI-PASS FILLET WELDS
SINGLE-PASS FILLET WELDS > 5/16"
SINGLE PASS FILL WELDS <= 5/16"
INSPECTION OF STEEL FRAME AND JOISTS
DETAILS SUCH AS BRACING AND STIFFENING
MEMBER SIZES AND LOCATION
APPLICATION OF CONNECTION DETAIL
S T
R U
C T
U R
A L
R E
IN
F
O R
C
IN
G S
T E
E
L PERIODIC
PERIODIC
CONTINUOUS
CONTINUOUS
CONTINUOUS
PERIODIC
PERIODIC
PERIODIC
PERIODIC
STRUCTURAL CONCEPT, STANDARDS AND LOADS
A. DESIGN CONCEPT:
1. THE STRUCTURE AS SHOWN HAS BEEN DESIGNED IN ACCORDANCE WITH THE BUILDING
CODE REQUIREMENTS AND DESIGN STANDARDS TO SUPPORT THE FINAL BUILDING
SERVICE LOADS. THE CONTRACTOR SHALL BE RESPONSIBLE FOR PROVIDING ADDITIONAL
SUPPORTS FOR THE STRUCTURE IF NECESSITATED BY THE CONSTRUCTION SEQUENCE
OR METHODS OF FABRICATION, HANDLING, ERECTION, AND OTHER CONSTRUCTION
OPERATIONS.
B. BUILDING CODES AND DESIGN STANDARDS:
1. INTERNATIONAL BUILDING CODE, 2021 EDITION.
2. AMERICAN SOCIETY OF CIVIL ENGINEERS (ASCE); MINIMUM DESIGN LOADS FOR BUILDINGS
AND OTHER STRUCTURES, ASCE 7-22 AS AMENDED.
3. AMERICAN CONCRETE INSTITUTE (ACI), BUILDING CODE REQUIREMENTS FOR
REINFORCED CONCRETE, ACI 318, AS AMENDED.
4. AMERICAN INSTITUTE OF STEEL CONSTRUCTION (AISC), MANUAL OF STEEL
CONSTRUCTION, 15TH EDITION (ASD), 2017, AS AMENDED.
5. AMERICAN WELDING SOCIETY (AWS).
6. STEEL JOIST INSTITUTE (SJI), STANDARD SPECIFICATIONS FOR OPEN WEB STEEL JOIST
AND JOIST GIRDERS.
C. GRAVITY LOADS:
1. SUPER-IMPOSED LOADS ARE GIVEN IN POUNDS PER SQUARE FOOT (PSF)
BUILDING AREA DEAD LOAD (PSF) LIVE LOAD (PSF)
SLAB ON GRADE 0 100
ROOF 20 20
N
E
O
A L
I G
EN
S
O S I N
E
F
R E
A
S
X F T E
P R
T
S
A T E
O
NSE
D
ECI
L
FRED DALLY
90904
Drawing Title
Drawing Number
Approved By
Checked By
Drawn By
Project Number
CONSULTANTS:
TRUE NORTH PLAN NORTH
MEP ENGINEER
6200 Savoy, Suite 100 Houston, TX 77036 t (713) 952-3366 f (713) 952 5002 www.autoarch.net
A+D PROJECT #: 25-202-00
10/07/2025
10/07/2025 BID,PERMIT,CONST
7550 Office City Dr Houston, TX 77012
HH ACS CLINICS
RADIOLOGY
21019-19
MS
LM
FD
S101
GENERAL
STRUCTURAL
CRITERIA
GULFGATE
HEALTH CENTER
SHEET LIST (WITH REVISIONS)
SHEET
NUMBER SHEET NAME REVISION DATE
S101 GENERAL STRUCTURAL CRITERIA
S201 EXISTING FRAMING PLAN & DETAILS
S201
EXISTING BUILDING
EXISTING
RTU
EXISTING ROOF
(E) W18X35
(E
W
X
(E
W
X
(E
W
X
(E
W
X
(E) W16X26 (E) W18X40
(E) W18X35
5'-0" OC
EXISTING 20K3
(E) W16X26 (E) W18X40
(E
W
X
(E
W
X
5'-0" OC
EXISTING 20K3
5'-0" OC
EXISTING 20KCS2
MEDICAL EQUIPMENT
RE MANUF. (1,455 LBS TOTAL)
P1001 UNISTRUT
RE DETAIL 2
S201
(E) TOS
CEILING
RE:ARCH
1/ 2"
M A
X
1/ 4"
M
IN
P1000 UNISTRUT HANGERS &
DIAGONALS AS REQUIRED BY
UNISTRUT SHOP DRAWING
P1001 UNISTRUT
ATTACHED TO EXISTING
JOIST BOTTOM FLANGE
(E) JOIST(E) JOIST(E) W BEAM
1/4
1/4
TYP
L3X3X1/4 DIAGONAL WITH 1/4"X4"X4" END
PLATES.
NOTE:
ALL UNISTRUT FRAMING AND CONNECTION TO STRUCTURE
TO BE PROVIDED BY UNISTRUT PROVIDER.GC. TO SUBMIT
SIGNED AND SEALED SHOP DRAWINGS AND CALCULATIONS
SHOWING UNISTRUT FRAMINS HAS BEEN DESIGNED FOR
THE LOADS INDICATED.
WT8X13, CUT TO
MATCH BOTTOM OF
EXISTING JOISTS
ELEVATION.
(E) JOIST
DIAGONAL UNISTRUT BRACE
IN OTHER DIRECTION AS
REQUIRED BY UNISTRUT
SHOP DRAWING
NEW UNIT
RE:ARCH
EQUIPMENT ATTACHMENT
TO UNITRUT
BY EQUIPMENT MANUFACTURER
WHEN CONCENTRATED LOADS (SUCH AS HEADER
SUPPORTS FOR THE ROOF TOP MEP UNITS)
FRAME TO JOIST TOP CHORD AND ARE NOT
LOCATED DIRECTY ABOVE A TOP CHORD PANEL
POINT. INSTALL AN ADDITIONAL WEB MEMBER ANGLE
AS SHOWN ABOVE. CONTACT STRUCTURAL ENGINEER
FOR ALL LOADS EXCEEDING 500 POUNDS.
L2X2X1/4 AS SHOWN. FIELD WELD TO
JOIST TOP AND BOTTOM CHORDS W/
3/16" WELD ALL AROUND
ROOF JOIST
CONCENTRATED LOAD
HANGING LOAD
6"
6"
N
E
O
A L
I G
EN
S
O S I N
E
F
R E
A
S
X F T E
P R
T
S
A T E
O
NSE
D
ECI
L
FRED DALLY
90904
Drawing Title
Drawing Number
Approved By
Checked By
Drawn By
Project Number
CONSULTANTS:
TRUE NORTH PLAN NORTH
MEP ENGINEER
6200 Savoy, Suite 100 Houston, TX 77036 t (713) 952-3366 f (713) 952 5002 www.autoarch.net
A+D PROJECT #: 25-202-00
10/07/2025
10/07/2025 BID,PERMIT,CONST
7550 Office City Dr Houston, TX 77012
HH ACS CLINICS
RADIOLOGY
21019-19
MS
LM
FD
S201
EXISTING FRAMING
PLAN & DETAILS
GULFGATE
HEALTH CENTER
3/32" = 1'-0"1
EXISTING PLAN - OVERALL
1/8" = 1'-0"2
PARTIAL EXISTING FRAMING PLAN
NOTES
1. G.C. FIELD VERIFY ALL EXISITNG CONDITIONS AND INFORM A/E TEAM OF ANY CONDITIONS OR
DIMENSIONS NOT MATCHING WHAT IS SHOWN IN THESE DRAWINGS. DO NOT PROCEED WITH
ANY WORK UNTIL A/E TEAM HAS REVIEWED THE CONDITIONS.
3/4" = 1'-0"3
EQUIPMENT SUPPORT DETAIL
3/4" = 1'-0"4
TYPICLA OFFSET LOAD JOIST SUPPORT
4 7/8"
7 1/4"
NEW INTERIOR PARTITIONS
N o n -R a te d
S o u n d
In s u la te d
Insulation marked 'SB' indicates sound attenuation batt (SAB) insulation. Sound-Insulated Partitions are also indicated with 'SB' at their tags.
Sound Batt Insulation Drapes over Partition, extend 60" either side of partition (NTS).
Partition stops at ceiling (re: Partition Types for more information on partition terminations at ceilings)
Partition goes to deck
A6 A6
SB
LEGEND
NOTES
All new partitions are non fire rated.
Typical Stud Spacing is 16" O.C. unless otherwise indicated.
Limiting Heights Indicate the maximum unsupported height of the type of partition. If not otherwise indicated, limiting heights are based on a deflection criteria of L/240. Where partitions support "brittle" finishes such as plaster and ceramic or porcelain tile, limiting heights shall be reduced to maintain a deflection ratio of L/360.
Limiting Heights indicated in partition types are for reference only and shall be verified by Contractor against manufacturer's information for the suppled light gage studs.
Where Floor to Structure Height of a partition exceeds the Limiting Height for that partition, provide supplemental bracing to the structure overhead as required to maintain the necessary deflection criteria for the partition.
45d
Supplemental Bracing consisting of Mtl. studs or mtl angles. Ensure braces are never visible below ceilings.
Limiting Height
• Suspended Ceilings shall not be considered as bracing unless indicated as allowable by the partition type.
• Where Gypsum Wallboard is to be provided in areas subject to moisture, or where it is to be the substrate for the installation of tile, provide water resistant board.
• STC Ratings for sound walls are based on laboratory tested assemblies and do not necessarily indicate the actual STC rating of the completed work.
• Partitions indicated as "Full Height" shall have all layers of gypsum board on both sides of the partition extended to structure above. Where partitions are not indicated thusly, studs only shall extend to structure above.
• Provide metal deck fillers where structure above is metal deck and full height partitions run perpendicular to deck span.
• Refer to Finish Schedule and Interior Elevations for Applied Finishes to Partitions.
• Refer to MEP Drawings for penetration conditions of pipes, conduit, and ducts.
3 1/8"
4 1/4"4 7/8"
7 1/4"
G264
RAD RM
277.64 SF
D04
D01
D06
D03
X01
2/ A2.01
A
.0
VIF
2' - 8"
11/ A2.01
/8
V
IF
15' - 10" VIF
G264
RAD RM
277.64 SF
G264
4' - 8"
A
.0
1L3
L3
GENERAL NOTES - DEMOLITION
1. Field verify all conditions prior to construction, particularly in areas of work.
2. Report to the architect any unforeseen conditions or as-built conditions not reflected in the drawings, that could affect the work.
3. Remove all abandoned cabling, lighting, and other ceiling-mounted equipment in the scope area. RE: Mechanical Drawings for extent of ductwork to be removed. Not all items to be removed are indicated graphically. All life safety devices are to be removed and salvaged for owner review. (DISCONNECT1; PROTECT1; FIXW)
GENERAL NOTES - FLOOR PLAN
1. Field verify all conditions prior to construction, particularly in areas of work.
2. Report to the architect any unforeseen conditions or as-built conditions not reflected in the drawings, that could affect the work.
3. Maintain safe and unrestricted access and egress routes for occupied areas adjacent to work area, in accordance with applicable codes.
4. All dimensions to walls are to finish-face of wall unless indicated otherwise. (side indicated graphically in the drawings).
5. Provide necessary blocking at walls for all plumbing fixtures, equipment, millwork, and accessories.
6. Plans indicate horizontal dimensions only. Refer to elevations & sections for vertical dimensions.
7. With the Exception of the mechanical and fire-riser rooms and their entrance doors, all new work in this project is to be accessible in accordance with the most recent edition of the Texas Accessibility Standards.
8. Refer to code information sheet A0.00 for Fire Sprinkler requirements.
9. Roll up and secure all security hardware that conflicts with new construction. Notify owner of all changes in security hardware. Reinstall all security hardware.
10. All new Partitions are Type A3 (SB) unless indicated otherwise. RE: Sheet A0.10 for Partition
Types
GENERAL NOTES - CEILING
1. All existing Ceilings that are to replaced shall be installed at the same height as the existing ceiling unless indicated otherwise.
2. All light fixtures installed in gyp. bd. ceilings are to be centered in the room and evenly spaced unless indicated otherwise.
3. All light fixtures and other equipment installed in acoustical ceilings is to be centered on a ceiling tile.
4. Light fixtures installed in Mechanical and Electrical rooms are indicated for quantity only. Final locations shall be coordinated with equipment in field.
5. Architectural RCPs indicate architectural lighting only. Refer to Electrical and Fire Protection drawings for emergency lighting, strobes, etc.
C02
C01
SUPPLY AIR DIFFUSERS
24X24 12X12
RETURN AIR DIFFUSERS
24X24 12X12
RECESSED
LINEAR FIXTURES
48" 24"
LINEAR PENDANTS
48" 96"
PENDANT
EXIT LIGHTS
ONE SIDED TWO SIDED
ACOUSTICAL LAY-IN
CEILING
ACOUSTICAL LAY-IN
CEILING GRID ONLY GYP. BD. CEILING
GYP. BD. FURR-DOWN
LINEAR BAR DIFFUSER
SLOT DIFFUSER
FLUORESCENT FIXTURES
2X4 2X4 W/ R/A 2X2 2X2 W/ R/A 1X4 1X4 W/ R/A
RECESSED CANS
8" SQUARE 8" ROUND
6" SQUARE 6" ROUND
xx'-xx"
CEILING HEIGHT A.F.F.
(IF NOT INDICATED,
CEILING HEIGHT IS PER
GENERAL NOTE)
NOTE: Not all items indicated in this legend occur in the project. Review drawings carefully.
/2
S E
C T
IO
N
A T
B A
S E
S E
C T
IO
N
A T
T O
P P
L A
N
3 5/8" MTL STUDSA3
6" MTL STUDSA6
OVERHEAD STRUCTURE
MTL RUNNER
TOP OF MTL STUD
PARTITION TYPE A: 25 GA
METAL STUDS WITH ONE
LAYER 5/8" GYP BD. EACH
SIDE.
13'-5" / 14'-4" 40 / 48+ 11'-7" / 12'-4"
16'-9" / 19'-9" 40+ / 48+ 16'-9" / 17'-11"
PARTITION
TYPE
A3
A6
SOUND BATT INSULATION IF
ENHANCED STC RATING IS
DESIRED. SEE BELOW.
CONT. FIRE SEALANT PER UL
LISTING REQUIREMENTS IF
RATED, BOTH SIDES.;
CONT. ACOUSTICAL SEALANT
IF STC RATING IS DESIRED.
LIMITING HT. L/240
24"O.C. / 16" O.C.
LIMITING HT. L/360
24"O.C. /16" O.C.
FIRE RATING
/UL LISTING
STC RATING
/STC WITH
SOUND BATT
INSULATION
/2
S E
C T
IO
N
A T
B A
S E
S E
C T
IO
N
A T
T O
P P
L A
N
2 1/2" MTL STUDSC2
3 5/8" MTL STUDSC3
OVERHEAD STRUCTURE
MTL RUNNER
TOP OF MTL STUD
PARTITION TYPE C: 25 GA
METAL STUDS WITH ONE
LAYER 5/8" GYP BD. ON ONE
SIDE.
10'-7" / 11'-3" - - 9'-3" / 9'-10"
13'-5" / 14'-4" - - 11'-7" / 12'-4"
PARTITION
TYPE
C2
C3
LIMITING HT. L/240
24"O.C. / 16" O.C.
LIMITING HT. L/360
24"O.C. /16" O.C.
FIRE RATING
/UL LISTING
STC RATING
/STC WITH
SOUND BATT
INSULATION
Dimension & Alignment Support Notes:
(ALIGN 1)
(ALIGN 2)
(ALIGN 3)
(LEVEL 1)
(LEVEL 2)
(LEVEL 3)
Construction & Condition Support Notes:
(HANDLE 1)
(HANDLE 2)
(HANDLE 3)
(FIXW)
(INFO1)
CONNECT1)
Align face of new construction w/face of existing.
Align Centerline of new construciton w/Centerline of existing.
Align gridline/join grid w/existing grid.
Ensure top of new construction is level w/existing surface.
Level floor & surface to recieve new construction.
Ensure the top of grade is level w/surrounding ground.
Handle item w/care, and store for owner review.
Handle remaining building, pavement, fence, or item w/care.
Handle re-located items with care. DISCONNECT 1, FIXW.
Fix floor/wall/ceiling/item where construction was removed and prepare the area to recieve new construction. Ensure the top of grade is level w/surrounding ground & maintain positive slope towards drain, gutter, and storm system away from building.
Inform Architect prior to the start of this work.
Connect new construction to existing, ensure continuity and structural integrity.
Ensure the top of new construction is level w/existing surface.
Support Notes are abbreviated notes that are used in conjunction with Keyed Notes to clarify and ensure alignments, construction conditions, dimensions, locations, and slopes. Support Notes usually appear between brackets at the end of Keyed Notes.
(CONNECT2) Connect remaining item to the new structure, and ensure structural integrity while meeting local Codes. Handle remaining buildings, pavement, fences, and other items w/care
(DISCONNECT1)
(ENGINEER1)
(SHOP1)
(REFERENCE)
Disconnect and conceal all pipes, electrical cables, data cables, and conduits where construction is removed.
Professional engineering supervision is required for this work.
Provide shop drawings for this work.
Refer to photo # for the existing condition at this location.
(SLOPE1)
(PROTECT1)
(EGRESS)
(OPERATE)
(ENSURE1)
(ENSURE2)
(ENSURE3)
Maintain positive slope towards drains, gutters, and storm systems and away from the building. Ensure maximum slope in all directions of 1:48 (2%) within accessible clearances; maximum 1:48 (2%) cross slope at sidewalks; maximum 1:20 (5%) running slope at sidewalks.
Protect item(s) to remain, including any buildings, furniture, sidewalks, roofs, utilities, and other items during the Demolition and Construction phases.
Maintain safe and unrestricted egress routes from areas adjacent to the Demolition site. Comply with all Applicable Codes.
Ensure all routes and utilities required for owner's use of and operations on site are protected. Owner's use of site shall not be interrupted.
Ensure all slopes to drain as intended, and that downspouts indicated to remain are protected to maintain normal flow at all times during demolition and construction. Protect items to remain including any buildings, furniture, sidewalks, roofs, utilities, and other items during demolition and construction.
Ensure system is water-tight. Provide additional flashing & sealants as needed.
Ensure the slope of the new roof matches the slope and slope direction of the existing roof.
/2
S E
C T
IO
N
A T
B A
S E
S E
C T
IO
N
A T
T O
P P
L A
N
3 5/8" MTL STUDSL3
6" MTL STUDSL6
OVERHEAD STRUCTURE
MTL RUNNER
TOP OF MTL STUD
PARTITION TYPE L: 25 GA
METAL STUDS WITH ONE
LAYER 5/8" GYP BD. EACH
SIDE. GYP BD. TO BE LEADED
ON SIDE OF EXPOSURE.
REFER TO SHIELDING
REPORT FOR THICKNESS OF
LEAD, AND ADDITIONAL
REQUIREMENTS.
13'-5" / 14'-4" 11'-7" / 12'-4"`
16'-9" / 19'-9" 16'-9" / 17'-11"
PARTITION
TYPE
L3
L6
SOUND BATT INSULATION IF
ENHANCED STC RATING IS
DESIRED. SEE BELOW.
CONT. FIRE SEALANT PER UL
LISTING REQUIREMENTS IF
RATED, BOTH SIDES.;
CONT. ACOUSTICAL SEALANT
IF STC RATING IS DESIRED.
LIMITING HT. L/240
24"O.C. / 16" O.C.
LIMITING HT. L/360
24"O.C. /16" O.C.
FIRE RATING
/UL LISTING
STC RATING
/STC WITH
SOUND BATT
INSULATION
LEAD LINED GYP BD. REFER
TO SHIELDING REPORT FOR
THICKNESS, MINIMUM
HEIGHT, OVERLAP, AND
OTHER REQUIREMENTS
PROJECT NOTES
1. For exact location of new Medical Equipment refer to Site Preparation Support Documents by Medical Equipment Vendor.
2. For shielding requirements refer to Shielding Reports.
3. All existing medical equipment will be removed and the new equipment will be installed by
Medical Equipment Vendor. GC to coordinate.
Drawing Title
Drawing Number
Approved By
Checked By
Drawn By
Project Number
CONSULTANTS:
KEY PLAN
TRUE NORTH PLAN NORTH
MEP ENGINEER
6200 Savoy, Suite 100 Houston, TX 77036 t (713) 952-3366 f (713) 952 5002 www.autoarch.net
STRUCTURAL ENGINEER
7550 Office City Dr Houston, TX 77012
HH ACS CLINICS
RADIOLOGY
Author
Checker
Approver
A2.00
FLOOR PLANS & RCPs
INFRASTRUCTURE ASSOCIATES, INC.
(713) 622-0120
GULFGATE
HEALTH CENTER
DALLY + ASSOCIATES, INC.
(713) 337-8881
Scale: 1/4" = 1'-0"11 FLOOR PLAN DEMOLITION
Scale: 1/4" = 1'-0"13 FLOOR PLAN PROPOSED
GENERAL NOTES
Scale: NTS01Scale: 1/4" = 1'-0"16 RCP DEMOLITION
Scale: 1/4" = 1'-0"18 RCP PROPOSED
RCP LEGEND
Scale: NTS30
Scale:NTS21 PARTITION TYPE A-MTL Scale:NTS26 PARTITION_NOTES-MTL1
Scale:NTS23 PARTITION TYPE C-MTL SUPPORT NOTES Scale: NTS03Scale:NTS28 PARTITION TYPE L-MTL
C01 Provide new Lay-In Ceiling, coordinate with new Strucutual items, to minimize fragmented ceiling tiles. Re: Structural & Specs
C02 Provide new 2'x4' light fixtures, coordinate with medical equipment for best lighting, inform A/E if there is a conflict. Re: MEP
D01 Remove existing millwork & plumbing fixtures i.a. RE: PLUMBING DRAWINGS (FIXW; HANDLE 1; HANDLE 2; DISCONNECT 1)
D03 Remove existing flooring. Prepare area to receive new flooring. RE: NEW CONSTRUCTION PLAN, FINISH PLANS & SPECS.
(FIXW; HANDLE 2, PROTECT 1)
D04 Demolish existing interior partition, store front, doors/frames, interior windows, & all appurtenances shown dashed. Preparen area to receive new construction. RE: CONSTRUCTION FLOOR PLAN, RCT & SPECS.(FIXW; HANDLE 2; PROTECT1;
OPERATE).
D06 All existing Medical Equipment and Accessories to be disconnected and removed by Vendor. GC to coordinate with equipment vendor and owner before construction begin. (HANDLE 1; PROTECT 1; FIXW)
X01 Existing door and frame to remain, protect during construction. Frame and door to be cleaned. (PROTECT1)
KEYNOTE LEGEND
Scale: NTS05
R E
E
L E
V A
T
IO
N
R E
E
L E
V A
T
IO
N
R E
W
IN
D
O W
T Y
P E
R E
W
IN
D
O W
T Y
P E
RE: WINDOW TYPERE: FLOOR PLAN
R E
W
IN
D
O W
T Y
P E
C G
16 / A2.01
17 / A2.01
12 / A2.01
PL-4
3' - 0" 3' - 0" 2' - 6"
SS-1PL-4
12" MIN. REQUIRED
FROM CEILING TO
TOP OF MILLWORK.
VERIFY IN FIELD.
2' - 0" UNO
/2
/4
/8
T Y
P
R E
E
L E
V A
T
IO
N
WHITE
MELAMINE ON
INTERIOR
SURFACES
PLASTIC LAMINATE
(HORIZONTAL) TOP
& SPLASH
SPECIFIED PULLS,
TYP.
4" WOOD BLOCKING
ANCHOR BOLTED
INTO SLAB AT 24"
O.C., TYP.
CASEWORK
MATERIALS AS
SPECIFIED. 3/4"
THICK TYP. UNO.
SCHEDULED BASE
0' -
/2
1/4" THK DRAWER
BOTTOM & SIDES.
ADJUSTABLE
SHELF. PROVIDE 1
PER CABINET UNO.
PLASTIC LAMINATE
(VERTICAL)
SOLID SURFACE
TOP & SPLASH
MODESTY PANEL
WITH VERTICAL
PLASTIC-LAMINATE
FINISH; FASTEN TO
PANELS ADJACENT
TO SINK. PROVIDE
WOOD-FRAME
BACKUP AS
NECESSARY TO
PREVENT WARPING.2
M
IN
0' - 8" MIN.
M
IN
0' - 6" MAX.
DASHED LINE
INDICATES REAR OF
ACCESSIBLE FLOOR
CLEARANCE IN
PLAN.
R E
E
L E
V
T Y
P U
N O
R E
E
L E
V A
T
IO
N S
" PLASTIC LAMINATE
(HORIZONTAL) TOP
& SPLASH
PROVIDE BRACING
IF KNEESPACE IS
MORE THAN 4'
WIDE, EVENLY
SPACED, 4' O.C.
0'
1/
2"
2' - 0" UNO.
KNEESPACE
/2
T Y
P
1' - 1"
PLASTIC LAMINATE
(VERTICAL) ON ALL
EXPOSED
SURFACES,
INCLUDING TOP
AND BOTTOM
SPECIFIED PULLS
OPTIONAL
UNDERCABINET
LIGHTING, RE:
ELECTRICAL
DRAWINGS.
ADJUSTABLE
SHELF. PROVIDE 1
PER CABINET UNO.
WHITE
MELAMINE
ON INTERIOR
SURFACES
These notes apply to this sheet.
1. For hardware sets, see specifications.
2. Glass types and specs for door glazing are in the specifications.
3. Changes in floor material between rooms should occur under the door.
4. Install treated wood blocking in gypsum board walls for wall-mounted door stops.
5. For fire-rated doors, refer to the door schedule and specifications. Comply with fire codes and install as recommended.
6. Non-rated doors, marked "WD," are plastic laminate-faced wood doors unless specified differently.
7. Doors with card readers, marked "CR," require a specified power supply. See MEP drawings.
8. Finish doors and frames as specified in the finish section 0190000.
9. Doors in aluminum frames/curtain wall must follow manufacturer details and recommendations.
10. Exterior door aluminum panels must be impact resistant and Kynar coated to match the frame.
11. Exterior door sills should have a 3/8” drop, with exterior sloping away. Comply with ADA.
SCHED. WIDTH
DOOR TYPE 'A'
SINGLE FLUSH, SCWD OR HM
S T
R
IK
E
S C
H E
D H
E
IG
H T
0' - 1 1/2" 0' - 0 5/8"
S E
E B
E L
O W
/2
/2
HM
HOLLOW METAL FRAME
REINFORCE HINGES,
CLOSERS, & STRIKES
AL
ALUMINUM FRAME
FINISH TO MATCH STOREFRONTS
BY STOREFRONT MANUF.
0' - 1 1/2" 0' - 0 1/2"
/2
/4
/4
THROAT DEPTH = PARTITION
THICKNESS AT
SCHEDULED PARTITIONS.
FRAME DEPTH = 5 7/8" AT CMU
PARTITIONS AND
EXTERIOR WALLS UNO.
S E
E B
E L
O W
T H
R O
A T
D E
P T
H
16 GA INTERIOR
14 GA GALV EXTERIOR
OMIT STOP FOR
DOUBLE EGRESS
DOORS.
8' - 0"
1' - 8"
SS-1SS-1
PL-4PL-4
SPECIFIED LEAD
GLAZING
WINDOW JAMB
BEYOND
WINDOW SILL AS
SPECIFIED, WITH
LEAD SHIELDING AS
REQUIRED. RE:
MANUF.
SCHEDULED TYPE
L3 INTERIOR
PARTITION
DOUBLE STUD AT
SILL
STEEL POST,
WHERE INDICATED
IN PLAN.
1X WD BLOCKING
SIDE OF EXPOSURE
REFER TO PHYSICIST SHIELDING REPORT FOR
MINIMUM OVERLAP, THICKNESS OF LEAD
LINING AND OTHER REQUIREMENTS
SCHEDULED TYPE
L3 INTERIOR
PARTITION
DOUBLE STUD AT
JAMB
1X WD BLOCKING
SPECIFIED LEAD
GLAZING
WINDOW HEAD AS
SPECIFIED, WITH
LEADSHIELDING AS
REQUIRED. RE:
MANUF.
LEAD BACKED DRY
WALL AS REQUIRED
REFER TO PHYSICIST SHIELDING REPORT FOR
MINIMUM OVERLAP, THICKNESS OF LEAD
LINING AND OTHER REQUIREMENTS
SIDE OF EXPOSURE
SPECIFIED LEAD
GLAZING
JAMB OR MULLION
BEYOND
WINDOW HEAD AS
SPECIFIED, WITH
LEADSHIELDING AS
REQUIRED. RE:
MANUF.
SCHEDULED TYPE
L3 INTERIOR
PARTITION
1X WD BLOCKING
BOX BEAM HEADER
AT ALL STUD WALL
OPENINGS, TYP.
SIDE OF EXPOSURE
REFER TO PHYSICIST SHIELDING REPORT FOR
MINIMUM OVERLAP, THICKNESS OF LEAD
LINING, AND OTHER REQUIREMENTS.
G264
RAD RM
277.64 SF
FLOOR: RSF-1
BASE: RB-3
WALL: PT-10
CEILING: ACT-1 @ 8' - 0"
21 / A2.01
26 / A2.01
A
.0
/2
4' - 4"
/2
1' - 10"
26 / A2.01
21 / A2.01
A
.0
Drawing Title
Drawing Number
Approved By
Checked By
Drawn By
Project Number
CONSULTANTS:
KEY PLAN
TRUE NORTH PLAN NORTH
MEP ENGINEER
6200 Savoy, Suite 100 Houston, TX 77036 t (713) 952-3366 f (713) 952 5002 www.autoarch.net
STRUCTURAL ENGINEER
7550 Office City Dr Houston, TX 77012
HH ACS CLINICS
RADIOLOGY
Author
Checker
Approver
A2.01
FINISH PLAN AND
MILLWORK
INFRASTRUCTURE ASSOCIATES, INC.
(713) 622-0120
GULFGATE
HEALTH CENTER
DALLY + ASSOCIATES, INC.
(713) 337-8881
Scale: 3/8" = 1'-0"11 MILLWORK @ SINK Scale: 1 1/2" = 1'-0"16 STANDARD BASE
Scale: 1 1/2" = 1'-0"12 ACCESSIBLE SINK Scale: 1 1/2" = 1'-0"07 WORKTOP WITH KNEESPACE
Scale: 1 1/2" = 1'-0"17 STANDARD UPPERS
PL-4 PLAM for Millwork Vertical Surfaces. RE: Finish Legend
SS-1 Solid Surface. RE: Finish Legend
KEYNOTES
Scale: NTS01
ROOM
Area
FINISHES
Ceiling Height CommentsNumber Name Floor Finish Base Finish Wall Finish Ceiling Finish
G264 RADIOLOGY
ROOM
277.64 SF RSF-1 RB-3 PT-10 ACT-1 8' - 0"
FINISH SCHEDULE
Scale: NTS13
DOOR GENERAL NOTES
Scale: NTS02
Scale: 3/16" = 1'-0"04 DOOR TYPE A
Scale: 3" = 1'-0"03 DOOR FRAME TYPES
Scale: 3/8" = 1'-0"06 MILLWORK @ WORKBOOTH Scale: 1 1/2" = 1'-0"21 WINDOW SILL
Scale: 1 1/2" = 1'-0"22 INT. STOREFRONT JAMB
Scale: 1 1/2" = 1'-0"26 WINDOW HEAD
Scale: 1/4" = 1'-0"23 FLOOR PLAN FINISHES
WINDOW TYPE A WINDOW TYPE B
WINDOW TYPES
Scale: NTS05
TCH
X CFM
X"Ø
AP ACCESS PANEL
FLEXIBLE CONNECTION, FLEXIBLE DUCT
DUCT ELBOW WITH TURNING VANES
DUCT ELBOW WITHOUT VANES
BDD
FLEXIBLE DUCT CONN. TO RECTANGULAR
BACK DRAFT DAMPER
SPLITTER DAMPER − DIMENSION AS
DUCT WITH SPIN−IN CONNECTOR
SD
DIM. NOTED ON DRAWING
DIFFUSER TYPE, NECK SIZE, CFM
REFER TO DETAIL #1 ON DRAWING M−801
UNDERCUT DOOR 1"UCD 1"
RE: I/M−801
CD
IONIZATION DETECTOR
FIRESTAT
SMOKE DETECTOR
CONDENSATE DRAIN
EXPANSION JOINT
THERMOMETER
TEST PLUG
MANUAL AIR VENT
PRESSURE GAUGE W/GAUGE COCK
THERMOMETER WELL
SOLENOID VALVE
FLOW SWITCH
RELIEF VALVE
STEAM TRAP
STEAM MOISTURE SEPARATOR
TEMPERATURE AND PRESSURE
EJ
45° ELBOW DOWN (OGEE)
TW
FS
S
TEE
UNION (SCREWED)
CROSS
TOP CONNECTION
UNION (FLANGED)
PIPE BREAK
CONCENTRIC REDUCER
DUCT MOUNTED TEMPERATURE SENSOR
DUCT MOUNTED PRESSURE SENSOR
DUCT MOUNTED SMOKE DETECTOR
MECHANICAL SYMBOLS LEGEND
CHS
CWR
CHR
HWS
HWR
CWS
CONTROL, PNEUMATIC−ELECTRIC
CONTROL, ELECTRIC−PNEUMATIC
RED. PRESS PRINCIPAL
BACKFLOW PREVENTER
PE
EP
ISOLATION VALVE
BALL VALVE
BUTTERFLY VALVE
END SUCTION PUMP
ECCENTRIC REDUCER
BALANCING VALVE
TWO−WAY VALVE (PNEUMATIC)
PRESSURE REDUCING VALVE
CHECK VALVE, SWING GATE
THREE−WAY VALVE (PNEUMATIC)
ANGLE PRESSURE RELIEF VALVE
GATE VALVE WITH QUICK DISCONNECT
PRESSURE REGULATOR
FLEXIBLE CONNECTION
THREE−WAY VALVE (ELECTRIC)
TWO−WAY VALVE (ELECTRIC)
STRAINER W/BLOW DOWN VALVE
QUICK OPENING/CLOSING VALVE
LOCK SHIELD
SUPPLY AIR DUCT UP (PLAN)
T
P
SD
AD
DUCT SPLIT WITH SPLITTER DAMPER
TRANSITION IN DUCT
ACCESS DOOR
SUPPLY AIR DUCT DOWN (PLAN)
RETURN OR OUTSIDE
RETURN OR OUTSIDE
RETURN AIR/TRANSFER AIR BOOT
CEILING SUPPLY AIR DEVICE
CEILING RETURN REGISTER
EXHAUST AIR DUCT UP (PLAN)
EXHAUST AIR DUCT DOWN (PLAN)
BRANCH DUCT TAP
AIR DUCT UP (PLAN)
AIR DUCT DOWN (PLAN)
VD
AFS
R D
SD
SIDEWALL SUPPLY/EXHAUST REGISTER
RETURN AIR GRILLE WITH BOOT
MOTORIZED VOLUME DAMPER
COMBINATION FIRE/SMOKE DAMPER
AIR PRESSURE DIFFERENTIAL SWITCH
DROP IN DUCT ELEVATION
RISE IN DUCT ELEVATION
AIR FLOW SWITCH
SMOKE DAMPER
FIRE DAMPER
VOLUME DAMPER
HUMIDISTAT
PIPE UP
90° ELBOW
CAP
PIPE DOWN
THERMOSTAT − MOUNT 48" AFF UNO
PRV
OR
CHILLED WATER RETURN
CHILLED WATER SUPPLY
CONDENSER WATER RETURN
CONDENSER WATER SUPPLY
HOT WATER SUPPLY
HOT WATER RETURN
NOTE:
NOT ALL ITEMS NECESSARILY USED.
HRS HEAT RECOVERY SUPPLY
HRR HEAT RECOVERY RETURN
LPR STEAM CONDENSATEM PNEUMATIC MOTOR
APD
A
AUTOMATIC AIR VENT
CEILING EXHAUST REGISTER
TEMPERATURE, CO2, HUMIDITY SENSOR
REFER TO DETAIL #1 ON DRAWING M−801RE: I/M−801
MECHANICAL DEMOLITION NOTES
- 2021 INTERNATIONAL BUILDING CODE (IBC) WITH CITY OF HOUSTON AMENDMENTS.
- 2021 UNIFORM MECHANICAL CODE (UMC) WITH CITY OF HOUSTON AMENDMENTS.
- 2021 INTERNATIONAL ENERGY CONSERVATION CODE (IECC) WITH CITY OF HOUSTON AMENDMENTS.
APPLICABLE CODES
MECHANICAL GENERAL NOTES
T
H
F
ID
SD
1. WHERE WORK IN RENOVATED AREAS AFFECTS SYSTEMS IN OTHER AREAS OF THE FACILITY, THE
CONTRACTOR SHALL COORDINATE THIS WORK WITH THE OWNER. THIS WORK SHALL BE DONE TO
FIT FACILITY OPERATIONAL SCHEDULE AND MINIMIZE THE DISRUPTIONS/DISCOMFORT TO OCCUPIED
AREAS. THE CONTRACTOR SHALL REPAIR (TO THE ARCHITECT’S SATISFACTION) ALL EXISTING
CONDITIONS DAMAGED DURING DEMOLITION OR RENOVATION.
2. CONTRACTOR TO REPAIR ANY…