About this file
This is a Geotechnical Investigation Report prepared by GeoStructures, Inc. for the Borough of Modena, Pennsylvania, documenting subsurface conditions at the proposed townhouses project located at the intersection of Union Street and Meredith Court in Modena, PA. The investigation encompassed three test borings (B-1, B-2, and B-3) conducted on February 18, 2026, soil laboratory testing including particle-size analysis and Atterberg limits testing, and geotechnical engineering analysis to establish design criteria for foundations. The project involves the demolition of five existing 2-story townhomes and reconstruction of five elevated 2-story townhomes designed to meet 100-year plus freeboard or 500-year flood levels, with the elevated first floors approximately 6 feet above grade. The site is located in a flood-prone area near Brandywine Creek with estimated groundwater levels between 8 and 11 feet below the current ground surface.
The report provides two foundation design options for the contractor's evaluation: a shallow foundation system utilizing strip and spread footings with an allowable bearing pressure of 3,000 psf on natural Stratum 1A soils, with estimated total settlement less than 1 inch and minimum footing embedment of 3 feet below final exterior grade for frost protection; and an alternative driven timber pile system with piles designed for an allowable vertical capacity of 10 tons, driven to approximately 14 feet embedment depth into dense Stratum 1B soils, with allowable lateral capacity of 5 kips and uplift resistance of 10 kips. Both systems require structural fill replacement of existing unsuitable fill materials and compaction testing to 98 percent of standard Proctor density for building pads. The report specifies requirements for site preparation, proofrolling with vibratory roller equipment, concrete slab on grade construction with 4-inch stone subbase, foundation wall design for active lateral earth pressures, and dynamic pile load testing using pile driving analyzer (PDA) in accordance with ASTM D4945 to verify pile capacity and establish driving termination criteria.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Exhibit C
Geotechnical Investigation Report dated 3/4/26
ExhibitE
Geotechnical Investigation Report dated 3/4/26
Ge o S t r uc t ur e s , I nc .│1 0 0 0 W e st 9 t h Av e n ue , K i n g o f P r us s i a , P A 1 9 4 0 6│P h. 6 1 0 . 2 6 5 . 1 8 18 , Fx . 6 1 0 . 2 65 . 1 8 3 3│www.geos t ruc tures . ne t
Project No. G26-132 March 4, 2026
Ms. Tara Dougherty, PE Meliora Design 259 Morgan St., Phoenixville, PA 19460 C. 484.928.0400 Tara@melioradesign.com
Re: Geotechnical Investigation Report
Proposed Townhouses Union St & Meredith Ct, Modena PA
Dear Mr. Dougherty:
GeoStructures, Inc. is pleased to submit this geotechnical investigation report for the referenced project.
The subsurface conditions allow to use shallow foundations meeting flood requirements and support the proposed structures. Alternative design of driven timber piles is also provided to facilitate evaluations and economics for the elevated floor design in the flood setting. Detailed design recommendations and construction requirements are presented herein.
We appreciate the opportunity to provide our services on this project and look forward to assisting you throughout the design, development, and construction phases. Please feel free to contact us if you have any questions.
Sincerely, Daniel W. Eshete, P.G.
Project Manager
Jianchao Li, P.E.
Associate mailto:Tara@melioradesign.com
GeoStructures, Inc. ii
TABLE OF CONTENTS
1. INTRODUCTION
2. EXISTING CONDITIONS AND PROJECT DESCRIPTION
3. FIELD EXPLORATION
4. LABORATORY TESTING
5. SUBSURFACE CONDITIONS
5.1 Geologic Formation
5.2 Soils
5.3 Groundwater
6. CONCLUSIONS AND RECOMMENDATIONS
6.1 General Evaluation
6.2 Foundations
6.3 Concrete Slab on Grade
6.4 Foundation Walls and Drainage
6.5 Excavation & Dewatering
6.6 Site Preparation, Structural Fill and Backfill
7. LIMITATIONS
FIGURES
Figure 1. Site Location Map Figure 2. Site Aerial Map Figure 3. Site Geologic Map
DRAWINGS
Drawing 1. Geotechnical Investigation Plan Drawing 2. Test Boring Profiles Detail 1. Ballast Stabilization Detail
APPENDICES
Appendix A. Test Boring Logs Appendix B. Laboratory Soil Test Results
GeoStructures, Inc. 3
1. INTRODUCTION
This report documents a geotechnical investigation conducted by GeoStructures, Inc. for the referenced project. The report pertains to the proposed buildings, pavement areas, and pool. The objectives of our study have been to explore and characterize the subsurface soil and groundwater conditions, and to establish the geotechnical criteria for the design and construction of foundations. Our completed tasks comprised subsurface exploration via test borings, soil laboratory testing, geotechnical engineering analysis, and documentation of our findings and recommendations.
2. EXISTING CONDITIONS AND PROJECT DESCRIPTION
The site is located at the intersection of Union Street and Meredith Court in Modena, Pennsylvania. Currently, there are five 2-story townhomes fronting Meredith Court and the rest is a relatively flat grass area near ground elevation 274.0 ft. Based on the project information, the property got flooded during the previously Hurricane Ida flood.
We understand that the existing structures will be demolished to make way for the new development. The project involves construction of five 2-story townhomes at the place of the existing ones. The townhomes will be elevated to about 6 ft above grade to meet potential flood criteria that will be close to 100-year + Freeboard or 500-year flood levels. The foundation walls are intended to be floodable and provided with code-compliant flood openings. They will have exterior open stair towers on opposite sides of the townhomes that originate at grade level and rise to the elevated first floor. There will be ADA ramp and catwalk at the front along Meredith
Court. The existing grade is expected to remain similar with minor grading work. As a part of the schematic structural design, both pile foundation and conventional shallow foundation system with structural concrete or masonry walls at the lower level are being evaluated for building support.
3. FIELD EXPLORATION
GeoStructures conducted 3 test borings at the locations marked as B-1 through B-3, as shown in
Drawing 1. Drilling was carried out on February 18, 2026 using a Geoprobe 3126GT track rig.
The soil sampling was performed in accordance with ASTM D1586 procedures for the standard penetration test (SPT). The equipment included a 2-in. (O.D.) split-barrel sampler equipped with
GeoStructures, Inc. 4 a 140-pound, automatic safety hammer dropped from a height of 30 in. The borings were advanced using hollow-stem augers and terminated in medium dense soils at depths of 14 to 15 ft below grade. Surface elevations at the drill locations are estimated from the project survey plan provided to us (dated 7/18/2022).
During drilling, the soil samples were visually classified according to ASTM D2488 guidelines and assigned a group name based on the Unified Soil Classification System (USCS). Fine-grained soil samples were probed with a hand-held penetrometer as a measure of consistency.
The boreholes were checked for groundwater after drilling completion, and then, they were backfilled with soil cuttings to grade and patched in kind. Detailed documentations of the borings, including material descriptions, SPT data, strata divisions, penetrometer readings, and water levels, were recorded in the test boring logs of Appendix A.
4. LABORATORY TESTING
GeoStructures subjected several soil samples to the following index tests in our laboratory to verify the visual classifications and determine key index properties of the encountered materials.
The tests included particle-size analysis per ASTM D422, Atterberg limits per ASTM D4318, water content per ASTM D2216, and soil classification per the Unified Soil Classification
System (USCS) following ASTM D2487. The lab results are presented in Appendix B.
5. SUBSURFACE CONDITIONS
5.1 Geologic Formation
As portrayed in Figure 3, The underlying geology is the Octoraro Formation (Oc), which includes albite-chlorite schist, phyllite, some hornblende gneiss, and granitized members. South of Meredith Court, the geology is Peters Creek Schist (Xpc), that consists of chlorite-sericite schist containing interbedded quartzite. Sediments derived from the Octoraro Formation were encountered at the bottom of the test borings. Bedrock is expected at the refusal depths of about
15 ft below grade.
5.2 Soils
The subsurface profiles of Drawing 2 depict our idealized subsurface characterization. The identified soil layers include two residual sediments (Stratum 1A and 1B) below the topsoil
GeoStructures, Inc. 5
(about 4 inches thick) and existing fill (about 3 to 6 ft thick).
Existing fill. The existing fill is encountered in all of the borings with thicknesses of about 3 to 6
ft. It is described as loose to medium dense, black, silty sand (SM) and soft to medium, brown, sandy lean clay (CL) with some cinders in very moist conditions (moisture content of 21%).
Stratum 1. The natural Stratum 1 layers are residual soils subdivided into 1A and 1B. Stratu 1A consists of medium dense, brown, silty sand with gravel (SM) with phyllite and quartzite gravel fragments in moist conditions. The soil moisture generally ranges from about 10 to 12% and locally wet (average moisture content of 13.5%). Stratum 1B at the bottom of the borings is same as 1A except that it is dense to very dense.
5.3 Groundwater
Based on natural soil moisture conditions during drilling, the estimated groundwater level is about 8 to 11 ft deep below the current ground surfaces. Due to the close proximity of the site to the adjacent Brandywine Creek, the groundwater at the site is expected to correspond to the water level at the Creek and fluctuate seasonally following dry and wet periods.
6. CONCLUSIONS AND RECOMMENDATIONS
6.1 General Evaluation
Base on the test borings, shallow foundation is feasible for the site conditions to support the proposed structures. The site is in or near a flood plain and it should be expected that some scour potential exists even though there were no sign of previous scour or loss of ground observed. To facilitate structural and cost evaluations of the elevated floor design, alternative foundation of driven timber piles is also provided. Detailed design recommendations are provided below.
6.2 Foundations
6.2.1 Shallow Foundation Option
1. A foundation system consisting of strip and spread footings designed for an allowable bearing pressure of 3,000 psf can be used to support the proposed structures. The footings will bear on the natural Stratum 1A, or a structural fill.
2. All footings should be embedded at a minimum depth of 3 ft below the final exterior
GeoStructures, Inc. 6 grade for frost protection.
3. Uplift resistance if required, should be achieved by increasing the size and thickness of footings or embedment depth.
4. Estimated total settlement for footings subjected to the design bearing pressure is less than ½ in. Differential settlement between footings is estimated to be negligible.
5. The existing fill is not suitable for foundation bearing, and if encountered below the footing bottom, it should be completely removed and replaced with structural fill per Section 6.6 as directed by the inspecting geotechnical engineer.
6. The bottoms of all footings should be properly compacted with a tamper or walk-behind roller and the bearing conditions should be inspected/approved by the geotechnical engineer. Approved footing subgrades should not be exposed to rain or freezing conditions.
6.2.2 Timber Piles Option
1. Driven timber piles can be used to support the proposed structures. The piles should be driven through Stratum 1 soils to be terminated on refusal depths in the dense to very dense, Stratum 1B. Estimated pile embedment is 14 ft, corresponding to pile tip elevation of 260.0 ft on average as shown in the Test Boring Profiles of Drawing 2. The piles should be designed for an allowable vertical capacity of 10 tons, which will be derived primarily from end bearing at Stratum 1B.
2. The piles should be treated Southern Pine or Douglas Fir, and have a minimum tip and butt diameters of 8 and 12 in., respectively. The piles should meet the requirements of ASTM D25. Piles should be spaced at a minimum of 3 times the pile diameter (center to center) or 3 ft, whichever is greater.
3. For piles of the above specified size, driven to the specified depth and assuming maximum loss of support of 3 ft due to flooding or scour, an allowable lateral capacity of 5 kips and 10 kips against uplift can be used for design. For a higher lateral capacity, piles should be battered at 3H:4V to provide lateral resistance.
4. The pile driving hammer should have a minimum rated energy level of 12,000 ft-lb.
Dynamic pile load testing using pile driving analyzer (PDA) is required to be performed in accordance with ASTM D4945 to verify the ultimate design capacity of the piles, evaluate adequacy of the hammer, and establish the termination criteria. Driving stresses and potential pile damage will be evaluated based on PDA testing as well. A minimum of 2 piles across the site are recommended to be tested. One pile should be load-tested at initial strike as well as re-strike later within 24 to 72 hours, if needed. A factor of safety of 2.5 should be used to calculate the allowable pile design capacity when using PDA testing.
5. The settlement of the pile foundations terminated in Stratum 1B soils is estimated to be
GeoStructures, Inc. 7 less than ½ in. Differential settlement between piles is estimated to be negligible.
6. Pile driving should be inspected by a qualified geotechnical engineer to verify that piles meet the specified requirements and driven to recommended depth per design.
6.3 Concrete Slab on Grade
Subgrade prepared per Section 6.6 can support slab on grade if proposed for the townhomes. In addition to reinforcement to prevent shrinkage cracking as well curling during curing per ACI recommendations, 4 in subbase stone such as ASSHTO No. 57 is recommended.
6.4 Foundation Walls and Drainage
The foundation walls should be designed to resist active lateral earth pressures conditions. The earth pressure coefficients for on-site soils are listed in Table 1. Base friction coefficient of 0.5 should be used between the cast-in-place concrete and bearing soils. It is important to note that backfill against the walls should not take place until the concrete walls attain the specified 7-day concrete strength.
Table 1. Design Soil Properties for Foundation Walls
Soils Effective
Cohesion, c’ (ksf)
Effective Friction
Angle, φ’ (º)
Moist Unit
Weight, γt (pcf)
Active Earth
Coeff., Ka
Passive Earth
Coeff., Kp
At Rest Earth
Coeff., Ko
Existing Fill 0 28 110 0.36 2.77 0.53
Stratum 1A 0 30 120 0.33 3.33 0.50
Stratum 1B 0 36 125 0.26 3.85 0.41
6.5 Excavation & Dewatering
Standard earth moving equipment such as a backhoe or trackhoe will prove effective for the site excavation work. Both rock excavation and construction dewatering are not expected for the project.
6.6 Site Preparation, Structural Fill and Backfill
After demolition of existing structures including stripping off topsoil, the exposed subgrade across the building pad area, ramp/catwalk, and any pavement should be proofrolled to establish
GeoStructures, Inc. 8 uniform solid base for construction. A minimum of 8 passes of a 10-ton smooth-drum vibratory roller is recommended. Proofrolling should be carried out under the supervision of a geotechnical engineer. Based on the laboratory tests, the existing fill materials may be wet and require drying within +/-2% of the optimum moisture content per the standard Proctor test (ASTM D698) to facilitate the proofrolling for effective densification. Subgrade judged to be unstable or exhibiting greater than 1 in. deflection under the roller due to excess moisture should be undercut and replaced with coarse aggregate or crushed, recycled concrete compacted per the requirements of this report. Unsatisfactory soils are those which are more than 2% wetter than optimum or contain organics, debris, trash, or rock fragments larger than 6 in.
Imported structural fill if needed should consist of crushed, recycled concrete or certified cleanfill granular soils such as USCS types SM, SW, GM, GW, or dual symbol combinations thereof. The recommended acceptance testing for imported fill includes water content, sieve analysis, Atterberg Limits, and standard Proctor per ASTM standards. The acceptance criteria are as follows.
1. Liquid limit < 30 and Plasticity index < 10.
2. Silt/clay content (finer than No. 200 sieve) < 35%.
3. Maximum particle size 4 in.
4. As delivered water content within +/- 2% of optimum.
5. No organics or trash.
6. Clean fill certificate.
Structural fill should be compacted at a field water content that is within +2% of the laboratory optimum determined according to the standard Proctor test (ASTM D 698). The maximum recommended lift thickness for structural fill is 6 in. when light duty compactors are used and 10
in. when a heavy-duty roller (10-ton static weight) is used. Benching is needed to “key in” new fills with existing soils where the existing grade is on a slope.
Each lift of structural fill or backfill should be tested for water content and compaction using a nuclear moisture-density gauge (ASTM D6938). For building and pavement areas, at least 1 test should be conducted for every 2,000 SF with no fewer than 3 tests per lift. Foundation walls and trench backfill tests should be conducted every 50 ft, with no fewer than 3 tests per lift. The
GeoStructures, Inc. 9 minimum required compaction is 98% of the standard Proctor density for building pads and under foundations; 95% under pavement areas, exterior concrete slabs, and in utility pipe trenches; and 90% for landscape areas.
7. LIMITATIONS
The findings and recommendations documented in this report are based on subsurface information from 3 test borings, laboratory tests, and design information presented in Section 2 and Drawing 2. Our subsurface idealization is strictly for engineering analysis purposes, and it is not implied that the conditions depicted in the test boring profiles are identical to those that will be encountered during construction. GeoStructures should be notified and kept up to date with any design changes in order to ensure that the recommended foundation options and related criteria are still adequate.
Figures and Drawings
GeoStructures, Inc.GeoStructures, Inc.
Figures and Drawings
FIGURE 1. SITE LOCATION MAP
PROPOSED TOWNHOUSES
UNION ST & MEREDITH CT, MODENA PA
Source:
“Bing Maps in Google Earth." Bing Maps in Google Earth. N.p., n.d. Web. 3/2/2026. < http://ge-map-overlays.appspot.com/bing-maps/road >.
FIGURE 2. SITE AERIAL PHOTO MAP
UNION ST & MEREDITH CT, MODENA PA
Source:
“Bing Maps in Google Earth." Bing Maps in Google Earth. N.p., n.d. Web. 3/2/2026. < http://ge-map-overlays.appspot.com/bing-maps/road >.
Sources:
(1) “Bing Maps in Google Earth." Bing Maps in Google Earth. N.p., n.d. Web. 3/2/2026. < http://ge-map-overlays.appspot.com/bing-maps/road >.
(2) Bedrock Geologic Map of Pennsylvania by Socolow, A.A. & Berg, T.M., 1980.
(3) http://mrdata.usgs.gov/geology/state/state.php?state=PA
Xo: Octoraro Formation):
Includes albite-chlorite schist, phyllite, some hornblende gneiss, and granitized members.
Xpc: Peters Creek Schist (Probably lower Paleozoic):
Chlorite-sericite schist containing interbedded quartzite.
FIGURE 3. SITE GEOLOGIC MAP
UNION ST & MEREDITH CT, MODENA PA
DATE: 3/3/2026
PROJECT NO:
DRAWING NO:
GEOTECHNICAL INVESTIGATION PLAN
PROPOSED TOWNHOMES
UNION ST & MEREDITH CT, MODENA PA
DRAWN BY: DWESCALE: 1" = 30'
CHECKED BY: JCL
PL
O
TT
ED
: 3 /3
/2
4:
:0
PM
BY
: D
AN
IE
L
ES
H
ET
E
| P
LO
TS
TY
LE
:G
SI
_H
AL
F.
C
TB
PL
O
TT
ER
:D
W G
T O
P D
F.
PC
FI
LE
P
AT
H
: G :\P
R O
JE
C
T
FO
LD
ER
S\
\G
-1
M
O D
EN
A
TO
W
N H
O M
E R
EC
O
N
ST
R U
C
TI
O N
\D R
AW
IN
G S\
G
EO
TE
C
H N
IC
AL
IN
VE
ST
IG
AT
IO
N P
LA
N
.D W
G
G26-132
015'
SCALE: 1" = 30'
30' 30'
TEST BORING
LEGEND
NOTE: THIS DRAWING IS BASED ON PROPOSED IMPROVEMENTS PLAN PREPARED BY PADULA ENGINEERING DATED 7/18/2022.
B-1
B-2
B-3
ESTIMATED BOTTOM OF
SHALLOW FDN. EL. 270.0
10.9' (2/18/26)
(EL. 263.1')
ESTIMATED PILE
TIP EL. 260.0
ASSUMED FIRST FLOOR
EL. = 280.0'280
EL. (FT)
B-1 (273.8)
0.5'
6.0'
11.5'
15.3'
50/3" 50/3"
7.8' (2/18/26)
(EL. 266.0')
B-2 (274.0)
0.4'
5.0'
13.5' 14.3'
50/4"
B-3 (273.8)
0.4'
3.0'
11.0'
14.3'
50/4"
11.4' (2/18/26)
(EL. 262.4')
PROPOSED TOWNHOMES
EXISTING
GRADE
LEGEND
EXISTING FILL: LOOSE TO MEDIUM DENSE, BLACK, SILTY SAND (SM) AND SOFT
TO MEDIUM, BROWN, SANDY LEAN CLAY (CL), VERY MOIST, SOME CINDERS.
STRATUM 1A: MEDIUM DENSE, BROWN, SILTY SAND WITH GRAVEL (SM), VERY
MOIST TO WET, PHYLLITE AND QUARTZITE GRAVEL FRAGMENTS (RESIDUAL).
STRATUM 1B: SAME AS 1A EXCEPT DENSE TO VERY DENSE.
TOPSOIL
SHELBY TUBE
SAMPLE
PIEZOMETER
SENSING SECTION
(% REC., % RQD)
SPT N60 [PENETROMETER
READING (TSF)]
BORING I.D
(EL. [FT])
KEY
DEPTH OF STRATA
SOIL/ROCK SYMBOL
GROUNDWATER DEPTH
AT DRILLING ELEVATION
GROUNDWATER DEPTH
STABILIZED ELEVATION
[ROCK UCS IN PSI]
04' 8'
SCALE: 18" = 1'
8'
DATE: 3/4/2026
PROJECT NO:
DRAWING NO:
SCALE: DRAWN BY:
CHECKED BY:
TEST BORING PROFILES
PROPOSED TOWNHOMES
UNION ST & MEREDITH CT, MODENA PA
DWE1/8" = 1'
JCL
PL
O
TT
ED
: 3 /4
/2
:3 8:
A
M
BY
: D
AN
IE
L
ES
H
ET
E | P
LO
TS
TY
LE
:G
SI
_H
AL
F.
C
TB
PL
O
TT
ER
:D W
G T
O P
D F.
PC
FI
LE
P
AT
H : G
:\P R
O
JE
C T
FO
LD
ER
S\
\G
-1
M O
D
EN
A
TO
W N
H O
M E
R
EC
O N
ST
R
U C
TI
O
N \D
R
AW
IN
G
S\ G
-1
M
O D
EN
A
BO
R
IN
G
P R
O
FI
LE
D
R
AW
IN
G
2.
D
W G
G26-132
Appendix A Test Boring Logs
GeoStructures, Inc.GeoStructures, Inc.
Appendix A Test Boring Logs
Topsoil.
Loose, black, silty sand with gravel (SM), very moist, some cinders
(FILL).
Soft, brown, lean clay with sand (CL), very moist, trace gravel (FILL).
Medium dense, brown, silty sand with gravel (SM), very moist to wet, phyllite and quartzite gravel fragments (RESIDUAL).
Same as above, except dense to very dense, moist.
Bottom of borehole at 15.3'.
1.0/50
1.0/50
1.0/50
0.9/45
0.8/40
1.4/80
0.3/100
0.0-2.0
2.0-4.0
4.0-6.0
6.0-8.0
8.0-10.0
13.0-14.8
15.0-15.3
S-1
S-2
S-3
S-4
S-5
S-6
S-7
3-2-2-3
2-1-1-2
WOH-1-1-3
8-8-8-6
5-7-11-12
18-17-40- 50/3"
50/3"
0.5
2.5
6.0
11.5
15.3
Project Name: Modena Townhomes Reconstruction Project No: G26-132
County: Chester
Checked By: DWE
Logged By: TM
Driller/Company:R. Miller/GeoStructures
Drilling Methods:3-1/4" I.D. Hollow Stem Auger.
Location: 2-20 Meredith Court State: PATwp.: Coatesville
Water Depth : 7.8' During drilling (02/18/26) Water Depth :
Date: 02/18/26 - 02/18/26
Rig Type: Geoprobe 3126GT, Automatic Hammer.
Rock Core
Shelby Tube
Material Description
W C
LL
/P
L
U S
C S
/A A
S H
TO
R ec ov er y (ft
S ym bo l
D ep th (f t)
S am pl e
In te rv al
(f t)
GENERAL NOTES
S am pl e
N o.
Remarks
S am pl e
Ty pe
S P
T B lo w s or
R Q
D (f t/%
S P
T N
SAMPLE LEGEND
SPT Sample
Bulk Sample
S tra ta D iv .(f t)
E le va tio n (ft
S tre ng th
(t sf
(r oc k
U C
S : p si
GeoStructures, Inc 1000 West 9th Avenue King of Prussia PA 19406 Ph: 610-265-1818 Fx: 610-265-1833 www.geostructures.net
TEST BORING LOG
Test Boring:
Sheet:
Elevation (ft):
B-1
P ro je ct
N am e:
M od en a To w nh om es
R ec on st ru ct io n
| P ro je ct
N um be r:
G
-1
P at h:
g :\f ie ld
\g in t p ro gr am p ro je ct d at a\ pr oj ec ts
\g
\g
-1 m od en a to w nh om e re co ns tru ct io n.
gp j | D at e an d
Ti m e:
2/
/2
:5
6.
273.8
Soft to medium, brown, sandy lean clay with gravel (CL), very moist
(FILL).
Medium dense to dense, brown, silty sand with gravel (SM), very moist to wet, phyllite and quartzite gravel
(RESIDUAL).
Same as above, except very dense, moist.
Bottom of borehole at 14.3'.
0.6/30
0.3/15
0.6/30
0.6/30
1.7/85
1.2/60
0.8/40
0.3/100
0.0-2.0
2.0-4.0
4.0-6.0
6.0-8.0
8.0-10.0
10.0-12.0
12.0-14.0
14.0-14.3
S-1
S-2
S-3
S-4
S-5
S-6
S-7
S-8
1-3-2-3
2-2-2-1
2-4-10-10
12-14-14-12
10-8-8-9
8-12-16-14
12-16-18-20
50/4"
0.4
5.0
13.5
14.3
Project Name: Modena Townhomes Reconstruction Project No: G26-132
County: Chester
Checked By: DWE
Logged By: TM
Driller/Company:R. Miller/GeoStructures
Drilling Methods:3-1/4" I.D. Hollow Stem Auger.
Location: 2-20 Meredith Court State: PATwp.: Coatesville
Water Depth : 10.9' During drilling (02/18/26) Water Depth :
Date: 02/18/26 - 02/18/26
Rig Type: Geoprobe 3126GT, Automatic Hammer.
Rock Core
Shelby Tube
Material Description
W C
LL
/P
L
U S
C S
/A A
S H
TO
R ec ov er y (ft
S ym bo l
D ep th (f t)
S am pl e
In te rv al
(f t)
GENERAL NOTES
S am pl e
N o.
Remarks
S am pl e
Ty pe
S P
T B lo w s or
R Q
D (f t/%
S P
T N
SAMPLE LEGEND
SPT Sample
Bulk Sample
S tra ta D iv .(f t)
E le va tio n (ft
S tre ng th
(t sf
(r oc k
U C
S : p si
GeoStructures, Inc 1000 West 9th Avenue King of Prussia PA 19406 Ph: 610-265-1818 Fx: 610-265-1833 www.geostructures.net
TEST BORING LOG
Test Boring:
Sheet:
Elevation (ft):
B-2
P ro je ct
N am e:
M od en a To w nh om es
R ec on st ru ct io n
| P ro je ct
N um be r:
G
-1
P at h:
g :\f ie ld
\g in t p ro gr am p ro je ct d at a\ pr oj ec ts
\g
\g
-1 m od en a to w nh om e re co ns tru ct io n.
gp j | D at e an d
Ti m e:
2/
/2
:5
274.0
Loose to medium dense, black, silty sand (SM), very moist, some cinders
(FILL).
Soft, brown, sandy lean clay (CL), very moist (FILL).
Medium dense to dense, brown, silty sand with gravel (SM), very moist to wet, interbedded phyllite and quartzite gravel fragments
(RESIDUAL).
Same as above, except very dense, moist.
Bottom of borehole at 14.3'.
0.7/35
1.4/70
1.0/50
1.2/60
1.0/50
1.3/65
1.3/65
0.3/100
0.0-2.0
2.0-4.0
4.0-6.0
6.0-8.0
8.0-10.0
10.0-12.0
12.0-14.0
14.0-14.3
S-1
S-2
S-3
S-4
S-5
S-6
S-7
S-8
5-4-1-1
3-8-12-12
10-13-13-12
10-8-10-6
6-8-8-8
7-6-20-25
26-19-21-30
50/4"
0.4 1.0
3.0
11.0
14.3
Project Name: Modena Townhomes Reconstruction Project No: G26-132
County: Chester
Checked By: DWE
Logged By: TM
Driller/Company:R. Miller/GeoStructures
Drilling Methods:3-1/4" I.D. Hollow Stem Auger.
Location: 2-20 Meredith Court State: PATwp.: Coatesville
Water Depth : 11.4' During drilling (02/18/26) Water Depth :
Date: 02/18/26 - 02/18/26
Rig Type: Geoprobe 3126GT, Automatic Hammer.
Rock Core
Shelby Tube
Material Description
W C
LL
/P
L
U S
C S
/A A
S H
TO
R ec ov er y (ft
S ym bo l
D ep th (f t)
S am pl e
In te rv al
(f t)
GENERAL NOTES
S am pl e
N o.
Remarks
S am pl e
Ty pe
S P
T B lo w s or
R Q
D (f t/%
S P
T N
SAMPLE LEGEND
SPT Sample
Bulk Sample
S tra ta D iv .(f t)
E le va tio n (ft
S tre ng th
(t sf
(r oc k
U C
S : p si
GeoStructures, Inc 1000 West 9th Avenue King of Prussia PA 19406 Ph: 610-265-1818 Fx: 610-265-1833 www.geostructures.net
TEST BORING LOG
Test Boring:
Sheet:
Elevation (ft):
B-3
P ro je ct
N am e:
M od en a To w nh om es
R ec on st ru ct io n
| P ro je ct
N um be r:
G
-1
P at h:
g :\f ie ld
\g in t p ro gr am p ro je ct d at a\ pr oj ec ts
\g
\g
-1 m od en a to w nh om e re co ns tru ct io n.
gp j | D at e an d
Ti m e:
2/
/2
:5
273.8
Brown (10YR-4/3), lean clay with gravel (CL), very moist.
Brown (10YR-4/3), clayey gravel with sand (GC), very moist to wet.
Bottom of borehole at 6.3'.
0.7
4.0
6.3
Project Name: Modena Townhomes Reconstruction Project No: G26-132
County: Chester
Checked By: DWE
Logged By: TM
Driller/Company:R. Miller/GeoStructures
Drilling Methods:
Location: 2-20 Meredith Court State: PATwp.: Coatesville
Water Depth : 5.8' After digging (02/19/26) Water Depth :
Date: 02/19/26 - 02/19/26
Rig Type: Mini Excavator, .
Rock Core
Shelby Tube
Material Description
W C
LL
/P
L
U S
C S
/A A
S H
TO
R ec ov er y (ft
S ym bo l
D ep th (f t)
S am pl e
In te rv al
(f t)
GENERAL NOTES
S am pl e
N o.
Remarks
S am pl e
Ty pe
S P
T B lo w s or
R Q
D (f t/%
S P
T N
SAMPLE LEGEND
SPT Sample
Bulk Sample
S tra ta D iv .(f t)
E le va tio n (ft
S tre ng th
(t sf
(r oc k
U C
S : p si
GeoStructures, Inc 1000 West 9th Avenue King of Prussia PA 19406 Ph: 610-265-1818 Fx: 610-265-1833 www.geostructures.net
TEST BORING LOG
Test Boring:
Sheet:
Elevation (ft):
IT-1
P ro je ct
N am e:
M od en a To w nh om es
R ec on st ru ct io n
| P ro je ct
N um be r:
G
-1
P at h:
g :\f ie ld
\g in t p ro gr am p ro je ct d at a\ pr oj ec ts
\g
\g
-1 m od en a to w nh om e re co ns tru ct io n te st p its .g pj
D at e an d Ti m e:
2/
/2
:3 1.
273.9
Brown (10YR-4/3), sandy lean clay with gravel (CL), very moist.
Brown (10YR-4/3), clayey gravel with sand (GC), very moist.
Bottom of borehole at 6.2'.
0.7
4.3
6.2
Project Name: Modena Townhomes Reconstruction Project No: G26-132
County: Chester
Checked By: DWE
Logged By: TM
Driller/Company:R. Miller/GeoStructures
Drilling Methods:
Location: 2-20 Meredith Court State: PATwp.: Coatesville
Water Depth : Dry After digging (02/19/26) Water Depth :
Date: 02/19/26 - 02/19/26
Rig Type: Mini Excavator, .
Rock Core
Shelby Tube
Material Description
W C
LL
/P
L
U S
C S
/A A
S H
TO
R ec ov er y (ft
S ym bo l
D ep th (f t)
S am pl e
In te rv al
(f t)
GENERAL NOTES
S am pl e
N o.
Remarks
S am pl e
Ty pe
S P
T B lo w s or
R Q
D (f t/%
S P
T N
SAMPLE LEGEND
SPT Sample
Bulk Sample
S tra ta D iv .(f t)
E le va tio n (ft
S tre ng th
(t sf
(r oc k
U C
S : p si
GeoStructures, Inc 1000 West 9th Avenue King of Prussia PA 19406 Ph: 610-265-1818 Fx: 610-265-1833 www.geostructures.net
TEST BORING LOG
Test Boring:
Sheet:
Elevation (ft):
IT-2
P ro je ct
N am e:
M od en a To w nh om es
R ec on st ru ct io n
| P ro je ct
N um be r:
G
-1
P at h:
g :\f ie ld
\g in t p ro gr am p ro je ct d at a\ pr oj ec ts
\g
\g
-1 m od en a to w nh om e re co ns tru ct io n te st p its .g pj
D at e an d Ti m e:
2/
/2
:3 2.
273.9
Appendix B Laboratory Testing Results
GeoStructures, Inc.GeoStructures, Inc.
Appendix B Laboratory Testing Results
Boring Sample Water
Content1 Ave. Stratum LL2 PL2 PI2
Fines3 USCS4
B-1 S-3 21.0% 21.0% Fill 34 25 9 43.1 SM B-1 S-4 9.8% - - - - - B-2 S-4 12.2% - - - - - B-3 S-3 9.6% - - - - - B-3 S-5 26.9% - - - - -
B-2 S-5 11.2% 28 21 7 23.5 SC-SM
B-3 S-4 11.0% 31 23 8 26.5 SM
1 ASTM D2216.
4 Upper case denotes classification per ASTM D2487; lower case is visual classification per ASTM D2488.
1A13.5%
6.0 - 8.0
6.0 - 8.0
8.0 - 10.0
4.0 - 6.0
Summary of Index Properties
Depth (ft)
4.0 - 6.0
6.0 - 8.0
8.0 - 10.0
2 ASTM D4318.
Modena Townhome Reconstruction
2/24/2026GFAPrepared By:GeoStructures Project No: G26-132
3 ASTM D6913.
Ph. 610.265.1818 Fax 610.265.1833
GeoStructures, Inc 1000 W. 9th Ave., King of Prussia, PA 19406 www.geostructures.net
SM
Sample
Fill B-1 S-3 w (%)
MSTested By:G26-132
Silty sand
Stratum Boring
43.1
Cu
44.9
Cc
Depth (ft) 4.0 - 6.0
#DIV/0!
PL
PI
#DIV/0!
21.0
43.1
59.2
No. 200
67.5 No. 10 No. 20
No. 60
2/20/2026
Modena Townhome Reconstruction
GeoStructures Project No.:
100.0
1/4" No. 4
90.4 3/8"
88.0
Fines (Silt, Clay)Cobbles Gravel
No. 140 53.5 45.7
96.7
1-1/2"
No. 40
Coarse Medium Fine
PARTICLE SIZE ANALYSIS OF SOILS
HYDROMETER
U.S. STANDARD SIEVE NUMBERS U.S. SIEVE OPENING IN INCHES
Coarse Fine
3"
Percent Finer
0.0 12.0
Sand
2"
Sieve
77.6
1/2" 94.0
1" 3/4"
Brown
Color USCS Group Name
USCS
LL
0.0010.010.1110100
Pe rc en t F in er b y
W ei gh t
Particle Size (mm)
3 1-1/2 1 3/42 1/2 3/8 1/4 4 10 20 40 60 140 200
0 10 20 30 40 50 60 70
Pl as tic ity
In de x (P
I)
Liquid Limit (LL)
MH or OH
ML or OL
CL or OL
CH or OH
CL-ML
Ph. 610.265.1818 1000 W. 9th Avenue, King of Prussia, PA 19406 www.geostructures.net Fax 610.265.1833
SC-SM
Sample
1A B-2 S-5 w (%)
MSTested By:G26-132
Silty, clayey sand with gravel
Stratum Boring
23.5
Cu
49.8
Cc
Depth (ft) 8.0 - 10.0
#DIV/0!
PL
PI
#DIV/0!
11.2
23.5
36.9
No. 200
45.1 No. 10 No. 20
No. 60
2/20/2026
Modena Townhome Reconstruction
GeoStructures Project No.:
100.0 94.2
1/4" No. 4
77.2 3/8"
73.3
Fines (Silt, Clay)Cobbles Gravel
No. 140 31.8 25.2
90.7
1-1/2"
No. 40
Coarse Medium Fine
PARTICLE SIZE ANALYSIS OF SOILS
HYDROMETER
U.S. STANDARD SIEVE NUMBERS U.S. SIEVE OPENING IN INCHES
Coarse Fine
3"
Percent Finer
0.0 26.7
Sand
2"
Sieve
59.6
1/2" 85.8
1" 3/4"
Brown
Color USCS Group Name
USCS
LL
0.0010.010.1110100
Pe rc en t F in er b y
W ei gh t
Particle Size (mm)
3 1-1/2 1 3/42 1/2 3/8 1/4 4 10 20 40 60 140 200
0 10 20 30 40 50 60 70
Pl as tic ity
In de x (P
I)
Liquid Limit (LL)
MH or OH
ML or OL
CL or OL
CH or OH
Ph. 610.265.1818 1000 W. 9th Avenue, King of Prussia, PA 19406 www.geostructures.net Fax 610.265.1833
Brown
Color USCS Group Name
USCS
LL
Sand
2"
Sieve
58.2
1/2" 84.8
1" 3/4"
Coarse Fine
3"
Percent Finer
0.0 29.3
Coarse Medium Fine
PARTICLE SIZE ANALYSIS OF SOILS
HYDROMETER
U.S. STANDARD SIEVE NUMBERS U.S. SIEVE OPENING IN INCHES
Fines (Silt, Clay)Cobbles Gravel
No. 140 34.7 28.2
91.2
1-1/2"
No. 40
100.0
1/4" No. 4
76.0 3/8"
70.7
2/20/2026
Modena Townhome Reconstruction
GeoStructures Project No.:
26.5
39.4
No. 200
46.4 No. 10 No. 20
No. 60
PL
PI
#DIV/0!
11.0
26.5
Cu
44.2
Cc
Depth (ft) 6.0 - 8.0
#DIV/0!
Stratum Boring
MSTested By:G26-132
Silty sand with gravel
SM
Sample
1A B-3 S-4 w (%)
0.0010.010.1110100
Pe rc en t F in er b y
W ei gh t
Particle Size (mm)
3 1-1/2 1 3/42 1/2 3/8 1/4 4 10 20 40 60 140 200
0 10 20 30 40 50 60 70
Pl as tic ity
In de x (P
I)
Liquid Limit (LL)
MH or OH
ML or OL
CL or OL
CH or OH
Ph. 610.265.1818 1000 W. 9th Avenue, King of Prussia, PA 19406 www.geostructures.net Fax 610.265.1833
| 1. INTRODUCTION |
| 2. EXISTING CONDITIONS AND PROJECT DESCRIPTION |
| 3. FIELD EXPLORATION |
| 4. LABORATORY TESTING |
| 5. SUBSURFACE CONDITIONS |
| 5.1 Geologic Formation |
| 5.2 Soils |
| 5.3 Groundwater |
| 6. CONCLUSIONS AND RECOMMENDATIONS |
| 6.1 General Evaluation |
| 6.2 Foundations |
| 6.2.1 Shallow Foundation Option |
| 6.2.2 Timber Piles Option |
| 6.3 Concrete Slab on Grade |
| 6.4 Foundation Walls and Drainage |
| 6.5 Excavation & Dewatering |
| 6.6 Site Preparation, Structural Fill and Backfill |
| 7. LIMITATIONS |
| geo appendix.pdf |
| 1. INTRODUCTION |
| 2. Existing Features and Proposed Construction |
| 3. FIELD EXPLORATION |
| 4. LABORATORY TESTING |
| 5. SUBSURFACE CHARACTERIZATION |
| 5.1 Site Geology and Bedrock |
| 5.2 Groundwater |
| 6. CONCLUSIONS AND RECOMMENDATIONS |
| 6.1 General Evaluation |
| 6.2 Shallow Foundation – Connector Addition |
| 6.3 Helical Piles – Angel Stair Columns |
| 6.4 Concrete Slab on Grade |
| 6.5 Excavation, Dewatering and Underpinning |
| 6.6 Subgrade Preparation and Proofrolling |
| 7. LIMITATIONS |
| Appendix.pdf |
| 1. INTRODUCTION |
| 2. SITE AND PROJECT DESCRIPTION |
| 3. FIELD EXPLORATION |
| 4. GEOTECHNICAL LABORATORY TESTING |
| 5. SUBSURFACE CHARACTERIZATION |
| 5.1 Site Geology |
| 5.2 Soils |
| 5.3 Groundwater |
| 6. CONCLUSIONS AND RECOMMENDATIONS |
| 6.1 General Evaluation |
| 6.2 Foundation Design and Construction |
| 6.3 Concrete Slab on Grade |
| 6.4 Excavation Methods |
| 6.5 Subgrade Preparation, Structural Fill, and Backfill |
| 7. LIMITATIONS |
| Appendix.pdf |
| FIGURES AND DRAWINGS |
| 1. OBJECTIVES AND SCOPE OF STUDY |
| 2. SITE AND PROJECT DESCRIPTION |
| 2.1 Site Description & Proposed Construction |
| 3. FIELD EXPLORATION |
| 4. LABORATORY TESTING |
| 5. SUBSURFACE CHARACTERIZATION |
| 5.1 Geologic Setting |
| 5.2 Soils |
| 5.3 Groundwater |
| 6. CONCLUSIONS AND RECOMMENDATIONS |
| 6.1 General |
| 6.2 Foundations |
| 6.3 Concrete Slab on Grade |
| 6.4 Basement Wall & Site Retaining Wall |
| 6.5 Excavation Methods |
| 6.6 Subgrade Preparation and Structural Fill |
| 7. LIMITATIONS |
| Appendix 2.pdf |
| FIGURES AND DRAWINGS |
| APPENDIX |
| 1. INTRODUCTION |
| 2. EXISTING CONDITIONS AND PROJECT DESCRIPTION |
| 3. FIELD EXPLORATION |
| 4. LABORATORY TESTING |
| 5. SUBSURFACE CONDITIONS |
| 5.1 Geologic Formation |
| 5.2 Soils |
| 5.3 Groundwater |
| 6. CONCLUSIONS AND RECOMMENDATIONS |
| 6.1 General |
| 6.2 Strip and Spread Footings |
| 6.3 Slabs on Grade |
| 6.4 Basement Walls and Lateral Earth Pressures |
| 6.5 Subgrade Preparation |
| 7. LIMITATIONS |
| Appendix.pdf |
| 659f0f6ce906be9ef6c2858d0ed7d3739eb622d32305fd5335531e6c2d6ab839.pdf |
| 8a804e114a3e8f9a2980361f8750ed7ee3b6bf32477b474f025eff7c77778b24.pdf |
| Figures and Drawings |
8a804e114a3e8f9a2980361f8750ed7ee3b6bf32477b474f025eff7c77778b24.pdf
| 659f0f6ce906be9ef6c2858d0ed7d3739eb622d32305fd5335531e6c2d6ab839.pdf |
| 659f0f6ce906be9ef6c2858d0ed7d3739eb622d32305fd5335531e6c2d6ab839.pdf |
| 8a804e114a3e8f9a2980361f8750ed7ee3b6bf32477b474f025eff7c77778b24.pdf |
| Appendix A |
| 8a804e114a3e8f9a2980361f8750ed7ee3b6bf32477b474f025eff7c77778b24.pdf |
| 8a804e114a3e8f9a2980361f8750ed7ee3b6bf32477b474f025eff7c77778b24.pdf |
| Appendix B |
8a804e114a3e8f9a2980361f8750ed7ee3b6bf32477b474f025eff7c77778b24.pdf
| 7600 Germantown Avenue - Geotechnical Investigation Plan-Drawing 1.pdf |
| Sheets and Views |
| Drawing 1 |
| Geotech Figures.pdf |
| Slide Number 1 |
| Slide Number 2 |
| Slide Number 3 |
| 7600 Germantown Avenue - Test Boring Profiles-Drawing 2.pdf |
| Sheets and Views |
| Drawing 2 |
| 7600 Germantown Avenue - Test Boring Profiles-Drawing 2.pdf |
| Sheets and Views |
| Drawing 2 |
| 1. Germantown ave. Summary of Index.pdf |
| Report |
| USCS Soil Classification B-4 S-3 (4.0'-6.0').pdf |
| Results Page |
| USCS Soil Classification B-3 S-4 (6.0'-8.0').pdf |
| Results Page |
| USCS Soil Classification B-1 S-3 (4.0'-6.0').pdf |
| Results Page |
| 7600 Germantown Avenue - Test Boring Profiles-Drawing 2.pdf |
| Sheets and Views |
| Drawing 2 |
| 1. Germantown ave. Summary of Index.pdf |
| Report |
| 1. Germantown ave. Summary of Index.pdf |
| Report |
| Ballast Stabilization Detail-Detail 1.pdf |
| Sheets and Views |
| Detail 1 |
| Ballast Stabilization Detail-Detail 1.pdf |
| Sheets and Views |
| Detail 1 |
| igures.pdf |
| Slide Number 1 |
| Slide Number 2 |
| Slide Number 3 |
| Geotechnical Investigation Plan-Drawing 1.pdf |
| Sheets and Views |
| Drawing 1 |
| Bornig profile Drawing2-Drawing 2.pdf |
| Sheets and Views |
| Drawing 2 |
| 1. Johnson Matthey Addition Summary of Index.pdf |
| Report |
| USCS Soil Classification B-2 S-2 (2.0'-4.0').pdf |
| Results Page |
| USCS Soil Classification B-1 S-4 (6.0'-8.0').pdf |
| Results Page |
| 1.pdf |
| 1. INTRODUCTION |
| 2. SITE AND PROJECT DESCRIPTION |
| 3. FIELD EXPLORATION |
| 4. GEOTECHNICAL LABORATORY TESTING |
| 5. SUBSURFACE CHARACTERIZATION |
| 5.1 Site Geology |
| 5.2 Soils |
| 5.3 Groundwater |
| 6. CONCLUSIONS AND RECOMMENDATIONS |
| 6.1 General Evaluation |
| 6.2 Foundation Design and Construction |
| 6.3 Concrete Slab on Grade |
| 6.4 Excavation Methods |
| 6.5 Subgrade Preparation, Structural Fill, and Backfill |
7. LIMITATIONS
| 1.pdf |
| 1. INTRODUCTION |
| 2. SITE AND PROJECT DESCRIPTION |
| 3. FIELD EXPLORATION |
| 4. GEOTECHNICAL LABORATORY TESTING |
| 5. SUBSURFACE CHARACTERIZATION |
| 5.1 Site Geology |
| 5.2 Soils |
| 5.3 Groundwater |
| 6. CONCLUSIONS AND RECOMMENDATIONS |
| 6.1 General Evaluation |
| 6.2 Foundation Design and Construction |
| 6.3 Concrete Slab on Grade |
| 6.4 Excavation Methods |
| 6.5 Subgrade Preparation, Structural Fill, and Backfill |
7. LIMITATIONS
| Report.pdf |
| 1. INTRODUCTION |
| 2. SITE AND PROJECT DESCRIPTION |
| 3. FIELD EXPLORATION |
| 4. GEOTECHNICAL LABORATORY TESTING |
| 5. SUBSURFACE CHARACTERIZATION |
| 5.1 Site Geology |
| 5.2 Soils |
| 5.3 Groundwater |
| 6. CONCLUSIONS AND RECOMMENDATIONS |
| 6.1 General Evaluation |
| 6.2 Foundation Design and Construction |
| 6.3 Concrete Slab on Grade |
| 6.4 Excavation Methods |
| 6.5 Subgrade Preparation, Structural Fill, and Backfill |
7. LIMITATIONS
| Figures.pdf |
| Slide Number 1 |
| Slide Number 2 |
| Slide Number 3 |
| 1. 106 Jamestown ave. Summary of Index.pdf |
| Report |
| USCS Soil Classification B-4 S-3 (4.0'-6.0').pdf |
| Results Page |
| USCS Soil Classification B-3 S-3 (4.0'-6.0').pdf |
| Results Page |
| USCS Soil Classification B-1 S-5 (8.0'-10.0').pdf |
| Results Page |
| USCS Soil Classification B-1 S-3 (4.0'-6.0').pdf |
| Results Page |
| Geotechnical Investigation Plan-Drawing 1.pdf |
| Sheets and Views |
| Drawing 1 |
| Boring Profile-Drawing2-Drawing 2.pdf |
| Sheets and Views |
| Drawing 2 |
| Geotechnical Investigation Plan-Drawing 1.pdf |
| Sheets and Views |
| Drawing 1 |
| Boring Profile-Drawing2-Drawing 2F.pdf |
| Sheets and Views |
| Drawing 2 |
| USCS Soil Classification B-4 S-3 (4.0'-6.0').pdf |
| Results Page |
| USCS Soil Classification B-3 S-3 (4.0'-6.0').pdf |
| Results Page |
| USCS Soil Classification B-1 S-5 (8.0'-10.0').pdf |
| Results Page |
| USCS Soil Classification B-1 S-3 (4.0'-6.0').pdf |
| Results Page |
| 1. 106 Jamestown ave. Summary of Index.pdf |
| Report |
| Ballast Stabilization Detail-Detail 1.pdf |
| Sheets and Views |
| Detail 1 |
| Boring Profile-Drawing2-Drawing 2.pdf |
| Sheets and Views |
| Drawing 2 |
| Boring Profile-Drawing2-Drawing 2.pdf |
| Sheets and Views |
| Drawing 2 |
| igures.pdf |
| Slide Number 1 |
| Slide Number 2 |
| Slide Number 3 |
| G25-369 19 S. 22nd St.Connector Addition - Geotechnical Investigation Plan-Drawing 1.pdf |
| Sheets and Views |
| Drawing 1 |
| G25-369 19 S. 22nd St.Connector Addition - Test Boring Profiles-Drawing 2B.pdf |
| Sheets and Views |
| Drawing 2 |
| G25-369 19 S. 22nd St.Connector Addition - Test Boring Profiles-Drawing 2.pdf |
| Sheets and Views |
| Drawing 2 |
| USCS Soil Classification TB-3 S-5 (8.0'-10.0').pdf |
| Results Page |
| USCS Soil Classification TB-2 S-6 (10.0'-12.0').pdf |
| Results Page |
| USCS Soil Classification TB-2 S-2 (2.0'-4.0').pdf |
| Results Page |
| USCS Soil Classification TB-1 S-4 (6.0'-8.0').pdf |
| Results Page |
| 1. 22nd str. Summary of Index.pdf |
| Report |
| Figures.pdf |
| Slide Number 1 |
| Slide Number 2 |
| Slide Number 3 |
| 1.1 USCS Soil Classification B-3 S-4 (6.0'-8.0').pdf |
| Results Page |
| 1.1 USCS Soil Classification B-2 S-5 (8.0'-10.0').pdf |
| Results Page |
| 1.1 USCS Soil Classification B-1 S-3 (4.0'-6.0').pdf |
| Results Page |
| 1. Modena Townhome Reconstruction - Summary of Index.pdf |
| Report |
File details come from the government source that posted it. Updated .