6. Statement of Work - EIS Sheds.pdf
PDF 119 KB Posted
- Attached to
- 183 EIS Storage Sheds
- Solicitation number
- 183EIS001
- Issued by
-
Department of the Army National Guard
About this file
This is a Statement of Work for supplies issued by the Illinois Air National Guard (ILANG) 217th Engineering Installation Squadron dated 21 October 2025.
The procurement requires four (4) single-car A-frame storage sheds with wood siding to provide additional storage for mission essential items beyond the capacity of the existing warehouse in Building 46. The sheds must measure 12' x 32' (with acceptable range of 12' x 24' to 12' x 32') and shall be delivered and installed at 3101 J Davis Jones Parkway, Springfield, Illinois 62707-5001 no later than 31 December 2026. The contractor is responsible for providing all materials and labor for delivery and set-up/installation on a customer-prepared lot. Detailed specifications include pressure-treated marine grade foundation runners (4" x 6"), marine grade treated floor joists (2" x 6" at 12" on-center), ¾" tongue and groove marine plywood flooring, 2" x 4" dimensional lumber stud walls, L.P. Smart Side shallow groove wood siding and trim, a 36" wide pre-hung steel entry door, a 24" x 36" window for light, a 9' x 7' overhead garage door, 2" x 4" roof trusses with added gussets, 7/16" wood roof sheeting, 30-year minimum asphalt shingles, and a vented ridge cap. Materials stored require protection from the elements (rain, snow) but not temperature control.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STATEMENT OF WORK (SOW) FOR SUPPLIES
ILLINOIS AIR NATIONAL GUARD (ILANG) UNIT/
DIRECTORATE DATE: 21 October 2025
TITLE: 217th Engineering Installation Squadron (EIS) Storage Sheds
1. PURPOSE. Storage sheds are required to provide additional storage for 217th EIS mission essential items/other property beyond the storage capacity of the EIS warehouse located in Building 46. Materials stored would need protection from the elements (rain, snow, etc.) but not necessarily temperature protection.
2. SCOPE OF WORK. The contractor shall provide all materials and support necessary to meet the required specifications for the storage sheds.
3. DELIVERY LOCATION AND DELIVERY DATE. This equipment shall be delivered to the Illinois Air National Guard, Building 46, located at 3101 J Davis Jones Parkway, Springfield, Illinois 62707-5001 not later than 31 December 2026.
4. QUANTITY REQUIRED: 4 each.
5. SPECIFICATIONS REQUIRED.
5.1 12’ x 32’ Single Car A-Frame Garage - Wood Siding (no smaller than 12’ x 24’ and no larger than 12’ x 32’)
5.2 4” x 6” Pressure Treated Foundation Runners (Marine Grade Treated)
5.3 2” x 6” Floor Joists 12” OC (Marine Grade Treated)
5.4 ¾ " Tongue and Groove Marine Plywood (floor)
5.5 2” x 4” Dimensional lumber stud walls
5.6 L.P. Smart Side Shallow Groove Wood Siding and Trim (standard exterior wood panel siding)
5.7 36” Wide pre-hung steel entry door
5.8 24” x 36” Window for light (other sizes acceptable) – There is no minimum size required.
5.9 9’ x 7’ Overhead Garage Door
5.10 2” x 4” Trusses with added gussets for strength
5.11 7/16” Wood Sheeting on Roof
5.12 30 Yr. Asphalt Shingles (minimum)
5.13 Vented Ridge Cap
5.14 Shall include delivery and set-up/installation on customer prepared lot
END
STATEMENT OF WORK (SOW) FOR SUPPLIES ILLINOIS AIR NATIONAL GUARD (ILANG) UNIT/ DIRECTORATE DATE: 21 October 2025
File details come from the government source that posted it. Updated .