Wilson Creek Sanitary Sewer Manhole Rehabilitation Project Summary
This is a sealed bid specification document issued by the City of McKinney, Texas for the Wilson Creek Sanitary Sewer Manhole Rehabilitation project (Project No. WW2550). The project encompasses full-depth manhole replacement, slip-line manhole rehabilitation, dowel manhole rehabilitation, and replacement of manhole tops and frames with pressure-rated components to adjust manhole heights and raise rim elevations along the Wilson Creek interceptor system. The bid submission deadline is 2:00 p.m. on May 7, 2026, with electronic submissions via the City's Bonfire procurement portal or in-person delivery to McKinney City Hall. A non-mandatory pre-submittal conference is scheduled for 1:00 p.m. on April 21, 2026, via Webex. Bid opening will occur immediately following the closing time and will be broadcasted via Webex. Hard copy contract documents are available from Gresham Smith at 500 N. Akard St, Suite 3200, Dallas, TX 75201 for a non-refundable fee of $500 per set. Electronic copies are available for download from Bonfire at no cost.
The Engineer's Opinion of Probable Construction Cost is $515,000. Contractors must submit bid security equal to five percent of the total proposal amount. Performance, payment, and maintenance bonds in the amount of 100 percent of the contract price are required upon award. Liquidated damages are assessed at $500 per calendar day for delays, with no early completion bonus offered. The contract incorporates the North Central Texas Council of Governments (NCTCOG) Fifth Edition (2023) Public Works Construction Standards as the governing specification document, with special conditions taking precedence in cases of conflict. Contractors are limited to subcontracting no more than 30 percent of labor costs and must comply with prevailing wage requirements established by the City of McKinney and applicable federal regulations. The maintenance bond extends for two calendar years following project acceptance to cover defects in materials and workmanship.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 1-02 Bid Proposal.pdf | ||
| 5-03 PLANS.pdf | ||
| 2-04 Bid Bond.pdf | ||
| 3-05 Required Forms Fillable.pdf | ||
| 4-06 Construction Agreement and Bonds.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SPECIFICATIONS
FOR
CONSTRUCTION
OF
McKINNEY WILSON CREEK MANHOLE
REHABILITATION
CITY OF McKINNEY
APRIL 10, 2026
Prepared by:
Gresham Smith
Project No.: WW2550
Bid No.: 26-57ITB
THE CONSTRUCTION OF
MCKINNEY WILSON CREEK MANHOLE REHABILITATION
CITY OF McKINNEY OFFICIALS
MAYOR
Bill Cox
COUNCIL MEMBERS
Gerê Feltus Justin Beller
Patrick Cloutier Rick Franklin Ernest Lynch Michael Jones
CITY MANAGER
Paul Grimes
DIRECTOR OF ENGINEERING
Gary Graham, P.E., PTOE
TABLE OF CONTENTS
TABLE OF CONTENTS
SECTION I
LEGAL NOTICE
INSTRUCTIONS TO BIDDERS
SECTION II
NCTCOG SPECIFICATIONS
STANDARD SPECIFICATIONS
SECTION 01100 - SUMMARY OF WORK
SECTION 01330 – SUBMITTAL PROCEDURES
SECTION 01665 – TRENCH SAFETY REQUIREMENTS
SECTION 01700 – CONFINED SPACE ENTRY PLAN
SECTION 02050 – DEMOLITION
SECTION 02300 – EXCAVATION AND BACKFILL
SECTION 02400 – EARTHWORK MATERIALS
SECTION 02600 –PRECAST CONCRETE MANHOLES (WASTEWATER)
SECTION 02605 – POLYMER MANHOLE STRUCTURES (WASTEWATER)
SECTION 02610 – SLIPLINE INSERT WITH POLYMER RISERS (WASTEWATER)
SECTION 02611 – PVC GRAVITY SEWR PIPE (WASTEWATER)
SECTION 02750 – BYPASS PUMPING (WASTEWATER)
SECTION 02936 – SEEDING AND SODDING
SECTION 09880– PROTECTIVE COATINGS FOR WW MANHOLES (HIGH
PERFORMANCE EPOXY)
SPECIAL CONDITIONS
SECTION I
LEGAL NOTICE
City of McKinney, Texas Advertisement for Bids
The City of McKinney (“City”) is accepting sealed bids for the Wilson Creek Sanitary Sewer Manhole Rehabilitation, Project No.: WW2550. Bids will be accepted until 2:00 p.m., May 07, 2026, (“Closing Time”) electronically via the City of McKinney’s procurement portal (“Bonfire”) or in person at the City of McKinney City Hall, 401 E. Virginia Street, McKinney, Texas 75069 (“City Hall”). Any Bid received at City Hall after Closing Time regardless of the cause will be returned unopened.
A non-mandatory pre-submittal conference is scheduled for 1:00 PM on April 21, 2026, via Webex meeting https://cityofmckinney.webex.com/cityofmckinney/j.php?MTID=m59a6323be55d02ac73aa8df5a 105fb66. Representatives of the Owner and Engineer will be present to discuss the Project. The Owner will make available to prospective bidders such Addenda as the Engineer considers necessary in response to issues raised with the Representative during the conference.
Bid opening will occur immediately following the Closing Time inside City Hall and will be broadcasted via a Webex meeting. Bidders are strongly encouraged to attend virtually versus in-person by following the Webex meeting details listed in Bonfire.
Electronic copies of Plans, Specifications and related Documents (collectively “Contract Documents”) will be available for download from Bonfire (https://mckinneytexas.bonfirehub.com/)
Hard copies of the Contract Documents will be available at Gresham Smith at 500, N. Akard St, Suite 3200, Dallas, TX, 75201. A set of Contract Documents may be acquired from that office upon Gresham Smith receipt of $500.00 per set, which amount is nonrefundable.
Hard copy submissions of Bids are to be addressed to the Procurement Services Office and shall be marked “SEALED BID – Wilson Creek Sanitary Sewer Manhole Rehabilitation, BID NO 26-57ITB” on the outside of the envelope.
The City makes no guarantee that any Bids sent via U.S. mail will be picked up from the U.S. Post Office and received at City Hall before the Closing Time. It is recommended that Bid are submitted electronically, as noted above, or via an alternate delivery method ensuring timely delivery to City Hall. Bidder bears full responsibility for delivering the Bid to City Hall before the Closing Time. The mere fact a Bid was dispatched does not equal timely receipt.
In accordance with the Americans with Disabilities Act, it is the policy of the City of McKinney to offer its public programs, services and meetings in a manner that is readily accessible to everyone, including individuals with disabilities. If you are a person with a disability and require information or materials in an appropriate alternative format; or if you require any other accommodation, please contact the ADA Coordinator at least 48 hours in advance of the event.
contact-adacompliance@mckinneytexas.org.
TO APPEAR IN THE MCKINNEY COURIER GAZETTE IN THE FOLLOWING EDITIONS:
https://cityofmckinney.webex.com/cityofmckinney/j.php?MTID=m59a6323be55d02ac73aa8df5a105fb66 https://mckinneytexas.bonfirehub.com/ mailto:contact-adacompliance@mckinneytexas.org
FIRST PUBLICATION: April 10, 2026 SECOND PUBLICATION: April 17, 2026
INSTRUCTIONS TO BIDDERS
GENERAL
The City of McKinney, Texas (the “Owner”) has adopted the North Central Texas Council of Governments (NCTCOG) Fifth Edition (2023) of the Public Works Construction Standards - North Central Texas (as amended) (the “NCTCOG Specifications”). The NCTCOG Specifications apply to this project, except as otherwise noted herein. In the event of a contradiction or conflict between the NCTCOG Specifications and these Contract Documents, the information in these Contract Documents shall control.
Bidders are specifically directed to become thoroughly familiar with the NCTCOG Specifications prior to submitting a bid. The NCTCOG Specifications may be purchased from:
North Central Texas Council of Governments 616 Six Flags Drive P.O. Box 5888 Arlington, Texas 76005-5888 817/461-3300 (Metro)
Bidders shall complete the following components, signing where required, and submit them with the bid proposal in accordance with the requirements for the bid proposal as set out in the legal notice:
1) Contractor Status Information;
2) Out of State Contractor Compliance to State Law (If Applicable);
3) Statement of Bidding Contractor’s Qualifications and Experience;
4) Statement of Subcontractor’s Qualifications and Experience (See Below);
5) Safety Record Questionnaire & Statement of Bidder’s Safety Experience;
6) Bid Proposal;
7) Bid Schedule (Table 1); and,
8) Bid Bond (in the form attached).
The “Statement of Subcontractor’s Qualifications and Experience” shall be completed at a minimum with the name of each subcontractor intended to perform work on the project when submitted with the bid proposal. Any incomplete or inaccurate subcontractor information shall be completed and/or corrected by the apparent low bidder and the next two lowest bidders (if requested by the City). The completed and/or corrected information shall be submitted to the City on or before 5:00 p.m. of the next business day immediately following the bid opening. Failure to submit the names of such subcontractors and/or timely correction or completion and submittal of the “Statement of Subcontractor’s Qualifications and Experience” in a timely fashion may result in the rejection or disqualification of the bidder’s proposal.
Any bidders obligated by law to register with the Texas Secretary of State must include their filing number on the Contractor Status Form. Responses from entities that are required to register and maintain an active right to transact business in Texas but fail to provide a filing number or lack an active right to transact business, may be deemed non-responsive and subsequently rejected.
I. DEFINED TERMS.
A. Terms used in these Instructions to Bidders are defined in the General Provisions of the NCTCOG Specifications. In addition:
“Engineer” means the City Engineer or their designee.
“Project” means the Wilson Creek Sanitary Sewer Manhole Rehabilitation project, Project No.: WW2250.
“Successful Bidder” means the lowest, qualified, responsible Bidder to whom Owner (on the basis of Owner's evaluation as hereinafter provided) makes an award.
“Work Order” as used in Item 108 means the notice to proceed issued by the Owner directing the Contractor to begin the Work.
II. COPIES OF CONTRACT DOCUMENTS.
A. Complete sets of the Contract Documents in the number and for the deposit sum, if any, stated in the Advertisement for Bids may be obtained from Engineer.
B. Complete sets of Contract Documents shall be used in preparing Proposals; neither Owner nor Engineer assumes any responsibility for errors or misinterpretations resulting from the use of incomplete sets of Contract Documents.
C. Owner and Engineer in making copies of Contract Documents available on the above terms do so only for the purpose of obtaining Proposals on the Work and do not confer a license or grant for any other use.
III. QUALIFICATIONS OF BIDDERS
A. Add the following paragraph at the end of current NCTCOG Specifications Item 102.12 as a new paragraph:
Within five (5) business days after Bid Opening, the apparent low Bidder shall submit such evidence as the OWNER may require establishing the Bidder's qualifications to satisfactorily perform the Work included in this Project. Information that may be required shall include the following:
1. Current Financial Statement;
2. Letter of Auditor’s opinion if available;
3. Previous years Balance Sheet, Income Statement and Change of Financial
Position;
4. Other information that may be pertinent to the Bidders qualifications.
Should the Bidder fail to produce evidence satisfactory to the OWNER on any of the foregoing points, they may be disqualified, and the Work awarded to the next Bidder so qualifying.
IV. EXAMINATION OF CONTRACT DOCUMENTS AND SITE
A. Refer to NCTCOG Specifications Items 102.3, 102.4 and 103.1.
The project is located in the City of McKinney, Texas.
B. On request, Owner will provide each Bidder access to the site to conduct such investigations and tests as each Bidder deems necessary for submission of their Proposal.
C. The lands upon which the Work is to be performed, rights-of-way for access thereto and other lands designated for use by Contractor in performing the Work are identified in the Special Conditions or Drawings.
D. The submission of a Proposal will constitute an incontrovertible representation by the
Bidder that they have complied with every requirement of this Article IV and that the Contract Documents are sufficient in scope and detail to indicate and convey understanding of all terms and conditions for performance of the Work.
V. INTERPRETATIONS
Bidders desiring further information or interpretation of the Plans or Specifications must make request for such information through the City of McKinney electronic procurement portal, Bonfire, at https://mckinneytexas.bonfirehub.com/, prior to April 30, 2026 at 2:00 p.m. CT. Answers to all such requests will be given in writing to all bidders, in Addendum form, and all Addenda will be bound with, and made a part of, the Contract Documents.
No other explanation or interpretation will be considered official, or binding and the City will not be responsible for any other explanations or interpretations. Should a bidder find discrepancies in, or omissions from the Plans, Specifications, or other Contract Documents, or should they be in doubt as to their meaning, they should at once notify the City in order that a written Addendum may be sent to all bidders. Any Addenda issued prior to forty-eight (48) hours before the opening of bids will be issued via Bonfire. The proposal as submitted by the Contractor will be understood to include any Addenda if such are issued by the City prior to forty-eight (48) hours before the opening of Proposals.
Any correction or change to information entered by bidder on a Proposal form must be initialed and dated by the person(s) preparing said Proposal form. Corrections should be made by striking out the incorrect information and writing or typing the correct information legibly in the margin or nearest available space. “White-out” is not an acceptable method of deleting information.
VI. BID SECURITY
Each Proposal submitted shall be accompanied by an acceptable bidder’s security bond or a bid guaranty in the form of a certified check or cashier’s check made payable to the City of McKinney in an amount not less than 5% of the greatest possible total amount of https://mckinneytexas.bonfirehub.com/ the Proposal submitted as a guarantee that, if awarded the contract, the Bidder will enter into a Contract and execute all necessary bonds and provide evidence of all required insurance coverage. The bid bond shall be issued in the form provided by the Owner as attached to the Instructions to Bidders (Section I). No alternate bid bond forms will be accepted. If a proposal is submitted electronically, the Bidder shall submit a .pdf (or other electronic format) of the original hard copy of the Bid Bond or bid guaranty with their proposal. If a hard copy of the proposal is submitted, the Bidder shall cause of the original hard copy of the Bid Bond, certified check, or Cashier’s Check to be enclosed with the proposal. All bidders’ security will be retained until a contract has been awarded and executed. See also, NCTCOG Specifications Items 102.5, 102.7 and 102.13.
A Bidder’s failure to include the original hard copy, or a .pdf (or other electronic format) of the original hard copy, of the Bid Bond, certified check, or Cashier’s Check with their proposal prior to bid opening shall be cause for rejection of their bid.
If the Bidder submitted their proposal electronically together with a .pdf (or other electronic format) of the original hard copy, of the Bid Bond, certified check, or Cashier’s Check, the Bidder shall provide the original hard copy thereof to the City’s Procurement Services Department within no more than 24 hours after the opening of the bids. Failure to timely submit the original hard copy of the Bid Bond, certified check, or Cashier’s Check within such 24-hour period shall be cause for rejection of the bid.
VII. PERFORMANCE, PAYMENT AND MAINTENANCE BONDS
Performance and payment bonds in the amount of not less than one hundred percent (100%) of the contract price conditioned upon the faithful performance of the contract, and upon payment of all persons supplying labor or furnishing materials, will be required upon the forms which are a part of the Contract Documents. In addition to the requirement of NCTCOG Specifications Item 103.3.1.1 that the Performance Bond provide for the repair and/or replacement of all defects due to faulty materials and workmanship that appear within a period of one year from the date of completion and acceptance of the improvement by the Owner, a Maintenance Bond in the amount of 100% of the contract sum covering defects of material and workmanship for two calendar years following the Owner's approval and acceptance of the construction shall also be required upon the forms which are a part of the Contract Documents. The performance, payment, and maintenance bonds shall be issued in the form provided by the Owner as attached to the Construction Agreement (Section II). No alternate performance, payment, and maintenance bond forms will be accepted. Bonds shall be executed by a surety company acceptable to and approved by the Owner, authorized to do business in the State of Texas, and acceptable for underwriting of risks as indicated by the latest revision of Treasury Department Circular 570 listing acceptable sureties on Federal Bonds. The period of the Maintenance Bond shall be two years from the date of acceptance of all work done under the Contract, to cover the guarantee as set forth in the Special Conditions.
VIII. DELAYS AND EXTENSIONS OF TIME
Requests for additional time shall be submitted in accordance with NCTCOG Specifications Item 108.8 and Special Condition 15 and will only be considered if the anticipated workdays, as outlined in NCTCOG Specifications Item 108.8 and Special Condition 15 have not been available. Regular documentation of such causes must be maintained for claims to be valid.
IX. LIQUIDATED DAMAGES
Refer to NCTCOG Specifications Item 108.8.1 and Special Condition 13 for specific information regarding Liquidated Damages
X. BONUSES
Refer to Special Condition 14 for specific information regarding Bonuses available for early completion, if any.
XI. SUBSTITUTE MATERIAL AND EQUIPMENT
Refer to Special Condition 19 for specific information regarding the use of equivalent materials and equipment and NCTCOG Specifications Item 106.1.
XII. SUBCONTRACTORS, ETC.
Refer to NCTCOG Specifications Item 108.5. Additionally, under this Contract no more than 30% of the labor for the Contract Work shall be subcontracted. Bid proposals that exceed this specified subcontracted work percentage shall be considered grounds for the rejection of the bid.
Contractor shall not be allowed to shift Contract Work from the Contractor to one or more subcontractors if such action increases the amount of Contract Work to be performed by subcontractors to an amount greater than 30% of the labor for the Contract Work unless specifically approved in advance and in writing by the Owner. All requests to modify the list of subcontractors, increase the number of subcontractors, or shift work from the Contractor to one or more subcontractors shall be accompanied by an updated written notice of subcontracts.
XIII. PROPOSAL FORM
A. Refer to NCTCOG Specifications Items 102.1, 102.2, 102.4 and 102.10.
B. NCTCOG Specifications Item 102.4 (Preparation of Proposal) shall be amended to eliminate requirements for written prices in ink and words where electronic bid proposal forms are utilized and submitted by the Contractor in lieu of a written proposal. All handwritten submittals shall conform with NCTCOG Specification Item 102.4.
XIV. SUBMISSION OF PROPOSALS
Refer to NCTCOG Specifications Item 102.6.
XV. MODIFICATION AND WITHDRAWAL OF PROPOSALS
Refer to NCTCOG Specifications Item 102.7.
XVI. OPENING OF PROPOSALS
Refer to NCTCOG Specifications Item 102.8.
PROPOSALS TO REMAIN OPEN
XVII.
Refer to NCTCOG Specifications Items 102.7, 103.2 and 103.5.2.
XVIII. AWARD OF CONTRACT
A. Refer to NCTCOG Specifications Items 102.9, 102.10, 103.2, 103.5.1 and 103.6.
B. The CONTRACTOR shall complete the execution of the required performance, payment and maintenance bonds, and Contract, within ten (10) calendar days of such Notice, or the OWNER shall be entitled to the proceeds of the Proposal Guaranty in accordance with NCTCOG Specifications Item 102.5.
XIX. PERFORMANCE AND OTHER BONDS
Refer to the Construction Agreement and the attached forms for Payment, Performance and Maintenance Bonds as well as NCTCOG Specifications Item 103.3.
XX. SIGNING OF AGREEMENT
Refer to NCTCOG Specifications Item 103.5.
XXI. PROTECTION OF THE PUBLIC
For protection and convenience of the public and emergencies, the Successful Bidder shall furnish the Owner with a telephone number at which the Contractor can be contacted 24 hours a day during the entire construction period of this Project. This telephone number shall be furnished to the Owner in writing prior to the beginning of construction.
XXII. GOVERNING DOCUMENTS
The work shall conform to the requirements of these Specifications and the details as shown on the Drawings. These Contract Documents are intended to be complementary.
Requirements of any of the Contract Documents are as binding as if called for by all. In the event of conflict between the Drawings and the Specifications, the interpretation of the Drawings shall have priority. In case of conflict between the referenced Specifications and the Project Specifications, the Project Specifications shall govern.
XXIII. REMOVAL OF DEFECTIVE AND UNAUTHORIZED WORK
All work which has been rejected or condemned shall be repaired, or if it cannot be repaired satisfactorily, it shall be removed and replaced at the Contractor's expense.
Defective materials shall be immediately removed from the site of the work. Work done without line and grade having been given, work done beyond the lines or not in conformity with the grades shown on the Drawings or as given, save as herein provided, work done without proper inspection, or any extra or unclassified work done without written authority and prior agreement in writing as to prices, shall be done at the Contractor's risk, and will be considered unauthorized, and at the option of the Engineer, may not be measured and paid for, and may be ordered removed at the Contractor's expense. If the Contractor fails to satisfactorily repair, replace or remove the rejected, condemned or unauthorized work or materials immediately upon receipt of written notice, the Engineer will have the authority to cause such remediation to be performed and to deduct the cost thereof from any monies due or to become due to the Contractor.
XXIV. SPECIAL LEGAL REQUIREMENTS
Refer to NCTCOG Specifications Item 107.14 -- State and Local Sales and Use Taxes.
XXV. PRE-BID CONFERENCE
A NON-MANDATORY pre-bid conference is scheduled for 1:00 PM on April 21, 2026, via a Webex meeting at:
https://cityofmckinney.webex.com/cityofmckinney/j.php?MTID=m59a6323be55d02ac73a a8df5a105fb66. Representatives of the Owner and Engineer will be present to discuss the Project. The Engineer will distribute to prospective bidders of record such Addenda as the Engineer considers necessary in response to discussions or inquiries arising at the conference.
XXVI. ENGINEER’S OPINION OF PROBABLE CONSTRUCTION COST
The Engineer’s opinion of probable construction cost is $515,000.
SECTION II
NCTCOG SPECIFICATIONS
The City of McKinney, Texas has adopted the Fifth Edition (2023) of the Public Works Construction Standards - North Central Texas as amended and published by the North Central Texas Council of Governments (the “NCTCOG Specifications”). The NCTCOG Specifications apply to this Project, except as noted herein. In the case of a contradiction between the NCTCOG Specifications and these Contract Documents, the information in these Contract Documents shall control.
Bidders are specifically directed to become thoroughly familiar with the NCTCOG Specifications prior to submitting a bid. The Specifications may be purchased from:
North Central Texas Council of Governments 616 Six Flags Drive P.O. Box 5888 Arlington, Texas 76005-5888 817/461-3300 (Metro)
Unless otherwise specifically noted on the Plans, or in these Specifications, all applicable sections of the NCTCOG Specifications are in effect. In this case of a contradiction between the NCTCOG Specifications and these Contract Documents, the information in these Contract Documents shall control.
STANDARD SPECIFICATIONS
DIVISION 1 – GENERAL REQUIREMENTS
01100 – SUMMARY OF WORK
01330 – SUBMITTAL PROCEDURES
01665 – TRENCH SAFETY REQUIREMENTS
01700 – CONFINED SPACE ENTRY PLAN
DIVISION 2 – SITE WORK
02050 – DEMOLITION
02300 – EXCAVATION AND BACKFILL
02400 – EARTHWORK MATERIALS
02600 – PRECAST CONCRETE MANHOLES (WASTEWATER)
02605 – POLYMER MANHOLE STRUCTURES (WASTEWATER)
02611 – PVC PIPE (WASTEWATER)
02750 – BYPASS PUMPING PIPE (WASTEWATER)
02936 – SEEDING AND SODDING
DIVISION 09 – COATINGS
09980– PROTECTIVE COATINGS WW MANHOLES (EPOXY)
APPENDIX A – PROJECT PHOTOS
APPENDIX B – WilsonCreekInterceptorSewer1
REFERENCE: WILSON CREEK RELIEF INTERCEPTOR US 75 TO HWY 5; YEAR 2001
36" TO 48" CLASS III RCP PIPE
EXISTING MANHOLE DETAILS (WilsonCreekInterceptorSewer1)
APPENDIX C – WilsonCreekInterceptorSewer2
REFERENCE: WILSON CREEK RELIEF INTERCEPTOR US 75 TO BOIS D ARC RD; 36" TO
48" YEAR 2001 CLASS III RCP PIPE
EXISTING MANHOLE DETAILS (WilsonCreekInterceptorSewer2)
APPENDIX D – WilsonCreekInterceptorSewer3
REFERENCE: WILSON CREEK RELIEF INTERCEPTOR BOIS D ARC RD TO APPROX
US380; 36" TO 48" YEAR 2001 PVC CLOSED PROFILE PIPE
EXISTING MANHOLE DETAILS (WilsonCreekInterceptorSewer3)
SECTION 01100
SUMMARY OF WORK
City of McKinney Wilson Creek Sanitary Sewer MH Improvements Gresham Smith Project No.: 49745.00 Feb 2026
SECTION 01100 - SUMMARY OF WORK
PART 1 - GENERAL
1.1 SECTION INCLUDES
A. Contract description.
B. Contractor's use of Site.
C. Work sequence.
D. Owner occupancy.
E. Project Information Exchange.
1.2 CONTRACT DESCRIPTION
A. Work of the Project includes:
Full Depth Manhole Replacement intended to adjust manhole heights to raise Rim Elevation of the Wilson Creek interceptors
Slip Line Manhole Rehabilitation of Manholes intended to adjust manhole heights to raise Rim Elevation of the Wilson Creek interceptors
Dowel Manhole Rehabilitation of Manholes intended to adjust manhole heights to raise Rim Elevation of the Wilson Creek interceptors
Replacement of Top and Frame of Manhole with Pressure Rated Top and Frame.
Manhole Removal of Demolition
1.3 CONTRACTOR’S USE OF SITE
A. Limit use of Site to allow:
Owner occupancy.
Work by Owner or Others.
1.4 WORK SEQUENCE
SECTION 01100
SUMMARY OF WORK
City of McKinney Wilson Creek Sanitary Sewer MH Improvements
A. Construct Work to accommodate Owner's occupancy requirements and limit disruptions during construction period. Coordinate construction schedule and operations with Owner and Engineer.
B. Sequencing of Construction Plan: Before start of construction, submit a plan showing sequencing of construction. After acceptance of plan, construction sequencing shall comply with accepted plan unless deviations are accepted by Owner in writing.
1.5 MCKINNEY PARKS
A. Contractor to limit access to McKinney Parks and Trails to maintain safe operations.
B. Cooperate with Park Department and post necessary signs showing restricted areas.
1.6 PROJECT INFORMATION EXCHANGE
A. Project Information Exchange: The Engineer will provide access to relevant Project files through its project information management software Newforma without charge to Contractor and provide instruction on its use. This software includes the ability to exchange large files and large numbers of files.
Contract Documents will be issued using this software.
Contractor shall use this software for transmitting all files for contract administration documents;
no other method is acceptable. The Engineer will not download documents from Contractor’s FTP site.
Additional requirements for specific types of contract administration documents are specified in other Division-01 Specifications sections.
END OF SECTION
SECTION 01330
SUBMITTAL PROCEDURES
City of McKinney Wilson Creek Sanitary Sewer MH Improvements
SECTION 01330 – SUBMITTAL PROCEDURES
1.1 SUMMARY
A. This Section includes administrative and procedural requirements for submitting Shop Drawings, Product Data, Samples, and other miscellaneous submittals.
1.2 DEFINITIONS
A. Action Submittals: Written and graphic information that requires Engineer's responsive action.
B. Informational Submittals: Written information that does not require Engineer's approval.
Submittals may be rejected for not complying with requirements.
1.3 SUBMITTAL PROCEDURES
A. General: Electronic copies of base plans of the Contract Drawings for Contractor's use in preparing submittals will not be provided.
B. Coordination: Coordinate preparation and processing of submittals with performance of construction activities.
Coordinate each submittal with fabrication, purchasing, testing, delivery, other submittals, and related activities that require sequential activity.
Coordinate transmittal of different types of submittals for related parts of the Work so processing will not be delayed because of need to review submittals concurrently for coordination.
Engineer reserves the right o withhold action on a submittal requiring coordination with other submittals until related submittals are received.
C. Submit a schedule indicating the date submittals will be sent to the Engineer and proposed dates that the product will be incorporated into the project. Make submittals promptly in accordance with the schedule so as to cause no delay in the project.
D. Processing Time:
Submittals shall be sent to Engineer allowing a reasonable time for delivery, review and marking submittals. Time for review is to include time for resubmission if necessary and to allow adequate time for the ordering, fabrication, and delivery of the product.
If resubmittal is necessary, process it in same manner as initial submittal.
No extension of the Contract Time will be authorized because of failure to transmit submittals enough in advance of the Work to permit processing.
Submittals out of sequence from agreed upon schedule may result in back charges to the Contractor.
Schedule submittal to provide all information for interrelated work at one time. No review will be performed on submittals requiring coordination with other submittals. Engineer will return submittals for resubmission as a complete package.
Shop drawings shall be reviewed in the order received.
The Contractor may mark submittals as "Priority" for review. Contractor should use discretion in the use of "Priority" submittals as this may delay the review of submittals previously submitted.
Priority submittals will be reviewed before other submittals for this project which have been received but not reviewed.
E. Submittals for systems and related equipment shall include information for all of the components required for a complete and operational system.
Include electrical, mechanical, and other information required to indicate how the various components of the system function.
Where certifications, warranties, and written guarantees are required, they will be provided with the submittal package for review.
F. Fabrication or installation of any products prior to the approval of shop drawings is done at the Contractor's risk. Products not meeting the requirements of Contract Documents are defective and may be rejected at the Owner's option.
G. Payment will not be made for products for which submittals are required until the submittals have been received. Payment will not be made for products for which shop drawings or samples are required until these are approved by the Engineer.
H. Identification: Place a permanent label or title block on each submittal for identification.
Indicate name of firm or entity that prepared each submittal on label or title block.
Provide a space on label or beside title block to record Contractor's review and approval markings.
Include the following information on label for processing and recording action taken:
Project name.
1) Date.
2) Name and address of Contractor.
3) Name and address of subcontractor.
4) Name and address of supplier.
5) Name of manufacturer.
6) Unique identifier, including revision number.
7) Number and title of appropriate Specification Section.
8) Drawing number and detail references, as appropriate.
9) Other necessary identification.
I. Conformance with Specification: Provide a copy of the specification section including addenda updates with each applicable submittal with check marks to the left of each paragraph that indicates conformance with the specification.
Deviations: Highlight, encircle, or otherwise identify deviations from the Contract Documents on submittals.
If deviations from the specifications are noted, Contractor shall provide with the submittal a written justification for each deviation.
Failure to include a copy of the marked-up specification sections, along with justification(s) for any requested deviations to the specification requirements shall be cause for rejection of the entire submittal with no further consideration.
J. Copies: Unless additional copies are required for final submittal, and unless Engineer observes noncompliance with provisions of the Contract Documents, initial submittal may serve as final submittal.
Final submittals shall be submitted electronically and three bound hard copy plus the number of copies the Contractor desires.
K. Transmittal: Package each submittal individually and appropriately for transmittal and handling. Transmit each submittal using a transmittal form. Engineer will return submittals, without review, received from sources other than Contractor.
L. Distribution: Furnish copies of final submittals to manufacturers, subcontractors, suppliers, fabricators, installers, authorities having jurisdiction, and others as necessary for performance of construction activities. Show distribution on transmittal forms.
M. Use for Construction: Use only final submittals with mark indicating action taken by Engineer in connection with construction.
1.4 RESUBMISSION REQUIREMENTS
A. Make all corrections or changes in the submittals required by the Engineer and resubmit until No Exceptions Taken.
B. For shop drawings:
Revise initial drawings or data and resubmit as specified for the original submittal.
Highlight in yellow those revisions which have been made in response to the first review by the Engineer.
Highlight in blue any new revisions which have been made or additional details of information that has been added since the previous review by the Engineer.
C. For samples:
Submit new samples as required for the initial sample.
Remove samples which have been rejected.
D. Engineering cost for excessive review of shop drawings will be paid by the Contractor.
Excessive review of shop drawings is defined as any review required after the original review has been made and the first resubmittal has been checked to see that corrections have been made.
Cost for additional review time will be billed to the Owner by the Engineer for the actual hours required for the review and marking of shop drawings by Engineer and in accordance with the following rates:
Position and Hourly Rates:
Principal in Charge $280.00
Project Manager and Design Lead Engineer $240.00
Design Engineer $170.00
Engineering Technician $140.00
Administrative $100.00
Pay cost for the additional review to the Owner on a monthly basis as billed by the Owner.
Need for more than one resubmission or any other delay of obtaining Engineer's review of submittals, will not entitle the Contractor to an extension of Contract Time. All costs associated with such delays shall be at the Contractor's expense.
PART 2 - PRODUCTS
2.1 ACTION SUBMITTALS
A. General: Prepare and submit Action Submittals required by individual Specification Sections.
B. Product Data: Collect information into a single submittal for each element of construction and type of product or equipment.
If information must be specially prepared for submittal because standard printed data are not suitable for use, submit as Shop Drawings, not as Product Data.
Mark each copy of each submittal to show which products and options are applicable.
Include the following information, as applicable:
1) Manufacturer's written recommendations.
2) Manufacturer's product specifications.
3) Manufacturer's installation instructions.
4) Standard color charts.
5) Manufacturer's catalog cuts.
6) Wiring diagrams showing factory-installed wiring.
7) Printed performance curves.
8) Operational range diagrams.
9) Mill reports.
10) Standard product operating and maintenance manuals.
11) Compliance with recognized trade association standards.
12) Compliance with recognized testing agency standards.
13) Application of testing agency labels and seals.
14) Notation of coordination requirements.
C. Shop Drawings: Prepare Project-specific information, drawn accurately to scale. Do not base Shop Drawings on reproductions of the Contract Documents or standard printed data.
Preparation: Include the following information, as applicable:
Dimensions.
Identification of products.
Fabrication and installation drawings.
Roughing-in and setting diagrams.
Wiring diagrams showing field-installed wiring, including power, signal, and control wiring.
Shopwork manufacturing instructions.
Templates and patterns.
Schedules.
Design calculations.
Compliance with specified standards.
Notation of coordination requirements.
Notation of dimensions established by field measurement.
Wiring Diagrams: Differentiate between manufacturer-installed and field-installed wiring.
D. Samples: Prepare physical units of materials or products, including the following:
Samples for Initial Selection: Submit manufacturer's color charts consisting of units or sections of units showing the full range of colors, textures, and patterns available.
Samples for Verification: Submit full-size units or Samples of size indicated, prepared from the same material to be used for the Work, cured and finished in manner specified, and physically identical with the product proposed for use, and that show full range of color and texture variations expected. Samples include, but are not limited to, the following: partial sections of manufactured or fabricated components; small cuts or containers of materials; complete units of repetitively used materials; swatches showing color, texture, and pattern; color range sets; and components used for independent testing and inspection.
Preparation: Mount, display, or package Samples in manner specified to facilitate review of qualities indicated. Attach label on unexposed side that includes the following:
1) Generic description of Sample.
2) Product name or name of manufacturer.
3) Sample source.
Submit a single Sample where assembly details, workmanship, fabrication techniques, connections, operation, and other similar characteristics are to be demonstrated.
Disposition: Maintain sets of approved Samples at Project site, available for quality-control comparisons throughout the course of construction activity. Sample sets may be used to determine final acceptance of construction associated with each set.
E. Subcontract List: Prepare a written summary identifying individuals or firms proposed for each portion of the Work, including those who are to furnish products or equipment fabricated to a special design. Include the following information in tabular form:
Name, address, and telephone number of entity performing subcontract or supplying products.
Number and title of related Specification Section(s) covered by subcontract.
Drawing number and detail references, as appropriate, covered by subcontract.
2.2 INFOMRATIONAL SUBMITTALS
A. General: Prepare and submit Informational Submittals required by other Specification Sections.
Certificates and Certifications: Provide a notarized statement that includes signature of entity responsible for preparing certification. Certificates and certifications shall be signed by an officer or other individual authorized to sign documents on behalf of that entity.
B. Qualification Data: Prepare written information that demonstrates capabilities and experience of firm or person. Include lists of completed projects with project names and addresses, names and addresses of architects and owners, and other information specified.
C. Product Certificates: Prepare written statements on manufacturer's letterhead certifying that product complies with requirements.
D. Welding Certificates: Prepare written certification that welding procedures and personnel comply with requirements. Submit record of Welding Procedure Specification (WPS) and Procedure Qualification Record (PQR) on AWS forms. Include names of firms and personnel certified.
E. Installer Certificates: Prepare written statements on manufacturer's letterhead certifying that Installer complies with requirements and, where required, is authorized for this specific Project.
F. Manufacturer Certificates: Prepare written statements on manufacturer's letterhead certifying that manufacturer complies with requirements. Include evidence of manufacturing experience where required.
G. Material Certificates: Prepare written statements on manufacturer's letterhead certifying that material complies with requirements.
H. Material Test Reports: Prepare reports written by a qualified testing agency, on testing agency's standard form, indicating and interpreting test results of material for compliance with requirements.
I. Preconstruction Test Reports: Prepare reports written by a qualified testing agency, on testing agency's standard form, indicating and interpreting results of tests performed before installation of product, for compliance with performance requirements.
J. Compatibility Test Reports: Prepare reports written by a qualified testing agency, on testing agency's standard form, indicating and interpreting results of compatibility tests performed before installation of product. Include written recommendations for primers and substrate preparation needed for adhesion.
K. Field Test Reports: Prepare reports written by a qualified testing agency, on testing agency's standard form, indicating and interpreting results of field tests performed either during installation of product or after product is installed in its final location, for compliance with requirements.
L. Product Test Reports: Prepare written reports indicating current product produced by manufacturer complies with requirements. Base reports on evaluation of tests performed by manufacturer and witnessed by a qualified testing agency, or on comprehensive tests performed by a qualified testing agency.
M. Maintenance Data: Prepare written and graphic instructions and procedures for operation and normal maintenance of products and equipment. Comply with requirements in Division 1 Section "Closeout Procedures."
N. Manufacturer's Instructions: Prepare written or published information that documents manufacturer's recommendations, guidelines, and procedures for installing or operating a product or equipment. Include name of product and name, address, and telephone number of manufacturer. Include the following, as applicable:
Preparation of substrates.
Required substrate tolerances.
Sequence of installation or erection.
Required installation tolerances.
Required adjustments.
Recommendations for cleaning and protection.
O. Manufacturer's Field Reports: Prepare written information documenting factory-authorized service representative's tests and inspections. Include the following, as applicable:
Name, address, and telephone number of factory-authorized service representative making report.
Statement on condition of substrates and their acceptability for installation of product.
Statement that products at Project site comply with requirements.
Summary of installation procedures being followed, whether they comply with requirements and, if not, what corrective action was taken.
Results of operational and other tests and a statement of whether observed performance complies with requirements.
Statement whether conditions, products, and installation will affect warranty.
Other required items indicated in individual Specification Sections.
P. Insurance Certificates and Bonds: Prepare written information indicating current status of insurance or bonding coverage. Include name of entity covered by insurance or bond, limits of coverage, amounts of deductibles, if any, and term of the coverage.
A. EXECUTION
2.3 CONTRACTOR’S REVIEW
A. Review each submittal and check for compliance with the Contract Documents. Note corrections and field dimensions. Mark with approval stamp before submitting to Engineer.
B. Approval Stamp: Stamp each submittal with a uniform, approval stamp. Include Project name and location, submittal number, Specification Section title and number, name of reviewer, date of Contractor's approval, and statement certifying that submittal has been reviewed, checked, and approved for compliance with the Contract Documents.
2.4 ENGINEER’S ACTION
A. General: Engineer will not review submittals that do not bear Contractor's approval stamp and will return them without action.
Review of submittals by Engineer is only for the limited purpose of checking for conformance with information given and the design concept expressed in the Contract Documents.
Review of submittals by Engineer is not for purpose of determining the accuracy and completeness of dimensions and quantities, or substantiating installation instructions.
B. Re-submittal Review: Submittals marked as “Revise and Resubmit" or "Rejected" will be re-reviewed and stamped with an action stamp. Engineer will mark the stamp appropriately to indicate action taken. If the re-submittal is marked as “Revise and Resubmit" or "Rejected", the Owner will deduct the amount of the Engineer's compensation for subsequent re-submittal review from the final payment to the Contractor as provided on the Bid Form.
C. Action Submittals: Engineer will review each submittal, make marks to indicate corrections or modifications required, and return it. Engineer will stamp each submittal with an action stamp and will mark stamp appropriately to indicate action taken, as follows:
No Exceptions Taken: Where submittal is marked "No Exceptions Taken", the Work covered by the submittal may proceed provided it complies with the Contract Documents.
Make Corrections Noted: Where submittal is marked "Make Corrections Noted", the Work covered by the submittal may proceed provided it complies with both Architect/Engineer's notations and corrections on the submittal and the Contract Documents.
Revise and Resubmit: Where the submittal is marked "Revise and Resubmit", the Contractor may not proceed with the Work covered by the submittal, including purchasing, fabrication, delivery, or other activity for the product submitted. Revise or prepare a new submittal according to Architect/Engineer's notations and corrections.
Rejected: Where submittal is marked "Rejected", the Contractor may not proceed with the Work covered by the submittal. Prepare new submittal that complies with the Contract Documents.
Reviewed for General Conformance Only: This response is for when the Architect/Engineer is a secondary reviewer to a third party, or Architect/Engineer’s subconsultant is providing the primary review. The Architect/Engineer’s stamp will demonstrate the submittal was reviewed without providing direction to the submitting entity – because the primary reviewer makes the determination regarding the acceptability of that submittal. The language that would accompany this choice would be as follows: “Submittal was reviewed for general conformance to the project documents. Since Gresham Smith is a secondary reviewer to a subconsultant or third party, the acceptability of the submittal is determined by the Primary Reviewer, whose stamp also appears on the submittal. Based upon our review, we are returning this submittal with comments marked on the documents.”
Delegated Design - Reviewed for General Conformance Only: This response is for a special class of submittal – Delegated Design – where Architect/Engineer is reviewing the work of a licensed professional to verify conformance with Architect/Engineer’s original design documents.
The language that would accompany this choice would be as follows: “In accordance with the Project Specifications, the information contained in this submittal bears the seal of a Professional Engineer who is responsible for the preparation, design, completeness and accuracy of the information presented in this submittal. Since our office did not prepare or design the information presented in this submittal, review of this submittal is for general conformance with the Contract Documents only. It is not reviewed for completeness or accuracy. Based upon our review, we are returning this submittal without comments
D. Submittals not required by the Contract Documents will not be reviewed and may be discarded.
SECTION 01665
TRENCH SAFETY REQUIREMENTS
City of McKinney Wilson Creek Sanitary Sewer MH Improvements
SECTION 01665 – TRENCH SAFETY REQUIREMENTS
1.1 SCOPE OF WORK
A. Furnish all labor, materials, and equipment and perform all operations to plan, design, construct, install, maintain, monitor, modify as necessary, and remove upon completion, a Trench Safety System as specified herein.
B. The requirements of this Section apply to all trenches which equal or exceed a depth of five
(5) feet, measured from the ground surface at the highest side of the trench to the trench bottom.
C. All applicable and non-conflicting portions of Section 02300 — Excavation and Backfill
PART 2 - PRODUCTS
2.1 GENERAL
A. All materials and products incorporated into the Trench Safety System shall be suitable for their intended uses; shall meet all design criteria and parameters used by the Trench Safety System designer; and shall meet all applicable requirements of OSHA Standards.
PART 3 - EXECUTION
3.1 PROCEDURES
A. At least ten (10) Calendar Days prior to execution or any excavation operations, and not more than thirty (30) Calendar Days following the execution date of the construction Agreement, Contractor shall submit a site-specific Trench Safety System Conformance Affidavit stating that operations will be conducted in full conformance with the OSHA Standards.
The Conformance Letter shall also describe the Trench Safety System techniques proposed to be used on the project.
Specific references to the applicable OSHA Standards sections shall be included for each technique to be used.
B. The Trench Safety System Plan shall be in writing, site specific and sufficiently detailed and clear to be understandable and usable by all personnel who will be executing, supervising and witnessing the trenching operations. A copy of the Trench Safety System Plan shall be
City of McKinney Wilson Creek Sanitary Sewer MH Improvements available at the site of trenching operations at all times. A second copy shall be provided to the OWNER for the OWNER’s records.
C. If borings and/or detailed geotechnical analyses are required to develop the Trench Safety System Plan, they shall be executed by the Contractor at his cost.
D. For trenches having depths greater than the various limits given in the OSHA Standards (8, 12 or 20 feet, depending on the techniques used), a site-specific protective system shall be designed by a Licensed Professional Engineer experienced in soil mechanics and structural design. The design shall be signed, sealed and dated by the Professional Engineer, and it shall identify those specific locations where the design is applicable.
3.2 METHODS OF PROVIDING FOR TRENCH SAFETY
A. Protective systems referenced in this Section shall be as defined and described in 29 CFR 1962.652, “Requirements for Protective Systems.”
B. It is the duty, responsibility and prerogative of the CONTRACTOR to determine the specific applicability of a proposed Trench Safety System for each field condition encountered on the project. CONTRACTOR specifically holds the OWNER, ENGINEER, and any of their designated representatives harmless in any actions resulting from the failure or inadequacy of the Trench Safety System used to complete the project.
C. Unless otherwise noted on the drawings or excluded below, Sloping/Benching, Trench Shielding with trench boxes, and/or Sheeting/Shoring/Bracing protective systems may be used on this project.
D. Restrictions on the use of the various…