This is a specifications and contract documents file for the City of Burleson, Texas, Capital Engineering Department for ITB 2026-013 Elk Drive Sidewalk Improvements (Project ST2503). The project consists of constructing approximately 220 square yards of 6-inch concrete pavement for Elk Drive and connecting driveways, 668 square yards of 5-foot-wide, 6-inch-thick concrete sidewalk with detectable warning surfaces, two 2-foot flumes with steel plates, four 5-foot flumes with steel plates, and Flexamat installation. Additional work includes removal of existing concrete sidewalk, driveway, and asphalt pavement; tree removal; sign relocation; concrete curb and gutter; 4-inch solid white striping; and crosswalk marking replacement. The bid submission deadline is February 12, 2026 at 2:00 PM CST with virtual bid opening at 3:00 PM. A non-mandatory pre-bid MS Teams meeting is scheduled for January 28, 2026 at 10:00 AM CST. Specifications and contract documents are available through Euna Solutions (formerly Bonfire) beginning January 17, 2026. The project has an expected duration of 60 calendar days from the date of written notice to commence work. The contractor must execute the formal contract and required bonds within 15 days after the Notice of Award.

Bidders must submit a 5 percent bid security bond and will be required to provide Performance, Payment, and Maintenance Bonds at 100 percent of the contract price, with the Maintenance Bond covering two years from acceptance. Prevailing wage rates as determined by the City of Burleson apply to the project, with applicable federal wage determinations included for building, heavy, and highway construction classifications. No set-asides are identified. Liquidated damages are assessed at $500 per calendar day for delays, applicable to contracts between $100,000 and $1,000,000. The City reserves the right to award based on best value considerations including price, bidder reputation, quality, meeting municipal needs, past relationships, compliance with HUB requirements, and total long-term cost. Insurance requirements include workers' compensation, commercial general liability at $1,000,000 per occurrence, commercial auto liability at $500,000 combined single limit, and umbrella liability at $2,000,000 per occurrence. The City of Burleson qualifies as a tax-exempt entity under Texas Tax Code Chapter 151.309, and construction water will be metered and billed to the contractor.

View the file

Other files

File Type Posted
1-06 - ITB 2026-013 Bid Opening Link.pdf PDF
2-03 - Contractor Reference List.pdf PDF
4-05 - ITB 2026-013 Pre-Bid Meeting Link.pdf PDF
5-04 - W9 Form.pdf PDF
3-02 - ITB 2026-013 Excel Bid Sheet.xlsx XLSX spreadsheet

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SPECIFICATIONS AND CONTRACT DOCUMENTS

FOR THE CONSTRUCTION OF

City of Burleson Rev. 3/7/2024

ELK DRIVE SIDEWALK IPROVEMENTS

PROJECT #: ST2503

FOR THE

CITY OF BURLESON, TEXAS

CAPITAL ENGINEERING DEPARTMENT

DECEMBER 2025

Section No. 1

Rev. 3/7/2024

Invitation to Bid

CITY OF BURLESON

ST2503 ELK DRIVE SIDEWALK IMPROVEMENTS

Notice is hereby given that the City of Burleson is seeking proposals for ITB 2026-013 Elk Drive Sidewalk Improvements (ST2503). The deadline for submission is February 12, 2026 at 2:00PM CST.

The bid opening will be virtual at 3:00PM. A non-mandatory pre-bid MS Teams Meeting will be held January 28, 2026 at 10:00AM CST. Links for the virtual meetings will be provided via Euna Solutions, formerly Bonfire.

The project includes: paving and grading improvements. The Project has an expected duration of 60 calendar days.

Specifications and Contract Documents for this project shall be available for viewing and download in electronic (PDF) format at the City’s e-procurement system, Euna Solutions https://burlesontx.bonfirehub.com/login (registration is required) at no cost beginning January 17th.

Any interpretations, corrections, clarifications, or changes to this Invitation to Bid will be issued via addendum. Addenda will be posted in Bonfire. It is the responsibility of the respondent to monitor the Bonfire website for addenda. Proposers shall acknowledge receipt of each addendum by submitting a signed copy with their submission. Oral explanations will not be binding.

POSTED THIS the 16th day of January 2026, in the Burleson City Hall, 141 West Renfro, Burleson, Texas.

January 17, 2026 January 24, 2026 Cleburne Times Review https://burlesontx.bonfirehub.com/login

Instructions to Bidders Rev. 12.29.2025

SECTION 2

INSTRUCTIONS TO BIDDERS

1. PROPOSAL:

1.1 The Proposal is included in these Bidding Documents; additional copies may be obtained from the City of Burleson, hereinafter called "OWNER”.

1.2 All blanks on the proposal shall be completed electronically.

a. Bidder may use the original proposal forms included in these bid documents or the Bidder may substitute a computer-generated proposal for the original proposal included in these bid documents. The substitute submittal shall be word-for-word as written in the original proposal contained herein. The Bidder shall also sign the Substitute Proposal.

b. If the Substitute Proposal changes the intent of a bid item or contains an error in the quantities, unit prices, or extension of prices, the OWNER may reject the bid submitted.

c. The Bid price of each item on the form shall be stated in words and numerals. Words take precedence in case of a conflict. In the case of a conflict between the unit price indicated and the extended amount shown, the unit indicated multiplied by the state quantity shall govern.

1.3 The President or a Vice President (or other corporate officer accompanied by evidence of authority to sign) shall execute bids by corporations in the corporate name and the corporate seal shall be affixed and attested by the Secretary or an Assistant Secretary. The corporate address and state of incorporation shall be shown below the signature.

1.4 Bids by partnerships must be executed in the partnership name and signed by a partner, whose title shall appear under the signature and at the official address of the partnership shall be shown below the signature.

1.5 All names shall be typed or printed below the signature.

1.6 The bid shall contain an acknowledgement of receipt of all Addenda (the numbers of which must be filled in on the Proposal).

1.7 The address and telephone number for communications regarding the bid shall be shown.

1.8 The bid shall be complete with prices stated for all alternates. The Bidder should be aware that the OWNER, to stay within the OWNER’s available funds could adjust the scope of the project. Alternates selected and revisions to limits of construction and resulting quantity adjustments will be identified in the Notice of Award and will be adjusted in the proposal contained in the executed contract.

2. SUBMISSION OF BIDS:

It shall be the Bidder's responsibility for the electronic delivery of his proposal at the proper place by the time stated in the Notice to Bidders. The mere fact that a proposal was dispatched will not be considered. Proposals must be submitted at http://burlesontx.bonfirehub.com. The BIDDER shall acknowledge receipt of any addenda.

3. BID SECURITY:

An approved bidder's bond made payable to the OWNER in an amount of five (5%) percent of the largest possible total of the bid may be required as a guarantee that, if awarded the contract, the Bidder will enter into a Contract and execute all necessary bonds. Bid securities will be returned to Bidders when the Contract award is made or bids are rejected.

4. PERFORMANCE, PAYMENT AND MAINTENANCE BONDS:

Performance, Payment and Maintenance Bonds in the amount of not less than one hundred percent (100%) of the contract price conditioned upon the faithful performance of the contract, and upon payment of all persons supplying labor or furnishing materials, will be required upon the forms which are a part of the contract Documents. Bonds shall be executed by a surety company acceptable to and approved by the OWNER, authorized to do business in the State of Texas and acceptable for underwriting of risks as indicated by the latest revision, Treasury Department Circular 570, listing acceptable sureties on Federal Bonds. The period of the Maintenance Bond shall be two years from the date of acceptance of all work done under the Contract, to cover the guarantee as set forth in the Special Conditions.

5. QUALIFICATION OF BIDDERS:

All Bidders on this project must be qualified to perform work as outlined within the contract documents. The City of Burleson Department of Public Works and Engineering will verify the work history and qualifications. The following subcontractors must also be qualified if applicable to the project: water and sewer, paving, storm drain, excavation and parkway and median landscape work (includes seeding, sod, irrigation and tree and shrubbery planting). Bidders must be familiar with the North Central Texas Council of Governments (NCTCOG) Standard Specifications for Public Works Construction, latest edition, and the construction methods, Standards and related Ordinances of the City of Burleson.

http://burlesontx.bonfirehub.com/

6. BIDDERS KNOWLEDGE OF CONDITIONS:

6.1 Prior to submission of a proposal, bidders shall make a thorough inspection of the site of work and a thorough examination of the plans and specifications, and shall become informed as to the nature of the work, labor conditions, federal, state and local Laws and Regulations, and all other matters that may affect the cost, progress, performance and time of completion of the Work.

6.2 Bidder shall notify OWNER of all conflicts, errors or discrepancies in the Contract Documents.

6.3 Bidder shall pay particular attention to providing methods of ingress and egress to adjacent private and public properties, procedures for protection existing improvements and disposition of all materials to be removed.

6.4 Information and data reflected in the Contract Documents with respect to underground facilities at or contiguous to the site is based upon information and data furnished to OWNER by owners of such underground facilities or other, and OWNER does not assume responsibility for the accuracy or completeness thereof.

6.5 The lands upon which the work is to be performed, rights-of-way and easements for access thereto and other lands designated for use by Contractor in performing the work are identified in the Contract Documents.

All additional lands and access thereto required for temporary construction facilities or storage of materials and equipment not provided by OWNER, are to be obtained and, if necessary, paid by Contractor.

6.6 The submission of a bid will constitute an incontestable representation by Bidder that Bidder has complied with every requirement of the Article 6, that without exception the bid is premised upon performing and furnishing the work required by the Contract Documents and such means, method, techniques, sequences or procedures of construction as may be indicated in or required by the Contract Documents, and that the Contract Documents are sufficient in scope and detail to indicate and convey understanding of all terms and conditions for performance and furnishing of the work.

7. AVAILABILITY OF UTILITY SERVICES

OWNER shall not make available or guarantee any utility services to the Contractor such as (but not all inclusive) water, sewer, electricity, gas, or telephone for performance of his work in this contract. Contractor shall be solely responsible for completing all requirements, make all arrangements, and make all payments as necessary to procure any utility services necessary to complete the work as prescribed in this contract.

8. INTERPRETATION OF DOCUMENT:

If any person contemplating submitting a bid is in doubt as to the meaning of any part of the plans, specifications, or other proposed contract documents, they may submit to the OWNER a written request for an interpretation thereof at least five (5) days prior to opening of bids. The person submitting the request will be responsible for its prompt delivery. Any interpretation of these documents will be made only by addendum duly issued. Only questions answered by formal written Addenda are to be binding. Oral interpretations or clarification will be without legal effect. The OWNER will not be responsible for any other explanations or interpretations.

9. STANDARD SPECIFICATIONS:

9.1 All work for this project including but not limited to all grading, utility and paving improvements described in this Proposal and Construction Drawings shall be done in accordance with the STANDARD

SPECIFICATIONS FOR PUBLIC WORKS

CONSTRUCTION as issued by the North Central Texas Council of Government (NCTCOG); the latest edition with any revisions as may be modified by the special conditions of this Contract.

9.2 Asphaltic concrete and standard concrete pavement improvements done within TxDOT right of way, shall be done in accordance with the

STANDARD SPECIFICATIONS FOR CONSTRUCTION OF

HIGHWAYS, STREETS, AND BRIDGES as issued by The Texas Department of Transportation; the latest edition with any revisions as may be modified by the special conditions of this Contract.

10. BEST VALUE EVALUATION FACTORS:

10.1 In accordance with Chapter 252 of the Texas Local Government Code §252.043(b) the City may award the vendor offering the Best Value based on the following considerations:

a. the purchase price;

b. the reputation of the bidder and of the bidder’s goods or services;

c. the quality of the bidder’s goods or services;

d. the extent to which the goods or services meet the municipality’s needs;

e. the bidder’s past relationship with the municipality;

f. the impact on the ability of the municipality to comply with laws and rules relating to contracting with historically underutilized businesses and non-profit organizations employing persons with disabilities;

g. the total long-term cost to the municipality to acquire the bidder’s good or services; and

h. Compliance with all bid requirements, delivery and needs of the City are considerations in evaluating bids. The City of Burleson reserves the right to contact any offeror, at any time, to clarify, verify or request information with regard to any bid.

11. AWARD OF CONTRACT:

11.1 OWNER reserves the right to reject any bid, to waive any and all informalities and to negotiate contract amendments with the successful Bidder, and the right to disregard all nonconforming, non-responsive, unbalanced or conditional bids. Also, OWNER reserves the right to reject the bid of any Bidder if OWNER believes that it would not be in the best interest of the Project to make an award to that Bidder, whether because the bid is not responsive or the Bidder is unqualified or of doubtful financial ability or fails to meet any other pertinent standard of criteria established by OWNER. Discrepancies in the multiplication of units of work and unit prices will be resolved in favor of the correct multiplication. Discrepancies between the unit price in words and the unit price in figures will be resolved in favor of the price in words.

Discrepancies between the indicated sum of a column of figures and the correct sum therefore will be resolved in favor of the correct sum.

11.2 In evaluating bids, OWNER will consider the qualifications of the Bidder, whether or not the bids comply with the prescribed requirements, and such alternates, unit prices and other data, as may be requested in the bid form or prior to the Notice of Award.

11.3 OWNER may consider compatibility of goods and services with the goods, services, and equipment already in use by OWNER.

11.4 OWNER may consider maintenance costs and availability for the goods, services, and equipment as compared to comparable products.

12. ALTERNATE BIDS:

No bids for alternate work items shall be submitted except as shown on the Proposal. The OWNER reserves the right to choose either the base bid or alternate bid whichever is most advantageous to the OWNER. There will be no adjustments to unit prices bid due to the OWNER’S choice of alternate bids.

13. EXECUTION OF CONTRACT

13.1 The successful Bidder shall execute the formal Contract Agreement and required Bonds to the OWNER within fifteen (15) days after the Notice of Award.

13.2 A Notice to Proceed authorizing the Contractor to commence work will be issued after the Contract Documents have been executed by the

OWNER.

14. PROTECTION OF THE PUBLIC:

For protection and convenience of the public and emergencies, the successful Bidder shall furnish the OWNER with a telephone number at which the contractor can be contacted 24 hours a day during the entire construction period of this project. This telephone number shall be furnished to the OWNER in writing prior to the beginning of construction.

15. AFFIDAVIT AGAINST PROHIBITED ACTS:

It shall be the successful Bidder's responsibility to complete this affidavit (Section 5 of the Contract Documents) prior to execution of the Contract by the OWNER (City of Burleson). Failure to complete this form may prohibit the contractor's ability to secure the Contract.

16. WAGE RATES

Contractor shall pay no less than the general prevailing rates for the Project location as determined in accordance with statutory requirements. The minimum rates for various labor classifications as established by the OWNER are included in the contract documents.

17. SALES TAXES

The OWNER qualifies as an exempt entity as defined by the statues (Chapter 151.309) of the Tax Code of the State of Texas. The OWNER’s purchasing department will issue exemption certificates. Comply with all statues and rulings of the State Comptroller.

18. GOVERNING DOCUMENTS:

The Work shall conform to the requirements of these specifications and the details as shown therein. These contract documents are intended to be Primary. Requirements of any of the contract documents are as binding as if called for by all. In case of conflict between the referenced Specifications and the Special Project Specifications, the Special Project Specifications shall govern.

19. SOIL INVESTIGATION:

Investigation of soil and foundation conditions of the size and areas near the site is considered subsidiary to the paving portion of the work. A certified lab competent to do such investigations for subgrade stabilization shall be used to determine the amounts of cement or lime necessary for the structural ability of the roadway. It has been assumed to use the rate of 30# per square yard of lime or Portland cement as a minimum treatment, but the actual amount is to be verified by the lab prior to pavement work. A copy of the lab report shall be submitted to the OWNER for approval.

20. REMOVAL OF DEFECTIVE AND UNAUTHORIZED WORK:

All work that has been rejected or condemned shall be repaired, or if it cannot be repaired satisfactorily, it shall be removed and replaced at the contractor's expense. Defective materials shall be immediately removed from the site of the work. Work done without line and grade having been given, work done beyond the lines or not in conformity with the grades shown on the drawings or as given, save as herein provided, work done without proper inspection, or any extra or unclassified work done without written authority and prior agreement in writing as to prices, shall be done at the contractor's risk, and will be considered unauthorized, and at the option of the OWNER, may not be measured and paid for, and may be ordered removed at the contractor's expense. If the contractor fails to satisfactorily repair, replace or remove the rejected, condemned or unauthorized work or materials immediately upon receipt of written notice, the OWNER will have the authority to cause such remediation to be performed and to deduct the cost thereof from any monies due or to become due to the contractor.

21. TRENCH SAFETY:

21.1 A trench safety system must be provided for all trench excavations according to current OSHA requirements.

21.2 On all public projects bid by the OWNER (City of Burleson) or private projects to be constructed within right-of-way or easements to be conveyed to the City of Burleson, compliance with the current minimum Occupational Safety and Health Administration (OSHA) or other governmental agencies standards for trench safety will be required as part of the plans and specifications. Prior to start of construction a detailed trench safety system must be provided to the City by the contractor.

This detailed trench safety system must meet all requirements by OSHA or other governmental agencies, and be designed and certified by a professional engineer licensed in the State of Texas.

21.3 A pay item shall be included in the plans and specifications for the trench safety system. Payment will be on a linear-foot basis and will be full compensation for labor, tools, materials, equipment and incidentals necessary to complete the work, including the removal of the trench safety system and back-filling the trench. Pursuant to Texas law, the City of Burleson has adopted a trench safety policy, which is addressed in Section 11 of the Specifications. Each bidder should be familiar with Section 11 prior to submitting a bid.

22. BID TABULATION:

A tabulation of all bids will be available within five (5) working days of contract award.

22 ADDENDUM:

22.1 The OWNER reserves the right to issue addendum(s) to the Plans, Proposal, Specifications, and Special Provisions. Addendums will be issued at https://burlesontx.bonfire.com https://burlesontx.bonfire.com/

22.2 The Bidders will acknowledge the receipt of the addendum(s) by submitting a signed copy of the addendum(s) with the submission of their bid.

22.3 It shall be the Bidder's responsibility to ensure that they are aware of all addendum(s) issued by the OWNER.

22.4 Upon receipt of the addendum(s), the Bidder shall acknowledge the receipt of the addendum(s) in the appropriate spaces provided in the proposal.

22.5 Bids that have not properly acknowledged addendum(s) will not be considered.

Prevailing Wage Rates for Municipal Construction in Texas

Rev. 3/7/2024

SECTION 3

PREVAILING WAGE RATES FOR MUNICIPAL CONSTRUCTION IN

BURLESON, TEXAS

The following minimum rates have been determined by the City of Burleson, Texas, in accordance with the statutory requirements and prevailing local wages:

Prevailing Wage Rates for Municipal Construction in Texas

Rev. 3/7/2024

THE STATE OF TEXAS §

COUNTY OF JOHNSON §

AFFIDAVIT

BEFORE ME, the undersigned authority, a Notary Public in and for the State of Texas, on this day personally appeared , who is known to me or who was proved to me on the oath of (name of person identifying the acknowledging person) or who was proved to me through (description of identity card or other document issued by the federal or state government containing the picture and signature of the acknowledging person) to be the person whose name is subscribed to this affidavit; and being by me first duly sworn, upon oath stated as follows:

"My name is . I am of sound mind and capable of making this affidavit. "I am a for the which day ofcompany entered into a contract on the , 20 , for construction related to the Elk Drive Sidewalk Improvements and I am duly authorized on behalf of said company to hereby swear and affirm that all wages for labor on the above-referenced project are in strict compliance with the established prevailing wage rates as described in the contract documents for the referenced project, and all wages have been and will be paid and satisfied as the prevailing rates may change from time to time. Upon request by the City of Burleson, I shall allow a complete examination of the financial records relative to this project, including, but not limited to, cancelled checks, invoices and statements at any time, and allow the City of Burleson to interview any and/or all employees of the above said company or any and/or all employees of said Company's subcontractor or subcontractors. Also, I hereby agree on behalf of the above company, to be accountable for any and all penalties and/or fine provisions in accordance with the contract documents and relevant law.

AFFIANT

GIVEN UNDER MY HAND AND SEAL OF OFFICE this the day of 20 .

Notary Public In and For the State of Texas

Notary's Printed Name

My Commission Expires:

"General Decision Number: TX20250257 07/18/2025

Superseded General Decision Number: TX20240257

State: Texas

Construction Type: Building

County: Johnson County in Texas.

BUILDING CONSTRUCTION PROJECTS (does not include single family homes or apartments up to and including 4 stories).

Note: Contracts subject to the Davis-Bacon Act are generally required to pay at least the applicable minimum wage rate required under Executive Order 14026 or Executive Order 13658.

Please note that these Executive Orders apply to covered contracts entered into by the federal government that are subject to the Davis-Bacon Act itself, but do not apply to contracts subject only to the Davis-Bacon Related Acts, including those set forth at 29 CFR 5.1(a)(1).

|If the contract is entered |. Executive Order 14026 | |into on or after January 30, | generally applies to the | |2022, or the contract is | contract. | |renewed or extended (e.g., an |. The contractor must pay | |option is exercised) on or | all covered workers at | |after January 30, 2022: | least $17.75 per hour (or | | | the applicable wage rate | | | listed on this wage | | | determination, if it is | | | higher) for all hours | | | spent performing on the | | | contract in 2025. | |If the contract was awarded on|. Executive Order 13658 | |or between January 1, 2015 and| generally applies to the | |January 29, 2022, and the | contract. | |contract is not renewed or |. The contractor must pay all| |extended on or after January | covered workers at least | |30, 2022: | $13.30 per hour (or the | | | applicable wage rate listed| | | on this wage determination,| | | if it is higher) for all | | | hours spent performing on | | | that contract in 2025. |

The applicable Executive Order minimum wage rate will be adjusted annually. If this contract is covered by one of the Executive Orders and a classification considered necessary for performance of work on the contract does not appear on this wage determination, the contractor must still submit a conformance request.

Additional information on contractor requirements and worker protections under the Executive Orders is available at http://www.dol.gov/whd/govcontracts.

Modification Number Publication Date 0 01/03/2025 1 03/14/2025 2 06/13/2025 3 07/04/2025 4 07/18/2025

ASBE0021-011 06/01/2025

Rates Fringes

ASBESTOS WORKER/HEAT & FROST

INSULATOR (Duct, Pipe and Mechanical System Insulation)....$ 33.23 7.52

BOIL0074-003 01/01/2025

Rates Fringes

BOILERMAKER......................$ 33.17 24.92

CARP1421-002 10/01/2023

Rates Fringes

MILLWRIGHT.......................$ 32.02 11.27

ELEV0021-006 01/01/2025

Rates Fringes

ELEVATOR MECHANIC................$ 51.93 38.435+a+b

FOOTNOTES:

A. 6% under 5 years based on regular hourly rate for all hours worked. 8% over 5 years based on regular hourly rate for all hours worked.

B. New Year's Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, the Friday after Thanksgiving Day, Christmas Day, and Veterans Day.

ENGI0178-005 06/01/2020

Rates Fringes

POWER EQUIPMENT OPERATOR

(1) Tower Crane.............$ 32.85 13.10

(2) Cranes with Pile Driving or Caisson Attachment and Hydraulic Crane 60 tons and above.....$ 28.75 10.60

(3) Hydraulic cranes 59 Tons and under..............$ 32.35 13.10

* IRON0263-005 06/01/2025

Rates Fringes

IRONWORKER (ORNAMENTAL AND

STRUCTURAL)......................$ 29.64 8.43

* PAIN0053-004 04/01/2014

Rates Fringes

PAINTER (Brush, Roller, and Spray (Excludes Drywall Finishing/Taping))...............$ 16.40 ** 5.45

PLUM0146-003 05/01/2025

Rates Fringes

PIPEFITTER (Excludes HVAC Pipe Installation)...............$ 41.28 12.16

* SUTX2014-033 07/21/2014

Rates Fringes

BRICKLAYER.......................$ 20.18 0.00

CARPENTER, Excludes Drywall Hanging, Form Work, and Metal Stud Installation................$ 15.12 ** 2.94

CEMENT MASON/CONCRETE FINISHER...$ 13.45 ** 0.00

DRYWALL FINISHER/TAPER...........$ 16.24 ** 3.94

DRYWALL HANGER AND METAL STUD

INSTALLER........................$ 16.20 ** 3.40

ELECTRICAL INSTALLER (Sound and Communication Systems Only)Excludes Wiring.............$ 17.79 2.41

ELECTRICIAN (Alarm Installation Only)...............$ 18.00 0.38

ELECTRICIAN (Low Voltage Wiring Only).....................$ 14.88 ** 2.15

ELECTRICIAN, Excludes Low Voltage Wiring and Installation of Alarms/Sound and Communication Systems........$ 20.68 4.39

FORM WORKER......................$ 12.38 ** 0.00

GLAZIER..........................$ 15.93 ** 2.37

HVAC MECHANIC (Installation of HVAC Unit Only)...............$ 22.18 6.48

INSTALLER - SIDING

(METAL/ALUMINUM/VINYL)...........$ 15.77 ** 0.00

IRONWORKER, REINFORCING..........$ 12.19 ** 0.00

LABORER: Common or General......$ 11.91 ** 2.64

LABORER: Mason Tender - Brick...$ 10.50 ** 0.00

LABORER: Mason Tender - Cement/Concrete..................$ 10.80 ** 0.00

LABORER: Pipelayer..............$ 13.00 ** 0.35

LABORER: Roof Tearoff...........$ 11.28 ** 0.00

LABORER: Landscape and Irrigation.......................$ 10.00 ** 0.00

OPERATOR:

Backhoe/Excavator/Trackhoe.......$ 13.06 ** 0.00

OPERATOR: Bobcat/Skid Steer/Skid Loader................$ 13.93 ** 0.00

OPERATOR: Bulldozer.............$ 18.29 1.31

OPERATOR: Drill.................$ 17.60 ** 0.50

OPERATOR: Forklift..............$ 14.20 ** 0.00

OPERATOR: Grader/Blade..........$ 12.95 ** 0.00

OPERATOR: Loader................$ 12.89 ** 1.19

OPERATOR: Mechanic..............$ 17.52 ** 3.33

OPERATOR: Paver (Asphalt, Aggregate, and Concrete).........$ 18.44 0.00

OPERATOR: Roller................$ 15.04 ** 0.00

PLASTERER........................$ 15.30 ** 0.00

PLUMBER (HVAC Pipe Installation Only)...............$ 19.33 3.57

PLUMBER, Excludes HVAC Pipe Installation.....................$ 24.00 2.71

ROOFER...........................$ 15.70 ** 0.58

SHEET METAL WORKER (HVAC Duct Installation Only)...............$ 18.25 3.02

SHEET METAL WORKER, Excludes HVAC Duct Installation...........$ 18.63 0.65

SPRINKLER FITTER (Fire Sprinklers)......................$ 18.89 0.00

TILE FINISHER....................$ 11.22 ** 0.00

TILE SETTER......................$ 12.00 ** 0.00

TRUCK DRIVER: Dump Truck........$ 12.39 ** 1.18

TRUCK DRIVER: Flatbed Truck.....$ 19.65 8.57

TRUCK DRIVER: Semi-Trailer Truck............................$ 12.50 ** 0.00

TRUCK DRIVER: Water Truck.......$ 12.00 ** 4.11

WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.

** Workers in this classification may be entitled to a higher minimum wage under Executive Order 14026 ($17.75) or 13658 ($13.30). Please see the Note at the top of the wage determination for more information. Please also note that the minimum wage requirements of Executive Order 14026 are not currently being enforced as to any contract or subcontract to which the states of Texas, Louisiana, or Mississippi, including their agencies, are a party.

Note: Executive Order (EO) 13706, Establishing Paid Sick Leave for Federal Contractors applies to all contracts subject to the Davis-Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January 1, 2017. If this contract is covered by the EO, the contractor must provide employees with 1 hour of paid sick leave for every 30 hours they work, up to 56 hours of paid sick leave each year.

Employees must be permitted to use paid sick leave for their own illness, injury or other health-related needs, including preventive care; to assist a family member (or person who is like family to the employee) who is ill, injured, or has other health-related needs, including preventive care; or for reasons resulting from, or to assist a family member (or person who is like family to the employee) who is a victim of, domestic violence, sexual assault, or stalking. Additional information on contractor requirements and worker protections under the EO is available at https://www.dol.gov/agencies/whd/government-contracts.

Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29CFR 5.5 (a) (1) (iii)).

The body of each wage determination lists the classifications and wage rates that have been found to be prevailing for the type(s) of construction and geographic area covered by the wage determination. The classifications are listed in alphabetical order under rate identifiers indicating whether the particular rate is a union rate (current union negotiated rate), a survey rate, a weighted union average rate, a state adopted rate, or a supplemental classification rate.

Union Rate Identifiers

A four-letter identifier beginning with characters other than ""SU"", ""UAVG"", ?SA?, or ?SC? denotes that a union rate was prevailing for that classification in the survey. Example:

PLUM0198-005 07/01/2024. PLUM is an identifier of the union whose collectively bargained rate prevailed in the survey for this classification, which in this example would be Plumbers.

0198 indicates the local union number or district council number where applicable, i.e., Plumbers Local 0198. The next number, 005 in the example, is an internal number used in processing the wage determination. The date, 07/01/2024 in the example, is the effective date of the most current negotiated rate.

Union prevailing wage rates are updated to reflect all changes over time that are reported to WHD in the rates in the collective bargaining agreement (CBA) governing the classification.

Union Average Rate Identifiers

The UAVG identifier indicates that no single rate prevailed for those classifications, but that 100% of the data reported for the classifications reflected union rates. EXAMPLE:

UAVG-OH-0010 01/01/2024. UAVG indicates that the rate is a weighted union average rate. OH indicates the State of Ohio.

The next number, 0010 in the example, is an internal number used in producing the wage determination. The date, 01/01/2024 in the example, indicates the date the wage determination was updated to reflect the most current union average rate.

A UAVG rate will be updated once a year, usually in January, to reflect a weighted average of the current rates in the collective bargaining agreements on which the rate is based.

Survey Rate Identifiers

The ""SU"" identifier indicates that either a single non-union rate prevailed (as defined in 29 CFR 1.2) for this classification in the survey or that the rate was derived by computing a weighted average rate based on all the rates reported in the survey for that classification. As a weighted average rate includes all rates reported in the survey, it may include both union and non-union rates. Example: SUFL2022-007 6/27/2024. SU indicates the rate is a single non-union prevailing rate or a weighted average of survey data for that classification. FL indicates the State of Florida. 2022 is the year of the survey on which these classifications and rates are based. The next number, 007 in the example, is an internal number used in producing the wage determination. The date, 6/27/2024 in the example, indicates the survey completion date for the classifications and rates under that identifier.

?SU? wage rates typically remain in effect until a new survey is conducted. However, the Wage and Hour Division (WHD) has the discretion to update such rates under 29 CFR 1.6(c)(1).

State Adopted Rate Identifiers

The ""SA"" identifier indicates that the classifications and prevailing wage rates set by a state (or local) government were adopted under 29 C.F.R 1.3(g)-(h). Example: SAME2023-007 01/03/2024. SA reflects that the rates are state adopted. ME refers to the State of Maine. 2023 is the year during which the state completed the survey on which the listed classifications and rates are based. The next number, 007 in the example, is an internal number used in producing the wage determination.

The date, 01/03/2024 in the example, reflects the date on which the classifications and rates under the ?SA? identifier took effect under state law in the state from which the rates were adopted.

WAGE DETERMINATION APPEALS PROCESS

1) Has there been an initial decision in the matter? This can be:

a) a survey underlying a wage determination

b) an existing published wage determination

c) an initial WHD letter setting forth a position on a wage determination matter

d) an initial conformance (additional classification and rate) determination

On survey related matters, initial contact, including requests for summaries of surveys, should be directed to the WHD Branch of Wage Surveys. Requests can be submitted via email to davisbaconinfo@dol.gov or by mail to:

Branch of Wage Surveys Wage and Hour Division U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

Regarding any other wage determination matter such as conformance decisions, requests for initial decisions should be directed to the WHD Branch of Construction Wage Determinations.

Requests can be submitted via email to BCWD-Office@dol.gov or by mail to:

Branch of Construction Wage Determinations Wage and Hour Division U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

2) If an initial decision has been issued, then any interested party (those affected by the action) that disagrees with the decision can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7).

Requests for review and reconsideration can be submitted via email to dba.reconsideration@dol.gov or by mail to:

Wage and Hour Administrator U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

The request should be accompanied by a full statement of the interested party's position and any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.

3) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative Review Board (formerly the Wage Appeals Board). Write to:

Administrative Review Board U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210.

END OF GENERAL DECISION"

"General Decision Number: TX20250026 06/13/2025

Superseded General Decision Number: TX20240026

State: Texas

Construction Type: Heavy

Counties: Johnson, Parker and Tarrant Counties in Texas.

Heavy Construction Projects (Including Water and Sewer Lines)

Note: Contracts subject to the Davis-Bacon Act are generally required to pay at least the applicable minimum wage rate required under Executive Order 14026 or Executive Order 13658.

Please note that these Executive Orders apply to covered contracts entered into by the federal government that are subject to the Davis-Bacon Act itself, but do not apply to contracts subject only to the Davis-Bacon Related Acts, including those set forth at 29 CFR 5.1(a)(1).

|If the contract is entered |. Executive Order 14026 | |into on or after January 30, | generally applies to the | |2022, or the contract is | contract. | |renewed or extended (e.g., an |. The contractor must pay | |option is exercised) on or | all covered workers at | |after January 30, 2022: | least $17.75 per hour (or | | | the applicable wage rate | | | listed on this wage | | | determination, if it is | | | higher) for all hours | | | spent performing on the | | | contract in 2025. | |If the contract was awarded on|. Executive Order 13658 | |or between January 1, 2015 and| generally applies to the | |January 29, 2022, and the | contract. | |contract is not renewed or |. The contractor must pay all| |extended on or after January | covered workers at least | |30, 2022: | $13.30 per hour (or the | | | applicable wage rate listed| | | on this wage determination,| | | if it is higher) for all | | | hours spent performing on | | | that contract in 2025. |

The applicable Executive Order minimum wage rate will be adjusted annually. If this contract is covered by one of the Executive Orders and a classification considered necessary for performance of work on the contract does not appear on this wage determination, the contractor must still submit a http://www.dol.gov/whd/govcontracts.

Modification Number Publication Date 0 01/03/2025 1 06/13/2025

PLUM0146-002 01/01/2024

Rates Fringes

PLUMBER/PIPEFITTER...............$ 38.28 12.81

* SUTX1990-041 06/01/1990

Rates Fringes

CARPENTER........................$ 10.40 ** $3.64

Concrete Finisher................$ 9.81 **

ELECTRICIAN......................$ 13.26 **

Form Setter......................$ 7.86 **

Laborers:

Common......................$ 7.25 ** Utility.....................$ 8.09 **

PAINTER..........................$ 10.89 **

Pipelayer........................$ 8.43 **

Power equipment operators:

Backhoe.....................$ 11.89 ** 3.30 Bulldozer...................$ 10.76 ** Crane.......................$ 13.16 ** 3.30 Front End Loader............$ 10.54 ** Mechanic....................$ 10.93 ** Scraper.....................$ 10.00 **

Reinforcing Steel Setter.........$ 10.64 **

TRUCK DRIVER.....................$ 7.34 **

WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.

** Workers in this classification may be entitled to a higher minimum wage under Executive Order 14026 ($17.75) or 13658 ($13.30). Please see the Note at the top of the wage determination for more information. Please also note that the minimum wage requirements of Executive Order 14026 are not currently being enforced as to any contract or subcontract to which the states of Texas, Louisiana, or Mississippi, including their agencies, are a party.

Note: Executive Order (EO) 13706, Establishing Paid Sick Leave for Federal Contractors applies to all contracts subject to the Davis-Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January 1, 2017. If this contract is covered by the EO, the contractor must provide employees with 1 hour of paid sick leave for every 30 hours they work, up to 56 hours of paid sick leave each year.

Employees must be permitted to use paid sick leave for their own illness, injury or other health-related needs, including preventive care; to assist a family member (or person who is like family to the employee) who is ill, injured, or has other health-related needs, including preventive care; or for reasons resulting from, or to assist a family member (or person who is like family to the employee) who is a victim of, domestic violence, sexual assault, or stalking. Additional information on contractor requirements and worker protections under the EO is available at https://www.dol.gov/agencies/whd/government-contracts.

Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29CFR 5.5 (a) (1) (iii)).

The body of each wage determination lists the classifications and wage rates that have been found to be prevailing for the type(s) of construction and geographic area covered by the wage determination. The classifications are listed in alphabetical order under rate identifiers indicating whether the particular rate is a union rate (current union negotiated rate), a survey rate, a weighted union average rate, a state adopted rate, or a supplemental classification rate.

Union Rate Identifiers

A four-letter identifier beginning with characters other than ""SU"", ""UAVG"", ?SA?, or ?SC? denotes that a union rate was prevailing for that classification in the survey. Example:

PLUM0198-005 07/01/2024. PLUM is an identifier of the union whose collectively bargained rate prevailed in the survey for this classification, which in this example would be Plumbers.

0198 indicates the local union number or district council number where applicable, i.e., Plumbers Local 0198. The next number, 005 in the example, is an internal number used in processing the wage determination. The date, 07/01/2024 in the example, is the effective date of the most current negotiated rate.

Union prevailing wage rates are updated to reflect all changes over time that are reported to WHD in the rates in the collective bargaining agreement (CBA) governing the classification.

Union Average Rate Identifiers

The UAVG identifier indicates that no single rate prevailed for those classifications, but that 100% of the data reported for the classifications reflected union rates. EXAMPLE:

UAVG-OH-0010 01/01/2024. UAVG indicates that the rate is a weighted union average rate. OH indicates the State of Ohio.

The next number, 0010 in the example, is an internal number used in producing the wage determination. The date, 01/01/2024 in the example, indicates the date the wage determination was updated to reflect the most current union average rate.

A UAVG rate will be updated once a year, usually in January, to reflect a weighted average of the current rates in the collective bargaining agreements on which the rate is based.

Survey Rate Identifiers

The ""SU"" identifier indicates that either a single non-union rate prevailed (as defined in 29 CFR 1.2) for this classification in the survey or that the rate was derived by computing a weighted average rate based on all the rates reported in the survey for that classification. As a weighted average rate includes all rates reported in the survey, it may include both union and non-union rates. Example: SUFL2022-007 6/27/2024. SU indicates the rate is a single non-union prevailing rate or a weighted average of survey data for that classification. FL indicates the State of Florida. 2022 is the year of the survey on which these classifications and rates are based. The next number, 007 in the example, is an internal number used in producing the wage determination. The date, 6/27/2024 in the example, indicates the survey completion date for the classifications and rates under that identifier.

?SU? wage rates typically remain in effect until a new survey is conducted. However, the Wage and Hour Division (WHD) has the discretion to update such rates under 29 CFR 1.6(c)(1).

State Adopted Rate Identifiers

The ""SA"" identifier indicates that the classifications and prevailing wage rates set by a state (or local) government were adopted under 29 C.F.R 1.3(g)-(h). Example: SAME2023-007 01/03/2024. SA reflects that the rates are state adopted. ME refers to the State of Maine. 2023 is the year during which the state completed the survey on which the listed classifications and rates are based. The next number, 007 in the example, is an internal number used in producing the wage determination.

The date, 01/03/2024 in the example, reflects the date on which the classifications and rates under the ?SA? identifier took effect under state law in the state from which the rates were adopted.

WAGE DETERMINATION APPEALS PROCESS

1) Has there been an initial decision in the matter? This can be:

a) a survey underlying a wage determination

b) an existing published wage determination

c) an initial WHD letter setting forth a position on a wage determination matter

d) an initial conformance (additional classification and rate) determination

On survey related matters, initial contact, including requests for summaries of surveys, should be directed to the WHD Branch of Wage Surveys. Requests can be submitted via email to davisbaconinfo@dol.gov or by mail to:

Branch of Wage Surveys Wage and Hour Division U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

Regarding any other wage determination matter such as conformance decisions, requests for initial decisions should be directed to the WHD Branch of Construction Wage Determinations.

Requests can be submitted via email to BCWD-Office@dol.gov or by mail to:

Branch of Construction Wage Determinations Wage and Hour Division U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

2) If an initial decision has been issued, then any interested party (those affected by the action) that disagrees with the decision can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7).

Requests for review and reconsideration can be submitted via email to dba.reconsideration@dol.gov or by mail to:

Wage and Hour Administrator U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

The request should be accompanied by a full statement of the interested party's position and any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.

3) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative Review Board (formerly the Wage Appeals Board). Write to:

Administrative Review Board

200 Constitution Avenue, N.W.

Washington, DC 20210.

"General Decision Number: TX20250294 09/19/2025

State: Texas

Construction Type: Highway

Counties: Collin, Dallas, Delta, Denton, Ellis, Grayson, Hunt, Johnson, Kaufman, Parker, Rockwall, Tarrant and Wise Counties in Texas.

HIGHWAY CONSTRUCTION PROJECTS

Note: Contracts subject to the Davis-Bacon Act are generally required to pay at least the applicable minimum wage rate required under Executive Order 14026 or Executive Order 13658.

Please note that these Executive Orders apply to covered contracts entered into by the federal government that are subject to the Davis-Bacon Act itself, but do not apply to contracts subject only to the Davis-Bacon Related Acts, including those set forth at 29 CFR 5.1(a)(1).

|If the contract is entered |� Executive Order 14026 | |into on or after January 30, | generally applies to the | |2022, or the contract is | contract. | |renewed or extended (e.g., an |� The contractor must pay | |option is exercised) on or | all covered workers at | |after January 30, 2022: | least $17.75 per hour (or | | | the applicable wage rate | | | listed on this wage | | | determination, if it is | | | higher) for all hours | | | spent performing on the | | | contract in 2025. | |If the contract was awarded on|� Executive Order 13658 | |or between January 1, 2015 and| generally applies to the | |January 29, 2022, and the | contract. | |contract is not renewed or |� The contractor must pay all| |extended on or after January | covered workers at least | |30, 2022: | $13.30 per hour (or the | | | applicable wage rate listed| | | on this wage determination,| | | if it is higher) for all | | | hours performing on that | | | contract in 2025. |

The applicable Executive Order minimum wage rate will be adjusted annually. If this contract is covered by one of the Executive Orders and a classification considered necessary for performance of work on the contract does not appear on this wage determination, the contractor must still submit a http://www.dol.gov/whd/govcontracts.

Modification Number Publication Date 0 09/19/2025

SATX2025-007 11/15/2023

Rates Fringes

Asphalt Distributor Operator.....$ 24.40 0.00

Asphalt Paving Machine Operator.........................$ 22.52 0.00

Asphalt Raker....................$ 19.87 0.00

Broom or Sweeper Operator........$ 18.01 0.00

Concrete Finisher, Paving and Structures.......................$ 22.48 0.00

Concrete Pavement Finishing Machine Operator.................$ 24.07 0.00

Concrete Saw Operator............$ 20.34 0.00

Crane Operator, Hydraulic 80 tons or less.....................$ 31.32 0.00

Crane Operator, Lattice Boom 80 Tons or Less..................$ 29.90 0.00

Crane Operator, Lattice Boom Over 80 Tons.....................$ 33.55 0.00

Crawler Tractor Operator.........$ 24.06 0.00

Electrician......................$ 36.10 0.00

Excavator Operator, 50,000 pounds or less...................$ 25.08 0.00

Excavator Operator, Over 50,000 pounds....................$ 25.34 0.00

Flagger..........................$ 14.80 ** 0.00

Form Builder/Setter, Structures.......................$ 22.50 0.00

Form Setter, Paving & Curb.......$ 20.89 0.00

Foundation Drill Operator, Crawler Mounted..................$ 29.25 0.00

Foundation Drill Operator, Truck Mounted....................$ 29.86 0.00

Front End Loader Operator, 3 CY or Less.......................$ 20.93 0.00

Front End Loader Operator, Over 3 CY........................$ 22.56 0.00

Laborer, Common..................$ 18.01 0.00

Laborer, Utility.................$ 19.32 0.00

Loader/Backhoe Operator..........$ 23.22 0.00

Mechanic.........................$ 27.44 0.00

Milling Machine Operator.........$ 20.94 0.00

Motor Grader Operator, Fine Grade............................$ 27.09 0.00

Motor Grader Operator, Rough.....$ 24.90 0.00

Off Road Hauler..................$ 23.70 0.00

Pavement Marking Machine Operator.........................$ 22.35 0.00

Pipelayer........................$ 22.46 0.00

Reclaimer/Pulverizer Operator....$ 22.17 0.00

Reinforcing Steel Worker.........$ 23.