5a - SOW OLIVER BERRY UWB CLEAN INSPECT.pdf
PDF 365 KB Posted
- Attached to
- Underwater body (UWB) cleaning, inspection, and anode replacement for the Coast Guard Cutter Oliver Berry.
- Solicitation number
- 21213416WH005
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
USCGC OLIVER F. BERRY (WPC-154) DOCKSIDE AVAILABILITY FY2021
13 (Draft-2)
11001_JLW_0220_154WPC
WORK ITEM 2: U/W Body (waterborne), Clean and Inspect
1. Scope
1.1 Intent.
and to renew zinc anodes, while the vessel is moored pier side.
1.2 Government-furnished property.
MTI ITEM DESCRIPTION NSN/PN QTY ESTIMATED
COST
($/UNIT)
N Anode, stern tube P/N: Z0020202H3
NIIN: 016445483
16 ea 50
N Nut, Self-Locking P/N: 90715A145
NIIN: 015085774
36 ea 5
N Anode, Sea Chest Grate P/N: GA-4
NIIN: 016476179
4 ea 30
N Screw, Prop zinc plate P/N: 950756
NIIN: 016340210
8 ea 5
N Screw, Sea Chest Grate Anode, P/N: 93190A634, NIIN: 016197182
4 ea 5
N Screw, stern tube covers P/N: 90585A626
NIIN: 016161107
42 ea 5
N Zinc plate, propeller P/N: 950733
NIIN: 016278941
2 ea 50
2. REFERENCES
COAST GUARD DRAWINGS
Coast Guard Drawing 154 WPC 111-301, Rev B, Shell Expansion
Coast Guard Drawing 154 WPC 161-301, Rev C, Skegs and Stern Tubes Support Structures
Coast Guard Drawing 154 WPC 562-201, Rev A, Rudder Details
Coast Guard Drawing 154 WPC 565-201, Rev -, Fin Stabilizer System A & D
Coast Guard Drawing 154 WPC 568-201, Rev B, Bow Thruster System A & D
Coast Guard Drawing 154 WPC 997-302, Rev -, Docking Plan
COAST GUARD PUBLICATIONS
Surface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), 2018, General Requirements
USCGC OLIVER F. BERRY (WPC-154) DOCKSIDE AVAILABILITY FY2021
14 (Draft-2)
Surface Forces Logistics Center Maintenance Procedure Card B10015.D (MPC B10015.D), 5/31/17, Insp/Cln U/W Equipment (Hull Plate)
Surface Forces Logistics Center Maintenance Procedure Card B10018.D (MPC B10018.D), 3/15/19, replace Underwater Zinc Anodes
OTHER REFERENCES
None
3. REQUIREMENTS
3.1 General.
3.1.1 CIR.
None.
3.1.2 Tech Rep.
Not Applicable.
3.1.3 Protective measures. The Contractor shall furnish and install all protective coverings to seal off and protect all non-affected vessel's components, equipment, and spaces near the work area against contamination during the performance of work. Upon completion of work, the Contractor shall remove all installed protective measures, inspect for the presence of contamination, and return all contaminated equipment, components, and spaces to original condition of cleanliness.
3.1.4 Interferences. The Contractor shall handle all interferences in accordance with SFLC Std Spec 0000, paragraph 3.3.5 (Interferences).
3.2 Requirements. The Contractor shall submit video highlights of underwater body surfaces (e.g. bow thruster, propellers, rudders, transducers, heavily fouled hull areas, etc.) before and after cleaning.
Referring to drawings listed in Section 2, the Contractor shall clean the U/W body surfaces free of all marine growth, debris, and all other surface contaminants in accordance with MPC B10015.D. Renew Government-furnished components listed below paragraph 1.2. in accordance with MPC B10018.D.
Ensure all transducer surfaces are cleaned with only hand held brushes, without the use of power attachments. Ensure that existing u/w body coating system or non-coated surfaces do not incur any damage during cleaning process.
4. NOTES
This section is not applicable to this work item.
File details come from the government source that posted it. Updated .