5962_Proposal.pdf

PDF 2 MB Posted

Attached to
Nisqually Rd SW (Nisqually River to I-5 Northbound Ramp). CRP 5962
Solicitation number
2026-MPW-210
Issued by
Pierce County, Washington

About this file

This is a proposal and contract form document for Pierce County Planning & Public Works in Washington State for the Nisqually Road Southwest project (CRP 5962, Federal Aid No. STBGR-G273(002)). The project provides for improvement of Nisqually Road Southwest from Nisqually River to I-5 Northbound Ramp through resurfacing existing asphalt pavement and paved shoulders, replacing substandard guardrail, installing new guardrail, and related work. The bid opening is scheduled for Wednesday, September 30, 2026, at 1:00 p.m. The scope of work includes 56 line items encompassing mobilization, guardrail removal and installation, pavement repair and resurfacing, hot mix asphalt work, traffic control, erosion control, permanent signing, temporary pavement marking, utility coordination, and various other construction-related tasks. Quantities include 2,800 linear feet of paint line removal, 5,120 tons of hot mix asphalt, 919 to 1,707 linear feet of beam guardrail in various configurations, 46,028 linear feet of plastic line, 30,976 linear feet of temporary pavement marking, 1,600 hours of flagger services, and numerous other measurable items.

The proposal requires a five percent proposal guaranty in the form of cash, cashier's check, or certified check payable to Pierce County. Bidders must submit prevailing wage certifications, non-collusion declarations, federal-aid contract compliance certifications, and wage law compliance certifications. The contract is federally funded through the Surface Transportation Block Grant program. Bidders are required to list any subcontractors for structural steel, rebar, HVAC, plumbing, and electrical work or indicate self-performance, and must submit a subcontractor list in compliance with Section 1-02.6. Additionally, bidders must propose the percentage of recycled materials to be incorporated into the project within limits specified in the Standard Specifications. The document includes required federal-aid contract provisions addressing nonsegregated facilities and equal employment opportunity requirements.

View the file

Other files

File Type Posted
5962_Contract.pdf PDF
5962_ConstructionPlans.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PROPOSAL AND CONTRACT FORMS

FOR

NISQUALLY ROAD SOUTHWEST

Nisqually River to I-5 Northbound Ramp

CRP 5962, Federal Aid No. STBGR-G273(002)

BID OPENING DATE:

Date: WEDNESDAY, SEPTEMBER 30, 2026 Bid Delivery Time: 1:00 p.m.

Bid Opening Time: 1:00 p.m., or as soon thereafter as possible.

PROPOSAL

TO THE PIERCE COUNTY DIRECTOR OF PLANNING & PUBLIC WORKS

TACOMA, WASHINGTON

This certifies that the undersigned has examined the location of

ITEM ITEM DESCRIPTION

NO. at $ . ct $ . ct

1 Mobilization at .

2 188 L.F. Removing Guardrail at . per L.F. .

3 2,800 L.F. Removing Paint Line at . per L.F. .

4 72 L.F. Removing Plastic Line at . per L.F. .

5 2 EACH Removing Plastic Traffic Marking at . per EACH .

6 324 S.F. Removing Plastic Crosswalk Line at . per S.F. .

7 10.7 HUND Removing Raised Pavement Marker at . per HUND .

8 151 S.Y.

Pavement Repair Excavation Incl.

Haul at . per S.Y. .

9 49 L.F. Expansion Joint Modification at . per L.F. .

10 Removing and Resetting Block Wall at .

11 105 TON Crushed Surfacing Base Course at . per TON .

12 373 TON Crushed Surfacing Top Course at . per TON .

GRADING

LUMP SUM LS LUMP SUM

SURFACING

STRUCTURE

NISQUALLY ROAD SOUTHWEST

LUMP SUM LUMP SUMLS

QUANTITY UNIT PRICE UNIT TOTAL AMOUNT

Nisqually River to I-5 Northbound Ramp

CRP 5962

PREPARATION

Federal Aid No. STBGR-G273(002) and that the plans, specifications and contract governing the work embraced in this improvement, and the method by which payment will be made for said work is understood. The undersigned hereby proposes to undertake and complete the work embraced in this improvement, or as much thereof as can be completed with the material available in accordance with the said plans, specifications and contract, and the following schedule of rates and prices.

Note: Unit price(s) for all item(s), all extensions, and total amount of bid shall be shown. All entries must be typed or entered in ink.

Show price per unit in figures only. Figures written to the right of the dot (decimal) in the price per unit column shall be interpreted as cents.

5962Proposal.xlsx P 1 8/17/2026

ITEM ITEM DESCRIPTION

NO. at $ . ct $ . ct

QUANTITY UNIT PRICE UNIT TOTAL AMOUNT

13 904 S.Y. Planing Bituminous Pavement at . per S.Y. .

14 5,120 TON HMA Cl. 1/2 In. PG 58H-22 at . per TON .

15 10,300$ DOLLAR Compaction Price Adjustment at 1 . 00 per CALC 10,300$ . 00

16 9,400$ DOLLAR Asphalt Cost Price Adjustment at 1 . 00 per CALC 9,400$ . 00

17 31 EACH Inlet Protection at . per EACH .

18 70 L.F. Silt Fence at . per L.F. .

19 1,000$ DOLLAR Erosion/Water Pollution Control at 1 . 00 per EST. 1,000$ . 00

20 919 L.F.

Beam Guardrail Type 31 - 8 Ft. Long Post at . per L.F. .

21 1,407 L.F.

Beam Guardrail Type 31 - 9 Ft. Long Post at . per L.F. .

22 357 L.F.

Beam Guardrail Type 31 - 11 Ft. Long Post at . per L.F. .

23 1,707 L.F. Beam Guardrail Type 31 at . per L.F. .

24 3 EACH

Beam Guardrail Transition Section Type 24 at . per EACH .

25 12 EACH

Beam Guardrail Type 31 Non-Flared Terminal at . per EACH .

26 150 L.F.

Precast Conc. Barrier Type F Unanchored at . per L.F. .

27 4 EACH Barrier Delineator at . per EACH .

28 173 EACH Guardrail Reflector at . per EACH .

29 38 EACH Vactor Post Excavation at . per EACH .

30 46,028 L.F. Plastic Line at . per L.F. .

31 3,661 L.F. Profiled Plastic Line at . per L.F. .

32 245 L.F. Profiled Plastic Wide Lane Line at . per L.F. .

EROSION CONTROL AND ROADSIDE PLANTING

HOT MIX ASPHALT

TRAFFIC

Show price per unit in figures only. Figures written to the right of the dot (decimal) in the price per unit column shall be interpreted as cents.

5962Proposal.xlsx P 2 8/17/2026

NO. at $ . ct $ . ct

QUANTITY UNIT PRICE UNIT TOTAL AMOUNT

33 72 L.F. Plastic Stop Line at . per L.F. .

34 2 EACH Plastic Traffic Arrow at . per EACH .

35 324 S.F. Plastic Crosswalk Line at . per S.F. .

36 1.0 HUND Raised Pavement Marker Type 1 at . per HUND .

37 4.0 HUND Raised Pavement Marker Type 2 at . per HUND .

38 Permanent Signing at .

39 30,976 L.F.

Temporary Pavement Marking - Short Duration at . per L.F. .

40 4 EACH

Temporary Misc. Pavement Markings - Short Duration at . per EACH .

41 144 L.F. Temporary Stop Line - Short Duration at . per L.F. .

42 324 L.F.

Temporary Crosswalk Line - Short Duration at . per L.F. .

43 384 HR Portable Changeable Message Sign at . per HR .

Other Temporary Traffic Control Devices at .

45 1,600 HR Flaggers at . per HR .

46 200 HR Other Traffic Control Labor at . per HR .

47 Traffic Control Supervisor at .

48 8,200$ DOLLAR Work Zone Safety Contingency at 1 . 00 per EST. 8,200$ . 00

49 48 S.F. Construction Signs Class A at . per S.F. .

50 Utility Coordination at .

51 13 EACH Monument at . per EACH .

52 21 EACH Adjust Catch Basin at . per EACH .

53 1,000$ DOLLAR Roadside Cleanup at 1 . 00 per EST. 1,000$ . 00

54 5,000$ DOLLAR

Reimbursement for Third Party Damage at 1 . 00 per EST. 5,000$ . 00

LS LUMP SUMLUMP SUM

LUMP SUM LS LUMP SUM

LUMP SUM LS LUMP SUM

LS LUMP SUMLUMP SUM

OTHER ITEMS

Show price per unit in figures only. Figures written to the right of the dot (decimal) in the price per unit column shall be interpreted as cents.

5962Proposal.xlsx P 3 8/17/2026

NO. at $ . ct $ . ct

QUANTITY UNIT PRICE UNIT TOTAL AMOUNT

55 10,000$ DOLLAR Minor Change at 1 . 00 per EST. 10,000$ . 00

56 SPCC Plan at .

57 FDC Plan at .

CONTRACT TOTAL

LUMP SUM

LUMP SUMLUMP SUM LS

LUMP SUM LS

Show price per unit in figures only. Figures written to the right of the dot (decimal) in the price per unit column shall be interpreted as cents.

5962Proposal.xlsx P 4 8/17/2026

NISQUALLY ROAD SOUTHWEST

CRP 5962, Federal Aid No. STBGR-G273(002) _26WORD.SPC\5962-FedPk-Aug 18 2026.docx P 5 08/18/2026

Proposal--Continued

The bidder is hereby advised that by signature of this proposal he/she is deemed to have acknowledged all requirements and signed all certificates contained herein.

The undersigned hereby agrees to pay not less than the prevailing rates of wages in accordance with the requirements of the special provisions for this project.

A proposal guaranty in an amount of five percent (5%) of the total bid, based upon the approximate estimate of quantities at the above prices and in the form as indicated below, is attached hereto:

CASH IN THE AMOUNT OF

CASHIER’S CHECK

CERTIFIED CHECK ($_________) PAYABLE TO PIERCE COUNTY

PROPOSAL BOND TREASURER IN THE AMOUNT OF 5% OF THE BID

Receipt is hereby acknowledged of addendum(s) No.(s) _____, _____, and _____.

PROPOSAL MUST BE SIGNED

SIGNATURE OF AUTHORIZED OFFICIAL(S)

By: By:

(Print Name) (Print Name)

FIRM NAME

ADDRESS

Street City State Zip

PHONE FAX E-MAIL

The following information is required per RCW 39.04.350

Contractor’s License No. Contractor’s UBI No.

Industrial Insurance Account No. Excise Tax No.

Employment Security Account No.

Signed and sworn to (or affirmed) before me this day of , 20____.

Notary Public in and for the State of Washington

Residing at My Appointment Expires

Note: (1) This proposal form is not transferable, and any alteration of the firm’s name entered hereon without prior permission from the County will be cause for considering the proposal irregular and subsequent rejection of the bid.

(2) Please refer to Section 1-02.6 of the Standard Specifications, re: “Preparation of Proposal.”

CRP 5962, Federal Aid No. STBGR-G273(002) _26WORD.SPC\5962-FedPk-Aug 18 2026.docx P 6 08/18/2026

PIERCE COUNTY PLANNING & PUBLIC WORKS

PROPOSAL BOND

KNOW ALL MEN BY THESE PRESENTS, That we of as principal, and the a corporation duly organized under the laws of the State of and authorized to do business in the State of Washington, as surety, are held and firmly bound unto Pierce County, State of Washington, in the full and penal sum of five (5) percent of the total amount of the bid proposal of said principal for the work hereinafter described, pursuant to and in compliance with the provisions of RCW 36.77.030, for the payment of which, well and truly to be made, we bind our heirs, executors, administrators and assigns, and successors and assigns, firmly by these presents.

The conditions of this bond are such, that whereas the principal herein is hereby submitting his/her or its sealed proposal for the following public works construction, to wit:

said bid and proposal, by reference thereto, being made a part hereof.

NOW, THEREFORE, if said proposal bid by said principal be accepted, and the contract be awarded to said principal, said principal shall duly make and enter into and execute said contract and shall furnish bond as required by RCW 36.77.040 within ten (10) days after notice of the award, exclusive of the day of notice, then this obligation shall be null and void, otherwise it shall remain and be in full force and effect.

IN TESTIMONY WHEREOF, the principal and the surety have caused these presents to be signed and sealed this __________________ day of __________________________, 20___.

Principal

Surety

Attorney-in-fact

Local Programs Subcontractor List In compliance Section 1-02.6

To be Submitted with Bid

DOT Form 271-015LP

Revised 08/2026

FA # LOCAL AGENCY

PROJECT NAME

BIDDER:

Bidders must list on this Subcontractor Form any Subcontractor(s) with whom the bidder will directly subcontract that are proposed to perform the work of structural steel installation, rebar installation, heating, ventilation and air conditioning, plumbing, as described in Chapter 18.106 RCW, and electrical, as described in Chapter 19.28 RCW or indicate when the Prime Contractor chooses to self-perform any of the work described herein.

Failure to list subcontractors with whom the bidder, if awarded the contract, will directly subcontract for performance of the work or naming more than one contractor to perform the same work will result in your bid being non-responsive.

Bidders are notified that it is the opinion of the contracting agency that PVC or metal conduit, junction boxes, etc, are considered electrical work. For Federal Aid Projects, bidders are not required to submit proof of license at the time of bid.

Trade You must select one box for each trade.

Heating, Ventilation & Air Conditioning

(HVAC)

☐ Name of Sub: ___________________________ ☐ N/A (this project does not include this work) ☐ Bidder will self-perform this work

Plumbing ☐ Name of Sub: ___________________________ ☐ N/A (this project does not include this work) ☐ Bidder will self-perform this work

Electrical ☐ Name of Sub: ___________________________ ☐ N/A (this project does not include this work) ☐ Bidder will self-perform this work

Structural Steel Installation

☐ Name of Sub: ___________________________ ☐ N/A (this project does not include this work) ☐ Bidder will self-perform this work

Rebar Installation ☐ Name of Sub: ___________________________ ☐ N/A (this project does not include this work) ☐ Bidder will self-perform this work

P 7

_26WORD.SPC\5962-FedPk-Aug 18 2026.docx P 8 08/18/2026

REQUIRED CONTRACT PROVISIONS

FEDERAL-AID CONSTRUCTION CONTRACTS

III. NONSEGREGATED FACILITIES

(Applicable to all Federal-aid construction contracts and to all related subcontracts of $10,000 or more.)

a. By submission of this bid, the execution of this contract or subcontract, or the consummation of this material supply agreement or purchase order, as appropriate, the bidder, Federal-aid construction contractor, subcontractor, material supplier, or vendor, as appropriate, certifies that the firm does not maintain or provide for its employees any segregated facilities at any of its establishments, and that the firm does not permit its employees to perform their services at any location, under its control, where segregated facilities are maintained. The firm agrees that a breach of this certification is a violation of the EEO provisions of this contract. The firm further certifies that no employee will be denied access to adequate facilities on the basis of sex or disability.

b. As used in this certification, the term “segregated facilities” means any waiting rooms, work areas, restrooms and washrooms, restaurants and other eating areas, time clocks, locker rooms, and other storage or dressing areas, parking lots, drinking fountains, recreation or entertainment areas, transportation, and housing facilities provided for employees which are segregated by explicit directive, or are, in fact, segregated on the basis of race, color, religion, national origin, age or disability, because of habit, local custom, or otherwise. The only exception will be for the disabled when the demands for accessibility override (e.g., disabled parking).

c. The contractor agrees that it has obtained or will obtain identical certification from proposed subcontractors or material suppliers prior to award of subcontractors or consummation of material supply agreements of $10,000 or more and that it will retain such certifications in its files.

_26WORD.SPC\5962-FedPk-Aug 18 2026.docx P 9 08/18/2026

Failure to return this Declaration as part of the bid proposal package will make the bid nonresponsive and ineligible for award.

NON-COLLUSION DECLARATION

I, by signing the proposal, hereby declare, under penalty of perjury under the laws of the United States, that the following statements are true and correct:

1. That the undersigned person(s), firm, association or corporation has (have) not, either directly or indirectly, entered into any agreement, participated in any collusion, or otherwise taken any action in restraint of free competitive bidding in connection with the project for which this proposal is submitted.

2. That by signing the signature page of this proposal, I am deemed to have signed and have agreed to the provisions of this declaration.

NOTICE TO ALL BIDDERS

To report bid rigging activities call: 1-800-424-9071

The U.S. Department of Transportation (USDOT) operates the above toll-free “hotline” Monday through Friday, 8:00 a.m. to 5:00 p.m., Eastern Time. Anyone with knowledge of possible bid rigging, bidder collusion, or other fraudulent activities should use the “hotline” to report such activities.

The “hotline” is part of USDOT’s continuing effort to identify and investigate highway construction contract fraud and abuse and is operated under the direction of the USDOT Inspector General. All information will be treated confidentially, and caller anonymity will be respected.

_26WORD.SPC\5962-FedPk-Aug 18 2026.docx P 10 08/18/2026

LOCAL AGENCY CERTIFICATION FOR FEDERAL-AID CONTRACTS

The prospective participant certifies, by signing and submitting this bid or proposal, to the best of his or her knowledge and belief, that:

1. No Federal appropriated funds have been paid or will be paid, by or on behalf of the undersigned, to any person for influencing or attempting to influence an officer or employee of any Federal agency, a Member of Congress, an officer or employee of Congress, or an employee of a Member of Congress in connection with the awarding of any Federal contract, the making of any Federal grant, the making of any Federal loan, the entering into of any cooperative agreement, and the extension, continuation, renewal, amendment, or modification of any Federal contract, grant, loan, or cooperative agreement.

2. If any funds other than Federal appropriated funds have been paid or will be paid to any person for influencing or attempting to influence an officer or employee of any Federal agency, a Member of Congress, an officer or employee of Congress, or an employee of a Member of Congress in connection with this Federal contract, grant, loan, or cooperative agreement, the undersigned shall complete and submit Standard Form-LLL, “Disclosure Form to Report Lobbying,” in accordance with its instructions.

This certification is a material representation of fact upon which reliance was placed when this transaction was made or entered into. Submission of this certification is a prerequisite for making or entering into this transaction imposed by Section 1352, Title 31, U.S. Code. Any person who fails to file the required certification shall be subject to a civil penalty of not less than $10,000 and not more than $100,000 for each such failure.

The prospective participant also agrees by submitting his or her bid or proposal that he or she shall require that the language of this certification be included in all lower tier subcontracts, which exceed $100,000 and that all such sub-recipients shall certify and disclose accordingly.

DOT 272-040A EF

7/2011

_26WORD.SPC\5962-FedPk-Aug 18 2026.docx P 11 08/18/2026

Proposal for Incorporating Recycled Materials into the Project

In compliance with a new law that went into effect January 1, 2016 (SHB1695), the Bidder shall propose below, the total percent of construction aggregate and concrete materials to be incorporated into the Project that are recycled materials. Calculated percentages must be within the amounts allowed in Section 9-03.21(1)F, Table on Maximum Allowable Percent (By Weight) of Recycled Material, of the Standard Specifications.

Proposed total percentage: _____________________________ percent.

Note: Use of recycled materials is highly encouraged within the limits shown above, but does not constitute a Bidder Preference, and will not affect the determination of award, unless two or more lowest responsive Bid totals are exactly equal, in which case proposed recycling percentages will be used as a tiebreaker, per the APWA GSP in Section 1-02.6 of the Special

Provisions. Regardless, the Bidder’s stated proposed percentages will become a goal the

Contractor should do its best to accomplish. Bidders will be required to report on recycled materials actually incorporated into the Project, in accordance with the APWA GSP in Section

1-06.6 of the Special Provisions.

Bidder Name:

Signature of Authorized Official:

Date:

_26WORD.SPC\5962-FedPk-Aug 18 2026.docx P 12 08/18/2026

CONTRACTOR CERTIFICATION WAGE LAW COMPLIANCE

The bidder hereby certifies that, within the three-year period immediately preceding the bid solicitation date (SEPTEMBER 30, 2026), the bidder is not a “willful” violator, as defined in RCW 49.48.082, of any provision of chapters 49.46, 49.48, or 49.52 RCW, as determined by a final and binding citation and notice of assessment issued by the Department of Labor and Industries or through a civil judgment entered by a court of limited or general jurisdiction.

I declare under penalty of perjury under the laws of the State of Washington that the foregoing is true and correct.

Bidder’s Business Name

Signature of Authorized Official*

Printed Name

Title

Date

City

State

Check One:

Sole Proprietorship ☐ Partnership ☐ Joint Venture ☐ Corporation ☐

State of Incorporation, or if not a corporation, State where business entity was formed:

If a co-partnership, give firm name under which business is transacted:

* If a corporation, proposal must be executed in the corporate name by the president or vice-president (or any other corporate officer accompanied by evidence of authority to sign). If a co-partnership, proposal must be executed by a partner.

B id de r Q ue st io nn ai re

Ag en cy

N am e Fe de ra l A id

N um be r

Pr im e C on tra ct or

N am e C on tra ct N um be r

C on tra ct

N am e

Fi rm

/S ub co nt ra ct or N am e

A dd re ss

(in cl . Z

IP

C od e)

D

B E

St at us

N A

IC

S

C od es

Sc op e of

W or k Fi rm A ge

Fi rm

G ro ss R ec ei pt s

If yo u ha ve a dd iti on al

F irm s or

S ub co nt ra ct or s th at s ub m itt ed B id s, p le as e co m pl et e ad di tio na l f or m s.

Al l b id de rs li st ed o n an y ot he r f or m s, in cl ud in g th e Su bc on tra ct or L is t, m us t a pp ea r o n th is fo rm

Pr im e C on tra ct or

R ep re se nt at iv e

D at e

D O

T Fo rm

-0

R ev is ed

/2

Pr ev io us

V er si on s O bs ol et e

P 13

D O

T Fo rm

-0

R ev is ed

2/

Pr ev io us V er si on s

O bs ol et e

Fo rm

In st ru ct io ns

Th e fo llo w in g in fo rm at io n fo r e ac h fir m th at s ub m itt ed a b id is re qu ire d as p ar t o f 4

C

FR

6.

(c

)(2

Fi rm

/S ub co nt ra ct or N am e:

E nt er th e na m e of e ac h fir m o r s ub co nt ra ct or w ho s ub m itt ed a q uo te o r a b id o n th e co nt ra ct

A dd re ss

: E nt er th e m ai n ad dr es s of th e fir m /s ub co nt ra ct or

. I nc lu de th e

ZI

P co de

D B

E St at us

: E nt er th e D

BE

s ta tu s.

O pt io ns a re D

B E a nd

N on

-D B

E

N A

IC

S

C od es : E nt er th e ap pr op ria te N

AI

C

S C od es fo r t he w or k th e bi d w as s ub m itt ed fo r.

Sc op e of

W or k:

E nt er th e sc op e of th e w or k th e bi d w as s ub m itt ed fo r.

Fi rm

A ge

: E nt er th e ag e of th e fir m

Fi rm

G ro ss R ec ei pt s:

E nt er th e an nu al g ro ss re ce ip ts . O pt io ns a re “L es s th an m ill io n”

$1 m ill io n”

$3 m ill io n”

$6 m ill io n”

$1

0- $2 m ill io n

.7 m ill io n

“G re at er th an

.7 m ill io n

P 14 https://20-$30.72