This is a proposal and contract form for a construction project administered by Pierce County Planning & Public Works in Tacoma, Washington. The project, designated CRP 5936 with Federal Aid No. TAP-2860(002), involves the improvement of 168th Street East from SR-7 to B Street East. The scope of work includes roadway widening to accommodate one through lane in each direction with a center turn lane, cement concrete traffic curb and gutter, sidewalks, bike lanes, on-street parking, enclosed storm drainage conveyance, stormwater treatment and infiltration facilities, street lighting, and traffic signal modifications. The bid opening is scheduled for Wednesday, September 9, 2026, at 1:00 p.m. The proposal itemizes 82 line items covering preparation, grading, drainage, storm sewer, surfacing, hot mix asphalt, erosion control, traffic control, and other construction work, with quantities specified in various units including cubic yards, linear feet, tons, square yards, and each. Bidders must provide unit prices for all items and extensions, with the proposal requiring notarization and submission of a proposal bond equal to five percent of the total bid.
Pricing is structured on a unit price basis with specific quantities assigned to each line item, allowing contractors to develop competitive bids based on their cost estimates. Several line items include fixed dollar amounts with price adjustment provisions, including a $4,600 compaction price adjustment and $5,000 asphalt cost price adjustment. The project is federally funded through the Transportation Alternatives Program (TAP), requiring compliance with federal contracting requirements including nonsegregated facilities certification, non-collusion declarations, and federal-aid contract provisions. Bidders must submit the Local Agency Subcontractor List identifying any direct subcontractors for structural steel, rebar, HVAC, plumbing, and electrical work as required by RCW 39.30.060. Additional requirements include wage law compliance certification, recycled materials documentation, and contractor questionnaires with firm demographics and DBE status. Contractors must hold valid Washington State licenses and provide Industrial Insurance and employment security information prior to award.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PROPOSAL AND CONTRACT FORMS
FOR
168TH STREET EAST
(SR7 to B Street East)
CRP 5936, Federal Aid No. TAP-2860(002)
BID OPENING DATE:
Date: WEDNESDAY, SEPTEMBER 9, 2026 Bid Delivery Time: 1:00 p.m.
Bid Opening Time: 1:00 p.m., or as soon thereafter as possible.
PROPOSAL
TO THE PIERCE COUNTY DIRECTOR OF PLANNING & PUBLIC WORKS
TACOMA, WASHINGTON
This certifies that the undersigned has examined the location of
ITEM ITEM DESCRIPTION
NO. at $ . ct $ . ct
PREPARATION
1 Mobilization at .
2 Clearing and Grubbing at .
3 2 EACH Removal of Drainage Structure at . per EACH .
4 70 S.Y. Removing Cement Conc. Sidewalk at . per S.Y. .
5 109 L.F. Removing Cement Conc. Curb and Gutter at . per L.F. .
6 8 L.F. Removing Cement Conc. Curb at . per L.F. .
7 2.1 HUND. Removing Raised Pavement Marker at . per HUND. .
8 10 EACH Removing Tree and Stump at . per EACH .
9 1 EACH Removing Gate at . per EACH .
10 335 L.F. Removing Fence at . per L.F. .
GRADING
11 5,215 C.Y. Roadway Excavation Incl. Haul at . per C.Y. .
12 90 C.Y. Embankment Compaction at . per C.Y.
13 660 TON Gravel Borrow Incl. Haul at . per TON .
LUMP SUM
168TH STREET EAST
LS LUMP SUM
SR-7 to B Street
LUMP SUM LUMP SUMLS
QUANTITY UNIT PRICE UNIT TOTAL AMOUNT
Fed Aid Number: TAP-2860(002)
CRP 5936
and that the plans, specifications and contract governing the work embraced in this improvement, and the method by which payment will be made for said work is understood. The undersigned hereby proposes to undertake and complete the work embraced in this improvement, or as much thereof as can be completed with the material available in accordance with the said plans, specifications and contract, and the following schedule of rates and prices.
Note: Unit price(s) for all item(s), all extensions, and total amount of bid shall be shown. All entries must be typed or entered in ink.
Show price per unit in figures only. Figures written to the right of the dot (decimal) in the price per unit column shall be interpreted as cents.
5936-Proposal Mar 2 2026.xlsx
P 1 6/15/2026
ITEM ITEM DESCRIPTION
NO. at $ . ct $ . ct
QUANTITY UNIT PRICE UNIT TOTAL AMOUNT
DRAINAGE
14 580 C.Y. Gravel Backfill for Drains at . per C.Y. .
15 217 L.F. 12" Underdrain Pipe at . per L.F. .
STORM SEWER
16 14 EACH Catch Basin Type 1 at . per EACH .
17 9 EACH Catch Basin Type 2 48 In. Diam. at . per EACH .
18 1 EACH Stormwater Treatment Catch Basin at . per EACH .
19 1 EACH
Stormwater Treatment Manhole 48 In.
Diam. at . per EACH .
20 2 EACH
Stormwater Treatment Manhole 72 In.
Diam. at . per EACH
21 969 L.F.
Schedule A Storm Sewer Pipe 12 In. Diam. at . per L.F. .
SURFACING
22 5,065 TON Crushed Surfacing Base Course at . per TON .
23 380 TON Crushed Surfacing Top Course at . per TON .
HOT MIX ASPHALT
24 2,500 TON HMA Cl. 1/2 In. PG58H-22 at . per TON .
25 4,600$ DOLLAR Compaction Price Adjustment at 1 . 00 per CALC. 4,600$ . 00
26 5,000$ DOLLAR Asphalt Cost Price Adjustment at 1 . 00 per CALC. 5,000$ . 00
EROSION CONTROL
AND ROADSIDE PLANTING
27 60 DAY Esc Lead at . per DAY .
28 7 EACH Inlet Protection at . per EACH
29 5,000$ DOLLAR Erosion/Water Pollution Control at 1 . 00 per EST. 5,000$ . 00
30 1,390 S.Y. Straw Mulch at . per S.Y.
31 375 S.Y. Seeding by Hand at . per S.Y. .
Show price per unit in figures only. Figures written to the right of the dot (decimal) in the price per unit column shall be interpreted as cents.
P 2 6/15/2026
NO. at $ . ct $ . ct
QUANTITY UNIT PRICE UNIT TOTAL AMOUNT
32 375 S.Y. Topsoil Type C at . per S.Y. .
TRAFFIC
33 2,687 L.F. Cement Conc. Traffic Curb and Gutter at . per L.F. .
34 37 L.F. Cement Conc. Pedestrian Curb at . per L.F. .
35 1,806 L.F. Paint Line at . per L.F. .
36 3,141 L.F. Painted Wide Line at . per L.F. .
37 121 L.F. Painted Broken Wide Line at . per L.F. .
38 324 S.Y. Plastic Crosswalk Line at . per S.Y. .
39 74 L.F. Plastic Stop Line at . per L.F. .
40 4 EACH Plastic Traffic Arrow at . per EACH .
41 4 EACH Plastic Bicycle Lane Symbol at . per EACH .
42 1.5 HUND. Raised Pavement Marker Type 1 at . per HUND. .
43 0.9 HUND. Raised Pavement Marker Type 2 at . per HUND. .
44 Permanent Signing at .
45 74 L.F.
Temporary Stop Line - Short Duration at . per L.F. .
46 162 L.F.
Temporary Crosswalk Line - Short Duration at . per L.F. .
47 4 EACH
Temporary Misc. Traffic Markings - Short Duration at . per EACH .
48 5,058 L.F.
Temporary Pavement Markings - Short Duration at . per L.F. .
49 32 HR.
Contractor Provided Uniformed Police Officer at . per HR. .
50 7,000$ DOLLAR Electrical Service Connection Fee at 1 . 00 per EST. 7,000$ . 00
51 Illumination System at .
52 Traffic Signal Modifications at .
53 Vehicle Detector at .
LUMP SUM LS LUMP SUM
LUMP SUM LS LUMP SUM
LS LUMP SUM
LUMP SUMLUMP SUM LS
LUMP SUM
Show price per unit in figures only. Figures written to the right of the dot (decimal) in the price per unit column shall be interpreted as cents.
P 3 6/15/2026
NO. at $ . ct $ . ct
QUANTITY UNIT PRICE UNIT TOTAL AMOUNT
54 960 HR. Portable Changeable Message Sign at . per HR. .
55 Other Temporary Traffic Control Devices at .
56 1,760 HR. Flaggers at . per HR. .
57 440 HR. Other Traffic Control Labor at . per HR. .
58 Traffic Control Supervisor at .
59 10,000$ DOLLAR Workzone Safety Contingency at 1 . 00 per EST. 10,000$ . 00
60 160 S.F Construction Signs Class A at . per S.F .
OTHER ITEMS
61 Utility Coordination at .
62 1,300 C.Y.
Structure Excavation Class B Incl. Haul at . per C.Y. .
63 3,968 S.F. Shoring or Extra Excavation Class B at . per S.F. .
64 68 C.Y. Pipe Zone Backfill at . per C.Y. .
65 100 MGAL Water at . per MGAL .
66 ADA Features Surveying at .
67 1 EACH Monument at . per EACH .
68 1,355 S.Y. Cement Conc. Sidewalk at . per S.Y. .
69 1,070 S.Y. Cement Conc. Approach at . per S.Y. .
70 8 EACH
Cement Conc. Curb Ramp Type Perpendicular at . per EACH .
71 2 EACH
Cement Conc. Curb Ramp Type Parallel at . per EACH .
72 5 EACH Adjust Catch Basin at . per EACH .
73 Reset Fence and Gate at .
74 130 S.Y.
Construction Geotextile for Permanent Erosion Control at . per S.Y. .
75 640 S.Y.
Construction Geotextile for Underground Drainage at . per S.Y. .
LUMP SUM
LS LUMP SUM
LUMP SUM LS LUMP SUM
LUMP SUM LS LUMP SUM
LUMP SUM
LS LUMP SUM
LUMP SUM LS LUMP SUM
Show price per unit in figures only. Figures written to the right of the dot (decimal) in the price per unit column shall be interpreted as cents.
P 4 6/15/2026
NO. at $ . ct $ . ct
QUANTITY UNIT PRICE UNIT TOTAL AMOUNT
76 10 EACH Mailbox Support Type 1-S at . per EACH .
77 4 EACH Mailbox Support Type 2 at . per EACH .
78 2,000$ DOLLAR Roadside Cleanup at 1 . 00 per EST. 2,000$ . 00
79 5,000$ DOLLAR Reimbursement for Third Party Damage at 1 . 00 per EST. 5,000$ . 00
80 25,000$ DOLLAR Minor Change at 1 . 00 per EST. 25,000$ . 00
81 SPCC Plan at .
82 FDC Plan at .
CONTRACT TOTAL
LUMP SUM LS LUMP SUM
LUMP SUM LS LUMP SUM
Show price per unit in figures only. Figures written to the right of the dot (decimal) in the price per unit column shall be interpreted as cents.
P 5 6/15/2026
168TH STREET EAST
CRP 5936, Federal Aid No. TAP-2860(002) _26WORD.SPC\5936-Federal Pack Jun 10 2026.docx P 6
Proposal--Continued
The bidder is hereby advised that by signature of this proposal he/she is deemed to have acknowledged all requirements and signed all certificates contained herein.
The undersigned hereby agrees to pay not less than the prevailing rates of wages in accordance with the requirements of the special provisions for this project.
A proposal guaranty in an amount of five percent (5%) of the total bid, based upon the approximate estimate of quantities at the above prices and in the form as indicated below, is attached hereto:
CASH IN THE AMOUNT OF
CASHIER’S CHECK
CERTIFIED CHECK ($_________) PAYABLE TO PIERCE COUNTY
PROPOSAL BOND TREASURER IN THE AMOUNT OF 5% OF THE BID
Receipt is hereby acknowledged of addendum(s) No.(s) _____, _____, and _____.
PROPOSAL MUST BE SIGNED
SIGNATURE OF AUTHORIZED OFFICIAL(S)
By: By:
(Print Name) (Print Name)
FIRM NAME
ADDRESS
Street City State Zip
PHONE FAX E-MAIL
The following information is required per RCW 39.04.350
Contractor’s License No. Contractor’s UBI No.
Industrial Insurance Account No. Excise Tax No.
Employment Security Account No.
Signed and sworn to (or affirmed) before me this day of , 20____.
Notary Public in and for the State of Washington
Residing at My Appointment Expires
Note: (1) This proposal form is not transferable, and any alteration of the firm’s name entered hereon without prior permission from the County will be cause for considering the proposal irregular and subsequent rejection of the bid.
(2) Please refer to Section 1-02.6 of the Standard Specifications, re: “Preparation of Proposal.”
CRP 5936, Federal Aid No. TAP-2860(002) _26WORD.SPC\5936-Federal Pack Jun 10 2026.docx P 7
PIERCE COUNTY PLANNING & PUBLIC WORKS
PROPOSAL BOND
KNOW ALL MEN BY THESE PRESENTS, That we of as principal, and the a corporation duly organized under the laws of the State of and authorized to do business in the State of Washington, as surety, are held and firmly bound unto Pierce County, State of Washington, in the full and penal sum of five (5) percent of the total amount of the bid proposal of said principal for the work hereinafter described, pursuant to and in compliance with the provisions of RCW 36.77.030, for the payment of which, well and truly to be made, we bind our heirs, executors, administrators and assigns, and successors and assigns, firmly by these presents.
The conditions of this bond are such, that whereas the principal herein is hereby submitting his/her or its sealed proposal for the following public works construction, to wit:
said bid and proposal, by reference thereto, being made a part hereof.
NOW, THEREFORE, if said proposal bid by said principal be accepted, and the contract be awarded to said principal, said principal shall duly make and enter into and execute said contract and shall furnish bond as required by RCW 36.77.040 within ten (10) days after notice of the award, exclusive of the day of notice, then this obligation shall be null and void, otherwise it shall remain and be in full force and effect.
IN TESTIMONY WHEREOF, the principal and the surety have caused these presents to be signed and sealed this __________________ day of __________________________, 20___.
Principal
Surety
Attorney-in-fact
P 8
Local Agency Subcontractor List Prepared in compliance with RCW 39.30.060 as amended.
To Be Submitted with the Bid Proposal
Project Name ___________________________________________________________________________________________
Failure to list subcontractors with whom the bidder, if awarded the contract, will directly subcontract for performance of the work of structural steel installation, rebar installation, heating, ventilation and air conditioning, plumbing, as described in Chapter 18.106 RCW, and electrical, as described in Chapter 19.28 RCW or naming more than one subcontractor to perform the same work will result in your bid being non-responsive and therefore void.
Subcontractor(s) with whom the bidder will directly subcontract that are proposed to perform the work of structural steel installation, rebar installation, heating, ventilation and air conditioning, plumbing, as described in Chapter 18.106 RCW, and electrical as described in Chapter 19.28 RCW must be listed below. The work to be performed is to be listed below the subcontractor(s) name.
To the extent the Project includes one or more categories of work referenced in RCW 39.30.060, and no subcontractor is listed below to perform such work, the bidder certifies that the work will either (i) be performed by the bidder itself, or (ii) be performed by a lower tier subcontractor who will not contract directly with the bidder.
Subcontractor Name ___________________________________________________________________________________
Work to be performed ___________________________________________________________________________________
Subcontractor Name ___________________________________________________________________________________
Work to be performed ___________________________________________________________________________________
Subcontractor Name ___________________________________________________________________________________
Work to be performed ___________________________________________________________________________________
Subcontractor Name ___________________________________________________________________________________
Work to be performed ___________________________________________________________________________________
Subcontractor Name ___________________________________________________________________________________
Work to be performed ___________________________________________________________________________________
*Bidders are notified that it is the opinion of the enforcement agency that PVC or metal conduit, junction boxes, etc., are considered electrical equipment and therefore considered part of electrical work, even if the installation is for future use and no wiring or electrical current is connected during the project.
DOT Form 271-015LP Revised 06/2020
Tacoma Mall Plaza 2702 South 42nd Street Suite 109 Tacoma, WA 98409
Pierce County Planning & Public Works
_26WORD.SPC\5936-Federal Pack Jun 10 2026.docx P 9 06/10/2026
REQUIRED CONTRACT PROVISIONS
FEDERAL-AID CONSTRUCTION CONTRACTS
III. NONSEGREGATED FACILITIES
(Applicable to all Federal-aid construction contracts and to all related subcontracts of $10,000 or more.)
a. By submission of this bid, the execution of this contract or subcontract, or the consummation of this material supply agreement or purchase order, as appropriate, the bidder, Federal-aid construction contractor, subcontractor, material supplier, or vendor, as appropriate, certifies that the firm does not maintain or provide for its employees any segregated facilities at any of its establishments, and that the firm does not permit its employees to perform their services at any location, under its control, where segregated facilities are maintained. The firm agrees that a breach of this certification is a violation of the EEO provisions of this contract. The firm further certifies that no employee will be denied access to adequate facilities on the basis of sex or disability.
b. As used in this certification, the term “segregated facilities” means any waiting rooms, work areas, restrooms and washrooms, restaurants and other eating areas, time clocks, locker rooms, and other storage or dressing areas, parking lots, drinking fountains, recreation or entertainment areas, transportation, and housing facilities provided for employees which are segregated by explicit directive, or are, in fact, segregated on the basis of race, color, religion, national origin, age or disability, because of habit, local custom, or otherwise. The only exception will be for the disabled when the demands for accessibility override (e.g., disabled parking).
c. The contractor agrees that it has obtained or will obtain identical certification from proposed subcontractors or material suppliers prior to award of subcontractors or consummation of material supply agreements of $10,000 or more and that it will retain such certifications in its files.
_26WORD.SPC\5936-Federal Pack Jun 10 2026.docx P 10 06/10/2026
Failure to return this Declaration as part of the bid proposal package will make the bid nonresponsive and ineligible for award.
NON-COLLUSION DECLARATION
I, by signing the proposal, hereby declare, under penalty of perjury under the laws of the United States, that the following statements are true and correct:
1. That the undersigned person(s), firm, association or corporation has (have) not, either directly or indirectly, entered into any agreement, participated in any collusion, or otherwise taken any action in restraint of free competitive bidding in connection with the project for which this proposal is submitted.
2. That by signing the signature page of this proposal, I am deemed to have signed and have agreed to the provisions of this declaration.
NOTICE TO ALL BIDDERS
To report bid rigging activities call: 1-800-424-9071
The U.S. Department of Transportation (USDOT) operates the above toll-free “hotline” Monday through Friday, 8:00 a.m. to 5:00 p.m., Eastern Time. Anyone with knowledge of possible bid rigging, bidder collusion, or other fraudulent activities should use the “hotline” to report such activities.
The “hotline” is part of USDOT’s continuing effort to identify and investigate highway construction contract fraud and abuse and is operated under the direction of the USDOT Inspector General. All information will be treated confidentially, and caller anonymity will be respected.
_26WORD.SPC\5936-Federal Pack Jun 10 2026.docx P 11 06/10/2026
LOCAL AGENCY CERTIFICATION FOR FEDERAL-AID CONTRACTS
The prospective participant certifies, by signing and submitting this bid or proposal, to the best of his or her knowledge and belief, that:
1. No Federal appropriated funds have been paid or will be paid, by or on behalf of the undersigned, to any person for influencing or attempting to influence an officer or employee of any Federal agency, a Member of Congress, an officer or employee of Congress, or an employee of a Member of Congress in connection with the awarding of any Federal contract, the making of any Federal grant, the making of any Federal loan, the entering into of any cooperative agreement, and the extension, continuation, renewal, amendment, or modification of any Federal contract, grant, loan, or cooperative agreement.
2. If any funds other than Federal appropriated funds have been paid or will be paid to any person for influencing or attempting to influence an officer or employee of any Federal agency, a Member of Congress, an officer or employee of Congress, or an employee of a Member of Congress in connection with this Federal contract, grant, loan, or cooperative agreement, the undersigned shall complete and submit Standard Form-LLL, “Disclosure Form to Report Lobbying,” in accordance with its instructions.
This certification is a material representation of fact upon which reliance was placed when this transaction was made or entered into. Submission of this certification is a prerequisite for making or entering into this transaction imposed by Section 1352, Title 31, U.S. Code. Any person who fails to file the required certification shall be subject to a civil penalty of not less than $10,000 and not more than $100,000 for each such failure.
The prospective participant also agrees by submitting his or her bid or proposal that he or she shall require that the language of this certification be included in all lower tier subcontracts, which exceed $100,000 and that all such sub-recipients shall certify and disclose accordingly.
DOT 272-040A EF
7/2011
_26WORD.SPC\5936-Federal Pack Jun 10 2026.docx P 12 06/10/2026
Proposal for Incorporating Recycled Materials into the Project
In compliance with a new law that went into effect January 1, 2016 (SHB1695), the Bidder shall propose below, the total percent of construction aggregate and concrete materials to be incorporated into the Project that are recycled materials. Calculated percentages must be within the amounts allowed in Section 9-03.21(1)E, Table on Maximum Allowable Percent (By Weight) of Recycled Material, of the Standard Specifications.
Proposed total percentage: _____________________________ percent.
Note: Use of recycled materials is highly encouraged within the limits shown above, but does not constitute a Bidder Preference, and will not affect the determination of award, unless two or more lowest responsive Bid totals are exactly equal, in which case proposed recycling percentages will be used as a tiebreaker, per the APWA GSP in Section 1-02.6 of the Special
Provisions. Regardless, the Bidder’s stated proposed percentages will become a goal the
Contractor should do its best to accomplish. Bidders will be required to report on recycled materials actually incorporated into the Project, in accordance with the APWA GSP in Section
1-06.6 of the Special Provisions.
Bidder Name:
Signature of Authorized Official:
Date:
_26WORD.SPC\5936-Federal Pack Jun 10 2026.docx P 13 06/10/2026
CONTRACTOR CERTIFICATION WAGE LAW COMPLIANCE
The bidder hereby certifies that, within the three-year period immediately preceding the bid solicitation date September 9, 2026, the bidder is not a “willful” violator, as defined in RCW 49.48.082, of any provision of chapters 49.46, 49.48, or 49.52 RCW, as determined by a final and binding citation and notice of assessment issued by the Department of Labor and Industries or through a civil judgment entered by a court of limited or general jurisdiction.
I declare under penalty of perjury under the laws of the State of Washington that the foregoing is true and correct.
Bidder’s Business Name
Signature of Authorized Official*
Printed Name
Title
Date
City
State
Check One:
Sole Proprietorship ☐ Partnership ☐ Joint Venture ☐ Corporation ☐
State of Incorporation, or if not a corporation, State where business entity was formed:
If a co-partnership, give firm name under which business is transacted:
* If a corporation, proposal must be executed in the corporate name by the president or vice-president (or any other corporate officer accompanied by evidence of authority to sign). If a co-partnership, proposal must be executed by a partner.
B id de r Q ue st io nn ai re
Ag en cy
N am e Fe de ra l A id
N um be r
Pr im e C on tra ct or
N am e C on tra ct N um be r
C on tra ct
N am e
Fi rm
/S ub co nt ra ct or N am e
A dd re ss
(in cl . Z
IP
C od e)
D
B E
St at us
N A
IC
S
C od es
Sc op e of
W or k Fi rm A ge
Fi rm
G ro ss R ec ei pt s
If yo u ha ve a dd iti on al
F irm s or
S ub co nt ra ct or s th at s ub m itt ed B id s, p le as e co m pl et e ad di tio na l f or m s.
Al l b id de rs li st ed o n an y ot he r f or m s, in cl ud in g th e Su bc on tra ct or L is t, m us t a pp ea r o n th is fo rm
Pr im e C on tra ct or
R ep re se nt at iv e
D at e
D O
T Fo rm
-0
R ev is ed
/2
Pr ev io us
V er si on s O bs ol et e
D O
T Fo rm
-0
R ev is ed
2/
Pr ev io us V er si on s
O bs ol et e
Fo rm
In st ru ct io ns
Th e fo llo w in g in fo rm at io n fo r e ac h fir m th at s ub m itt ed a b id is re qu ire d as p ar t o f 4
C
FR
6.
(c
)(2
Fi rm
/S ub co nt ra ct or N am e:
E nt er th e na m e of e ac h fir m o r s ub co nt ra ct or w ho s ub m itt ed a q uo te o r a b id o n th e co nt ra ct
A dd re ss
: E nt er th e m ai n ad dr es s of th e fir m /s ub co nt ra ct or
. I nc lu de th e
ZI
P co de
D B
E St at us
: E nt er th e D
BE
s ta tu s.
O pt io ns a re D
B E a nd
N on
-D B
E
N A
IC
S
C od es : E nt er th e ap pr op ria te N
AI
C
S C od es fo r t he w or k th e bi d w as s ub m itt ed fo r.
Sc op e of
W or k:
E nt er th e sc op e of th e w or k th e bi d w as s ub m itt ed fo r.
Fi rm
A ge
: E nt er th e ag e of th e fir m
Fi rm
G ro ss R ec ei pt s:
E nt er th e an nu al g ro ss re ce ip ts . O pt io ns a re “L es s th an m ill io n”
$1 m ill io n”
$3 m ill io n”
$6 m ill io n”
$1
0- $2 m ill io n
.7 m ill io n
“G re at er th an
.7 m ill io n https://20-$30.72
| Text Field 3: |
| Text Field 5: |
| Text Field 6: |
| Text Field 8: |
| Text Field 243: |
| Text Field 4: |
| Text Field 7: |
| Text Field 177: |
| Text Field 176: |
| Text Field 15: |
| Text Field 271: |
| Text Field 272: |
| Text Field 273: |
| Text Field 274: |
| Text Field 275: |
| Text Field 276: |
| Text Field 277: |
| Text Field 278: |
| Text Field 279: |
| Text Field 145: |
| Text Field 289: |
| Text Field 290: |
| Text Field 291: |
| Text Field 292: |
| Text Field 293: |
| Text Field 294: |
| Text Field 295: |
| Text Field 296: |
| Text Field 297: |
| Text Field 298: |
| Text Field 299: |
| Text Field 300: |
| Text Field 301: |
| Text Field 302: |
| Text Field 303: |
| Text Field 304: |
| Text Field 305: |
| Text Field 306: |
| Text Field 307: |
| Text Field 308: |
| Text Field 309: |
| Text Field 310: |
| Text Field 311: |
| Text Field 312: |
| Text Field 313: |
| Text Field 314: |
| Text Field 315: |
| Text Field 316: |
| Text Field 317: |
| Text Field 318: |
| Text Field 319: |
| Text Field 320: |
| Text Field 321: |
| Text Field 322: |
| Text Field 323: |
| Text Field 324: |
| Text Field 143: |
| Text Field 325: |
| Dropdown1: [] |
| Dropdown2: [] |
| Dropdown3: [] |
| Dropdown4: [] |
| Dropdown5: [] |
| Dropdown6: [] |
| Dropdown7: [] |
| Dropdown8: [] |
| Dropdown9: [] |
| Dropdown10: [] |
| Dropdown46: [] |
| Dropdown47: [] |
| Dropdown48: [] |
| Dropdown49: [] |
| Dropdown50: [] |
| Dropdown51: [] |
| Dropdown52: [] |
| Dropdown53: [] |
| Dropdown54: [] |
| Dropdown55: [] |
File details come from the government source that posted it. Updated .