593-26-103 AV Equipment Locations.pdf
PDF 2 MB Posted
- Solicitation number
- 36C26126R0041
About this file
This document contains architectural and infrastructure design drawings for education and training rooms at the US Department of Veterans Affairs Medical Center (VAMC) in Las Vegas, Project Number OP497899.
The drawings include four sheets: an overall floor plan (AV-200) showing the 1st floor building facility layout with areas of work; detailed floor plans for "The Quad" spaces (AV-201) depicting AV device placement and infrastructure requirements; a reflected ceiling plan (AV-202) indicating speaker (SPK) and microphone (MIC) placements with connections to the Intermediate Distribution Frame (IDF); and a ceiling plan for the quad training rooms showing lighting and HVAC distribution. The infrastructure specifications require multiple display installations including 65" and 90" displays mounted on walls with backing boards sized 48" x 32" capable of withstanding display and mount weight with a 5:1 safety factor or per local code. Each installation includes duplex receptacles, 1-gang electrical boxes, dual data ports, and 1-1/4" conduit stubbed to accessible ceilings with pull strings. Lectern areas feature floorboxes with capacity for up to eight CAT6 cable runs and dual 1-1/4" conduit paths. The drawings are dated 3/16/26 and marked "FOR REVIEW" status, prepared by AVISPL at scale as noted on each drawing.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 593-26-103 Combined Specifications.pdf | ||
| 36C26126R0041.docx | DOCX document | |
| 593-26-103 Reference Drawings.pdf | ||
| VASNHS Renovate Education BLDG Training Hub SOW.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AV1
+65"
AV1
+90"
AV1
+65"
AV1
+90"
AV1
+65"
AV1
+90"
AV1
+65"
AV1
+90"
AV-201
AV-201
AV-201
AV-201
FB
LECTERN:
FLOORBOX
UP TO 8 CAT6 RUNS
FB
(X2) 1-1/4" CONDUIT PATH
(DIRECT OR STUB UPS)
LECTERN:
FLOORBOX
UP TO 8 CAT6 RUNS
2 2
(X2) 1-1/4" CONDUIT PATH
(DIRECT OR STUB UPS)
1 1ST FLOOR OVERALL BUILDING FACILITY PLAN - AREAS OF WORK
SCALE: 1/8" = 1'-0"
D
AT
E R
EV
AP
R
VD
ST
AT
U S
D
ES
C R
IP
TI
O N
PROJECT NUMBER:
DRAWING #
PR
O
JE
C
T:
D R
AW
IN
G T
IT
LE
DRAWN BY:
CHECKED BY:
© COPYRIGHT AVI-SPL INC.
SCALE:
DATE:
PROJ ENG:
PROJ MGR:
PL
O
TT
ED
: 3 /1
6/
:3
PM
F
IL
E:
(C
:\U se rs \N
D od d\ O ne D riv e
- A
VI
-S
PL
\M Y
JO
BS
\V A\
O P4
Tr ai ni ng R oo m s\ C
AD
\O
P4
El ev at io ns .d w g)
B Y:
N
AT
H
AN
D O
D D
N
AT
IV
E
SI
ZE
: A R
C H
E
(3
X
IN
C
H
ES
www.avispl.com
U S
D
EP
T O
F
VE
TE
R
AN
S
AF
FA
IR
S
VA
M
C L
AS
V
EG
AS
E D
U C
AT
IO
N T
R
AI
N
IN
G R
O O
M S
OP497899
3/16/26
AS NOTED
O
VE
R
AL
L
FL
O O
R P
LA
N
S
AV-200FOR REVIEW
9' -0
OF WALL / TABLE FIELD COORDINATE
EQUIPMENT FRONT VIEW SIDE VIEW
PROVIDE PULL STRING IN ALL CONDUIT
98" DISPLAY: PLANAR URP982
WALL MOUNT: CHIEF AS3LDP7
9' -0
OF WALL / TABLE FIELD COORDINATE
DISPLAY WEIGHT: 163 lbs MOUNT WEIGHT: 31.6 lbs
INFRASTRUCTURE FRONT VIEW
PROVIDE PULL STRING IN ALL CONDUIT
/4
" T O
L
EN
S
10 3/8"
/4
" T O
M O
U N
T
CAMERA: AVER TR315V3
/4
" T O
M O
U N
T
/8 " T
O T
O P
H O
LE
O
F M
O U
N T
48" x 32" BACKING TO
WITHSTAND THE WEIGHT OF
THE DISPLAY AND MOUNT
WITH A SAFETY FACTOR OF
AT LEAST 5:1 OR
ACCORDANCE TO LOCAL
CODE.
DUPLEX RECEPTACLE
1-GANG BOX DEEP
(2) DATA PORT
(1) 1-1/4" CONDUIT STUBBED
TO ACCESSIBLE CEILING86 3/4"
/2
" 48
/4
5"
" T
O
-G
AN
G B
O X
AV-201
AV-201
AV-201
AV-201
AV1
+65"
AV1
+90"
AV1
+65"
AV1
+90"
AV1
+65"
AV1
+90"
AV1
+65"
AV1
+90"
AV-201
AV-201
AV-201
AV-201
FB
LECTERN:
FLOORBOX
UP TO 8 CAT6 RUNS
FB
(X2) 1-1/4" CONDUIT PATH
(DIRECT OR STUB UPS)
LECTERN:
FLOORBOX
UP TO 8 CAT6 RUNS
2 2
(X2) 1-1/4" CONDUIT PATH
(DIRECT OR STUB UPS)
9' -0
OF WALL / TABLE FIELD COORDINATE
EQUIPMENT FRONT VIEW SIDE VIEW
PROVIDE PULL STRING IN ALL CONDUIT
98" DISPLAY: PLANAR URP982
WALL MOUNT: CHIEF AS3LDP7
9' -0
OF WALL / TABLE FIELD COORDINATE
DISPLAY WEIGHT: 163 lbs MOUNT WEIGHT: 31.6 lbs
INFRASTRUCTURE FRONT VIEW
PROVIDE PULL STRING IN ALL CONDUIT
/4
" T O
L
EN
S
10 3/8"
/4
" T O
M O
U N
T
CAMERA: AVER TR315V3
/4
" T O
M O
U N
T
/8 " T
O T
O P
H O
LE
O
F M
O U
N T
48" x 32" BACKING TO
WITHSTAND THE WEIGHT OF
THE DISPLAY AND MOUNT
WITH A SAFETY FACTOR OF
AT LEAST 5:1 OR
ACCORDANCE TO LOCAL
CODE.
DUPLEX RECEPTACLE
1-GANG BOX DEEP
(2) DATA PORT
(1) 1-1/4" CONDUIT STUBBED
TO ACCESSIBLE CEILING86 3/4"
/2
" 48
/4
5"
" T
O
-G
AN
G B
O X
THE QUAD
AV DEVICE FLOOR PLAN
SCALE: 1/4" = 1'-0" 2
THE QUAD
AV INFRASTRUCTURE FLOOR PLAN
SCALE: 1/4" = 1'-0"
THE QUAD
AV ELEVATION
SCALE: 1/2" = 1'-0"
D
AT
E R
EV
AP
R
VD
ST
AT
U S
D
ES
C R
IP
TI
O N
PROJECT NUMBER:
DRAWING #
PR
O
JE
C
T:
D R
AW
IN
G T
IT
LE
DRAWN BY:
CHECKED BY:
© COPYRIGHT AVI-SPL INC.
SCALE:
DATE:
PROJ ENG:
PROJ MGR:
PL
O
TT
ED
: 3 /1
6/
:3
PM
F
IL
E:
(C
:\U se rs \N
D od d\ O ne D riv e
- A
VI
-S
PL
\M Y
JO
BS
\V A\
O P4
Tr ai ni ng R oo m s\ C
AD
\O
P4
El ev at io ns .d w g)
B Y:
N
AT
H
AN
D O
D D
N
AT
IV
E
SI
ZE
: A R
C H
E
(3
X
IN
C
H
ES
www.avispl.com
U S
D
EP
T O
F
VE
TE
R
AN
S
AF
FA
IR
S
VA
M
C L
AS
V
EG
AS
E D
U C
AT
IO
N T
R
AI
N
IN
G R
O O
M S
OP497899
3/16/26
AS NOTED
TH
E
Q U
AD
F
LO
O
R P
LA
N
S
AV-201FOR REVIEW
THE QUAD
AV ELEVATION
SCALE: 1/2" = 1'-0"
SPK SPK
SPK SPK
SPK SPK
SPKSPK
SPKSPK
SPK SPKSPKSPK
SPK SPK
MIC MIC
MICMIC
TO IDF
TO IDF TO IDF
TO IDF
TO IDF TO IDF
TO IDFTO IDF
PART
SENSOR
TO IDF
THE QUAD
AV DEVICE CEILING PLAN
SCALE: 1/4" = 1'-0"
D
AT
E R
EV
AP
R
VD
ST
AT
U S
D
ES
C R
IP
TI
O N
PROJECT NUMBER:
DRAWING #
PR
O
JE
C
T:
D R
AW
IN
G T
IT
LE
DRAWN BY:
CHECKED BY:
© COPYRIGHT AVI-SPL INC.
SCALE:
DATE:
PROJ ENG:
PROJ MGR:
PL
O
TT
ED
: 3 /1
6/
:3
PM
F
IL
E:
(C
:\U se rs \N
D od d\ O ne D riv e
- A
VI
-S
PL
\M Y
JO
BS
\V A\
O P4
Tr ai ni ng R oo m s\ C
AD
\O
P4
El ev at io ns .d w g)
B Y:
N
AT
H
AN
D O
D D
N
AT
IV
E
SI
ZE
: A R
C H
E
(3
X
IN
C
H
ES
www.avispl.com
U S
D
EP
T O
F
VE
TE
R
AN
S
AF
FA
IR
S
VA
M
C L
AS
V
EG
AS
E D
U C
AT
IO
N T
R
AI
N
IN
G R
O O
M S
OP497899
3/16/26
AS NOTED
TH
E
Q U
AD
R
EF
LE
C
TE
D C
EI
LI
N G
P
LA
N
AV-202FOR REVIEW
| Sheets and Views |
| AV-200 OVERALL FLOOR PLANS |
| AV-201 THE QUAD FLOOR PLANS |
| AV-202 THE QUAD REFLECTED CEILING PLAN |
File details come from the government source that posted it. Updated .