This is a Construction Documents (CD) set of architectural, structural, mechanical, and electrical design drawings for the VA TX Houston Replace or Chillers project at the Michael E. Debakey VA Medical Center in Houston, Texas (Project #580-23-105). The 31-sheet drawing package, prepared by SPEES Design Build with A/E firm H2B, Inc., documents the replacement of existing chilled water systems and associated infrastructure at the facility.
The project scope includes demolition of existing air-cooled chillers (100-ACRCU1 and 100-ACRCU2), chilled water pumps (100-CHP15 and 100-CHP16), and associated piping systems, with installation of new YORK YVAA0269 270-ton VSD screw chillers, Armstrong Series 4280 chilled water circulation pumps, new hydronic piping with insulation, and mechanical controls. The mechanical systems are located primarily in rooms C6A-101 and the associated mechanical court at Level 6 (118 feet, 4 inches elevation). The electrical work includes new VFDs (Variable Frequency Drives) for pump control, distribution panel connections, heat trace systems for pipe freeze protection (RAYCHEM 3BTV1-CR), and associated conduit and wiring. Structural work involves demolition of existing chiller support columns and framing, replacement with new support framing, X-bracing, and catwalk grating rated for 40 PSF live load. The drawings specify compliance with 2024 International Building Code, ASHRAE standards, AISC steel specifications, and VA design standards. Construction is fully sprinklered, with estimated equipment weights of approximately 20,000 pounds for each chiller unit. The document set includes general notes, abbreviations, legends, equipment schedules, mechanical flow and control diagrams, and detailed specifications for pipe hangers, connections, and support systems.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
C
D
D
D
D
E
DD2
' D
R
IV
IN
G
A
IS
LE
' D
R
IV
IN
G
A
IS
LE 2
' D
R
IV
IN
G
A
IS
LE
S A N (R
EC
O R D
I
V A
N V
A N
V A
N
VAN
V A
N
VAN
VAN
VAN
V A
N
V A
N
V A
N V A
N
V A
N
V A
NV
A
N
NO
PARK
ING
V A
N
RA
M
P
H
ARCHITECT
SPEES DESIGN BUILD
23830 PACIFIC HIGHWAY S.
SUITE 300
KENT, WA 98032
PHONE: (206) 590-2118
DESIGN TEAM
STRUCTURAL
ELECTRICAL
PLUMBING
MECHANICAL
SPEES DESIGN BUILD
SPEES DESIGN BUILD
SPEES DESIGN BUILD
H2B
1225 NORTH LOOP WEST
SUITE 800
HOUSTON, TX 77008
PHONE: (713) 864-2900
23830 PACIFIC HIGHWAY S.
SUITE 300
KENT, WA 98032
PHONE: (206) 590-2118
23830 PACIFIC HIGHWAY S.
SUITE 300
KENT, WA 98032
PHONE: (206) 590-2118
23830 PACIFIC HIGHWAY S.
SUITE 300
KENT, WA 98032
PHONE: (206) 590-2118
PROJECT INFORMATION
STATE:
COUNTY:
OWNER:
GENERAL INFORMATION PROJECT DESCRIPTION
REPLACEMENT OF TWO END OF LIFE
ROOFTOP CHILLERS SERVING B100
OPERATING ROOM SUITE AT THE MICHAEL E.
DEBAKEY VAMC.
PROJECT SCOPE INCLUDES THE REMOVAL
AND REPLACEMENT OF EXISTING CHILLERS
AND ASSOCIATED EQUIPMENT AND
INFRASTRUCTURE. NEW EQUIPMENT AND
INFRASTRUCTURE IS DESIGNED TO MEET THE
LATEST VA STANDARDS.
APPLICABLE BUILDING & LEVEL
BUILDING 100, LEVEL 3
APPLICABLE CLINIC
N/A
ICRA LEVEL REQUIREMENTS
SEE ICRA SHEET(S) & SPEC SECTION 01 35 26 -
SAFETY REQUIREMENTS
APPROX SQUARE FEET IN SCOPE
1759 SF
TEXAS
HARRIS
GOV, VETERANS AFFAIRS
CODE ANALYSIS
NO IMPACTS TO FIRE LIFE SAFETY
GENERAL NOTES
1. DO NOT SCALE DRAWINGS.
BLDG 100
AREA OF WORK
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
ENGINEERING DISCIPLINE:
G-001
COVER SHEET
MK MC
CONSTRUCTION
DOCUMENTS (CD)
2/26/2026
580-23-105
MICHAEL E. DEBAKEY VA MEDICAL CENTER, HOUSTON, TX
VA TX HOUSTON REPLACE OR
CHILLERS
SPEES DESIGN BUILD
23830 PACIFIC HIGHWAY S.
SUITE 300
VA TX HOUSTON REPLACE OR CHILLERS
MICHAEL E. DEBAKEY VA MEDICAL CENTER, HOUSTON - TEXAS
PROJECT #: 580-23-105
DRAWING INDEX
PAGE # SHEET # SHEET NAME
GENERAL
1 OF 31 G-001 COVER SHEET
ARCHITECTURAL
2 OF 31 A-001 ARCH SYMBOLS, ABBREVIATIONS, & GENERAL NOTES
3 OF 31 AS101 ICRA
4 OF 31 AE101 LEVEL 6 - FLOOR PLAN
5 OF 31 AE401 INTERIOR ELEVATIONS, ENLARGED FLOOR PLAN
STRUCTURAL
6 OF 31 S-000 GENERAL NOTES AND SPECIAL INSPECTIONS, ABBREVIATIONS, AND LEGEND
7 OF 31 SF101 EXISTING FRAMING PLAN BELOW MACHINE ROOM
8 OF 31 SF102 EXISTING MACHINE ROOM FRAMING PLAN
9 OF 31 SF103 MACHINE ROOM FRAMING PLAN
10 OF 31 SF201 FRAMING ELEVATIONS
11 OF 31 SF501 FRAMING SECTIONS AND DETAILS
MECHANICAL
12 OF 31 M-001 MECHANICAL GENERAL NOTES
13 OF 31 M-002 MECHANICAL ABBREVIATIONS & LEGENDS
14 OF 31 M-101 LEVEL 6 - OVERALL FLOOR PLAN
15 OF 31 M-301 MECHANICAL SECTION VIEWS
16. OF 31 M-401 LEVEL 6 - DEMO & NEW FLOOR PLANS
17 OF 31 M-501 MECHANICAL DETAILS
18 OF 31 M-601 MECAHNICAL EQUIPMENT SCHEDULE
19 OF 31 M-701 MECHANICAL FLOW AND CONTROLS DIAGRAM
20 OF 31 M-702 MECHANICAL CONTROLS
ELECTRICAL
21 OF 31 E-001 ABBREVIATIONS, GENERAL NOTES, AND SHEET INDEX
22 OF 31 E-002 ELECTRICAL LEGENDS
23 OF 31 E-101 LEVEL 05 - OVERALL ELECTRICAL PLAN
24 OF 31 E-102 LEVEL 06 - OVERALL ELECTRICAL PLAN
25 OF 31 E-201 INTERIOR ELEVATION PLANS
26 OF 31 E-401 ENLARGED ELECTRICAL PLANS
27 OF 31 E-501 ELECTRICAL DETAILS
28 OF 31 E-601 ONE-LINE DIAGRAM - EXISTING
29 OF 31 E-611 ONE-LINE DIAGRAM - REVISED
30 OF 31 E-701 ELECTRICAL SCHEDULES
31 OF 31 E-702 ELECTRICAL SCHEDULES
NOT TO SCALE
FACILITY SITE PLAN
TRUE
NORTH
Revisions: Date:
2/26/2026
101A
EXTERIOR ELEVATION
INTERIOR ELEVATION
BUILDING SECTION FLAG
WALL SECTION FLAG
CALLOUT FLAG
VERTICAL GRID LINE
HORIZONTAL GRID LINE
TRUE NORTH ARROW
PROJECT NORTH ARROW
(TRUE NORTH DASHED)
ELEVATION / LEVEL MARKER
KEY NOTE
ROOM TAG
(SF OPTIONAL)
CEILING HEIGHT TAG
WALL TAG
FLOOR TAG
ROOF TAG
DOOR TAG
WINDOW TAG
SPECIALTY EQUIPMENT TAG
SIGNAGE TAG
SIGNAGE KEY NOTE
(AW SHEETS ONLY)
SIGNAGE MATERIAL TAG
(AW SHEETS ONLY)
TOILET
150 SF
A
01A
TRUE
NORTH
W1
PROJECT
NORTH
TRUE NORTH
(DASHED)
A01
D88
A5175SOAP DISH
ACT 2x2
9' - 0" AFF
F-1
R-1
SYMBOLS
A-101
A-101
A-101
EXISTING TO REMAIN
NEW CONSTRUCTION
TO DEMOLISH
(DEMO SHEET(S) ONLY)
ABOVE
BELOW
EXISTING DOOR TO REMAIN
EXISTING DOOR TO DEMOLISH
(DEMO SHEET(S) ONLY)
NEW DOOR
AREA SHOWN ON SHEET
OUT OF SCOPE
INACCESSIBLE DURING PHASE
(ICRA SHEET(S) ONLY)
TEMPORARY ICRA BOUNDRY
(ICRA SHEET(S) ONLY)
TEMPORARY ICRA BARRIER
(ICRA SHEET(S) ONLY)
TEMPORARY ICRA DOOR
(ICRA SHEET(S) ONLY)
ADHESIVE WALK-OFF MATS
(ICRA SHEET(S) ONLY)
TEMPORARY ICRA AIR PRESSURE
(ICRA SHEET(S) ONLY)
CONTRACTOR PATH OF TRAVEL
(ICRA SHEET(S) ONLY)
SMOKE COMPARTMENT PERIMETER
(FIRE LIFE SAFETY SHEET(S) ONLY)
SMOKE RATED WALL
1 HR FIRE RATED WALL
2 HR FIRE RATED WALL
SMOKE & 1 HR FIRE RATED WALL
FIRE EXTINGUISHER CABINET
(FIRE LIFE SAFETY SHEET(S) ONLY)
EMERGENCY EGRESS ROUTE
(FIRE LIFE SAFETY SHEET(S) ONLY)
SPRINKLER PER FIRE PROTECTION
DIFFUSER PER MECHANICAL
(SIZE & PROPORTION MAY VARY)
LIGHT FIXTURE PER ELECTRICAL
(SIZE & PROPORTION MAY VARY)
MATERIALS
EARTH
SAND
BATT INSULATION
RIGID INSULATION
CONCRETE
STEEL
PLYWOOD, FIRE RATED
GYPSUM BOARD, TYPE 'X'
GYPSUM BOARD, LEAD LINED
ACOUSTICAL CEILING TILE, 2' x 2'
ACOUSTICAL CEILING TILE, 2' x 4'
A-101
A-101
FEC
IN-04.02-01
ABBREVIATIONS
SYMBOLS
& AND
∠ ANGLE
@ AT
℄ CENTERLINE
° DEGREES
# NUMBER
A
AB ANCHOR BOLT
ABA ARCHITECTURAL BARRIERS ACT
A(C)T ACOUSTICAL (CEILING) TILE
ACM ASBESTOS CONTAINING MATERIAL
ACW ACOUSTICAL WALL
ADA AMERICANS W/ DISABILITIES ACT
ADJ ADJACENT
A/E ARCHITECT/ENGINEER
AF ACCESS FLOOR
AFF ABOVE FINISH FLOOR
AGG AGGREGATE
ALT ALTERNATE
ALUM ALUMINUM
APPROX APPROXIMATELY
ARCH ARCHITECT(URAL)
ASPH ASPHALT
A/V AUDIO / VIDEO
B
BARR BARRIER
BATH BATHROOM
BB BACKER BOARD
BLD(G) BUILDING
BLK(G) BLOCK(ING)
BLW BELOW
BM BEAM
BMT(U) BONE MARROW TRANSPLANT (UNIT)
BO BOTTOM OF
BOC BOTTOM OF CURB
BOS BOTTOM OF SLAB
BRC BRACE, BRACING
BRKT BRACKET
BRNG BEARING
BTM BOTTOM
BTWN BETWEEN
C
CAB CABINET
CC CONTRACTOR FURN, CONTRACTOR INST
CD CONSTRUCTION / CONTRACT DOCUMENTS
CJ CONTROL JOINT
CLG CEILING
CLR CLEAR(ANCE)
CMU CONCRETE MASONRY UNIT
CO CONTRACTING OFFICER
COL COLUMN
COMP COMPOSITION
CONC CONCRETE
CONN CONNECTION
CONST CONSTRUCTION
CONT CONTINUOUS
COORD COORDINATE
COR CONTRACTING OFFICER REPRESENTATIVE
CORR CORRIDOR
CS CONCRETE SEALER
CT CERAMIC TILE
CTR CENTER
CV CONTRACTOR FURNISHED, VA INSTALLED
D
DB DESIGN BUILD
DBL DOUBLE
DC DIRECT CURRENT
DD DESIGN DEVELOPMENT
DEMO DEMOLISH(ION)
DEPT DEPARTMENT
DG DESIGN GUIDE
DIA DIAMETER
DIM DIMENSION
DM DESIGN MANUAL
DWN DOWN
DR DOOR
DTL DETAIL
DWG DRAWING(S)
E
E EAST
EA EACH
EJ EXPANSION JOINT
ELEC ELECTRIC(AL)
ELEV ELEVATION OR ELEVATOR
ENG ENGINEER(ING)
EOC EDGE OF CURB
EOP EDGE OF PAVEMENT
EPDM ETHYLENE PROPYLENE DIENE TERPOLYMER
EQ EQUAL
EQUIP EQUIPMENT
ES EACH SIDE
ETS EXPOSED TO STRUCTURE
EX(IST) EXISTING
EXP EXPANSION
EXT EXTERIOR
F
FA FIRE ALARM
FD FLOOR DRAIN
FE(C) FIRE EXTINGUISHER (CABINET)
FF FACTORY FINISH
FFB FINISH FLOOR BREAK
FIN FINISH(ED)
FLASH FLASHING
FLR FLOOR(ING)
FLRSNT FLORESCENT
FNDN FOUNDATION
FOC FACE OF CONCRETE
FOF FACE OF FINISH
FOS FACE OF STUDS
FP FIRE PROOF
FR FIRE RATED
FRM FRAME
FT FOOT, FEET
FTG FOOTING
FUR FURRING
FURN FURNISHED
G
GA GAGE, GAUGE
GALV GALVANIZED
GE GENERAL ELECTRIC
G(W)B GYPSUM (WALL) BOARD
GC GENERAL CONTRACTOR
GL GRID LINE
GLB GLUE LAMINATED BEAM
GMU GLASS MASONRY UNIT
GOV(T) GOVERNMENT
GYP GYPSUM BOARD
H
HAC HOUSEKEEPING AIDES CLOSET
HDR HEADER
H(D)W(E) HARDWARE
HM HOLLOW METAL
HORZ HORIZONTAL
HPDL HIGH PRESSURE DECORATIVE LAM
HR HOUR
HT HEIGHT
HVAC HEATING, VENTILATION & AIR CONDITIONING
I
ICRA INFECTIOUS CONTROL RISK ASSESSMENT
ID INSIDE DIAMETER OR DIM
ILSM INTERIM LIFE SAFETY MEASURES
INCL INCLUDE(D,ING)
INST INSTALL
INSUL INSULATION
INT INTERIOR
J
JT JOINT
K
KV KILOVOLT
L
LAM LAMINATE(D)
LAV LAVATORY
LCM LEAD CONTAINING MATERIAL(S)
LD LEAD
LT LIGHT
M
MAT MATERIAL(S)
MAX MAXIMUM
MDF MEDIUM-DENSITY FIBREBOARD
MECH MECHANIC(AL)
MEP MECHANICAL, ELECTRICAL, PLUMBING
MFR MANUFACTURE(R)
MIN MINIMUM
MISC MISCELLANEOUS
MOD MODIFIED
MTL METAL
N
N NORTH
N(/)A NOT APPLICABLE
NEG NEGATIVE
NO. NUMBER
NOM NOMINAL
NTS NOT TO SCALE
O
O.C. ON CENTER(S)
OPN(G) OPEN(ING)
OPP OPPOSITE
OPT OPTION(AL)
OVHD OVERHEAD
P
P PAINT
PCONC PRECAST CONCRETE
PCRA PRE-CONSTRUCTION RISK ASSESSMENT
PL PLATE
PLAM PLASTIC LAMINATE
PLY(WD) PLYWOOD
PNL PANEL
PR PAIR
PRFB PREFABRICATED
PS PLASTIC
PT PORCELAIN TILE
PTN(S) PARTITION(S)
PVMT PAVEMENT
Q
QTY QUANTITY
R
RAD RADIUS
RB RESILIENT BASE
RCP(S) REFLECTED CEILING PLAN(S)
REF REFERENCE
REINF REINFORCE(D,ING)
REP REPRESENTATIVE
REQ(S,(')D) REQUIRE(D,S,MENT(S))
RESIL RESILIENT
REV REVERSE
RF ROOF
RM ROOM
RMV REMOVE
RO ROUGH OPENING
S
S SOUTH
SCHED SCHEDULE
SCI(D) SPINAL CORD INJURY (& DISABILITY)
SD SCHEMATIC DESIGN
SDSF SOLID SURFACE
SECT SECTION
SF SQUARE FEET
SFRM SPRAY APPLIED FIRE-RESISTIVE MATERIAL
SHG SHINGLES
SHLD(G) SHEILD(ING)
SHT(G) SHEET (SHEATHING)
SIM SIMILAR
SM SEAM
SOW SCOPE OF WORK
SPEC SPECIFICATION
SQ SQUARE
SS STAINLESS STEEL
ST STAIN
STDG STANDING
STF STAFF
STL STEEL
STOR STORAGE
STRUCT STRUCTURAL
SURG SURGERY, SURGICAL
SUSP SUSPENDED
SV SHEET VINYL
SYS SYSTEM
T
TBD TO BE DETERMINED
TBL TABLE
TEMP TEMPORARY
T&G TONGUE AND GROOVE
THK THICK(NESS)
THRESH THRESHOLD
TOC TABLE OF CONTENTS
TOS TOP OF SLAB
TPH TOILET PAPER HOLDER
TRANS TRANSITION
TS TUBE STEEL
TYP TYPICAL
U
UNO UNLESS NOTED OTHERWISE
UON UNLESS OTHERWISE NOTED
V
VA VETERANS AFFAIRS
VAR VARIES
VB VAPOR BARRIER
VC VA FURNISHED, CONTRACTOR INSTALLED
VERT VERTICAL
VIF VERIFY IN FIELD
VV VA FURNISHED, VA INSTALLED
W
W WEST
W/ WITH
WD WOOD
WDW WINDOW
WGHT WEIGHT
W/O WITHOUT
WP WATERPROOF(ING)
WR WATER RESISTANT
WRK WORK
X
XRY X-RAY
GENERAL NOTES
1. SEE OTHER DISCIPLINE DRAWING SHEETS FOR
EXPLANATION OF SYMBOLS AND WORK OUTSIDE OF
ARCHITECTURAL'S SCOPE.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
ENGINEERING DISCIPLINE:
A-001
ARCH SYMBOLS, ABBREVIATIONS,
& GENERAL NOTES 100
MK MC
CONSTRUCTION
DOCUMENTS (CD)
2/26/2026
580-23-105
MICHAEL E. DEBAKEY VA MEDICAL CENTER, HOUSTON, TX
VA TX HOUSTON REPLACE OR
CHILLERS
SPEES DESIGN BUILD
23830 PACIFIC HIGHWAY S.
SUITE 300
OUT OF SCOPE
EXISTING WALL TEMPORARILY ACTING AS AN
ICRA BOUNDRY. SEAL ALL PENETRATIONS,
OPENINGS, & DUCTS AS REQUIRED TO COMPLY
WITH SPEC SECTION 01 35 26 - SAFETY REQS.
TEMPORARY ICRA BARRIER FRAMED TO
STRUCTURE ABOVE. CONSTRUCT WHERE
SHOWN AND AS REQUIRED TO COMPLY WITH
SPEC SECTION 01 35 26 - SAFETY REQS.
TEMPORARY ICRA AIR PRESSURE
ADHESIVE WALK-OFF MATS
CONTRACTOR PATH OF TRAVEL
AREA SHOWN
AREA K
1212.212.412.9131415
D
D.2
E
E.5
E.8
F
F.5
F.8
G
G.2
E.12
E.13
E.14
E.15
1111.512.513.914.514.815.515.816
I1
ELEV MECH ROOM
6A-110
966 SF
UNAS
X6A-110A
328 SF
MECH COURT
1759 SF
FAN & PUMP ROOM
C6A-101
654 SF
ST-13
VEST
C6A-100
241 SF
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
ENGINEERING DISCIPLINE:
AS101
ICRA
MK MC
CONSTRUCTION
DOCUMENTS (CD)
2/26/2026
580-23-105
MICHAEL E. DEBAKEY VA MEDICAL CENTER, HOUSTON, TX
VA TX HOUSTON REPLACE OR
CHILLERS
SPEES DESIGN BUILD
23830 PACIFIC HIGHWAY S.
SUITE 300
LEGEND
GENERAL NOTES
KEY NOTES (THIS SHEET ONLY)
KEY PLAN
1. ICRA CLASS II REQUIREMENTS MUST BE MET
THROUGHOUT THE ENTIRE DURATION OF CONSTRUCTION.
2. COMPLY WITH ALL REQUIREMENTS IN SPECIFICATION
SECTION 01 35 26 - SAFETY REQUIREMENTS PER ICRA
VERSION 1.3 (ISSUED ON DEC 9, 2024)
3. CONSTRUCTION ZONE ENTRANCES AND EXITS SHALL BE
LOCKED AT ALL TIMES UNLESS IN USE BY THE
CONTRACTOR. WHEN IN USE, ACCESS WILL BE
CONTROLLED AND MONITORED BY THE CONTRACTOR.
4. ADHESIVE WALK-OFF MATS TO BE USED AS SHOWN AND
AT ALL CONSTRUCTION ENTRANCES AND EXITS,
INCLUDING ANTE ROOMS.
5. TEMPORARY BARRIERS AND DOORS MAY ONLY BE
DEMOLISHED ONCE GIVEN FINAL APPROVAL BY THE VA
COR.
6. SHEET PLASTIC WITH ZIPPER ACCESS MAY BE USED AS A
MEANS OF DUST CONTROL WHILE CONSTRUCTING AND
DEMOLISHING TEMPORARY ICRA BARRIERS.
I1 EXISTING DOOR AND FRAME ACTING AS AN ICRA DOOR
AND FRAME. USE PLASTIC SHEETING AS A DUST
BARRIER ON WORK AREA SIDE OF DOOR.
1/8" = 1'-0"
LEVEL 06 - ICRA PLAN
AREA SHOWN
AREA K
1. DIMENSIONS SHOWN ARE FROM GRID LINES TO FACE OF
STUD, CENTERLINE OF STRUCTURAL COLUMNS,
CENTERLINE OF OPENINGS, UNO.
2. ANY DOORS NOT DIMENSIONED SHALL BE INSTALLED 6"
FROM THE INTERSECTING WALL OR CENTERED ON THE
WALL, UNO.
3. ALL DIMENSIONS NOTED AS CLEAR SHALL MAINTAIN THE
FULL SPACE INDICATED WITHOUT ENCROACHMENTS.
4. ENSURE THAT ALL REQUIRED BACKING IS INSTALLED IN
WALLS PRIOR TO INSTALLING GYPSUM BOARD.
5. SEE EQUIPMENT PLANS AND INTERIOR ELEVATIONS FOR
LOCATIONS OF SPECIALTY EQUIPMENT.
EXISTING TO REMAIN (CUT & PROJECTION)
NEW (CUT & PROJECTION)
EXISTING DOOR TO REMAIN
ELEV MECH ROOM
6A-110
966 SF
UNAS
X6A-110A
328 SF
FAN & PUMP ROOM
C6A-101
654 SF
ST-13
VEST
C6A-100
241 SF
MECH COURT
1759 SF
1212.212.412.9131415
D
D.2
E
E.5
E.8
F
F.5
F.8
G
G.2
E.12
E.13
E.14
E.15
1111.512.513.914.514.815.515.816
F1
F2
AE401
F3
F3
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
ENGINEERING DISCIPLINE:
AE101
LEVEL 6 - FLOOR PLAN
MK MC/NE
CONSTRUCTION
DOCUMENTS (CD)
2/26/2026
580-23-105
MICHAEL E. DEBAKEY VA MEDICAL CENTER, HOUSTON, TX
VA TX HOUSTON REPLACE OR
CHILLERS
SPEES DESIGN BUILD
23830 PACIFIC HIGHWAY S.
SUITE 300
LEGEND
GENERAL NOTES
KEY NOTES (THIS SHEET ONLY)
KEY PLAN
F1 PRE-MANUFACTURED METAL STAIR, PLATFORM, AND
RAILING. CONNECTION TO ROOF SYSTEM PER
STRUCTURAL.
F2 CATWALK AND GUARDRAIL, SEE STRUCTURAL
F3 PRE-MANUFACTURED CROSSOVER STAIR.
CONNECTION TO ROOF SYSTEM PER STRUCTURAL.
1/8" = 1'-0"
LEVEL 06 - AREA K OVERALL FLOOR PLAN
1. ALL VERTICAL HEIGHTS INDICATED ARE FROM THE FINISH
FLOOR ELEVATION, UNO.
12 12.2 12.4 12.9 1312.5
MECH COURT
1759 SF
F1
/4
F3
G G.2 E.12 E.13 E.14 E.15
MECH COURT
1759 SF
F1
F3
/4
AE401
1212.212.412.913
F.8
G
G.2
E.12
E.13
E.14
E.15
12.5
F1
F2
3' - 8"
F3
F3
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
ENGINEERING DISCIPLINE:
AE401
INTERIOR ELEVATIONS,
ENLARGED FLOOR PLAN 100
MK MC/NE
CONSTRUCTION
DOCUMENTS (CD)
2/26/2026
580-23-105
MICHAEL E. DEBAKEY VA MEDICAL CENTER, HOUSTON, TX
VA TX HOUSTON REPLACE OR
CHILLERS
SPEES DESIGN BUILD
23830 PACIFIC HIGHWAY S.
SUITE 300
GENERAL NOTESKEY NOTES (THIS SHEET ONLY)#
F1 PRE-MANUFACTURED METAL STAIR, PLATFORM, AND
RAILING. CONNECTION TO ROOF SYSTEM PER
STRUCTURAL.
F2 CATWALK AND GUARDRAIL, SEE STRUCTURAL
F3 PRE-MANUFACTURED CROSSOVER STAIR.
CONNECTION TO ROOF SYSTEM PER STRUCTURAL.
1/4" = 1'-0"
MECH COURT - WEST ELEVATION
1/4" = 1'-0"
MECH COURT - SOUTH ELEVATION
1/4" = 1'-0"
MECH COURT - ENLARGED FLOOR PLAN
American Welding Society
American National Standards Institute
American Society for Testing and Materials
American Iron and Steel Institute
American Institute of Steel Construction
American Institute of Architects
American Concrete Institute
CC Carried Column
CIP Cast In Place
Addition
Alternate
Air Condition
Aggregate
Anchor BoltAB
ALT
A/C
AGGR
ADD
Angle
And
Asphalt
Approximate
AIA
ACI
AISI
ANSI
ASTM
AISC
L
ASPH
ARCH
APPROX
AWS
Average
Bottom
Bearing
Bending Moment
Base Plate
Building
Center
Ceiling
Center to Center
Center of Gravity
Bottom of Deck
M
BOT
BRG
B PL
AVG
CG
CEN
CLG
BLDG
B/D
AssemblyASSY
Architect or Architectural
Column
Clear
Channel
Concrete
Control Joint
Connection
Cubic Yard
Cubic Foot
Continuous
Construction
C
CJ
CONN
CONC
COL
CLR
CY
CF
CMU
CMP
CONT
CONST
Diagonal
Detail
Ditto
Diameter
Double Angle
Dimensions
Drawing
Douglas Fir
2L
DO
DIM
DIA
DIAG
DET
DF
DWG
DoubleDBL
Concrete Masonry Units
Corrugated Metal Pipe
C/C
AluminumAL
MB Machine Bolt
Glu lam BeamGLB
Quarter
Radius
Reference
Reinforce, Reinforced, QTR
REF
RAD
REINF
Round
Required
Section
Schedule
Revise or Revision
South
Similar
Steel
Standard
Square
Specifications
Sheet
Stock
Tangent
Symmetrical
Structural
Strut Force
Through
Top of Concrete
Top and Bottom
Tongue & Groove
Tolerance
Thick
Top of Footing or Top of Foundation
RD
REV
SECT
SCHED
REQD
S
SIM
STL
STD
SQ
SPECS
SHT
SYM
STK
TAN
SF
STRUCT
TOL
T/F
T/C
T & B
T & G
THRU
THK
Typical
Total
Transverse
Top of Steel
Top of Masonry
Vertical
Verify in the Field
Unless Noted
Unless Noted Otherwise
Top of Concrete Wall
West
Without
With
Work Point
Wide Flange
Welded Wire Fabric
Yard
T/S
T/M
TYP
TOT
TRANS
UNO
UN
VIF
VERT
W
W
WWF
WP
W/O
W/
YD
T/W
Reinforcement, or Reinforcing
Long
Light
Length
Laminated
Longitudinal
LAM
LGTH
LG
LT
LONGIT
Each
East
EF
EA
E
EW
ELECT Electric or Electrical
Each way
Each face
Mark
Metal
Maximum
Material
Maximum
Mechanical
Manufacturer
LLH
LLBB
LLV
MK
MAX
MECH
MATL
MAX
MET
MFR
Medium
Mezzanine
Minimum
Minute
Miscellaneous
Mixture
North
Nominal
Near Side
Near Face
Multiple
MED
MIN
MEZZ
MIX
MISC
MIN
NF
N
NOM
NS
MULT
EQ
ENGR
ETC
EST
EXCAV
EQUIP
EXT
EJ
EXIST
X-STR
X-HVY
Etcetera
Extra Strong
Extra Heavy
Exterior
Expansion Joint
Existing
Excavate
Estimate
Equipment
Equal
Engineer
FS
FF
FT or '
FIN
FIG
FBM
FTG
FD
FRMG
FND
FLR
Framing
Foundation
Footing
Floor Drain
Floor
Finish
Figure
Feet Board Measure
Feet or Foot
Far Side
Far Face
FabricationFAB
Opposite
Opening
On Center
Number
Perpendicular
Permanent
Original
OPP
OPNG
OC
OD
PERP
PERM
d
ORIG
Point
Plate
Pound
Plywood
Project
PT
PL
PLYWD
PSF
PCF
LB
PROJ
PSI
Piece, Pile CapPC
GEN
GI
GALV
GRND
GR
HEX
HGT
HORIZ
S
IN or " Inches
I Beam
Horizontal
Hexagon
Height
Ground
Grade
General (Notes)
Galvanized Iron
Galvanize
Joint
Joist
ID
JT
JST
KO
K
Knockout
Kip (1,000 lbs)
Inside Diameter
Include or IncludedINCL
Not to ScaleGage or Gauge NTSGA
Elevation LHEELEV
Pounds Per Square Inch
Pounds Per Square Foot
Pounds Per Cubic Foot
Penny (Nails, etc)
Outside Diameter
Long Leg Vertical
Long Leg Horizontal
Long Leg Back To Back
Low Hydrogen Electrode
General Structural NotesGSN
ABBREVIATIONSGENERAL NOTES AND SPECIAL INSPECTIONS
LEGEND:
GSN = GENERAL STRUCTURAL NOTES
UNO = UNLESS NOTED OTHERWISE
INDICATES TUBE COLUMN
INDICATES WIDE FLANGE COLUMN
INDICATES BEAM SPLICE
INDICATES FOOTING SIZE. SEE SCHEDULE.
F1
SYMBOLS AND ABBREVIATIONS FOR CONCRETE (as per ACI)
SLOPE DIRECTION DOWN
MISCELLANEOUS ELEVATION
FLOOR OR STEEL ELEVATION
REQUIRED NUMBER OF HEADED SHEAR STUDS
RIGID CONNECTION
CAMBER UP
00'-0"
00'-0"
(00'-0")
C=0"
[00]
STEEL ELEVATION
SPAN DIRECTION
To Indicate Size of Deformed Bar.#
Clear
Bottom
Bent
Each Face
Column Tie
Each Way
Limits of Area Covered By Bars
Direction in Which Bars Extend
Spacing Center to Center
Spiral
Stirrup
Plain Bar
Outside Face
Near Face
Inside Face
Top
Straight
Far Face
AT
EF
CT
CL
BOT
BT
EW
T
STR
SP
STIR
PL
OF
NF
IF
FF
Plain Rounds, as Spirals/
INDICATES STD PIPE COLUMN
SYMBOL LEGEND
GENERAL
1. THE CONTRACTOR SHALL VERIFY ALL DIMENSIONS PRIOR TO STARTING CONSTRUCTION. NOTIFY
COR OF ANY DISCREPANCIES
2. DO NOT SCALE THE DRAWINGS.
3. GENERAL STRUCTURAL NOTES AND TYPICAL DETAILS APPLY UNLESS NOTED OTHERWISE ON
PLANS, ELEVATIONS, DETAILS AND SPECIFICATIONS. IN CASE OF CONFLICT THE GREATER
REQUIREMENT GOVERNS.
4. THE CONTRACT STRUCTURAL DRAWINGS AND SPECIFICATIONS REPRESENT THE FINISHED
STRUCTURE. THEY DO NOT INDICATE THE METHOD OF CONSTRUCTION.
5. THE STRUCTURAL ENGINEER SHALL NOT HAVE CONTROL OR CHARGE OF, AND SHALL NOT BE
RESPONSIBLE FOR, CONSTRUCTION MEANS, METHODS, TECHNIQUES, SEQUENCES OR
PROCEDURES, FOR SAFETY PRECAUTIONS AND PROGRAMS IN CONNECTION WITH THE WORK, FOR
THE ACTS OF OMISSIONS OF THE CONTRACTOR, SUB-CONTRACTORS OR ANY OTHER PERSONS
PERFORMING AN OF THE WORK, OR FOR THE FAILURE OF ANY OF THEM TO CARRY OUT THE WORK
IN ACCORDANCE WITH THE CONTRACT DOCUMENTS.
6. THE CONTRACTOR SHALL PROVIDE ALL MEASURES NECESSARY TO PROTECT THE STRUCTURE
DURING CONSTRUCTION. SUCH MEASURES SHALL INCLUDE, BUT NOT BE LIMITED TO BRACING AND SHORING FOR LOADS DUE TO HYDROSTATIC, EARTH, WIND OR SEISMIC FORCES, CONSTRUCTION EQUIPMENT, ETC. OBSERVATION VISITS TO THE SITE BY THE STRUCTURAL ENGINEER SHALL NOT
INCLUDE INSPECTION OF THE ABOVE ITEMS.
7. NOTIFY THE STRUCTURAL ENGINEER VIA COR THROUGH THE COR WHEN DRAWINGS BY OTHERS SHOW OPENINGS, POCKETS, ETC., NOT SHOWN ON THE STRUCTURAL DRAWINGS, BUT WHICH ARE
LOCATED IN THE STRUCTURAL MEMBER.
8. ALL SPECIFICATIONS AND CODES NOTED SHALL BE THE LATEST APPROVED EDITIONS AND
REVISIONS BY THE GOVERNMENTAL AGENCY HAVING JURISDICTION OVER THIS PROJECT.
9. COST OF ADDITIONAL FIELD AND OFFICE WORK NECESSITATED BY REQUESTS BY THE
CONTRACTOR FOR AN OPTION OR DUE TO ERRORS OR OMISSIONS IN CONSTRUCTION SHALL BE
BORNE BY THE CONTRACTOR. OPTIONS ARE FOR CONTRACTOR'S CONVENIENCE. HE SHALL BE
RESPONSIBLE FOR ALL CHANGES NECESSARY IF HE CHOOSES AN OPTION AND HE SHALL
COORDINATE ALL DETAILS.
10. ANY ENGINEERING DESIGN PROVIDED BY OTHERS AND SUBMITTED FOR REVIEW SHALL BEAR THE
SEAL OF AN ENGINEER REGISTERED IN CALIFORNIA.
11. UNLESS NOTED OTHERWISE, DETAILS ON STRUCTURAL DRAWINGS ARE TYPICAL AS INDICATED BY
CUTS, REFERENCES OR TITLE.
12. CONTRACTOR SHALL VERIFY ALL DIMENSIONS WITH ARCHITECTURAL DRAWINGS.
13. FIELD VERIFY ALL EXISTING DIMENSIONS AND CONDITIONS PRIOR TO THE START OF SHOP
DRAWINGS OR CONSTRUCTION.
14. EXISTING CONDITIONS REQUIRING MODIFICATIONS TO DOCUMENTS FOR PROPOSED
CONSTRUCTION SHALL BE IMMEDIATELY SUBMITTED TO THE COR.
CODE AND DESIGN CRITERIA
1. BUILDING CODE: LATEST EDITION OF U.S. DEPARTMENT OF VETERANS AFFAIRS DESIGN GUIDES, STANDARDS, AND MANUALS.
2024 INTERNATIONAL BUILDING CODE (IBC)
2. DESIGN LIVE LOADS:
a. ROOF LL ---------------------------------------------------- 20 PSF
b. EQUIPMENT AREA --------------------------------------- 150 PSF
c. CATWALK --------------------------------------------------- 40 PSF
3. WIND DESIGN DATA:
a. BASIC WIND SPEED ----------------------------------- 146 MPH (ULTIMATE)
b. EXPOSURE ----------------------------------------------- C
INTERNAL PRESSURE COEFFICIENT-------------- +/- 0.18
4. SEISMIC DESIGN DATA:
a. BUILDING RISK CATEGORY------------------------- IV
b. IMPORTANCE FACTOR (IE) -------------------------- 1.5
c. SS ------------------------------------------------------------ 0.08g
d. S1 ------------------------------------------------------------ 0.04g
e. SITE CLASS ---------------------------------------------- D
f. SDS ---------------------------------------------------------- 0.071g
g. SD1---------------------------------------------------------- 0.065g
h. SEISMIC DESIGN CATEGORY--------------------- A
STRUCTURAL STEEL
1. STRUCTURAL STEEL SHALL BE DESIGNED, DETAILED, FABRICATED AND ERECTED IN ACCORDANCE WITH THE AISC 'SPECIFICATION FOR STRUCTURAL STEEL BUILDINGS' AND 'CODE OF STANDARD
PRACTICE FOR STEEL BUILDINGS AND BRIDGES' (LATEST EDITION AND SUPPLEMENTS).
2. ALL WIDE FLANGE SHAPES SHALL CONFORM TO ASTM A992.
3. ALL CHANNELS, ANGLES, PLATES & BARS SHALL CONFORM TO ASTM A36. UNLESS NOTED
OTHERWISE.
4. ALL PIPE COLUMNS SHALL CONFORM TO ASTM A53 (TYPES E OR S), GRADE B OR ASTM A501.
5. ALL SQUARE OR RECTANGULAR TUBING SECTIONS SHALL CONFORM TO ASTM A500, GRADE C, OR ASTM A501 WITH Fy= 50 KSI.
6. ALL SIMPLE BEAM TO BEAM OR COLUMN CONNECTION PLATE MATERIAL, INCLUDING BEARING PLATES, GUSSET PLATES, STIFFENER PLATES, FILLER PLATES, ETC. SHALL CONFORM TO A36, UNLESS NOTED OTHERWISE.
7. ALL CONNECTION ANGLE MATERIAL SHALL CONFORM TO ASTM A36 UNLESS NOTED OTHERWISE.
8. CONNECTING OR SPLICING OF STRUCTURAL STEEL NOT SHOWN ON THE DRAWINGS IS PROHIBITED
WITHOUT PRIOR WRITTEN APPROVAL OF THE COR/ ENGINEER-OF-RECORD.
9. THE STRUCTURAL STEEL FABRICATOR SHALL FURNISH SHOP DRAWINGS OF ALL STRUCTURAL
STEEL, FOR COR'S REVIEW BEFORE FABRICATION. SHOP DRAWINGS SHALL SHOW THE ERECTION PROCEDURES AND DETAILS. THE ICC REPORT, INCLUDING VERTICAL LOAD AND DIAPHRAGM SHEAR
CAPACITY SHALL BE FURNISHED.
10. BOLT HOLES IN STEEL SHALL BE 1/16 INCH LARGER THAN NOMINAL SIZE OF BOLT USED. HOLE SIZES FOR A307 AND A449 ANCHOR BOLTS MAY BE MADE OVERSIZE TO FACILITATE ERECTION AS
FOLLOWS:
a. BOLTS 3/4 TO 1 INCH: 5/16" LARGER THAN NORMAL SIZE OF BOLT.
b. BOLTS 1 TO 2 INCH: 1/2" LARGER THAN NORMAL SIZE OF BOLT.
c. BOLTS OVER 2 INCHES: 1" LARGER THAN NORMAL SIZE OF BOLT.
IF A449 ANCHOR BOLTS ARE OVERSIZED, AN ASTM F436 HARDENED WASHER SHALL BE
INSTALLED UNDER THE BOLT HEAD AND THE NUTS SHALL MEET THE REQUIREMENTS OF ASTM
A563.
11. SEE SPECIFICATIONS FOR FINISH/PAINTING REQUIREMENTS FOR STRUCTURAL STEEL SURFACES.
VERIFY WITH ARCHITECTURAL DRAWINGS AND SPECIFICATIONS FOR ADDITIONAL REQUIREMENTS.
12. WELDED JOINTS SHALL CONFORM TO THE PREQUALIFIED JOINT DETAILS AS INDICATED IN THE
STRUCTURAL WELDING CODE (AWS D1.1) BY THE AMERICAN WELDING SOCIETY.
13. ALL WELDING SHALL BE BY WELDERS HOLDING CURRENT VALID CERTIFICATES AND HAVING
CURRENT EXPERIENCE IN TYPE OF WELD CALLED FOR. WELDING RODS TO BE LOW HYDROGEN
TYPE, E70.
14. ALL GROOVE WELDS TO BE FULL PENETRATION UNLESS NOTED. FULL PENETRATION WELDS AND
ALL BUTT WELDED SPLICES OR CONNECTIONS SHALL BE ULTRASONICALLY TESTED AND
INSPECTED BY AN INDEPENDENT TESTING LABORATORY TO CERTIFY ALL SPLICES AS MEETING OR
EXCEEDING STRENGTH OF MATERIALS SPLICED. REDUCTION IN TESTING MAY BE MADE IN
ACCORDANCE WITH THE BUILDING CODE WITH APPROVAL OF THE ENGINEER. TWO COPIES OF ALL
TEST REPORTS AND A LETTER OF SUCH CERTIFICATION SHALL BE SUBMITTED TO THE COR.
15. WELDS MAY BE MADE IN SHOP OR FIELD WITH APPROVAL.
16. WELD LENGTHS CALLED FOR ON PLANS ARE THE NET EFFECTIVE LENGTH REQUIRED. WELD SIZE SHALL BE AISC MINIMUM PER AISC SECTION J2.1b AND 2.2b UNLESS A LARGER SIZE IS NOTED.
17. WELD TEST AND INSPECTIONS, SEE SPECIFICATIONS.
18. EXCEPT AS SUBSEQUENTLY NOTED, HIGH STRENGTH BOLTS NEED NOT BE TIGHTENED BEYOND THE SNUG-TIGHT CONDITION, AS DEFINED IN SECTION 8.(c) OF THE SPECIFICATIONS FOR STRUCTURAL JOINTS USING ASTM A325 OR A490 BOLTS. FOR CONNECTIONS SUBJECT TO DIRECT
TENSION, CONNECTIONS FOR BRACED FRAMES, AND OTHER CONNECTIONS SHOWN OR NOTED ON
THE PLANS AS SC (SLIP CRITICAL) OR FULLY TENSIONED, BOLTS SHALL BE TIGHTENED BY ONE OF THE METHODS DESCRIBED IN SECTION 8.(d) AND TO THE MINIMUM TENSION SPECIFIED IN SECTION 8.(d), TABLE 4.
19. SEE MECHANICAL DRAWINGS FOR MECHANICAL EQUIPMENT SUPPORT FRAMING.
SPECIAL INSPECTIONS
A. ALL FIELD WELDING (EXCEPT METAL STUDS, FURRING CHANNELS, ETC). SHOP WELDING FOR
PROCEDURES AND MULTIPLE PASS WELDS.
B. ALL FULL PENETRATION WELDS SHALL BE SPECIALLY INSPECTED ACCORDANCE WITH AWS AND
THE CURRENT INTERNATIONAL BUILDING CODE.
C. ALL FILLET WELDS SHALL BE VISUALLY INSPECTED IN ACCORDANCE WITH AWS AND THE CURRENT
INTERNATIONAL BUILDING CODE.
D. ALL HIGH STRENGTH BOLTS.
E. ALL EXPANSION BOLTS AND ADHESIVE ANCHORS.
QUALITY ASSURANCE PLAN AND STATEMENT OF SPECIAL INSPECTION
1. SPECIAL INSPECTION, PER THE 2024 INTERNATIONAL BUILDING CODE CHAPTER 17, SECTION 1704 AND 1705. SEE PROJECT SPECIFICATIONS AND STATEMENT OF SPECIAL INSPECTIONS BELOW FOR
SPECIFIED REQUIREMENTS.
2. STATEMENT OF SPECIAL INSPECTIONS THIS STATEMENT OF SPECIAL INSPECTIONS IS IN
ACCORDANCE WITH SECTIONS 1704.3 OF THE IBC 2024 CODE. THE INTENT OF THIS SECTION IS THAT ALL SPECIAL INSPECTIONS SHALL BE PERFORMED IN ACCORDANCE WITH THE PROVISIONS OF CHAPTER 17 OF THE 2018 IBC UNLESS SPECIFICALLY NOTED OTHERWISE. SPECIAL INSPECTION
IS REQUIRED FOR THE FOLLOWING:
a. STEEL CONSTRUCTION (IBC 1705.2, AISC 360-22)
i. WELDING:
ii. HIGH STRENGTH BOLTS:
b. ANCHORAGE OF PLUMBING, MECHANICAL, AND ELECTRICAL EQUIPMENT (IBC 1705.13.6
i. PERIODIC PER IBC 1705.13.6
c. VERIFY THAT THE COMPONENT LABEL, ANCHORAGE, AND MOUNTING CONFORMS TO THE
CERTIFICATE OF COMPLIANCE FOR ELEMENTS OF THE DESIGNATED SEISMIC SYSTEMS
REQUIRING SEISMIC QUALIFICATION (IBC 1705.13.4)
i. PERIODIC PER IBC 1705.13.4
3. THE SPECIAL INSPECTOR (SI) SHALL BE RETAINED BY THE CONTRACTOR AND APPROVED BY THE
CONTRACTING OFFICER AS HAVING THE COMPETENCE NECESSARY TO INSPECT A PARTICULAR
TYPE OFCONSTRUCTION REQUIRING SPECIAL INSPECTIONS. THE SI MUST BE AN INDEPENDENT
THIRD PARTY HIRED DIRECTLY BY THE PRIME CONTRACTOR.
4. ITEMS SPECIFIED AS QUALITY CONTROL (QC) IN THE FOLLOWING TABLES SHALL BE PROVIDED BY
THE CONTRACTOR'S FABRICATOR AND ERECTOR AS REQUIRED PER AISC 360.
5. ITEMS NOTED AS QUALITY ASSURANCE (QA) SHALL BE PROVIDED BY THE CONTRACTOR'S SPECIAL
INSPECTOR.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
STRUCTURAL:
CONSTRUCTION
DOCUMENTS (CD)
1225 N LOOP W #800
HOUSTON, TX 77008
(713) 864-2900
H2B, INC.
23830 PACIFIC HIGHWAY S.
SUITE 300
SPEES DESIGN BUILD
S-000
GENERAL NOTES AND SPECIAL
INSPECTIONS, ABBREVIATIONS,
AND LEGEND
TH TM
580-23-105VA TX HOUSTON REPLACE OR
CHILLERS
MICHAEL E. DEBAKEY VA MEDICAL CENTER, HOUSTON, TX
02/26/2026 02/26/2026
O – Observe these items on a random basis. Operations need not be delayed pending these inspections.
P – Perform these tasks for each welded joint or member.
Check welding equipment O -
Fit-up of fillet welds
• Dimensions (alignment, gaps at root)
• Cleanliness (condition of steel surfaces)
• Tacking (tack weld quality and location)
O O
Configuration and finish of access holes O O
Fit-up of CJP groove welds of HSS T-, Y-, and K-joints without backing (including joint geometry)
• Joint preparation
• Dimensions (alignment, root opening, root face, bevel)
• Cleanliness (condition of steel surfaces)
• Tacking (tack weld quality and location)
O O
Fit-up of groove welds (including joint geometry)
• Joint preparation
• Dimensions (alignment, root opening, root face, bevel)
• Cleanliness (condition of steel surfaces)
• Tacking (tack weld quality and location)
• Backing type and fit (if applicable)
P O
Welder identification system
• Fabricator or erector, as applicable, shall maintain a system by which a welder who has welded a joint or member can be identified.
• Die stamping of members subjected to fatigue shall be prohibited unless approved by the engineer of record.
O O
Material identification (type/grade) O O
Manufacturer certifications for welding consumables available
P P
WPS available P P
Welder qualification records and continuity records P O
INSPECTION TASKS PRIOR TO WELDING QC QA
REQUIRED SPECIAL INSPECTIONS AND TESTS OF STRUCTURAL STEEL - REFERENCE 2024 IBC 1705.2 INSPECTION TASKS PRIOR TO WELDING - REFERENCE AISC 360-22 SPECIFICATION, TABLE N5.4-1
O – Observe these items on a random basis. Operations need not be delayed pending these inspections.
P – Perform these tasks for each welded joint or member.
Placement and installation of steel headed stud anchors P P
Welding techniques
• Interpass and final cleanin
• Each pass within profile limitations
• Each pass meets quality requirements
O O
WPS followed
• Settings on welding equipment
• Travel speed
• Selected welding materials
• Shielding gas type/flow rate
• Preheat applied
• Interpass temperature maintained (min./max.)
• Proper position (F, V, H, OH)
O O
Environmental conditions
• Wind speed within limits
• Precipitation and temperature
O O
No welding over cracked tack welds O O
Control and handling of welding consumables
• Packaging
• Exposure control
O O
INSPECTION TASKS DURING WELDING QC QA
REQUIRED SPECIAL INSPECTIONS AND TESTS OF STRUCTURAL STEEL - REFERENCE 2024 IBC 1705.2 INSPECTION TASKS DURING WELDING - REFERENCE AISC 360-22 SPECIFICATION, TABLE N5.4-2
O – Observe these items on a random basis. Operations need not be delayed pending these inspections.
P – Perform these tasks for each welded joint or member.
No prohibited welds have been added without the approval or EOR
O O
Document acceptance or rejection of welded joint or member
P P
Repair activities P P
Backing removed and weld tabs removed (if required) P P
Weld access holes in rolled heavy shapes and built-up heavy shapes
P P k-area P P
Arc strikes P P
Welds meet visual acceptance criteria
• Crack prohibition
• Weld/base-metal fusion
• Crater cross section
• Weld profiles
• Weld size
• Undercut
• Porosity
P P
Size, length and location of welds P P
Welds cleaned O O
INSPECTION TASKS AFTER WELDING QC QA
REQUIRED SPECIAL INSPECTIONS AND TESTS OF STRUCTURAL STEEL - REFERENCE 2024 IBC 1705.2 INSPECTION TASKS AFTER WELDING - REFERENCE AISC 360-22 SPECIFICATION, TABLE N5.4-3
O – Observe these items on a random basis. Operations need not be delayed pending these inspections.
P – Perform these tasks for each welded joint or member.
Proper storage provided for bolts, nuts, washers and other fastener components
O O
Pre-installation verification testing by installation personnel observed and documented for fastener assemblies and methods used
P O
Connecting elements, including the appropriate faying surface condition and hole preparation, if specified, meet applicable requirements
O O
Correct bolting procedure selected for joint detail O O
Correrct fasteners selected for the joint detail (grade, type, bolt length if threads are to be excluded from shear plane)
O O
Fasteners marked in accordance with ASTM requirements
O P
Manufacturer’s certifications available for fastener materials
O P
INSPECTION TASKS PRIOR TO BOLTING QC QA
REQUIRED SPECIAL INSPECTIONS AND TESTS OF STRUCTURAL STEEL - REFERENCE 2024 IBC 1705.2 INSPECTION TASKS PRIOR TO BOLTING - REFERENCE AISC 360-22 SPECIFICATION, TABLE N5.6-1
O – Observe these items on a random basis. Operations need not be delayed pending these inspections.
P – Perform these tasks for each welded joint or member.
Fasteners are pretensioned in accordance with the RCSC Specification, progressing systematically from the most rigid point toward the free edges
O O
Fastener component not turned by the wrench prevented from rotating
O O
Joint brought to the snug-tight condition prior to the pretensioning operation
O O
Fastener assemblies placed in all holes and washers and nuts are positioned as required
O O
INSPECTION TASKS DURING BOLTING QC QA
REQUIRED SPECIAL INSPECTIONS AND TESTS OF STRUCTURAL STEEL - REFERENCE 2024 IBC 1705.2 INSPECTION TASKS DURING BOLTING - REFERENCE AISC 360-22 SPECIFICATION, TABLE N5.6-2
O – Observe these items on a random basis. Operations need not be delayed pending these inspections.
P – Perform these tasks for each welded joint or member.
Document acceptance or rejection of bolted connections P P
INSPECTION TASKS AFTER BOLTING QC QA
REQUIRED SPECIAL INSPECTIONS AND TESTS OF STRUCTURAL STEEL - REFERENCE 2024 IBC 1705.2 INSPECTION TASKS AFTER BOLTING - REFERENCE AISC 360-22 SPECIFICATION, TABLE N5.6-3
D Check welding equipment OBSERVE OBSERVE
C Check welding equipment OBSERVE OBSERVE
B Material identification (type/grade) OBSERVE OBSERVE
A Welding procedure specifications (WPS) available
OBSERVE OBSERVE
TASK QC QA
REQUIRED SPECIAL INSPECTIONS AND TESTS OF STRUCTURAL STEEL - REFERENCE
ANSI-SDI-QAQC-2022 TABLE 1.3 INSPECTION OR EXECUTION TASKS PRIOR TO WELDING
D WPS followed OBSERVE OBSERVE
C Environmental conditions (wind speed, moisture, temperature)
OBSERVE OBSERVE
B Control and handling of welding consumables
OBSERVE OBSERVE
A Use of qualified welders OBSERVE OBSERVE
TASK QC QA
REQUIRED SPECIAL INSPECTIONS AND TESTS OF STRUCTURAL STEEL - REFERENCE
ANSI-SDI-QAQC-2022 TABLE 1.4 INSPECTION OR EXECUTION TASKS DURING WELDING
D Document accpetance or rejection of welds
PERFORM PERFORM
C Verify repair activites PERFORM PERFORM
B Welds meet visual accpetance criteria PERFORM PERFORM
A Verify size and location of welds, including support, side-lap and perimeter welds
PERFORM PERFORM
TASK QC QA
REQUIRED SPECIAL INSPECTIONS AND TESTS OF STRUCTURAL STEEL - REFERENCE
ANSI-SDI-QAQC-2022 TABLE 1.5 INSPECTION OR EXECUTION TASKS AFTER WELDING
# FRAMING PLAN NOTES:
1. CATWALK GRATING WALKING SURFACE, LIVE LOAD CAPACITY = 40 PSF.
PROVIDE OPENINGS IN GRATING AS REQUIRED TO ACCOMMODATE
PENETRATIONS THROUGH GRATING, COORDINATE WITH MECHANICAL AND
ARCHITECTURAL.
2. NEW CHILLER, SEE MECHANICAL.
3. DEMO EXISTING CHILLER SUPPORT COLUMNS TO THE BASE PLATE. DEMO
CHILLER SUPPORT FRAMING AND GRATING.
4. NEW CHILLER SUPPORT FRAMING PER PLANS.
5. EXISTING BEAM.
6. X-BRACING, SEE DETAIL 7 / SF501.
7. ANGLE BRACE, SEE DETAIL 12 / SF501 .
GENERAL SHEET NOTES
A. REFERENCE SHEET S-000 FOR GENERAL NOTES AND SF501 FOR TYPICAL
DETAILS. REVIEW NOTES & DETAILS FOR APPLICABILITY.
B. EXISTING DIMENSIONS ARE INDICATED AS ( XX'-XX" ). CONTRACTOR TO VERIFY
ALL EXISTING CONDITIONS.
C. VERIFY ALL DIMENSIONS WITH ARCHITECTURAL DRAWINGS.
D. FOR BEAM TO COLUMN AND BEAM TO BEAM CONNECTIONS SEE SHEET SF501.
G
H
( 36' - 6" )
W
X28
W21X62 W21X73
W30X108
W21X62 W21X73
W21X93
W18X40 W21X57
W21X57 W21X93
W21X57W21X68
W
X
W
X
W
X
W
X
W
X
W
X
W21X57
W21X57
W21X57
W 14X283
HSS4X
4X
3/
(T
YP)
W 14X283
W
X28
TYP
W
X28
G.2
F.8
12.5
( 7' - 1 3/4" ) ( 11' - 1 1/4" ) ( 3' - 4 1/4" ) ( 7' - 1 3/4" ) ( 7' - 9" )
5'
3'
/2
9'
/2
9'
/2
9'
/2
SCALE: 3/8" = 1'-0"
EXISTING FRAMING PLAN BELOW MACHINE ROOM
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
STRUCTURAL:
CONSTRUCTION
DOCUMENTS (CD)
1225 N LOOP W #800
HOUSTON, TX 77008
(713) 864-2900
H2B, INC.
23830 PACIFIC HIGHWAY S.
SUITE 300
SPEES DESIGN BUILD
SF101
EXISTING FRAMING PLAN BELOW
MACHINE ROOM
TH TM
580-23-105VA TX HOUSTON REPLACE OR
CHILLERS
MICHAEL E. DEBAKEY VA MEDICAL CENTER, HOUSTON, TX
02/26/2026 02/26/2026
PROVIDE OPENINGS IN GRATING AS REQUIRED TO ACCOMMODATE
PENETRATIONS THROUGH GRATING, COORDINATE WITH MECHANICAL AND
ARCHITECTURAL.
2. NEW CHILLER, SEE MECHANICAL.
3. DEMO EXISTING CHILLER SUPPORT COLUMNS TO THE BASE PLATE. DEMO
CHILLER SUPPORT FRAMING AND GRATING.
4. NEW CHILLER SUPPORT FRAMING PER PLANS.
5. EXISTING BEAM.
6. X-BRACING, SEE DETAIL 7 / SF501.
7. ANGLE BRACE, SEE DETAIL 12 / SF501 .
GENERAL SHEET NOTES
A. REFERENCE SHEET S-000 FOR GENERAL NOTES AND SF501 FOR TYPICAL
DETAILS. REVIEW NOTES & DETAILS FOR APPLICABILITY.
B. EXISTING DIMENSIONS ARE INDICATED AS ( XX'-XX" ). CONTRACTOR TO VERIFY
ALL EXISTING CONDITIONS.
C. VERIFY ALL DIMENSIONS WITH ARCHITECTURAL DRAWINGS.
D. FOR BEAM TO COLUMN AND BEAM TO BEAM CONNECTIONS SEE SHEET SF501.
G
H
5'
3'
/2
9'
/2
9'
/2
9'
/2
( 36' - 6" )
W12X14
W
X
W
X
W24X62
W24X62
W
X
M C
X
.6
W 6X
C6X8.2
C6X8.2
C6X8.2
W 6X
W 6X
W 6X
W 6X
W 6X
W 6X
W 6X
W 6X
W
X
W
X
M C
X
.6
W
X
W
X
W12X14
W12X14
W12X14
W12X14
W12X14
W12X14
W12X14
W12X14 TS6X6X1/4
W 6X
W 6X
W 6X
W 6X
W 6X
C6X8.2
C6X8.2
C6X8.2
C6X8.2
C6X8.2
C6X8.2
C6X8.2
C6X8.2
C6X8.2
M C
X
.6
TYP
G.2
F.8
12.5
( 7' - 1 3/4" ) ( 11' - 1 1/4" ) ( 3' - 4 1/4" ) ( 7' - 1 3/4" ) ( 7' - 9" )
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
STRUCTURAL:
CONSTRUCTION
DOCUMENTS (CD)
1225 N LOOP W #800
HOUSTON, TX 77008
(713) 864-2900
H2B, INC.
23830 PACIFIC HIGHWAY S.
SUITE 300
SPEES DESIGN BUILD
SF102
EXISTING MACHINE ROOM
FRAMING PLAN
TH TM
580-23-105VA TX HOUSTON REPLACE OR
CHILLERS
MICHAEL E. DEBAKEY VA MEDICAL CENTER, HOUSTON, TX
02/26/2026 02/26/2026
SCALE: 3/8" = 1'-0"
EXISTING MACHINE ROOM FRAMING PLAN
PROVIDE OPENINGS IN GRATING AS REQUIRED TO ACCOMMODATE
PENETRATIONS THROUGH GRATING, COORDINATE WITH MECHANICAL AND
ARCHITECTURAL.
2. NEW CHILLER, SEE MECHANICAL.
3. DEMO EXISTING CHILLER SUPPORT COLUMNS TO THE BASE PLATE. DEMO
CHILLER SUPPORT FRAMING AND GRATING.
4. NEW CHILLER SUPPORT FRAMING PER PLANS.
5. EXISTING BEAM.
6. X-BRACING, SEE DETAIL 7 / SF501.
7. ANGLE BRACE, SEE DETAIL 12 / SF501 .
GENERAL SHEET NOTES
A. REFERENCE SHEET S-000 FOR GENERAL NOTES AND SF501 FOR TYPICAL
DETAILS. REVIEW NOTES & DETAILS FOR APPLICABILITY.
B. EXISTING DIMENSIONS ARE INDICATED AS ( XX'-XX" ). CONTRACTOR TO VERIFY
ALL EXISTING CONDITIONS.
C. VERIFY ALL DIMENSIONS WITH ARCHITECTURAL DRAWINGS.
D. FOR BEAM TO COLUMN AND BEAM TO BEAM CONNECTIONS SEE SHEET SF501.
G
H
SF501
TYP
SF501
TYP
SF501
TYP
_____ 2
SF501
TYP
SF501
TYP
SF501
TYP
SF501
SF501
TYP
TYP
TYP
L3X3X1/4 L3X3X1/4
W8X24
L3X3X1/4 L3
X3X 1/4
W 8X
L3X3X1/4
L3 X3
X1 /4
W8X24
L3X3X1/4L3X3X1/4
W8X24
W8X10
W8X24
W8X10 W8X10
L3X3X1/4 L3X3X1/4
W8X24W8X24
W8X10
W8X24 W8X24 W8X24
L3X3X1/4L3 X3X
1/4W
X
W8X24W8X24 W8X24
W8X10
L3X3X1/4L3X3X1/4
W8X24
L3X3X1/4L3 X3X
1/4
W
X
W8X24
W8X10
L3X3X1/4
L3 X3
X1 /4
W8X24
L3X3X1/4 L3X3X1/4
W8X24
L3 X3X
1/4L3X3X1/4
W8X24
L3X3X1/4L3X3X1/4
W8X10
W8X24
W
X
W
X
W 8X
TYP
W 8X
SF2012
SF201
SF501
TYP
TYP
( 36' - 6" )
9'
/2
9'
/2
9'
/2
9'
/2
1' - 5" 3' - 0"
7'
2'
/2
2'
/2
7'
3" 4'
4'
1/
2" 4'
1/
2" 3"
4'
W 8X
3' - 0" 1' - 5"
W 8X
W8X24 W8X24 W8X24
W8X24W8X24 W8X24
W 8X
G.2
F.8
12.5
( 7' - 1 3/4" ) ( 11' - 1 1/4" ) ( 3' - 4 1/4" ) ( 7' - 1 3/4" ) ( 7' - 9" )
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
STRUCTURAL:
CONSTRUCTION
DOCUMENTS (CD)
1225 N LOOP W #800
HOUSTON, TX 77008
(713) 864-2900
H2B, INC.
23830 PACIFIC HIGHWAY S.
SUITE 300
SPEES DESIGN BUILD
SF103
MACHINE ROOM FRAMING PLAN
TH TM
580-23-105VA TX HOUSTON REPLACE OR
CHILLERS
MICHAEL E. DEBAKEY VA MEDICAL CENTER, HOUSTON, TX
02/26/2026 02/26/2026
SCALE: 3/8" = 1'-0"
MACHINE ROOM FRAMING PLAN.
ELEVATION PLAN NOTES
1. CONTRACTOR TO VERIFY ELEVATION IN FIELD.
GENERAL SHEET NOTES
A. REFERENCE SHEET S-000 FOR GENERAL NOTES AND SF501 FOR TYPICAL
DETAILS. REVIEW NOTES & DETAILS FOR APPLICABILITY.
B. EXISTING DIMENSIONS ARE INDICATED AS ( XX'-XX" ). CONTRACTOR TO VERIFY
ALL EXISTING CONDITIONS.
C. VERIFY ALL DIMENSIONS WITH ARCHITECTURAL DRAWINGS.
D. FOR BEAM TO COLUMN AND BEAM TO BEAM CONNECTIONS SEE SHEET SF501.
G.3G.6G.9
MACHINE ROOM TOS
+ 4'-0"
TOC
W8X10
2L 6X
6X 1/2
X5/8
W8X10
4'
" 2L6X6X1/2X5/8
L3X3X1/4L3X3X1/4
( 9' - 1 1/2" ) ( 9' - 1 1/2" )
(H
SS4X
4X 3/
8)
(T
YP)
SF501
TYP
SF501
TYP
SF501
TYP
W12X14
G.2
13 12.9 12.4 12.2
MACHINE ROOM TOS
+ 4'-0"
TOC
4'
SF501
TYP
W8X10
2L6X6X1/2X5/8
W8X24
W12X14
W8X24
L3X3X1/4 L3X3X1/4
SF501
TYP
( 7' - 1 3/4" )
SF501
TYP
W12X14
W8X24
( 14' - 5 1/2" ) ( 7' - 1 3/4" )
W8X24 W8X24
W12X14
HSS4X4X3/8
(TYP)
L3X3X1/4 L3X3X1/4
SF501
TYP
2L 6X
6X 1/2
X5/8
W12X14
W8X10
12.5
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
STRUCTURAL:
CONSTRUCTION
DOCUMENTS (CD)
1225 N LOOP W #800
HOUSTON, TX 77008
(713) 864-2900
H2B, INC.
23830 PACIFIC HIGHWAY S.
SUITE 300
SPEES DESIGN BUILD
SF201
FRAMING ELEVATIONS
TH TM
580-23-105VA TX HOUSTON REPLACE OR
CHILLERS
MICHAEL E. DEBAKEY VA MEDICAL CENTER, HOUSTON, TX
02/26/2026 02/26/2026
SCALE: 3/4" = 1'-0"
ELEVATION ALONG GRID 12.2
SCALE: 3/4" = 1'-0"
ELEVATION ALONG GRID G.9
NOTE:
SEE DETAIL 1 / SF501 FOR
BEAM TO BEAM CONNECTION
1. 5/8" GUSSET PLATE.
2. ANGLE BRACE, SEE ELEVATION
FOR SIZE.
1/4
1/4
4 1
1/4" TYP
D
IS
T A
N C
E B
E A
M 'K
)+1
-0
1. SEE PLAN FOR BEAM SIZE.
2. STIFFENER PLATE 3/8 TYPICAL UNLESS
NOTED OR DETAILED OTHERWISE.
3. FULL HEIGHT STIFFENER PLATE.
4. EXTEND PLATE AS MAY BE REQ'D. FOR
CONNECTIONS. USE LARGER PLATE
AND WELD AS MAY BE REQ'D BY BEAM
CONNECTION SCHEDULE.
5. PARTIAL HEIGHT STIFFENER PLATE.
6. 2-SIDES FOR PARTIAL HEIGHT
STIFFENER PLATE 3-SIDES FOR FULL
HEIGHT STIFFENER PLATE.3/16
REMARKS
SIZE OF
FILLET WELD
SHEAR PLATE
THICKNESS
BOLTS No.
AND SIZE
BEAM
DEPTH
8" - 10"
12" - 14"
16"
18"
21"
3/8
3/8
3/8
3/8
3/8
BEAM CONNECTION SCHEDULE FOR MEMBER
CARRYING ROOFING MATERIAL
(2) 3/4"
(3) 3/4"
(4) 3/4"
(5) 3/4"
(6) 3/4"
5/16
5/16
5/16
5/16
5/16
NOTES:
ALL 3/4" BOLTS SHALL BE A325-N. ALL 1" BOLTS SHALL BE A490-N, UNLESS NOTED OR DETAILED OTHERWISE.
AS REQ'D
1. CENTERLINE OF COLUMN.
2. SEE PLAN FOR BEAM SIZE.
3. FINISHED COLUMN.
4. CAP PL 5"x5"x3/4".
5. STIFFENER PL 3/8" EACH SIDE INTERSECTING
MEMBERS MAY OCCUR. SEE DETAIL
6. USE LARGER PLATE AND WELD AS MAY BE
REQ'D. BY BEAM CONN. SCHED. OR BY AISC
WELDING SPECIFICATIONS.
3/16
1/4
1/4
3/16
MACHINE ROOM TOS
1/4
1/4
1. BEAM PER PLAN.
2. L5X3X1/4 ANGLE.
3. 19W4 1x3/16 SER BLK STEEL GRATING.
4. 1/4" Ø SCHED. 40 GUARDRAIL @ 4'-0" MAX.
5. 3/8" STIFFENER PLATE, SEE DETAIL
6. CURB FOR AHU BY OTHERS.
/4 SF501
1. BEAM PER PLAN.
2. L5X3X1/4 ANGLE.
3. 19W4 1x3/16 SER BLK STEEL GRATING.
4. 1/4" Ø SCHED. 40 GUARDRAIL @ 4'-0" MAX.
5. 3/8" STIFFENER PLATE, SEE DETAIL
1/4
1/4
1/4
TYP
/4 SF501
1. BEAM, SEE PLAN.
2. ANGLE BRACE, SEE PLAN.
3. 5/8" GUSSET PLATE.
4. COLUMN, SEE PLAN.
5. ANGLE BRACE, IF APPLICABLE.
ELVATION VIEWPLAN VIEW
3 4
1/4
TYP
1/4
TYP
1/4
TYP
1/4
1/4
1/4
1/4
1/4
1. 5/8" GUSSET PLATE.
2. CENTERLINE.
3. BRACE MEMBER – SEE ELEVATION FOR
SIZE.
4. COLUMN – SEE PLAN.
5. 5" x 5" x 3/4" BASE PLATE.
6. EXISTING BEAM – SEE PLAN.
4 3
1 EXISTING STEEL BEAM TO REMAIN.
2. EXISTING STEEL DECK TO REMAIN.
3. REMOVE EXISTING COLUMN AND BASE PLATE.
REPLACE WITH NEW COLUMN AND BASE PLATE.
4. DEMOLISH CONCRETE CURB AND CONCRETE
OVER DECK AS REQUIRED TO FACILITATE
COLUMN REMOVAL.
TOC
4"
1. 3/8" SPACER PLATE.
2. ANGLE BRACE – SEE ELEVATIONS FOR SIZE.
1/4
TYP.
1/2"
1/4
1/4
1/4
1/4
1. 5/8" GUSSET PLATE.
2. CENTERLINE.
3. BRACE MEMBER – SEE ELEVATION FOR SIZE.
4. BRACE – OCCURS WHERE SHOWN ON PLANS.
5. BEAM – SEE PLAN.
6. BEAM – OCCURS WHERE SHOWN ON PLANS.
7. COLUMN – SEE PLANS.
8. CAP PLATE 3/4" x 1" LARGER THAN COLUMN.
9. 3/8" STIFFENER PLATE – SEE DETAIL 4/SF501.
1/
2" M
IN
3" T
Y P D
IS
T A
N C
E B
E A
M
3"
1 1/2" MIN
1. PROVIDE PARTIAL HEIGHT STIFF. PLATE
(THICKNESS TO MATCH THICKNESS OF
SHEAR PLATE) THIS SIDE FOR 6 OR 7 BOLT
CONNECTIONS.
NOTE:
SEE DETAIL 3 / SF501 FOR
BOLTS, WELDING, SHEAR
PLATE ETC.
'K
)+1
-0
SEE
SCHED
BRACING NOT SHOWN
FOR CLARITY, TYP.
SEE
SCHED
TYP.
1. BEAM – SEE PLAN.
2. COLUMN – SEE PLAN.
3. 5/8" GUSSET PLATE.
4. DOUBLE ANGLE BRACE – SEE PLAN.
NOTE:
SEE DETAIL 3/SF501 FOR
BOLTS, WELDING, SHEAR
PLATE, AND RELATED
REQUIREMENTS.
MACHINE ROOM TOS
8"
1/
2" M
IN
3" T
Y P
1/
2" M
IN
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
STRUCTURAL:
CONSTRUCTION
DOCUMENTS (CD)
1225 N LOOP W #800
HOUSTON, TX 77008
(713) 864-2900
H2B, INC.
23830 PACIFIC HIGHWAY S.
SUITE 300
SPEES DESIGN BUILD
SF501
FRAMING SECTIONS AND DETAILS
TH TM
580-23-105VA TX HOUSTON REPLACE OR
CHILLERS
MICHAEL E. DEBAKEY VA MEDICAL CENTER, HOUSTON, TX
02/26/2026 02/26/2026
NTS
BRACE TO BEAM
NTS
STIFFENER PLATES
NTS
BEAM CONNECTION SCHEDULES
NTS
BEAM TO COL CONN
NTS
PERIMETER BEAM DETAIL
NTS
PERIMETER BEAM DETAIL
NTS
HORIZONTAL BRACE TO BEAM
NTS
BRACE CONNECTION TO BASE PLATE
NTS
DEMOLITION DETAIL
NTS
BRACE CONNECTION
NTS
BRACE TO COLUMN CONNECTION
NTS
BEAM TO BEAM - 1 SIDED
NTS
BEAM TO BEAM - 2 SIDED
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
ENGINEERING DISCIPLINE:
SPEES DESIGN BUILD
23830 PACIFIC HIGHWAY S. SUITE 300
KENT, WA 98032
(206) 209-2246
RAY SPEES
MECHANICAL GENERAL NOTES,
ABBREVIATIONS, & LEGENDS
CONSTRUCTION
DOCUMENTS (CD)
VA TX HOUSTON REPLACE OR
CHILLERS
MICHAEL E. DEBAKEY VA MEDICAL CENTER, HOUSTON,
TX
2/26/2026 MGH/JW RT/CY/RQ/BC
580-23-105
M-001
ADDITIONAL SYMBOLS
BALL VALVE WITH MEMORY STOP (BALANCING VALVE)
UNION OR FLANGE (AS INDICATED BY PIPE SIZE - SEE SPEC.)
PIPE BREAK (SINGLE LINE)
RISE (SINGLE LINE - PLAN VIEW)
DROP (SINGLE LINE - PLAN VIEW)
BOTTOM TAKEOFF
TOP TAKEOFF
BLIND FLANGE
END CAP
BALL VALVE
GATE VALVE
CHILLED WATER SUPPLY
CHILLED WATER RETURN
PIPING LEGEND
CHR
CHS
NEW AND EXISTING WORK
POINT OF CONNECTION BETWEEN
LIMIT OF DEMOLITION
TEMPERATURE SENSOR OR
THERMOSTAT
T
H
ROOM HUMIDISTAT
M
R
MOISTURE SENSOR
REFRIGERANT SENSOR
ADDITIONAL SYMBOLS
H4
H7
A
26-SF 3
26-TU-I-I
DETAIL NUMBER
DRAWING NUMBER WHERE SHOWN
SECTION LETTER
TYPICAL UNIT NO.
BUILDING NO. WHERE EQUIPMENT IS LOCATED.
SUPPLY FAN NO. 3 IN BUILDING NO. 26
EQUIPMENT ABBREVIATION (SUPPLY FAN)
ITEM NUMBER (TERMINAL UNIT NO. 1)
ITEM (TERMINAL UNIT SHOWN)
SERVED BY AIR HANDLER UNIT NO. 1
DRAWING NUMBER WHERE DRAWN
BUILDING NO. WHERE EQUIPMENT IS LOCATED
26-SF 3
26-TU-I-I
OR
OR
CHILLED GLYCOL-WATER RETURN
CHILLED GLYCOL-WATER SUPPLYGCS
GCS
ABS:
AC:
ACR:
A/E:
AFF:
AFG:
AG:
AI:
AISI:
AO:
ASHRAE:
ASJ:
ASME:
ASPE:
ASR:
AWG:
BACNET:
BAG:
BAS:
BCUP:
BFP:
BHP:
BTU:
BTU/H:
BSG:
C:
CD:
CDA:
CGA:
CFM:
CO:
COR:
CPVC:
CR:
CRS:
CV:
CXA
ACRYLONITRILE BUTADIENE STYRENE
ALTERNATING CURRENT
AIR CONDITIONING AND REFRIGERATION
ARCHITECT/ENGINEER
ABOVE FINISH FLOOR
ABOVE FINISH GRADE
AIR GAP
ANALOG INPUT
AMERICAN IRON AND STEEL INSTITUTE
ANALOG OUTPUT
AMERICAN SOCIETY OF HEATING REFRIGERATION, AIR
CONDITIONING ENGINEERS
ALL SERVICE JACKET
AMERICAN SOCIETY OF MECHANICAL ENGINEERS
AMERICAN SOCIETY OF PLUMBING ENGINEERS
AUTOMATIC SPRINKLER RISER
AMERICAN WIRE GAUGE
BUILDING AUTOMATION AND CONTROL NETWORK
SILVER-COPPER-ZINC BRAZING ALLOY
BUILDING AUTOMATION SYSTEM
SILVER-COPPER-PHOSPHORUS BRAZING ALLOY
REDUCED PRESSURE BACKFLOW PREVENTER
BRAKE HORSEPOWER
BRITISH THERMAL UNIT
BRITISH THERMAL UNIT PER HOUR
BOROSILICATE GLASS PIPE
CELSIUS
COMPACT DISK
COPPER DEVELOPMENT ASSOCIATION
COMPRESSED GAS ASSOCIATION
CUBIC FEET PER MINUTE
CLEANOUT
CONTRACTING OFFICER'S REPRESENTATIVE
CHLORINATED POLYVINYL CHLORIDE
CHLOROPRENE
CORROSION RESISTANT STEEL
CONTROL VALVE
COMMISSIONING AGENT
DB:
DB(A):
DDC:
DFU:
DI:
DI:
DISS:
DN:
DO:
DOE:
DVD:
DW:
DWG:
DWV:
ECC:
EL:
EPA:
EPACT:
EPDM:
EPT:
ETO:
EX:
F:
FAR:
FCO:
FD:
FDC:
FNPT:
FOP:
FOR:
FOS:
FOV:
FPM:
FS:
FSK:
FSS:
FU:
N2:
N20:
NC:
NF:
NG:
NIC:
NO:
NOM:
NPTF:
NPS:
NPT:
NTS:
O2:
OC:
OCAMES:
OD:
OR:
OSD:
OS&Y:
OXY:
DECIBELS
DECIBELS (A WEIGHTED)
DIRECT DIGITAL CONTROL
DRAINAGE FIXTURE UNITS
DIGITAL INPUT
DEIONIZED WATER
DIAMETER INDEX SAFETY SYSTEM
DIAMETER NOMINAL
DIGITAL OUTPUT
DEPARTMENT OF ENERGY
DIGITAL VIDEO DISC
DISHWASHER
DRAWING
DRAINAGE, WASTE AND VENT
ENGINEERING CONTROL CENTER AKA BAS
ELEVATION
ENVIRONMENTAL PROTECTION AGENCY
ENERGY POLICY ACT
ETHYLENE PROPYLENE DIENE MONOMER
ETHYLENE PROPYLENE TERPOLYMER
ETHYLENE OXIDE
EXISTING
FAHRENHEIT
FEDERAL ACQUISITION REGULATIONS
FLOOR CLEANOUT
FLOOR DRAIN
FIRE DEPARTMENT (HOSE) CONNECTION
FEMALE NATIONAL PIPE THREAD
FUEL OIL PUMP
FUEL OIL RETURN
FUEL OIL SUPPLY
FUEL OIL VENT
FLUOROELASTOMER POLYMER
FLOW SWITCH
FOIL-SCRIM-KRAFT FACING
VA CONSTRUCTION & FACILITIES MANAGEMENT, FACILITY
STANDARDS SERVICE
FIXTURE UNITS
NITROGEN
NITROGEN OXIDE
NORMALLY CLOSED
OIL FREE DRY (NITROGEN)
NATURAL GAS
NOT IN CONTRACT
NORMALLY OPEN
NOMINAL
NATIONAL PIPE THREAD FEMALE
NOMINAL PIPE SIZE
NOMINAL PIPE THREAD
NOT TO SCALE
OXYGEN
ON CENTER
REPLACED BY HEFP
OUTSIDE DIAMETER
OPERATING ROOM
OPEN SIGHT DRAIN
OUTSIDE STEM AND YOKE
OXYGEN
P Pa
PC
PCF
PD
PEF
PF
PGW
PHC
PPM
PRS
PRV
PSI
PSIA
PSIG
PSS
PSV
PTAC
R/E
RA
RAD
RAF
RAHX
RAT
RCCH
RCU
RD
RDS
REA
RELAD
RF
RG
RH
RHC
RHG
RL
RLA
RO
RPM
RR
RS
RTU
RV
PUMP
PASCAL
PUMPED CONDENSATE
POUNDS PER CUBIC FOOT (FEET)
P…