This document package includes construction drawings and specifications for a renovation project at a Veterans Affairs medical center. The project involves renovating Wing 4B at the Malcom Randall VAMC located in Gainesville, Florida into a hemodialysis unit. Key project details include installing new ceiling systems, light fixtures, curtain tracks, and patient lift supports. The construction documents also specify material requirements for concrete slabs, fasteners, and other components. Offerors are to submit proposals in response to solicitation number 36C24822R0158 by August 29, 2022 at 3:30 PM Eastern Time for consideration for this project. The Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 8 is listed as the contracting agency.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

14" MAX

10" MIN

14" MAX

10" MIN

CONCRETE SLAB MIN 3000 PSI Item # Part # Description Qty

000.00394 THREADED ROD 3/8-16 X 10' ZINC 13

000.00402 LOCKNUT STOVER 3/8-16 ZINC 14

000.00405 NUT 3/8-16 ZINC 45

000.00424 1

000.04430 FLAT WASHER M10 ZINC 5

200.11140 CEILING PLATE ø100MM 2

200.11170 BRACKET SHIM 12mm 1

LUS-304582 HILTI KBTZ 3/8 X 3 3/4 3

700.11100 TRACK BRACKET KWIKTRAK 1

LUS-P1068 UNISTRUT ANGLE 2

000.04435 TAB WASHER M10 1

LIFT CAPACITY= 600 LBS

LIFT TRACK BY

ARJO

FINISH

CEILING

21_

" MAX. DISTANCE

BETWEEN ANGLE

FITTING AND CEILING

EXISTING

CONCRETE SLAB

MIN 3 1/8"

BRACE

1-5/8 x 10' SLOTTED CHANNEL

EQUAL +2" OF

CENTERLINE

OF STRUT

000.00425 LOCKWASHER 3/8" 4

000.04875 FLAT WASHER M12 4

2 7 9 11 1715

BRACE

"NOTE: ARJO GUARANTEES THE STRUCTURAL INTEGRITY OF THE TOTAL LIFT SYSTEM DESIGN, INCLUDING TRACK, BRACING, HANGERS, AND ALL CONNECTIONS TO THE BUILDING STRUCTURE. OUR DESIGN IS BASED ON THE REQUIREMENTS OF THE CURRENT INTERNATIONAL BUILDING CODE (IBC) AND THE SESMIC LOADS OF THE REGION. THE FACILITY MUST VERIFY THE ADEQUACY OF THE BUILDING STRUCTURE TO SUPPORT THE LOADS IMPOSED BY THE LIFT SYSTEM."

2 1/2" MIN.

EMBEDMENT TYP.

LUS-P1000T 20"

200.11160

200.11150

BRACKET SHIM 3mm

BRACKET SHIM 1.5mm

FINISH

CEILING

BRACE

EQUAL +2" OF

CENTERLINE

OF STRUT

LIFT TRACK BY

ARJO

LIFT CAPACITY= 1000 LBS

3/4" MAX. DISTANCE

BETWEEN ANGLE

FITTING AND CEILING12

Item # Part # Description Qty

000.00394 THREADED ROD 3/8-16 X 10' ZINC 23

000.00402 LOCKNUT STOVER 3/8-16 ZINC 24

000.00405 NUT 3/8-16 ZINC 65

000.04430 FLAT WASHER M10 ZINC 6

200.11140 CEILING PLATE ø100MM 4

700.11204 TRACK BRACKET SWL [1000 LBS] 1

LUS-P1068 UNISTRUT ANGLE 2

1 3

000.00425 LOCKWASHER 3/8" 4

000.04875 FLAT WASHER M12 4

2 2

"NOTE: ARJO GUARANTEES THE STRUCTURAL INTEGRITY OF THE TOTAL LIFT SYSTEM DESIGN, INCLUDING TRACK, BRACING, HANGERS, AND ALL CONNECTIONS TO THE BUILDING STRUCTURE. OUR DESIGN IS BASED ON THE REQUIREMENTS OF THE CURRENT INTERNATIONAL BUILDING CODE (IBC) AND THE SESMIC LOADS OF THE REGION. THE FACILITY MUST VERIFY THE ADEQUACY OF THE BUILDING STRUCTURE TO SUPPORT THE LOADS IMPOSED BY THE LIFT SYSTEM."

2 1/2" MIN.

EMBEDMENT TYP.

1-5/8 x 10' SLOTTED CHANNEL

311__

HILTI KBTZ 3/8 X 3 3/4

LUS-P1000T 20"

LUS-304582

2 7 9 10 1614

BRACE

200.11170 BRACKET SHIM 12mm 2

12 200.11160

200.11150

BRACKET SHIM 3mm

BRACKET SHIM 1.5mm

(X2) UPPER AND LOWER

CONNECTION FOR LATERAL

(X2) UPPER AND LOWER

CONNECTION FOR LATERAL

STANDARD TRACK INSTALLATION

STANDARD TRACK INSTALLATIONCONCRETE SLAB MIN 3000 PSI

000.00375 BOLT 3/8" - 16 X 11/4 "

000.00357 BOLT 3/8" - 16 X 1 "

000.00426 2

000.00424

000.00426

LU

S-P

T 9 '7 " M

AX.

U N

IS

TR

U T P

2' -6

" M

AX.

LU

S-P

T 9 '7 " M

AX.

U N

IS

TR

U T P

2' -6

" M

AX.

CHANNEL NUT 3/8-16

CHANNEL NUT 3/8-16

SADDLE NUT 3/8"-16

SADDLE NUT 3/8"-16

EXISTING

CONCRETE SLAB

MIN 3 1/8"

60"(X2)LUS-P1000T 1-5/8 x 1- 5/8 12GA 10' SLOTTED

4(X2)LUS-P2486 CRADLE CLIP 15" O/C MAX SPACING

60"LUS-P1000T 1-5/8 x 1- 5/8 12GA 10' SLOTTED

4LUS-P2486 CRADLE CLIP 15" O/C MAX SPACING

FACE OF WALL OR

VERTICAL

CONSTRUCTION

CONTROL OR

EXPANSION

JOINT WITH

CAULK

BEAD AND JOINT

COMPOUNDTYPICAL 5/8" GYPSUM

BD.

TIE WIRE OR CLIPS

TIE WIRE OR PENCIL

RODS TO STRUCTURE

ABOVE

7/8" METAL FURRING

CHANNELS @ 16" O.C.

1-1/2" COLD ROLLED

CHANNEL @ 4'-0" O.C.

GYPSUM BOARD

CEILING

1/4" MUD-IN

REVEAL MOLDING.

PAINT TO MATCH

ADJACENT CEILING

5/8" GYPSUM BOARD ON 3

5/8" MTL. STUDS @ 16"

O.C.

SEE RCP

VARIES

2 1/2" MTL FRAMING

DIAGONALS 4' - 0" O.C. MAX

FASTEN TO STRUCTURE

ABOVE

SUSPENDED ACCOUSTICAL

CEILING

3-5/8" MTL. FRAMING 16"

O.C. TO STRUCTURE

ABOVE

S E

E R

C P

V A

R

IE

S

CONTINUOUS MUD-IN

CORNER BEAD - EACH

SIDE

S E

E R

C P

V A

R

IE

S

M

IN

MUD-IN CORNER

BEAD -TYP.

5/8" GYP. BD. ON

2 1/2" MTL. FRAMING

16" O.C.

LUMINAIRE.

REFER TO

SCHEDULE

ARCHITECTURAL

CEILING GRID

LUMINAIRE MANUFACTURER'S

EARTHQUAKE CLIP, (4) PER FIXTURE

AT CORNERS. ATTACH WITH SHEET

METAL SCREW

FIXTURE WHIP FROM

JUNCTION BOX

(6FT. LONG MAX.)

LUMINAIRE.

REFER TO

SCHEDULE

LUMINAIRE

SUSPENSION WIRES

(#10 MIN) ATTACHED

TO STRUCTURE

(TYP EA. CORNER)

3 TWIST MINIMUM (TYP)

ACOUSTICAL CEILING

TILE (TYP)

#12 GA. HANGER WIRE THROUGH INTEGRAL

GALVANIZED LIPPED STEEL MOUNTING

CHANNEL & ATTACHED TO STRUCTURE

INTEGRAL GALVANIZED LIPPED

STEEL MOUNTING CHANNEL

ARCHITECTURAL

CEILING GRID

CEILING HANGER WIRE

WIRE TIE THROUGH

MOUNTING CHANNEL

& CROSS BEAM, TYP.

ACOUSTICAL

CEILING

TILE (TYP.)

ARCHITECTURAL

CEILING GRID

ARCHITECTURAL

CEILING GRID

LOCKING SQUARE

WASHER & NUT

1/4" SCREW

JUNCTION BOX

INDEPENDENT CADY SUPPORT

CLIP @ EACH LIGHT FIXTURE

CONNECTION

UNDERSIDE OF ROOF

NO. 12 GA. VERTICAL

WIRE HANGER, TURN

CEILING GRID LEVEL

PRIOR TO SETTING

TUBE

SPLAYED BRACING WIRES

2'' WIDE CROSS TEE

2'' WIDE MAINS

5/8'' GYP BD

SLOT END OF TUBE

TO

FIT OVER CEILING

RUNNER

TUBE SPACERS AS

REQUIRED.

CURTAIN TRACK. BASIS

OF DESIGN: NELSON

1200CT

CEILING TILE. REFER

TO RELECTED

CEILING PLAN.

#8 X 2" TEK

SCREW AT 24"

ON CENTER.

CONTINUOS SUSPENDED

FURRING CHANNEL

GALVANIZED 12 GAUGE

STEEL HANGER WIRE

SUSPENDED FROM

STRUCTURE ABOVE.

1 2 3 4 5 6 7 8 9 10

1 2 3 4 5 6 7 8 9 10

A

B

C

D

E

F

A

B

C

D

E

F

CONSULTANT ARCHITECT/ENGINEER OF RECORD STAMP Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

Drawing Title

Approved: Project Director

Phase Project Title Project Number

Building Number

Drawing NumberLocation

Issue Date Checked Drawn

VA FORM 08-6231

FULLY SPRINKLERED

08/25/2022

ARCHITECTURAL - CEILING

DETAILS

RENOVATION OF WING 4B FOR

HEMODIALYSIS UNIT

1601 SW. ARCHER RD.

GAINESVILLE, FL 32608

CZ CR

573-18-601

AE504

BID DOCUMENTS

3" = 1'-0"

CEILING DETAIL - GYPSUM BOARD @ WALL

12" = 1'-0"

CEILING DETAIL - GYPSUM BOARD@CONTROL JOINT

1 1/2" = 1'-0"

CEILING DETAIL - HEADER

1 1/2" = 1'-0"

CEILING DETAIL - SOFFIT

0 6" 9"3"

0 1/2" 1" 2"

0 1' 1 1/2'1/2'

0 1' 1 1/2'1/2'

1/8" = 1'-0"5

CEILING DETAIL - TYP. LUMINAIRE MOUNTING AT ACT CEILING

1/8" = 1'-0"6

TYP. EXIT SIGN MOUNTING AT ACT CEILING

0 4' 8' 16'

0 4' 8' 16'

1 1/2" = 1'-0"7

DETAIL - GYPSUM BOARD CEILING SUSPENSION

0 1' 1 1/2'1/2'

Revisions: Date:

30% SCHEMATIC DESIGN 07/17/2020

65% DESIGN DEVELOPMENT 04/22/2021

95% CONSTRUCTION DOCUMENTS 06/16/2021

BID DOCUMENTS 07/28/2021

ADDENDUM 1 08/25/2022

6" = 1'-0"8

CURTAIN TRACK MOUNTING DETAIL

0 1" 2" 3" 4"

1/4" = 1'-0"9

PATIENT LIFT SUPPORT DETAILS

Sheets
AE504 - ARCHITECTURAL - CEILING DETAILS