This document contains the scope of work for the replacement of the garage floor at the OPWDD Sunmount DDSO Hostel #10607 located at 56 Bellevue Terrace in Tupper Lake, New York. The project requires the vendor to provide all labor and materials to remove the existing concrete floor, prepare the subbase, and install a new concrete floor in compliance with New York State building code. The work must be completed within 30 days of the award, and a mandatory site visit is scheduled for June 28, 2024. Proposals are due by July 12, 2024, and the contract is for a one-year term.

This procurement opportunity is limited to New York State Small Businesses, MWBE, and SDVOB contractors. The contract is set aside for MWBE and SDVOB firms only. There are no incumbent contractors, and the project is funded through the OPWDD operating budget. The contractor must provide liability, workers' compensation, and disability insurance, and comply with prevailing wage requirements.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PROJECT SCOPE

Facility:

OPWDD Sunmount DDSO Hostel #10607 Facility Address:

56 Bellevue Terrace Tupper Lake, NY 12986

Point of Contact:

Sam Gaff MS2 Contact Phone Number:

(518) 359-4174 Samuel.gaff@opwdd.ny.gov

Project Title:

Garage Floor Replacement Summary of Work:

Replacement of garage floor

DESCRIPTION:

Replacement of garage floor at residence. The vendor shall provide all labor and materials necessary to complete the work in a professional manner according to scope of work and architectural drawings if supplied. Work is to be completed within 30 days of award, unless modified below. This is a NYS Public Works project and prevailing wages are to be paid. Certified Payrolls must be submitted at time of completion. Refer to attached specification for the following scope of work. Site must be cleaned, and all materials secured at the end of each workday. Absolutely no scraps, especially fasteners, are to be left unsecured. Upon completion of garage floor replacement, before removal of equipment and scaffolding, contractor is to schedule a quality control and quality assurance inspection with Plant Superintendent or his/her representative.

SCOPE OF WORK includes, but is not necessarily limited to the following:

Remove any and all existing garage floor concrete. Properly dispose of offsite.

Prepare area for new concrete floor, this includes ensuring that the subbase meet NYS building code requirements. It also includes any drainage improvements that may be necessary.

Replace floor with new concrete in compliance with NYS building code. All reinforcement shall comply with NYS building code.

Smooth floor to ensure there are no uneven areas and so all doors will close properly.

GENERAL REQUIREMENTS:

0. Proposal price is to include all materials, labor, disposal of materials fees and site clean-up. Final acceptance of completed job will be provided by the appropriate Maintenance Supervisor.

Work is to be done between the hours of 8am and 4pm, Monday through Friday. Contractor is advised that this is an occupied home and may be occupied during these times.

All tools must always be controlled, and debris, tools and materials secured and stored at the end of each workday.

Any unforeseen conditions that may alter the established price are to be reported to the Plant Superintendent or his/her representative listed above immediately upon discovery.

Smoking is prohibited by contractors at all residential and program sites owned by OPWDD.

Prior to the commencement of the work, there shall be a meeting with OPWDD Operations and Maintenance staff and Safety Department to discuss specific safety requirements needed to be adhered to during the work period.

Safety Data Sheets as applicable will be provided to the Plant Superintendent or his/her representative prior to the start of work and a copy maintained at the property.

All applicable environmental testing associated with this work will be provided to the contractor prior to start of work, if necessary.

Contractor must be able to provide Certificate of Liability insurance, $1 million/$2 million aggregate. Workers Comp Insurance, NYS Disability Insurance with Certificate Holders as: OPWDD/Sunmount DDSO, 2445 State Rte. 30, Tupper Lake, NY 12986

SITE VISIT:

A MANDATORY site visit has been scheduled for Friday, June 28, 2024 @ 9am, for exact measurements of jobsite. If you cannot attend on above date, please call and accommodations will be made, if possible, for an alternate date. Please call (518)-359-4174 to schedule a time at the project site. All questions or requests for information shall be submitted, in writing, to Samuel.Gaff@opwdd.ny.gov

Proposals must be submitted to the Facility by 3 PM on Friday, July 12, 2024.

OR Via mail:

SUNMOUNT DDSO (ATTN: Heather Mace/Proposals)

2445 STATE RTE 30,

TUPPER LAKE, NY 12986

OR

Via Fax: (518)359-4230 (ATTN: Heather Mace)

A. Lawn Damage/Property Damage

· If the delivery of materials or any other work necessitates the contractor, his suppliers, or sub-contractors to drive on the lawn for ANY reason, the contractor shall be held responsible for the repair of the lawn.

· Personal vehicles are not to be parked on the grass.

· Any property damage caused by work performed is to be corrected to the condition existing prior to start of the job.

B. Continuity of Work/Communication/Scheduling

· Once the job has begun, it is to be worked on continuously until completed.

· If there are any delays, even if due to inclement weather, a Work Control Representative MUST be contacted.

C. Work must be scheduled to start within 30 days of receiving the material.

D. General Safety

· The residence operates 7 days a week, 24 hours per day.

· The contractor must take all reasonable care to safeguard the residents and the staff.

· The contractor shall ensure all tools, materials and other items are picked up, removed, or stored and are safely secured at the end of each workday.

· Any ladders, scaffolding or lifts used in conjunction with this job are to be stored to the satisfaction of the safety Director at the end of the day.

· The work as indicated above shall be scheduled as not to interfered with other functions of the campus. All work performed as part of this job is to be coordinated with the Safety Director and Plant Superintendent or his/her representative listed above.

· The awarded vendor/contractor will provide a safety plan to the Plant Superintendent or his/her representative before work begins.

image1.emf