552-24-101 Repair Upgrade steam distribution phase 1 eval criteria 6-28-2023.docx

DOCX document 159 KB Posted

Attached to
C1EZ--552-24-101 A/E Repair-Upgrade Steam Distribution Phase 1 - VAMC Dayton
Solicitation number
36C25023R0198
Issued by

About this file

This document outlines evaluation criteria for a solicitation seeking architectural and engineering services for repairs and upgrades to a steam distribution system at a Veterans Affairs medical center. Key personnel experience and qualifications, past performance on similar projects, construction period services capabilities, company location, and utilization of veteran-owned small businesses as subcontractors will be evaluated. Technical approach, schedule and understanding of requirements are the most heavily weighted factors. Experience with healthcare facility design, field inspections, submittal reviews, cost estimating and contract changes during construction are emphasized. Proposals are due by June 28, 2023 for the project located at the Dayton VAMC in Dayton, Ohio.

View the file

Other files

File Type Posted
36C25023R0198.docx DOCX document
A-E SOW 552-24-101 07-17-2023.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Evaluation Criteria for the

552-24-101 REPAIR-UPGRADE STEAM DISTRIBUTION PHASE 1

PROJECT DESCRIPTION

Design work will include performing a survey and study of the existing steam distribution system on the campus of the Dayton VAMC. This survey and study will include evaluation of steam and condensate lines within the tunnels as well as the tunnels themselves. The tunnels will be evaluated for structural integrity, lighting, and adequate drainage to the storm system. Steam and condensate lines, pipe mounts/guides/anchors, along with steam traps will be surveyed for leaks or other damages. In addition, upon completion of the study, the A/E will provide a detailed report of the survey, along with recommendations for repairs, ranked by priority. The recommended repairs will also be designed by the A/E and packaged in specs and drawings to be issued for bids to perform the repairs. The A/E will also work with the Dayton VAMC to develop any additional construction phases to this work. Provide complete design services, including all necessary schematics, design development, surveys, cost estimates, construction drawings and specifications, and construction period services (CPS) for solicitation to Repair-Upgrade Steam Distribution, Phase 1 on the Dayton VA Medical Center, 4100 West Third Street, Dayton, OH 45428.

EVALUATION FACTORS

The Government will award a contract resulting from this solicitation to the responsible offeror whose offer conforming to the solicitation will be most advantageous to the Government other factors considered. The following factors shall be used to evaluate offers:

a) Technical Capability- 40%

b) Past Performance- 25%

c) Construction Period Services- 15%

d) Location-10%

e) SDVOSB/VOSB or other small business subcontractors 10% The government will evaluate information based on the evaluation procedures authorized in FAR 36.602-1, Selection Criteria using the following evaluation criteria:

Factor 1 - Technical Capability: The evaluation process will consider whether the qualifications demonstrate a clear understanding of the technical features involved in meeting the requirements of the solicitation.

· Professional Qualifications necessary for satisfactory performance of required services. Provide resumes for all key personnel required to complete the services indicated in this solicitation. Professional disciplines are required to be licensed, registered, or certified by a US state, the District of Columbia or a US territory.

· Specialized experience of personnel proposed for assignment to the contract and their record of working together as a team. Provide specialized experience and technical competence with healthcare related designs in inpatient, ambulatory care settings, in the type of work indicated in this solicitation.

Factor 2 - Past Performance: The offeror’s proposal must include a summary description of at least three to five prior contracts/projects per team for projects completed within the last five years with organizations with similar mission and functional domains, and of comparable size, complexity, and scope. These references must also include:

· Contract/Order Number, brief description of the project, type of contract, amount of the contract

· Contracting Officer’s Name and Phone Number, Government agency

· Contracting Officer’s Representative Name and Phone Number

· The Offeror must indicate whether they were the prime contractor, sub-contractor or other teaming arrangement. Prime shall indicate which aspect they are directly responsible for of this requirement.

· The Offeror is required to provide references for the above projects. In the event the company itself does not have relevant past performance; references may be submitted on contracts performed by the Key Personnel of the company. The VA reserves the right to contact all the references that the Offeror lists.

Factor 3 - Construction Period Services:

Experience in construction period services to include professional field inspections during the construction period, review of construction submittals, support in answering requests for information during the construction period, and support of construction contract changes to include drafting statements of work, and cost estimates shall be included as an evaluation criterion when construction period services is included in the statement of work for A-E services.

· Professional Field Inspections

· Review of Construction Submittals

· RFI Support

· Support Construction Contract Changes to Include Drafting Statements of Work

· Cost Estimates Factor 4 - Location: The Offeror must indicate how far their company is located from the Dayton VA Medical Center by stating the timeframe to be onsite for this project in response to an emergent need.

Factor 5 - The extent to which potential contractors identify and commit to the use of service-disabled Veteran-owned small businesses, Veteran-owned small businesses, and other types of small businesses as subcontractors:

· Firms (Prime and Subcontractor(s)) shall be certified through the SBA Veteran Small Business Certification if SDVOSB or VOSB.

· All other socioeconomic firms shall be certified by Systems of Award Management and/or Small Business Administration.

· Estimate percent of project overall workload shall be designated for each firm (prime and sub).

a) SDVOSB shall be given greatest preference.

b) VOSB shall be given great preference.

c) All other social economic classifications to be preferred.

FACTOR DEFINITIONS:

Table 1: Technical Ratings

Pts
Assessment
Definition
1
Outstanding
Qualifications meet requirements and indicate an exceptional approach and understanding of the requirements. Qualifications contain multiple strengths and no deficiencies.
2
Good
Qualifications meet requirements and indicate a thorough approach and understanding of the requirements. Qualifications contain at least one strength and no deficiencies.
3
Acceptable
Qualifications meet requirements and indicate an adequate approach and understanding of the requirements. Qualifications contain no strengths or deficiencies.
4
Marginal
Qualifications do not clearly meet requirements and does not demonstrate an adequate approach and understanding of the requirements.
5
Unacceptable
Qualifications do not meet requirements and contains one or more deficiencies and is un-awardable.

Consensus Evaluation: State the reasons why the best rated qualifications were found to be superior to the others. What major evaluation factors were significant in your decision? What limitations of non-selected firms were significant? This paragraph should be two or three sentences, using information provided above, and should clearly explain your selection. This is a consensus report, and I should only receive one of these from the team. Your raw worksheets should be provided as well, but the Chair has the responsibility for combining all the comments into a coherent explanation of the SSEB’s selection.

image1.png image2.jpg

File details come from the government source that posted it. Updated .