542-19-113 - Bid Form - Reno Building 58- Updated.xlsx

XLSX spreadsheet 20 KB Posted

Attached to
AMENDMENT 0002 Z1DA--542-19-13 | Renovate Building 58 1st and 2nd Floors Domiciliary 100% Set-Aside for SDVOSB Contractors
Solicitation number
36C24423R0083_0002
Issued by

About this file

This document contains a bid form and amendment notice for a federal contract opportunity. The bid form provides a template for contractors to submit pricing details for renovations to Building 58 at a Veterans Affairs facility, including first and second floor renovations to divisions including general conditions, construction, HVAC, electrical, and plumbing. Contractors should include line item costs for materials, labor, equipment, overhead and fees. The related amendment notice indicates the opportunity is set aside for Service-Disabled Veteran-Owned Small Businesses, and provides additional context that the renovation work pertains to a domiciliary at the Veterans Affairs facility. The agency issuing this contract is the Veterans Health Administration within the Veterans Affairs Network 4.

View the file

Other files

File Type Posted
36C24423R0083 Amendment 0002 01162024.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Bid Form (auto calc)

Contractor Bid FormProject Name:Renovate Building 58 1st and 2nd Floors
Project Number:542-19-113
Contract Number:
Contractor Name:
Date:
To be filled out by the Contractor
DescriptionQtyUnitMatrl SubtotalLabor SubtotalEquipment SubtotalTotal
Divisions
NoGeneral Conditions
1Division 1
2Division 2
3Division 3
4Division 4
5Division 5
6Division 6
7Division 7
8Division 8
9Division 9
10Division 10
11Division 12
12Division 21
13Division 22
14Division 23
15Division 26
16Division 27
17Division 28
Base Bid Subtotal
Bid Deducts
Deduct 1
Deduct 2
Deduct 3
Deduct 4
Deduct 5
Bid Deducts Subtotal

Subtotal (Direct Costs)

Direct Overhead (first $20,000)10.0%
Direct Overhead (next $30,000)7.5%
Direct Overhead (over $50,000)5.0%
Direct Overhead Total

Subtotal (Direct + Overhead

Profit (first $20,000)10.0%
Profit (next $30,000)7.5%
Profit (over $50,000)5.0%
Profit Total

Insurance and Taxes %

Taxes on Material and Equipment %

Total Prime Contractor Cost