54-CA-04-12127420_Sweeping Proposal - Final (May 2024).pdf

PDF 2 MB Posted

Attached to
Sweeping of Median Jersey Barrier on I-95
Solicitation number
54-CA-04-12127420
Issued by
Johnston County, North Carolina

About this file

This document is a Request for Proposal (RFP) issued by the North Carolina Department of Transportation (NCDOT) for sweeping services on Interstate I-95 in Johnston County. The contract is for sweeping of the median jersey barrier on the northbound and southbound lanes of I-95 from milepost 97 to milepost 107 north of Selma. The estimated number of shoulder miles per cycle is 17.4 miles, with three cycles performed each year. The date of availability for this contract is June 1, 2024, and the completion date is May 31, 2025. The contract may be extended for two additional one-year periods at the discretion of NCDOT.

The contract is a multi-year maintenance contract with a maximum annual value of $5 million. Payment and performance bonds are not required. The contract will be awarded to the lowest responsible bidder without discrimination. The contractor must provide all labor, equipment, tools, materials, transportation, traffic control, and disposal necessary for the work. Routine sweeping and additional sweeping as directed by the engineer will be paid per shoulder mile swept.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

MAY 1, 2024 54-CA-04-12127420

STATE OF NORTH CAROLINA

DEPARTMENT OF TRANSPORTATION

REQUEST FOR PROPOSAL

DATE AND TIME OF BID OPENING: MAY 22, 2024 AT 2:00 P.M.

BID PROPOSAL NO.: 54-CA-04-12127420

WBS ELEMENT NO.: VARIOUS

COUNTY: DIVISION 4 – JOHNSTON COUNTY

ROUTE NO.: VARIOUS

TYPE OF WORK: SWEEPING OF MEDIAN JERSEY BARRIER ON I-95

DATE OF AVAILABILITY: JUNE 1, 2024

COMPLETION DATE: MAY 31, 2025

PRE-QUALIFICATION MANDATORY

PROPOSAL FOR THE CONSTRUCTION OF

CONTRACT NO. 54-CA-04-12127420 IN JOHNSTON COUNTY, NORTH CAROLINA

MAY 1, 2024

DEPARTMENT OF TRANSPORTATION

The Bidder has carefully examined the location of the proposed work to be known as BID NO 54-CA-04- 12127420; has carefully examined the plans and specifications, which are acknowledged to be part of the proposal, the special provisions, the proposal, the form of contract; and thoroughly understands the stipulations, requirements and provisions. The undersigned bidder agrees to be bound upon his execution of the bid and subsequent award to him by the Department of Transportation in accordance with this proposal.

Payment and performance bonds are not required on this project. The undersigned Bidder further agrees to provide all necessary machinery, tools, labor, and other means of construction; and to do all the work and to furnish all materials, except as otherwise noted, necessary to perform and complete the said contract in accordance with the 2024 Standard Specifications for Roads and Structures by the dates(s) specified in the Project Special Provisions and in accordance with the requirements of the Engineer, and at the unit or lump sum prices, as the case may be, for the various items given on the sheets contained herein.

The Bidder shall provide and furnish all the materials, machinery, implements, appliances and tools, and perform the work and required labor to construct and complete State Highway BID NO. 54-CA-04-12127420, for the unit or lump sum prices, as the case may be, bid by the Bidder in his bid and according to the proposal, plans, and specifications prepared by said Department, which proposal, plans, and specifications show the details covering this project, and hereby become a part of this contract.

The published volume entitled North Carolina Department of Transportation, Raleigh, Standard Specifications for Roads and Structures, January 2024 with all amendments and supplements thereto, is by reference incorporated into and made a part of this contract; that, except as herein modified, all the construction and work included in this contract is to be done in accordance with the specifications contained in said volume, and amendments and supplements thereto, under the direction of the Engineer.

If the proposal is accepted and the award is made, the contract is valid only when signed either by the Contract Officer or such other person as may be designated by the Secretary to sign for the Department of Transportation. The conditions and provisions herein cannot be changed except over the signature of the said Contract Officer or Division Engineer.

The quantities shown in the itemized proposal for the project are considered to be approximate only and are given as the basis for comparison of bids. The Department of Transportation may increase or decrease the quantity of any item or portion of the work as may be deemed necessary or expedient.

An increase or decrease in the quantity of an item will not be regarded as sufficient ground for an increase or decrease in the unit prices, nor in the time allowed for the completion of the work, except as provided for the contract.

TABLE OF CONTENTS

Project Special Provisions General 1

Project Special Provisions - Sweeping 6

Work Zone Traffic Control 10

Standard Special Provisions 23

Instructions to Bidders 45

Delivery of Bids 46

PROJECT SPECIAL PROVISIONS GENERAL

GENERAL

This contract is for sweeping of the median jersey barrier on Interstate I-95 northbound and southbound lanes from milepost 97 to milepost 107 north of Selma in Johnston County.

All materials and workmanship shall be in accordance with the following: The Project Special Provisions, Project Standard Provisions, most current Standard Special Provisions, Manual of Uniform Traffic Control Devices (MUTCD), Provisions contained in the applicable Sections of the North Carolina Department of Transportation’s Standard Specifications for Roads and Structures and Drawings contained in the applicable sections of the North Carolina Department of Transportation’s Roadway Standard Drawings shall apply.

The published volume entitled North Carolina Department of Transportation, Raleigh, Standard Specifications for Roads and Structures, with all amendments and supplements thereto, is by reference incorporated into and made a part of this contract; that, except as herein modified, all the construction and work included in the contract is to be done in accordance with the specifications contained in said volume, and amendments and supplements thereto, under the direction of the Engineer.

The Contractor shall keep himself fully informed of all Federal, State and local laws, ordinances, and regulations, and shall comply with the provisions of Section 107 of the Standard Specifications for Roads and Structures.

PRE-QUALIFICATION

Any firm that wishes to bid as a prime contractor shall be prequalified as a Bidder or PO Prime Contractor prior to submitting a bid. Information regarding prequalification can be found at:

https://connect.ncdot.gov/business/Prequal/Pages/default.aspx.

In addition, the prime contractor and/or subcontractor(s) shall be prequalified in the work code(s) for which they identify as work items in the prime contractor’s construction progress schedule that they will complete themselves. Any contractor identified as working outside their expertise may be considered in default of contract.

INTERESTED PARTIES LIST NOT REQUIRED:

(6-21-22)(Rev. 2-20-24) 102 SP1 G02

Revise the Standard Specifications as follows:

The Interested Parties List sign up process is not applicable to this contract.

Page 1-13, Article 102-3 PROPOSALS AND INTERESTED PARTIES LIST, lines 12-15, delete the first paragraph.

Page 1-14, Article 102-8 PREPARATION AND SUBMISSION OF BIDS, lines 43-44, delete the first sentence of the first paragraph.

BOND REQUIREMENTS – No Bonds Required (6-1-16)(Rev. 1-16-24) SPD 01-420B

The provisions of Articles 102-10 and 103-7 of the Standard Specifications are waived for this project. No bonds required.

https://connect.ncdot.gov/business/Prequal/Pages/default.aspx

CONTRACT TIME

The date of availability for this contract is June 1, 2024.

No work will be permitted and no purchase order will be issued until all required bonds and prerequisite conditions and certifications have been satisfied.

The completion date for this contract is May 31, 2025. The Contractor shall submit his/her bid for one (1) year.

TERM OF CONTRACT

This contract shall be effective for one (1) contract period. The contract period will last from the availability date to the completion date, as noted above.

At the sole option and discretion of the contracting agency, North Carolina Department of Transportation (NCDOT), and upon written notification, this contract may be extended for two (2) additional periods, one (1) year each, unless a shorter time is mutually agreed upon by the parties, (maximum of three years total). Extensions for additional term(s) are not guaranteed. Each line item bid price will be increased for each one (1) year extension by two (2) percent of the current price. No changes in the terms, conditions, etc. of this contract will be made when an extension to the contract is implemented. Including all renewals, the total contract expenditures shall not exceed the maximum purchase order value of $5 million.

The Contractor will be notified within sixty (60) days before expiration of the contract if NCDOT chooses not to offer an extension. Upon receipt of notification, the Contractor must notify the Engineer in writing within thirty (30) days the contract completion date of his/her acceptance or rejection of this offer. Failure on the part of the Contractor to reply will be considered a rejection of the contract extension. NCDOT is under no obligation to renew this contract beyond its original one (1) year period.

INTERMEDIATE CONTRACT TIME NUMBER 1 AND LIQUIDATED DAMAGES:

The Contractor shall complete the required work of installing, maintaining, and removing the traffic control devices for lane closures and restoring traffic to the existing traffic pattern. The Contractor shall not close or narrow a lane of traffic on I- 95 during the following time restrictions:

DAY AND TIME RESTRICTIONS

MONDAY TO THURSDAY – 7:00 a.m. – 8:00 p.m.

FRIDAY TO SUNDAY – 7:00 a.m. – 10:00 p.m.

In addition, the Contractor shall not close or narrow a lane of traffic on I-95, detain and/or alter the traffic flow on or during holidays, holiday weekends, special events, or any other time when traffic is unusually heavy, including the following schedules:

HOLIDAY AND HOLIDAY WEEKEND LANE CLOSURE RESTRICTIONS

1. For unexpected occurrence that creates unusually high traffic volumes, as directed by the Engineer.

2. For New Year’s Day, between the hours of 6:30 a.m. December 31st and 8:00 p.m. January 2nd. If New Year’s Day is on a Friday, Saturday, Sunday or Monday, then until 8:00 p.m. the following Tuesday.

3. For Easter, between the hours of 6:30 a.m. Thursday and 8:00 p.m. Tuesday.

4. For Memorial Day, between the hours of 6:30 a.m. Friday and 8:00 p.m. Wednesday.

5. For Independence Day, between the hours of 6:30 a.m. the Friday before the week of Independence Day and 8:00 p.m. the following Monday after the week of Independence Day.

6. For Labor Day, between the hours of 6:30 a.m. Friday and 8:00 p.m. Wednesday.

7. For Thanksgiving Day, between the hours of 6:30 a.m. Tuesday and 8:00 p.m. Monday.

8. For Christmas, between the hours of 6:30 a.m. the Friday before the week of Christmas Day and 8:00 p.m. the following Tuesday after the week of Christmas.

Holidays and holiday weekends shall include New Year's, Easter, Memorial Day, Independence Day, Labor Day, Thanksgiving, and Christmas. The Contractor shall schedule his work so that lane closures will not be required during these periods, unless otherwise directed by the Engineer.

The time of availability for this intermediate contract work shall be the time the Contractor begins to install all traffic control devices for lane closures according to the time restrictions listed herein.

The completion time for this intermediate contract work shall be the time the Contractor is required to complete the removal of all traffic control devices for lane closures according to the time restrictions stated above and place traffic in the existing traffic pattern.

The liquidated damages are Five Hundred Dollars ($500.00) per hour.

CONTRACT BID QUANTITIES

The quantities shown in the itemized proposal for the project are considered to be approximate only and are given as the basis for comparison of bids. The Department of Transportation may increase or decrease the quantity of any item or portion of the work as may be deemed necessary or expedient.

MULTI-YEAR MAINTENANCE CONTRACTS:

(4-20-21) (Rev. 4-19-22) SP1 G76

This contract is a multi-year maintenance contract let pursuant to the provisions of N.C. General Statute §136-28.1(b). In accordance with N.C. General Statute §136-28.1(b), an award in a maintenance contract may be for an amount less but shall not exceed $5,000,000 per year. No payments in excess of this amount will be disbursed, in accordance with the Statute.

AWARD OF CONTRACT

“The North Carolina Department of Transportation, in accordance with the provisions of Title VI of the Civil Rights Act of 1964 (78 Stat. 252) and the Regulations of the Department of Transportation (49 C.F.R., Part 21), issued pursuant to such act, hereby notifies all bidders that it will affirmatively insure that the contract entered into pursuant to this advertisement will be awarded to the lowest responsible bidder without discrimination on the ground of race, color, or national origin”.

All awards are final and are not subject to further review. Any formal complaints concerning awards should be made in writing to the Engineer.

INSURANCE

The Contractor shall maintain all legally required insurance coverage, including without limitation, worker’s compensation and vehicle liability, in the amounts required by law. Refer to Section 107-15 in the “Standard

Specifications for Roads and Structures” for additional information.

PROSECUTION OF WORK

The Contractor will be required to prosecute the work in a continuous and uninterrupted manner from the time he begins the work until completion and final acceptance of the project. The Contractor will not be permitted to suspend his operations except for reasons beyond his control or except where the Engineer has authorized a suspension of the Contractor's operations in writing.

In the event that the Contractor's operations are suspended in violation of the above provisions, the sum of Two Hundred and Fifty Dollars ($250.00) will be charged the Contractor for each and every calendar day that such suspension takes place. The said amount is hereby agreed upon as liquidated damages due to extra engineering and maintenance costs and due to increased public hazard resulting from a suspension of the work. Liquidated damages chargeable due to suspension of the work will be additional to any liquidated damages that may become chargeable due to failure to complete the work on time.

POSTED WEIGHT LIMITS

The Contractor's attention is directed to Article 105-15 of the Standard Specifications and to the fact that various Primary and Secondary Roads and bridges may be posted with weight limits less than the legal limit. Do not exceed the posted weight limits in transporting materials and/or equipment to the projects. Make a thorough examination of all projects and haul routes and be prepared to discuss them at the Preconstruction Conference.

NO MAJOR CONTRACT ITEMS

None of the items included in this contract will be major items.

NO SPECIALTY ITEMS:

(7-1-95)(Rev. 1-16-24) 108-6 SP1 G34

None of the items included in this contract will be specialty items (see Article 108-6 of the Standard Specifications).

RESTRICTIONS ON ITS EQUIPMENT AND SERVICES:

(11-17-20) SP01 G090

All telecommunications, video or other ITS equipment or services installed or utilized on this project must be in conformance with UNIFORM ADMINISTRATIVE REQUIREMENTS, COST PRINCIPLES, AND AUDIT REQUIREMENTS FOR FEDERAL AWARDS 2 CFR, § 200.216 Prohibition on certain telecommunications and video surveillance services or equipment.

USE OF UNMANNED AIRCRAFT SYSTEM (UAS):

(8-20-19) SP01 G092

The Contractor shall adhere to all Federal, State and Local regulations and guidelines for the use of Unmanned Aircraft Systems (UAS). This includes but is not limited to US 14 CFR Part 107 Small UAS Rule, NC GS 15A-300.2 Regulation of launch and recovery sites, NC GS 63-95 Training required for the operation of unmanned aircraft systems, NC GS 63-96 Permit required for commercial operation of unmanned aircraft system, and NCDOT UAS Policy. The required operator certifications include possessing a current Federal Aviation Administration (FAA) Remote Pilot Certificate, a NC UAS Operator Permit as well as operating a UAS registered with the FAA.

Prior to beginning operations, the Contractor shall complete the NCDOT UAS – Flight Operation Approval Form and submit it to the Engineer for approval. All UAS operations shall be approved by the Engineer prior to beginning the operations.

All contractors or subcontractors operating UAS shall have UAS specific general liability insurance to cover all operations under this contract.

The use of UAS is at the Contractor’s discretion. No measurement or payment will be made for the use of UAS. In the event that the Department directs the Contractor to utilize UAS, payment will be in accordance with Article 104-7 Extra Work.

EQUIPMENT IDLING GUIDELINES:

Exercise reduced fuel consumption and reduced equipment emissions during the construction of all work associated with this contract. Employees engaged in the construction of this project should turn off vehicles when stopped for more than thirty (30) minutes and off-highway equipment should idle no longer than fifteen (15) consecutive minutes.

These guidelines for turning off vehicles and equipment when idling do not apply to:

1. Idling when queuing.

2. Idling to verify the vehicle is in safe operating condition.

3. Idling for testing, servicing, repairing or diagnostic purposes.

4. Idling necessary to accomplish work for which the vehicle was designed (such as operating a crane, mixing concrete, etc.).

5. Idling required to bring the machine system to operating temperature.

6. Emergency vehicles, utility company, construction, and maintenance vehicles where the engines must run to perform needed work.

7. Idling to ensure safe operation of the vehicle.

8. Idling when the propulsion engine is providing auxiliary power for other than heating or air conditioning. (such as hydraulic systems for pavers)

9. When specific traffic, safety, or emergency situations arise.

10. If the ambient temperature is less than 32 degrees Fahrenheit. Limited idling to provide for the safety of vehicle occupants (e.g. to run the heater).

11. If the ambient temperature is greater than 90 degrees Fahrenheit. Limited idling to provide for the safety of vehicle occupants of off-highway equipment (e.g. to run the air conditioning) no more than 30 minutes.

12. Diesel powered vehicles may idle for up to 30 minutes to minimize restart problems.

Any vehicle, truck, or equipment in which the primary source of fuel is natural gas or electricity is exempt from the idling limitations set forth in this special provision.

OUTSOURCING OUTSIDE THE USA

All work on consultant contracts, services contracts, and construction contracts shall be performed in the United States of America. No work shall be outsourced outside of the United States of America.

Outsourcing for the purpose of this provision is defined as the practice of subcontracting labor, work, services, staffing, or personnel to entities located outside of the United States.

The North Carolina Secretary of Transportation shall approve exceptions to this provision in writing.

PROJECT SPECIAL PROVISIONS - SWEEPING

SWEEPING

Any material including, but not limited to, loose aggregates, undesirable grasses and other accumulated material or foreign matter not intentionally attached or bonded to the shoulder pavement surface and not required for the operation or maintenance of the highway shall be removed by sweeping, cleaning, vacuuming, and disposing of the material. Any trash at the transition from barrier wall, guardrail, cable rail, to grass areas must be removed by hand and/or mechanical means.

This includes all areas swept.

The estimated number of shoulder miles per cycle of Routine Sweeping is 17.4 miles. Three (3) cycles will be performed each year. When all sections are completed and accepted, a cycle is completed. This contract is for sweeping of the median jersey barrier on Interstate I-95 northbound and southbound lanes from milepost 97 to milepost 107 north of Selma in Johnston County.

The number of cycles and sweeping shoulder mileage is an estimate and may be increased or decreased by written authorization of the Engineer and/or his representative. No claims may be filed due to reduction of quantities. No price adjustments will be made due to reduction of quantities.

The work shall include furnishing of all labor, equipment, tools, materials, transportation, traffic control, and disposal necessary for the prosecution and completion of the work.

SWEEPING - PROSECUTION OF WORK

Notification of need for sweeping roads will be made by the Engineer and may be made by email, telephone call, or fax.

Any of the above methods shall be considered sufficient. Notification will be made a minimum of 7 days prior to need.

The Engineer will provide the Contractor with a start date, start time and location. Should the Contractor fail to begin work within seven calendar days of the start date provided by the Engineer, the Contractor will be found in default and the contract cancelled. Default may lead to Contractor being removed from the “Directory of Transportation Firms” for a minimum of one year.

ROUTINE SWEEPING

This item consists of the sweeping, cleaning and removal of any foreign matter by brooming, suction or other approved method from designated pavement areas, paved shoulders adjacent to the travel lanes, paved shoulders next to barrier walls, curb and gutter, ramps, gore areas, bridges and transitions from hard surfaces to grass areas. Items too large for removal by the mechanical means mentioned above shall be removed by other mechanical methods or by hand.

The designated area is a swath adjacent to a barrier wall or the outside edge of the paved shoulder. A swath begins at the barrier wall, curb, outside edge of paved shoulder or the bridge curb/rail and shall be a minimum of ten (10) feet in width.

The sweeping operation shall not cause material to be thrown into a travel lane and at no time shall material be swept across a travel lane.

Additional Sweeping This item consists of the sweeping, cleaning and removal of any material from adjacent roadways, for short distances, intersecting the system roadways as directed by the Engineer between sunset and sunrise (Night) or between sunrise and sunset (Day).

Equipment Requirements The Contractor shall furnish equipment of sufficient type, capacity, and quantity to safely and efficiently perform the sweeping work. The Contractor shall display the company name on each piece of equipment.

The Contractor shall demonstrate to the satisfaction of the Engineer that sweeping equipment to be used in the work is in good working condition and suitable for performing the required work. Sweepers used in the cleaning operation may be brush/vacuum, mechanical, or regenerative air, or may be a combination of industrial types.

All sweepers shall have a minimum capacity of (3) three cubic yards and shall be equipped with adequate water systems for dust control. The Contractor shall be required to provide his own source of water. All sweepers shall be equipped with dual steering and dual brooms. All such equipment is subject to inspection and final approval by the Engineer.

Approval may require an onsite demonstration of the capability of any proposed equipment.

Hazardous, Contaminated and/or Toxic Materials When the Contractor’s operations encounter or expose any abnormal condition which may indicate the presence of hazardous, contaminated, and/or toxic material, such operations shall be discontinued in the vicinity of the abnormal condition and the Engineer shall be notified immediately.

Removal and Disposal of Debris Removal and disposal of all materials shall be the responsibility of the Contractor. Disposal of the materials shall be made in either a public or private sanitary landfill approved and permitted by the State of North Carolina Solid Waste Management Division. All costs involved with the disposal of material shall be considered incidental to the unit prices included in the contract and shall be included at no additional cost.

A sweeping cycle will not be considered to be completed and accepted by the Department until the original “DUMPING TICKET” issued to the Contractor for disposal of materials is presented to the Department’s inspector.

Stockpiling of debris on the right of way shall not be permitted and all work will be suspended if contractor is charged with illegal dumping.

THIS CONTRACT WILL BE TERMINATED IMMEDIATELY IF THE CONTRACTOR IS FOUND GUILTY

OF ILLEGAL DUMPING.

Quality Completed work areas shall be clean and free of all accumulated debris immediately after sweeping as determined by the Engineer’s inspector.

The Contractor shall correct any deficiency no later than seventy-two (72) hours following receipt of such notice.

The Department of Transportation’s inspector will maintain a daily log of completed work and will verify completion of the Contractor’s work with the Contractor upon completion of a cycle.

In the event of a road rehabilitation or improvement project where cleaning is scheduled, that portion of cleaning cycle will be deleted from the appropriate list at the direction of the Department. The section(s) of road(s) deleted may be re-entered at the first scheduled cycle following completion of the road rehabilitation or improvement project.

Prior to re-entering any such road (rehabilitation or improvement project) into the cycle, Department personnel will make a field inspection with the Contractor to determine what cleaning will be required by others. In no event will the Department allow the sweeping contractor to perform initial cleaning of a re-entered road following a rehabilitation or improvement project.

Inspection All work will be subject to inspection by the Engineer at any time. The Engineer or designated representative will make periodic (next day) inspections of the completed work. It shall be the responsibility of the Contractor to keep the

Engineer informed of his/her proposed work plan and to notify the Engineer 48 hours before work is started and within 24 hours after work is completed. It shall also be the responsibility of the Contractor to submit written reports of work accomplished on a frequency to be determined by the Engineer.

It is intended that the work will be completed in a professional manner. These specifications and special provisions are result oriented. Although the main purpose of this contract is to accomplish road-sweeping operations on State roadways, the Contractor will encounter objects larger than what a vacuum or mechanical sweeper can remove.

The Contractor shall remove vehicle parts, tires, tire parts, large stones, boxes, tree limbs, wood, cable, etc. by hand if vacuum or mechanical means are unsuccessful.

Method of Measurement and Basis of Payment The quantity of routine sweeping to be paid for will be the actual number of shoulder miles swept. Highway mileage will be determined from NCDOT county maintenance maps, except in the case of dispute or obvious error, when actual mileage shall be measured. Normally, one map mile of two-lane undivided highway will equal two (2) shoulder miles, and one map mile of multi-lane divided highways with grassed median or barrier will equal four (4) shoulder miles. It is understood that during the course of the contract, routes may be added to or deleted from the contract. It will be the responsibility of the Contractor to sweep or not sweep such routes as directed by the Engineer.

All work or items necessary to complete the work other than those listed on the “Bid Proposal Form” will be considered incidental in nature and no additional compensation shall be made.

The quantity of Additional Sweeping to be paid for will be the number of shoulder miles, measured along the surface of the ground which has been swept at the direction of the Engineer.

The Contractor shall furnish all labor, equipment, tools, materials, transportation and traffic control necessary for the prosecution and completion of the work.

Payment will be made under:

Pay Item Unit

Routine Sweeping SHM Additional Sweeping SHM

EROSION CONTROL

The Contractor shall exercise every reasonable precaution throughout the life of the project to prevent erosion and siltation.

BASIS OF PAYMENT:

The quantities contained herein are estimated only and the quantity to be paid for shall be the actual quantities which were used on the project. All work items, other than those listed on the Bid Form contained in the Contract Proposal, necessary to complete this work will be considered incidental in nature an no further compensation will be made.

The Contractor will submit a request for payment on an interval approved by the Engineer. Compensation for all pay items shall be in accordance with the Standard Specifications. The amount of the payment will be based on the work accomplished and accepted on the last day of the approved pay period.

Requests for payment can be made by submitting an original invoice and an original Subcontractor Payment Information form (DBE-IS), which includes all subcontractor payments. The form shall be completely and legibly filled out with all appropriate information supplied and shall be signed by an authorized representative of the Contractor.

The invoice for work performed shall contain the following:

1) Company Name and Address

2) DUE UPON REQUEST

3) REMIT TO address (place REMIT TO above the address)

The invoice shall also be subdivided by worksite location and include at each location of work:

1) General location of work site

2) Dates worked at location, including the start and end dates

3) Quantity of line items, including Unit of Measurement, per the contract

4) Sub-total of cost at each location of work

If the request for payment is made by Contractor’s Invoice, the Invoice shall be submitted to: Bryant Adams, Division 4 Roadside Environmental Engineer.

NCDOT

Attn: Bryant Adams, Division 4 Roadside Environmental Engineer

PO Box 3165 Wilson, NC 27895

FAXED INVOICES WILL NOT BE PROCESSED

All invoice items and unit costs shall correspond to contract pay items. In the event of error or discrepancy in items or unit costs, the Department may return the invoice to the contractor for correction. When the Engineering Specialist has determined the quantities submitted for payment by the Contractor are correct, the invoice will be processed for payment.

Invoices must be "electronically scanned" and the image is transmitted to the Purchasing Unit to verify payment. To avoid confusion and delay of payments, the invoice should be positively identified and associated with the Purchase Order by including the Purchase Order Number, an invoice sequence number and the invoice date on the Invoice.

TC-1

Johnston County

WORK ZONE TRAFFIC CONTROL

Project Special Provisions

Table of Contents

Special Provision Page

Work Zone Traffic Control for Interstate/Freeway Resurfacing TC-2

Connected Lane Closure System TC-10

04/25/2024

TC-2

WORK ZONE TRAFFIC CONTROL FOR INTERSTATE /

FREEWAY SHOULDER OPERATIONS

General Requirements

This Provision is intended for interstate / freeway shoulder operation projects. In the event, the day and time restrictions allow for daytime work activities the Sequential Flashing Warning Lights are to be omitted during daylight hours. However, the Connected Lane Closure Devices will be required at all times as described below.

Maintain traffic in accordance with Divisions 10, 11 and 12 of the NCDOT Standard Specifications and the following provisions:

Install Work Zone Advance Warning Signs in accordance with the attached drawing prior to beginning any other work.

When personnel and/or equipment are working on the shoulder adjacent to a divided facility and within 10 feet of an open travel lane, close the nearest open travel lane using Standard Drawing

1101.02 of the NCDOT Roadway Standard Drawings.

When personnel and/or equipment are working within a lane of travel of a divided facility, close the lane using Standard Drawing 1101.02 of the NCDOT Roadway Standard Drawings or as directed by the Engineer. Conduct the work so that all personnel and/or equipment remain within the closed travel lane. Perform work only when weather and visibility conditions allow safe operations as directed by the Engineer.

1. Time Restrictions for Lane Closure and Road Closure Activities

All lane closure and road closure activities shall be performed in compliance with the day and time restrictions listed and defined in this Contract.

Any activities performed outside of these requirements will be subject to liquidated damages unless approved by the Engineer prior to beginning the activity.

The Contractor may place/pre-stage all required signs and traffic control devices necessary for lane closures prior to the closure time as approved by the Engineer. However, flashing arrow boards and changeable message signs shall not indicate lane closure information until 30 minutes or less prior to the installation of the lane closure taper. Allowable pre-staging times are 1 hour for a single lane closure and 2 hours for double and triple lane closures. The travel lane(s) are to be closed at the prescribed times defined in this Contract. When available, law enforcement should be onsite to shadow workers during pre-staging activities.

TC-3

For removal, the lane(s) must be reopened in compliance with the times defined in this Contract.

It is acceptable to remove the signs and traffic control devices from the shoulder/staging area after the lane(s) are reopened to traffic. All electronic lane closure messages and flashing arrow displays shall be off once lanes are opened. When available, law enforcement should remain on the project while workers remove and secure their signs and devices.

2. Connected Lane Closure Devices

Furnish and install Connected Lane Closure Devices that transmit the location of the lane closure to navigational companies and the Statewide Transportation Operations Center (STOC).

3. Sequential Flashing Warning Lights

Provide the following for nighttime work activities:

Furnish and install Sequential Flashing Warning Lights on drums used for merging tapers to assist motorists in determining which direction to merge and to decrease late lane merging.

Refer to Section 1140 of the NCDOT Standard Specifications.

4. Law Enforcement

Use two (2) off duty, uniformed law enforcement officers and official law enforcement vehicles, equipped with blue lights during lane closure operations and one (1) additional law enforcement officer for each ramp/loop closure when both operations occur simultaneously.

Use law enforcement officers to assist in the shadowing of workers during the installation and during the removal of lane closures.

Law enforcement vehicles shall not be parked within the buffer space or be used to block an active travel lane at any time, including while installing or removing lane closure tapers. When possible, position one law enforcement officer downstream of the other to conduct enforcement operations.

When space is confined, conduct enforcement outside of the lane closure area.

Temporary Traffic Control (TTC)

Refer to Standard Drawing No. 1101.02, 1101.11, 1110.01, 1110.02, 1115.01, 1130.01, 1135.01, 1165.01, and 1180.01 of the NCDOT Roadway Standard Drawings when closing a lane of travel in a stationary work zone.

Drums are recommended for all lane closure operations occurring at night. However, if skinny drums are used at night, they shall be placed every 80’ in the tangent sections of lane closure operations. Skinny drums shall not be used for upstream or shifting tapers.

TC-4

When covering any signs, use an opaque material that prevents reading of the sign at night by a driver using high beam headlights. Use material which does not damage the sign sheeting.

Adhesives of any kind, including tape, shall not be applied to the sign face.

Refer to Roadway Standard Drawing No. 1101.02, Sheets 10 and 11, of the NCDOT Roadway

Standard Drawings for operations affecting ramps or loops unless otherwise approved to be closed by the Engineer. If approved, see attached drawing for typical placement of devices and signing for the detour route. All items shall be compensated for based on the unit bid price for the respective item.

Refer to Roadway Standard Drawing No. 1101.03, Sheet 7, of the NCDOT Roadway Standard

Drawings for a closure of the interstate/freeway with traffic detoured via interchange ramps for items such as minor bridge and approach slab rehabilitation. Use flaggers or law enforcement to direct traffic at ramp terminals as directed by the Engineer.

Refer to Roadway Standard Drawing No. 1101.02, Sheet 15 or 16, of the NCDOT Roadway

Standard Drawings for utilizing a moving operation. A minimum speed of 3 mph shall be maintained at all times with no stops that narrow or close a lane of travel. If the moving operation is progressing slower than 3 mph at any time, install a lane closure. All traffic control devices for this operation are considered incidental to the pay items for pavement markings and markers.

Traffic Operations

1. Project Requirements

Failure to comply with the following requirements will result in a suspension of all other operations:

A. Before working on ANY MAP, the Contractor shall submit a written construction sequence for traffic control and construction lighting for ALL MAPS to the Engineer at the first pre-construction meeting and the sequence must be approved before closing a lane of traffic.

B. The standard active work area is 2 miles. This is defined as the distance of Resurfacing

Operations taking place in a single work period. However, the maximum allowed lane closure distance is 5 miles. Approval by the Engineer is required before closing more than

2 miles of Interstate to ensure the Contractor has the equipment and labor force to actively pursue the work.

C. Obtain written approval of the Engineer before working in more than one location or setting up additional lane closures.

TC-5

D. The Contractor on this and any adjacent projects, or subcontractors working within this project shall coordinate lane closure location, type, and direction with the Engineer to best maintain lane continuity through the limits of this and adjacent projects.

E. Operate equipment and conduct operations in the same direction as the flow of traffic.

Maintain vehicular access in accordance with Article 1101-05 of the NCDOT Standard

Specifications.

F. Provide appropriate construction lighting in accordance with Section 1413 of the NCDOT

Standard Specifications.

2. Work Zone Signing

A. Description

Install advance/general warning work zone signs according to the attached drawings prior to beginning work.

Install and maintain signing in accordance with Divisions 11 and 12 of the NCDOT

Standard Specifications.

B. Installation

All stationary Work Zone Advance/General Warning signs require notification to existing

Utility owners per Article 105-8 of the NCDOT Standard Specifications and within 3 to 12 full working days prior to installation.

Install all Work Zone Advance/General Warning signs before beginning work on a particular map. If signs are installed more than seven (7) calendar days prior to the beginning of work on a particular map, cover the signs until the work begins. Install each

Work Zone Advance/General Warning sign separately and not on the same post or stand with any other sign except where an advisory speed plate or directional arrow is used.

All sign locations to be verified by the Engineer prior to installation. Once the signs have been installed and accepted, any sign relocations requested by the Department will be compensated in accordance with Article 104-7. Any additional signs other than the ones required in this provision or attached drawings will be compensated in accordance with

Article 104-7.

If there is a period of construction inactivity longer than 14 calendar days, remove or cover

Work Zone Advance/General Warning signs. Uncover Work Zone Advance/General

Warning signs no more than 7 calendar days before work resumes.

TC-6

All other operations may be suspended upon failure to comply with the above requirements. Such suspended operations would not be resumed until the above requirements are fulfilled.

C. Sign Removal

Once Maps on the project are substantially completed, it is acceptable to remove the stationary work zone signs on those Maps in lieu of waiting until all of the Maps are completed on the project. Any remaining punch list items requiring traffic control are to be completed using portable work zone signing with compensation covered in the contract unit price for the required traffic control items.

Stationary Work Zone Sign removal is a condition of final project acceptance.

D. Lane Closure Work Zone Signs

Install any required lane closure signing needed during the life of the project in accordance with Standard Drawing No. 1101.02, 1101.11, and 1110.02 of the NCDOT Roadway

Standard Drawings.

Measurement and Payment

The lane closure distance is measured from the end of the merge taper where traffic is completely in the remaining open lane(s) to the last channelizing device closing the lane. For multiple lane closures, the lane closure distance is measured from the end of the first merge taper to the last channelizing device closing the lanes.

Work Zone Signs (Stationary) will be measured and paid in accordance with Section 1110-4 of the

Standard Specifications.

Single Lane Closure will be measured and paid as the actual number of single stationary lane closures satisfactorily installed for required operations as shown in Roadway Standard Drawing

1101.02, Sheets 4, 5, 6, 10 & 11. All labor, traffic control devices, and signing for Single Lane

Closure, up to 5 miles, as shown in these Roadway Standard Drawings are paid under this item.

Ramp/Loop Closure will be measured and paid as the actual number of total ramp/loop closures and detours satisfactorily installed for ramp/loop paving and all other required operations, as shown on Roadway Standard Drawing 1101.02, Sheets 12 & 13, and the Short Term Closure and

Detour of Interstate/Freeway Ramps detail drawing. All labor, traffic control devices and signing required for re-routing traffic as shown on the Roadway Standard Drawing and the Short Term

Closure and Detour of Interstate/Freeway Ramps detail drawing are paid under this item. In the

TC-7

event two separate ramps are closed at the same time, they will be measured individually and paid on a per each basis.

Law Enforcement will be measured and paid in accordance with Section 1190-3 of the Standard

Specifications.

Sequential Flashing Warning Lights will be measured and paid in accordance with Section 1140-

5 of the Standard Specifications.

Connected Lane Closure Devices will be paid separately in accordance with the special provision found elsewhere in this contract.

Payment will be made under:

Pay Item Pay Unit

Work Zone Signs (Stationary) SF

Single Lane Closure EA

Ramp/Loop Closures EA

Law Enforcement HR

Sequential Flashing Warning Lights EA

TC-8

TC-9

TC-10

CONNECTED LANE CLOSURE SYSTEM:

(10/29/2018) (Rev. 2/7/2023)

Description

Furnish, install, operate, maintain, relocate, and remove connected lane closure devices for use on Interstate and Freeway lane closures. The purpose of a Connected Lane Closure System

(CLCS) is to transmit real-time information of active lane closures on Interstate and Freeways for use by the State Transportation Operations Center (STOC), Regional Transportation

Management Centers (TMCs), and 511 systems; and for third party vendors (Mapping, Navigation, Connected Vehicles, etc.) to identify and provide advanced notification of active lane closures to approaching motorists.

Materials

The CLCS shall be designed and built to transmit the location of the real-time lane closure from the START to the END such that the full length of the lane closure is known. The information transmitted shall be approved by each entity, conform to the current version of the USDOT’s

Work Zone Data Exchange (WZDx) specification and be publicly available to NCDOT approved consumers of this data. More information about the WZDx specification can be found at

(https://www.transportation.gov/av/data/wzdx).

The connected lane closure devices shall be capable of wireless communication.

The initial connected device representing the START location shall be designed and attached to the flashing arrow board in such a manner that it is only activated when either the left or right arrows are displayed, not when the flashing arrow board is operated in caution mode. When the lane closure is removed, and the flashing arrow board is turned off or changed to caution mode, the connected device shall automatically turn off simultaneously and its location shall no longer be transmitted. The device shall also have a visual indicator (e.g. an illuminated light either steady burn or flash) to allow clear, visual proof the device is powered on, has established communication and is transmitting. The visual indicator shall not be located such that it potentially creates confusion to the motorists.

A second connected device representing the END location shall be installed on a crashworthy

(e.g. NCHRP 350 or MASH-16) traffic control device. It shall have an easily accessible power switch and a small status indicator light mounted such that it is visible when passing by in a vehicle at operating speed. When switched to the ON position, the light shall indicate the device has established communication and is transmitting. The light may be either steady burn or flashing and shall not exceed one (1) inch in diameter. This second connected device representing the END location may be created virtually by a connected flashing arrow board.

https://www.transportation.gov/av/data/wzdx

TC-11

The devices shall have battery life sufficient to maintain operation for the duration of the lane closure or have the ability to be recharged without deactivating the device or impacting the location of the lane closure information transmitted to the external parties. All costs associated with charging are incidental and shall be included in the cost of the system.

Construction Methods

Connected lane closure devices shall be used on all lane closures on freeways and interstates throughout the project.

A START and END location shall be established by the installed system per grouping of lane closures (single, double, or triple); one attached and wired into the flashing arrow board at the beginning of the first taper. The other at the last traffic control device at the end of the lane closure(s) if the END location cannot be created virtually. Supplemental flashing arrow boards in advance of the first lane closure taper or flashing arrow boards in subsequent lane closures (for double and triple lane closures) shall not be transmitting if equipped with connected devices.

Subsequent lane closures occurring downstream of where all lanes have been reopened and lane closures in the opposite direction of travel will require additional connected devices.

The second connected lane closure device shall be manually turned ON and OFF by crews installing and removing the lane closure unless the device can be controlled or virtually created by the initial connected device. The unit shall be turned on immediately upon installation of the lane closure and turned off immediately upon removal of the lane closure.

Once installed, the Contractor shall verify that the connected lane closure devices are transmitting information prior to leaving the device unattended and re-verify transmission every

72 hours for long-term installations.

Technical Requirements

The connected devices shall run continuously during any active lane closures for the length of the contract.

The GPS within the connected devices shall have a horizontal accuracy of 10 feet, 95% of the time.

The system shall send real-time alerts to designated NCDOT personnel when the flashing arrow mode or direction is changed. The alert shall be within 5 minutes of the actual change.

The connected device information, including the location, transmission status, and battery status shall be transmitted within five (5) minutes of initiation and updated every thirty (30) minutes to the central server.

TC-12

The contractor shall provide multiple logins to a secured server (e.g. vendor dashboard) that provides real-time and historic status. The status must be exportable, within 24 hours, in .csv or

.xls format and include data for date, display direction, time on, time off, and GPS coordinates.

The historic logged information shall be available to CLCS users 24/7/365 during the length of the entire construction phase. All logged information from the project shall be retained by the

Contractor and be available to the NCDOT for at least one (1) year after the contract ends.

Information shall include timestamps, device name, flashing arrow mode, communication status, battery voltage and GPS location.

The battery voltage shall be collected at least once an hour. The information shall be stored and available for troubleshooting. To prevent communication loss, the system shall transmit an alert via E-mail or SMS to designated personnel if the battery voltage of a device is under a specified threshold.

The CLCS shall provide an immediate electronic alert (e.g. via E-mail or SMS) to the Traffic

Control Supervisor or other designated individual if a device is not transmitting its position for a period of 30 minutes or more.

The outputs from the connected device on the arrow board and the downstream connected (or virtual) device at the end of the lane closure shall be easily identifiable as a single system, either by sequential device IDs, identical project names, or other method as approved by the Engineer.

Additional pairs on the project shall have unique identifiable information such that it is not confused with another project system.

Measurement and Payment

Connected Lane Closure System will be measured and paid as the maximum number of connected systems acceptably placed and in use at any one time during the life of the project.

Each lane closure system may be satisfied by one of the following:

Two (2) connected lane closure devices; one connected to the flashing arrow board and the other on a crashworthy device at the downstream end of the lane closure.

One (1) connected lane closure device connected to the flashing arrow board that can generate a virtual END location with 50’ accuracy.

All devices for each system must be functioning properly to receive payment for the system. No payment will be made for a system until all devices are satisfactorily installed and operational at the device and on the vendors dashboard. A copy of the device status reporting should be provided by the contractor every 2 weeks.

TC-13

The price for each connected lane closure system will cover all material, labor, maintenance,…