531-24-104 Replace HVAC B23-B45 Final Drawings REV 1.pdf
PDF 5 MB Posted
- Attached to
- Z1DA--531-24-104 | Replace HVAC B23-B45 - Construction Federal contract opportunity
- Solicitation number
- 36C26026R0026
About this file
This is a Design/Construction Bid Set for a VA Medical Center HVAC Replacement Project at the Boise, Idaho facility. The project scope involves replacing fan coil and fin tube radiator units throughout Buildings 23 and 45, which will include architectural, mechanical, plumbing, and electrical work. The project documentation includes comprehensive architectural, mechanical, and electrical plans for demolition and new installation, with detailed drawings covering ground through third floors of both buildings.
Key technical specifications include installing new Daikin fan coil units with varying air flow capacities (200-1000 CFM), replacing existing geothermal heating piping, and integrating new heating hot water systems. The project will utilize four-pipe fan coil units and involves extensive coordination with existing building infrastructure. The design team is AESUS Design Group, and the project is planned for a July 2025 implementation, following 2023 International Building, Mechanical, Electrical, and Fire Codes. The total project number is 531-24-104, with an estimated replacement of approximately 40 fan coil units across the two buildings.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 36C26026R0026 0001.pdf | ||
| Attachment 1.pdf | ||
| Attachment 2.pdf | ||
| 531-24-104 Replace HVAC B23-B45 Final Specs REV 1.pdf | ||
| 36C26026R0026 RFP.pdf | ||
| 531-24-104_Construction-SOW.pdf | ||
| WD ID20250104 Building.pdf | ||
| S02 EXHIBIT A Past Performance Reference Form.docx | DOCX document | |
| 852.219-75 VA NOTICE OF LIMITATIONS ON SUBCONTRACTING.docx | DOCX document |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
A. THE CONTRACTORS SHALL COORDINATE EQUIPMENT AND MATERIAL TRAFFIC AND STORAGE
WITH COR.
B. ALL UTILITY WORK SHALL BE COORDINATED WITH CIVIL PLANS.
C. ALL ASPECTS OF CONTRACTOR STAGING AND CONSTRUCTION PHASING SHALL BE
APPROVED BY COR.
D. ALL HOSPITAL ACCESS POINTS, AND ALL BUILDING EXITS, MUST REMAIN ACCESSIBLE, CLEAR
AND UNOBSTRUCTED THROUGHOUT ALL PHASES OF DEMOLITION AND CONSTRUCTION.
SHORT-TERM CLOSURE MAY BE ACCEPTABLE AS COORDINATED WITH COR.
HAZARDOUS MATERIALS
1. THE CONSTRACTOR AND/OR THE CONTRATOR'S SUBS SHALL
IMMEDIATELY NOTIFY THE VA IF AN SUSPECT MATERIAL IS FOUND.
BOISE VAMC SPECIFIC NOTES
The VA requires that all penetrations through fire rated barriers be accomplished by a qualified firestop contractor in accordance with specification 078400. When work takes place within existing building that are not separated by a 2-hour barrier from occupied areas, and where it is not feasible to have a qualified firestop contractor providing fire sealing on a daily basis, it shall be the responsibility of the trade penetrating the fire rated barrier to provide temporary fire protection of all penetrations at the end of each work day. Temporary protection must meet all NFPA codes related to fire barrier penetrations. The temporary protection must be maintained in proper order until the permanent fire stopping material is installed. Firebricks or fire plugs must be used to seal penetrations in temporary or permanent fire separations (floors and walls) until they can be properly fire sealed (i.e. core drills for new sewer lines prior to installation and fire stopping of sewer lines).
The ceiling space from the bottom of the ceiling grid to a minimum of 6” above the bottom of the ceiling grid is reserved for installation of ceiling mounted items (i.e. light fixtures, speakers, diffusers). No piping, ductwork, conduits, etc., except drops serving the ceiling mounted items, is allowed to be installed in this space, unless otherwise approved by the Resident Engineer.
Contractor is required to follow all OSHA regulations concerning construction. The superintendent is required to have completed, as a minimum, OSHA’s 30-hour training and be knowledgeable of general safety requirements for confined spaces, fall protection, personal protective equipment, trenching, scaffolding, cranes, electrical, etc. Applicable subcontractors are to have a competent person on site when required by OSHA. If accessing a confined space, the contractor is required have their own confined space air monitor and to test the air prior to entering any confined space. If the contractor must enter a sanitary sewer manhole, in addition to a confined space air monitor, they must have proper OSHA rescue equipment for a permit required confined space. Where it is not possible for the VA to shutdown an electrical panel or circuit, the contractor must provide and use the appropriate safety clothing and equipment as required by NFPA 70E. The VA will be monitoring the contractor’s compliance with OSHA regulations. Failure to comply is grounds for stopping work.
In some instances, it may have been impracticable to detail all items in specifications or on drawings because of variances in design team’s methods of achieving specified results. In such instances, the contractor will be required to furnish all labor, materials, drawings, services, and connections necessary to produce systems or equipment which are completely installed, functional, and ready for operation by facility personnel in accordance with their intended use at no additional cost to the government.
SITE PLAN GENERAL NOTES
1. CONTRACTOR IS RESPONSIBLE FOR PROTECTING EXISTING UTILITIES.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
Architecture, Engineering, and, Sustainable DesignAESUS 1050 E. Southern Ave, Suite #D, Tempe, Arizona 85282, (480) 454-2861 design group
A u to d e s k D o c s /A
E S
U S
P ro je c ts
/5
-2
-1
R e p la c e
H V
A C
B .2
B .4
A R
C H
.r v t
/3
/2
:1
:4
P
M
COVER SHEET
AESUS AESUS
GI-001
960 BROADWAY AVE, BOISE, ID 83706
531-24-104
23 & 45
July 10, 2025
REPLACE HVAC, B.23 & B.45
Phase
100% SUBMISSION
Department of Veterans Affairs
500 W Fort Street Boise, ID 85702
Project No: 531-24-104
NORTH
DESIGN TEAM
OWNER
CODE REFERENCES
BUILDING CODE:
2023 INTERNATIONAL BUILDING CODE
2023 EXISTING BUILDING CODE
2023 INTERNATIONAL ENERGY CONSERVATION CODE
2023 INTERNATIONAL FIRE CODE
ACCESSIBILITY CODE & GUIDELINES:
ABAAS & BFDG
MECHANICAL CODE:
2023 INTERNATIONAL MECHANICAL CODE
PLUMBING CODE:
2023 INTERNATIONAL PLUMBING CODE
ELECTRICAL CODE:
2023 INTERNATIONAL ELECTRICAL CODE
PROJECT DESCRIPTION
FACILITY MAP
SYMBOL LEGEND
BUILDING INFORMATION
NO LIFE SAFETY WILL BE AFFECTED BY THIS PROJECT.
GENERAL NOTES
VICINITY MAP
THIS PROJECT IS LOCATED AT THE BOISE, IDAHO VA MEDICAL CENTER. THE
PROJECT'S SCOPE OF WORK SHALL BE AS FOLLOWS: REPLACE THE FAN COIL AND
FIN TUBE RADIATOR UNITS THROUGHOUT BUILDINGS 23 & 45.
THIS WORK SHALL INCLUDE BUT NOT BE LIMITED TO ARCHITECTURAL, MECHANICAL,
PLUMBING, & ELECTRICAL DISCIPLINES.
Replace HVAC, B.23 & B.45, Project No. 531-24-104
Boise, Idaho VA Medical Center Department of Veterans Affairs
Architect
MPE Engineers
1050 E. Southern Ave. Suite 5, Tempe, Arizona 85282
AESUS Design Group
1050 E. Southern Ave. Suite 5, Tempe, Arizona 85282
AESUS Design Group
Orlando Gonzales (ogonzales@aesusdesign.com)
480-454-2861
David Combs (dcombs@aesusdesign.com)
480-454-2861
N O
R T
H
PROJECT AREA
PROJECT SITE
NFPA
NFPA 101 LIFE SAFETY CODE
NFPA NATIONAL FIRE CODES
NFPA 900 (OSHA)
DX
A3-301
DETAIL FLAG NUMBER
DOOR NUMBER
AE-501
BUILDING SECTION CUT
OTHER SECTION CUT
SHEET WHERE APPEARS (TYPICAL)
AE-301
AA
SHEET WHERE APPEARS
ELEVATION NUMBER
SHEET WHERE APPEARS
x x x x
EXISTING COLUMN CENTER LINEA
X
AE-301
AA
AE-301
AA
ELEVATION NUMBER
AE-710
4 2
DASHED LINE
AROUND
AREA DETAILED
KEYED NOTEX
CONTRACT LIMIT LINE
COLUMN CENTER LINE
NEW WALL
DEMOLITION
EXISTING WALL
DESCRIPTIONSYMBOL
X
X
WINDOW TAG
WALL TYPE
SHEET / DETAIL
x x
DOOR RATING (IF APPLICABLE)
GENERAL PHASING NOTES
A. ANY CHANGES MUST BE APPROVED BY VA BEFORE DOING ANY
ADDITIONAL WORK. WORK SCHEDULE TO BE PERFORMED DURING
REGULAR DAY SHIFT HOURS (8AM-4:30PM) ANY WORK OUTSIDE OF
REGULAR SCHEDULE REQUIRES APPROVAL FROM COR.
B. COORDINATE STAGING AREA WITH COR. CONTRACTOR TO PROVIDE
STORAGE CONTAINER(S), IF NEEDED, TO BE LOCATED IN THE
STAGING AREA.
C. PERFORM WORK IN ACCORDANCE WITH VHA DIRECTIVE 2004-012
SAFETY AND HEALTH DURING CONSTRUCTION ACTIVITIES AND VHA
DIRECTIVE 7701 OCCUPATIONAL SAFETY AND HEALTH (OSH) .
D. WORK PERFORMED FOR THIS PROJECT MAY INTERRUPT SERVICE TO
ADJACENT AREAS AT TIMES BUT WILL NOT INTERRUPT OVERALL
FACILITY OPERATION. SEE ELECTRICAL FOR POWER INTERRUPTION
AND OUTAGE REQUIREMENTS.
E. CONTRACTOR TO VERIFY ALL DETAILS AGAINST EXISTING
CONDITIONS PRIOR TO PURCHASE OF EQUIPMENT AND PRIOR TO
CONSTRUCTION. CONTRACTOR IS RESPONSIBLE FOR BRINGING ANY
DISCREPANCIES IN PLANS AND EXISTING SITE CONDITIONS TO
IMMEDIATE ATTENTION OF CONTRACTING OFFICER
REPRESENTATIVE.
F. CONTRACTOR SHALL PERFORM ALL WORK AND PROVIDE ALL
MATERIALS IN ACCORDANCE WITH PROJECT SPECIFICATIONS.
G. CONTRACTOR IS RESPONSIBLE FOR PROTECTING EXISTING
UTILITIES.
ISSUED SHEETS
Sheet Number Sheet Name
General Information
GI-001 COVER SHEET
Architecture
AD-100 DEMOLITION PLANS
AE-100 FLOOR PLANS
MECHANICAL
M-001 MECHANICAL LEGEND AND ABBREVIATIONS
MD-223 MECHANICAL DEMOLITION PLAN BUILDING 23
MD-245 MECHANICAL DEMOLITION PLAN BUILDING 45
M-223A MECHANICAL LEVELS 0 & 1 BUILDING 23 PLAN
M-223B MECHANICAL LEVELS 2 & 3 BUILDING 23 PLAN
M-245 MECHANICAL BUILDING 45 PLAN
M-501 MECHANICAL DETAILS
M-801 MECHANICAL CONTROLS
ELECTRICAL
EP-000 SYMBOLS AND ABBREVIATIONS
ED-101 ELECTRICAL DEMOLITION PLANS - BUILDING 23
ED-102 ELECTRICAL DEMOLITION PLANS - BUILDING 45
EP-101 ELECTRICAL POWER PLANS - BUILDING 23
EP-102 ELECTRICAL POWER PLANS - BUILDING 45
OSHA REGULATION:
SAFETY AND HEALTH REGULATIONS FOR CONSTRUCTION - STD. 1926
Revisions: Date:
08/05/25
G03
G01
CG02
STG1
OFFICE
CRAWL SPACE
STORAGE
U P
UP
B .1
G05
G06
STG4STG3
G04
G03
G02 CG01
G01 G10
CG02
G09
G08
G07
CG03
CG04
IT
MECH
CERAMIC OVEN
STORAGE
OFFICE
CORRIDOR
STORAGE
CORRIDOR
CORRIDORCORRIDORSTORAGE
STORAGE
OFFICE OFFICE
B .1
102 108
ST13 ST14
102A
103 107
104 106
C12
ST12ST11
C11
105 110
102B 108B
C15
C14
C13
C16
OFFICE KITCHEN
CORRIDOR
RESTROOM
CORRIDOR
CORRIDOR CORRIDOR
CORRIDORCORRIDOR
OFFICE
OFFICE
RESTROOM
STORAGESTORAGE
OFFICE
GROUP ROOM GROUP ROOM
101A
C11
ST11 103
STG2
104B
STORAGE
FRONT PORCH
OFFICE
OFFICE
REAR PORCH
KITCHEN
CORRIDOR
CONFERENCE
D O W N
U P
D O W N
D O W N
U P
D O W N
104A
F N D
ST21
C21
203A
205A
207A
A
RF1
RF2
CORRIDOR
STORAGE
STORAGE
STORAGESTORAGE
S T
O R
A G
E
OFFICE
OFFICE
OFFICE
OFFICE
OFFICE
RESTROOM
RESTROOM
U P
D O W N
D O W N
B .1
ST23 ST24
208A
C26
C25
212213
213A201A
201202
202A
C
C
ST21 ST22
206 207
C21
C23
OFFICE KITCHEN
CORRIDOR
CORRIDOR
C O
R R
ID
O
R
C O
R R
ID
O
R
CORRIDOR CORRIDOR
OFFICE
OFFICE
OFFICE OFFICE OFFICE OFFICE
OFFICE
OFFICE
STORAGE STORAGE
STORAGE
STORAGESTORAGERESTROOM
ST33 ST34
C33C32
C31
302 307
C34
308A 307A
308301
301A302A
MECHCORRIDOR
STORAGE
RESTROOM
STORAGE STORAGE STORAGE
CORRIDOR
CORRIDORCORRIDOR
OFFICE
OFFICE
OFFICE OFFICE
OFFICE
MECH
RF3
RF6RF5
RF4
RF8 RF7
RF9
304A
302A
301A
C31
ST31
CORRIDOR
RESTROOM
OFFICE
OFFICE
ATTIC
STORAGE
STORAGESTORAGE
STORAGE
D O W N
DEMOLITION SYMBOL LEGEND
GENERAL DEMOLITION NOTES
A. EXISTING CONSTRUCTION TO BE REMOVED IS INDICATED ON THE DRAWINGS:
COORDINATE DEMOLITION WITH ARCHITECTURAL DRAWINGS AND
REQUIREMENTS SHOWN ON ALL MECHANICAL PLUMBING AND ELECTRICAL,
AND STRUCTURAL DRAWINGS
B. EXISTING CONDITIONS SHOWN ARE FROM AVAILBLE RECORD DRAWINGS AND
VISUAL FIELD SURVEYS. THE CONTRACTOR SHALL VERIFY ACTUAL EXISTING
CONDITIONS AND NOTIFY THE OWNER OF ANY DISCREPENCIES.
C. CONDUCT DEMOLITION TO MINIMIZE INTERFERENCE WITH ADJACENT BUILDING
AREAS
D. AREA OF WORK CONTAINS BUILDING INFRASTRUCTURE WHICH MAY BE
CRITICAL TO THE ONGOING OPERATIONS OF THE HOSPITAL. ATTENTION SHALL
BE BROUGHT TO THE COR PRIOR TO ANY DEMOLITION OR SHUT-DOWNS.
REFER TO SPECIFICATIONS FOR MAJOR AND MINOR SHUTDOWN PROCEDURES.
E. PROTECT EXISTING MATIERALS AND EQUIPMENT WHICH ARE NOT TO BE
DEMOLISHED. CONTRACTOR TO PROTECT FROM DAMAGE ALL EXISTING
FLOORS, WALLS, CEILINGS, ETC. CONTRACTOR IS RESPONSIBLE FOR REPAIR
AND REPLACEMENT OF ALL DAMAGED FLOORING, WALLS, CEILINGS, ETC. IF
AREAS NEED TO BE REPAIRED, FINISHES ARE TO MATCH EXISTING.
F. MAINTAIN PROTECTED EGRESS AND ACCESS TO THE WORK. ALSO MAINTAIN
REQUIRED EGRESS AROUND TEMPORARY PARTITIONS.
G. REMOVE ANY UNUSED OR ABANDONED MATERIALS IN WALLS AND ABOVE
CEILINGS.
H. THE CONTRACTOR SHALL NOTIFY THE OWNER IN ADVANCE OF ANY
SCHEDULED DEMO WORK IN THE AREA TO ALLOW THE OWNER TO REMOVE
PERSONAL BELONGINGS AND DESIGNATE ALL MEDICAL EQUIPMENT,
FURNITURE, AND OTHER ITEMS TO BE SALVAGED AND STORED BY THE
CONTRACTOR. ALL ITEMS NOT DESIGNATED AS "SALVAGED" BY THE OWNER
AFTER THIS TIME SHALL BE DISPOSED OF BY THE CONTRACTOR. REFER TO
SPECIFICATION FOR NOTIFICATION REQUIREMENTS.
I. SCOPE OF WORK TO BE REMOVED IS SHOWN WITH DASHED LINES.
COORDINATE EXTENT OF DEMOLITION OF EXISTING ITEMS TO BE PARTIALLY
DEMOLISHED WITH THE FLOOR PLAN AND REFLECTED CEILING PLAN.
J. REMOVE AND SALVAGE ANY PNEUMATIC DAMPER OPERATORS, AND HEATING
COIL ACTUATORS AND VLAVES. SALVAGED ITEMS ARE TO BE STORED BY
CONTRACTOR IF THEY ARE TO BE RE-USED IN PROJECT. REPORT ANY OTHER
ITEMS TO OWNER FOR HANDLING.
K. CONTRACTOR SHALL REMOVE EXISTING INSULATION OR PIPE JACKETING
WHERE IT DOES NOT COMPLY WITH FIRE STOPPING REQUIREMENTS AT PIPING
PENETRATIONS AND OTHER CONDITIONS WHERE FIRE STOPPING IS REQUIRED.
REFER TO, AND COMPLY WITH, I.B.C. SECTION 712.
L. REMOVE AND DISPOSE OF ALL DEMOLISHED MATERIALS OFF-SITE WHICH ARE
NOT SCHEDULED TO REMAIN, BE RELOCATED, OR BECOME THE PROPERTY OF
THE OWNER.
M. PROVIDE TEMPORARY EXIT SIGNS AND ILLUMINATION LEVELS PER THE IBC
AND VA GUIDELINES. ALL EGRESS PATHS SHALL REMAIN CLEAR AT ALL TIMES.
N. ALL CONSTRUCTION BARRICADES FIRE-RATING SHALL MAINTAIN FIRE RATING
CONTINUITY OF THE SURROUNDING WALLS. FIRE-RATING OF CONSTRUCTION
ACCESS DOORS SHALL BE APPROPRIATE FOR THE FIRE-RATED WALL TYPES.
PAINT ALL TUNNELS AND BARRICADES ON THE SIDE VISIBLE TO THE PUBLIC.
O. CONTRACTOR TO VERIFY EXISTING CONDITIONS AT ALL COLUMNS AND
CHASES PRIOR TO DEMOLITION
P. DO NOT PENETRATE THE FLOOR SLAB WITHOUT COORDINATING WITH
STRUCTURAL REQUIREMENTS.
KEYED DEMOLITION NOTES
ITEMS SHOWN DASHED TO BE
DEMOLISHED
HATCH INDICATES AREA TO BE COVERED
BY KEYED NOTES LOCATED WITHIN
01 02
1 1
2 2
1 1
1 1
2 2
2 2
2 2
1 1
1 1
1 1
6 6
8 8
1 1
2 2 2
2 2
2 2
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
KEY PLAN NTS
Architecture, Engineering, and, Sustainable DesignAESUS 1050 E. Southern Ave, Suite #D, Tempe, Arizona 85282, (480) 454-2861 design group
B.45
B.23
A u to d e s k D o c s /A
E S
U S
P ro je c ts
/5
-2
-1
R e p la c e
H V
A C
B .2
B .4
A R
C H
.r v t
/1
/2
:1
:0
P
M
DEMOLITION PLANS
AESUS AESUS
AD-100
960 BROADWAY AVE, BOISE, ID 83706
531-24-104
23 & 45
July 10, 2025
REPLACE HVAC, B.23 & B.4595% SUBMISSION NOT FOR
CONSTRUCTION
KEYNOTE LEGEND - DEMOLITION
KEY VALUE KEYNOTE TEXT
1 EXISTING MECHANICAL EQUIPMENT TO BE REMOVED, REF.
MECHANICAL DRAWINGS.
2 ANY DAMAGE CAUSED BY CONSTRUCTION ACTIVITIES SHALL BE
PATCHED & REPAIRED TO MATCH EXISTING CONDITIONS.
3 REMOVE PORTION OF EXISTING CEILING/FLOOR ASSEMBLY ABOVE FOR
INSTALLATION OF NEW MECHANICAL PIPING. PATCH & REPAIR
CEILING/FLOOR FINISHES TO MATCH EXISTING.
4 EXISTING MECHANICAL EQUIPMENT TO REMAIN, REF. MECHANICAL
DRAWINGS.
6 REMOVE PORTION OF EXISTING CEILING SYSTEM FOR THE
INSTALLATION OF MECHANICAL PIPING, REPLACE OR PATCH & REPAIR
FINISHES TO MATCH EXISING CONDITIONS.
8 EXISTING ROOF TO REMAIN.
3/32" = 1'-0"1
B45 GROUND FLOOR DEMO PLAN
3/32" = 1'-0"5
B23 GROUND FLOOR DEMO PLAN
3/32" = 1'-0"6 B23 1st FLOOR DEMO PLAN
3/32" = 1'-0"2 B45 1st FLOOR DEMO PLAN
3/32" = 1'-0"3 B45 2nd FLOOR DEMO PLAN
3/32" = 1'-0"7 B23 2nd FLOOR DEMO PLAN
3/32" = 1'-0"8 B23 3rd FLOOR DEMO PLAN
3/32" = 1'-0"4 B45 3rd FLOOR DEMO PLAN
Revisions: Date:
Project Number
Building Number
Project TitlePhase
531-24-104
23 & 45
REPLACE HVAC, B.23 & B.45100% SUBMISSION
CG02
STG1
OFFICE
CRAWL SPACE
STORAGE
U P
UP
B .1
G05
G06
STG4STG3
G04
G03
G02 CG01
G01 G10
CG02
G09
G08
G07
CG03
CG04
IT
MECH
CERAMIC OVEN
STORAGE
OFFICE
CORRIDOR
STORAGE
CORRIDOR
CORRIDORCORRIDORSTORAGE
STORAGE
OFFICE OFFICE
101A
C11
ST11 103
STG2
104B
STORAGE
FRONT PORCH
OFFICE
OFFICE
REAR PORCH
KITCHEN
CORRIDOR
CONFERENCE
D O W N
U P
D O W N
D O W N
U P
D O W N
104A
B .1
102 108
ST13 ST14
102A
103 107
104 106
C12
ST12ST11
C11
105 110
102B 108B
C15
C14
C13
C16
OFFICE KITCHEN
CORRIDOR
RESTROOM
CORRIDOR
CORRIDOR CORRIDOR
CORRIDORCORRIDOR
OFFICE
OFFICE
RESTROOM
STORAGESTORAGE
OFFICE
GROUP ROOM GROUP ROOM
ST21
C21
203A
205A
207A
A
RF1
RF2
CORRIDOR
STORAGE
STORAGE
STORAGESTORAGE
S T
O R
A G
E
OFFICE
OFFICE
OFFICE
OFFICE
OFFICE
RESTROOM
RESTROOM
U P
D O W N
D O W N
B .1
ST23 ST24
208A
C26
C25
212213
213A201A
201202
202A
C
C
ST21 ST22
206 207
C21
C23
OFFICE KITCHEN
CORRIDOR
CORRIDOR
C O
R R
ID
O
R
C O
R R
ID
O
R
CORRIDOR CORRIDOR
OFFICE
OFFICE
OFFICE OFFICE OFFICE OFFICE
OFFICE
OFFICE
STORAGE STORAGE
STORAGE
STORAGESTORAGERESTROOM
304A
302A
301A
C31
ST31
CORRIDOR
RESTROOM
OFFICE
OFFICE
ATTIC
STORAGE
STORAGESTORAGE
STORAGE
D O W N
ST33 ST34
C33C32
C31 302 307
C34
308A 307A
308301
301A302A
MECHCORRIDOR
STORAGE
RESTROOM
STORAGE STORAGE STORAGE
CORRIDOR
CORRIDORCORRIDOR
OFFICE
OFFICE
OFFICE OFFICE
OFFICE
MECH
RF1
RF3
RF2
RF6RF5
RF4
RF8 RF7
RF9
A. ALL DIMENSIONS ARE TAKEN FROM EXISTING FACE OF WALLS
B. ALL UTILITY WORK SHALL BE COORDINATED WITH MECHANICAL, PLUMBING,
ELECTRICAL, AND FIRE PROTECTION DRAWINGS.
C. REFER AND ADHERE TO THE INFECTION PREVENTION MEASURE REQUIREMENTS
IN SPECIFICATION SECTION 01 35 26 17.
D. ADJUST FURRING SPACE AS NECESSARY TO CLEAR ANY PIPES OR CONDUITS
WITHIN THE FURRED SPACE. PROVIDE 1/2-INCH MINIMUM CLEARANCE BETWEEN
PIPES/CONDUITS AND THE BACK OF GYPSUM BOARD, U.O.N.
E. PROVIDE ADDITIONAL FULL HEIGHT 16 GA. STEEL STUDS FROM FLOOR TO
STRUCTURE ABOVE AT EACH ADJUSTABLE SHELF STANDARD LOCATION.
F. PROVIDE TWO ROWS OF CONTINUOUS BACKING PLATES ALONG ALL PARTITIONS
INSIDE STORAGE ROOMS, U.O.N. VERIFY MOUNTING HEIGHT OF THE BACKING
PLATES WITH OWNER, U.O.N.
G. WHERE (N) WORK IS INSTALLED IN (E) PARTITIONS, REPLACE (E) STUDS AS
NECESSARY FOR PROPER SUPPORT OF GYP BD. ASSEMBLY AND WALL
MOUNTED EQUIPMENT, EITHER RECESSED OR SURFACE MOUNTED.
H. PATCH ALL AREAS OF FIREPROOFING WHERE REMOVED FOR INSTALLATION OF
NEW WORK.
I. REMOVE (E) GYP. BD. AS NECESSARY TO INSTALL ALL DUCT, PIPING, CONDUIT
AND ACCESSORIES. REINSTALL GYP. BD. FINISH TO MATCH EXIST. CONDITIONS
AND TO VA'S ACCEPTANCE.
J. REPLACE CORRIDOR CEILING AND FLOORING FINISHES AND PAINT AFTER
REMOVAL OF CONSTRUCTION BARRICADES.
K. PROVIDE FIRESTOPPING AND/OR SEALANT AT ALL UNPROTECTED
PENETRATIONS AND OPENINGS IN EXISTING RATED PARTITIONS AND FLOOR
SLABS EXPOSED DURING THE CONSTRUCTION PROJECT THAT ARE WITHIN THE
PROJECT AREA.
L. CONFIRM THAT ALL EXISTING WIFI IS REMOVED AND SALVAGED AND RELOCATED
IN PLACE. CONTRACTOR TO COORDINATE WITH OWNER.
M. PRIOR TO SAW CUTTING AND OR CORE DRILLING CONCRETE, THE CONTRACTOR
SHALL X-RAY USING "A MODERN DETECTION SYSTEM" TO LOCATE REINFORCING
AND OBSTRUCTIONS IN THE CONCRETE.
N. IF ASBESTOS CONTAINING MATERIALS ARE SUSPECTED, STOP ALL WORK IN THE
AREA AND REPORT TO OWNER.
O. PROTECT ALL EXISTING CONDITIONS & EQUIPMENT DURING CONSTRUCTION.
CONTRACTOR IS RESPONSIBLE FOR PROTECTING ANY OPENINGS AND
REPONSIBLE FOR ANY DAMAGE THAT MAY RESULT FROM SUCH OPENINGS BEING
LEFT UNPROTECTED OR THOSE THAT HAVE OCCURED AS A RESULT OF
PROTECTING THE OPENINGS.
FLOOR PLAN GENERAL NOTES
2 2 2
9 9
7 7
2 2
2 2 2
2 11
7 7
7 7 7
2 2 2 2
2 2
2 2
11 11
2 2
2 2
2 2
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
KEY PLAN NTS
Architecture, Engineering, and, Sustainable DesignAESUS 1050 E. Southern Ave, Suite #D, Tempe, Arizona 85282, (480) 454-2861 design group
B.45
B.23
A u to d e s k D o c s /A
E S
U S
P ro je c ts
/5
-2
-1
R e p la c e
H V
A C
B .2
B .4
A R
C H
.r v t
/1
/2
:1
:0
P
M
FLOOR PLANS
AESUS AESUS
AE-100
960 BROADWAY AVE, BOISE, ID 83706
531-24-104
23 & 45
July 10, 2025
REPLACE HVAC, B.23 & B.4595% SUBMISSION NOT FOR
CONSTRUCTION
KEYNOTE LEGEND - NEW WORK
KEY VALUE KEYNOTE TEXT
2 ANY DAMAGE CAUSED BY CONSTRUCTION ACTIVITIES SHALL BE
PATCHED & REPAIRED TO MATCH EXISTING CONDITIONS.
7 NEW CEILING MOUNTED HVAC UNIT, REF. MECHANICAL DRAWINGS.
9 NEW FLOOR MOUNTED HVAC UNIT, REF. MECHANICAL DRAWINGS.
10 NEW PUMP, REF. MECHANICAL DRAWINGS.
11 REPLACE OR PATCH & REPAIR CEILING FINISHES TO MATCH EXISING
CONDITIONS.
3/32" = 1'-0"1
B45 GROUND FLOOR PLAN
3/32" = 1'-0"5
B23 GROUND FLOOR PLAN
3/32" = 1'-0"2 B45 1st FLOOR PLAN
3/32" = 1'-0"6 B23 1st FLOOR PLAN
3/32" = 1'-0"3 B45 2nd FLOOR PLAN
3/32" = 1'-0"7 B23 2nd FLOOR PLAN
3/32" = 1'-0"4 B45 3rd FLOOR PLAN
3/32" = 1'-0"8 B23 3rd FLOOR PLAN
Revisions: Date:
Project Number
Building Number
Project TitlePhase
531-24-104
23 & 45
REPLACE HVAC, B.23 & B.45100% SUBMISSION
SYMBOL
ALL SYMBOLS SHOWN MAY NOT APPEAR IN ALL DRAWINGS. SYMBOLS ARE SHOWN SCHEMATIC AND MAY NOT BE TO SCALE.
MECHANICAL SYMBOLS LEGEND
DESCRIPTION
X-X, Xø
DIFFUSER TAG
(X-X = DIFFUSER TYPE, Xø = NECK SIZE, ### = CFM VALUE)
SUPPLY DIFFUSER
RETURN GRILLE
EXHAUST GRILLE
SUPPLY, RETURN, OR EXHAUST SIDEWALL DIFFUSER/GRILLE
FLEXIBLE ROUND DUCT
FLEXIBLE RECTANGULAR DUCT
SUPPLY RECTANGULAR DUCT GOING DOWN
SUPPLY RECTANGULAR DUCT GOING DOWN
SUPPLY RECTANGULAR DUCT GOING DOWN
SUPPLY RECTANGULAR DUCT GOING UP
RETURN RECTANGULAR DUCT GOING UP
EXHAUST RECTANGULAR DUCT GOING UP
SUPPLY ROUND DUCT GOING DOWN
RETURN ROUND DUCT GOING DOWN
SUPPLY ROUND DUCT GOING DOWN
SUPPLY ROUND DUCT GOING UP
RETURN ROUND DUCT GOING UP
SUPPLY ROUND DUCT GOING UP
PIPE GOING DOWN
PIPE TEE GOING DOWN
PIPE GOING UP
PIPE TEE GOING UP
M
SD
FSD
MANUAL DAMPER
SMOKE DAMPER
FD FIRE DAMPER
FIRE AND SMOKE DAMPER
MOTORIZED DAMPER
DUCT SMOKE DETECTOR
THERMOSTATT
BALANCING VALVE
R
BALL VALVE
BUTTERFLY VALVE
CHECK VALVE
GATE VALVE
GLOBE VALVE
PRESSURE REGULATING VALVE
STEAM TRAP - INVERTED VALVE
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
KEY PLAN NTS
Architecture, Engineering, and, Sustainable DesignAESUS 1050 E. Southern Ave, Suite #D, Tempe, Arizona 85282, (480) 454-2861design group
B.45
B.23
Au to de sk
D oc s:
//A
ES
U
S Pr oj ec ts /5
-2
4-
R ep la ce H
VA
C
B .2
B.
_M
EC
H .rv t 7/
/2
2:
:3
PM
MECHANICAL LEGEND AND
ABBREVIATIONS
AESUS AESUS
M-001
960 BROADWAY AVE, BOISE, ID 83706
531-24-104
23 & 45
July 10, 2025
REPLACE HVAC, B.23 & B.45100% SUBMISSION
GENERAL NOTES
A.
B.
C.
D.
E.
F.
G.
H.
I.
J.
K.
L.
M.
N.
O.
P.
Q.
ALL MECHANICAL, ELECTRICAL, AND PLUMBING WORK SHALL COMPLY WITH ALL VA TIL
GUIDELINES AND APPLICABLE STATE AND LOCAL BUILDING CODES. REFER TO
SPECIFICATIONS FOR MATERIALS AND METHODS FOR MECHANICAL CONSTRUCTION.
CONTRACTOR SHALL OBTAIN ALL NECESSARY PERMITS, PAY ALL FEES, AND COMPLY
WITH ALL NATIONAL, STATE, AND MUNICIPAL LAWS, CODES, AND ORDINANCES
RELATING TO BUILDING AND PUBLIC SAFETY.
CONTRACTOR SHALL FURNISH ALL MATERIALS, EQUIPMENT, AND LABOR REQUIRED
FOR A COMPLETE WORKING AND COORDINATED SYSTEM.
COORDINATE THE EXACT LOCATION OF MECHANICAL EQUIPMENT WITH THE
LOCATIONS OF LIGHT FIXTURES, PIPING, CONDUIT AND OTHER CONSTRUCTION, TO
ALLOW FOR PROPER ACCESS TO SERVICE EQUIPMENT.
COORDINATE THE LOCATION OF PIPING WITH OTHER TRADES AND PROVIDE OFFSETS
IN PIPING AS REQUIRED.
CONDUIT, PIPING, AND DUCTWORK SHALL BE INDEPENDENTLY SUPPORTED, AND EACH
SUPPORT SHALL BE INDEPENDENT OF PARTITION AND CEILING SYSTEMS SUPPORTS.
REFER TO RISER DIAGRAMS AND FLOW DIAGRAMS FOR PIPE SIZES NOT SHOWN ON
THE PLANS.
INSTALL ALL FLOOR MOUNTED EQUIPMENT ON PADS AS SPECIFIED. PAD BY GENERAL
CONTRACTOR. COORDINATE REQUIREMENTS WITH GENERAL CONTRACTOR.
PROTECT EQUIPMENT FROM DAMAGE DURING HANDLING AND INSTALLATION UNTIL
COMPLETION OF CONSTRUCTION.
REMOVE ALL EXCESS MATERIAL AND DEBRIS AND CLEAN ALL EQUIPMENT UPON
COMPLETION OF WORK. TOUCH UP WITH PAINT WHERE REQUIRED.
CONTRACTOR SHALL VISIT JOBSITE AND VERIFY SIZE AND LOCATION OF ALL EXISTING
ITEMS AND CONDITIONS.
ALL CONNECTIONS BETWEEN PIPES OF DISSIMILAR MATERIALS SHALL BE MADE WITH
DIELECTRIC UNIONS.
ALL EXISTING FACILITIES SHALL BE PROTECTED DURING THE CONSTRUCTION
ACTIVITIES. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO RELOCATE
AND STORE ITEMS WHICH ARE SUBJECT TO DAMAGE.
ANY DEVIATIONS FROM SCHEDULED EQUIPMENT RESULTING IN ADDITIONAL COST DUE
TO THE LACK OF COORDINATION WITH DIMENSIONS AND WEIGHTS WILL BE THE
RESPONSIBILITY OF THE CONTRACTOR.
ALL DUCT DETECTORS TO COMPLY WITH NFPA WHICH REQUIRES VISUAL LED
MONITORING AS WELL AS CENTRAL FIRE ALARM & BMS MONITORING OF ALL DUCT
DETECTORS. VISUAL MONITORS WILL BE INSTALLED WHERE AVAILABLE. WHERE NOT
AVAILABLE, A VISUAL AND AUDIBLE ALARM WILL BE PROVIDED THROUGH THE BMS AND
FIRE ALARM SYSTEM TO A CONSTANTLY ATTENDED LOCATION.
VENTILATION SYSTEMS SHALL BE BALANCED USING A NATIONALLY ACCEPTED AIR
BALANCING TEST METHOD. SUCH BALANCING SHALL VERIFY THAT THE VENTILATION
SYSTEM IS CAPABLE OF SUPPLYING AND EXHAUSTING THE AIRFLOW RATES REQUIRED
BY SECTIONS 403.3 AND 403.3.1.2. A FINAL REPORT SHALL BE PROVIDED TO THE
ENGINEER OF RECORD AND THE MECHANICAL INSPECTOR.
VA WILL SHUT DOWN EXISTING UTILITY SYSTEM AS NECESSARY FOR CONTRACTOR TO
PERFORM REQUIRED WORK. CONTRACTOR IS RESPONSIBLE FOR DRAINING EXISTING
WET SYSTEMS, SUCH AS WATER, CHILLED WATER, HEATING WATER ETC. AS REQUIRED
TO ACCOMPLISH NEW WORK. CONTRACTOR IS ALSO RESPONSIBLE FOR RE-FILLING
SYSTEMS INCLUDING ADDING CHEMICAL AS REQUIRED. IT IS ACCEPTABLE TO
SALVAGE EXISTING TREATED WATER IN CLEAN STORAGE CONTAINERS APPROVED BY
THE VA, AND RE-INJECT IT INTO THE SYSTEM UPON COMPLETION OF WORK. ANY
TREATED WATER NOT RE-INJECTED IS TO BE PROPERLY DISPOSED OF.
MECHANICAL ACCESSORIES SCHEDULE
MARK TYPE DESCRIPTION ELECTRICAL
P-GLY-1 GLYCOL
MAKEUP.
BLDG 23
AUTOMATED GLYCOL MAKEUP, 6-GALLON CAPACITY, PRESSURIATION PUMP WITH INTEGRAL CONTROLS, PRV AND GAUGE, ADJUSTABLE DISCHARGE
PRESSURE (20 PSI SETPOINT), EQUAL TO WESSELS GLYMATIC G-6
120V
P-GLY-1 GLYCOL
MAKEUP.
BLDG 45
AUTOMATED GLYCOL MAKEUP, 6-GALLON CAPACITY, PRESSURIATION PUMP WITH INTEGRAL CONTROLS, PRV AND GAUGE, ADJUSTABLE DISCHARGE
PRESSURE (20 PSI SETPOINT), EQUAL TO WESSELS GLYMATIC G-6
120V
POT-1 POT FEEDER,
BLDG 23
POT FEEDER, 2-GALLON CAPACITY
POT-1 POT FEEDER,
BLDG 45
POT FEEDER, 2-GALLON CAPACITY
NOTES:
1. NEW UNIT LOCATION. PROVIDE NEW BACNET THERMOSTAT EQUAL TO EXISTING UNITS IN BUILDING.
FAN COIL UNIT SCHEDULE (BLDG 23)
MARK LOCATION TYPE (NOTES 2,3)
FAN AIR
FLOW
(CFM)
WEIGHT
(LBS)
BASIS OF DESIGN
REMARKSMANUFACTURER MODEL
FCU-G01 G01 Office HORIZONTAL EXPOSED, BOTTOM RETURN, LOW PROFILE 600 131 DAIKIN FCHC-206A FCU-G03 G03 Office HORIZONTAL EXPOSED, BOTTOM RETURN, LOW PROFILE 300 94 DAIKIN FCHC-203A FCU-G05 G05 IT HORIZONTAL EXPOSED, BOTTOM RETURN, LOW PROFILE 300 94 DAIKIN FCHC-203A FCU-G08 G08 Creative Arts HORIZONTAL EXPOSED, BOTTOM RETURN, LOW PROFILE 300 94 DAIKIN FCHC-203A FCU-G10 G10 Office HORIZONTAL EXPOSED, BOTTOM RETURN, LOW PROFILE 600 131 DAIKIN FCHC-206A FCU-101 101 Office VERTICAL, EXPOSED, FLAT TOP, THIN PROFILE 300 94 DAIKIN FCVC-103A FCU-102 102 Office HORIZONTAL EXPOSED, BOTTOM RETURN, LOW PROFILE 300 94 DAIKIN FCHC-203A
FCU-102A 102A Office VERTICAL, EXPOSED, FLAT TOP, THIN PROFILE 200 83 DAIKIN FCVC-102A FCU-105 105 Group Room VERTICAL, EXPOSED, FLAT TOP, THIN PROFILE 1000 178 DAIKIN FCVC-110A FCU-108 108 Kitchen HORIZONTAL EXPOSED, BOTTOM RETURN, LOW PROFILE 400 108 DAIKIN FCHC-204A FCU-109 109 Office VERTICAL, EXPOSED, FLAT TOP, THIN PROFILE 400 108 DAIKIN FCVC-104A FCU-110 110 Group Room VERTICAL, EXPOSED, FLAT TOP, THIN PROFILE 1000 178 DAIKIN FCVC-110A FCU-C11 C11 Corridor VERTICAL, EXPOSED, FLAT TOP, THIN PROFILE 200 83 DAIKIN FCVC-102A NOTE 1 FCU-C15 C15 Corridor VERTICAL, EXPOSED, FLAT TOP, THIN PROFILE 200 83 DAIKIN FCVC-102A NOTE 1 FCU-201 201 Office HORIZONTAL EXPOSED, BOTTOM RETURN, LOW PROFILE 600 131 DAIKIN FCHC-206A FCU-202 202 Office HORIZONTAL EXPOSED, BOTTOM RETURN, LOW PROFILE 400 108 DAIKIN FCHC-204A
FCU-202A 202A Restroom HORIZONTAL EXPOSED, BOTTOM RETURN, LOW PROFILE 200 83 DAIKIN FCHC-202A NOTE 1 FCU-203 203 Office HORIZONTAL EXPOSED, BOTTOM RETURN, LOW PROFILE 400 108 DAIKIN FCHC-204A FCU-204 204 Office HORIZONTAL EXPOSED, BOTTOM RETURN, LOW PROFILE 200 83 DAIKIN FCHC-202A FCU-205 205 Office HORIZONTAL EXPOSED, BOTTOM RETURN, LOW PROFILE 300 94 DAIKIN FCHC-203A FCU-208 208 Kitchen HORIZONTAL EXPOSED, BOTTOM RETURN, LOW PROFILE 400 108 DAIKIN FCHC-204A FCU-210 210 Office HORIZONTAL EXPOSED, BOTTOM RETURN, LOW PROFILE 400 108 DAIKIN FCHC-204A FCU-211 211 Office HORIZONTAL EXPOSED, BOTTOM RETURN, LOW PROFILE 300 94 DAIKIN FCHC-203A NOTE 1 FCU-212 212 Office HORIZONTAL EXPOSED, BOTTOM RETURN, LOW PROFILE 400 108 DAIKIN FCHC-204A FCU-213 213 Office HORIZONTAL EXPOSED, BOTTOM RETURN, LOW PROFILE 600 131 DAIKIN FCHC-206A FCU-301 301 Office VERTICAL, EXPOSED, FLAT TOP, THIN PROFILE 400 108 DAIKIN FCVC-104A FCU-302 302 Office VERTICAL, EXPOSED, FLAT TOP, THIN PROFILE 300 94 DAIKIN FCVC-103A FCU-304 304 Bath HORIZONTAL EXPOSED, BOTTOM RETURN, LOW PROFILE 200 83 DAIKIN FCHC-202A FCU-305 305 Office VERTICAL, EXPOSED, FLAT TOP, THIN PROFILE 200 83 DAIKIN FCVC-102A FCU-307 307 Office VERTICAL, EXPOSED, FLAT TOP, THIN PROFILE 300 94 DAIKIN FCVC-103A FCU-308 308 Office VERTICAL, EXPOSED, FLAT TOP, THIN PROFILE 400 108 DAIKIN FCVC-104A FCU-C32 C32 Corridor VERTICAL, EXPOSED, FLAT TOP, THIN PROFILE 300 94 DAIKIN FCVC-103A FCU-C33 C33 Corridor VERTICAL, EXPOSED, FLAT TOP, THIN PROFILE 300 94 DAIKIN FCVC-103A
NOTES:
1. NEW UNIT LOCATION. PROVIDE NEW BACNET THERMOSTAT EQUAL TO EXISTING UNITS IN BUILDING.
FAN COIL UNIT SCHEDULE (BLDG 45)
MARK LOCATION TYPE
AIR FLOW
WEIGHT
(LBS)
BASIS OF DESIGN
REMARKS
FAN AIR
FLOW
(CFM) MANUFACTURER MODEL
FCU-CG02 G02 Mech HORIZONTAL, CONCEALED, PLENUM 400 76 DAIKIN FCHH-204A FCU-1-105 105 Conf VERTICAL, EXPOSED, FLAT TOP, THIN PROFILE 300 94 DAIKIN FCVC-103A FCU-2-105 105 Conf VERTICAL, EXPOSED, FLAT TOP, THIN PROFILE 400 108 DAIKIN FCVC-104A FCU-101 101 Office VERTICAL, EXPOSED, FLAT TOP, THIN PROFILE 600 131 DAIKIN FCVC-106A FCU-102 102 Office VERTICAL, EXPOSED, FLAT TOP, THIN PROFILE 600 131 DAIKIN FCVC-106A FCU-104 104 Kitchen HORIZONTAL EXPOSED, BOTTOM RETURN, LOW PROFILE 800 153 DAIKIN FCHC-208A FCU-C11 C11 Corridor VERTICAL, EXPOSED, FLAT TOP, THIN PROFILE 600 131 DAIKIN FCVC-106A
FCU-1-206 206 Office HORIZONTAL EXPOSED, BOTTOM RETURN, LOW PROFILE 300 94 DAIKIN FCHC-203A FCU-2-206 206 Office HORIZONTAL EXPOSED, BOTTOM RETURN, LOW PROFILE 300 94 DAIKIN FCHC-203A FCU-201 201 Office HORIZONTAL EXPOSED, BOTTOM RETURN, LOW PROFILE 200 83 DAIKIN FCHC-202A FCU-202 202 Bathroom VERTICAL, EXPOSED, FLAT TOP, THIN PROFILE, HEATING
ONLY
200 83 DAIKIN FCVC-102A NOTE 1
FCU-203 203 Office HORIZONTAL EXPOSED, BOTTOM RETURN, LOW PROFILE 400 108 DAIKIN FCHC-204A FCU-205 205 Office HORIZONTAL EXPOSED, BOTTOM RETURN, LOW PROFILE 300 94 DAIKIN FCHC-203A FCU-207 207 Office HORIZONTAL EXPOSED, BOTTOM RETURN, LOW PROFILE 300 94 DAIKIN FCHC-203A FCU-208 208 Bath HORIZONTAL EXPOSED, BOTTOM RETURN, LOW PROFILE 200 83 DAIKIN FCHC-202A NOTE 1 FCU-301 301 Office VERTICAL, EXPOSED, FLAT TOP, THIN PROFILE 600 131 DAIKIN FCVC-106A FCU-302 302 Office VERTICAL, EXPOSED, FLAT TOP, THIN PROFILE 600 131 DAIKIN FCVC-106A FCU-305 305 Bath VERTICAL, EXPOSED, FLAT TOP, THIN PROFILE 200 83 DAIKIN FCVC-102A NOTE 1 FCU-C31 C31 Corridor VERTICAL, EXPOSED, FLAT TOP, THIN PROFILE 200 83 DAIKIN FCVC-102A
NOTES:
1. HEATING WATER AND CHILLED WATER ARE 30% PROPELENE GLYCOL.
2. PROVIDE UNIT WITH CONDENSATE OVERFLOW SWITCH, DISCHARGE SUPPLY GRILLE, AND DISCONNECT SWITCH.
3. THERMOSTATS ARE NETWORKED, BUILDING MANAGEMENT TYPE. COORDINATE FURNISHED FAN COIL UNIT OPTIONS WITH CONTROLS VENDOR. PROVIDE LOW-VOLTAGE INTERFACE BOARD AS REQUIRED.
4. PROVIDE THREE-WAY CONTROL VALVES EXTERNAL TO UNIT (BASIS OF DESIGN: BELIMO). FAN COIL UNIT PIPING CONNECTION PACKAGES ARE AVAILABLE IN LEFT-HAND, RIGHT-HAND, SAME-SIDE (HOT & COLD), OR OPPOSITE SIDES (HOT & COLD). CONTRACTOR IS RESPONSIBLE FOR IDENTIFYING ANY OBSTRUCTIONS ABOVE CEILING PRIOR TO FINALIZING ORDER. INSPECT EACH EXISTING CONDITION AND NOTE DESIRED COIL ORIENTATION, DISCONNECT SWITCH ORIENTATION, AND CONTROL PANEL ORIENTATION.
FAN COIL UNIT SCHEDULE TYPE SCHEDULE
TYPE (NOTES 2,3)
FAN AIR
FLOW
(CFM)
COOLING REQUIREMENTS (NOTES 1,4) HEATING REQUIREMENTS (NOTES 1,4)
FILTER
(MERV
RATING)
WEIGHT
(LBS)
ELECTRICAL BASIS OF DESIGN
CAPACITY EAT
FLOW
(GPM) EWT (°F)
RUNOUT
SIZE (IN)
CAPACITY
(BTUH) EAT (°F)
FLOW
(GPM) EWT (°F)
RUNOUT
SIZE (IN) VOLT PHASE
MOTOR CIRCUIT
MANUFACTURER MODEL
SENSIBLE
(BTUH)
TOTAL
(BTUH) Db (°F) Wb (°F) HP FLA MCA MOCP
HORIZONTAL EXPOSED, BOTTOM RETURN, LOW PROFILE 200 4944 4669 78.0 °F 57.0 °F 1.1 45.0 °F 0.5 8940 50.0 °F 0.9 140.0 °F 0.5 MERV13 83 120 1 0.25 3.5 4.4 15 DAIKIN FCHC-202A HORIZONTAL EXPOSED, BOTTOM RETURN, LOW PROFILE 300 6961 6961 78.0 °F 57.0 °F 1.5 45.0 °F 0.5 11029 50.0 °F 1.2 140.0 °F 0.5 MERV13 94 120 1 0.25 3.5 4.4 15 DAIKIN FCHC-203A HORIZONTAL EXPOSED, BOTTOM RETURN, LOW PROFILE 400 9058 9058 78.0 °F 57.0 °F 2 45.0 °F 0.5 15841 50.0 °F 1.7 140.0 °F 0.5 MERV13 108 120 1 0.25 3.5 4.4 15 DAIKIN FCHC-204A HORIZONTAL EXPOSED, BOTTOM RETURN, LOW PROFILE 600 12492 12492 78.0 °F 57.0 °F 2.7 45.0 °F 0.5 32786 50.0 °F 3.4 140.0 °F 0.5 MERV13 131 120 1 0.25 3.5 4.4 15 DAIKIN FCHC-206A HORIZONTAL EXPOSED, BOTTOM RETURN, LOW PROFILE 800 15094 15094 78.0 °F 57.0 °F 3.2 45.0 °F 0.5 38395 50.0 °F 2.5 140.0 °F 0.5 MERV13 153 120 1 0.25 3.5 4.4 15 DAIKIN FCHC-208A
HORIZONTAL, CONCEALED, PLENUM 400 9058 9058 78.0 °F 57.0 °F 2 45.0 °F 0.5 15841 50.0 °F 1.7 140.0 °F 0.5 MERV8 76 120 1 0.25 3.5 4.4 15 DAIKIN FCHH-204A VERTICAL, EXPOSED, FLAT TOP, THIN PROFILE 200 4620 4596 78.0 °F 57.0 °F 1 45.0 °F 0.5 8121 50.0 °F 0.9 140.0 °F 0.5 MERV13 83 120 1 0.25 3.5 4.4 15 DAIKIN FCVC-102A VERTICAL, EXPOSED, FLAT TOP, THIN PROFILE 300 6105 6105 78.0 °F 57.0 °F 1.3 45.0 °F 0.5 13675 50.0 °F 1.4 140.0 °F 0.5 MERV13 94 120 1 0.25 3.5 4.4 15 DAIKIN FCVC-103A VERTICAL, EXPOSED, FLAT TOP, THIN PROFILE 400 9243 9243 78.0 °F 57.0 °F 2 45.0 °F 0.5 20237 50.0 °F 2.1 140.0 °F 0.5 MERV13 108 120 1 0.25 3.5 4.4 15 DAIKIN FCVC-104A VERTICAL, EXPOSED, FLAT TOP, THIN PROFILE 600 12018 12018 78.0 °F 57.0 °F 2.6 45.0 °F 0.5 28054 50.0 °F 2.9 140.0 °F 0.5 MERV13 131 120 1 0.25 3.5 4.4 15 DAIKIN FCVC-106A VERTICAL, EXPOSED, FLAT TOP, THIN PROFILE 1000 18050 18050 78.0 °F 57.0 °F 4 45.0 °F 0.5 39876 50.0 °F 2.5 140.0 °F 0.5 MERV13 178 120 1 (2) 0.25 7 8.8 15 DAIKIN FCVC-110A
VERTICAL, EXPOSED, FLAT TOP, THIN PROFILE, HEATING ONLY 200 0 0 78.0 °F 57.0 °F 0 45.0 °F 0 8121 50.0 °F 0.9 140.0 °F 0.5 MERV13 83 120 1 0.25 3.5 4.4 15 DAIKIN FCVC-102A
NOTES:
1. COUNTERFLOW DESIGN, 316L CONSTRUCTION, REMOVABLE PLATES.
LIQUID TO LIQUID HEAT EXCHANGER SCHEDULE
MARK LOCATION SERVES SYSTEM
HOT SIDE COLD SIDE
WEIGHT
(LBS)
BASIS OF DESIGN
REMARKSTYPE
FLOW
(GPM)
EWT
(°F)
LWT
(°F)
WPD
(FT) TYPE
FLOW
(GPM)
EWT
(°F)
LWT
(°F)
WPD
(FT) MANUFACTURER MODEL
HX-1 B.45 MECH B.45 HEATING HOT
WATER
GEOTHERMAL,
0% GLYCOL
16.25 158 140 23.1 HEATING, 30%
GLYCOL
15 120 140 22.0 200 ALFA LAVAL AQ2A-MFG ALL
HX-1 B.23 MECH B.23 HEATING HOT
WATER
GEOTHERMAL,
0% GLYCOL
32.5 158 140 23.1 HEATING, 30%
GLYCOL
30 120 140 22.0 200 ALFA LAVAL AQ2A-MFG ALL
NOTES:
1. PROVIDE MOTOR STARTER AND DISCONNECT.
PUMP SCHEUDLE
MARK LOCATION SERVES SYSTEM
FLUID
WEIGHT
(LBS)
ELECTRICAL BASIS OF DESIGN
REMARKS
FLOW
(GPM)
HEAD
(FT)
TEMPERTURE
(°F) SP GR VOLT PHASE
MOTOR
MANUFACTURER MODELHP RPM
SPEED
CONTROL
P-HWHS-1 B.23 MECH B.23 HEATING HOT
WATER
30 45 140.0 °F 1.024 50 220 1 1.5 1725 CONST TACO 1207D ALL
P-HWHS-1 B.45 MECH B.45 HEATING HOT
WATER
15 45 140.0 °F 1.024 50 220 1 1.5 1725 CONST TACO 1207D ALL
P-HWHS-2 B.23 MECH B.23 HEATING HOT
WATER
30 45 140.0 °F 1.024 50 220 1 1.5 1725 CONST TACO 1207D ALL
P-HWHS-2 B.45 MECH B.45 HEATING HOT
WATER
15 45 140.0 °F 1.024 50 220 1 1.5 1725 CONST TACO 1207D ALL
MECHANICAL ABBREVIATIONS
AC ABOVE CEILING
AFF ABOVE FINISHED FLOOR
AI ANALOG INPUT
AO ANALOG OUTPUT
BF BELOW FLOOR, BLIND FLANGE
BFC BELOW FINISHED CEILING
BI BINARY INPUT
BG BELOW GRADE
BO BINARY OUTPUT
CD CONDENSATE DRAIN
CFM CUBIC FEET PER MINUTE
CH CHILLER
CHR CHILLED WATER RETURN
CHS CHILLED WATER SUPPLY
CHW CHILLED WATER
DIA DIAMETER
DS DISCONNECT SWITCH
E EXISTING
EA EXHAUST AIR
EF EXHAUST FAN
FCU FAN COIL UNIT
FMB FILTER MIXING BOX
FPB FAN POWERED BOX
FPI FINS PER INCH
GC GENERAL CONTRACTOR
GEF GENERAL EXHAUST FAN
GLY PROPYLENE GLYCOL
GWR GLYCOL WATER RETURN
GWS GLYCOL WATER SUPPLY
HWHR HOT WATER HEATING RETURN
HWHS HOT WATER HEATING SUPPLY
HWH HOT WATER HEATING
HWR HOT WATER RETURN
HWS HOT WATER SUPPLY
HX HEAT EXCHANGER
IN HG INCHES MERCURY (PRESSURE)
IN WC INCHES WATER COLUMN (PRESSURE)
LBS POUNDS
MA MIXED AIR
MAX MAXIMUM
MIN MINIMUM
MVD MOTORIZED VOLUME DAMPER
N NEW
OA OUTSIDE AIR
OBD OPPOSED BLADE DAMPER
P PUMP
POT POT FEEDER
PRV PRESSURE RELIEF (OR REDUCING) VALVE
RA RETURN AIR
RLA RELIEF AIR
SA SUPPLY AIR
SF SUPPLY FAN
SV SAFETY VALVE
T THERMOSTAT
TYP TYPICAL
UH UNIT HEATER
UNO UNLESS NOTED OTHERWISE
VD VOLUME DAMPER
WH WATER HEATER
07/30/2025
ST33 ST34
306C33C32
C31 302 307
C34
308A 307A
308301
301A302A
MECHCORRIDOR
STORAGE
RESTROOM
STORAGE STORAGE STORAGE
CORRIDOR
CORRIDORCORRIDOR
OFFICE
OFFICE
OFFICE OFFICE
OFFICE
MECH
T
T T
T
T
T
T
T
B .1
ST23 ST24
208A
C26
C25
212213
213A201A
201202
202A
C2
C2
ST21 ST22
206 207
C21
C23
OFFICE KITCHEN
CORRIDOR
CORRIDOR
CO
RR
ID
OR
CO
RR
ID
OR
CORRIDOR CORRIDOR
OFFICE
OFFICE
OFFICE OFFICE OFFICE OFFICE
OFFICE
OFFICE
STORAGE STORAGE
STORAGE
STORAGESTORAGERESTROOM
T T T T
T
T T
T T
B .1
102 108
ST13 ST14
102A
103 107
104 106
C12
ST12ST11
C11
105 110
102B 108B
C15
C14
C13
C16
OFFICE KITCHEN
CORRIDOR
RESTROOM
CORRIDOR
CORRIDOR CORRIDOR
CORRIDORCORRIDOR
OFFICE
OFFICE
RESTROOM
STORAGESTORAGEOFFICE
GROUP ROOM GROUP ROOM
B C
TT
T
T
T
T
T
B .1
G05
G06
STG4STG3
G04
G03
G02 CG01
G01 G10
CG02
G09
G08
G07
CG03
CG04
IT
MECH
CERAMIC OVEN
STORAGE
OFFICE
CORRIDOR
STORAGE
CORRIDOR
CORRIDORCORRIDORSTORAGE
STORAGE
OFFICE OFFICE
TT
T
TT
GENERAL NOTES
A.
B.
C.
D.
REFER TO SHEET M-001 FOR ADDITIONAL GENERAL NOTES.
EXISTING GEOTHERMAL HEATING PIPING AND RADIATORS ARE REMOVED
THROUGHOUT.
EXISTING THERMOSTATS MAY BE RE-USED AND RE-WIRED WITH NEW FAN COILS.
EXISTING FAN COIL UNITS SHALL BE REMOVED AS INDICATED ON DEMO SHEETS.
DISCONNECT AND RETURN DDC CONTROLLERS BACK TO OWNER.
DEMOLISH ALL
RADIATORS
AND FAN COILS
THROUGHOUT,
TYPICAL
DEMOLISH ALL
GEOTHERMAL
PIPING
THROUGHOUT,
EXCEPT AS
NOTED
OTHERWISE
(E )1
"C
HR
(E )3
/4"
CD
(E)CHW & CD
DN
DEMOLISH ALL
GEOTHERMAL
PIPING
THROUGHOUT,
EXCEPT AS
NOTED
OTHERWISE
(E)3/4"GWS (E)1"GWS
(E)3/4"GWS(E)3/4"GWR
(E)FCU BELOW
CEILING
(E )R
AD
IA
TO
R
(E )R
AD
IA
TO
R
(E )F
CU
A
T
FL
OO
R
(E )F
CU
A
T
FL
OO
R
(E )R
AD
IA
TO
R
(E )F
CU
A
T
FL
OO
R
(E )R
AD
IA
TO
R
(E )R
AD
IA
TO
R
(E )F
CU
A
T
FL
OO
R(E)FCU AT
FLOOR
(E)FCU AT
FLOOR
(E)FCU AT
FLOOR
(E )R
AD
IA
TO
R
(E)RADIATOR (E)RADIATOR
DEMOLISH
RADIATORS
AND FCUS
THROUGHOUT,
TYPICAL
(E )1
"C
HR (E
)1 "C
HS
(E )1
"C
HS
(E )1
"C
HR
(E )1
"C
HS
(E )1
"C
HR
2 2
2 2
(E )3
/4"
CD
(E )3
/4"
CD
(E)3/4"CD
(E)3/4"CD
(E)1"CHR
(E)3/4"CD
5 TYP ALL
T-STATS
(E)RADIATOR (E)RADIATOR(E)RADIATOR
(E )R
AD
IA
TO
R
(E )R
AD
IA
TO
R
(E )R
AD
IA
TO
R
(E)RADIATOR
(E)RADIATOR
(E)RADIATOR
(E )R
AD
IA
TO
R
(E )R
AD
IA
TO
R
(E)RADIATOR
(E)FCU BELOW
CEILING
(E)FCU BELOW
CEILING
(E)FCU BELOW
CEILING
(E)FCU BELOW
CEILING
(E)FCU BELOW
CEILING
(E)FCU BELOW
CEILING
(E)FCU BELOW
CEILING
(E)FCU BELOW
CEILING
DEMOLISH ALL
RADIATORS
AND FAN COILS
THROUGHOUT,
TYPICAL
2 2
(E)CHW & (E)CD
FROM BELOW(E)CHW & (E)CD
FROM BELOW
5 TYP ALL
T-STATS
(E)FCU AT
FLOOR
(E)FCU AT
FLOOR
(E)FCU ON
FLOOR
(E)FCU ON
FLOOR
(E)FCU ON
FLOOR
(E)FCU AT
FLOOR
(E)FCU BELOW
CEILING
(E)FCU BELOW
CEILING
(E)FCU ON
FLOOR
(E)RADIATOR
(E )R
AD
IA
TO
R
(E)RADIATOR (E)RADIATOR
(E )R
AD
IA
TO
R
DEMOLISH ALL
RADIATORS
AND FAN COILS
THROUGHOUT,
TYPICAL
(E )2
1/ 2"
CH
S
(E )1
1/ 2"
CH
R
(E )2
1/ 2"
CH
R
(E )2
1/ 2"
CH
S
(E )1
1/ 2"
CH
R
(E)1"CHR
(E)1"CHS
(E)1 1/2"CHR
(E)1 1/2"CHS
(E)1 1/2"CHR
1(E )3
/4"
CD
(E )3
/4"
CD
(E)1 1/2"CHS
(E)3/4"CD (E)3/4"CD(E)3/4"CD
(E)3/4"CD
(E)1 1/2"CHS
(E)3/4"CHR
(E)3/4"CHS
(E )3
/4"
CD
CD TO UTILITY
SINK
(E)3/4"CD
(E)3/4"CD
(E)CONDENSATE
TO HUB DRAIN
(E)1"CHR
(E)1"CHS
3 3
(E)3/4"GWS(E)3/4"GWR
(E )3
/4"
GW
R (E )3
/4"
GW
S
(E)1"GWR
(E )1
"G W
S
(E)3/4"CHR
(E)3/4"GWS
(E)3/4"GWR
5 TYP ALL
T-STATS
(E)FCU ON
FLOOR
(E)FCU ON
FLOOR
(E)FCU BELOW
CEILING
(E)FCU BELOW
CEILING
(E)FCU BELOW
CEILING(E)FCU BELOW
CEILING
(E)FCU BELOW
CEILING
EXISTING BACNET INTEGRATION
PANEL, B.23 AND B.45 (VIA
TUNNEL)
2 2
EXISTING PIPING
NEW PIPING
DEMOLISHED PIPING
EXISTING EQUIPMENT
NEW EQUIPMENT
DEMOLISHED EQUIPMENT
LEGEND
1/8" = 1'-0"1 MECHANICAL BUILDING 23 GROUND DEMOLITION PLAN
1/8" = 1'-0"2 MECHANICAL BUILDING 23 LEVEL 1 DEMOLITION PLAN
1/8" = 1'-0"3 MECHANICAL BUILDING 23 LEVEL 2 DEMOLITION PLAN
1/8" = 1'-0"4 MECHANICAL BUILDING 23 LEVEL 3 DEMOLITION PLAN
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
KEY PLAN NTS
Architecture, Engineering, and, Sustainable DesignAESUS 1050 E. Southern Ave, Suite #D, Tempe, Arizona 85282, (480) 454-2861design group
B.45
B.23
Au to de sk
D oc s:
//A
ES
U
S Pr oj ec ts /5
-2
4-
R ep la ce H
VA
C
B .2
B.
_M
EC
H .rv t 7/
/2
2:
:3
PM
MECHANICAL DEMOLITION PLAN
BUILDING 23
AESUS AESUS
MD-223
960 BROADWAY AVE, BOISE, ID 83706
531-24-104
23 & 45
July 10, 2025
REPLACE HVAC, B.23 & B.45100% SUBMISSION
LEGEND NOTES
1 REMOVE ALL RADIATORS THROUGHOUT. PATCH AND REPAIR. REFER TO ARCHITECTURAL.
TYPICAL ALL.
2 DISCONNECT AND REMOVE EXISTING GEOTHERMAL PIPING RISERS. MINIMIZE
DISTURBANCE OF EXISTING PLASTER WALLS/CHASES (DROP PIPING DOWN TO FLOORS
BELOW). PATCH AND REPAIR WALL.
3 EXISTING CHILLED WATER AND CONDENSATE UP TO FAN COIL UNIT ABOVE.
4 EXISTING CHILLED WATER AND CONDENSATE TO RISERS FROM THIRD FLOOR TO GROUND
FLOOR.
5 PREPARE TO RE-USE OF EXISTING THERMOSTAT. RE-WIRE AT NEW FCU (AND ASSOCIATED
NEW CONTROLLER) FOR RE-USE.
6 REMOVE EXISTING GEOTHERMAL PUMPS AND PIPING. PREPARE TO CONNECT
GEOTHERMAL WATER TO NEW HEAT EXCHANGER SKID. REFER TO DETAILS.
101A
C11
ST11 103
STG2
104B
STORAGE
FRONT PORCH
OFFICE
OFFICE
REAR PORCH
KITCHEN
CORRIDOR
CONFERENCE
D O W N
U P
D O W N
D O W N
U P
D O W N
104A
FN
D
T
T
T
T T
ST21
C21
203A
205A
207A
1A
RF1
RF2
CORRIDOR
STORAGE
STORAGE
STORAGESTORAGE
ST
OR
AG
E
OFFICE
OFFICE
OFFICE
OFFICE OFFICE
RESTROOM
RESTROOM
U P
D O W N
D O W N
T
T
T
TT
304A
302A
301A
C31
ST31
CORRIDOR
RESTROOM
OFFICE
OFFICE
ATTIC
STORAGE
STORAGESTORAGE
STORAGE
D O W N
T
T
T
G03
G01
CG02
STG1
OFFICE
CRAWL SPACE
STORAGE
U P
UP
T
GENERAL NOTES
A.
B.
C.
D.
REFER TO SHEET M-001 FOR ADDITIONAL GENERAL NOTES.
EXISTING GEOTHERMAL HEATING PIPING AND RADIATORS ARE REMOVED
THROUGHOUT.
EXISTING THERMOSTATS MAY BE RE-USED AND RE-WIRED WITH NEW FAN COILS.
EXISTING FAN COIL UNITS SHALL BE REMOVED AS INDICATED ON DEMO SHEETS.
DISCONNECT AND RETURN DDC CONTROLLERS BACK TO OWNER.
DEMOLISH ALL
RADIATORS
AND FAN COILS
THROUGHOUT,
TYPICAL
TYP ALL
T-STATS
REMOVE
RISERS
(PREPARE TO
REPLACE)
(E )R
AD
IA
TO
R
(E )R
AD
IA
TO
R
(E)RADIATOR
(E)FCU AT
FLOOR
(E)FCU AT
FLOOR
(E)FCU AT
FLOOR
(E)FCU AT
FLOOR
(E)FCU AT
FLOOR
(E)FCU BELOW
CEILING
(E)FCU AT
FLOOR
(E)FCU AT
FLOOR
(E)FCU AT
FLOOR
(E)1 1/2"CHS
(E)1 1/2"CHR(E)1 1/4"CD
DEMOLISH ALL
RADIATORS
AND FAN COILS
THROUGHOUT,
TYPICAL
(E)FUTURE
STUB
3 3
(E )1
1/ 4"
CD
(E
)1 1/
2"
CH
S (E
)1 1/
2"
CH
R
6 TYP ALL
T-STATS
(E)RADIATOR (E)RADIATOR (E)RADIATOR
(E)FCU BELOW
CEILING
(E)FCU BELOW
CEILING
(E)FCU BELOW
CEILING
(E)FCU BELOW
CEILING
(E)FCU BELOW
CEILING
(E)FCU BELOW
CEILING
(E)RADIATOR
(E )R
AD
IA
TO
R
(E)RADIATOR
DEMOLISH ALL
RADIATORS
AND FAN COILS
THROUGHOUT,
TYPICAL
6 TYP ALL
T-STATS
(E)RADIATOR
(E )R
AD
IA
TO
R
(E )F
CU
A
T
FL
OO
R
(E)FCU AT
FLOOR
(E)FCU AT
FLOOR
(E)RADIATOR
(E )3
/4"
CH
R (E
)3 /4"
CH
S
(E)3/4"CD
(E )1
1/ 4"
CD
(E)1 1/4"CD
DEMOLISH ALL
RADIATORS
AND FAN COILS
THROUGHOUT,
TYPICAL
(E )1
"C
HS (E
)1 "C
HR
(E
)1 "C
D
(E)2"CHR
(E)2"CHS
(E)1 1/4"CD
6 TYP ALL
T-STATS
5 5
(E)FCU AT
FLOOR
(E)EXPOSED
FCU
EXISTING BACNET PANEL,
NETWORKS BACK TO B.23
EXISTING PIPING
NEW PIPING
DEMOLISHED PIPING
EXISTING EQUIPMENT
NEW EQUIPMENT
DEMOLISHED EQUIPMENT
LEGEND
3/16" = 1'-0"1 MECHANICAL BUILDING 45 GROUND DEMOLITION PLAN
3/16" = 1'-0"2 MECHANICAL BUILDING 45 LEVEL 1 DEMOLITION PLAN
3/16" = 1'-0"3 MECHANICAL BUILDING 45 LEVEL 2 DEMOLITION PLAN 3/16" = 1'-0"4 MECHANICAL BUILDING 45 LEVEL 3 DEMOLITION PLAN
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
KEY PLAN NTS
Architecture, Engineering, and, Sustainable DesignAESUS 1050 E. Southern Ave, Suite #D, Tempe, Arizona 85282, (480) 454-2861design group
B.45
B.23
Au to de sk
D oc s:
//A
ES
U
S Pr oj ec ts /5
-2
4-
R ep la ce H
VA
C
B .2
B.
_M
EC
H .rv t 7/
/2
2:
:3
PM
MECHANICAL DEMOLITION PLAN
BUILDING 45
AESUS AESUS
MD-245
960 BROADWAY AVE, BOISE, ID 83706
531-24-104
23 & 45
July 10, 2025
REPLACE HVAC, B.23 & B.45100% SUBMISSION
LEGEND NOTES
1 REMOVE EXISTING GEOTHERMAL PUMPS AND PIPING. PREPARE TO CONNECT
GEOTHERMAL WATER TO NEW HEAT EXCHANGER SKID. REFER TO DETAILS.
2 REMOVE ALL RADIATORS THROUGHOUT. PATCH AND REPAIR. REFER TO ARCHITECTURAL.
TYPICAL ALL.
3 EXISTING CHILLED WATER AND CONDENSATE UP TO FAN COIL UNIT ABOVE.
4 EXISTING CHILLED WATER AND CONDENSATE TO RISERS FROM THIRD FLOOR TO GROUND
FLOOR.
5 DISCONNECT AND REMOVE EXISTING GEOTHERMAL PIPING RISERS. MINIMIZE
DISTURBANCE OF EXISTING PLASTER WALLS/CHASES (DROP PIPING DOWN TO FLOORS
BELOW). PATCH AND REPAIR WALL.
6 PREPARE TO RE-USE OF EXISTING THERMOSTAT. RE-WIRE AT NEW FCU (AND ASSOCIATED
NEW CONTROLLER) FOR RE-USE.
B .1
102 108
ST13 ST14
102A
103 107
104 106
C12
ST12ST11
C11
105 110
102B 108B
C15
C14
C13
C16
OFFICE KITCHEN
CORRIDOR
RESTROOM
CORRIDOR
CORRIDOR CORRIDOR
CORRIDORCORRIDOR
OFFICE
OFFICE
RESTROOM
STORAGESTORAGEOFFICE
GROUP ROOM GROUP ROOM
B C
TT
T T
T
T
T
T
T
B .1
G05
G06
STG4STG3
G04
G03
G02 CG01
G01 G10
CG02
G09
G08
G07
CG03
CG04
IT
MECH
CERAMIC OVEN
STORAGE
OFFICE
CORRIDOR
STORAGE
CORRIDOR
CORRIDORCORRIDORSTORAGE
STORAGE
OFFICE OFFICE
TT
T
TT
GENERAL NOTES
A.
B.
C.
REFER TO SHEET M-001 FOR ADDITIONAL GENERAL NOTES.
EXISTING CHILLED WATER AND CONDENSATE SHALL BE RE-USED WHERE POSSIBLE.
CONTROL VALVES SHALL BE INSTALLED EXTERNAL TO UNIT. THERMOSTATS MAY BE
RE-USED AND RE-WIRED WITH NEW FAN COILS.
CHILLED AND HOT WATER COIL CONNECTIONS FOR FCUS ARE AVAILABLE IN LEFT-
HAND, RIGHT-HAND, SAME-SIDE, OR OPPOSITE. CONTRACTOR SHALL IDENTIFY ANY
OBSTRUCTIONS ABOVE CEILING PRIOR TO FINALIZING CONFIGURATION WITH FCU
VENDOR. ALSO COORDINATE PREFERRED ORIENTATION OF DISCONNECT AND
CONTROL PANEL.
7 7
7 7
8 TYP ALL (E)T-STATS
(E)CHW & (E)CD
FROM BELOW
(E)CHW & (E)CD
FROM BELOW
1 1 /2"
HW
S
3/4"HWS 3/4"HWS
FCU-110FCU-105
FCU-C11 FCU-C15
FCU-109
FCU-108
FCU-102
FCU-101
FCU-102A
HX-1
P-HWHS-1
P-HWHS-2
(E)BF-2
(E)BF-1
(E )2
1/ 2"
CH
S
(E)1"CHS
(E)1"CHR
(E)1 1/2"CHS
(E)1 1/2"CHR
(E)1"CHS
(E)1"CHR
(E)1 1/2"CHR
(E)1 1/2"CHS
(E )1
1/ 2"
CH
R
(E)3/4"CHR
(E )3
/4"
CH
R
(E )2
1/ 2"
CH
S
P-GLY-1
1"
HW
S
1"
HW
R
GLYCOL
WATER
ENTERS
BUILDING
CD TO UTILITY
SINK
(E)CONDENSATE
TO HUB DRAIN
6 6
6 6
7 7
8TYP ALL (E)T-STATS
(E)3/4"CD
(E )3
/4"
CH
S
(E )3
/4"
CD
(E )3
/4"
CD
(E)1 1/2"CHR
(E)1 1/2"CHS
(E)3/4"CD (E)3/4"CD
(E)3/4"CD
3/4"HWS
1 1 /2"
HW
R
1 1 /2"
HW
S
1 1/2"
1 1/2"HWR
10 10
UP TO FCU,
RE-USE
PREVIOUS
PENETRATIONS
UP TO FCU,
RE-USE
PREVIOUS
PENETRATIONS
3/4"HWS
3/4"HWR
3/4"HWS
1"HWS 1"HWR1"HWR 1"HWS
FCU-G10FCU-G01
FCU-G03 FCU-G08
FCU-G05
EXISTING
BACNET
INTEGRATION
PANEL, B.23
AND B.45 (VIA
TUNNEL)
POT-1
(E)1 1/2"GWR
(E)1 1/2"GWS
EXISTING PIPING
NEW PIPING
DEMOLISHED PIPING
EXISTING EQUIPMENT
NEW EQUIPMENT
DEMOLISHED EQUIPMENT
LEGEND
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
KEY PLAN NTS
Architecture, Engineering, and, Sustainable DesignAESUS 1050 E. Southern Ave, Suite #D, Tempe, Arizona 85282, (480) 454-2861design group
B.45
B.23
Au to de sk
D oc s:
//A
ES
U
S Pr oj ec ts /5
-2
4-
R ep la ce H
VA
C
B .2
B.
_M
EC
H .rv t 7/
/2
2:
:3
PM
MECHANICAL LEVELS 0 & 1
BUILDING 23 PLAN
AESUS AESUS
M-223A
960 BROADWAY AVE, BOISE, ID 83706
531-24-104
23 & 45
July 10, 2025
REPLACE HVAC, B.23 & B.45100% SUBMISSION
3/16" = 1'-0"1 MECHANICAL BUILDING 23 GROUND PLAN
3/16" = 1'-0"2 MECHANICAL BUILDING 23 LEVEL 1 PLAN
LEGEND NOTES
1 PROVIDE GEOTHERMAL HEAT EXCHANGER AND ASSOCIATED MOTORIZED VALVES AND
CONTROLS. REFER TO DETAILS ON SHEET M-501.
2 PROVIDE HEATING HOT WATER PUMPS (PRIMARY / BACKUP) AND ASSOCIATED MOTOR
STARTER AND CONTROLS.
3 PROVIDE NEW GLYCOL MAKE-UP UNIT (30%PG) FOR HEATING HOT WATER.
4 ROUTE NEW HEATING HOT WATER PIPING ALONGSIDE EXISTING CHILLED WATER PIPING.
EXTEND PIPING TO ALL FOUR-PIPE FAN COIL UNITS THROUGHOUT BUILDING.
5 EXISTING CHILLED WATER AND CONDENSATE TO RISERS FROM THIRD FLOOR TO GROUND
FLOOR.
6 EXISTING CHILLED WATER AND CONDENSATE UP TO FAN COIL UNIT ABOVE.
7 DISCONNECT AND REMOVE EXISTING GEOTHERMAL PIPING RISERS. MINIMIZE
DISTURBANCE OF EXISTING PLASTER WALLS/CHASES (DROP PIPING DOWN TO FLOORS
BELOW). PATCH AND REPAIR WALL.
8 PREPARE TO RE-USE OF EXISTING THERMOSTAT. RE-WIRE AT NEW FCU (AND ASSOCIATED
NEW CONTROLLER) FOR RE-USE.
9 NEW HEATING WATER TO RISERS FROM THIRD FLOOR TO GROUND FLOOR.
10 NEW HEATING WATER CONNECTIONS UP TO NEW FAN COIL UNIT ABOVE.
11 NEW FAN COIL UNIT LOCATION. EXTEND NEW HYDRONIC WATER AND CONDENSATE
RUNOUTS. PROVIDE NEW THERMOSTAT AND CONNECT TO BACNET NETWORK.
12 PIPING RUNOUTS UP THROUGH FLOOR SERVING FCU AT NEW LOCATION.
ST23 ST24
208A
C26
C25
212213
213A201A
201202
202A
C2
C2
ST21 ST22
206 207
C21
C23
OFFICE KITCHEN
CORRIDOR
CORRIDOR
CO
RR
ID
OR
CO
RR
ID
OR
CORRIDOR CORRIDOR
OFFICE
OFFICE
OFFICE OFFICE OFFICE OFFICE
OFFICE
OFFICE
STORAGE STORAGE
STORAGE
STORAGESTORAGERESTROOM
T T T T
T
T
T T
T
T T
ST33 ST34
306C33C32
C31 302 307
C34
308A 307A
308301
301A302A
MECHCORRIDOR
STORAGE
RESTROOM
STORAGE STORAGE STORAGE
CORRIDOR
CORRIDORCORRIDOR
OFFICE
OFFICE
OFFICE OFFICE
OFFICE
MECH
T
T T
T
T
T
T
T
GENERAL NOTES
A.
B.
C.
REFER TO SHEET M-001 FOR ADDITIONAL GENERAL NOTES.
EXISTING CHILLED WATER AND CONDENSATE SHALL BE RE-USED WHERE POSSIBLE.
CONTROL VALVES SHALL BE INSTALLED EXTERNAL TO UNIT. THERMOSTATS MAY BE
RE-USED AND RE-WIRED WITH NEW FAN COILS.
CHILLED AND HOT WATER COIL CONNECTIONS FOR FCUS ARE AVAILABLE IN LEFT-
HAND, RIGHT-HAND, SAME-SIDE, OR OPPOSITE. CONTRACTOR SHALL IDENTIFY ANY
OBSTRUCTIONS ABOVE CEILING PRIOR TO FINALIZING CONFIGURATION WITH FCU
VENDOR. ALSO COORDINATE PREFERRED ORIENTATION OF DISCONNECT AND
CONTROL PANEL.
(E )1
"C
HS
(E )1
"C
HR
(E )1
"C
HR
(E )1
"C
HS
(E)1"CHS
(E)1"CHR
(E )1
"C
HS
(E )1
"C
HR
(E )3
/4"
CD (E
)3 /4"
CD
3 3
4 TYP ALL
T-STATS
1"HWR
1"HWS
1"HWR
1"HWS
1"
HW
R 1"
HW
S
1"
HW
R 1"
HW
S
1"
HW
R 1"
HW
S
3/4 "H
W R
3/4 "H
W R
FCU-202
FCU-201 FCU-213
FCU-212
FCU-211
FCU-210
FCU-203
FCU-204
FCU-205 FCU-208
FCU-202A
(E )1
"C
HR
(E )1
"C
HR
3 3
3 3
4 TYP ALL
T-STATS
(E )3
/4"
CD
3/4 "H
W S
3/4 "H
W R
NEW HEATING
WATER FROM
FLOOR BELOW
FCU-304
FCU-305
FCU-C33
FCU-C32
FCU-301 FCU-308
FCU-307
FCU-302
EXISTING PIPING
NEW PIPING
DEMOLISHED PIPING
EXISTING EQUIPMENT
NEW EQUIPMENT
DEMOLISHED EQUIPMENT
LEGEND
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
KEY PLAN NTS
Architecture, Engineering, and, Sustainable DesignAESUS 1050 E. Southern Ave, Suite #D, Tempe, Arizona 85282, (480) 454-2861design group
B.45
B.23
Au to de sk
D oc s:
//A
ES
U
S Pr oj ec ts /5
-2
4-
R ep la ce H
VA
C
B .2
B.
_M
EC
H .rv t 7/
/2
2:
:3
PM
MECHANICAL LEVELS 2 & 3
BUILDING 23 PLAN
AESUS AESUS
M-223B
960 BROADWAY AVE, BOISE, ID 83706
531-24-104
23 & 45
July 10, 2025
REPLACE HVAC, B.23 & B.45100% SUBMISSION
3/16" = 1'-0"1 MECHANICAL BUILDING 23 LEVEL 2 PLAN
3/16" = 1'-0"2 MECHANICAL BUILDING 23 LEVEL 3 PLAN
LEGEND NOTES
1 EXISTING CHILLED WATER AND CONDENSATE UP TO FAN COIL UNIT ABOVE.
2 EXISTING CHILLED WATER AND CONDENSATE TO RISERS FROM THIRD FLOOR TO GROUND
FLOOR.
3 DISCONNECT AND REMOVE EXISTING GEOTHERMAL PIPING RISERS. MINIMIZE
DISTURBANCE OF EXISTING PLASTER WALLS/CHASES (DROP PIPING DOWN TO FLOORS
BELOW). PATCH AND REPAIR WALL.
4 PREPARE TO RE-USE OF EXISTING THERMOSTAT. RE-WIRE AT NEW FCU (AND ASSOCIATED
NEW CONTROLLER) FOR RE-USE.
5 NEW HEATING WATER TO RISERS FROM THIRD FLOOR TO GROUND FLOOR.
6 NEW HEATING WATER CONNECTIONS UP TO NEW FAN COIL UNIT ABOVE.
7 NEW FAN COIL UNIT LOCATION. EXTEND NEW HYDRONIC WATER AND CONDENSATE
RUNOUTS. PROVIDE NEW THERMOSTAT AND CONNECT TO BACNET NETWORK.
CG02
STG1
OFFICE
CRAWL…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .