53-26 - Front Ends and Specs.pdf
PDF 18 MB Posted
- Solicitation number
- 53-26
- Issued by
- El Paso County, Texas
About this file
This file contains front end specifications and technical details for the Hillcrest Estates Water Improvements Project - Phase II in Texas. The project involves the design and installation of a potable water distribution system for the Hillcrest Estates subdivision, including 8-inch and 12-inch PVC pipeline, gate valves, water service connections with yard piping, water stubouts, bonnet boxes, master meters, clearing and grubbing operations, trenching, backfill and compaction work, fire hydrants, and related appurtenances necessary for system completion. The specifications document establishes the technical standards, materials, construction methods, and quality requirements that contractors must follow to ensure proper installation and long-term functionality of the water infrastructure serving the residential subdivision.
The front end specifications establish the baseline requirements for material quality, installation procedures, testing protocols, and performance standards that bidders must comply with when preparing proposals and executing the work. These specifications typically address pipe specifications, joint connections, valve installation standards, fire hydrant placement, service line installation protocols, trenching depth and width requirements, backfill compaction specifications, and system pressure testing and disinfection procedures. Compliance with these detailed technical requirements ensures system reliability, longevity, and adherence to applicable Texas water utility standards and local regulations governing potable water distribution infrastructure.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .