About this file

This solicitation is for renovation work on the third and fourth floors of D Wing at the Syracuse VA Medical Center. The work includes renovating primary care areas on those floors. This is a total SDVOSB set-aside procurement conducted according to Public Law 109-461. Offerors must be verified in VetBiz.gov and registered in SAM.gov under NAICS code 236220 to be considered. The site visit is scheduled for January 13, 2021 and questions are due by January 28, 2021. The lowest priced responsive, responsible bidder will be awarded the contract. Bids are to be emailed to the contracting officer by the due date following the specified subject line instructions. The Department of Veterans Affairs VHA VISN 2 is the issuing agency.

View the file

Other files for this federal contract opportunity

Other files attached to Z1DA--528A7-19-708 SCI RENOVATION-THIRD AND FOURTH FLOOR D-WING, newest first.
File Type Posted
36C24221B0016 AMENDMENT 6.pdf PDF
528A7-19-708 VA Syracuse D Wing Phasing Drawing .pdf PDF
36C24221B0016 AMENDMENT 5.pdf PDF
36C24221B0016 4th Amendment .docx DOCX document
SAM-DESCRIPTION.docx DOCX document
087100 - DOOR HARDWARE.pdf PDF
528A7-19-708 VA Syracuse D Wing Final Drawing Rev02 02.pdf PDF
528A7-19-708 Addendum Clarifications Rev02.pdf PDF
Patient Lifts Q_A part 2 Signed.pdf PDF
081400 - INTERIOR WOOD DOORS.pdf PDF
RFI Form Brass Covers Signed.pdf PDF
3 - RFI Form Asbestos Abatement Specification Signed.pdf PDF
237300 - Indoor Central-Station Air-Handling Units.pdf PDF
117300 - CEILING MOUNTED PATIENT LIFT SYSTEM.pdf PDF
081113 - HOLLOW METAL DOORS AND FRAMES.pdf PDF
2 - RFI Form Door Hardware Specification Signed.pdf PDF
RFI Form for 3rd and fourth floor d wing teledata Signed.pdf PDF
RFI Form Electrical Data Jacks Welch Signed.pdf PDF
RFI Form for 3rd and fourth floor d wing wirig specification Signed.pdf PDF
RFI Form Recessed Conduit Signed.pdf PDF
RFI Form for 3rd and fourth floor d wing FA questions Signed.pdf PDF
RFI Form Exam Room AOV IMS Signed.pdf PDF
RFI Watt Stopper and Lighting Signed.pdf PDF
RFI Form for 3rd and fourth floor d wing Nurse Call Signed.pdf PDF
1-21-2021 Question on Nurse Calls.pdf PDF
36C24221B0016_4.docx DOCX document
36C24221B0016_3.docx DOCX document
117300 - CEILING MOUNTED PATIENT LIFT SYSTEM update 1-19-21 pk.pdf PDF
D-Wing Walk through SIGN IN SHEET 1-13-21.pdf PDF
36C24221B0016_1.docx DOCX document
528A7 19 708 VA Syracuse D Wing Final Specifications.pdf PDF
36C24221B0016_2.docx DOCX document
SOW 528A7_19_708 Renovate 3rd_4th floor D Wing 02.docx DOCX document
P07-WAGE RATE.pdf PDF
528A7 19 708 VA Syracuse D Wing Final Specifications.pdf PDF
Show all 35

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ENGINEERING LLP

www.fellp.com

181 Church St., Suite 100, Poughkeepsie, NY 12601 t 845-454-9704 fx 855-320-8735

22 Mulberry St., Suite 2A, Middletown, NY 10940 t 845-343-1481 fx 845-343-4986

FE PROJECT #: 19-083

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

100% CONSTRUCTION

DOCUMENTS

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseENGINEER OF RECORDCONSULTANT

321 4 5 6 7 8 9 10

VA MEDICAL CENTER SYRACUSE

3RD & 4TH FLOOR 'D' WING

RENOVATIONS

VAMC, SYRACUSE, NY

528A7-19-708

Project Director

10-21-20Revisions: Date:

Fi le

N am e:

F

:\2

9\

-0

V A

S Y

R A

C U

S E rd th F lo or

D W in g\

(1 ) T

S .d w g

(L ay ou t:

(1

)T S

D at e:

F ri, N ov

0,

- 2

:1

P M

N am e:

z r)

HYMAN

HAYES

ASSOCIATES

6 Wembley Court

Albany, NY 12205

(518) 452-3470 www.hymanhayes.com

ARCHITECT:

TS

TITLE SHEET WITH INDEX TO

DRAWINGS

REF.

A B BB C

HOOD

HOOD

CONF.

D325OFFICE

D323A

OFFICE

D323B

SWING SPACE

D321

SWING SPACE

D305 SWING SPACE

D304

D301

JAN. (E)

OFFICE

D308

LAB

D311

OFFICE

D323

OFFICE

D324

LAB

D314

Room D313A

Room D313B

HOT/COLD PROCESSING

D313

CORRIDOR

D300A

ELEC.

D310

FIRE APP.

D312

BLS-3 ANTE ROOM

D307

BLS-3 LAB

D307A

CORRIDOR

D300

TOILET

D303

STORAGE

D320

OFFICE

D322

ELEC.

D306

A B BB C

OFFICE

D425

OFFICE

D423

OFFICE

D421

OFFICE

D411A

SCI / RESEARCH LAB

D407

SCI PROCEDURE RM

D405

TOILET (E)

D412

BREAK ROOM

D408

SOILED UTILITY

D402

TOILET

D401

MECHANICAL

D417

STORAGE

D404

LARGE EXAM

C429

HOME

CARE

NURSE

CUBICLES (4)

D426

OFFICE

D419

EXAM

C426

EXAM

C428

LARGE EXAM

C423

HOME CARE NURSE

C432

EXAM

C430

LARGE EXAM

C434

JAN. (E)

D406

CUBICLES

D415

CONF. ROOM

D409

OFFICE

D411C

OFFICE

D411B

CORRIDOR

D432

CORRIDOR

D432A

STORAGE

C441A

TELEHEALTH

C420

ENGINEERING LLP

www.fellp.com

181 Church St., Suite 100, Poughkeepsie, NY 12601 t 845-454-9704 fx 855-320-8735

22 Mulberry St., Suite 2A, Middletown, NY 10940 t 845-343-1481 fx 845-343-4986

FE PROJECT #: 19-083

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

100% CONSTRUCTION

DOCUMENTS

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseENGINEER OF RECORDCONSULTANT

321 4 5 6 7 8 9 10

VA MEDICAL CENTER SYRACUSE

3RD & 4TH FLOOR 'D' WING

RENOVATIONS

VAMC, SYRACUSE, NY

528A7-19-708

Project Director

10-21-20Revisions: Date:

Fi le

N am e:

F

:\2

9\

-0

V A

S Y

R A

C U

S E rd th F lo or

D W in g\

(2 ) 1

-G I-0

.d w g

(L ay ou t:

(2

) 1 -G

I-0

D at e:

F ri, D ec

4,

- 1

1:

A

N am e:

z r)

HYMAN

HAYES

ASSOCIATES

6 Wembley Court

Albany, NY 12205

(518) 452-3470 www.hymanhayes.com

ARCHITECT:

UL U465 (2 HOUR RATED)

FIRECODE 'X' GYPSUM BD PANELS

APPLIED VERTICALLY OR HORIZONTALLY.

HORIZONTAL JOINTS NEED NOT BE

STAGGERED. FACE LAYER JOINTS TO BE

FINISHED. FIRE CAULK ALL

PENETRATIONS. PROVIDE 4' DOORS WITH

2 HOUR RATING AS REQUIRED.

3RD FLOOR ICRA PLAN1 4TH FLOOR ICRA PLAN2

CONSTRUCTION PARTITION WALL DETAIL3

1-GI-001

3RD & 4TH FLOOR 'D' WING

ICRA PLANS

KEYED NOTES:

NOTES:

A B C

C453 C451 C449

C447

C445 C443 C441A C424

C441

C426

C428

C430

C432

C434

C429

C423

C425

C422

C420

C444C446C448C450C452C454 D408

C427

C461D400

D402

D406

D401

D404D405

D407

D409

D415

D417

D416

D412

D410

4S6

CORRIDOR 445

M305F

C

7 6 5 4 3 2 1

A B

C

D3

A D3

B

D3

D3

D3

D3

D3

D3

D3

D3

D3

C4

D3

C4

D3

D3

D3

D3

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

SCHEMATIC DESIGN

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

VA MEDICAL CENTER SYRACUSE

3RD & 4TH FLOOR 'D' WING

RENOVATIONS

VAMC, SYRACUSE, NY

528A7-19-708

10/21/2020

Egan Environmental Consulting, Inc.

TGE EDS

Drawing 01 OF 01

C :\T em p\

R ev it Fi le s\

S yr ac us e V

A D

W in g R en ov at io ns _m pa tte rs on

C 5J

.rv t 3/

5/

1:

:2

A M

1-HA-101

THIRD & FOURTH FLOOR

ASBESTOS ABATEMENT PLAN

SCALE: 1/8" = 1'-0"

2 4TH FLOOR ASBESTOS ABATEMENT PLAN

PROJECT

NORTH

KEY PLAN- 4TH FLOOR

SCALE: 1/8" = 1'-0"1-HA-101

1 3RD FLOOR ASBESTOS ABATEMENT PLAN

PROJECT

NORTH

PROJECT

NORTH

3rd & 4th FLOOR ASBESTOS ABATEMENT TO BE COMPLETED PRIOR TO

START OF CONSTRUCTION. PROPOSED WORK TO BE BASED ON TESTING

REPORT. COORDINATE ALL DEMOLITION WORK WITH ASBESTOS REPORT

RESULTS AND ABATEMENT SCOPE.

Revisions: Date:

1-HA-101

A B BB C

C426

C428

C430

C432

C434

C429

C423

D408

C427

C461 D406

D404D405

D407

D409

D415

D417

D416

D412

D410

4S6

VERIFY EXITING WALLS BUILT ON CONCRETE SUBFLOOR TOPPING;

REPORT TO ARCHITECT IF EXISTING WALL IS FOUND TO BE CONSTRUCTED

ON TOP OF DECKING (TYPICAL)

FEC

CONTRACTOR TO DEMOLISH CHASE

IN ITS ENTIRERTY TO ALLOW

ACCESS FOR POTENTIAL

ENVIRONMENTAL CONTAMINANTS

TO BE REMOVED

D414

D416

ASSUMED METAL HAT CHANNEL W/

GWB WALL FINISH. REMOVE &

DISPOSE TO ALLOW FOR PROPOSED

INSTALLATION OF RIGID INSULATION

& METAL FRAMING

NO EXISTING FLOORING

FEC

C420

TELEHEALTH

NO EXISTING FLOORING

D401

D402D404

CONTRACTOR TO DEMOLISH CHASE

IN ITS ENTIRERTY TO ALLOW

ACCESS FOR POTENTIAL

ENVIRONMENTAL CONTAMINANTS

TO BE REMOVED

CONTRACTOR TO DEMOLISH CHASE

IN ITS ENTIRERTY TO ALLOW

ACCESS FOR POTENTIAL

ENVIRONMENTAL CONTAMINANTS

TO BE REMOVED

CONTRACTOR TO DEMOLISH CHASE

IN ITS ENTIRERTY TO ALLOW

ACCESS FOR POTENTIAL

ENVIRONMENTAL CONTAMINANTS

TO BE REMOVED

DEMOLITION LEGEND:

EXISTING DOOR TO REMAIN

PARTITION TO BE REMOVED

DOOR AND FRAME TO BE REMOVED

PLUMBING FIXTURE TO REMAIN

PLUMBING FIXTURE TO BE REMOVED

EXISTING WALL TO REMAIN

AREA NOT HATCHED INDICATES REMOVAL OF ALL

ITEMS INCLUDING, BUT NOT LIMITED TO PARTITIONS,

VINYL WALL COVERINGS, ALL FINISH FLOOR

MATERIALS, WALL BASE AND ASSOCIATED

ADHESIVES AND MASTICS, FLOOR ACCESS PANELS,

FLOOR DRAINS, BORROWED LITES, WALL

PROTECTION, CERAMIC TILE, MILLWORK, CASEWORK,

LOCKERS, BENCHES, SHELVING, AND STANDARDS,

WHITEBOARDS, BULLETIN BOARDS, LIGHT FIXTURES,

GYPSUM BOARD CEILINGS AND SOFFITS, SUSPENDED

CEILING SYSTEMS, DIFFUSERS, GRILLES, COAT

RACKS, PRIVACY CURTAINS AND TRACKS, PLUMBING

FIXTURES, TOILET ACCESSORIES, WALL BUMPERS,

CHAIR RAILS, TV AND BRACKETS, SHARPS BOXES,

ZONE VALVE BOXES, ANESTHESIA COLUMNS, GLOVE

BOXES, CLOCKS, HAND SANITIZER DISPENSERS,

PNEUMATIC TUBE STATIONS, SURGICAL BOOMS,

PRECISION AIR DIFFUSER SYSTEMS.

COORDINATE DUCTWORK, ELECTRICAL AND ALL

MEDICAL GAS SYSTEM REMOVALS WITH MEP

ENGINEER. COORDINATE WITH OWNER FOR THE

ITEMS THAT REQUIRE SALVAGING. COORDINATE

STORAGE OF SALVAGED ITEMS WITH OWNER'S

REPRESENTATIVE.

EXISTING AREA TO REMAIN

(NOT IN CONTRACT)

XXXX DOOR TO BE REMOVED AND

SALVAGED FOR RELOCATION

A B BB C

D323B D323A

D323

D325

D324

D321

D304D305

D308

D311

D314D313

D306

D312

T

SPILL CONTROL

STATION

FPS

COORDINATE COLD UNIT

COMPRESSOR RELOCATION

W/ MEP DOCUMENTS

D310

DEMOLITION NOTES

1. DRAWINGS SHOW GENERAL SCOPE OF REMOVAL WORK. CONTRACTOR IS REQUIRED TO

VISIT SITE TO CONFIRM EXACT ITEMS AND MATERIALS TO BE REMOVED.

2. CONTRACTOR IS TO PROVIDE ALL DEMOLITION WORK AS REQUIRED TO ALLOW FOR

INSTALLATION OF NEW WORK AS SHOWN ON DRAWINGS.

3. PROVIDE NEW OPENINGS IN EXISTING CONSTRUCTION. REMOVE ONLY AS MUCH

EXISTING CONSTRUCTION AS REQUIRED TO PROVIDE NEW OPENING. COORDINATE SIZE

OF OPENING WITH FLOOR PLAN

4. COORDINATE ACTUAL SIZE, LOCATION AND EXTENT OF FLOOR SLAB REMOVAL WITH

MECHANICAL, ELECTRICAL AND PLUMBING DRAWINGS. SAW CUT CONCRETE SLAB.

JACKHAMMERS ARE NOT ALLOWED.

5. REMOVE EXISTING FLOORING IN AREAS OF NEW WORK IN THEIR ENTIRETY TO ALLOW

FOR SMOOTH SUBSTRATE FOR NEW FLOORING.

6. SHORE EXISTING CONSTRUCTION AS REQUIRED FOR DEMOLITION AND REMOVALS.

7. REMOVE DEBRIS FROM DEMOLITION AREA AS IT IS PRODUCED. LEGALLY DISPOSE OF

MATERIALS OFF SITE.

8. PROMPTLY REPAIR ADJACENT SURFACES DAMAGED BY THE DEMOLITION.

9. ALL DOORS, EQUIPMENT, FIXTURES, REGISTERS AND OTHER ITEMS REMOVED DURING

DEMOLITION ARE TO REMAIN THE PROPERTY OF THE OWNER UNLESS OTHERWISE

DIRECTED BY THE OWNER'S REPRESENTATIVE.

10. REUSE ITEMS REMOVED AS INDICATED ON DRAWINGS OR AS DIRECTED BY OWNER.

11. REMOVE ALL EXISTING EXPOSED OR CONCEALED CONDUIT, WIRING INSTALLATION,

WIRING DEVICES, ELECTRICAL EQUIPMENT, PIPING, DUCTWORK, AND EQUIPMENT

RENDERED OBSOLETE BY THE DEMOLITION OR ALTERATION. REMOVE PIPING TO THE

NEAREST MAIN.

12. RESTORE ANY EXISTING ELECTRICAL INSTALLATION DISTURBED DURING THE COURSE

OF CONSTRUCTION AND NOT INDICATED FOR REMOVAL.

13. ALL EXTERIOR DOORS AND WINDOWS TO REMAIN, UNLESS OTHERWISE INDICATED.

14. PROVIDE FIRE SAFING AND FIRESTOP SEALANT ALL PIPING AND CONDUIT REMOVALS AS

REQUIRED TO MAINTAIN WALL/ FLOOR RATINGS.

15. CAREFULLY REMOVE PARTITIONS AROUND COLUMNS AND AT PARTITIONS TO REMAIN.

TO AVOID DAMAGING COLUMNS AND MINIMIZE DAMAGE TO CONSTRUCTION TO REMAIN.

16. PRIOR TO DEMOLITION NOTIFY OWNER OF ALL FIXTURES, DEVICES, ETC. TO BE

DISCARDED AND SET ASIDE THOSE THE OWNER WANTS TO SALVAGE.

HYMAN

HAYES

ASSOCIATES

6 Wembley Court, Albany, NY 12205

(518) 452-3470 www.hymanhayes.com

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

100% CONSTRUCTION

DOCUMENTS

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

ARCHITECT:

VA MEDICAL CENTER SYRACUSE

3RD & 4TH fOOR 'D' WING

RENOVATIONS

VAMC, SYRACUSE, NY

528A7-19-708

10/21/2020

C T e m p \R e v it F ile s \S y ra c u s e

V A

D W in g

R e n o v a ti o n s m p a tt e rs o n

C J

.r v t

/1 /2

:4

:1

P M

1-AD-101

THIRD & FOURTH FLOOR

DEMOLITION PLAN

SCALE: 1/8" = 1'-0"1-AD-101

2 4TH FLOOR DEMOLITION PLAN

PROJECT

NORTH

KEY PLAN- 4TH FLOOR

SCALE: 1/8" = 1'-0"1-AD-101

1 3RD FLOOR DEMOLITION PLAN

PROJECT

NORTH

PROJECT

NORTH

1 COORDINATE EXISTING PLUMBING FIXTURE W/ ASBESTOS

REMOVALS; VERIFY EXTENT OF ALL PLUMBING REMOVALS

WITH PLUMBING DOCUMENTS.

2 REMOVE AND DISPOSE OF EXISTING CASEWORK;

COUNTERTOPS WILL BE REMOVED BY OTHERS PRIOR TO

START OF CONSTRUCTION

3 REMOVE AND DISPOSE OF EXISTING SOLID SURFACE WINDOW

SILL AND APRON

4 REMOVE AND DISPOSE OF ALL PLUMBING FIXTURES AND

ASSOCIATED PLUMBING; VERIFY EXTENT OF ALL REMOVALS

WITH PLUMBING DOCUMENTS

5 REMOVE AND DISPOSE OF EXISTING 4" MASONRY INTERIOR

WALL TO ALLOW FOR PROPOSED CONSTRUCTION

6 REMOVE AND DISPOSE OF EXISTING DOOR AND FRAME TO

ALLOW FOR PROPOSED CONSTRUCTION

8 REMOVE AND DISPOSE OF ALL EXISTING FINISHED FLOORING,

WALL BASE & ADHESIVES TO CONCRETE SLAB

9 REMOVE AND DISPOSE OF EXISTING SUSPENDED CEILING

SYSTEM TO ALLOW FOR PROPOSED CONSTRUCTION

10 REMOVE AND DISPOSE OF EXISTING METAL PARTITION

SYSTEMS TO ALLOW FOR PROPOSED CONSTRUCTION

11 REMOVE AND DISPOSE OF EXISTING WALL MOUNTED

PLUMBING FIXTURES, PATCH EXISTING WALL TO ALLOW FOR A

SMOOTH EVEN SURFACE TO MATCH EXISTING ADJACENT

CONDITIONS

12 REMOVE EXISTING WALL PROTECTION/WALL TILE TO ALLOW

FOR A SMOOTH & CLEAN SURFACE FOR PROPOSED

CONSTRUCTION (TYP.) OF ENTIRE ROOM

13 REMOVE AND SALVAGE EXISTING METAL LOCKER SYSTEM TO

ALLOW FOR PROPOSED REINSTALLATION; COORDINATE WITH

PROPOSED CONSTRUCTION

14 DISASSEMBLE EXISTING HOT/COLD UNITS & ASSOCIATED

PLUMBING/ELECTRICAL AS NEEDED TO ALLOW FOR SALVAGE

AND RELOCATION; COORDINATE ALL PLUMBING & ELECTRICAL

REMOVALS WITH M.E.P. DRAWINGS.

15 REMOVE AND DISPOSE OF EXISTING WALL MOUNTED SHELVING

TO ALLOW FOR PROPOSED CONSTRUCTION

16 REMOVE AND DISPOSE OF EXISTING DOOR, FRAME & METAL

FRAMING W/ GWB SHEATHING AS NEEDED TO ALLOW FOR

PROPOSED CONSTRUCTION

7 REMOVE AND DISPOSE OF EXISTING METAL FRAMING W/ GWB

SHEATHING EA. SIDE TO ALLOW FOR PROPOSED

CONSTRUCTION

17 REMOVE AND DISPOSE OF EXISTING 2X4 SUSPENDED CEILING

SYSTEM AS NEEDED TO ALLOW FOR PROPOSED

CONSTRUCTION. COORDINATE W/ SHEET A3.01 PRIOR TO

DEMOLITION.

KEY NOTES

THIRD FLOOR ASBESTOS ABATEMENT TO BE COMPLETED PRIOR TO

START OF CONSTRUCTION. PROPOSED WORK TO BE BASED ON TESTING

REPORT. COORDINATE ALL DEMOLITION WORK WITH ASBESTOS REPORT

RESULTS AND ABATEMENT SCOPE.

FOURTH FLOOR ASBESTOS ABATEMENT TO BE COMPLETED PRIOR TO

START OF CONSTRUCTION. PROPOSED WORK TO BE BASED ON TESTING

REPORT. COORDINATE ALL DEMOLITION WORK WITH ASBESTOS REPORT

RESULTS AND ABATEMENT SCOPE.

18 COORDINATE REMOVE AND DISPOSE OF ALL EXISTING

FINISHED FLOORING & WALL BASE W/ ASBESTOS REMOVALS

REMOVE & DISPOSE OF ALL WALL ADHERED

ACOUSTICAL PANELS & ADHESIVE TO CMU WALL. CMU

WALL TO BE CLEAN & SMOOTH TO ALLOW FOR

PROPOSED PRIMER & PAINT FINISH. (TYP.)

19 COORDINATE REMOVE AND DISPOSE OF ALL EXISTING FRP

WALL COVERINGS AND ADHESIVES TO ALLOW FOR PROPOSED

CONSTRUCTION

EXISTING 3RD FLOOR DOORS TO BE REMOVED BY ASBESTOS

CONTRACTOR. ALL EXISTING METAL DOOR FRAMES @ MASONRY WALLS

TO REMAIN.

EXISTING 4TH FLOOR DOORS TO BE REMOVED BY ASBESTOS

CONTRACTOR. ALL EXISTING METAL DOOR FRAMES @ MASONRY WALLS

TO REMAIN. ALL FRAMES TO BE REMOVED AT EXISTING WALLS DESIGNED

TO BE REMOVED.

Revisions: Date:

JStasack Snapshot

JStasack Snapshot

ALIGN

CODE

ACCESSORY LEGEND

ITEM

PROVIDED BY

O = OWNER/ C = CONTRACTOR

INSTALLED BY

MODEL NUMBER

OCODE BLUECB O SEE SPECS

CCLOTHING HOOKCH C SEE SPECS

GRAB BARGB SEE SPECS

OHAND SANITIZER DISPENSERHSD SEE SPECS

OLIQUID SOAP DISPENSERLSD C SEE SPECS

CMIRRORMR C SEE SPECS

ONURSE CALLNC C SEE SPECS

OPAPER TOWEL DISPENSERPTD C SEE SPECS

OSANITARY NAPKIN DISPOSALSND C SEE SPECS

C C

C

OTOILE TISSUE DISPENSERTTH C SEE SPECS

OWASTE BASKET WB O SEE SPECS

FEC SIGNAGE

H T

TEL/

DATA

TWIST LOCK

RECEPTACLE

RECEPTACLE

'-6

'-0

DOOR

ACTUATOR

LIGHTING

SWITCHES

HUMIDISTAT

THERMOSTAT

ALARM

PANEL

FIRE HOSE

CABINET (FHC)

'-0

'-0

'-0

ZONE VALVE BOXES

Z.V. Z.V.

ELECTRIC

PANEL (E.P.)

'-6

'-0

FEC

'-6

" A T

S T

A F

F /D

U T

Y S

T A

T

IO

N S

'-9

NURSE

CALL

NC

'-0

'-1

CH

'-4

SHARPS BOX

PTD

'-2

LSD

'-6

SND

'-3

'-0

HOLDER OUTLET

AND TOP EDGE

OF DISPOSAL

TYPICAL MOUNTING HEIGHTS, EXCLUDES

TOILET ROOMS UNLESS OTHERWISE NOTED.

SOFFIT

3" LIGHT VALANCE,

AS INDICATED

COUNTERTOP AND

BACKSPLASH AS

INDICATED

SINK AND FAUCET -

SEE PLUMBING

DRAWINGS

DOOR SWING

WALL BASE

ADJUSTABLE SHELVES ON BRACKETS

STANDARDS

RECEPTACLE - COORDINATE WITH

ELECTRICAL DRAWINGS

WORK SURFACE

FABRIC WRAPPED TACK PANEL, AS INDICATED

BACKSPLASH, AS INDICATED

METAL

SUPPORT

BRACKET

WALL CABINET

CABINET

MICROWAVE

OPEN

WALL CABINET

WALL SHELVES

ADJUSTABLE

COUNTER/ SINK BASE CABINET

(1) DRAWER

BASE CABINET/ BASE CABINET

(4) DRAWER

BASE CABINET/

W/ BACKSPLASH

WORKSURFACE

NOTE:

CABINET TYPE LEGEND GRAPHICALLY DENOTES MILLWORK

TYPES FOUND IN INTERIOR ELEVATIONS. SEE 1-AS-701

DRAWING SERIES FOR CORRESPONDING MILLWORK

SECTIONS.

DOOR PULLS

V A

R

IE

S

C O

U N

T E

R H

E

IG

H T

SLOPED TOP, AS

INDICATED

OPEN

U .N

.O

MICROWAVE

SINK APRON

NOTE:

ELEVATION IS FOR GENERIC HEIGHTS & LOCATIONS. NOT

ALL OF THE ELEMENTS SHOWN ARE PROVIDED ON THE

CONTRACT DOCUMENTS

GENERAL NOTES

1. ALL WORK SHALL COMPLY WITH ALL APPLICABLE GOVERNMENT CODES INCLUDING BUT

NOT LIMITED TO OSHA, ADA, AND NFPA.

2. ALL ENTRANCES SHALL COMPLY WITH THE ARCHITECTURAL BARRIERS ACT (ABA)

ACCESSIBILITY STANDARDS.

3. CONTRACTOR IS TO PERFORM A SITE VISIT TO BECOME FAMILIARIZED WITH EXISTING

CONDITIONS BEFORE SUBMITTING PRICING.

4. CONTRACTOR SHALL REVIEW ALL DRAWINGS AND SPECIFICATIONS AND NOTIFY VA COR

OF ANY INACCURACIES PRIOR TO COMMENCEMENT OF WORK.

5. THE CONTRACTOR SHALL HOLD THE OWNER, ARCHITECT AND ENGINEERS HARMLESS

AGAINST ANY AND ALL CLAIMS ARISING FROM WORK PERFORMED ON THE

CONSTRUCTION SITE.

6. COMMENCE WORK IMMEDIATELY UPON AWARD OF THE CONTRACT. PROCEED

DILIGENTLY AND CONTINUOUSLY TO COMPLETION.

7. PRIOR TO STARTING WORK, SUBMIT FOR OWNER'S APPROVAL A DETAILED SCHEDULE

INDICATING ALL WORK THAT MIGHT AFFECT OWNER'S USE OF BUILDING SUCH AS

UTILITY SHUT DOWNS, NOISE GENERATING CONSTRUCTION, ETC.

8. EXISTING FACILITY WILL REMAIN IN OPERATION DURING THIS WORK. ENSURE SAFE

PASSAGE OF ALL PERSONS AROUND WORK AREAS. ERECT BARRIERS AS REQUIRED

AND/OR AS DIRECTED BY OWNER. MAINTAIN ALL REQUIRED EGRESS ROUTES. DO NOT

LIMIT OWNER'S USE OF FACILITY WITHOUT OWNER'S APPROVAL.

9. CONTRACTOR SHALL TAKE PRECAUTIONS TO AVOID ANY DISRUPTION, DAMAGE OR

HAZARD TO OWNER AND OWNER'S CLIENTS DURING CONSTRUCTION. MAINTAIN

BUILDING SECURITY AND PROTECTION FOR OCCUPANTS SAFETY.

10. PATCH FIRE PROTECTION DAMAGED DURING CONSTRUCTION TO RESTORE EXISTING

FIRE RATING.

11. DO NOT INTERRUPT EXISTING UTILITY SERVICE WITHOUT OWNER AUTHORIZATION.

PROVIDE SERVICE DURING INTERRUPTIONS.

12. PERFORM WORK IN A MANNER WHICH MINIMIZES NOISE. SCHEDULE OPERATIONS AS

MAY BE DIRECTED BY OWNER.

13. PROVIDE OWNER WITH TIMELINE SCHEDULE FOR INSTALLATION OF OWNER-PROVIDED,

CONTRACTOR INSTALLED EQUIPMENT.

14. CONTRACTOR SHALL PROVIDE ALL LABOR AND MATERIALS REQUIRED TO COMPLETE

THE WORK.

15. PROVIDE ALL MATERIALS AND PERFORM ALL WORK IN ACCORDANCE WITH RECOGNIZED

GOOD STANDARD PRACTICES.

16. ALL MATERIALS SHALL BE AS SPECIFIED, OR AS EQUAL AS APPROVED BY ARCHITECT.

MATERIALS SPECIFIED INDICATE QUALITY INTENT THAT WILL BE USED AS A BASIS FOR

REVIEW OF SUBSTITUTES.

17. ALL ITEMS WHICH ARE NOT SPECIFICALLY REFEREED TO ON THESE DRAWINGS ARE TO

BE SELECTED BY THE OWNER FROM THE MANUFACTURER'S STANDARD SAMPLES

SHOWING FULL RANGE OF TEXTURES AND COLORS AVAILABLE.

18. FOLLOW MANUFACTURER'S SPECIFICATIONS AND INSTRUCTIONS FOR INSTALLATION OF

ALL MATERIALS.

19. SURVEY PROJECT AREA FOR ANY OPENINGS THAT ARE UNSEALED IN FLOORS OR FIRE

BARRIERS OR SMOKE BARRIERS. SEAL ALL PENETRATIONS AS REQUIRED BY PARTITION

TYPE.

20. THE WORDS "PROVIDE" OR "SUPPLY" SHALL INCLUDE BOTH FURNISHING AND

INSTALLING THE SPECIFIED OR DETAILED ITEM, IN PLACE AND READY FOR OPERATION

AND USE.

21. CONTRACTOR SHALL STORE MATERIALS IN OWNER DESIGNATED AREAS. MATERIAL

DELIVERY SHALL BE AS DIRECTED BY OWNER.

22. FIELD VERIFY ALL EXISTING CONDITIONS PRIOR TO BEGINNING WORK.

23. ALL DIMENSIONS SHALL BE FIELD VERIFIED. DO NOT SCALE DRAWINGS. INDICATED

DIMENSIONS ARE TO CENTERLINE OF STEEL, FACE OF EXISTING GYPSUM BOARD

PARTITIONS, FACE OF STUDS AT NEW GYPSUM BOARD PARTITIONS OR FACE OF CMU.

24. MINOR ITEMS OF WORK SUCH AS CUTTING, BLOCKING, TRIM, ETC. SHALL BE

PERFORMED AS REQUIRED TO MAKE THE WORK COMPLETE WHETHER SHOWN ON THE

CONTRACT DOCUMENTS OR NOT.

25. PROTECT FINISHED FLOORS AND OTHER SURFACES WITH DURABLE SHEET MATERIALS

FROM TRAFFIC, DIRT, WEAR, DAMAGE OR MOVEMENT OF HEAVY OBJECTS.

26. PRIOR TO DEMOLITION, NOTIFY OWNER OF ALL FIXTURES, DEVICES, ETC. TO BE

DISCARDED AND SET ASIDE THOSE THE OWNER WANTS TO SALVAGE.

27. NOTIFY OWNER OF ALL TELEPHONE, DATA CABLE(S) AND DEVICES INDICATED TO BE

REMOVED OR DISCONNECTED PRIOR TO TAKING ACTION. OWNER MAY OPT TO REMOVE.

ELECTRICAL CONTRACTOR TO REMOVE RACEWAY.

28. USE SUITABLE METHODS TO LIMIT DUST/DIRT FROM ADJACENT SURFACES DIRTIED BY

THE REMOVALS.

29. CONTROL ACCUMULATION OF WASTE MATERIALS AND RUBBISH FROM CONSTRUCTION.

LEAVE PROJECT AREA BROOM CLEAN AT THE END OF EACH DAY. REMOVE ALL DEBRIS

FROM THE SITE IN ACCORDANCE WITH STATE AND LOCAL CODES. COORDINATE

REMOVAL WITH OWNER.

30. PERFORM FINAL CLEANING AT THE END OF THE CONTRACT. CLEAN INTERIOR

SURFACES, EQUIPMENT, FIXTURES AND PLENUMN. REPLACE FILTERS AT MECHANICAL

EQUIPMENT.

31. CONTRACTOR SHALL SECURE AND PAY FOR ALL REQUIRED PERMITS.

5/8" TYPE "X" MMR GYPSUM

WALLBOARD, EACH SIDE

3 1/2" MINERAL WOOL

INSULATION

3 5/8" 20 GA @ 16"

O.C. STEEL STUD

FRAMING. BRACING

@ 4'-0" OC

J08

PARTITION TYPE

SCALE: 1" = 1'-0"

4 1/4"

(5/8" CEMENT BACKER BOARD

@ ALL WALL TILE LOCATIONS)

5/8" TYPE "X" MMR GYPSUM

WALLBOARD, EACH SIDE

3 5/8" x 20 GA @ 16"

O.C. STEEL STUD

FRAMING

3 1/2" MINERAL

WOOL INSULATION

J18

PARTITION TYPE

SCALE: 1" = 1'-0"

STC 46 UL DESIGN No. U465

(WHERE 1 HR.

RATING NOTED)

4 7/8"

5/8" TYPE "X" GYPSUM

WALLBOARD, EACH SIDE

3 5/8" x 20 GA @ 16" O.C.

STEEL STUD FRAMING

3 1/2" MINERAL WOOL

INSULATION

J10

PARTITION TYPE

SCALE: 1" = 1'-0"

STC 46 UL DESIGN No. U465

(WHERE 1 HR.

RATING NOTED)

4 7/8"

5/8" TYPE "X" GYPSUM

WALLBOARD, EACH SIDE

6" x 20 GA @ 16" O.C.

STEEL STUD FRAMING

5 1/2" MINERAL

WOOL INSULATION

L10

PARTITION TYPE

SCALE: 1" = 1'-0" STC 49 UL DESIGN No. U465 (WHERE 1 HR.

RATING NOTED)

7 1/4"

A08

PARTITION TYPE

5/8" TYPE "X" MMR

GYPSUM WALLBOARD,

ONE SIDE

7/8" x 20 GA FURRING HAT

CHANNEL @ 16" O.C.

EXISTING WALL

SCALE: 1" = 1'-0"

1 1/2"

(5/8" CEMENT BACKER BOARD

@ ALL WALL TILE LOCATIONS)

3 5/8" x 20 GA @ 16" O.C.

STEEL STUD FRAMING

(2) LAYERS 5/8" TYPE "X"

MMR GYPSUM WALLBOARD,

EACH SIDE - STAGGER

JOINTS

3 1/2" MINERAL

WOOL INSULATION

J14

PARTITION TYPE

SCALE: 1" = 1'-0" STC 56 UL DESIGN No. U411 (WHERE 2 HR.

RATING NOTED)

6 1/8"

EXISTING CONCRETE DECK

FIRESTOP SEALNT

STEEL TRACK

MECHANICALLY FASTEN

24" O.C. MAX

5/8" TYPE-X

GYPSUM BOARD

3 5/8" STEEL STUD

16" O.C. (SEE PARTITION TYPE FOR STEEL GAGE)

MINERAL WOOL INSULATION

FLEXIBLE SEALANT1

/4

M

IN

/4

M

A X

HEAD OF WALL - 1HR

UL DESIGN: HW-D-0079

UL DESIGN: HW-D-0083

PARTITION - 1HR

UL DESIGN: U465

UL DESIGN: V438

EXISTING CONCRETE DECK

FIRESTOP SEALNT

STEEL TRACK

MECHANICALLY FASTEN

24" O.C. MAX

(2) LAYERS 5/8" TYPE-X

GYPSUM BOARD

3 5/8" STEEL STUD

16" O.C. (SEE PARTITION TYPE FOR STEEL GAGE)

MINERAL WOOL INSULATION

FLEXIBLE SEALANT1

/4

M

IN

/4

M

A X

.HEAD OF WALL - 2HR

UL DESIGN: HW-D-0079

UL DESIGN: HW-D-0083

PARTITION - 2HR

UL DESIGN: U411

UL DESIGN: V438

POLTETHYLENE BACKER

ROD OR MINERAL WOOL

A0

PARTITION TYPE

5/8" TYPE "X" GYPSUM

WALLBOARD, ONE SIDE

1 5/8" x 20 GA @ 16" O.C.

STEEL STUD FURRING

EXISTING WALL

SCALE: 1" = 1'-0"

3 3/4"

1.5" MINERAL FIBER BOARD

INSULATION ADHERED TO EXTERIOR

WALL & TAPED @ ALL JOINTS

(5/8" CEMENT BACKER BOARD

@ ALL WALL TILE LOCATIONS)

FLOOR PLAN LEGEND:

FIRE EXTINGUISHER CABINET

DETAIL/CALLOUT KEY

ROOM TAG

ELEVATION KEY

SECTION KEY

ALIGN KEY

DOOR NUMBER

CORNER GUARD

EXISTING DOOR AND FRAME

NEW DOOR AND FRAME

EXISTING WALL

X

AX.XX

FEC

CG

X

AX.XX

X

AX.XX

NEW PARTITION

FIRE HOSE CABINETFHC

ZONE VALVE BOX. COORDINATE

WITH PLUMBING DRAWINGS.

ZV

MED GAS ALARM PANEL COORDINATE

WITH PLUMBING DRAWINGS.

AP

ELECTRICAL PANEL COORDINATE

WITH ELECTRICAL DRAWINGS.

EP

X

WINDOW TAG/ DESIGNATION

WALL MOUNTED GAS OUTLET

(0-OXYGEN, V-VACUUM, MA-MEDICAL AIR)

AX.XX

HATCH INDICATED AREA NOT IN CONTRACT

XXXX

RELOCATED DOOR

XXXX

Room name

XXXX

DIMENSION TO CENTERLINE OF OBJECT

MR

PTD

'-4

1'-3"

'-1

MIN.

8"

LEG CLEARANCE

11" MIN.

CLEARANCE

9" TOE

'-3

LAVATORY

'-1

'-1

/2

MR

LIQUID SOAP

DISPENSER

LSD

CLEAR KNEE SPACE

TYPICAL MOUNTING HEIGHTS AT TOILET

ROOMS UNLESS OTHERWISE NOTED.

1'-6"

3'-6" 1'-0"

'-1

'-9

'-6

39" TO 41"

3'-0" 6"

TOILET - FLOOR MOUNTED

'-5

'-6

7" TO 9"

'-0

NC

GB

GB

TTH

GB

HYMAN

HAYES

ASSOCIATES

6 Wembley Court, Albany, NY 12205

(518) 452-3470 www.hymanhayes.com

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

100% CONSTRUCTION

DOCUMENTS

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

ARCHITECT:

VA MEDICAL CENTER SYRACUSE

3RD & 4TH fOOR 'D' WING

RENOVATIONS

VAMC, SYRACUSE, NY

528A7-19-708

10/21/2020

C T e m p \R e v it F ile s \S y ra c u s e

V A

D W in g

R e n o v a ti o n s m p a tt e rs o n

C J

.r v t

/1 /2

:4

:2

P M

1-AS-001

GENERAL NOTES, TYPICAL

ELEVATIONS

SCALE: 1/2" = 1'-0"1-AS-001

3 TYPICAL MOUNTING HEIGHTS

SCALE: 1/2" = 1'-0"1-AS-001

2 TYPICAL TOILET ROOM MOUNTING HEIGHTS

SCALE: 1/2" = 1'-0"1-AS-001

4 TYPICAL CABINET TYPE LEGEND

NOTE:

ALL ITEMS INDICATED ON THIS SHEET MAY

NOT BE PRESENT IN THE SCOPE OF WORK.

NOTE:

STC RATINGS INDICATED VALID WHEN PARTITION

EXTENDS TO DECK ABOVE AND SEALED.

SCALE: 1 1/2" = 1'-0"1-AS-001

6 1HR RATED ASSEMBLY TO CONCRETE DECK

SCALE: 1 1/2" = 1'-0"1-AS-001

7 2HR RATED ASSEMBLY TO CONCRETE DECK

SCALE: 1/2" = 1'-0"1-AS-001

1 TOILET ROOM FIXTURE LOCATIONS

SS SS

S S

REF.

LIFE SAFETY LEGEND:

EGRESS PATH

EXIT SIGN (E-EXISTING)

1 HR FIRE BARRIER / SMOKE

BARRIER (45 MINUTE DOOR AND

FIRE / SMOKE DAMPERS)

EXISTING AREA TO REMAIN

(NOT IN CONTRACT)

INDICATES EXIT ACCESS POINT

2 HR FIRE RATED PARTITION/ SMOKE

BARRIER (1 1/2 HOUR DOOR AND

FIRE / SMOKE DAMPERS

FIRE EXTINGUISHER CABINETFEC

NON FIRE BARRIER SMOKE

LIMITING BARRIER

HORIZONTAL EXIT

1 HR FIRE BARRIER

(45 MINUTE DOOR)

2 HR FIRE BARRIER (1 1/2 HR DOOR

AND FIRE DAMPERS)

FIRE HOSE CABINETFHC

HE

NOTE:

GENERAL CONTRACTOR TO VERIFY INTEGRITY OF

RATED PARTITIONS INDICATED AS EXISTING WITHIN THE

PROJECT AREA. PROVIDE SAFING/ AND PATCHING AS

REQUIRED TO ACHIEVE RATING INDICATED.

A B BB C

CONF.

D325

OFFICE

D323A

OFFICE

D323B

SWING SPACE

D321

SWING SPACE

D305

SWING SPACE

D304

D301

JAN. (E)

OFFICE

D308

LAB

D311

OFFICE

D323

OFFICE

D324

'-8

/2

(E

'-7

(E

'-0

(E

'-2

(E

'-6

(E

HOOD

M A

X D

E A

D E

N D

C O

R R

ID

O

R

M A

X C

O M

M O

N P

A T

H O

F T

R A

V E

L

M A

X T

R A

V E

L D

IS

T

A N

C E

39'-3" V.I.F.

20'-3" (E) 6'-8" (E) 13'-7" (E)

'-8

/2

V

.I .F

'-6

(E

'-1

(E

'-4

(E

9'-9" (E) 10'-1" (E) 18'-9" (E)

'-5

(E

'-4

(E

'-4

(E

'-4

(E

'-4

(E

'-5

(E

'-6

(E

'-8

(E

'-1

(E

'-1

/8

(E

'-8

/8

(E

'-0

(E

'-1

(E

OFFICE

D322

TOILET

D303 D320

LAB

D314

HOT/COLD PROCESSING

D313

FEC

FEC

19'-3" (E) 20'-2" (E)

HE

D307A

BLS-3 LAB

D307

BLS-3 ANTE

ROOM

BUSINESS

II (0,0,0)

74'-0"' (COMPLIES) 3RD FLR

51'-0" (COMPLIES) 3RD FLR

22'-0" (COMPLIES) 3RD FLR

VARIES: 8'-0" TO 6'-0"

(COMPLIES)

(2) EXITS (COMPLIES)

NA

.3" / OCCUPANT=13"

7.3.3.1

N.A.

N.A.

.2" / OCCUPANT=8.8"

7.3.3.1

72" (COMPLIES)

2-HR RATED

(COMPLIES)

2 HR-4 STORIES & MORE

1 HR-3 STORIES & LESS

7.1.3.2.1

OCCUPANCY: BUSINESS

MAXIMUM DEAD

END CORRIDOR

COMMON PATH

OF TRAVEL

RATINGS -

CORRIDORS

RATINGS -

STAIRS

2 HR-4 STORIES & MORE

1 HR-3 STORIES & LESS

BUT NO LESS THAN

FLOOR RATING

8.6.5

RATINGS -

SHAFTS

ACTUAL / REMARKS

(IF APPLICABLE)

NFPA 101

PROJECT/BUILDING INFORMATION

BUILDING SQUARE FOOTAGE: NA

BUILDING IS FULLY SPRINKLERED

PROJECT IS LOCATED AT THE 3RD & 4TH FLOOR OF HOSPITAL

HOSPITAL HAS TOTAL OF 9 FLOORS PLUS BASEMENT

LIFE SAFETY SCHEDULE

CODE

OCCUPANCY

CONSTRUCTION

TYPE

MAX. TRAVEL

DISTANCE

300' 38.2.6

REMOTENESS OF

EXITS

REQUIRED NUMBER

OF EXITS

MINIMUM

CORRIDOR WIDTH

REQUIRED EGRESS

WIDTH (PROJECT

CORRIDOR)

REQUIRED STAIR

DIMENSIONS (EXIST)

WIDTH

LANDINGS

RISERS

TREADS

HEAD HEIGHT

REQUIRED EGRESS

WIDTH (STAIRS)

RATING-STORAGE

OCCUPANT LOAD 1 OCCUPANT/100 SF 44 OCCUPANTS MAX

NEW BUSINESS

CHAPTER 38

100' 38.2.5.3

50' 38.2.5.2

NOT LESS THAN 1/3

MAX DISTANCE (126'-6")

7.5.4.2

(COMPLIES)

38.2.4.2

44" (3'-8") 38.2.3.2

44" MIN.

7 1/2" MAX.

10" MIN.

6'-8" MIN.

NO RATING REQUIRED

38.3.6

2-HR RATED

(COMPLIES)

RATING-SOILED/

WASTE

1 HR OR SPRINKLER W/

SMOKE BARRIER 38.3.2.1

& 8.7.1.1

1-HR RATED

(COMPLIES)

2-HR RATED

(COMPLIES)

1-HR RATED

(COMPLIES)

ALLOWABLE

STORIES & HEIGHT

ALLOWABLE AREA

FLOOR TO FLOOR HEIGHT: 10'-0"

1 HR OR SPRINKLER W/

SMOKE BARRIER 38.3.2.1

& 8.7.1.2

58'-0"' (COMPLIES) 4TH FLR

52'-0" (COMPLIES) 4TH FLR

42'-0" (COMPLIES) 4TH FLR

42'-0"

NANA

NANA

HYMAN

HAYES

ASSOCIATES

6 Wembley Court, Albany, NY 12205

(518) 452-3470 www.hymanhayes.com

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

100% CONSTRUCTION

DOCUMENTS

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

ARCHITECT:

VA MEDICAL CENTER SYRACUSE

3RD & 4TH fOOR 'D' WING

RENOVATIONS

VAMC, SYRACUSE, NY

528A7-19-708

10/21/2020

C T e m p \R e v it F ile s \S y ra c u s e

V A

D W in g

R e n o v a ti o n s m p a tt e rs o n

C J

.r v t

/1 /2

:4

:3

A

M

1-AS-101

THIRD FLOOR LIFE SAFETY PLAN

PROJECT

NORTH

KEY PLAN- 4TH FLOOR

SCALE: 1/8" = 1'-0"1-AS-101

1 THIRD FLOOR PLAN LIFE SAFETY

PROJECT

NORTH

STAIR EXITS TO FIRST

FLOOR CORRIDOR

SS SS

S S

78 SF

OFFICE

D425

77 SF

OFFICE

D423

78 SF

OFFICE

D421

87 SF

OFFICE

D411A

198 SF

SCI / RESEARCH LAB

D407

390 SF

SCI PROCEDURE RM

D405

106 SF

TOILET (E)

D412

105 SF

D408

BREAK

ROOM 78 SF

SOILED UTILITY

D402

72 SF

TOILET

D401

764 SF

MECHANICAL

D417

STORAGE

D404

219 SF

C429

LARGE

EXAM

HOME

CARE

NURSE

257 SF

CUBICLES (4)

D426

79 SF

OFFICE

D419

210 SF

C426

EXAM

177 SF

C428

EXAM

204 SF

C423

LARGE

EXAM

130 SF

C432

HOME

CARE

NURSE

180 SF

C430

EXAM

226 SF

C434

LARGE

EXAM

JAN. (E)

D406

39'-9" (E)

'-8

/2

V

.I .F

39'-3" V.I.F.

M A

X D

E A

D E

N D

C O

R R

ID

O

R

M A

X C

O M

M O

N P

A T

H O

F T

R A

V E

L

M A

X T

R A

V E

L D

IS

T

A N

C E

STAIR EXITS TO FIRST FLOOR

CORRIDOR

20'-4 1/2" 18'-4 1/2"

'-3

'-1

/2

'-6

/2

'-7

'-1

/2

'-9

(E

'-1

/4

(E

'-2

(E

'-1

(E

'-8

(E

'-8

/2

(E

'-2

/2

(E

'-4

(E

13'-3 1/2" (E)

15'-8 1/2" (E)

18'-7" (E)

239 SF

CONF. ROOM

D409

'-3

'-1

/2

'-7

'-9

/2

371 SF

D415

CUBICLES

96 SF

D411B

OFFICE

88 SF

D411C

OFFICE

PRINTER/MAIL

AREA

'-4

'-7

FEC

FEC

FEC

HE

LIFE SAFETY LEGEND:

EGRESS PATH

EXIT SIGN (E-EXISTING)

1 HR FIRE BARRIER/ SMOKE

BARRIER (45 MINUTE DOOR AND

FIRE / SMOKE DAMPERS)

EXISTING AREA TO REMAIN

(NOT IN CONTRACT)

INDICATES EXIT ACCESS POINT

2 HR FIRE BARRIER/ SMOKE

BARRIER (1 1/2 HOUR DOOR AND

FIRE / SMOKE DAMPERS

FIRE EXTINGUISHER CABINETFEC

NON FIRE BARRIER SMOKE

LIMITING BARRIER

HORIZONTAL EXIT

1 HR FIRE BARRIER

(45 MINUTE DOOR)

2 HR FIRE BARRIER

(1 1/2 HR DOOR AND FIRE DAMPERS)

FIRE HOSE CABINETFHC

HE

BUSINESS

II (0,0,0)

74'-0"' (COMPLIES)

51'-0" (COMPLIES)

22'-0" (COMPLIES)

VARIES: 8'-0" TO 6'-0"

(COMPLIES)

(2) EXITS (COMPLIES)

NA

.3" / OCCUPANT=13"

7.3.3.1

N.A.

N.A.

.2" / OCCUPANT=8.8"

7.3.3.1

72" (COMPLIES)

2-HR RATED

(COMPLIES)

2 HR-4 STORIES & MORE

1 HR-3 STORIES & LESS

7.1.3.2.1

OCCUPANCY: BUSINESS

MAXIMUM DEAD

END CORRIDOR

COMMON PATH

OF TRAVEL

RATINGS -

CORRIDORS

RATINGS -

STAIRS

2 HR-4 STORIES & MORE

1 HR-3 STORIES & LESS

BUT NO LESS THAN

FLOOR RATING

8.6.5

RATINGS -

SHAFTS

ACTUAL / REMARKS

(IF APPLICABLE)

NFPA 101

PROJECT/BUILDING INFORMATION

BUILDING SQUARE FOOTAGE: NA

BUILDING IS FULLY SPRINKLERED

PROJECT IS LOCATED AT THE 3RD & 4TH FLOOR OF HOSPITAL

HOSPITAL HAS TOTAL OF 9 FLOORS PLUS BASEMENT

LIFE SAFETY SCHEDULE

CODE

OCCUPANCY

CONSTRUCTION

TYPE

MAX. TRAVEL

DISTANCE

300' 38.2.6

REMOTENESS OF

EXITS

REQUIRED NUMBER

OF EXITS

MINIMUM

CORRIDOR WIDTH

REQUIRED EGRESS

WIDTH (PROJECT

CORRIDOR)

REQUIRED STAIR

DIMENSIONS (EXIST)

WIDTH

LANDINGS

RISERS

TREADS

HEAD HEIGHT

REQUIRED EGRESS

WIDTH (STAIRS)

RATING-STORAGE

OCCUPANT LOAD 1 OCCUPANT/100 SF 44 OCCUPANTS MAX

NEW BUSINESS

CHAPTER 38

100' 38.2.5.3

50' 38.2.5.2

NOT LESS THAN 1/3

MAX DISTANCE (126'-6")

7.5.4.2

COMPLIES

38.2.4.2

44" (3'-8") 38.2.3.2

44" MIN.

7 1/2" MAX.

10" MIN.

6'-8" MIN.

NO RATING REQUIRED

38.3.6

2-HR RATED

(COMPLIES)

RATING-SOILED/

WASTE

1 HR OR SPRINKLER W/

SMOKE BARRIER 38.3.2.1

& 8.7.1.1

1-HR RATED

(COMPLIES)

2-HR RATED

(COMPLIES)

1-HR RATED

(COMPLIES)

ALLOWABLE

STORIES & HEIGHT

ALLOWABLE AREA

FLOOR TO FLOOR HEIGHT: 10'-0"

1 HR OR SPRINKLER W/

SMOKE BARRIER

PARTITION 38.3.2.1 & 8.7.1.2

58'-0"' (COMPLIES)

52'-0" (COMPLIES)

42'-0" (COMPLIES)

42'-0"

HYMAN

HAYES

ASSOCIATES

6 Wembley Court, Albany, NY 12205

(518) 452-3470 www.hymanhayes.com

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

100% CONSTRUCTION

DOCUMENTS

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

ARCHITECT:

VA MEDICAL CENTER SYRACUSE

3RD & 4TH fOOR 'D' WING

RENOVATIONS

VAMC, SYRACUSE, NY

528A7-19-708

10/21/2020

C T e m p \R e v it F ile s \S y ra c u s e

V A

D W in g

R e n o v a ti o n s m p a tt e rs o n

C J

.r v t

/1 /2

:4

:2

P M

1-AS-102

FOURTH FLOOR LIFE SAFETY PLAN

PROJECT

NORTH

SCALE: 1/8" = 1'-0"1-AS-102

1 FOURTH FLOOR PLAN LIFE SAFETY

Revisions: Date:

R E

F

REF.

ALIGN

mm

VERTICAL

US

HORIZONTAL

MOVEMENT ±

mm US

JOINT WIDTH

US mm

4" [102mm]

10 3/8" [264mm]

1/4" [6mm]

CONT. ALUM. TAPERED

CENTER PLATE (J4C004)

CONT. ALUM. SURFACE

MOUNT FRAME (J4A013)

STEEL CENTERING BAR

(7 PER PLATE @ 18"

[457mm] O.C.) (J4J017)

FIN. FLR.

(BY OTHERS)

1/4" x 2 1/4” [M6x56] HEX

HEAD CONCRETE

SCREW (7 PER FRAME @

18" [457mm] O.C.) (JK001)

1/4" x 2 1/4” [M6x56] FLAT

HEAD CONCRETE SLEEVE

ANCHOR (7 PER PLATE @

18" [457mm] O.C.) (JK020)

HIGH STRENGTH EPOXY

GROUT (BY OTHERS)

4 1/8" [104mm]

MIN. BLOCKOUT

1 1/2"

[38mm]

CONT. ALUM.

RECESSED FRAME

(J4A004)

1/4-20 X 3" PHILLIPS FLAT

HEAD MACHINE SCREW W/

COMPRESSION SPRING

ASSEMBLY (7 PER PLATE

@ 18" [457mm] O.C.) (JK123)

461-A01-100

4" 102 2" 51 1" 25

PARTITION TYPE SYMBOLS

--S

PARTITION TYPE

HOURLY FIRE RATING: PARTITION EXTENDS

TO BOTTOM OF STRUCTURE ABOVE.

PARTITION TYPE

PARTITION EXTENDS TO DECK

ABOVE AND SEALED WITH SAFING.

FRAMING EXTENDS TO BOTTOM

OF STRUCTURE ABOVE.

PARTITION TYPE

FINISHES ONE SIDE EXTEND TO 6"

ABOVE HIGHEST ADJACENT CEILING.

FINISHES ONE SIDE EXTEND TO

BOTTOM OF STRUCTURE ABOVE.

PARTITION FRAMING EXTENDS TO

STRUCTURE ABOVE. GYPSUM WALL

BOARD TERMINATES 6" ABOVE HIGHEST

ADJACENT CEILING.

PARTITION TYPE

SUFFIX "S" INDICATES SMOKE BARRIER -

SEAL ONE SIDE TO DECK AND AROUND

ALL PENETRATIONS.

INFILL OPENING. MATCH WALL THICKNESS

AND ALIGN WITH EXISTING WALL.

INFILL

PARTIAL HEIGHT WALL TO UNDERSIDE OF

COUNTER UNLESS OTHERWISE NOTED.

PART

1. THE PARTITION TYPE SYMBOLS WILL KEY THE PARTITION TYPES ON PLANS.

2. ANY PENETRATION THROUGH HOURLY RATED PARTITIONS SHALL BE

FIRESTOPPED WITH MATERIALS TO EQUAL THE HOURLY RATING OF THE

PARTITION SYSTEM IN ACCORDANCE WITH THE SPECIFICATIONS. EXISTING

WALLS WITH NEW PENETRATIONS ARE TO BE SEALED AS REQUIRED TO

MAINTAIN RATING.

3. ALL NEW PARTITIONS TO BE UNLESS OTHERWISE NOTED.

COORDINATE WITH PARTITION TYPE SCHEDULE.

4. ALL CHASES AND DUCT/ PIPE/ COLUMN ENCLOSURES TO BE UNLESS

OTHERWISE NOTED.

5. ALL SINK CARRIER WALLS TO BE UNLESS OTHERWISE NOTED.

PARTITION TYPE NOTES

J18

J08

L10

CONSTRUCTION NOTES:

1. LOCATE SIDE OF DOOR FRAMES 4" FROM PERPENDICULAR

WALL UNLESS OTHERWISE INDICATED.

2. CONTRACTOR TO COORDINATE LOCATION OF ALL

PARTITIONS ENCLOSING EQUIPMENT WITH APPROVED SHOP

DRAWINGS.

3. PROVIDE 1/2" X 6" FIRE RETARDANT PLYWOOD BLOCKING OR

6" HIGH X 18 GA SHEET BLOCKING IN PARTITIONS AT ALL

LOCATIONS WITH SURFACE APPLIED EQUIPMENT OR

ACCESSORIES SUCH AS HANDRAILS, TOILET ACCESSORIES,

WALL BUMPERS, WALL MOUNTED DOOR STOPS AND FOR

SUPPORT OF WALL CABINETS, SHELVES, EQUIPMENT, ETC.

4. CONFIRM CHASE WALL DIMENSIONS WITH PLUMBING

CONTRACTOR, NOTIFY VA COORDINATOR OF ANY

DISCREPANCIES.

5. CUT AND PATCH EXISTING CONSTRUCTION AS REQUIRED TO

COMPLETE THE WORK.

6. MINOR ITEMS OF WORK SUCH AS CUTTING, BLOCKING, TRIM,

ETC. SHALL BE PERFORMED AS REQUIRED TO MAKE THE

WORK COMPLETE WHETHER SHOWN OR NOTED ON THE

CONTRACT DOCUMENTS OR NOT.

7. RESTORE DAMAGED AND EXPOSED FINISHES OR PATCHED

AREAS IN A MANNER WHICH ELIMINATES EVIDENCE OF

PATCHING AND REFINISHING.

A B BB C

78 SF

OFFICE

D425

77 SF

OFFICE

D423

78 SF

OFFICE

D421

87 SF

OFFICE

D411A

198 SF

SCI / RESEARCH LAB

D407

390 SF

SCI PROCEDURE RM

D405

106 SF

TOILET (E)

D412

105 SF

D408

BREAK

ROOM

78 SF

SOILED UTILITY

D400

72 SF

TOILET

D401

764 SF

MECHANICAL

D417

STORAGE

D404

219 SF

C429

LARGE

EXAM

HOME

CARE

NURSE

257 SF

CUBICLES (4)

D426

79 SF

OFFICE

D419

210 SF

C426

EXAM

177 SF

C428

EXAM

204 SF

C423

LARGE

EXAM

130 SF

C432

HOME

CARE

NURSE

180 SF

C430

EXAM

226 SF

C434

LARGE

EXAM

JAN. (E)

D406

1-AS-402

1-AS-403

1-AS-402

1-AS-404

1-AS-404

'-3

/8

'-1

/2

'-7

'-7

/2

'-0

/2

'-9

(E

10'-7 3/4"

6'-7 1/2"

135.00°

20'-4 5/8" 18'-5 1/2"

'-8

/8

'-6

/2

'-8

5'-7"135.00°

39'-9" V.I.F.

5' -1

1"

5'-1 1/4"

D426

D425

D423

D421

D405A

D407

D401

D470CD419

D411A

D411C

C436F

C429

C434

D405B

9'-1"

'-0

9'-3"

3'-2 1/2"

4'-3"

18'-7"

C426

'-8

/2

V

.I .F

J10

J10

J10

J10

J10

J10 J10

J10

J10

J10

PART

J10

PART

J10

J08

39'-3" V.I.F.

J10

1-AS-402

J10

J10

D409

J18

1-AS-404

1-AS-402

2'-5 1/2"

ALL FURNITURE SHOWN FOR REFERENCE ONLY.

OWNER TO SUPPLY AND INSTALL UNLESS

OTHERWISE NOTED

J10

J10

EXISTING EXPANSION JOINT LOCATION

COORDINATE FINISHED FLOOR & WALL BASE

INSTALLATION. CONTRACTOR TO REPLACE

EXISTING EXPANSION JOINT AS SPECIFIED BY

MAUFACTURER SEE DETAIL 6/1-AS-103

EXPANSION JOINT REPLACEMENT

A08

D411B

1-AS-404

1-AS-405

D403

D410

D414

D416

D405A

D415

88 SF

D411C

OFFICE

96 SF

D411B

OFFICE

239 SF

CONF. ROOM

D409

J10

J10

J10

1-AS-405

A0

A0

A0

A0

A0

A0

A0

A0

A0

A0

A0

A0

A0

A0

PROVIDE CEMENTIOUS UNDERLAYMENT

THROUGHOUT D WING PROPOSED FLOOR

REPLACMENT 3RD & 4TH FLOOR

'-0

J18

'-1

'-3

'-4

NOTE: AFTER DEMO & PRIOR TO START OF PROPOSED CONSTRUCTION; CONTRACTOR TO

PROVIDE CEMENTITIOUS UNDERLAYMENT OVER ENTIRE SUBFLOOR OF D-WING PROJECT AREA

(APPROXIMATELY - 3,820 SQFT) TO ALLOW FOR A LEVEL FINISHED FLOORING INSTALLATION.

FILL/PLUG ALL HOLES WATER TIGHT & TO APPROPRIATE FIRE RATING TO MATCH EXISTING

ADJACENT PRIOR TO INSTALLATION, SEE DETAIL 6/1-AS-103.

1-AS-103

1-AS-103

1-AS-103

27 SF

STORAGE

C441A

D415

PROVIDE WALL PROTECTION,

HANDRAIL & WALL PNT TO

MATCH EXISTING ADJACENT

FEC

FEC

FEC

96 SF

C420

TELEHEALTH

D432

CORRIDOR

D432A

CORRIDOR PROVIDE WALL PROTECTION,

HANDRAIL & WALL PNT TO

MATCH EXISTING ADJACENT

1'-6"

11'-7 1/2"

'-1

'-7

3'-2 3/8"

J08

L14

L14

G08

L14

D402

D404

D406

D408

D414

D410

D416

D432

D417

D412

D432A

PROVIDE NEW WALL SHEATHING AND FINISHES

TO MATCH EXISTING ADJACENT MATERIALS @

ALL CHASE LOCATIONS DISTURBED BY

ASBESTOS ABATEMENT. COORDINATE ALL

WORK W/ ASBESTOS ABATEMENT PLANS PRIOR

TO CONSTRUCTION. (TYP. FOR ROOMS C434,

C432, C430, C429, C428, C426 & C423.)

4'-10 1/2"

7'-7"

ON EXISTING DOOR PROVIDE AUTOMATIC DOOR

OPERATORS AND CONTROLS PER

SPECIFICATION SECTION 087113. ALL HARDWARE

SHOULD BE CONSISTENT WITH HARDWARE

GROUP 10A

A B BB C

8'-0"

10'-4"8'-0"

19'-8"

8'-0" (E)

19'-3" (E)

1'-5"

'-0

10'-9"

20'-2" (E)

10'-4" (E)

'-0

(E

'-6

(E

3'-6" (E)

1'-0"

6'-0"

'-1

'-0

6'-0" (E)

'-4

(E

'-7

(E

'-2

(E

'-0

(E

20'-3" (E) 6'-8" (E)

'-5

(E

'-4

(E

'-4

(E

'-4

(E

'-4

(E

'-5

(E

13'-10" (E)

6'-7" (E)

CONF.

D325

OFFICE

D323A

OFFICE

D323B

SWING SPACE

D321

SWING SPACE

D305

SWING SPACE

D304

D301

JAN. (E)

OFFICE

D308

LAB

D311

OFFICE

D323

OFFICE

D324

'-1

13'-7" (E)

9'-9" (E) 10'-1" (E) 18'-9" (E)

2'-6"

'-7

7"

2'-1 1/2"

'-2

1'-6"

'-8

20'-2" (E)

'-1

(E

'-1

'-2

/2

2'-1 1/2"

'-1

1'-8 1/2"

19'-6" (E)

'-7

/2

(E

'-0

/2

'-8

/2

(E

'-7

(E

'-0

(E

'-2

(E

'-6

(E

'-6

(E

H O

O D

1-AS-401

D304E

J10

LAB

D314

D313

HOT/COLD

PROCESSING

HOOD

'-0

'-8

/4

OFFICE

D322

TOILET

D303

INFILL

J08

INFILL

J08

L18

J18

SEE SHEET 1-AS-001 FOR TYP.

BATHROOM ELEVATIONS

RELOCATE EXISTING HOT/COLD UNITS & PROVIDE

ALL ASSOCIATED MECH., PLUMBING &

ELECTRICAL AS NEEDED TO ALLOW FOR PROPER

INSTALLATION. INSTALL NEW FLOORING &

CEILING TO ALLOW FOR PROPER ALIGNMENT

6'-0"

D322

D320

D303

STORAGE

D320

12'-6"

8'-5 1/2"3'-8"

J18

J18

D312

D306

1-AS-401

HOOD

D310

A0

A0

A0A0

A0

A0

A0

A0

A0

A0

A0

'-9

/2

A0

A0

'-7

/4

'-4

'-0

CONTRACTOR TO PROVIDE CEMENTITIOUS UNDERLAYMENT

@ ALL EXISTING ROOMS TO RECIEVE NEW FINISHED

FLOORING. FILL/PLUG ALL HOLES WATER TIGHT & TO

APPROPRIATE FIRE RATING TO MATCH EXISITNG ADJACENT,

SEE DETAIL 6/1-AS-103

FEC

FEC

D300A

CORRIDOR

D300

CORRIDOR

A0A08

D307A

BLS-3 LAB

D307

BLS-3 ANTE

ROOM

D313A

Room

D313B

Room

D323B D323A

D323

D325

D324

D321 D301

D304

D305

D308

D306

D310

D312

D311

D314D313

1-AS-405

CONTRACTOR TO PROVIDE ELEVATOR CONTROL

SEQUENCING. COORDINATE W/ OWNER'S

VENDOR TO ALLOW FOR PROPOSED

CONSTRUCTION

D344

SEALANT BOTH SIDES

VARIES

1/2" THICK NEOPRENE PAD

LINE OF EXISTING WINDOW FRAME

METAL END CAP, MATCH WINDOW

SEALANT FULL PERIMETER

WALL PARTITION

WINDOW MULLION

LINE OF WINDOW

FRAME- BEYOND

LINE OF WINDOW

FRAME- BEYOND

/8

METAL END CAP.PAINT

TO MATCH MULLION,

TO BE CONTINUOUS

AROUND THE NEW

PARTITION

LINE OF SILL BELOW

SEALANT

EQ EQ

X

DIAMETER

CORED HOLE

EXISTING CONCRETE SLAB

STEEL CHANNEL

WIDTH = X+2

LENGTH = X+6

1/2" DIA. x 2" LONG EMBEDED HILTI

HDI DROP IN ANCHOR (TYP.)

FILL CORED HOLE W/ NON-

SHRINK GROUT

NOTE:

COORDINATE FLOOR OPENING W/

MEP DRAWINGS

HYMAN

HAYES

ASSOCIATES

6 Wembley Court, Albany, NY 12205

(518) 452-3470 www.hymanhayes.com

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

100% CONSTRUCTION

DOCUMENTS

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

ARCHITECT:

VA MEDICAL CENTER SYRACUSE

3RD & 4TH fOOR 'D' WING

RENOVATIONS

VAMC, SYRACUSE, NY

528A7-19-708

10/21/2020

C T e m p \R e v it F ile s \S y ra c u s e

V A

D W in g

R e n o v a ti o n s m p a tt e rs o n

C J

.r v t

/1 /2

:4

:3

A

M

1-AS-103

THIRD & FOURTH FLOOR PLANS

PROJECT

NORTH

SCALE: 1/8" = 1'-0"1-AS-103

2 FOURTH FLOOR PLAN

PROJECT

NORTH

KEY PLAN- 4TH FLOOR

SCALE: 1/8" = 1'-0"1-AS-103

1 THIRD FLOOR PLAN

PROJECT

NORTH

SCALE: 1 1/2" = 1'-0"1-AS-103

3 PARTITION TO WINDOW

1 PREPARE EXISTING SUBFLOOR TO ALLOW FOR PROPOSED

NEW FLOORING; COORDINATE INSTALLATION W/

MANUFACTURER'S SPECIFICATIONS

2 PREPARE EXISTING CMU WALL SURFACES TO RECEIVE NEW

PAINT COORDINATE W/ MANUFACTURER'S SPECIFICATIONS

3 VERIFY EXISTING CONDITION OF ALL DOORS, FRAMES &

FINISHES TO REMAIN. REPORT TO VA COR ANY ADVERSE

CONDITIONS

4 EXISTING FINISHED FLOORING TO REMAIN @ CORRIDOR;

COORDINATE FLOORING REPLACEMENT W/ PROPOSED C429

RENOVATIONS AND WALL INFILL, REPLACE FLOORING TO

MATCH EXISTING ADJACENT AS NEEDED TO ALLOW FOR

PROPOSED CONSTRUCTION

5 PATCH & PAINT EXISTING GWB WALL FINISH @ ALL PROPOSED

WALL INFILL AND PROPOSED NEW DOOR & FRAME LOCATIONS

AS NEEDED TO ALLOW FOR A CONTINUOUS SMOOTH SURFACE.

PRIME & PAINTED TO MATCH EXISTING ADJACENT WALL FINISH

6 PROVIDE WALL INFILL TO MATCH EXISTING ADJACENT

CONSTRUCTION & FINISHES TO ALLOW FOR A CONTINUOUS

SMOOTH SURFACE

7 PROVIDE ALUMINUM J- CHANNEL @ ALL PROPOSED GWB WALL

FINISH TO EXISTING CMU WALL TRANSITIONS. FINISHED GWB

SURFACE TO BE IN ALIGNMENT W/ FACE OF CMU. PROVIDE FIRE

SEALANT @ ALL RATED ASSEMBLIES

8 PATCH AND PAINT EXISTING WALL SURFACE TO ALLOW FOR A

SMOOTH CONTINUOUS SURFACE FLUSH WITH EXISTING

ADJACENT WHERE ALL WALL MOUNTED ITEMS WERE

REMOVED.

KEY NOTES:

SCALE: 1" = 1'-0"1-AS-103

4 PARTITION TO WINDOW MULLION

PHASE 1: 3RD FLOOR D-WING PHASE 2A: 4TH FLOOR D-WING

PHASE 2B: 4TH FLOOR C-WING,

SCI EXAM ROOMS

PHASE 2C: 4TH FLOOR C-WING

SCALE: 1" = 1'-0"1-AS-103

5 CORE HOLE INFILL - TYPICAL

SCALE: 3" = 1'-0"1-AS-103

6 EXPANSION JOINT

BLS-3 LAB (307A) & BLS-3 ANTE (307) TO REMAIN

OPERATIONAL THROUGHOUT ENTIRETY OF CONSTRUCTION

Revisions: Date:

JStasack Snapshot

JStasack Snapshot

JStasack Callout ON EXISTING DOOR PROVIDE AUTOMATIC DOOR OPERATORS AND CONTROLS PER SPECIFICATION SECTION 087113. ALL HARDWARE SHOULD BE CONSISTENT WITH HARDWARE GROUP 10A

F

A B BB C

D325

D323AD323B

D323

D324

D301

D321

D305

D311

D308

D304

D313

D314

D322

D303

1-AS-401

8'-0" 8'-0"

8'-0"

8'-0" 8'-0"

8'-0"

8'-0"

8'-0"

8'-0"

8'-0"

8'-0"

8'-0"

8'-0"

8'-0"

8'-0"

1-AS-401

8'-0"

D300

D300A

ALL CEILING HEIGHTS ARE FROM FINISHED FLOOR

D320

1-AS-405

8'-0"

5/8" GWB

SUSPENDED

CEILING

SEE REFLECTED

CEILING PLAN

SEE REFLECTED

CEILING PLAN

SEE REFLECTED

CEILING PLAN

EXIST. CONCRETE DECK

3 5/8" x 20 GA. METAL STUDS @

1'-4" O.C. ANCHORED TO

UNDERSIDE OF EXISTING DECK.

BRACE STUDS @ STRUCTURE

ABOVE AS REQUIRED

EXIST. CONCRETE DECK

3 5/8" x 20 GA. METAL STUDS

@ 1'-4" O.C. ANCHORED TO

UNDERSIDE OF EXISTING

DECK

5/8" GWB

3 5/8" MTL. STUD BRACING AT 2'-8" O.C.

SUSPENDED CEILING

(SEE REFLECTED CEILING PLAN)

VARIES

SEE REFLECTED

CEILING PLAN

SEE REFLECTED

CEILING PLAN

SEE REFLECTED

CEILING PLAN

REFLECTED CEILING PLAN NOTES

1. VERIFY FINAL LOCATION OF ALL CEILING PENETRATIONS WITH OWNER,

MECHANICAL AND ELECTRICAL CONTRACTORS PRIOR TO INSTALLATION OF

CEILING SYSTEM.

2. SOFFITS ARE TO BE 5/8" GYPSUM WALL BOARD ON 3 5/8" METAL STUDS AT

1'-4" O.C. UNLESS OTHERWISE NOTED.

3. REMOVE EXISTING CEILING SYSTEM, INCLUDING OUTSIDE OF PROJECT

WORK AREA AS REQUIRED FOR INSTALLATION OF DUCTWORK, AND

ELECTRICAL WIRING/ CONDUIT NOT SHOWN ON THESE DRAWINGS.

REINSTALL FOLLOWING COMPLETION OF WORK NOTED. SEE MECHANICAL,

PLUMBING AND ELECTRICAL DRAWINGS.

4. ALL SOFFITS AT WALL CABINETS TO OVERHANG EXPOSED CABINET SIDES 1".

BOTTOM OF ALL SUCH SOFFITS TO BE 7'-0" A.F.F. UNLESS NOTED

OTHERWISE.

5. ALL AREAS NOT DESIGNATED TO RECEIVE A NEW CEILING HAVE AN EXISTING

CEILING OR ARE TO HAVE EXPOSED STRUCTURE.

6. REPLACE ANY EXISTING CEILINGS DAMAGED AS A RESULT OF THE NEW

WORK. MATCH EXISTING CONSTRUCTION.

7. ALL DIMENSIONS ON REFLECTED CEILING PLAN ARE TO FACE OF FINISHED

SURFACE UNLESS NOTED OTHERWISE.

8. LIGHT FIXTURES, SPRINKLER HEADS, ETC. TO BE LOCATED CENTERED ON

CEILING TILE UNLESS OTHERWISE INDICATED.

9. ALL SUSPENDED CEILING SYSTEMS ARE TO BE CENTERED WITHIN THE

OVERALL DIMENSIONS OF THE ROOM UNLESS NOTED OTHERWISE.

10. REFER TO FINISH SCHEDULE FOR ADDITIONAL CEILING FINISH INFORMATION.

11. REFER TO FINISH SCHEDULE FOR ALL CEILING HEIGHTS NOT DESIGNATED.

WALL / CEILING MOUNTED EXIT SIGN

CEILING GRID START POINT

SUPPLY GRILLE - COORDINATE WITH

MECHANICAL DRAWINGS

NEW 2'x2' ACOUSTICAL TILE CEILING

GYPSUM BOARD CEILING,

BULKHEAD, SOFFIT AND

FASCIA

RECESSED LIGHT FIXTURE

2'x4' RECESSED LIGHT FIXTURE

2'x2' RECESSED LIGHT FIXTURE

CEILING LEGEND:

EXHAUST/ RETURN GRILLE - COORDINATE

WITH MECHANICAL DRAWINGS

PRIVACY CURTAIN TRACK

1'x4' RECESSED LIGHT FIXTURE

1'x4' SUSPENDED LIGHT FIXTURE

CEILING MOUNTED PATIENT LIFT

SPRINKLER HEAD REF. FIRE PROTECTION DWGS.

A B BB C

D401

D405

D426

D425

D423

D407

D421

D419

D406 D404

D408

D411A

D412

D417

D402

C426

C428

C430

C432

C434

C429

C423

1-AS-104

1-AS-104

1-AS-104

1-AS-104

COORDINATE CEILING & LIGHTING INSTALLATION W/

PROPOSED 3-D PATIENT LIFT (TYP.).

PROVIDE 3-D PATIENT LIFT & ASSOCIATED DECK

MOUNTING BRACKETS; INSTALL PER MANUFACTURER'S

SPECIFICATIONS (TYP.) 6/1-AS-104

'-7

'-8

1-AS-402

1-AS-402

1-AS-402

1-AS-402

1-AS-403

8'-0"

8'-0"

8'-0"

8'-0"

8'-0"

8'-0"

8'-0"

8'-0"

8'-0"

8'-0"

8'-0"

8'-0"

8'-0"

8'-0"

1-AS-104

2'-2"

1-AS-404

1-AS-405

1-AS-405

1-AS-104

1-AS-104

COORDINATE CEILING & LIGHTING INSTALLATION W/

PROPOSED 3-D PATIENT LIFT (TYP.).

PROVIDE 3-D PATIENT LIFT & ASSOCIATED DECK

MOUNTING BRACKETS; INSTALL PER MANUFACTURER'S

SPECIFICATIONS (TYP.) 6/1-AS-104

8'-0"

8'-0"

ALL CEILING HEIGHTS ARE FROM FINISHED FLOOR

D409

D411CD411B

1-AS-104

1-AS-104

EXISTING DIFFUSER LOCATIONS TO REMAIN;

COORDINATE PROPOSED GRID INSTALLATION (TYP.)

EXISTING DIFFUSER LOCATIONS TO REMAIN;

COORDINATE PROPOSED GRID INSTALLATION (TYP.)

EXISTING DIFFUSER LOCATIONS TO REMAIN;

COORDINATE PROPOSED GRID INSTALLATION (TYP.)

EXISTING DIFFUSER LOCATIONS TO REMAIN;

COORDINATE PROPOSED GRID INSTALLATION (TYP.)

8'-0"

8'-0"

8'-0"

D415

D432

D432A

D411

D405A

OPEN TO STRUCTURE

7'-10"

C441A

7'-10"

7'-0"

8'-0"

7'-0"

7'-10"7'-0"

7'-10"

7'-10"

7'-0"

EXIST. CONCRETE DECK

3 5/8" x 20 GA. METAL STUDS @

1'-4" O.C. ANCHORED TO

UNDERSIDE OF EXISTING DECK

5/8" GWB

3 5/8" MTL. STUD

BRACING AT 2'-8" O.C.

SUSPENDED CEILING

SEE REFLECTED

CEILING PLAN

SEE REFLECTED

CEILING PLAN

VARIES

1" OVERHANG TYP.

CONCRETE SLAB

HILTI CONCRETE INSERT

P1000 UNISTRUT

SPRING NUT

FLAT WASHER

LOCK WASHER

3/8" HEX NUT

3/8" THREADED ROD

3/8" HEX NUT

LOCK WASHERFLAT WASHER

3/8 X 1/12" COUPLER

LOCK WASHER

3/8" HEX NUT

P1063 UNISTRUT

FLAT PLATE

3/8" HEX BOLT

CEILING BRACKET

TRACK

CEILING

COORDINATE TRACK INSTALLATION

SYSTEM W/ MANUFACTURER'S

SPECIFICATIONS

UNISRUT 45 ANGLE

UNISRUT 45 ANGLE

HILTI CONCRETE INSERT

HYMAN

HAYES

ASSOCIATES

6 Wembley Court, Albany, NY 12205

(518) 452-3470 www.hymanhayes.com

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

100% CONSTRUCTION

DOCUMENTS

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

ARCHITECT:

VA MEDICAL CENTER SYRACUSE

3RD & 4TH fOOR 'D' WING

RENOVATIONS

VAMC, SYRACUSE, NY

528A7-19-708

10/21/2020

C T e m p \R e v it F ile s \S y ra c u s e

V A

D W in g

R e n o v a ti o n s m p a tt e rs o n

C J

.r v t

/1 /2

:4

:3

P M

1-AS-104

THIRD & FOURTH FLOOR

REFLECTED CEILING PLAN

SCALE: 1/8" = 1'-0"1-AS-104

1 THIRD FLOOR REFLECTED CEILING PLAN

SCALE: 1" = 1'-0"1-AS-104

4 TYPICAL BULKHEAD DETAIL

SCALE: 1" = 1'-0"1-AS-104

3 TYPICAL SOFFIT DETAIL

SCALE: 1/8" = 1'-0"1-AS-104

2 FOURTH FLOOR REFLECTED CEILING PLAN

PROJECT

NORTH

PROJECT

NORTH

PROJECT

NORTH

KEY PLAN- 4TH FLOOR

SCALE: 1" = 1'-0"1-AS-104

5 DETAIL - GYPSUM WALLBOARD SOFFIT AT WALL

SCALE: 1 1/2" = 1'-0"1-AS-104

6 LIFT TRACK MOUNTING DETAIL

SOFFIT ELEVATION TO MATCH EXISTING BULK HEAD

Revisions: Date:

B B

B BB B

B

BBB B

ALIGN

ALIGN

ALIGN

ALIGN

ALIGN

ALIGN

ALIGN

D D

D D

D

D D

D D

D

DD DD

DD DD

AA A

AA

A A

A AA

A

A

AA AAA

A A

A

A A

A

A A

A A

A A

A A

A A

AA A

AA AAA

A A

A

A A

A A

A A

AA AA

AA AA

A

AA A

A A

A A

A AA A A

A A

A A

A

AA AAAA

A A

A A

A

AA A

AA AA

A

AA AAA

A

A

A

A A

A

AA A

A A

AA

AA

A A

A A

A A

A A A A

A A

A A

A

A A A AA A

A A

A A

A A A

A A

A A

A A

A AA

C CC

C C

C

CC C

CC CC

C C

C

BB BB

B B

B B

B B

B

B BB B

ALIGN

A

LI

G N

D DD D

A AA

B BB

C CC

SHEET

TOP CAP

OUTSIDE

CORNER

5/16 " 8mm

3/4", 1-1/2" OR 3"

[19mm, 38mm, or 76mm] WING

TAPE-ON CORNER GUARD

USE 535 PL PREMIUM

WHEN INSTALLING

WITHOUT TAPE

FOR .080" [2mm] THICK SHEET, USE 417 TOP CAP, 418 VERTICAL DIVIDER BAR AND 419 INSIDE CORNER

2 3 5

3/8 " 10mm

VERTICAL

DIVIDER BAR 4

INSIDE

CORNER

1/2" 13mm

BUTT

JOINT

1/16" [2mm]

COLOR

MATCHED

CAULK

A B BB C

D325

CONF.

D323A

OFFICE

D323B

OFFICE

D321

SWING

SPACE

D305

SWING

SPACE

D304

SWING

SPACE

D301

JAN. (E)

D308

OFFICE

D311

LAB

D323

OFFICE D324

OFFICE

H O

O D

D314

LAB

D313

HOT/COLD

PROCESSING

D322

OFFICE

D303

TOILET

D320

STORAGE

D312

FIRE APP.

D310

ELEC.

D306

ELEC.

V .I .F

'-7

D300

D300A

CG-1

CG-1

V .I .F

'-0

V.I.F

8'-10" +/-

'-1

V .I .F

'-9

FTS

A B BB C

D425

OFFICE

D423

OFFICE

D421

OFFICE

D411A

OFFICE

D407

SCI /

RESEARCH

LAB

D405

SCI

PROCEDURE

RM

D412

TOILET (E)

D408

BREAK

ROOM

D400

SOILED

UTILITY

D401

TOILET

D417

MECHANICAL

STORAGE

D404

C429

LARGE

EXAM

HOME

CARE

NURSE

D426

CUBICLES

(4)

D419

OFFICE

C426

EXAM

C428

EXAM

C423

LARGE

EXAM

C432

HOME

CARE

NURSE

C430

EXAM

C434

LARGE

EXAM

D406

JAN. (E)

STORAGE

C441A

D409

CONF.

ROOM

D411

PRINTER/MAIL

AREA

D411B

OFFICE

D411C

OFFICE

D415

CUBICLES

D410

D414

D416

D403

D405A

PROVIDE FLOORING TO MATCH EXISTING

ADJACENT AS NEEDED TO ALLOW FOR

PORPOSED CONSTRUTION

EXISTING FLOORING TO REMAIN

CG-1

CG-1 CG-1

CG-1

CG-1

CG-1

CG-1

CG-2

CG-2

CG-2

CG-1

CG-1

CG-1

CG-1

CG-1

CG-1

CG-1

CG-1

CG-1

CG-1

CG-1

V.I.F

6'-0" +/- V

.I .F

'-0

V.I.F

8'–9" +/-

V.I.F

5'–11" +/-

'-0

5'-0"

'-3

'-0

V.I.F

7'-6" +/-

V .I .F

EXISTING FLOORING TO REMAIN

FTS

FTS

NOTE: CONTRACTOR TO CONFIRM REDUCER TRANSITION STRIP COMPLIES WITH SUBMITTED FLOORING

MATERIALS.

FLOOR HATCH LEGEND:

WSF

PFTLVT-1

NOTE: NOT ALL FINISHES ARE

INDICATED ON PLANS. ONLY

ROOMS/COLORS WHERE

PATTERNS ARE REQUIRED. SEE

ROOM FINISH SCHEDULE FOR

FLOORING TYPES WHERE THERE

ARE NO FLOOR PATTERNS.

CONCLVT-2

LVT-3

CHAIR RAIL

(TARKETT RAMPART)

CHAIR RAIL ONLY

B

TOP OF

WALL PANEL

WALL PROTECTION

PANEL ONLY

A

'-6

U N

L E

S S

N O

T E

D O

T H

E R

W

IS

E

'-0

IN

S

C H

E D

U L E

TOP OF

WALL PANEL

WALL PROTECTION

PANEL AND WALL

GUARDS

C U N

L E

S S

N O

T E

D O

T H

E R

W

IS

E

'-0

IN

S

C H

E D

U L E

'-0

FULL HEIGHT

FRP PANEL

FRP PANEL ONLY

D

NOTE: CONTRACTOR TO COORDINATE MATERIALS AND FINISHES W/ FINISH LEGEND & SCHEDULE ON 1-AS-802

(NO WOOD)

WALL PROTECTION LEGEND

WALL PROTECTION PANEL ONLY

CHAIR RAIL ONLY

WALL PROTECTION AND WALL GUARDS

FRP WALL COVERING

LVT FLOORING

SCHLUTER "RENO-K"

TRANSITION STRIP, VERIFY

ASSEMBLY THICKNESS FOR

TRANSITION STRIP

SELECTION

CONCRETE

LVT TILE

CONCRETE FLOOR SLAB

SCHLUTER "SCHIENE"

TRANSITION STRIP,

VERIFY ASSEMBLY THICKNESS

FOR TRANSITION STRIP SELECTION

LVT

7-3/4”

197mm

CONTINUOUS ALUMINUM

RETAINER .080” [2mm]

VINYL

COVER

.080”

[2mm]

CONTINUOUS

IMPACT BUMPER

.080”

[2mm]

WALLGUARD

HEIGHT PER

PLAN

#10 X 1-3/4”

SHEET METAL

SCREW WITH

ALLIGATOR

ANCHOR

1”

25mm

FROM EACH

END FOR

ANCHORS

FIELD DIMENSION

(TYP ALL WALLS)

SPLICE

OUTSIDE CORNER

INSIDE CORNER

SPACE REMAINING HOLES

DRILLED FROM

EACH END

FOR ANCHORS

IN ZIGZAG PATTERN

EVENLY OVER LG

(10 ANCHORS/12’)

REVEAL

RETURN

DISTANCE TO BE

DETERMINED BY

INSTALLER

4"

4"

1 5/16"

1"

HYMAN

HAYES

ASSOCIATES

6 Wembley Court, Albany, NY 12205

(518) 452-3470 www.hymanhayes.com

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

100% CONSTRUCTION

DOCUMENTS

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

ARCHITECT:

VA MEDICAL CENTER SYRACUSE

3RD & 4TH fOOR 'D' WING

RENOVATIONS

VAMC, SYRACUSE, NY

528A7-19-708

10/21/2020

C T e m p \R e v it F ile s \S y ra c u s e

V A

D W in g

R e n o v a ti o n s m p a tt e rs o n

C J

.r v t

/3 /2

:5

:5

P

M

1-AS-105

THIRD & FOURTH FLOOR FINISH

PLAN

SCALE: 1/8" = 1'-0"1-AS-105

1 THIRD FLOOR FINISH PLAN

SCALE: 1/8" = 1'-0"1-AS-105

2 FOURTH FLOOR FINISH PLAN

PROJECT

NORTH

PROJECT

NORTH

FINISH LEGEND ABBREVIATIONS

APC ACOUSTICAL PANEL CEILING

AWP ACOUSTICAL WALL PANEL

BB BULLETIN BOARD

CBB CEMENT BOARD

CG CORNER GUARD

CONC CONCRETE

CPT CARPET

CR CHAIR RAIL

CT CERAMIC TILE

DP DECORATIVE PANEL

E- EXISTING

EFTR EXSITING FINISH TO REMAIN

EPX EPOXY PAINT

FF FACTORY FINISH

FTP FABRIC WRAPPED TACK PANEL

FTS FLOOR TRANSITION STRIP

GT GROUT

GWB GYPSUM WALL BOARD

HR HANDRAIL

IR IMPACT RESISTANT GWB

LCK LOCKER

LMC LINEAR METAL CEILING

LVT LUXURY VINYL TILE

MMMR MOISTURE MOLD MILDEW RESISTANT GWB

MT METAL TRIM

NF NATURAL FINSIH

PC PRIVACY CURTAIN

PFT PORCELAIN FLOOR TILE

PL PLASTIC LAMINATE

PLY PLYWOOD

PT PAINT

PWT PORCELAIN WALL TILE

QT QUARTZ SURFACE

RES RESINOUS PANEL

RFC RESINOUS FLOOR COATING

RST…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .