528A7 19 708 VA Syracuse D Wing Final Specifications.pdf

PDF 7 MB Posted

Attached to
Z1DA--528A7-19-708 SCI RENOVATION-THIRD AND FOURTH FLOOR D-WING Federal contract opportunity
Solicitation number
36C24221B0016
Issued by
Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 2

About this file

This solicitation is for renovations to the third and fourth floors of Building 1, D-Wing at the Syracuse VA Medical Center in Syracuse, New York. The project includes general construction work, electrical work, mechanical work, and asbestos abatement. A site visit is scheduled for January 13, 2021 and questions are due by January 28, 2021. Bids are due by email to the contracting officer by an unspecified date. The solicitation is set aside for total service-disabled veteran-owned small businesses. The North American Industry Classification System code is 236220 and the business size standard is $39.5 million. The architect engineer that designed the project cannot be awarded the construction contract.

View the file

Other files for this federal contract opportunity

Other files attached to Z1DA--528A7-19-708 SCI RENOVATION-THIRD AND FOURTH FLOOR D-WING, newest first.
File Type Posted
36C24221B0016 AMENDMENT 6.pdf PDF
528A7-19-708 VA Syracuse D Wing Phasing Drawing .pdf PDF
36C24221B0016 AMENDMENT 5.pdf PDF
36C24221B0016 4th Amendment .docx DOCX document
528A7-19-708 VA Syracuse D Wing Final Drawing Rev02 02.pdf PDF
528A7-19-708 Addendum Clarifications Rev02.pdf PDF
Patient Lifts Q_A part 2 Signed.pdf PDF
081400 - INTERIOR WOOD DOORS.pdf PDF
SAM-DESCRIPTION.docx DOCX document
087100 - DOOR HARDWARE.pdf PDF
RFI Form Brass Covers Signed.pdf PDF
3 - RFI Form Asbestos Abatement Specification Signed.pdf PDF
237300 - Indoor Central-Station Air-Handling Units.pdf PDF
117300 - CEILING MOUNTED PATIENT LIFT SYSTEM.pdf PDF
081113 - HOLLOW METAL DOORS AND FRAMES.pdf PDF
2 - RFI Form Door Hardware Specification Signed.pdf PDF
RFI Form for 3rd and fourth floor d wing teledata Signed.pdf PDF
RFI Form Electrical Data Jacks Welch Signed.pdf PDF
RFI Form for 3rd and fourth floor d wing wirig specification Signed.pdf PDF
RFI Form Recessed Conduit Signed.pdf PDF
RFI Form for 3rd and fourth floor d wing FA questions Signed.pdf PDF
RFI Form Exam Room AOV IMS Signed.pdf PDF
RFI Watt Stopper and Lighting Signed.pdf PDF
RFI Form for 3rd and fourth floor d wing Nurse Call Signed.pdf PDF
1-21-2021 Question on Nurse Calls.pdf PDF
36C24221B0016_4.docx DOCX document
36C24221B0016_3.docx DOCX document
117300 - CEILING MOUNTED PATIENT LIFT SYSTEM update 1-19-21 pk.pdf PDF
D-Wing Walk through SIGN IN SHEET 1-13-21.pdf PDF
36C24221B0016_1.docx DOCX document
36C24221B0016_2.docx DOCX document
SOW 528A7_19_708 Renovate 3rd_4th floor D Wing 02.docx DOCX document
P07-WAGE RATE.pdf PDF
528A7 19 708 VA Syracuse D Wing Final Specifications.pdf PDF
528A7-19-708 VA Syracuse D Wing Final Drawing Rev01.pdf PDF
Show all 35

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PROJECT SPECIFICATIONS

VOLUME I

100% CONSTRUCTION DOCUMENTS

Syracuse VA Medical Center

800 Irving Avenue

Syracuse, NY 13210

3RD AND 4TH FLOOR

D-WING RENOVATIONS

VA PROJECT NO. 528A7-19-708

FELLENZER ENGINEERING, LLP

22 MULBERRY STREET

MIDDLETOWN, NY 10940

(845) 343-1481

FE PROJECT NO. 19-083 NOVEMBER 10, 2020

SYRACUSE VA MEDICAL CENTER

DESIGN 3RD AND 4TH FLOOR D-WING RENOVATION

VA PROJECT NO. 528A7-19-708

FE PROJECT NO. 19-083

09-01-19

00 01 10-1

DEPARTMENT OF VETERANS AFFAIRS

VHA MASTER SPECIFICATIONS

TABLE OF CONTENTS

Section 00 01 10

DIVISION 00 - SPECIAL SECTIONS DATE

00 01 15 List of Drawing Sheets 07-15

DIVISION 01 - GENERAL REQUIREMENTS

01 00 00 General Requirements 12-18

01 32 16.15 Project Schedules (Small Projects – Design/Bid/Build 04-13

01 33 23 Shop Drawings, Product Data, and Samples 05-17

01 35 26 Safety Requirements 02-17

01 42 19 Reference Standards 09-19

01 45 00 Quality Control 03-19

01 57 19 Temporary Environmental Controls 01-11

01 74 19 Construction Waste Management 09-13

01 91 00 General Commissioning Requirements 10-15

DIVISION 02 – EXISTING CONDITIONS

02 41 00 Demolition 08-17

02 82 11 Traditional Asbestos Abatement

02 82 13.13 Glovebag Asbestos Abatement 09-15

02 82 13.19 Asbestos Floor Tile and Mastic Abatement 09-15

DIVISION 03 – CONCRETE

03 30 53 (Short-Form) Cast-in-Place Concrete 02-16

03 53 00 Concrete Topping 10-15

DIVISION 05 – METALS

05 50 00 Metal Fabrications 08-18

DIVISION 06 – WOOD, PLASTICS AND COMPOSITES

06 10 00 Rough Carpentry 10-17

06 20 00 Finish Carpentry 08-16

DIVISION 07 - THERMAL AND MOISTURE PROTECTION

07 21 13 Thermal Insulation 10-17

07 22 00 Roof and Deck Insulation 10-20

07 53 23 EPDM Roofing 10-20

07 84 00 Firestopping 02-16

07 92 00 Joint Sealants 10-17

DIVISION 08 - OPENINGS

08 11 13 Hollow Metal Doors and Frames 08-16

08 14 00 Interior Wood Doors 02-16

08 31 13 Access Doors and Frames 02-16

08 71 00 Door Hardware 08-19

VA PROJECT NO. 528A7-19-708

FE PROJECT NO. 19-083

09-01-19

00 01 10-2

08 71 13 Automatic Door Operators 02-16

08 80 00 Glazing 10-15

08 90 00 Louvers and Vents 05-15

DIVISION 09 – FINISHES

09 05 16 Subsurface Preparation for Floor Finishes 02-15

09 22 16 Non-Structural Metal Framing 06-18

09 29 00 Gypsum Board 06-18

09 30 13 Ceramic/Porcelain Tiling 09-15

09 51 00 Acoustical Ceilings 12-18

09 65 13 Resilient Base and Accessories 02-16

09 65 16 Resilient Sheet Flooring 05-18

09 65 19 Resilient Tile Flooring 05-18

09 91 00 Painting 01-16

DIVISION 10 – SPECIALTIES

10 14 00 Signage 10-15

10 21 23 Cubicle Curtain Tracks 05-15

10 26 00 Wall and Door Protection 10-15

10 28 00 Toilet, Bath, and Laundry Accessories 02-16

10 44 13 Fire Extinguisher Cabinets 08-18

DIVISION 11 – EQUIPMENT

11 41 21 Walk-In Coolers and Freezers 05-15

11 73 00 Ceiling Mounted Patient Lift System 01-17

DIVISION 12 – FURNISHINGS

12 24 00 Window Shades 08-17

12 24 21 Lightproof Shades 05-15

12 31 00 Manufactured Metal Casework 05-15

12 32 00 Manufactured Wood Casework 09-15

12 36 00 Countertops 12-18

DIVISION 13- SPECIAL CONSTRUCTION

13 05 41 Seismic Restraint Requirements 10-20

DIVISION 21- FIRE SUPPRESSION

21 08 00 Commissioning of Fire Suppression System 11-16

21 13 13 Wet-Pipe Sprinkler Systems 06-15

DIVISION 22 – PLUMBING

22 05 11 Common Work Results for Plumbing 07-16

22 05 23 General-Duty Valves for Plumbing Piping 09-15

22 07 11 Plumbing Insulation 09-19

22 08 00 Commissioning of Plumbing Systems 11-16

22 11 00 Facility Water Distribution 09-15

22 13 00 Facility Sanitary and Vent Piping 09-15

22 33 00 Electric Domestic Water Heaters 09-15

22 40 00 Plumbing Fixtures 09-15

22 62 00 Vacuum Systems for Laboratory and Healthcare Facilities 09-15

22 63 00 Gas Systems for Laboratory and Healthcare Facilities 09-15

VA PROJECT NO. 528A7-19-708

FE PROJECT NO. 19-083

09-01-19

00 01 10-3

DIVISION 23 – HEATING, VENTILATING, AND AIR

CONDITIONING (HVAC)

23 05 11 Common Work Results for HVAC 08-17

23 05 12 General Motor Requirements for HVAC and Steam

Generation Equipment

08-17

23 05 41 Noise and Vibration Control for HVAC Piping and

Equipment

02-15

23 05 93 Testing, Adjusting, and Balancing for HVAC 02-15

23 07 11 HVAC and Boiler Plant Insulation 02-15

23 08 00 Commissioning of HVAC Systems 11-16

23 09 23 Direct-Digital Control System for HVAC 09-11

23 21 13 Hydronic Piping 08-17

23 21 23 Hydronic Pumps 08-17 23 22 13 Steam and Condensate Heating Piping 08-17

23 22 16 Steam and Condensate Heating Piping Specialties

23 25 00 HVAC Water Treatment 02-15

23 31 00 HVAC Ducts and Casings 03-13

23 34 00 HVAC Fans 02-15

23 36 00 Air Terminal Units 02-15

23 37 00 Air Outlets and Inlets 02-15

23 40 00 HVAC Air Cleaning Devices 02-12

23 57 00 Heat Exchanger Pre-Piped Skid Package for HVAC

23 72 00 Air-to-Air Energy Recovery Equipment 05-11

23 73 00 Indoor Central-Station Air-Handling Units 04-11

23 74 13 Packaged, Outdoor, Central-Station Air-Handling Units 04-11

23 81 00 Decentralized Unitary HVAC Equipment 02-11

23 81 43 Air-Source Unitary Heat Pumps 04-11

23 82 00 Convection Heating and Cooling Units 04-11

23 82 16 Air Coils 04-11

DIVISION 26 – ELECTRICAL

26 05 11 Requirements for Electrical Installations 01-16

26 05 19 Low-Voltage Electrical Power Conductors and Cables 01-17

26 05 26 Grounding and Bonding for Electrical Systems 01-17

26 05 33 Raceway and Boxes for Electrical Systems 01-18

26 05 73 Overcurrent Protective Device Coordination Study 01-18

26 08 00 Commissioning of Electrical Systems 11-16

26 09 23 Lighting Controls 01-18

26 24 16 Panelboards 01-18

26 27 26 Wiring Devices 01-18

26 29 11 Motor Controllers 01-18

26 29 21 Enclosed Switches and Circuit Breakers 01-17

26 43 13 Surge Protective Devices 01-17

26 51 00 Interior Lighting 01-18

DIVISION 27 – COMMUNICATIONS

27 05 11 Requirements for Communications Installations 09-19

27 05 26 Grounding and Bonding for Communications Systems 06-15

27 05 33 Raceways and Boxes for Communications Systems 10-18

VA PROJECT NO. 528A7-19-708

FE PROJECT NO. 19-083

09-01-19

00 01 10-4

27 08 00 Commissioning of Communications Systems 11-16

27 10 00 Control, Communication and Signal Wiring 06-15

27 15 00 Communications Structured Cabling 01-16

27 52 23 Nurse Call and Code Blue Systems 10-18

DIVISION 28 – ELECTRONIC SAFETY AND SECURITY

28 05 00 Common Work Results for Electronic Safety and Security 04-18

28 05 13 Conductors and Cables for Electronic Safety and

Security

10-18

28 05 26 Grounding and Bonding for Electronic Safety and

Security

09-11

28 05 28.33 Conduits and Backboxes for Electronic Safety and

Security

09-11

28 08 00 Commissioning of Electronic Safety and Security Systems 11-16

28 13 00 Physical Access Control System 10-11

28 13 16 Physical Access Control System and Database Management 09-11

28 31 00 Fire Detection and Alarm 10-11

VA PROJECT NO. 528A7-19-708

FE PROJECT NO. 19-083

07-01-15

00 01 15 - 1

SECTION 00 01 15

LIST OF DRAWING SHEETS

The drawings listed below accompanying this specification form a part of the contract.

Drawing No. Title

TS TITLE SHEET WITH INDEX TO DRAWINGS

1-GI-001 3RD & 4TH FLOOR ‘D’ WING ICRA PLANS

1-HA-101 THIRD & FOURTH FLOOR ASBESTOS ABATEMENT PLAN

1-AD-101 THIRD & FOURTH FLOOR DEMOLITION PLAN

1-AS-001 GENERAL NOTES, TYPICAL ELEVATIONS

1-AS-101 THIRD FLOOR LIFE SAFETY PLAN

1-AS-102 FOURTH FLOOR LIFE SAFETY PLAN

1-AS-103 THIRD & FOURTH FLOOR PLANS

1-AS-104 THIRD & FOURTH FLOOR REFLECTED CEILING PLAN

1-AS-105 THIRD & FOURTH FLOOR FINISH PLAN

1-AS-106 SIGNAGE FLOOR PLAN

1-AS-401 ENLARGED FLOOR PLANS & ELEVATIONS

1-AS-402 ENLARGED FLOOR PLANS & ELEVATIONS

1-AS-403 ENLARGED FLOOR PLANS & ELEVATIONS

1-AS-404 ENLARGED FLOOR PLANS & ELEVATIONS

1-AS-405 ENLARGED FLOOR PLANS & ELEVATIONS

1-AS-701 MILLWORK SECTIONS

1-AS-801 DOOR SCHEDULE AND DETAILS

1-AS-802 ROOM FINISH SCHEDULES

1-M-001 MECHANICAL SYMBOLS, NOTES, & ABBREVIATIONS

1-MD-101 MECHANICAL: 3RD FLOOR 'D' WING DEMOLITION

DUCTWORK AND HYDRONIC PIPING PLANS

1-MD-102 MECHANICAL: 4TH FLOOR 'D' WING DEMOLITION

DUCTWORK AND HYDRONIC PIPING PLANS

1-MH-101 MECHANICAL: 3RD FLOOR 'D' WING NEW DUCTWORK AND

HYDRONIC PIPING PLANS

1-MH-102 MECHANICAL: 4TH FLOOR 'D' WING NEW DUCTWORK AND

HYDRONIC PIPING PLANS

1-MD-401 MECHANICAL: ENLARGED MECHANICAL ROOM 417

DEMOLITION DUCTWORK AND PIPING PLANS

1-MH-401T MECHANICAL: ENLARGED MECAHNICAL ROOM 417

TEMPORARY NEW DUCTWORK AND PIPING PLANS

1-MH-401 MECHANICAL: ENLARGED MECHANICAL ROOM 417 NEW

DUCTWORK AND PIPING PLANS

VA PROJECT NO. 528A7-19-708

FE PROJECT NO. 19-083

07-01-15

00 01 15 - 2

1-MH-402T MECHANICAL: PARTIAL 3RD FLOOR ROOF AND ENLARGED

4TH FLOOR MECHANICAL ROOM D417 NEW WORK PLAN

1-MH-501 MECHANICAL: HVAC CONTROLS DIAGRAM AND POINTS

LIST

1-M-701 MECHANICAL: DETAILS

1-M-702 MECHANICAL: DETAILS

1-M-703 MECHANICAL: DETAILS

1-M-801 MECHANICAL: SCHEDULES

1-M-802 MECHANICAL: SCHEDULES

1-PL-001 PLUMBING SYMBOLS, NOTES, & ABBREVIATIONS

1-PD-101 PLUMBING: 3RD FLOOR 'D' WING DEMOLITION

SANITARY, DOMESTIC, AND MEDICAL GAS PIPING

PLANS

1-PD-102 PLUMBING: 4TH FLOOR 'D' WING DEMOLITION

SANITARY AND DOMESTIC PIPING PLANS

1-PD-103 PLUMBING: 3RD FLOOR ‘D’ WING DEMOLITION MEDICAL

GAS PIPING PLAN

1-PL-101 PLUMBING: 3RD FLOOR 'D' WING NEW SANITARY,

DOMESTIC, AND MEDICAL GAS PIPING PLANS

1-PL-102 PLUMBING: 4TH FLOOR 'D' WING NEW SANITARY AND

DOMESTIC PIPING PLANS

1-PL-103 PLUMBING: 4TH FLOOR ‘D’ WING NEW MEDICAL GAS

PIPING PLAN

1-FX-001 FIRE PROTECTION SYMBOLS, NOTES, & ABBREVIATIONS

1-FX-101 FIRE PROTECTION: 3RD FLOOR 'D' WING DEMOLITION

AND NEW SPRINKLER PLANS

1-FX-102 FIRE PROTECTION: 4TH FLOOR 'D' WING DEMOLITION

AND NEW SPRINKLER PLANS

1-E-001 ELECTRICAL SYMBOLS, NOTES, & ABBREVIATIONS

1-ED-101 ELECTRICAL: 3RD FLOOR 'D' WING DEMOLITION

LIGHTING AND POWER PLANS

1-ED-102 ELECTRICAL: 4TH FLOOR 'D' WING DEMOLITION

LIGHTING AND POWER PLANS

1-EP-101 ELECTRICAL: 3RD FLOOR 'D' WING NEW LIGHTING AND

POWER PLANS

1-EP-102 ELECTRICAL: 4TH FLOOR 'D' WING NEW LIGHTING AND

POWER PLANS

1-E-701 ELECTRICAL: ONE-LINE DIAGRAMS

1-E-702 ELECTRICAL: DETAILS

1-E-801 ELECTRICAL: SCHEDULES

1-E-802 ELECTRICAL: SCHEDULES

- - - END - - -

12-01-18

DESIGN 3RD AND 4TH FLOOR D-WING RENOVATION

FE PROJECT NO. 19-083

01 00 00 -1

SECTION 01 00 00

GENERAL REQUIREMENTS

TABLE OF CONTENTS

1.1 SAFETY REQUIREMENTS

1.2 GENERAL INTENTION

1.3 STATEMENT OF BID ITEM(S)

1.4 SPECIFICATIONS AND DRAWINGS FOR CONTRACTOR

1.5 CONSTRUCTION SECURITY REQUIREMENTS

1.6 OPERATIONS AND STORAGE AREAS

1.7 ALTERATIONS

1.8 DISPOSAL AND RETENTION

1.9 PROTECTION OF EXISTING VEGETATION, STRUCTURES, EQUIPMENT,

UTILITIES, AND IMPROVEMENTS

1.10 RESTORATION

1.11 LAYOUT OF WORK

1.12 AS-BUILT DRAWINGS

1.13 WARRANTY MANAGEMENT

1.14 USE OF ROADWAYS

1.15 TEMPORARY USE OF MECHANICAL AND ELECTRICAL EQUIPMENT

1.16 TEMPORARY USE OF EXISTING ELEVATORS

1.17 TEMPORARY TOILETS

1.18 AVAILABILITY AND USE OF UTILITY SERVICES

1.19 NEW TELEPHONE EQUIPMENT

1.20 TESTS

1.21 INSTRUCTIONS

1.22 GOVERNMENT-FURNISHED PROPERTY

1.23 RELOCATED EQUIPMENT

1.24 General Project Requirements

DESIGN 3RD AND 4TH FLOOR D-WING RENOVATION

01 00 00 -2

SECTION 01 00 00

GENERAL REQUIREMENTS

1.1 SAFETY REQUIREMENTS

Refer to section 01 35 26, SAFETY REQUIREMENTS for safety and infection control requirements.

1.2 GENERAL INTENTION

A. Contractor shall completely prepare site for building operations, including demolition and removal of existing structures, and furnish labor and materials and perform work to redesign and renovate the existing 3rd and 4th Floor of the SCI D-Wing, and select renovations to a portion of the 4th floor C-wing as required by drawings and specifications.

B. Visits to the site by Bidders may be made only by appointment with the

Medical Center Contracting Officer.

C. Offices of Fellenzer Engineering, LLP, as Engineers-Architects, will render certain technical services during construction. Such services shall be considered as advisory to the Government and shall not be construed as expressing or implying a contractual act of the Government without affirmations by Contracting Officer or his duly authorized representative.

D. Before placement and installation of work subject to tests by testing laboratory retained by Department of Veterans Affairs, the Contractor shall notify the COR in sufficient time to enable testing laboratory personnel to be present at the site in time for proper taking and testing of specimens and field inspection. Such prior notice shall be not less than three work days unless otherwise designated by the COR.

E. All employees of general contractor and subcontractors shall comply with VA security management program and obtain permission of the VA police, be identified by project and employer, and restricted from unauthorized access.

DESIGN 3RD AND 4TH FLOOR D-WING RENOVATION

01 00 00 -3

1.3 STATEMENT OF BID ITEM(S)

A. ITEM I, GENERAL CONSTRUCTION: Work includes general construction, alterations, necessary removal of existing construction and certain other items.

ITEM II, Electrical Work: Work includes all labor, material, equipment and supervision to perform the required electrical construction work on this project.

ITEM III, Mechanical Work: Work includes all labor, material, equipment and supervision to perform the required Mechanical construction work on this project.

ITEM IV, Abatement SOW: Work includes all labor, material, equipment and supervision to perform the required Abatement work on this project.

1.4 SPECIFICATIONS AND DRAWINGS FOR CONTRACTOR

A. Drawings and contract documents may be obtained from the website where the solicitation is posted. Additional copies will be at Contractor's expense.

1.5 CONSTRUCTION SECURITY REQUIREMENTS

A. Security Plan:

1. The security plan defines both physical and administrative security procedures that will remain effective for the entire duration of the project.

2. The General Contractor is responsible for assuring that all sub-contractors working on the project and their employees also comply with these regulations.

B. Security Procedures:

1. General Contractor’s employees shall not enter the project site without appropriate badge. Photo Identification and Security badges shall be issued by the VA Site Security Officer, and shall be worn and visible by All Contractor/Sub-contractor’s employees at all times for inspection/verification by VA staff. They may also be subject to inspection of their personal effects when entering or leaving the project site.

DESIGN 3RD AND 4TH FLOOR D-WING RENOVATION

01 00 00 -4

2. Before starting work the General Contractor shall give one week’s notice and coordinate with the COR to have all general contractor employees and their subcontractors begin the security process to obtain VA Badges. During the time period where the person does not have a PIV Card Badge the person is required to wear a paper badge obtained from the VA Police Department each day. This notice is separate from any notices required for utility shutdown described later in this section.

3. No photography of VA premises is allowed without written permission of the Contracting Officer.

4. VA reserves the right to close down or shut down the project site and order General Contractor’s employees off the premises in the event of a national emergency. The General Contractor may return to the site only with the written approval of the Contracting Officer.

C. Guards: Not Used

D. Key Control:

1. The General Contractor shall provide duplicate keys and lock combinations to the Contracting officers representative (COR) for the purpose of security inspections of every area of project including tool boxes and parked machines and take any emergency action.

2. The General Contractor shall turn over all permanent lock cylinders to the VA locksmith for permanent installation. See Section 08 71

00, DOOR HARDWARE and coordinate.

E. Document Control:

1. Before starting any work, the General Contractor/Sub Contractors shall submit an electronic security memorandum describing the approach to following goals and maintaining confidentiality of

“sensitive information”.

2. The General Contractor is responsible for safekeeping of all drawings, project manual and other project information. This

DESIGN 3RD AND 4TH FLOOR D-WING RENOVATION

01 00 00 -5 information shall be shared only with those with a specific need to accomplish the project.

3. Certain documents, sketches, videos or photographs and drawings may be marked “Law Enforcement Sensitive” or “Sensitive Unclassified”.

Secure such information in separate containers and limit the access to only those who will need it for the project. Return the information to the Contracting Officer upon request.

4. These security documents shall not be removed or transmitted from the project site without the written approval of Contracting

Officer.

5. All paper waste or electronic media such as CD’s and diskettes shall be shredded and destroyed in a manner acceptable to the VA.

6. Notify Contracting Officer, COR immediately when there is a loss or compromise of “sensitive information”.

7. All electronic information shall be stored in specified location following VA standards and procedures using an Engineering Document

Management Software (EDMS).

a. Security, access and maintenance of all project drawings, both scanned and electronic shall be performed and tracked through the

EDMS system.

b. “Sensitive information” including drawings and other documents may be attached to e-mail provided all VA encryption procedures are followed.

F. Motor Vehicle Restrictions

1. Parking for Contractor Employees and Sub-Contractors is NOT provided. ONE parking permit will be provided to the General

Contractor; there shall be no additional parking on VA Medical

Center Property other than this one parking permit. This parking permit can either be used for one Vehicle, parking in a designated area set forth by the VA, OR for the placement of a 20 Foot Covered

Dumpster, placed in a designated area set forth by the VA OR for the placement of a 20 Foot storage container, placed in a designated

DESIGN 3RD AND 4TH FLOOR D-WING RENOVATION

01 00 00 -6 area set forth by the VA. It shall be noted that Parking Spaces for

Vehicles are limited in number and are not guaranteed. Parking is

NOT assigned; and is first come first served.

2. Use of the warehouse loading dock shall be coordinated with the COR at least 24 hours in advance of requested use. No vehicle shall be left at the loading dock without the approval of the COR.

1.6 OPERATIONS AND STORAGE AREAS

A. The Contractor shall confine all operations (including storage of materials) on Government premises to areas authorized or approved by the Contracting Officer within the Areas of Work. The Contractor shall hold and save the Government, its officers and agents, free and harmless from liability of any nature occasioned by the Contractor's performance. No additional on-site storage shall be permitted.

B. Temporary buildings – Not Used.

C. The Contractor shall, under regulations prescribed by the Contracting

Officer, use only established roadways when and as authorized by the

Contracting Officer. When materials are transported in prosecuting the work, vehicles shall not be loaded beyond the loading capacity recommended by the manufacturer of the vehicle or prescribed by any

Federal, State, or local law or regulation. When it is necessary to cross curbs or sidewalks, the Contractor shall protect them from damage. The Contractor shall repair or pay for the repair of any damaged curbs, sidewalks, or roads.

D. Working space and space available for storing materials shall be as determined by the COR within the Areas of Work. No additional on-site storage shall be permitted.

E. Workers are subject to rules of Medical Center as applicable to their conduct.

F. Execute work in such a manner as to interfere as little as possible with work being done by others. Keep roads clear of construction materials, debris, standing construction equipment and vehicles at all times. All material that is shipped to the Medical Center must have the

Project Name, Project Number and COR’s Name on the package. The VA nor

DESIGN 3RD AND 4TH FLOOR D-WING RENOVATION

01 00 00 -7 any of its employees shall be held responsible for any items that are sent to the VA that are lost, or mishandled. The contractor assumes all responsibility for items that are shipped to the VA.

G. Execute work so as to interfere as little as possible with normal functioning of Medical Center as a whole, including operations of utility services, fire protection systems and any existing equipment, and with work being done by others. Use of equipment and tools that transmit vibrations and noises through the building structure, are not permitted in buildings that are occupied, during construction, jointly by patients or medical personnel, and Contractor's personnel, except as permitted by COR where required by limited working space.

1. Do not store materials and equipment in other than assigned areas.

2. Schedule delivery of materials and equipment to immediate construction working areas within buildings in use by Department of

Veterans Affairs in quantities sufficient for not more than two work days. Provide unobstructed access to Medical Center areas required to remain in operation.

3.

All materials shipped to VA shall have the “Project Name and Number” as well as CORS Name on each package. The VA nor any of it’s employee’s shall be held responsible for any items that are sent to the VA that are lost or mishandled. The Contractor assumes all responsibility for items that are shipped to the VA.

H. Phasing:

The Medical Center must maintain its operation 24 hours a day 7 days a week. Therefore, any interruption in service must be scheduled and coordinated with the COR to ensure that no lapses in operation occur.

The Contractor shall take all measures and provide all material necessary for protecting existing equipment and property in affected areas of construction against dust and debris, so that equipment and affected areas to be used in the Medical Centers operations will not be hindered. Contractor shall permit access to Department of Veterans

Affairs personnel through other construction areas which serve as

DESIGN 3RD AND 4TH FLOOR D-WING RENOVATION

01 00 00 -8 routes of access to such affected areas and equipment. These routes whether access or egress shall be isolated from the construction area by temporary partitions and have walking surfaces, lighting etc. to facilitate patient and staff access. Coordinate alteration work in areas occupied by Department of Veterans Affairs so that Medical Center operations will continue during the construction period. It is the

CONTRACTOR'S responsibility to develop a work plan and schedule detailing, at a minimum, the procedures to be employed, the equipment and materials to be used, the interim life safety measure to be used during the work, and a schedule defining the duration of the work with milestone subtasks. See Drawings for Preliminary Outline Phasing Plan.

The work to be outlined shall include, but not be limited to:

To ensure such executions, Contractor shall furnish the COR with a schedule of approximate phasing dates on which the Contractor intends to accomplish work in each specific area of site, building or portion thereof. In addition, Contractor shall notify the Resident Engineer or

COR minimum two weeks in advance of the proposed date of starting work in each specific area of site, building or portion thereof. Arrange such dates to ensure accomplishment of this work in successive phases mutually agreeable to Medical Center Director, COR, and Contractor, as follows:

Phase I: See Drawing IAS-103

Phase II: See Drawing IAS-103

I. Clinical spaces immediately adjacent to Building No. 1, 3rd Floor, ‘D’ and partial “C’ wing, and 4th Floor ‘D’ Wing will be occupied by

Medical Center personnel during performance of work. Immediate areas of alterations will be vacated by Government in accordance with above phasing and beginning immediately after date of receipt of Notice to

Proceed and turned over to Contractor.

1. Contractor shall take all measures and provide all material necessary for protecting existing equipment and property in affected areas of construction against dust and debris, so that equipment and affected areas to be used in the Medical Centers operations will not be hindered. Contractor shall permit access to Department of

DESIGN 3RD AND 4TH FLOOR D-WING RENOVATION

01 00 00 -9

Veterans Affairs personnel and patients through other construction areas which serve as routes of access to such affected areas and equipment. These routes whether access or egress shall be isolated from the construction area by temporary partitions and have walking surfaces, lighting etc. to facilitate patient and staff access.

Coordinate alteration work in areas occupied by Department of

Veterans Affairs so that Medical Center operations will continue during the construction period.

J. When areas of a building and/or construction site is turned over to

Contractor, Contractor shall accept entire responsibility including upkeep and maintenance therefore:

1. Contractor shall maintain a minimum temperature of 4 degrees C (40 degrees F) at all times, except as otherwise specified.

2. Contractor shall maintain in operating condition existing fire protection and alarm equipment. In connection with fire alarm equipment, Contractor shall make arrangements for pre-inspection of site with Fire Department or Company (Department of Veterans Affairs or municipal) whichever will be required to respond to an alarm from

Contractor's employee or watchman.

K. Utilities Services: Maintain existing utility services for Medical

Center at all times. Provide temporary facilities, labor, materials, equipment, connections, and utilities to assure uninterrupted services.

Where necessary to cut or interrupt existing water, steam, gases, sewer or air pipes, or conduits, wires, cables, etc. of utility services or of fire protection systems and communications systems (including telephone), services shall be cut and capped / terminated at suitable places where shown; or, in absence of such indication, where directed by COR. All such actions shall be coordinated with the COR or Utility

Company involved.

1. No utility service such as water, gas, steam, sewers or electricity, or fire protection systems and communications systems may be interrupted without prior approval of COR. Electrical work shall be accomplished with all affected circuits or equipment de-energized.

When an electrical outage cannot be accomplished, work on any

DESIGN 3RD AND 4TH FLOOR D-WING RENOVATION

01 00 00 -10 energized circuits or equipment shall not commence without a detailed work plan, the Medical Center Director’s prior knowledge and written approval. Refer to specification Sections 26 05 11, REQUIREMENTS FOR ELECTRICAL INSTALLATIONS, 27 05 11 REQUIREMENTS FOR

COMMUNICATIONS INSTALLATIONS and 28 05 00, COMMON WORK RESULTS FOR

ELECTRONIC SAFETY AND SECURITY for additional requirements.

2. Contractor shall submit a request to interrupt any such services to

COR, in writing, 7 days in advance of proposed interruption. Request shall state reason, date, exact time of, and approximate duration of such interruption.

3. Contractor will be advised (in writing) of approval of request, or of which other date and/or time such interruption will cause least inconvenience to operations of Medical Center. Interruption time approved by Medical Center may occur at other than Contractor's normal working hours.

4. Major interruptions of any system must be requested, in writing, at least 15 calendar days prior to the desired time and shall be performed as directed by the Resident Engineer or COR.

5. In case of a contract construction emergency, service will be interrupted on approval of COR. Such approval will be confirmed in writing as soon as practical.

6. Whenever it is required that a connection fee be paid to a public utility provider for new permanent service to the construction project, for such items as water, sewer, electricity, gas or steam, payment of such fee shall be the responsibility of the Government and not the Contractor.

L. Abandoned Lines: All service lines such as wires, cables, conduits, ducts, pipes and the like, and their hangers or supports, which are to be abandoned but are not required to be entirely removed, shall be sealed, capped or plugged at the main, branch or panel they originate from. The lines shall not be capped in finished areas, but shall be removed and sealed, capped or plugged in ceilings, within furred

DESIGN 3RD AND 4TH FLOOR D-WING RENOVATION

01 00 00 -11 spaces, in unfinished areas, or within walls or partitions; so that they are completely behind the finished surfaces.

M. To minimize interference of construction activities with flow of

Medical Center traffic, comply with the following:

1. Keep roads, walks and entrances to grounds, to parking and to occupied areas of buildings clear of construction materials, debris and standing construction equipment and vehicles.

N. Coordinate the work for this contract with other construction operations as directed by COR. This includes the scheduling of traffic and the use of roadways, as specified in Article, USE OF ROADWAYS.

1.7 ALTERATIONS

A. Survey: Before any work is started, the Contractor shall make a thorough survey with the COR and a representative of VA Supply Service, of areas of buildings in which alterations occur and areas which are anticipated routes of access, and furnish a report, signed by all, to the Contracting Officer. This report shall list by rooms and spaces:

1. Existing condition and types of resilient flooring, doors, windows, walls and other surfaces not required to be altered throughout affected areas of building.

2. Existence and conditions of items such as plumbing fixtures and accessories, electrical fixtures, equipment, venetian blinds, shades, etc., required by drawings to be either reused or relocated, or both.

3. Shall note any discrepancies between drawings and existing conditions at site.

4. Shall designate areas for working space, materials storage and routes of access to areas within buildings where alterations occur and which have been agreed upon by Contractor and COR.

B. Any items required by drawings to be either reused or relocated or both, found during this survey to be nonexistent, or in opinion of COR, to be in such condition that their use is impossible or impractical, shall be furnished and/or replaced by Contractor with new items in

DESIGN 3RD AND 4TH FLOOR D-WING RENOVATION

01 00 00 -12 accordance with specifications which will be furnished by Government.

Provided the contract work is changed by reason of this subparagraph B, the contract will be modified accordingly, under provisions of clause entitled "DIFFERING SITE CONDITIONS" (FAR 52.236-2) and "CHANGES" (FAR

52.243-4 and VAAR 852.236-88).

C. The CO or COR reserves the right to refuse any and all change orders that have resulted from the General Contractor (GC) or any GC Subs due to the lack of knowledge of what the intent of the planned project final delivered outcome. If there has not been any posted RFI’s during the project bidding submittal process pertaining to the task in question. Then it will be presumed that the GC and its Subs fully understand the project requirements, and all associated related costs will be the responsibility of the GC to cover with no additional cost to the VA Medical Center.

D. If work being done by General Contractor (GC) or its Subs are found to be a safety concern by the CO or the COR. Regardless of what prints or specifications state. The GC will have the responsibility to correct these safety concerns at the cost of the GC to the full satisfaction of the CO or COR.

E. Re-Survey: Thirty days before expected partial or final inspection date, the Contractor and COR together shall make a thorough re-survey of the areas of buildings involved. They shall furnish a report on conditions then existing, of resilient flooring, doors, windows, walls and other surfaces as compared with conditions of same as noted in first condition survey report:

1. Re-survey report shall also list any damage caused by Contractor to such flooring and other surfaces, despite protection measures; and, will form basis for determining extent of repair work required of

Contractor to restore damage caused by Contractor's workers in executing work of this contract.

F. Protection: Provide the following protective measures:

DESIGN 3RD AND 4TH FLOOR D-WING RENOVATION

01 00 00 -13

1. Wherever existing roof surfaces are disturbed they shall be protected against water infiltration. In case of leaks, they shall be repaired immediately upon discovery.

2. Protection of interior of existing structures at all times, from damage, dust and weather inclemency. Wherever work is performed, floor surfaces that are to remain in place shall be adequately protected prior to starting work, and this protection shall be maintained intact until all work in the area is completed. The contractor shall be required to replace all flooring protection when it becomes visibly damaged or when the COR requests it.

1.8 DISPOSAL AND RETENTION

A. Materials and equipment accruing from work removed and from demolition of buildings or structures, or parts thereof, shall be disposed of as follows:

1. Reserved items which are to remain property of the Government are identified by attached tags or noted on drawings or in specifications as items to be stored. Items that remain property of the Government shall be removed or dislodged from present locations in such a manner as to prevent damage which would be detrimental to re-installation and reuse. Store such items where directed by COR.

2. Items not reserved shall become property of the Contractor and be removed by Contractor from the Medical Center.

3. Items of portable equipment and furnishings located in rooms and spaces in which work is to be done under this contract shall remain the property of the Government. When rooms and spaces are vacated by the Department of Veterans Affairs during the alteration period, such items which are NOT required by drawings and specifications to be either relocated or reused will be removed by the Government in advance of work to avoid interfering with Contractor's operation.

1.9 PROTECTION OF EXISTING VEGETATION, STRUCTURES, EQUIPMENT, UTILITIES, AND

IMPROVEMENTS

A. The Contractor shall preserve and protect all structures, equipment, and vegetation (such as trees, shrubs, and grass) on or adjacent to the

DESIGN 3RD AND 4TH FLOOR D-WING RENOVATION

01 00 00 -14 work site, which are not to be removed and which do not unreasonably interfere with the work required under this contract. The Contractor shall avoid damaging vegetation that will remain in place. If any limbs or branches of trees are broken during contract performance, or by the careless operation of equipment, or by workers, the Contractor shall trim those limbs or branches with a clean cut and paint the cut with a tree-pruning compound as directed by the Contracting Officer or COR.

B. The Contractor shall protect from damage all existing improvements and utilities at or near the work site and on adjacent property of a third party, the locations of which are made known to or should be known by the Contractor. The Contractor shall repair any damage to those facilities, including those that are the property of a third party, resulting from failure to comply with the requirements of this contract or failure to exercise reasonable care in performing the work. If the

Contractor fails or refuses to repair the damage promptly, the

Contracting Officer may have the necessary work performed and charge the cost to the Contractor.

1.10 RESTORATION

A. Remove, cut, alter, replace, patch and repair existing work as necessary to install new work and meet the general intent of the

Contract documents. Except as otherwise shown or specified, do not cut, alter or remove any structural work, and do not disturb any ducts, plumbing, steam, gas, or electric work without approval of the COR.

Existing work to be altered or extended and that is found to be defective in any way, shall be reported to the COR before it is disturbed. Materials and workmanship used in restoring work, shall conform in type and quality to that of original existing construction, except as otherwise shown or specified.

B. Upon completion of contract, deliver work complete and undamaged.

Existing work (walls, ceilings, partitions, floors, mechanical and electrical work, lawns, paving, roads, walks, etc.) disturbed or removed as a result of performing required new work, shall be patched, repaired, reinstalled, or replaced with new work, and refinished and left in as good condition as existed before commencing work.

DESIGN 3RD AND 4TH FLOOR D-WING RENOVATION

01 00 00 -15

C. At Contractor's own expense, Contractor shall immediately restore to service and repair any damage caused by Contractor's workers to existing piping and conduits, wires, cables, etc., of utility services or of fire protection systems and communications systems (including telephone) which are not scheduled for discontinuance or abandonment.

D. Expense of repairs to such utilities and systems not shown on drawings or locations of which are unknown will be covered by adjustment to contract time and price in accordance with clause entitled "CHANGES"

(FAR 52.243-4 and VAAR 852.236-88) and "DIFFERING SITE CONDITIONS" (FAR

52.236-2).

1.11 LAYOUT OF WORK

A. The Contractor shall lay out the work from Government established base lines and bench marks, indicated on the drawings, and shall be responsible for all measurements in connection with the layout. The

Contractor shall furnish all equipment, tools, materials and labor required to lay out all parts of the work. The Contractor shall be responsible for executing the work to the lines and grades that may be established or indicated by the Contracting Officer or COR.

1.12 AS-BUILT DRAWINGS

A. The contractor shall maintain two full size sets of as-built drawings which will be kept current during construction of the project, to include all contract changes, modifications and clarifications.

B. All variations shall be shown in the same general detail as used in the contract drawings. To ensure compliance, as-built drawings shall be made available for the COR’s review, as often as requested.

C. Contractor shall deliver two approved completed sets of as-built drawings in the electronic version (scanned PDF) to the COR within 15 calendar days after each completed phase and after the acceptance of the project by the COR.

D. Paragraphs A, B, & C shall also apply to all shop drawings.

1.13 WARRANTY MANAGEMENT

A. Warranty Management Plan: Develop a warranty management plan which contains information relevant to FAR 52.246-21 Warranty of Construction

DESIGN 3RD AND 4TH FLOOR D-WING RENOVATION

01 00 00 -16 at least 30 days before the planned pre-warranty conference, submit four sets of the warranty management plan. Include within the warranty management plan all required actions and documents to assure that the

Government receives all warranties to which it is entitled. The plan must be in narrative form and contain sufficient detail to render it suitable for use by future maintenance and repair personnel, whether tradesman, or of engineering background, not necessarily familiar with this contract. The term “status” as indicated below must include due date and whether item has been submitted or was approved. Warranty information made available during the construction phase must be submitted to the Contracting Officer for approval prior to each monthly invoice for payment. Assemble approved information in a binder and turn over to the Government upon acceptance of the work. The construction warranty period will begin on the date of the project acceptance and continue for the product warranty period. A joint 4 month and 9 month warranty inspection will be conducted, measured from time of acceptance, by the Contactor and the Contracting Officer. Include in the warranty management plan, but not limited to, the following:

1. Roles and responsibilities of all personnel associated with the warranty process, including points of contact and telephone numbers within the company of the Contractor, subcontractors, manufacturers or suppliers involved.

2. Furnish with each warranty the name, address and telephone number of each of the guarantor’s representatives nearest project location.

3. Listing and status of delivery of all Certificates of Warranty for extended warranty items, to include roofs, HVAC balancing, pumps, motors, transformers and for all commissioned systems such as fire protection and alarm systems, sprinkler systems and lightning protection systems, etc.

4. A list for each warranted equipment item, feature of construction or system indicating:

a. Name of item.

b. Model and serial numbers.

DESIGN 3RD AND 4TH FLOOR D-WING RENOVATION

01 00 00 -17

c. Location where installed.

d. Name and phone numbers of manufacturers and suppliers.

e. Name and phone numbers of manufacturers or suppliers.

f. Names, addresses and phone numbers of sources of spare parts.

g. Warranties and terms of warranty. Include one-year overall warranty of construction, including the starting date of warranty of construction. Items which have extended warranties must be indicated with separate warranty expiration dates.

h. Starting point and duration of warranty period.

i. Summary of maintenance procedures required to continue the warranty in force.

j. Cross-reference to specific pertinent Operation and Maintenance manuals.

k. Organizations, names and phone numbers of persons to call for warranty service.

l. Typical response time and repair time expected for various warranted equipment.

5. The plans for attendance at the 4 and 9-month post construction warranty inspections conducted by the government.

6. Procedure and status of tagging of all equipment covered by extended warranties.

7. Copies of instructions to be posted near selected pieces of equipment where operation is critical for warranty and/or safety reasons.

B. Performance Bond: The Performance Bond must remain effective throughout the entirety of the construction period.

1. In the event the Contractor fails to commence and diligently pursue any construction warranty work required, the Contracting Officer will have the work performed by others, and after completion of the

DESIGN 3RD AND 4TH FLOOR D-WING RENOVATION

01 00 00 -18 work, will charge the remaining construction warranty funds of expenses incurred by the Government while performing the work, including, but not limited to administrative expenses.

2. In the event sufficient funds are not available to cover the construction warranty work performed by the Government at the contractor’s expenses, the Contracting Officer will have the right to recoup expenses from the bonding company.

3. Following oral or written notification of required construction warranty repair work, the Contractor shall respond in a timely manner. Written verification will follow oral instructions. Failure to respond will be cause for the Contracting Officer to proceed against the Contractor.

C. Pre-Warranty Conference: Prior to contract completion, and at a time designated by the Contracting Officer, the Contractor shall meet with the Contracting Officer to develop a mutual understanding with respect to the requirements of this section. Communication procedures for

Contractor notification of construction warranty defects, priorities with respect to the type of defect, reasonable time required for

Contractor response, and other details deemed necessary by the

Contracting Officer for the execution of the construction warranty will be established/ reviewed at this meeting. In connection with these requirements and at the time of the Contractor’s quality control completion inspection, furnish the name, telephone number and address of a licensed and bonded company which is authorized to initiate and pursue construction warranty work action on behalf of the Contractor.

This point of contract will be located within the local service area of the warranted construction, be continuously available and be responsive to Government inquiry on warranty work action and status. This requirement does not relieve the Contractor of any of its responsibilities in conjunction with other portions of this provision.

D. Contractor’s Response to Construction Warranty Service Requirements:

Following oral or written notification by the Contracting Officer, the

Contractor shall respond to construction warranty service requirements in accordance with the “Construction Warranty Service Priority List”

DESIGN 3RD AND 4TH FLOOR D-WING RENOVATION

01 00 00 -19 and the three categories of priorities listed below. Submit a report on any warranty item that has been repaired during the warranty period.

Include within the report the cause of the problem, date reported, corrective action taken, and when the repair was completed. If the

Contractor does not perform the construction warranty within the timeframe specified, the Government will perform the work and back charge the construction warranty payment item established.

1. First Priority Code 1. Perform onsite inspection to evaluate situation, and determine course of action within 4 hours, initiate work within 6 hours and work continuously to completion or relief.

2. Second Priority Code 2. Perform onsite inspection to evaluate situation, and determine course of action within 8 hours, initiate work within 24 hours and work continuously to completion or relief.

3. Third Priority Code 3. All other work to be initiated within 3 work days and work continuously to completion or relief.

4. The “Construction Warranty Service Priority List” is as follows:

Code 1-Life Safety Systems

a. Fire suppression systems.

b. Fire alarm system(s).

Code 1-Air Conditioning Systems

a. Air conditioning leak in part of the building, if causing damage.

b. Air conditioning system not cooling properly.

c. Heating system not heating properly.

Code 1 Doors

a. Interior, exterior personnel doors or hardware, not functioning properly, causing security, fire or safety problem.

Code 3-Doors

a. Interior/exterior personnel doors or hardware not functioning properly.

DESIGN 3RD AND 4TH FLOOR D-WING RENOVATION

01 00 00 -20

Code 1-Electrical

a. Power failure (entire area or any building operational after 1600 hours).

b. Security lights.

c. Smoke detectors.

Code 2-Electrical

a. Power failure (no power to a room or part of building).

b. Receptacles and lights not operational (in a room or part of building).

Code 3-Electrical

a. Exterior lights not operational.

Code 1-Gas

a. Leaks and pipeline breaks.

Code 1-Heat

a. Power failure affecting heat.

Code 1-Plumbing

a. Hot water heater failure.

b. Leaking water supply pipes.

Code 2-Plumbing

a. Flush valves not operating properly

b. Fixture drain, supply line or any water pipe leaking.

c. Toilet leaking at base.

Code 3- Plumbing

a. Leaky faucets.

b. Medical systems not operating properly.

DESIGN 3RD AND 4TH FLOOR D-WING RENOVATION

01 00 00 -21

Code 3-Interior

a. Floors damaged.

b. Paint chipping or peeling.

c. Casework damaged.

Code 2-Water (Hot)

a. No hot water in portion of building listed.

Code 3

a. All work not listed above.

E. Warranty Tags: At the time of installation, tag each warranted item with a durable, oil and water-resistant tag approved by the Contracting

Officer. Attach each tag with a copper wire and spray with a silicone waterproof coating. Also submit two record copies of the warranty tags showing the layout and design. The date of acceptance and the QC signature must remain blank until the project is accepted for beneficial occupancy. Show the following information on the tag.

DESIGN 3RD AND 4TH FLOOR D-WING RENOVATION

01 00 00 -22

1.14 USE OF ROADWAYS

A. For hauling, use only established public roads and roads on Medical

Center property as authorized by the COR.

1.15 TEMPORARY USE OF MECHANICAL AND ELECTRICAL EQUIPMENT

A. Use of new installed mechanical and electrical equipment to provide heat, ventilation, plumbing, light and power will be permitted subject to written approval and compliance with the following provisions:

1. Permission to use each unit or system must be given by COR in writing. If the equipment is not installed and maintained in accordance with the written agreement and following provisions, the

COR will withdraw permission for use of the equipment.

2. Electrical installations used by the equipment shall be completed in accordance with the drawings and specifications to prevent damage to the equipment and the electrical systems, i.e. transformers, relays, DESIGN 3RD AND 4TH FLOOR D-WING RENOVATION

01 00 00 -23 circuit breakers, fuses, conductors, motor controllers and their overload elements shall be properly sized, coordinated and adjusted.

Installation of temporary electrical equipment or devices shall be in accordance with NFPA 70, National Electrical Code, (2014

Edition), Article 590, Temporary Installations. Voltage supplied to each item of equipment shall be verified to be correct and it shall be determined that motors are not overloaded. The electrical equipment shall be thoroughly cleaned before using it and again immediately before final inspection including vacuum cleaning and wiping clean interior and exterior surfaces.

3. Units shall be properly lubricated, balanced, and aligned.

Vibrations must be eliminated.

4. Automatic temperature control systems for preheat coils shall function properly and all safety controls shall function to prevent coil freeze-up damage.

5. The air filtering system utilized shall be that which is designed for the system when complete, and all filter elements shall be replaced at completion of construction and prior to testing and balancing of system.

6. All components of heat production and distribution system, metering equipment, condensate returns, and other auxiliary facilities used in temporary service shall be cleaned prior to use; maintained to prevent corrosion internally and externally during use; and cleaned, maintained and inspected prior to acceptance by the Government.

Boilers, pumps, feedwater heaters and auxiliary equipment must be operated as a complete system and be fully maintained by operating personnel. Boiler water must be given complete and continuous chemical treatment.

B. Prior to final inspection, the equipment or parts used which show wear and tear beyond normal, shall be replaced with identical replacements, at no additional cost to the Government.

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .