RFI Form Brass Covers Signed.pdf
PDF 130 KB Posted
- Attached to
- Z1DA--528A7-19-708 SCI RENOVATION-THIRD AND FOURTH FLOOR D-WING Federal contract opportunity
- Solicitation number
- 36C24221B0016
About this file
This document contains a request for information form and a related federal contract opportunity solicitation. The request for information form seeks clarification on whether brass floor covers in a demolition area need to be removed for the Syracuse VA Medical Center's project to renovate the third and fourth floors of the D wing. The response indicates the brass covers will need to be removed, plugged, and filled to floor level before new flooring can be installed.
The related federal contract opportunity solicitation is for the renovation of the third and fourth floors of the D wing at the Syracuse VA Medical Center. The solicitation is set aside for total service-disabled veteran-owned small businesses. Offerors must be verified in VetBiz.gov and registered in SAM.gov under NAICS code 236220. Questions are due by January 28, 2021 and site visits will take place on January 13, 2021. The award will be made to the responsive, responsible bidder submitting the lowest price. The work includes renovation of the specified floors and is further described in specification section 01 00 00.
View the file
Other files for this federal contract opportunity
Show all 35
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Project:
Project
No.
Date:
To: Number:
Spec.or Drawing
Reference Attention:
Phone:
Email:
REQUEST:
Requested By:
Signed: Date:
ANSWER:
Answered By:
Signed: Date:
| Project: VA 3rd & 4th floor D wing renovations | |
| Project No: 528A7-19-708 | |
| Date: 1/28/2021 | |
| To: VA Hospital Syracuse NY | |
| Number: 3 | |
| To_2: | |
| Attention: Nicholas Winne | |
| Phone: 716-862-7461 EXT: 22438 | |
| Email: nicholas.winne@va.gov | |
| Specor Drawing Reference: 1-ED-101, 1-ED-102 | |
| REQUESTRow1: On the Demo there are brass covers in the floor do they need to be removed? | |
| undefined: Paul Kerestedjian | |
| undefined_2: 1/28/2021 | |
| ANSWER: In the demo there are brass cover plates that will need to be removed plugged and then filled to floor level before flooring can be installed. | |
| undefined_3: | |
| undefined_4: | |
| 2021-01-28T08:18:09-0500 | |
| PAUL KERESTEDJIAN 1699249 |