528A7-19-708 Addendum Clarifications Rev02.pdf
PDF 423 KB Posted
- Attached to
- Z1DA--528A7-19-708 SCI RENOVATION-THIRD AND FOURTH FLOOR D-WING Federal contract opportunity
- Solicitation number
- 36C24221B0016
About this file
This document contains an addendum to plans and specifications for the renovation of the third and fourth floors of D-Wing at the Syracuse VA Medical Center, as well as the related solicitation for the construction project. Key details include that the addendum revises and clarifies elements of the plans and specifications submitted on January 28, 2021 for the project. Revisions are provided to floor plans, mechanical drawings, and specifications sections covering hollow metal doors and frames, interior wood doors, door hardware, ceiling-mounted patient lifts, and indoor central-station air-handling units. The solicitation seeks bids for the construction work, which is set aside for total service-disabled veteran-owned small businesses. The bid submission deadline is February 11, 2021. Bids must be emailed to the contracting officer at the specified address. The project site is the Syracuse VA Medical Center and work shall be performed only at this location.
View the file
Other files for this federal contract opportunity
Show all 35
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
28 January 2021
Syracuse VA Medical Center
800 Irving Avenue
Syracuse, NY 13210
Design 3rd and 4th Floor D –Wing Renovation
VA Project #528A7-19-708
FE Project #19-083
Attn: Paul Kerestedjian, COR
The following is a summary of changes made to the project plans and specifications, submitted on the above date. The attached revised plans and specifications comprise addendum #2, summarized as follows:
Plans:
1-AD-101
o Existing sink shown in room C428.
o Existing sink shown in C434 has been removed (no sink currently present).
1-AS-001
o Included lavatory shield in detail 1.
1-AS-103
o Specifying new wall mounted casework above existing sink in room C428.
1-AS-104
o Revised location of new soffit to coordinate with existing sink in room C428.
1-AS-401
o Clarification of existing plumbing piping in new lab room D311 enlarged plans/elevations.
1-M-001 o Removed the word “copper” from general note 20.
o Removed “SEQUENCE OF WORK” o Revised “PHASING WORK” o Added/revised general symbols.
1-MD-101
o Specified removal of CHWS & CHWR risers on detail 2.
1-MD-102
o Specified removal of ceiling diffusers & exhaust registers in rooms D400 & D402.
1-MH-101
o Revised ductwork routing in rooms D305 & D311.
o Specified duct size to CD-1 in room D308.
1-MH-102
o Specified new ceiling diffusers & exhaust registers in rooms D401 & D402.
o Specified ceiling diffuser & exhaust register type and CFM requirements in 4th floor C-wing.
1-MD-401
o Revised details 2 and 3 to clarify ductwork remaining which is serving 1st and 2nd floors.
1-MH-401
o Revised ductwork size in detail 2 from 44x12 to 40x12.
1-M-802 o Revised schedule to reflect correct VAV, ETU, and ACUV requirements.
1-PD-102
o Existing sink shown in room C428.
o Existing sink shown in C434 has been removed (no sink currently present).
o Existing toiler shown as removal in room D412 (was specified as a removal, but was the wrong line type).
1-PL-102
o Sink in room C428 is existing, eliminated requirement for new sink/piping.
o New sink/piping specified in room C434.
1-ED-101
o Clarified removal of items in electrical room D306 (items were already specified to be removed, however text was not bold).
1-EP-101
o Changed 1 light fixture to an emergency fixture in rooms D303, D313A, & D313B.
o Clarified wiring of lighting in corridors D300 & D300A.
o Clarified wiring of receptacles in rooms D313A & D313B.
1-EP-102
o Clarified homerun for lighting in room D405.
o Clarified wiring of lighting in corridors D432 & D432A.
o Clarified wiring of receptacles in rooms C430 & C434.
o Revised note 5 on detail 2.
o Revised callout for enlarged electrical room detail to indicate correct location.
Specifications:
08 11 13 – Hollow Metal Doors and Frames o Added 2.1(A)(5) & 3.1 (C) o Deleted 2.6(F)
08 14 00 – Interior Wood Doors o Added 1.4(A)(4), 2.2(E)(2)(c), & 3.1(D)
08 71 00 – Door Harware o Revised lockset information, as well as various other sections.
11 73 00 – Ceiling Mounted Patient Lift System o Revised lift capacities, which now vary depending on install location.
23 73 00 – Indoor Central-Station Air-Handling Units o Revised Part 2 – Products
Sincerely, Anthony Ciani
Project Manager