528A7-19-708 Addendum Clarifications Rev02.pdf

PDF 423 KB Posted

Attached to
Z1DA--528A7-19-708 SCI RENOVATION-THIRD AND FOURTH FLOOR D-WING Federal contract opportunity
Solicitation number
36C24221B0016
Issued by
Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 2

About this file

This document contains an addendum to plans and specifications for the renovation of the third and fourth floors of D-Wing at the Syracuse VA Medical Center, as well as the related solicitation for the construction project. Key details include that the addendum revises and clarifies elements of the plans and specifications submitted on January 28, 2021 for the project. Revisions are provided to floor plans, mechanical drawings, and specifications sections covering hollow metal doors and frames, interior wood doors, door hardware, ceiling-mounted patient lifts, and indoor central-station air-handling units. The solicitation seeks bids for the construction work, which is set aside for total service-disabled veteran-owned small businesses. The bid submission deadline is February 11, 2021. Bids must be emailed to the contracting officer at the specified address. The project site is the Syracuse VA Medical Center and work shall be performed only at this location.

View the file

Other files for this federal contract opportunity

Other files attached to Z1DA--528A7-19-708 SCI RENOVATION-THIRD AND FOURTH FLOOR D-WING, newest first.
File Type Posted
36C24221B0016 AMENDMENT 6.pdf PDF
528A7-19-708 VA Syracuse D Wing Phasing Drawing .pdf PDF
36C24221B0016 AMENDMENT 5.pdf PDF
36C24221B0016 4th Amendment .docx DOCX document
SAM-DESCRIPTION.docx DOCX document
087100 - DOOR HARDWARE.pdf PDF
528A7-19-708 VA Syracuse D Wing Final Drawing Rev02 02.pdf PDF
Patient Lifts Q_A part 2 Signed.pdf PDF
081400 - INTERIOR WOOD DOORS.pdf PDF
RFI Form Brass Covers Signed.pdf PDF
3 - RFI Form Asbestos Abatement Specification Signed.pdf PDF
237300 - Indoor Central-Station Air-Handling Units.pdf PDF
117300 - CEILING MOUNTED PATIENT LIFT SYSTEM.pdf PDF
081113 - HOLLOW METAL DOORS AND FRAMES.pdf PDF
2 - RFI Form Door Hardware Specification Signed.pdf PDF
RFI Form for 3rd and fourth floor d wing teledata Signed.pdf PDF
RFI Form Electrical Data Jacks Welch Signed.pdf PDF
RFI Form for 3rd and fourth floor d wing wirig specification Signed.pdf PDF
RFI Form Recessed Conduit Signed.pdf PDF
RFI Form for 3rd and fourth floor d wing FA questions Signed.pdf PDF
RFI Form Exam Room AOV IMS Signed.pdf PDF
RFI Watt Stopper and Lighting Signed.pdf PDF
RFI Form for 3rd and fourth floor d wing Nurse Call Signed.pdf PDF
1-21-2021 Question on Nurse Calls.pdf PDF
36C24221B0016_4.docx DOCX document
36C24221B0016_3.docx DOCX document
117300 - CEILING MOUNTED PATIENT LIFT SYSTEM update 1-19-21 pk.pdf PDF
D-Wing Walk through SIGN IN SHEET 1-13-21.pdf PDF
36C24221B0016_1.docx DOCX document
528A7 19 708 VA Syracuse D Wing Final Specifications.pdf PDF
36C24221B0016_2.docx DOCX document
SOW 528A7_19_708 Renovate 3rd_4th floor D Wing 02.docx DOCX document
P07-WAGE RATE.pdf PDF
528A7 19 708 VA Syracuse D Wing Final Specifications.pdf PDF
528A7-19-708 VA Syracuse D Wing Final Drawing Rev01.pdf PDF
Show all 35

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

28 January 2021

Syracuse VA Medical Center

800 Irving Avenue

Syracuse, NY 13210

Design 3rd and 4th Floor D –Wing Renovation

VA Project #528A7-19-708

FE Project #19-083

Attn: Paul Kerestedjian, COR

The following is a summary of changes made to the project plans and specifications, submitted on the above date. The attached revised plans and specifications comprise addendum #2, summarized as follows:

Plans:

1-AD-101

o Existing sink shown in room C428.

o Existing sink shown in C434 has been removed (no sink currently present).

1-AS-001

o Included lavatory shield in detail 1.

1-AS-103

o Specifying new wall mounted casework above existing sink in room C428.

1-AS-104

o Revised location of new soffit to coordinate with existing sink in room C428.

1-AS-401

o Clarification of existing plumbing piping in new lab room D311 enlarged plans/elevations.

1-M-001 o Removed the word “copper” from general note 20.

o Removed “SEQUENCE OF WORK” o Revised “PHASING WORK” o Added/revised general symbols.

1-MD-101

o Specified removal of CHWS & CHWR risers on detail 2.

1-MD-102

o Specified removal of ceiling diffusers & exhaust registers in rooms D400 & D402.

1-MH-101

o Revised ductwork routing in rooms D305 & D311.

o Specified duct size to CD-1 in room D308.

1-MH-102

o Specified new ceiling diffusers & exhaust registers in rooms D401 & D402.

o Specified ceiling diffuser & exhaust register type and CFM requirements in 4th floor C-wing.

1-MD-401

o Revised details 2 and 3 to clarify ductwork remaining which is serving 1st and 2nd floors.

1-MH-401

o Revised ductwork size in detail 2 from 44x12 to 40x12.

1-M-802 o Revised schedule to reflect correct VAV, ETU, and ACUV requirements.

1-PD-102

o Existing sink shown in room C428.

o Existing sink shown in C434 has been removed (no sink currently present).

o Existing toiler shown as removal in room D412 (was specified as a removal, but was the wrong line type).

1-PL-102

o Sink in room C428 is existing, eliminated requirement for new sink/piping.

o New sink/piping specified in room C434.

1-ED-101

o Clarified removal of items in electrical room D306 (items were already specified to be removed, however text was not bold).

1-EP-101

o Changed 1 light fixture to an emergency fixture in rooms D303, D313A, & D313B.

o Clarified wiring of lighting in corridors D300 & D300A.

o Clarified wiring of receptacles in rooms D313A & D313B.

1-EP-102

o Clarified homerun for lighting in room D405.

o Clarified wiring of lighting in corridors D432 & D432A.

o Clarified wiring of receptacles in rooms C430 & C434.

o Revised note 5 on detail 2.

o Revised callout for enlarged electrical room detail to indicate correct location.

Specifications:

08 11 13 – Hollow Metal Doors and Frames o Added 2.1(A)(5) & 3.1 (C) o Deleted 2.6(F)

08 14 00 – Interior Wood Doors o Added 1.4(A)(4), 2.2(E)(2)(c), & 3.1(D)

08 71 00 – Door Harware o Revised lockset information, as well as various other sections.

11 73 00 – Ceiling Mounted Patient Lift System o Revised lift capacities, which now vary depending on install location.

23 73 00 – Indoor Central-Station Air-Handling Units o Revised Part 2 – Products

Sincerely, Anthony Ciani

Project Manager