RFI Watt Stopper and Lighting Signed.pdf
PDF 153 KB Posted
- Attached to
- Z1DA--528A7-19-708 SCI RENOVATION-THIRD AND FOURTH FLOOR D-WING Federal contract opportunity
- Solicitation number
- 36C24221B0016
About this file
This document outlines a federal contract opportunity for renovation work at the Syracuse VA Medical Center in New York. The solicitation is set aside for Service-Disabled Veteran-Owned Small Businesses and seeks bids for renovations to the third and fourth floors of the facility's D Wing to create new primary care spaces. A mandatory site visit was held on January 13th and questions for the contracting officer must be submitted by January 28th. Bids are due by email on February 16th and should be sent to the contracting officer at the specified email address with the subject line formatted as instructed. The work encompasses renovations to existing spaces per the specifications and drawings referenced. The North American Industry Classification code for this opportunity is 236220 for commercial and institutional building construction.
View the file
Other files for this federal contract opportunity
Show all 35
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Project:
Project
No.
Date:
To: Number:
Spec.or Drawing
Reference Attention:
Phone:
Email:
REQUEST:
Requested By:
Signed: Date:
ANSWER:
Answered By:
Signed: Date:
| Project: VA 3rd & 4th floor D wing renovations | |
| Project No: 528A7-19-708 | |
| Date: 1/26/2021 | |
| To: VA Hospital Syracuse NY | |
| Number: 2 | |
| To_2: | |
| Attention: Paul Kerestedjian | |
| Phone: 315-425-4400 EXT: 54704 | |
| Email: Paul.Kerestedjian@va.gov | |
| Specor Drawing Reference: 1-EP-101, 1-EP-102, 1-E-702 detail 1. | |
| REQUESTRow1: How are the Watt Stoppers installed and configured for the D-Wing 3rd & 4th floor areas. | |
| undefined: Paul Kerestedjian | |
| undefined_2: 1/26/2021 | |
| ANSWER: Room controller (RC1) devices will be used to control the lights in the hallways in each zoned area. The room controllers will operate in conjunction with ceiling mounted occupancy sensors and wall mounted light switches, as shown on plans. Hallways will be set for automatic "on" operation based on ceiling sensors, and can also turn lights on/off via wall switches. Individual rooms will have vacancy sensor switches, set to manual "on" operation, there are no room controllers or ceiling sensors in these rooms. See electrical details for more information. The term Watt Stopper does not imply that we are connecting into the building existing "Watt Stopper" system. This will be a stand-alone system for the D-Wing 3rd & 4th floor. | |
| undefined_3: | |
| undefined_4: | |
| 2021-01-26T09:17:24-0500 | |
| PAUL KERESTEDJIAN 1699249 |