528-22-134 Demo Drawings.pdf
PDF 390 KB Posted
- Solicitation number
- 36C24223B0025
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C24223B0025 0004.docx | DOCX document | |
| Project 528-22-134 Site Visit Sign-in Sheet.pdf | ||
| 01 32 16.15 - 528-22-134 Project Schedules.pdf | ||
| 01 00 00 - 528-22-134 General Requirements.pdf | ||
| 528-22-134 Restroom 49 _ 50 C Demo RFI Responses.pdf | ||
| 02 41 00 - 528-22-134 Demolition.pdf | ||
| 36C24223B0025 0003.docx | DOCX document | |
| 01 74 19 - 528-22-134 Construction Waste Management.pdf | ||
| 01 35 26 - 528-22-134 Safety Requirements.pdf | ||
| 36C24223B0025 0002.docx | DOCX document | |
| 36C24223B0025 0001.docx | DOCX document | |
| Wage Rates for Erie County 2023.pdf | ||
| 528-22-134 SOW.docx | DOCX document | |
| 36C24223B0025_1.docx | DOCX document |
Show all 14
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
66''--55"" XX 77''--11""
XX
XX
EE
XX
IISS
TT
WW
OO
MM
EE
NN
''SS
RR
OO
OO
MM
EE
XX
IISS
TT
MM
EE
NN
''SS
RR
OO
OO
MM
EEXXIISSTT.. EEMMSS
D1D1 D2D2
D4D4
D4D4
D3D3
D5D5
D6D6
D6D6
D7D7
SCOPE OF WORK AREASCOPE OF WORK AREA
BASEMENT LEVELBASEMENT LEVEL
EXISTINGEXISTING
STAIRSTAIR
EXISTING CORRIDOREXISTING CORRIDOREXISTING CORRIDOREXISTING CORRIDOR
EXISTING RETAILEXISTING RETAIL
STORAGESTORAGE
WALL TO BE REMOVED
EXIST. WALL TO REMAIN
EXISTING DOOR
D#D# KEY TO DEMO NOTE
D7D7
D2D2
LIMIT OF DEMOLITIONLIMIT OF DEMOLITION
SCOPE OF WORK AREASCOPE OF WORK AREA
EXISTINGEXISTING
CONCRETE COLUMNSCONCRETE COLUMNS
TO REMAINTO REMAIN
SSHHEEEETT::
PPRROOJJEECCTT NNOO..
SSCCAALLEE::
DESCRIPTION DDAATTEE::BBYY DDAATTEENO. PPRROOJJEECCTT DDEESSCCRRIIPPTTIIOONN:: SSHHEEEETT TTIITTLLEE::
DDEEMMOOLLIITTIIOONN
PPLLAANN
AA..00
BBAASSEEMMEENNTT
RREESSTTRROOOOMM 4499 && 5500
RREENNOOVVAATTIIOONNSS
DDEEMMOOLLIITTIIOONN PPLLAANN
AASS NNOOTTEEDD
1100..1144..2222
2222--113344
RRAADD0011
11//44"" == 11''--00""
IISSSSUUEEDD FFOORR IINNTTEERRNNAALL RREEVVIIEEWW
NN
DEMOLITION SCOPING NOTES:DEMOLITION SCOPING NOTES:
EXISTING MASONRY PARTITION WALL TO BE REMOVED FULL HEIGHT.
EXISTING MASONRY PARTITION WALL & MASONRY PLUMBING CHASE TO BE
REMOVED FULL HEIGHT.
EXISTING AUTOMATIC SWING DOORS, FRAMES AND CONTROLS TO BE
REMOVED.
EXISTING PLUMBING CHASE TO BE REMOVED FULL HEIGHT. ALL EXISTING
UTILITIES AND PIPING CONTAINED WITHIN CHASE SHALL REMAIN IN PLACE.
UTILITIES MAY BE ACTIVE, PROTECT DURING DEMOLITION.
EXISTING FINISHES AND IMPROVEMENTS TO BE REMOVED WITHIN RETAIL
OVERSTOCK AREA AS REQUIRED TO ACCOMMODATE NEW CONSTRUCTION.
EXISTING FLOOR & WALL FINISHES TO BE REMOVED THROUGHOUT
REMOVE ALL OVERHEAD STEEL FRAMING FOR TOILET PARTITION BRACING.
DD11DD11
DD##DD##
DD22DD22
DD33DD33
DD44DD44
DD55DD55
DD66DD66
DD77DD77
1100//1144//2222
RRAADD0022 IISSSSUUEEDD FFOORR BBIIDD 0033//1133//2233BBAASSEEMMEENNTT KKEEYY PPLLAANN
2222 NNTTSS
NN
SCOPE OF WORK AREA
A.A. PERFORM DEMOLITION IN SUCH MANNER AS TO ELIMINATE HAZARDS TO PERSONS AND PROPERTY; TO MINIMIZE INTERFERENCE WITHPERFORM DEMOLITION IN SUCH MANNER AS TO ELIMINATE HAZARDS TO PERSONS AND PROPERTY; TO MINIMIZE INTERFERENCE WITH
USE OF ADJACENT AREAS, UTILITIES AND STRUCTURES OR INTERRUPTION OF USE OF SUCH UTILITIES; AND TO PROVIDE FREE PASSAGEUSE OF ADJACENT AREAS, UTILITIES AND STRUCTURES OR INTERRUPTION OF USE OF SUCH UTILITIES; AND TO PROVIDE FREE PASSAGE
TO AND FROM SUCH ADJACENT AREAS OF STRUCTURES. COMPLY WITH REQUIREMENTS OF GENERAL CONDITIONS ARTICLE, ACCIDENTTO AND FROM SUCH ADJACENT AREAS OF STRUCTURES. COMPLY WITH REQUIREMENTS OF GENERAL CONDITIONS ARTICLE, ACCIDENT
PREVENTION.PREVENTION.
B.B. PROVIDE SAFEGUARDS, INCLUDING WARNING SIGNS, BARRICADES, TEMPORARY FENCES, WARNING LIGHTS, AND OTHER SIMILAR ITEMSPROVIDE SAFEGUARDS, INCLUDING WARNING SIGNS, BARRICADES, TEMPORARY FENCES, WARNING LIGHTS, AND OTHER SIMILAR ITEMS
THAT ARE REQUIRED FOR PROTECTION OF ALL PERSONNEL DURING DEMOLITION AND REMOVAL OPERATIONS. THAT ARE REQUIRED FOR PROTECTION OF ALL PERSONNEL DURING DEMOLITION AND REMOVAL OPERATIONS.
C.C. PREVENT SPREAD OF FLYING PARTICLES AND DUST. SPRINKLE RUBBISH AND DEBRIS WITH WATER TO KEEP DUST TO A MINIMUM. DO NOTPREVENT SPREAD OF FLYING PARTICLES AND DUST. SPRINKLE RUBBISH AND DEBRIS WITH WATER TO KEEP DUST TO A MINIMUM. DO NOT
USE WATER IF IT RESULTS IN HAZARDOUS OR OBJECTIONABLE CONDITION SUCH AS, BUT NOT LIMITED TO; ICE, FLOODING, OR POLLUTION.USE WATER IF IT RESULTS IN HAZARDOUS OR OBJECTIONABLE CONDITION SUCH AS, BUT NOT LIMITED TO; ICE, FLOODING, OR POLLUTION.
VACUUM AND DUST THE WORK AREA DAILY.VACUUM AND DUST THE WORK AREA DAILY.
DDEEMMOOLLIITTIIOONN GGEENNEERRAALL NNOOTTEESS
D.D. BEFORE BEGINNING ANY DEMOLITION WORK, THE CONTRACTOR SHALL SURVEY THE SITE AND EXAMINE THE DRAWINGS ANDBEFORE BEGINNING ANY DEMOLITION WORK, THE CONTRACTOR SHALL SURVEY THE SITE AND EXAMINE THE DRAWINGS AND
SPECIFICATIONS TO DETERMINE THE EXTENT OF THE WORK. THE CONTRACTOR SHALL TAKE NECESSARY PRECAUTIONS TO AVOIDSPECIFICATIONS TO DETERMINE THE EXTENT OF THE WORK. THE CONTRACTOR SHALL TAKE NECESSARY PRECAUTIONS TO AVOID
DAMAGES TO EXISTING ITEMS TO REMAIN IN PLACE, TO BE REUSED, OR TO REMAIN THE PROPERTY OF THE MEDICAL CENTER; ANYDAMAGES TO EXISTING ITEMS TO REMAIN IN PLACE, TO BE REUSED, OR TO REMAIN THE PROPERTY OF THE MEDICAL CENTER; ANY
DAMAGED ITEMS SHALL BE REPAIRED OR REPLACED AS APPROVED BY THE RESIDENT ENGINEER. THE CONTRACTOR SHALL COORDINATEDAMAGED ITEMS SHALL BE REPAIRED OR REPLACED AS APPROVED BY THE RESIDENT ENGINEER. THE CONTRACTOR SHALL COORDINATE
THE WORK OF THIS SECTION WITH ALL OTHER WORK AND SHALL CONSTRUCT AND MAINTAIN SHORING, BRACING, AND SUPPORTS ASTHE WORK OF THIS SECTION WITH ALL OTHER WORK AND SHALL CONSTRUCT AND MAINTAIN SHORING, BRACING, AND SUPPORTS AS
REQUIRED. THE CONTRACTOR SHALL ENSURE THAT STRUCTURAL ELEMENTS ARE NOT OVERLOADED AND SHALL BE RESPONSIBLE FORREQUIRED. THE CONTRACTOR SHALL ENSURE THAT STRUCTURAL ELEMENTS ARE NOT OVERLOADED AND SHALL BE RESPONSIBLE FOR
INCREASING STRUCTURAL SUPPORTS OR ADDING NEW SUPPORTS AS MAY BE REQUIRED AS A RESULT OF ANY CUTTING, REMOVAL, ORINCREASING STRUCTURAL SUPPORTS OR ADDING NEW SUPPORTS AS MAY BE REQUIRED AS A RESULT OF ANY CUTTING, REMOVAL, OR
DEMOLITION WORK PERFORMED UNDER THIS CONTRACT. DO NOT OVERLOAD STRUCTURAL ELEMENTS. PROVIDE NEW SUPPORTS ANDDEMOLITION WORK PERFORMED UNDER THIS CONTRACT. DO NOT OVERLOAD STRUCTURAL ELEMENTS. PROVIDE NEW SUPPORTS AND
REINFORCEMENT FOR EXISTING CONSTRUCTION WEAKENED BY DEMOLITION OR REMOVAL WORKS. REPAIRS, REINFORCEMENT, ORREINFORCEMENT FOR EXISTING CONSTRUCTION WEAKENED BY DEMOLITION OR REMOVAL WORKS. REPAIRS, REINFORCEMENT, OR
STRUCTURAL REPLACEMENT MUST HAVE RESIDENT ENGINEER’S APPROVAL. STRUCTURAL REPLACEMENT MUST HAVE RESIDENT ENGINEER’S APPROVAL.
E. E. REMOVE AND LEGALLY DISPOSE OF ALL MATERIALS, OTHER THAN EARTH TO REMAIN AS PART OF PROJECT WORK, FROM ANYREMOVE AND LEGALLY DISPOSE OF ALL MATERIALS, OTHER THAN EARTH TO REMAIN AS PART OF PROJECT WORK, FROM ANY
TRASH DUMPS SHOWN. MATERIALS REMOVED SHALL BECOME PROPERTY OF CONTRACTOR AND SHALL BE DISPOSED OF INTRASH DUMPS SHOWN. MATERIALS REMOVED SHALL BECOME PROPERTY OF CONTRACTOR AND SHALL BE DISPOSED OF IN
COMPLIANCE WITH APPLICABLE FEDERAL, STATE OR LOCAL PERMITS, RULES AND/OR REGULATIONS. COMPLIANCE WITH APPLICABLE FEDERAL, STATE OR LOCAL PERMITS, RULES AND/OR REGULATIONS.
F.F. ON COMPLETION OF WORK OF THIS SECTION AND AFTER REMOVAL OF ALL DEBRIS, LEAVE SITE IN CLEAN CONDITION SATISFACTORYON COMPLETION OF WORK OF THIS SECTION AND AFTER REMOVAL OF ALL DEBRIS, LEAVE SITE IN CLEAN CONDITION SATISFACTORY
TO RESIDENT ENGINEER. CLEANTO RESIDENT ENGINEER. CLEAN‑UP SHALL INCLUDE OFF THE MEDICAL CENTER DISPOSAL OF ALL ITEMS AND MATERIALS NOT REQUIRED TOUP SHALL INCLUDE OFF THE MEDICAL CENTER DISPOSAL OF ALL ITEMS AND MATERIALS NOT REQUIRED TO
REMAIN PROPERTY OF THE GOVERNMENT AS WELL AS ALL DEBRIS AND RUBBISH RESULTING FROM DEMOLITION OPERATIONS.REMAIN PROPERTY OF THE GOVERNMENT AS WELL AS ALL DEBRIS AND RUBBISH RESULTING FROM DEMOLITION OPERATIONS.
File details come from the government source that posted it. Updated .