528-19-108 Spec Proc Drawing Package.pdf

PDF 29 MB Posted

Attached to
Z1DA--528-19-108C SPECIAL PROCEDURES EQUIPMENT SITE PREPARATION
Solicitation number
36C24222B0046
Issued by

About this file

This scope of work document outlines the requirements for a construction project to prepare space at the Buffalo VA Medical Center for the installation of nuclear medicine equipment. The construction will fully renovate and perform site preparation according to the provided drawing package and specifications.

The contractor will be responsible for demolition and construction of building systems, equipment and finishes within a hospital. This includes adhering to infection control barriers and monitoring, coordinating with equipment vendors, performing rigging services for equipment installation, and assuming renovations will be needed for common building systems. The contractor must also ensure proper startup and commissioning of medical equipment.

The contractor must provide personnel, materials, services, facilities, submittals, meetings, status reports and more in accordance with the detailed requirements in the general, construction, verification, delivery and records management sections. A quality assurance/quality control plan is required and final functional verification of the installed equipment will be conducted jointly before acceptance. The period of performance is not to exceed 8 months.

View the file

Other files

File Type Posted
Datamate (1).jpg JPG image
36C24222B0046 0002.docx DOCX document
Liebert Challenger 3000 (1).jpg JPG image
Datamate.jpg JPG image
Liebert Challenger 3000.jpg JPG image
36C24222B0046 0001.docx DOCX document
528-19-108 - Spec Proc Spec List BK-1.pdf PDF
36C24222B0046_2.docx DOCX document
WAGE RATES.pdf PDF
528-19-108 - Spec Proc Spec List BK-2.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

A

/1

/2

:3

:0

P

M

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANTS

321 4 5 6 7 8 9 10

U.S. Department of Veterans Affairs

LIST OF DRAWINGS

PROJECT CONTACT DIRECTORY

LOCATION MAP

CONTRACTING OFFICER REPRESENTATIVE (COR) ARCHITECT / MEP/FP & STRUCTURAL ENGINEERS acela architects + engineers, pc 2633 Moravian Avenue Allentown, PA 18103

Joseph L. Herman, AIA, NCARB, LEED AP Cell: (610) 417-7850 jherman@acela-ae.com

APPROVALS

PROJECT INFORMATION

CONTRACT OFFICER/SPECIALIST

GI001

COVER SHEET

11/22/2021 JLH ACELA

BUFFALO VA MEDICAL CENTER

528-19-1082ND FLOOR SPECIAL

PROCEDURES SITE

PREPARATIONS

2ND FLOOR SPECIAL PROCEDURES

SITE PREPARATIONS

BUFFALO VA MEDICAL CENTER

BID DOCUMENTS (100%)

3495 Bailey Avenue Buffalo, NY 14215

Zachary Reisdorf zachary.reisdorf@va.gov Office: (716) 834-9200 x2803 Cell: (716) 208-2320

VA Project Number: 528-19-108

Approved by Medical Center Director

Approved by Project COR

Approved by Infection Control

Approved by Project CO

Approved by Director of Facility Management Service

Approved by Medical Director

Approved by Safety Office

Shaun Maines shaun.maines@va.gov Office: (716) 862-7461 x22470

VA WESTERN NEW YORK

HEALTHCARE SYSTEM,

BUFFALO VA CAMPUS

ARCHITECTURAL ELEMENTS SHEET LIST

6 AE101 2ND FLOOR - NEW WORK PLANS

7 AE102 INTERIOR ELEVATONS, SECTIONS & DETAILS

GENERAL CONTRACT SHEET LIST

4 GC101 2ND FLOOR - ICRA CONTROL PLAN

GENERAL INFORMATION SHEET LIST

1 GI001 COVER SHEET

2 GI002 GENERAL INFORMATION

3 GI201 2ND FLOOR - LIFE SAFETY PLAN

ARCHITECTURAL DEMOLITION SHEET LIST

5 AD101 2ND FLOOR - DEMOLITION PLANS

INTERIOR FINISH ELEMENTS SHEET LIST

8 AI101 2ND FLOOR - SCHEDULED FINISH LEGEND, FINISH PLANS & DETAILS

ARCHITECTURAL EQUIPMENT SHEET LIST

9 Q101 2ND FLOOR - EQUIPMENT PLAN

STRUCTURAL SHEET LIST

15 SF100 STRUCTURAL NOTES

16 SF101 PARTIAL 2ND AND 3RD FLOOR FRAMING PLANS

17 SF102 ENLARGED 2ND AND 3RD FLOOR FRAMING PLANS, SECTIONS AND

DETAILS

EQUIPMENT SHEETS

10 QJ101 GE SHEETS - 225A

11 QJ102 GE SHEETS - 225A

12 QJ103 GE SHEETS - 225A

13 QJ104 GE SHEETS - 225A

14 QJ105 GE SHEETS - 225A

Revisions: Date:

FIRE PROTECTION SHEET LIST

18 F001 FIRE PROTECTION GENERAL NOTES AND DETAILS

19 F101 SECOND FLOOR FIRE PROTECTION DEMO AND NEW WORK PLANS

PLUMBING SHEET LIST

20 P001 PLUMBING ABBREVIATIONS, NOTES AND LEGENDS

21 PD101 SECOND FLOOR PLUMBING DEMOLITION PLANS

22 PN101 SECOND FLOOR PLUMBING NEW WORK PLANS

MECHANICAL SHEET LIST

23 M001 MECHANICAL ABBREVIAITONS, NOTES, LEGENDS AND SCHEDULES

24 M101 SECOND FLOOR DEMOLITION & NEW WORK PLANS

25 M201 MECHANICAL DETAILS

26 M202 MECHANICAL DETAILS

ELECTRICAL SHEET LIST

27 E001 ELECTRICAL ABBREVIATIONS, NOTES AND LEGENDS

28 E101 2ND FLOOR POWER DEMOLITION AND NEW WORK PLANS

29 E201 2ND FLOOR LIGHTING DEMOLITION AND NEW WORK PLANS

30 E601 SINGLE-LINE DIAGRAM, PANEL SCHEDULE AND DETAILS

NY LIC. NO.:

043141

CENTER LINE

DETAIL INDICATOR

DIMENSION LINE

NEW DOOR OPENING / BORROWED LIGHT IDENTIFIER

- SEE DOOR SCHEDULE, DETAILS AND ELEVATIONS SHEET

DRAWING BLOCK TITLE, TYPICAL

BUILDING SECTION INDICATOR

TYPICAL DETAIL INDICATOR

COLUMN NUMBER

GENERAL CONSTRUCTION KEYNOTE TAG

WALL OR PARTITION TYPE

FIRE EXTINGUISHER CABINET

CORNER GUARD

NORTH ARROW

CG

FEC

DETAIL NUMBER

SHEET NUMBER

XX-XX

1"

XX-XX

CL

XX-XX

x'-x"

SPOT ELEVATION

1 REVISION

REVISION CLOUD

BREAK LINE

DD ROOM TAG - ROOM NAME AND NUMBER

X

EXISTING DOOR OPENING

View Name 1/8" = 1'-0"

Room name

N

PROJECT

NORTH

1/8" = 1'-0"

0' 8'4' 16'2'

GRAPHIC SCALE

X INTERIOR SIGNAGE TAG

DOOR TAG

E###

DOOR TAG

REFLECTED CEILING KEYNOTE TAGX

ELEVATION INDICATOR- 1

SHEET NUMBER

ELEVATION NUMBER

WOOD

WOOD FINISH

ALUMINUM

STEEL

EARTH

GYPSUM - PLASTER

MASONRY - CONCRETE BLOCK

RIGID INSULATION

BATT INSULATION

PLYWOOD

CONCRETE

EXISTING CONSTRUCTION TO REMAIN

EXISTING CONSTRUCTION TO BE REMOVED

& AND

@ AT

C CENTERLINE

# NUMBER

AB ANCHOR BOLT

ABV ABOVE

ACT ACOUSTIC CEILING TILE

AD AREA DRAIN

ADA AMERICANS WITH

DISABILITIES ACT

ADJ ADJUSTABLE

AFF ABOVE FINISHED FLOOR

AHU AIR HANDLING UNIT

AIA AMERICAN INSTITUTE OF

ARCHITECTS

ALUM ALUMINUM

ALT ALTERNATE

AP ACCESS PANEL

APPROX APPROXIMATE

ARCH ARCHITECTURAL

AT ACOUSTIC TILE

AUTO AUTOMATIC

AVG AVERAGE

BD BOARD

BLDG BUILDING

BLK BLOCK

BM BEAM

BMPR BUMPER

BOT BOTTOM

BRG BEARING

BEL BELOW

BR BUMPER RAIL

BRK BRICK

C CONCRETE

CAB CABINET

CB CATCH BASIN

CEM CEMENT

CCT CUBICLE CURTAIN TRACK

CG CORNER GUARD

CI CAST IRON

CIP CAST IN PLACE

CJ CONTROL JOINT

CT CERAMIC TILE

CLG CEILING

CL CLOSET

COL COLUMN

CONC CONCRETE

CONF CONFERENCE

CONT CONTINUOUS

CPT CARPET

CU CUBIC

DBL DOUBLE

DEMO DEMOLITION

DEPT DEPARTMENT

DET DETAIL

DF DRINKING FOUNTAIN

DIA DIAMETER

DIM DIMENSION

DISP DISPENSER

DN DOWN

DO DOOR OPENING

DOZ DOZEN

DP DAMPPROOFING

DR DOOR

DWG DRAWING

DWGS DRAWINGS

DWR DRAWER

E EAST

EA EXHAUST AIR, EACH

EL ELEVATION

ELEV ELEVATION

ELEC ELECTRICAL

EMER EMERGENCY

ENCL ENCLOSURE

ENGR ENGINEER

EP ELECTRICAL PANELBOARD

EPY EPOXY

EQ EQUAL

EQUIP EQUIPMENT

EWC ELECTRIC WATER COOLER

EWS EYE WASH STATION

EXP EXPANSION

EJ EXPANSION JOINT

EXIST EXISTING

EXT EXTERIOR

FA FIRE ALARM

FB FACE BRICK

FD FLOOR DRAIN

FDC FIRE DEPARTMENT

CONNECTION

FDN FOUNDATION

FE FIRE EXTINGUISHER

FEC FIRE EXTINGUISHER

CABINET

FF FINISH FACE

FHC FIRE HOSE CABINET

FIN FINISH

FLR FLOOR

FLUOR FLUORESCENT

FO __ FACE OF __

FOC FACE OF CONCRETE

FOS FACE OF STUD

FOW FACE OF WALL

FPRF FIREPROOF(ING)

FR FIRE RATING, FRAME

FRMG FRAMING

FS FULL SIZE

FT FOOT OR FEET

FTG FOOTING

FUR FURRING

FUT FUTURE

GC GENERAL CONTRACTOR

GA GAUGE

GAL GALLON

GALV GALVANIZED

GALV STL GALVANIZED STEEL

GB GRAB BAR

GC GENERAL CONTRACTOR

GD GUARD

GL GLASS

GND GROUND

GR GRADE

GWB GYPSUM WALLBOARD

GYP BD GYPSUM WALLBOARD

HB HOSE BIBB

HC HOLLOW CORE

HD HEAD

HDPL HIGH DENSITY PLASTIC LAMINATE

HDWR HARDWARE

HDWD HARDWOOD

HT HEIGHT

HDRL HANDRAIL

HM HOLLOW METAL

HMD HOLLOW METAL DOOR

HMF HOLLOW METAL FRAME

HR HANDRAIL

HO HOLD OPEN

HORIZ HORIZONTAL

HP HIGH POINT

HR HOUR

HVAC HEATING, VENTILATION, AIR

CONDITIONING

IBC INTERNATIONAL BUILDING CODE

ID IDENTIFICATION, INSIDE

DIAMETER / DIMENSION

IN INCH

INCL INCLUDE(D)

INSUL INSULATION

INT INTERIOR

INV INVERT

JAN JANITOR

JST JOIST

JT JOINT

KP KICK PLATE

KO KNOCKOUT

L LENGTH

LAB LABORATORY

LAM LAMINATE

LAV LAVATORY

LBS POUND

LED LIGHT EMITTING DIODE

LF LINEAR FEET

LH LEFT HAND

LIN LINEAR

LIQ LIQUID

LKR LOCKER

LG LONG

LL LEAD LINED

LLV LONG LEG VERTICAL

LP LOW POINT

LRG LARGE

LT LIGHT

LT WT LIGHTWEIGHT

LVR LOUVER

LVT LUXURY VINYL TILE

MAT WALK-OFF CARPET

MATL MATERIAL

MAS MASONRY

MAX MAXIMUM

MECH MECHANICAL

MTL METAL

MFR MANUFACTURER

MH MANHOLE

MIN MINIMUM

MISC MISCELLANEOUS

MO MASONRY OPENING

MP MOP PLATE

MTD MOUNTED

N NORTH

NA NOT APPLICABLE

NEC NATIONAL ELECTRICAL CODE

NEG NEGATIVE

NFC NATIONAL FIRE CODE

NFPA NATIONAL FIRE PROTECTION

ASSOCIATION

NIC NOT IN CONTRACT

NO NUMBER

NOM NOMINAL

NTS NOT TO SCALE

OA OVERALL

OC ON CENTER

OD OUTSIDE DIAMETER / DIMENSION

OFF OFFICE

OH OPPOSITE HAND

OPNG OPENING

OPP OPPOSITE

OH OVERHEAD

OZ OUNCE

P PAINT

PAV PAVING

PC PRECAST CONCRETE

PL PLATE

PLAM PLASTIC LAMINATE

PLAS PLASTER

PLYWD PLYWOOD

PLBG PLUMBING

PMF PREMOLDED FILLER

PR PAIR

PT POINT

PT PORCELAIN TILE

PTN PARTITION

QT QUARRY TILE

R RADIUS, RISER

RA RETURN AIR

RAD RADIUS

RB RESILIENT BASE, RUBBER

BASE

RD ROOF DRAIN

RL ROOF LEADER

REF REFERENCE

REFR REFRIGERATOR

REQ'D REQUIRED

REV REVISION

RFI REQUEST FOR

INFORMATION

RFP REQUEST FOR PROPOSAL

RH RIGHT HAND

RM ROOM

RO ROUGH OPENING

RT RUBBER TILE

S SOUTH

S SOLID SURFACE

SA SUPPLY AIR

SAN SANITARY

SC SOLID CORE

SCHED SCHEDULE

SECT SECTION

SH SPRINKLER HEAD

SHT SHEET

SIM SIMILAR

SM SMOKE

SPEC SPECIFICATION

SPKR SPEAKER

SQ SQUARE

STA STATION

STD STANDARD

STO STORAGE

STL STEEL

SS STAINLESS STEEL

STOR STORAGE

STRUCT STRUCTURAL

SUSP SUSPENDED

SYM SYMMETRICAL

SYS SYSTEM

T TREAD

TEL TELEPHONE

TEMP TEMPERED

T&G TONGUE AND GROOVE

THK THICK

TOC TOP OF CONCRETE

TOP TOP OF PAVEMENT

TOS TOP OF STEEL

TOW TOP OF WALL

TRAN TRANSITION

TV TELEVISION

TYP TYPICAL

UNFIN UNFINISHED

UON UNLESS OTHERWISE

NOTED

VB VAPOR BARRIER

VERT VERTICAL

VCT VINYL COMPOSITION TILE

VIF VERIFY IN FIELD

VTR VET THRU ROOF

W WEST

W/ WITH

WD WOOD

W/O WITHOUT

WP WATERPROOF

WP WALL PROTECTION

WRS WINDOW ROLLER SHADE

WT WEIGHT

WWF WELDED WIRE FRAME

NOTE: ALL ABBREVIATIONS SHOWN MAY NOT BE

USED ON THIS PROJECT. CERTAIN COMMON

ABBREVIATIONS MAY NOT BE SHOWN. SEE

MATERIAL LEGEND FOR INTERIOR FINISH

ABBREVIATIONS.

1. ALL DIMENSIONS OF NEW PARTITIONS/BARRIERS SHALL BE TAKEN TO FACE OF STUD. DIMENSIONS TO EXISTING WORK SHALL BE TAKEN TO

FACE OF FINISH SURFACE.

2. DO NOT SCALE DRAWINGS. DRAWINGS ARE CONCEPTUAL PLANS.

3. THE WORK OF THE CONTRACTOR SHALL INCLUDE ALL LABOR AND MATERIALS FOR ALL TRADES CONCERNED FOR COMPLETING THE PROJECT

IN ACCORDANCE WITH THE DRAWINGS AND SPECIFICATIONS.

4. THE CONTRACTOR SHALL PROCURE, COMPLETE AND APPLY FOR ALL PERMITS AS REQUIRED TO CONSTRUCT THE PROJECT.

5. THE CONTRACTOR SHALL BE FAMILIAR WITH THE CONTRACT DOCUMENTS AND MUST VISIT THE SITE AND BE ACQUAINTED WITH THE

CONDITIONS AFFECTING THE WORK.

6. WORKMANSHIP. ALL WORK TO BE FIRST RATE, HIGH QUALITY, AND ACCOMPLISHED IN A WORKMANLIKE MANNER BY SKILLED CRAFTSMEN

USING ACCEPTED PRACTICES AND METHODS APPROPRIATE TO THE TRADE INVOLVED.

7. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE DAILY CLEANING UP OF THE WORK AREA. THE AREA SHALL BE CLEANED EACH DAY AND TRASH SHALL BE DISPOSED OF AT THE END OF EACH DAY. AT THE END OF THE PROJECT, THE CONTRACTOR SHALL CLEAN THE WORK AREA

THOROUGHLY.

8. ALL WORK SHALL BE GUARANTEED FOR ONE YEAR FROM THE TIME OF ACCEPTANCE BY THE OWNER UNLESS OTHERWISE NOTED IN THE

SPECIFICATIONS.

9. ALL PLUMBING WORK SHALL CONFORM TO THE ADOPTED EDITION OF THE INTERNATIONAL PLUMBING CODE. INSTALL ALL WATER, WASTE AND VENT PIPING IN ACCORDANCE WITH ALL APPLICABLE CODES. REVIEW DRAWINGS AND PROVIDE ALL WORK FOR A COMPLETE AND OPERABLE SYSTEM, INCLUDING ALL INCIDENTALS, REQUIRED BY CODE AGENCIES AND LOCAL GOVERNING BODIES.

IBC - 2018

VA PLUMBING DESIGN GUIDE - 2021

10. PRIOR TO START OF CONSTRUCTION, CONTRACTOR SHALL VERIFY ALL BUILDING CONDITIONS, COORDINATE ALL DIMENSIONS IN FIELD AND

VERIFY ALL LOCATIONS OF UTILITIES IN THE FIELD.

11. ALL HEATING, VENTILATING AND AIR CONDITIONING WORK SHALL CONFORM TO THE ADOPTED EDITION OF THE INTERNATIONAL MECHANICAL AND ENERGY CODES (AS APPLICABLE), STATE CODES, AND ANY REQUIREMENTS OF THE LOCAL AUTHORITIES HAVING JURISDICTION.

IBC - 2018

NFPA 70 - 2020

NFPA 90A - 2021

NFPA 99 - 2021

NFPA 101 - 2021

VA HVAC DESIGN GUIDE - 2020

13. THE COMPLETE ELECTRICAL SYSTEM AND INSTALLATION SHALL COMPLY AND CONFORM TO ALL ADOPTED CODES, REGULATIONS OF THE NATIONAL ELECTRICAL CODE AS WELL AS TO ALL STATE AND LOCAL LAWS, ORDINANCES AND CODES.

IBC - 2018

NFPA 101 - 2021

VA ELECTRICAL DESIGN GUIDE - 2019

VA ELECTRICAL DESIGN MANUAL FOR REPLACEMENT HOSPITALS, CLINICAL ADDITIONS, ENERGY CENTERS, AND LABORATORY

BUILDINGS - 2015

VA LIGHTING DESIGN MANUAL - 2008

VA RADIOLOGY DESIGN MANUAL - 2008

VA PHYSICAL SECURITY DESIGN MANUAL FOR LIFE SAFETY PROTECTED FACILITIES - 2015

14. THE COMPLETE FIRE PROTECTION SYSTEM AND INSTALLATION SHALL COMPLY AND CONFORM TO ALL ADOPTED CODES, REGULATIONS OF THE NATIONAL FIRE PROTECTION CODE AS WELL AS TO ALL STATE AND LOCAL LAWS, ORDINANCES AND CODES.

IBC - 2018

NFPA 101 - 2021

NFPA 13 - 2019

NFPA 72 - 2021

VA FIRE PROTECTION DESIGN GUIDE - 2021

1. SPACES AROUND THE PROJECT AREAS WILL BE OCCUPIED DURING PERFORMANCE OF WORK. IMMEDIATE AREAS OF ALTERATIONS WILL BE VACATED. ALL CONTRACTOR WORK WILL BE PERFORMED DURING NORMAL DAYTIME WORKING HOURS UNLESS INDICATED. ALL TEMPORARY SYSTEM SHUTDOWNS WILL OCCUR DURING 2ND SHIFT OR WEEKENDS AND COORDINATED AND APPROVED BY THE PROJECT COR.

2. BEFORE STARTING WORK WITHIN AN OCCUPIED AREA, THE CONTRACTOR WILL BE RESPONSIBLE TO SET-UP TEMPORARY/PERMANENT CONSTRUCTION/ICRA BARRIERS WITH ANTEROOM AND MAINTAIN NEGATIVE AIR PRESSURE. ALL TEMPORARY CONSTRUCTION BARRIERS OUTSIDE THE INDICATED CONSTRUCTION PHASE AREA WILL BE REMOVED AT THE CONCLUSION OF THE WORK SHIFT. THE CONTRACTOR WILL BE RESPONSIBLE TO CLEAN AND PREPARE THE AREA TO BE OCCUPIED BY MEDICAL CENTER STAFF AND PATIENTS.

3. DIMENSIONS SUPERSEDE DRAWINGS. DO NOT SCALE PLANS. DIMENSIONS ARE TO THE FACE OF EXISTING MATERIALS UNLESS OTHERWISE NOTED. DIMENSIONS AND ELEVATIONS SHALL BE VERIFIED AT THE SITE BEFORE PROCEEDING WITH THE WORK. NOTIFY THE ARCHITECT IMMEDIATELY OF ANY DISCREPANCIES. THE CONTRACTOR SHALL VERIFY ALL EXISTING CONDITIONS, DIMENSIONS, AND MATERIALS REQUIRED FOR THE CONTRACTED WORK. REPORT ALL DISCREPANCIES TO ARCHITECT PRIOR TO FABRICATIONS AND ERECTION.

4. IT IS SOLELY THE CONTRACTOR'S RESPONSIBILITY TO FOLLOW ALL APPLICABLE SAFETY CODES AND REGULATIONS DURING ALL PHASES OF CONSTRUCTION. ALL CONSTRUCTION WORK SHALL BE PERFORMED IN CONTRACTOR'S RESPONSIBILITY TO DETERMINE CONSTRUCTION PROCEDURES AND SEQUENCE AND TO INSURE THE SAFETY OF THE BUILDING AND ITS COMPONENT PARTS DURING CONSTRUCTION SHALL PROVIDE ADEQUATE SHORING AND BRACING DURING DEMOLITION AND CONSTRUCTION TO SUPPORT LOADS. SUCH MATERIAL SHALL BE REMOVED AT THE COMPLETION OF WORK AND SHALL REMAIN THE CONTRACTOR'S PROPERTY AFTER THE COMPLETION OF THE PROJECT.

5. DO NOT CUT AND PATCH STRUCTURAL ELEMENTS IN A MANNER THAT WOULD REDUCE THEIR LOAD CARRYING CAPACITY OR LOAD-DEFLECTION

RATIO.

6. WHERE EXISTING CONSTRUCTION, EQUIPMENT, ETC. IS REQUIRED TO BE REMOVED, RESTORE EXPOSED FINISHES OF CUT AND PATCHED AREAS AND EXTEND FINISH RESTORATION INTO ADJOINING CONSTRUCTION IN A MANNER THAT WILL ELIMINATE EVIDENCE OF PATCHING AND REFINISHING. CUT EXISTING CONSTRUCTION USING METHODS LEAST LIKELY TO DAMAGE ELEMENTS TO BE RETAINED OR ADJOINING CONSTRUCTION. WHERE INDICATED TO REMOVE FINISHES, REMOVE SO TOTALLY, FROM PLANE TO PLANE, TREAT REMAINING SUBSURFACE TO

RECEIVE NEW FINISHES DESIGNATED.

7. WHERE EXISTING CONSTRUCTION, EQUIPMENT, ETC. SHOWN TO BE RELOCATED SHALL BE COORDINATED BY THE CONTRACTOR WITH THE VA PRIOR TO START OF WORK IN EACH AREA. THE VA WILL REMOVE ALL ITEMS OF SALVAGEABLE VALUE, INCLUDING BUT NOT LIMITED TO DOORS, HARDWARE, MOVEABLE EQUIPMENT NOT ALREADY DESIGNATED FOR REINSTALLATION/REUSE, PRIOR TO CONTRACTOR COMMENCING WORK.

8. WHERE EXISTING PARTITIONS HAVE BEEN REMOVED OR NEW SERVICES PENETRATE EXISTING SURFACES, THE OPENINGS SHALL BE PATCHED

TO MATCH THE EXISTING ADJACENT SURFACES FINISH, TEXTURE AND SHEEN.

9. WHERE EXISTING PARTITIONS HAVE BEEN REMOVED OR NEW SERVICES PENETRATE EXISTING SURFACES, THE OPENING SHALL BE PATCHED

TO MATCH THE EXISTING ADJACENT SURFACES FINISH, TEXTURE AND SHEEN.

10. IN GENERAL, WHEREVER SERVICES ARE REMOVED, THE OPENINGS SHALL BE PATCHED TO MATCH THE EXISTING ADJACENT SURFACES FINISH TEXTURE AND SHEEN. WHERE REMOVAL OF EXISTING CONSTRUCTION, PIPING, DUCTWORK AND OTHER ITEMS CREATES OPENINGS IN THE WALLS, FLOORS OR CEILINGS, PATCH OPENINGS IMMEDIATELY WITH THE SAME MATERIALS AS ADJACENT CONSTRUCTION. MAINTAIN THE REQUIRED FIRE RATING. SEE MEP DRAWINGS FOR ADDITIONAL INFORMATION. FILL IN ALL EXISTING OPENINGS THAT ARE NOT TO REMAIN, UNLESS OTHERWISE NOTED. FINISH TO MATCH FINISH OF ADJACENT SURFACE.

11. WHERE CODED NOTE DESIGNATIONS ARE SHOWN AS "TYP" OR "TYPICAL" IT IS INTENDED THAT THE NOTE GENERALLY REFERS TO ALL SIMILAR

ITEMS OR SURFACES.

12. A HAZARDOUS MATERIALS SURVEY WAS CONDUCTED BY THE ARCHITECT OF RECORD. THE RESULTS OF THE SAMPLES TAKEN ARE INCLUDED WITHIN THE CONSTRUCTION DOCUMENTS AND A COPY OF REPORT IS INCLUDED WITH THE SPECIFICATIONS. IT IS THE CONTRACTORS RESPONSIBILITY TO TAKE PROTECTIVE MEASURES FOR ITS WORKERS PRIOR TO THE BEGINNING OF ANY RENOVATION OR DEMOLITION WORK.

13. AFTER COMPLETION OF DEMOLITION, SCHEDULE A WALK-THROUGH WITH THE COR AND ARCHITECT FOR REVIEW OF EXISTING CONDITIONS.

14. PATCH AND FIRE STOP EXISTING ABANDONED PENETRATIONS THROUGH THE CONCRETE FLOORS AND WALLS.

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANTS

321 4 5 6 7 8 9 10

C U s e rs \a k a n u s k y \D o c u m e n ts

\2

-U S

D V

A -0

A

R C

H a k a n u s k y V

B N

S Y

.r v t

/2 /2

:2

:1

A M

GI002

GENERAL INFORMATION

11/22/2021 JLH ACELA

BUFFALO VA MEDICAL CENTER

528-19-1082ND FLOOR SPECIAL

PROCEDURES SITE

PREPARATIONS

BID DOCUMENTS (100%)

ARCHITECTURAL SYMBOLS MATERIAL LEGENDARCHITECTURAL ABBREVIATIONS

GENERAL NOTES - NEW CONSTRUCTION

GENERAL NOTES - GENERAL CONDITIONS

Revisions: Date:

043141 Page 2 of 30

200E-4

200E-5

200E-6

218E-3 219-E 201E-1

221-E

201E-2

218-E

201E-3

217-E

ST-42

218E-2

218E-1

217E-2

217E-1

MRI

214E

SIGNAL

ROOM

215-E

EQUIPMENT

ROOM

214E

212-E

212E-1

210E-1

210-E

CONTROL

ROOM

ELECTRICAL

ROOM

213E

204-E

202-E 203-E

203E-1

205-E

206-E

207-EMECH

ROOM

210A-1

QUALITY

CONTROL

210-A

222-A

222A-1

234-A

235-A

236-A

237-A

238-A

238A-2

238A-1

#3

240-A

200A-2

239-A

201-2

204-A

200-A

206-A

207-A

200-E

CT SCAN

ROOM

211A

200E-6

213-E

213E-1

211-E

211E-1

209-E209E-1

205-E

206-E

207-E

208-E

216-A215-A

200A-3

RADIOGRAPHIC

220A

RADIOGRAPHIC

219A

TOILET

219A-1

CONTROL

219A-2

4 5

"A" WING

GENERAL NOTES

A. PARTITIONS SHALL BE TYPE A1 UNLESS NOTED OTHERWISE.

B. REFER TO SPECIFICATIONS AND PARTITION TYPE SCHEDULE FOR ADDITIONAL NOTES.

C. NEW PARTITIONS ARE DIMENSIONED TO FACE OF METAL STUD OR MASONRY UNLESS NOTED

OTHERWISE.

D. EXISTING PARTITIONS ARE DIMENSIONED TO FINISH FACE UNLESS NOTED OTHERWISE.

FIRE RATING LEGEND

SYMBOL

(NUMBER SHOWS OPENING RATING) BARRIER OPENING RATING

CORRIDOR

POSITIVE LATCH DOOR HARDWARE

(EXISTING SMOKE BARRIER)

EXISTING EXISTING

NOTE: FOR SCHEDULED OPENINGS WHERE SMOKE AND FIRE SEPARATIONS

COINCIDE,THE MORE STRINGENT FIRE RATING SHALL APPLY. REFER TO THE

PARTITION SCHEDULE FOR FIRE RESISTIVE REFERENCES.

FIRE EXTINGUISHER

ESM ESM

E90 E90

EXIT LIGHT SIGNAGE

INDICATES COMMON PATH OF TRAVEL TO POINT OF DECISION

INDICATES PATH OF TRAVEL TO POINT OF EXIT

(FROM COMMON PATH OF TRAVEL)

STARTING POINT

GENERAL AREA OF WORK

N

PLAN

NORTH

E90

STAIR

.3"/OCC

CODE MIN:

PROVIDED:

(E)

(18)

36"

42"

8"

C O

M M

O N

P A

T H

7'

STAIR #2

DOOR

.2"/OCC

CODE MIN:

PROVIDED:

(E)

(18)

32"

42"

5"

CORRIDOR

.2"/OCC

CODE MIN:

PROVIDED:

(E)

(18)

44"

96"

5"

151 SF

MECHANICAL

ROOM

156 SF

CONTROL

ROOM

352 SF

SPECIAL

PROCEDURES

PLAN NOTES:

1. SEE ELECTRICAL PLANS FOR EMERGENCY LIGHTS, SMOKE

DETECTORS, ETC...

C O

M M

O N

P A

T H

8'

COMMON PATH 19'-0"

EXISTING AREA

E90

E

STAIR #3STAIR

.3"/OCC

CODE MIN:

PROVIDED:

(E)

(18)

36"

42"

8"

DOOR

.2"/OCC

CODE MIN:

PROVIDED:

(E)

(18)

32"

42"

5"

EXISTING AREA

EXISTING AREA

E90

E90

E90

E90

E

E

STAIR #1

STAIR #42

E90

E90

E

E

STAIR

.3"/OCC

CODE MIN:

PROVIDED:

(E)

(18)

36"

42"

8"

DOOR

.2"/OCC

CODE MIN:

PROVIDED:

(E)

(18)

32"

38"

5"

CORRIDOR

.2"/OCC

CODE MIN:

PROVIDED:

(E)

(18)

44"

100"

5"

STAIR

.3"/OCC

CODE MIN:

PROVIDED:

(E)

(18)

36"

42"

8"

DOOR

.2"/OCC

CODE MIN:

PROVIDED:

(E)

(18)

32"

32"

5"

CORRIDOR

.2"/OCC

CODE MIN:

PROVIDED:

(E)

(18)

44"

96"

5"

E90

ESM

ESM

ESM

P A

T H

O F

T R

A V

E L

T O

S T

A

IR

'-0

P

A T

H O

F T

R A

V E

L T

O S

T A

IR

'-0

E90

E90 E90

ESM

E S

M

E S

M

E90

E90

E90

EXIT CAPACITIES LEGEND

DOORS

DOOR

.2"/OCC

CODE MIN:

PROVIDED:

32"

WIDTH PER OCCUPANT (NFPA T 7.3.3.1)

OCCUPANTS (AREA/OCCUPANCY LOAD FACTOR)

MIN. WIDTH (0.2" X OCCUPANCY)

CODE MIN (18 IBC 1010.1.1)

CLEARANCE PROVIDED

CLEARANCE SHOWN W/ DOOR OPEN 90° BETWEEN STOP & OPEN DOOR FACE

CORRIDORS

WIDTH PER OCCUPANT (NFPA T 7.3.3.1)

OCCUPANTS (AREA/OCCUPANCY LOAD FACTOR)

MIN. WIDTH (0.2" X OCCUPANCY)

CODE MIN (2018 NFPA 39.2.3.2)

CLEARANCE PROVIDED

CLEARANCE SHOWN BETWEEN FACE OF WALLS

STAIRS

WIDTH PER OCCUPANT (NFPA T 7.3.3.1)

OCCUPANTS (AREA/OCCUPANCY LOAD FACTOR)

MIN. WIDTH (0.3" X OCCUPANCY)

CODE MIN (18 IBC 1010.1.1)

CLEARANCE PROVIDED

* 2018 NFPA TABLE 7.2.2.2.1.1(b) EXISTING STAIRS

CORRIDOR

.2"/OCC

CODE MIN:

PROVIDED:

44"

STAIR

.3"/OCC

CODE MIN:

PROVIDED:

36" *

(2021 NFPA 101, TABLE 7.3.1.2 OCCUPANT LOAD FACTOR)

OCCUPANT LOAD FACTORS

SPACE FUNCTION SF/OCCUPANT

AMBULATORY HEALTH CARE 150 GROSS

DESIGN CODE

2021 NFPA 101 LIFE SAFETY CODE

CHAPTER 6: CLASSIFICATION OF OCCUPANCY AND HAZARD OF CONTENTS

6.1.5 HEALTH CARE - EXISTING. CHAPTER 19.

FIRE SUPPRESSION: FULLY SPRINKLERED

CHAPTER 19: EXISTING HEALTH CARE OCCUPANCIES

CONSTRUCTION TYPE LIMITATIONS (TABLE 19.1.6.1)

CONSTRUCTION TYPE: II (222)

FIRE RESISTANCE REQUIREMENTS

PRIMARY STRUCTURE FRAME 2-HOURS (EXISTING)

BEARING WALLS EXTERIOR 2-HOURS (EXISTING)

BEARING WALLS INTERIOR 2-HOURS (EXISTING)

NONBEARING WALLS 0

NONBEARING WALLS INTERIOR 0

FLOOR CONSTRUCTION 2-HOURS (EXISTING)

STAIRWELL EGRESS 2-HOURS (EXISTING)

SECOND FLOOR:

CONTROL ROOM 156 SF (EXISTING)

SPECIAL PROCEDURES 352 SF (EXISTING)

MECHANICAL 151 SF (EXISTING)

19.2.5 ARRANGEMENT OF MEANS OF EGRESS.

19.2.5.3 DEAD-END CORRIDORS: NOT TO EXCEED 30'-0"

19.2.5.7 HEALTH CARE SUITES.

19.2.5.7.3.3 (A) TRAVEL DISTANCE WITHIN A PATIENT CARE NONSLEEPING SUITE TO AN EXIT ACCESS DOOR TO ANOTHER SUITE, AN EXIT ACCESS CORRIDOR DOOR, OR A HORIZONTAL EXIT DOOR FROM THE

SUITE SHALL NOT EXCEED 100'-0".

19.2.5.7.3.3 (B) TRAVEL DISTANCE BETWEEN ANY POINT IN A NONSLEEPING SUITE AND AN EXIT SHALL NOT EXCEED 200'-0" IN A BUILDING PROTECTED THROUGHOUT BY AN APPROVED ELECTRICALLY

SUPERVISED SPRINKLER SYSTEM.

19.3.6.2 CONSTRUCTION OF CORRIDOR WALLS.

19.3.6.2.3 CORRIDOR WALLS SHALL FORM A BARRIER TO LIMIT THE TRANSFER OF SMOKE.

19.3.6.2.4 CORRIDOR WALLS SHALL BE PERMITTED TO TERMINATE AT OR ABOVE THE CEILING, BUT SHALL NOT BE REQUIRED TO EXTEND TO THE DECK ABOVE, WHERE THE CEILING IS CONSTRUCTED TO LIMIT

THE TRANSFER OF SMOKE.

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANTS

321 4 5 6 7 8 9 10

C U s e rs \a k a n u s k y \D o c u m e n ts

\2

-U S

D V

A -0

A

R C

H a k a n u s k y V

B N

S Y

.r v t

/2 /2

:2

:2

A M

GI201

2ND FLOOR - LIFE SAFETY PLAN

11/22/2021 JLH ACELA

BUFFALO VA MEDICAL CENTER

528-19-1082ND FLOOR SPECIAL

PROCEDURES SITE

PREPARATIONS

BID DOCUMENTS (100%)

2ND FLOOR KEY PLAN

1/8" = 1'-0"1

SECOND FLOOR LIFE SAFETY PLAN

LIFE SAFETY CODE INFORMATION

Revisions: Date:

043141 Page 3 of 30

ULTRASOUND 2

227A

TOILET

228A-1

MAMMOGRAPHY

228A

MECHANICAL ROOM

226A

STAIR

#2

CONTROL ROOM

224A

ULTRASOUND 1

223A

OFFICE

229A

OFFICE

229A-1

OFFICE

230A

SPECIAL

PROCEDURES

225A

OFFICE

231A

3 421

9 10

CLEAR

5'-0"

T1

T1

T1

TD2

T1

T1

T1

TD1

CLEAR

5'-0"

T1

T1

T1

TD3

GENERAL AREA OF WORK

N

PLAN

NORTH

PRECAUTIONS DURING CONSTRUCTION

1. EXECUTE WORK BY METHODS TO MINIMIZE RAISING DUST FROM CONSTRUCTION OPERATIONS.

2. IMMEDIATELY REPLACE A CEILING TILE DISPLACED FOR VISUAL INSPECTION.

3. PROVIDE ACTIVE MEANS TO PREVENT AIRBORNE DUST FROM DISPERSING INTO ATMOSPHERE.

4. WATER MIST WORK SURFACES TO CONTROL DUST WHILE CUTTING DRY WALL FOR BARRIERS.

5. BLOCK OFF AND SEAL AIR VENTS IN THE CONSTRUCTION AREA.

6. PLACE TWO DUST MATS AT ENTRANCE AND EXIT OF WORK AREA.

7. REMOVE OR ISOLATE HVAC SYSTEM IN AREA WHERE WORK IS BEING DONE TO PREVENT

CONTAMINATION OF DUCT SYSTEM.

8. REMOVE CONSTRUCTION WASTE DAILY.

9. PROVIDE TEMPORARY 1 HR. FIRE BARRIER PARTITIONS AS INDICATED AND SEAL UNUSED DOORS AT PERIMETER OF THE WORK AREA WITH RED CONSTRUCTION SEAM TAPE TO SEAL AREA FROM NON-

WORK AREA BEFORE CONSTRUCTION BEGINS.

10. MAINTAIN NEGATIVE AIR PRESSURE WITHIN WORK SITE UTILIZING HEPA FILTER EQUIPPED AIR FILTRATION UNITS. COORDINATE LOCATION OF WINDOW AND ABOVE FLOOR PENETRATIONS WITH COR.

SPACE SHALL BE CONTINUOUSLY MONITORED. BALL IN THE WALL IS NOT ACCEPTABLE. PATCH FLOOR

PENETRATION AND REPLACE WINDOW GLAZING AFTER CONSTRUCTION AS REQUIRED TO MATCH

EXISTING.

11. CONTAIN CONSTRUCTION WASTE BEFORE TRANSPORT IN TIGHTLY COVERED CONTAINERS OR BY COVERING IN PLASTIC AND SEALING WITH DUCT TAPE. REMOVE WASTE DAILY EITHER AFTER 5 PM AND

BEFORE 7 AM.

12. USE ROUTE AGREED UPON BY THE ICRA TEAM AND COR FOR TRANSPORT OF TRANSPORT CONTAINERS

THROUGH THE FACILITY.

13. SEAL HOLES, PIPES, CONDUITS, AND PUNCTURES AIRTIGHT AND/OR FIRE SEAL AS REQUIRED.

14. CONSTRUCT AN AIRTIGHT ONE-HOUR RATED ANTEROOM AND REQUIRE ALL PERSONNEL TO PASS THROUGH THIS ROOM SO THEY CAN BE VACUUMED USING HEPA VACUUM CLEANER BEFORE LEAVING WORK SITE; OR WEAR PAPER COVERALLS THAT ARE REMOVED EACH TIME THEY LEAVE THE WORK

SITE.

15. ALL PERSONNEL ENTERING WORK SITE ARE REQUIRED TO WEAR SHOE COVERS. SHOE COVERS MUST

BE CHANGED EACH TIME THE WORKER EXITS THE WORK AREA THROUGH THE ANTEROOM.

16. WORK OUTSIDE THE PRIMARY WORK AREA (AREA OF CONTAINMENT) WILL BE PERFORMED WITHIN A FIRE-RATED PLASTIC ENCLOSURE WITH NEGATIVE AIR HEPA FILTER SYSTEM TO CONTROL DUST. A MOBILE ICRA CART (DUST COLLECTION CART) MAY ALSO BE USED. ENCLOSURE TO BE CONSTRUCTED AND REMOVED DAILY AS REQUIRED BY THE COR. CONTRACTOR TO SANITIZE WORK AREA PRIOR TO

REMOVING PLASTIC CONTAINMENT AREA.

EXISTING OR ICRA WALL

EXISTING OR

ICRA DOOR

PROVIDE STICKY WALK-OFF MAT

(TYP. EACH SIDE OF DOOR)

GLAZING PANEL REMOVAL

EXISTING WALL CONSTRUCTION TO REMAIN

EXISTING GLAZING PANEL TO BE REMOVED FROM

EXISTING WINDOW SYSTEM PRIOR TO START OF

ABATEMENT. CONTRACTOR TO STORE GLAZING

PANEL IN A SAFE LOCATION UNTIL WORK IS

COMPLETE AND REPLACE TO IT'S EXISTING

CONDITION. IF DAMAGED, CONTRACTOR WILL

REPLACE TO MATCH EXISTING

EXISTING WINDOW SYSTEM FRAME TO REMAIN-

VERIFY IN FIELD THE WINDOW SYSTEM TYPE

HEPA EXHAUST

EXISTING WALL CONSTRUCTION TO REMAIN

PROVIDE HEPA FILTRATION EXHAUST DUCTING

THROUGH NEW TEMPORARY PLYWOOD PANEL

PROVIDE 3/4" FIRE TREATED PLYWOOD PANEL

WITHIN EXISTING ALUMINUM FRAME

NOTE:

1. GENERAL CONTRACTOR TO LOCATE PER

QUANTITIES REQUIRED.

PROVIDE DUCT SEALING TAPE AROUND

PENETRATION (TYPICAL)

EXTERIORINTERIOR EXTERIOR

INTERIOR

(NEGATIVE SPACE)

EXISTING WINDOW SYSTEM FRAME TO REMAIN-

VERIFY IN FIELD THE WINDOW SYSTEM TYPE

LINE OF FINISHED FLOOR, SEE ROOM FINISH

SCHEDULE FOR FLOOR & BASE TYPE

FACE OF EXISTING WALL

3 5/8" METAL STUDS @ 16" O.C., TYPICAL

(1) LAYER 5/8" TYPE 'X' GYPSUM

BOARD BOTH SIDES

SECTION

PLAN

T1

/8

1-HR RATED

FIRE CAULK IN ACCORDANCE WITH UL 419

ASSEMBLY: UL-U419

STC: 48

NOTE: ANY PENETRATIONS THROUGH PARTITION ARE TO BE FIRE CAULKED

TEMPORARY CONSTRUCTION BARRIER

CONTINUOUS METAL STUD BOTTOM TRACK

SET IN CONTINUOUS BEAD OF SEALANT.

CONTINUOUS 3 1/2" SOUND

ATTENUATION BATTS AS SCHEDULE

CONTINUOUS METAL HORIZONTAL BRIDGING

CHANNEL @ MID HEIGHT, TYPICAL

FIRE CAULK IN ACCORDANCE WITH UL 419

METAL STUD FRAMING W/ 5/8" TYPE 'X'

GYPSUM BOARD, ONE SIDE

TYPE 'X' GYPSUM BOARD BOTH SIDES

RUBBER BASE. SEE FINISH SCHEDULE

BOTH SIDES

LINE OF CEILING SYSTEM, SEE ROOM

FINISH SCHEDULE FOR TYPE & HEIGHT

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANTS

321 4 5 6 7 8 9 10

C U s e rs \a k a n u s k y \D o c u m e n ts

\2

-U S

D V

A -0

A

R C

H a k a n u s k y V

B N

S Y

.r v t

/2 /2

:2

:1

A M

GC101

2ND FLOOR - ICRA CONTROL PLAN

11/22/2021 JLH ACELA

BUFFALO VA MEDICAL CENTER

528-19-1082ND FLOOR SPECIAL

PROCEDURES SITE

PREPARATIONS

BID DOCUMENTS (100%)

1/4" = 1'-0"1

2ND FLOOR ICRA CONTROL PLAN

2ND FLOOR KEY PLAN

ICRA CONTROL POLICY

ICRA KEY NOTES

NUMBER DESCRIPTION

1 HIGH EFFICIENCY PARTICULATE AIR-EQUIPPED (HEPA) FILTRATION MACHINE RATED AT 95% CAPTURE OF 0.3 MICRONS

INCLUDING POLLEN, MOLD SPORES, AND DUST PARTICLES

2 HEAVY DUTY, FLEXIBLE STEEL REINFORCED HEPA EXHAUST, DIRECTLY VENTED TO EXTERIOR. SEE B/GC101 FOR DETAIL

3 REMOVE EXISTING GLAZING, INSTALL PLYWOOD WITH SEALED EXHAUST PORT. SEE DETAIL B/GC101

4 WALK-OFF MAT. SEE SPECIFICATIONS & DETAIL A/GC101

1/2" = 1'-0"A

STICKY WALK-OFF MAT DETAIL

1 1/2" = 1'-0"B

TYPICAL HEPA FILTRATION THROUGH WINDOW DETAIL

DOOR AND FRAME SCHEDULE ICRA

DOOR NO.

DOOR FRAME

FIRE

RATING

HARDWARE

SET (HW) KICK PLATE REMARKS DOOR NO.

SIZE

TYPE MATERIAL TYPE MATERIAL

DETAIL

WIDTH HEIGHT THICKNESS HEAD JAMB SILL

TD1 3'-0" 7'-0" 1 3/4" F WD 1 HM H1 J1 - C HW-3 - - TD1

TD2 3'-0" 7'-0" 1 3/4" F WD 1 HM H1 J1 - C HW-3 - - TD2

TD3 3'-0" 7'-0" 1 3/4" F WD 1 HM H1 J1 - C HW-3 - - TD3

Revisions: Date:

043141 Page 4 of 30

GENERAL AREA OF WORK

N

PLAN

NORTH

ULTRASOUND 2

227A

TOILET

228A-1

MAMMOGRAPHY

228A

MECHANICAL

ROOM

226A

STAIR

#2

CONTROL ROOM

224A

ULTRASOUND 1

223A

OFFICE

229A

OFFICE

229A-1

OFFICE

230A

SPECIAL

PROCEDURES

224A

OFFICE

231A

3 421

9 10

DEMOLISH WALLS AS

REQUIRED TO INSTALL NEW

STRUCTURAL FRAMING

ABOVE.

EXISTING CONSTRUCTION TO REMAIN. PATCH AS

REQUIRED BY THE SPECIFICATIONS WITHIN THE

CONTRACT AREA

EXISTING WALL CONSTRUCTION SHOWN HATCHED TO BE

DEMOLISHED AND REMOVED IN ITS ENTIRETY

EXISTING DOOR TO BE REMOVED. EXISTING FRAME TO REMAIN.

REMOVE AND RE-INSTALL EXISTING HARDWARE UNLESS NOTED

OTHERWISE. PREP AND PAINT EXISTING FRAME FOR NEW PAINT

EXISTING WALL MOUNTED SINK/ LAVATORY TO

BE REMOVED. SEE PLUMBING DRAWINGS

AREA GENERALLY NOT INCLUDED IN CONTRACT

1. REFER TO SPECIFICATIONS SECTION 024119 - SELECTIVE DEMOLITION FOR ADDITIONAL REQUIREMENTS AND INFORMATION.

2. PROJECT SCOPE LINE IS INDICATED FOR GENERAL INTENT ONLY. ADDITIONAL DEMOLITION MAY BE REQUIRED OUTSIDE OF THIS LINE. ARCHITECTURAL DEMOLITION DRAWINGS ARE FOR SCHEMATIC PURPOSES. CONTRACTOR SHALL COORDINATE ALL DEMOLITION WITH THE ENTIRE SET OF CONTRACT DOCUMENTS FOR FULL SCOPE OF

DEMOLITION WORK REQUIRED FOR THE PROJECT.

3. EXISTING CONDITIONS SHOWN ON THESE DRAWINGS ARE NOT GUARANTEED TO BE COMPLETE. THE CONTRACTOR SHALL VERIFY ALL EXISTING CONDITIONS, DIMENSIONS AND MATERIALS REQUIRED FOR THE CONTRACTED WORK. REPORT ALL DISCREPANCIES TO ARCHITECT PRIOR TO FABRICATION, ERECTION AND/OR INSTALLATION.

4. COORDINATE ALL NEW PENETRATIONS AND/OR OPENINGS WITH OTHER ASSOCIATED TRADES.

5. THE OWNER MAY SELECT AND TAG ITEMS FOR DEMOLITION TO BE SALVAGED. THE CONTRACTOR SHALL REMOVE SELECTED ITEMS FROM SCOPE OF WORK AND DELIVER TO

THE OWNER'S LOCATION WITHIN THE EXISTING FACILITY.

6. CONTRACTOR SHALL PROVIDE HEPA FILTERED NEGATIVE AIR MACHINE(S) TO MAINTAIN NEGATIVE PRESSURE TO SCOPE OF WORK AREA ENSURING NO DUST WILL BE TRANSFERRED TO OCCUPIED AREAS. PROVIDE VISUAL PRESSURE MONITORING DEVICE AT DUST PROOF BARRICADE TO CONFIRM PRESSURE.

7. THE FACILITY'S EXISTING SMOKE AND FIRE SUPPRESSION SYSTEM SHALL REMAIN IN OPERATION DURING THE ENTIRE CONSTRUCTION PHASE. COVER FIRE SPRINKLER HEADS

WITH A THIN PAPER BAG TO PROTECT HEADS DURING CONSTRUCTION.

8. ALL DEMOLITION WORK BEING DONE OUTSIDE OF TEMPORARY PARTITIONS IS TO BE APPROPRIATELY SEALED OFF TO PREVENT THE TRANSMISSION OF DUST AND DEBRIS AND MINIMIZE DISRUPTION TO VISITORS, RESIDENTS AND STAFF. COORDINATE LOCATION OF BARRIERS WITH OWNER.

9. REMOVE PARTITIONS INDICATED FROM THE FLOOR TO THE UNDERSIDE OF THE STRUCTURE ABOVE.

10. PREPARE ALL ADJACENT SURFACES TO RECEIVE NEW CONSTRUCTION AND SCHEDULED FINISH. EXISTING WALLS SHOWN TO BE REMOVED SHALL BE DEMOLISHED COMPLETELY. THIS INCLUDES THE REMOVAL OF REINFORCEMENT, SOFFITS, DOORS, WINDOWS, FRAMES AND OVERHEAD BRACING. COORDINATE WITH MECHANICAL AND ELECTRICAL FOR DISCONNECTION AND REMOVAL OF EXISTING UTILITIES AND DEVICES LOCATED WITHIN AREAS SCHEDULED TO BE DEMOLISHED.

11. SOME ITEMS MAY BE INDICATED IN THE DEMOLITION DRAWINGS AND DEMOLITION NOTES WHICH ARE NOT NECESSARILY DEMOLITION WORK BUT ARE INCLUDED TO DESCRIBE THE OVERALL SCOPE OF THE PROJECT AND TO AID IN THE DEMOLITION COORDINATION. THE CONTRACTOR IS RESPONSIBLE FOR ALL WORK REQUIRED TO COMPLETE THE

INTENDED WORK OF THE OVERALL PROJECT.

12. FLOORING DEMOLITION INCLUDES THE REMOVAL OF EXISTING FLOOR FINISHES, INCLUDING VCT, SHEET VINYL, CERAMIC TILE, QUARRY TILE, CARPET AND OTHER FINISHES, GROUTS, MASTICS AND SETTING BEDS COMPLETE TO EXISTING CONCRETE FLOOR SLAB OR OTHER SUBSTRATE READY FOR NEW FLOOR FINISHES. FLOOR PREP SHALL BE

BY THE INSTALLING CONTRACTOR.

13. REMOVE MISCELLANEOUS ITEMS WITHIN LIMITS OF DEMOLITION. COORDINATE WITH OWNER ANY ITEMS TO BE SALVAGED.

14. DEMOLITION OF CEILINGS INCLUDES GRID, TILE, SUPPORTS, SOFFITS AND RELATED ITEMS. COORDINATE WITH ELECTRICAL WORK ON REMOVAL OF LIGHTS, CONDUIT, TIES, SUPPORTS AND RELATED WIRING. COORDINATE WITH MECHANICAL ON REMOVAL OF DIFFUSERS GRILLS, AND RELATED DUCTWORK EQUIPMENT CONTAINED THEREIN.

15. PLUG ABANDONED FLOOR OPENINGS WITH NEW CONCRETE. PLUG SHALL MATCH EXISTING SLAB DEPTH AND BE STRUCTURALLY SOUND TO CARRY FLOOR LOAD OF 100 LBS. /

SQ. FT. UNLESS NOTED OTHERWISE.

16. ALL FIRE RATED ASSEMBLIES (COLUMNS, SHAFTS, WALLS, ETC.) SHALL BE MAINTAINED OR BE RELOCATED / PATCHED. MATCH EXISTING FIRE RATING UNLESS NOTED

OTHERWISE.

17. REMOVE EXISTING DOORS, FRAMES, SIDELIGHTS, ANCHORS, THRESHOLDS AND HARDWARE AS INDICATED WITHIN LIMITS OF CONSTRUCTION. PATCH AND REPAIR WALL AND FLOOR TO MATCH EXISTING. OWNER SHALL HAVE THE RIGHT TO SALVAGE ANY AND ALL DOORS AND HARDWARE. CONTRACTOR SHALL VERIFY DOORS FOR SALVAGE OR

RELOCATION PRIOR TO COMMENCING DEMOLITION.

18. WHERE NEW DOORS ARE INDICATED, CUT OPENINGS IN EXISTING WALL. PREPARE OPENINGS FOR NEW DOOR. PATCH REQUIRED WALLS TO MATCH EXISTING. PROVIDE

LINTELS AS REQUIRED FOR NEW OPENINGS. PREPARE SURFACES FOR SCHEDULED FINISHES.

19. PROTECT EXISTING FINISHED WORK & EQUIPMENT WHICH IS TO REMAIN IN AREAS OF DEMOLITION WORK.

20. AFTER THE REMOVAL OF ICRA WALLS, CLEAN AND PATCH EXISTING WALLS AND CEILINGS EFFECTED BY CONSTRUCTION AND MATCH EXISTING FINISHES.

21. REMOVE ALL PLUMBING FIXTURES AS INDICATED WITHIN THE LIMITS OF CONSTRUCTION. CAP ALL PLUMBING LINES NOT REQUIRED BY NEW CONSTRUCTION. COORDINATE WITH PLUMBING PLANS FOR ADDITIONAL INFORMATION. REMOVE ALL ACCESSORIES ASSOCIATED WITH PLUMBING, INCLUDING PARTITIONS, GRAB BARS, DISPENSERS, RACKS, SHELVING, SINK BASE, DISPOSALS, ETC.

22. ICRA BARRIERS AND NEGATIVE PRESSURE SYSTEM ARE NOT TO BE REMOVED FROM CONSTRUCTION SPACE UNTIL AFTER THE SPACE HAS BEEN THOROUGHLY CLEANED AND UNTIL A NOTICE HAS BEEN RECEIVED FROM THE OWNER THAT AN INSPECTION HAS BEEN COMPLETED AND APPROVED.

CONTROL ROOM

224A

SPECIAL

PROCEDURES

224A

C

D

E

B

B

ULTRASOUND 2

227A

TOILET

228A-1

MAMMOGRAPHY

228A

MECHANICAL

ROOM

226A

STAIR

#2

ULTRASOUND 1

223A

OFFICE

229A

OFFICE

229A-1

OFFICE

230A

OFFICE

231A

A

D

E

EXISTING ACOUSTICAL CEILING TILE SYSTEM TO BE

REMOVED

EXISTING LIGHT FIXTURE(S) TO BE REMOVED. SEE

ELECTRICAL DRAWINGS.

EXISTING MECHANICAL GRILLES TO BE REMOVED.

CONTRACTOR TO MODIFY MECHANICAL SYSTEM AS

REQUIRED. SEE MECHANICAL DRAWINGS

SPRINKLER HEAD: DESIGN INTENT IS TO NOT MODIFY

EXISTING SYSTEM.

EXISTING ACOUSTICAL CEILING TILE SYSTEM TO

REMAIN UNLESS NOTED OTHERWISE.

GENERAL AREA OF WORK NOT INCLUDED IN CONTRACT

EXISTING LIGHT FIXTURE(S) TO REMAIN. SEE

ELECTRICAL DRAWINGS.

EXISTING MECHANICAL GRILLES TO REMAIN. SEE

MECHANICAL DRAWINGS

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANTS

321 4 5 6 7 8 9 10

C U s e rs \a k a n u s k y \D o c u m e n ts

\2

-U S

D V

A -0

A

R C

H a k a n u s k y V

B N

S Y

.r v t

/2 /2

:2

:0

A M

AD101

2ND FLOOR - DEMOLITION PLANS

11/22/2021 JLH ACELA

BUFFALO VA MEDICAL CENTER

528-19-1082ND FLOOR SPECIAL

PROCEDURES SITE

PREPARATIONS

BID DOCUMENTS (100%)

2ND FLOOR KEY PLAN

1/4" = 1'-0"2

2ND FLOOR PLAN - DEMOLITION

DEMOLITION LEGEND - FLOOR PLAN

GENERAL DEMOLITION NOTES

DEMOLITION KEY NOTES - 2ND FLOOR PLAN

NUMBER DESCRIPTION

1 EXISTING GANTRY TO BE REPLACED. REMOVE ASSOCIATED EQUIPMENT, CEILING MOUNTED DEVICES, AND RAIL SYSTEM. PREPARE TO RECEIVE NEW

GANTRY.

2 REMOVE EXISTING FLOOR FINISH AND WALL BASE IN ITS ENTIRETY. PREP CONCRETE DECK AND EXISTING WALLS FOR NEW FINISHES.

3 REMOVE EXISTING LEAD DOOR. EXISTING FRAME TO REMAIN. EXISTING HARDWARE IS TO BE SALVAGED FOR RE-USE UNLESS NOTED OTHERWISE.

PREP EXISTING FRAME FOR NEW PAINT

4 REMOVE EXISTING DOOR. EXISTING FRAME TO REMAIN. EXISTING HARDWARE IS TO BE SALVAGED FOR RE-USE UNLESS NOTED OTHERWISE. PREP

EXISTING FRAME FOR NEW PAINT.

5 REMOVE EXISTING COUNTERTOP AND SUPPORT SHOWN DASHED. VERTICAL SUPPORTS ARE TO BE SALVAGED FOR RE-USE AS REQUIRED. PREP

EXISTING WALLS FOR NEW FINISHES.

6 REMOVE EXISTING SINK. COORDINATE WITH PLUMBING DRAWINGS. PATCH/REPAIR WALLS FOR NEW FINISHES. SEE FINISH SCHEDULE.

7 REMOVE EXISTING WALL SHOWN DASHED. PREP ADJACENT WALLS FOR NEW FINISHES.

8 EXISTING MECHANICAL EQUIPMENT TO REMAIN AND BE PROTECTED DURING DEMOLITION AND CONSTRUCTION. COORDINATE WITH OWNER TO HAVE

HVAC UNIT AND BOM MONITORING TURNED OFF DURING DEMOLITION AND CONSTRUCTION

9 REFER TO ELECTRICAL DRAWINGS FOR EQUIPMENT DEMOLITION INFORMATION

10 EXISTING FLOORING AND WALL BASE ARE TO REMAIN AND BE PROTECTED DURING DEMOLITION AND CONSTRUCTION

11 EXISTING FLOOR DRAIN TO REMAIN, PROTECT FROM CONSTRUCTION DEBRIS.

12 EXISTING WINDOW SILL FINISH IS TO REMAIN AND BE PREPPED TO RECEIVE NEW CLADDING

13 DEMOLISH WALLS AS REQUIRED TO INSTALL NEW STRUCTURAL FRAMING ABOVE.

14 EXISTING WALL MOUNTED MECHANICAL UNIT IS TO BE REMOVED IN ITS ENTIRETY. PREP WALL TO RECEIVE NEW VERTICALLY ORIENTED UNIT

15 EXISTING WINDOW SYSTEM IS TO BE REMOVED AND OPENING IS TO BE PREPPED TO RECEIVE NEW LOUVERED PANEL INSERT. REFER TO NEW WORK

PLANS, ELEVATIONS AND SECTIONS FOR MORE INFORMATION

16 APPROXIMATE LOCATION OF ICRA CONSTRUCTION BARRIER. REFER TO ICRA PLANS FOR MORE INFORMATION

1/4" = 1'-0"1

2ND FLOOR REFLECTED CEILING PLAN - DEMOLITION

DEMOLITION LEGEND - REFLECTED CEILING PLAN

EXISTING FINISH SCHEDULE - SECOND FLOOR

RM

NUMBER RM NAME FLOOR BASE

WALL -

NORTH

WALL -

SOUTH

WALL -

EAST

WALL -

WEST MILLWORK CEILING

224A CONTROL ROOM HETEROGENEOUS

SHEET

HETEROGENEOUS

SHEET

PAINT PAINT PAINT PAINT EXISTING WINDOW

SILLS TO REMAIN

ACOUSTICAL CEILING W/

PAINTED DRYWALL FASCIA

224A SPECIAL

PROCEDURES

HETEROGENEOUS

SHEET

HETEROGENEOUS

SHEET

PAINT PAINT PAINT PAINT EXISTING WINDOW

SILLS TO REMAIN

ACOUSTICAL CEILING W/

PAINTED DRYWALL FASCIA

DEMOLITION KEY NOTES - 2ND FLOOR RCP

NUMBER DESCRIPTION

A NO ARCHITECTURAL WORK IN THIS AREA SHOWN IN SOLID HATCH: EXISTING CEILING, GRID, FIXTURES AND DIFFUSERS ARE TO REMAIN

B EXISTING GANTRY EQUIPMENT RAILS SHOWN DASHED TO BE REMOVED TYPICAL.

C EXISTING UNISTRUT SYSTEM IS TO BE REMOVED

D REMOVE EXISTING CEILING TILES AND GRID SUSPENSION SYSTEM THROUGHOUT ROOM. PREP WALLS AS REQUIRED FOR NEW FINISHES.

E EXISTING GYPSUM WALL BOARD SOFFIT TO REMAIN. PREP FOR NEW FINISHES.

X

Revisions: Date:

043141 Page 5 of 30

S S

S

S S

S

ULTRASOUND 2

227A

TOILET

228A-1

MAMMOGRAPHY

228A

ULTRASOUND 1

223A

OFFICE

229A

OFFICE

229A-1

OFFICE

230A

OFFICE

231A

STAIR

#2

A

B

A

SPECIAL

PROCEDURES

225A

CONTROL

ROOM

224A

MECHANICAL ROOM

226A

C

AT-1

9'-6"

AT-1

9'-4"

D

AE102

TYP.

T Y

P

/2

ULTRASOUND 2

227A

TOILET

228A-1

MAMMOGRAPHY

228A

ULTRASOUND 1

223A

OFFICE

229A

OFFICE

229A-1

OFFICE

230A

OFFICE

231A

STAIR

#2

CONTROL

ROOM

224A

SPECIAL

PROCEDURES

225A

AE102

AE102

AE102

AE102

AE102

2'-6"

MECHANICAL ROOM

226A

5'-11"

224A

225A

226AA

A

B

CG

CG

CG

CG

CG

CONTROL

POINT

AE1028

3 421

9 10

/2

CUTOUT FOR

GROMMET (TYP.)

2"x24" CUTOUT FOR

AIR TRANSFER

3" HIGH S-1 BACKPLASH FOR AIR

TRANSFER AS SHOWN. PROVIDE

STRUCTURAL BACKUP

(PLYWOOD) AS REQUIRED TO

MAKE BACKSPLASH DURABLE.

GENERAL AREA OF WORK

N

PLAN

NORTH

2x2 ACOUSTICAL CEILING TILE

SYSTEM

EXHAUST GRILLE

SPRINKLER HEAD

RETURN AIR GRILLE

SUPPLY AIR GRILLE

S SPEAKER

NEW 2"W RECESSED LINEAR LIGHT

FIXTURE- LENGTH VARIES

AREA GENERALLY NOT

INCLUDED IN CONTRACT

EXISTING CONSTRUCTION TO REMAIN. PATCH AS

REQUIRED FOR NEW FINISHES IF INDICATED ON

FINISH SCHEDULE.

NEW CONSTRUCTION

AREA GENERALLY NOT INCLUDED IN CONTRACT

NEW LAVATORY

NEW MILLWORK TO BE PROVIDED BY

GENERAL CONTRACTOR

CG

INDICATES CORNERGUARD-REFER TO FINISH

PLANS FOR TYPE

1. CONTRACTOR TO VERIFY ALL DIMENSIONS AND CONDITIONS IN THE FIELD PRIOR TO

COMMENCEMENT OF WORK. IF DRAWINGS CONFLICT WITH ACTUAL FIELD CONDITIONS,

CONTACT ARCHITECT PRIOR TO PROCEEDING WITH WORK.

2. REFER TO LIFE SAFETY PLANS FOR RATED WALL LOCATIONS.

3. REFER TO QJ SERIES DRAWINGS FOR FURNITURE AND EQUIPMENT LOCATION COORDINATION.

FURNITURE AND EQUIPMENT ITEMS SHOWN FOR REFERENCE ONLY AND IS NOT PART OF THE

GENERAL CONTRACT. THESE ITEMS WILL BE PROVIDED AND INSTALLED BY OWNER.

CONTRACTOR MAY NEED TO COORDINATE SPECIFIC FIXTURE AND EQUIPMENT

REQUIREMENTS IF NOTED.

4. PROVIDE CONCEALED IN-WALL REINFORCING / BLOCKING FOR ATTACHMENT OF ALL

MILLWORK, CASEWORK, AND / OR ACCESSORIES AS REQUIRED.

5. ALL DIMENSIONS ARE TO THE FACE OF STUD AT NEW CONSTRUCTION UNLESS NOTED

OTHERWISE. VERIFY IN FIELD WITH DESIGNER FINAL LOCATIONS OF ALL LIGHT SWITCHES,

STROBES, FIRE EXTINGUISHER CABINETS, FIRE ALARM PULLS AND OTHER DEVICES ON WALLS.

A LAMINATED GLASS

D DOUBLE GLAZED TEMPERED GLASS

F FIRE RATED GLAZING

G DOOR GASKETS AND DOOR SWEEP

H ELECTRIC HOLD OPEN

L1 LOUVER: 12x12 L2 LOUVER: 18x18 L3 LOUVER: 18x26

LL LEAD LINED

LP LIGHT PROOF LOUVER

M MECHANICAL SEAL FOR LIGHT PROOF & SOUND

RETARDING DOOR

T TEMPERED GLASS

U UNDERCUT 1/2" (19mm)

V LEAD GLASS

W/F WIRED FLAT GLASS

GENERAL NOTE:

1. ALL 'B' LABELED DOORS WILL HAVE A 90 MINUTE RATING.

2. ALL 'C' LABELED DOORS WILL HAVE A 45 MINUTE RATING.

TYPE 'F'

TYPE 1

(EXISTING TO REMAIN)

PREPARE EXISTING DOOR FRAME TO

RECEIVE NEW PAINT, DOOR, AND

RELOCATED HARDWARE

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANTS

321 4 5 6 7 8 9 10

C U s e rs \a k a n u s k y \D o c u m e n ts

\2

-U S

D V

A -0

A

R C

H a k a n u s k y V

B N

S Y

.r v t

/2 /2

:2

:1

A M

AE101

2ND FLOOR - NEW WORK PLANS

11/22/2021 JLH ACELA

BUFFALO VA MEDICAL CENTER

528-19-1082ND FLOOR SPECIAL

PROCEDURES SITE

PREPARATIONS

BID DOCUMENTS (100%)

1/4" = 1'-0"1

2ND FLOOR REFLECTED CEILING PLAN - NEW WORK

1/4" = 1'-0"2

2ND FLOOR PLAN - NEW WORK

2ND FLOOR KEY PLAN

KEY NOTES - FLOOR PLAN

NUMBER DESCRIPTION

1 NEW WALL MOUNTED SINK

2 NEW CONTINUOUS 30" DEEP SOLID SURFACE COUNTER AND METAL SUPPORTS AS REQUIRED

3 NEW GANTRY WITH XT SUSPENSION ABOVE

4 EXISTING MECHANICAL EQUIPMENT TO REMAIN & BE PROTECTED DURING CONSTRUCTION - REFER TO MECHANICAL (M) DRAWINGS

5 OUTLINE OF RAILS ABOVE - REFER TO 'QJ' SERIES DRAWINGS FOR MORE INFORMATION

6 INSTALL NEW VERTICALLY ORIENTED HVAC UNIT. REFER TO MECHANICAL DRAWINGS FOR MORE INFORMATION

7 EXISTING WINDOW SYSTEM IS TO BE REPLACED WITH NEW LOUVERED PANEL SYSTEM. REFER TO ELEVATION AND SECTION FOR MORE

INFORMATION

KEY NOTES - REFLECTED CEILING PLAN

NUMBER DESCRIPTION

A NEW CEILING TILES AND GRID SUSPENSION SYSTEM THROUGHOUT ROOM. PREP WALLS AS REQUIRED FOR NEW FINISHES.

B NEW EQUIPMENT RAILS

C EXISTING CEILING GRID, TILE AND LIGHTING ARE TO REMAIN

D OUTLINE OF UNISTRUT GRID. ACT CEILING SYSTEM TO BE INSTALLED BETWEEN UNITSTRUT RUNS. REFER TO DETAIL

LEGEND - REFLECTED CEILING PLANFLOOR PLAN LEGEND

# X

GENERAL FLOOR PLAN NOTES

DOOR REMARKS

DOOR TYPESDOOR FRAMES - INTERIOR

DOOR AND FRAME SCHEDULE

DOOR FRAME

FIRE

RATING KICK PLATE

HARDWARE

SET REMARKS

DOOR

NUMBERNUMBER

SIZE

TYPE MATERIAL TYPE MATERIAL

DETAILS

WIDTH HEIGHT THICKNESS HEAD JAMB SILL

224A 3'-8" 7'-0" 1 3/4" F LAM WD 1 EXISTING EXISTING EXISTING - - RELOCATED U 224A

225A 3'-10" 7'-0" 1 3/4" F LAM WD 1 EXISTING EXISTING EXISTING - - RELOCATED LL, U 225A

226AA 3'-8" 7'-0" 1 3/4" F LAM WD 1 EXISTING EXISTING EXISTING - - RELOCATED U 226AA

226AB 2'-0" 7'-0" 1 3/4" F LAM WD 1 EXISTING EXISTING EXISTING - - RELOCATED LL 226AB

Revisions: Date:

043141 Page 6 of 30

RE-USE EXISTING WORK

SURFACE BRACKET

EXISTING EXTERIOR WINDOW / WALL

ASSEMBLY BEYOND

AE102

EXISTING IN-WALL HVAC UNIT

(BEHIND NEW REMOVABLE PANELS)

REMOVABLE BENT METAL

BRACKET. SEE 4/AE102

SOLID SURFACE WORKSURFACE (S-1)

POWDER COATED SUPPORT BRACKET,

BASIS OF DESIGN HAFELE 'SPEED BRACE'-

SPACED AS RECOMMENDED BY

MANUFACTURER - TO BE IN BLACK FINISH

NEW 1/2" SOLID SURFACE CLADDING (S-2)

NEW WALL BASE, SEE

FINISHES LEGEND

AE102

POWDER COATED SUPPORT

BRACKET, BASIS OF DESIGN HAFELE

'SPEED BRACE'- SPACED AS

RECOMMENDED BY

MANUFACTURER - TO BE IN BLACK

FINISH

FINISHED END

EXISTING WINDOW / WALL

ASSEMBLY TO REMAIN

OPEN

WALL BASE - REFER TO FINISH PLANS

SOLID SURFACE WORKSURFACE (S-1)

OPEN

BEYOND

SOLID SURFACE COUNTERTOP

(S-1)

CUTOUT FOR GROMMETS AS

REQUIRED. REFER TO PLAN FOR

LOCATION / QUANTITY

POWDER COATED SUPPORT

BRACKET, BASIS OF DESIGN

HAFELE 'SPEED BRACE'- SPACED

AS RECOMMENDED BY

MANUFACTURER - TO BE IN BLACK

FINISH

/2

EXISTING WALL

ACOUSTICAL CEILING GRID WITH

DROP-IN TILE (TYPICAL)

T-BAR

L-ANGLE MOLDING

PARTITION SYSTEM - REFER TO PLANS

GALVANIZED STEEL HANGER

WIRE SUSPENDED FROM JOISTS

TO ACOUSTICAL CEILING GRID

MAINS

SOLID SURFACE COUNTERTOP

(S-1)

2'-6"

CUTOUT FOR AIR TRANSFER.

REFER TO PLAN FOR LOCATION /

QUANTITY.

EXISTING IN-WALL HVAC UNIT- AIR

INTAKE

REMOVABLE BENT METAL PANEL

W/ SIDE RETURNS. TO BE IN

POWDER COATED BLACK FINISH.

ATTACHED WITH MECHANICAL

FASTENERS TO UNDERSIDE OF

NEW WORKSURFACE & EXISTING

HVAC UNIT / EXTERIOR WALL

WALL BASE

EXISTING IN-WALL HVAC UNIT- AIR

SUPPLY

/2

SECOND FLOOR

11'-10"

THIRD FLOOR

24'-2"

AE102

NEW OUTSIDE AIR IN-TAKE LOUVER.

CONTRACTOR TO REMOVE EXISTING

WINDOW SYSTEM AND INSTALL NEW

DUCTWORK AND LOUVER.

REFER TO SECTION AND MECHANICAL

DRAWINGS FOR MORE INFORMATION.

FINISH OF LOUVER TO MATCH EXISTING

EXTERIOR WALL FINISH

ACOUSTICAL CEILING GRID WITH

LAY-IN TILE (TYPICAL)

DOUBLE UNISTRUT

CHANNEL. TO BE FINISHED

ON ALL SIDES TO MATCH ACT

CEILING GRID. SEE

STRUCTURAL DRAWINGS

FOR LAYOUT AND HANGING

CONNECTIONS

ACOUSTICAL CEILING SYSTEM

WALL ANGLE TO BE ALIGN WITH

UNISTRUT

NEW 1/2" SOLID SURFACE CLADDING

(S-2). ADHERE TO EXISTING SILL WITH

PROPER ADHESIVE

EXISTING WINDOW SILL

CONSTRUCTION TO REMAIN

/2

EXISTING WINDOW

EXISTING WALL

SEALANT WITH BACKER ROD

SECOND FLOOR

11'-10"

THIRD FLOOR

24'-2"

EXISTING WINDOW TO BE REPLACED BY

NEW OUTSIDE AIR INTAKE LOUVER.

REFER TO MECHANICAL DRAWINGS FOR

CONNECTED DUCT SIZE, PATHWAY, ETC.

ALUMINUM SILL PAN FLASHING

EXISTING WALL CONSTRUCTION

SEALANT

BIRD SCREEN

PROVIDE CONTINUOUS

SEALANT AT PERIMETER

PROVIDE CONTINUOUS BEAD OF EXTERIOR

GRADE SEALANT AT PERIMETER OF LOUVER

REFER TO MECHANICAL DRAWINGS

FOR EXTENT OF INSULATED BLANK-

OFF PANEL ASSEMBLY

1/2" GYPSUM BOARD OVER 3/4"

PLYWOOD SHEATHING OVER 2"

RIGID INSULATION OVER METAL

BLANK OFF PANEL

EXISTING ELECTRICAL DEVICES,

CONDUIT, UNISTRUTS AND WINDOW

BLANK OFF MATERIAL TO BE

TEMPORARILY REMOVED TO

PERMIT INSTALLATION OF NEW

LOUVER SYSTEM. ITEMS SHALL BE

PUT BACK IN WORKING ORDER.

NEW INSULATED OUTSIDE AIR

INTAKE DUCTING, REFER TO

MECHANICAL PLANS

EXISTING WINDOW BLANK-OFF PANEL TO

RECEIVE PENETRATION TO ALLOW PASSAGE

OF NEW INSULATED OUTSIDE AIR INTAKE

DUCT. VERIFY DUCT SIZE WITH MECHANICAL

PLANS.

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANTS

321 4 5 6 7 8 9 10

C U s e rs \a k a n u s k y \D o c u m e n ts

\2

-U S

D V

A -0

A

R C

H a k a n u s k y V

B N

S Y

.r v t

/2 /2

:2

:5

A M

AE102

INTERIOR ELEVATONS, SECTIONS & DETAILS

11/22/2021 JLH ACELA

BUFFALO VA MEDICAL CENTER

528-19-1082ND FLOOR SPECIAL

PROCEDURES SITE

PREPARATIONS

BID DOCUMENTS (100%)

3/8" = 1'-0"1

ELEVATION - CONTROL ROOM 224A - EAST

3/8" = 1'-0"2

ELEVATION - CONTROL ROOM 224A - SOUTH

1" = 1'-0"3

SECTION - WORK SURFACE

3" = 1'-0"5

TYPICAL ACT CEILING DETAIL

1" = 1'-0"4

SECTION - WORK SURFACE

3/8" = 1'-0"8

EXTERIOR ELEVATION - MECHANICAL ROOM 226A

3" = 1'-0"6

UNISTRUT @ ACT CEILING

1 1/2" = 1'-0"7

WINDOW SILL SECTION

3/4" = 1'-0"9

SECTION @ 2ND FLOOR EXTERIOR WALL DUCTWORK PENETRATION

Revisions: Date:

043141 Page 7 of 30

PLAN

NORTH

GENERAL NOTES:

1. EXISTING CONDITIONS HAVE BEEN SHOWN FROM GENERAL SPACE OBSERVATIONS AND

EXISTING DRAWINGS. RESPECTIVE TRADES SHALL CONDUCT A COMPLETE FIELD SURVEY OF

EXISTING CONDITIONS PRIOR TO SUBMISSION OF BID PRICE. NO ADDITIONAL PAYMENT WILL BE

MADE FOR CLAIMS THAT ARISE FROM LACK OF KNOWLEDGE OF EXISTING CONDITIONS.

2. ALL FINISHES SHALL COMPLY WITH AND BE INSTALLED IN ACCORDANCE WITH ALL APPLICABLE

VA SPECIFICATIONS, LOCAL CODES AND ORDINANCES; IBC SECTIONS 803, 804 AND 805.

3. THE CONTRACTOR SHALL GUARANTEE ALL WORK AND MATERIALS FOR A MINIMUM OF TWELVE

(12) MONTHS AFTER THE DATE OF FINAL COMPLETION TO CONTRACTOR UNDER THE CONTRACT.

ANY ITEMS DEEMED TO BE DEFECTIVE SHALL BE REPLACED AT CONTRACTORS SOLE EXPENSE,

BUT AT OWNER'S OPTION AND CONVENIENCE, BE REPAIRED, REPLACED OR RE-PERFORMED.

4. ALL GYPSUM BOARD SOFFITS AND HEADERS WITHIN THE SCOPE LIMIT LINES TO BE PAINTED

SAME AS ADJACENT WALL COLOR UNLESS NOTED OTHERWISE.

5. FINISH DRAWINGS SUPERSEDE ARCHITECTURAL DRAWINGS FOR FINISH MATERIALS, COLORS

AND LOCATIONS ONLY.

6. FINISH SAMPLES SHALL BE SUBMITTED TO COR FOR APPROVAL BEFORE PURCHASING AND

INSTALLATION. PRODUCT SPECIFICATION SUBMITTALS SHALL BE DELIVERED TO THE COR FOR

ANY AND ALL MATERIALS BEFORE INSTALLATION. IF MATERIAL IS INSTALLED WITHOUT A

SUBMITTAL, DEMOLITION OF INSTALLED MATERIAL MAY BE REQUESTED BY VA, AT NO EXPENSE

TO THE VA.

7. FINAL COUNTERTOP GROMMET LOCATIONS TO BE FIELD VERIFIED.

FLOORING NOTES:

1. CONTRACTOR IS TO FIELD VERIFY ALL EXISTING CONDITIONS AND NOTIFY COR OF ANY

DISCREPANCIES.

2. PROVIDE NEW RUBBER BASE AND FLOOR COVERINGS AS SPECIFIED THROUGHOUT.

CONTRACTOR TO PREP FLOORS AS NECESSARY FOR NEW FINISHES.

3. CONTRACTOR TO PROVIDE TEMPORARY PROTECTION ON ALL NEW FLOORING.

4. CONTRACTOR TO CLEAR CAULK AT ALL DOOR FRAMES WHERE NEW RESILIENT FLOORING HAS

BEEN INSTALLED WITHIN SCOPE LIMITS.

5. TRANSITION AND REDUCING STRIPS ARE TO BE INSTALLED AT ALL CHANGES IN FLOOR MATERIAL

AND/OR ELEVATION THAT OCCURS IN AREAS TO BE NEWLY FINISHED. VERIFY WITH COR EACH

CONDITION AND TYPE OF TRANSITION AND/OR REDUCING STRIP TO BE USED PRIOR TO

INSTALLATION. FLOAT FLOOR AS REQUIRED FOR SMOOTH/FLUSH TRANSITION BETWEEN

MATERIAL CHANGES. TRANSITION TO BE INSTALLED AT CENTER OF DOOR.

WALL NOTES:

1. PREP WALLS FOR NEW FINISHES, PATCH AND REPAIR WALLS TO CREATE A SMOOTH UNIFORM

FINISH.

2. CONTRACTOR TO APPLY AT LEAST TWO COATS OF PAINT. EACH COAT TO BE EQUAL TO 1.6 MIL.

APPLY MORE IF NECESSARY TO COVER EXISTING COLOR.

3. CONTRACTOR IS TO PREP WALLS AS NECESSARY FOR NEW WALL BASE.

4. CONTRACTOR SHALL PAINT ALL MISC. METAL ITEMS SUCH AS ELECTRICAL PANEL COVERS,

COUNTERTOP SUPPORT BRACKETS, ELECTRICAL WIRE MOLD, ETC. TO MATCH ADJACENT WALL

COLOR. SEE WALL FINISH SCHEDULE.

SPECIAL

PROCEDURES

225A

CONTROL

ROOM

224A

MATERIAL: WSF-1

1. SEE DRAWING FOR FLOORING PATTERN.

2. UTILIZE WIDEST ROLLS SIZE AVAILABLE TO MINIMIZE SEAMING.

COR TO REVIEW SEAMING DIAGRAM.

MATERIAL: WSF-2

1. SEE DRAWING FOR FLOORING PATTERN.

2. UTILIZE WIDEST ROLLS SIZE AVAILABLE TO MINIMIZE SEAMING.

COR TO REVIEW SEAMING DIAGRAM.

MATERIAL: WSF-3

1. SEE DRAWING FOR FLOORING PATTERN.

2. UTILIZE WIDEST ROLLS SIZE AVAILABLE TO MINIMIZE SEAMING.

COR TO REVIEW SEAMING DIAGRAM.

AREA NOT IN CONTRACT

ULTRASOUND 2

227A

TOILET

228A-1

MAMMOGRAPHY

228A MECHANICAL ROOM

226A

OFFICE

229A

OFFICE

229A-1

OFFICE

230A

OFFICE

231A

STAIR

#2

SPECIAL

PROCEDURES

225A

CONTROL

ROOM

224A

CG-1

CG-1

CG-1

CG-1

CG-2

AI101

C 1

1/8" METAL COVE

STRIP (WSFCAP-1)

PARTITION: REFER TO

PLANS

HETEROGENEOUS SHEET / EPOXY

FLOORING W/ INTEGRAL BASE

STAINLESS STEEL FLOORING TRANSITION

EXISTING VCT FLOOR TILE NEW EPOXY / HETEROGENEOUS

SHEET FLOORING

NOTE: GC TO SELECT PROPER

SIZING. ENSURE SELECTION IS

ADA COMPLIANT.

/8

FEATHER JOINT

COMPOUND BOTH SIDES

5/8" GYP BOARD EACH SIDE

CONTINUOUS ALUMINUM

RETAINER

VINYL COVER

1 1/4" DRYWALL SCREWS

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .