528-19-108 Spec Proc Drawing Package.pdf
PDF 29 MB Posted
- Solicitation number
- 36C24222B0046
About this file
This scope of work document outlines the requirements for a construction project to prepare space at the Buffalo VA Medical Center for the installation of nuclear medicine equipment. The construction will fully renovate and perform site preparation according to the provided drawing package and specifications.
The contractor will be responsible for demolition and construction of building systems, equipment and finishes within a hospital. This includes adhering to infection control barriers and monitoring, coordinating with equipment vendors, performing rigging services for equipment installation, and assuming renovations will be needed for common building systems. The contractor must also ensure proper startup and commissioning of medical equipment.
The contractor must provide personnel, materials, services, facilities, submittals, meetings, status reports and more in accordance with the detailed requirements in the general, construction, verification, delivery and records management sections. A quality assurance/quality control plan is required and final functional verification of the installed equipment will be conducted jointly before acceptance. The period of performance is not to exceed 8 months.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Datamate (1).jpg | JPG image | |
| 36C24222B0046 0002.docx | DOCX document | |
| Liebert Challenger 3000 (1).jpg | JPG image | |
| Datamate.jpg | JPG image | |
| Liebert Challenger 3000.jpg | JPG image | |
| 36C24222B0046 0001.docx | DOCX document | |
| 528-19-108 - Spec Proc Spec List BK-1.pdf | ||
| 36C24222B0046_2.docx | DOCX document | |
| WAGE RATES.pdf | ||
| 528-19-108 - Spec Proc Spec List BK-2.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
A
/1
/2
:3
:0
P
M
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANTS
321 4 5 6 7 8 9 10
U.S. Department of Veterans Affairs
LIST OF DRAWINGS
PROJECT CONTACT DIRECTORY
LOCATION MAP
CONTRACTING OFFICER REPRESENTATIVE (COR) ARCHITECT / MEP/FP & STRUCTURAL ENGINEERS acela architects + engineers, pc 2633 Moravian Avenue Allentown, PA 18103
Joseph L. Herman, AIA, NCARB, LEED AP Cell: (610) 417-7850 jherman@acela-ae.com
APPROVALS
PROJECT INFORMATION
CONTRACT OFFICER/SPECIALIST
GI001
COVER SHEET
11/22/2021 JLH ACELA
BUFFALO VA MEDICAL CENTER
528-19-1082ND FLOOR SPECIAL
PROCEDURES SITE
PREPARATIONS
2ND FLOOR SPECIAL PROCEDURES
SITE PREPARATIONS
BUFFALO VA MEDICAL CENTER
BID DOCUMENTS (100%)
3495 Bailey Avenue Buffalo, NY 14215
Zachary Reisdorf zachary.reisdorf@va.gov Office: (716) 834-9200 x2803 Cell: (716) 208-2320
VA Project Number: 528-19-108
Approved by Medical Center Director
Approved by Project COR
Approved by Infection Control
Approved by Project CO
Approved by Director of Facility Management Service
Approved by Medical Director
Approved by Safety Office
Shaun Maines shaun.maines@va.gov Office: (716) 862-7461 x22470
VA WESTERN NEW YORK
HEALTHCARE SYSTEM,
BUFFALO VA CAMPUS
ARCHITECTURAL ELEMENTS SHEET LIST
6 AE101 2ND FLOOR - NEW WORK PLANS
7 AE102 INTERIOR ELEVATONS, SECTIONS & DETAILS
GENERAL CONTRACT SHEET LIST
4 GC101 2ND FLOOR - ICRA CONTROL PLAN
GENERAL INFORMATION SHEET LIST
1 GI001 COVER SHEET
2 GI002 GENERAL INFORMATION
3 GI201 2ND FLOOR - LIFE SAFETY PLAN
ARCHITECTURAL DEMOLITION SHEET LIST
5 AD101 2ND FLOOR - DEMOLITION PLANS
INTERIOR FINISH ELEMENTS SHEET LIST
8 AI101 2ND FLOOR - SCHEDULED FINISH LEGEND, FINISH PLANS & DETAILS
ARCHITECTURAL EQUIPMENT SHEET LIST
9 Q101 2ND FLOOR - EQUIPMENT PLAN
STRUCTURAL SHEET LIST
15 SF100 STRUCTURAL NOTES
16 SF101 PARTIAL 2ND AND 3RD FLOOR FRAMING PLANS
17 SF102 ENLARGED 2ND AND 3RD FLOOR FRAMING PLANS, SECTIONS AND
DETAILS
EQUIPMENT SHEETS
10 QJ101 GE SHEETS - 225A
11 QJ102 GE SHEETS - 225A
12 QJ103 GE SHEETS - 225A
13 QJ104 GE SHEETS - 225A
14 QJ105 GE SHEETS - 225A
Revisions: Date:
FIRE PROTECTION SHEET LIST
18 F001 FIRE PROTECTION GENERAL NOTES AND DETAILS
19 F101 SECOND FLOOR FIRE PROTECTION DEMO AND NEW WORK PLANS
PLUMBING SHEET LIST
20 P001 PLUMBING ABBREVIATIONS, NOTES AND LEGENDS
21 PD101 SECOND FLOOR PLUMBING DEMOLITION PLANS
22 PN101 SECOND FLOOR PLUMBING NEW WORK PLANS
MECHANICAL SHEET LIST
23 M001 MECHANICAL ABBREVIAITONS, NOTES, LEGENDS AND SCHEDULES
24 M101 SECOND FLOOR DEMOLITION & NEW WORK PLANS
25 M201 MECHANICAL DETAILS
26 M202 MECHANICAL DETAILS
ELECTRICAL SHEET LIST
27 E001 ELECTRICAL ABBREVIATIONS, NOTES AND LEGENDS
28 E101 2ND FLOOR POWER DEMOLITION AND NEW WORK PLANS
29 E201 2ND FLOOR LIGHTING DEMOLITION AND NEW WORK PLANS
30 E601 SINGLE-LINE DIAGRAM, PANEL SCHEDULE AND DETAILS
NY LIC. NO.:
043141
CENTER LINE
DETAIL INDICATOR
DIMENSION LINE
NEW DOOR OPENING / BORROWED LIGHT IDENTIFIER
- SEE DOOR SCHEDULE, DETAILS AND ELEVATIONS SHEET
DRAWING BLOCK TITLE, TYPICAL
BUILDING SECTION INDICATOR
TYPICAL DETAIL INDICATOR
COLUMN NUMBER
GENERAL CONSTRUCTION KEYNOTE TAG
WALL OR PARTITION TYPE
FIRE EXTINGUISHER CABINET
CORNER GUARD
NORTH ARROW
CG
FEC
DETAIL NUMBER
SHEET NUMBER
XX-XX
1"
XX-XX
CL
XX-XX
x'-x"
SPOT ELEVATION
1 REVISION
REVISION CLOUD
BREAK LINE
DD ROOM TAG - ROOM NAME AND NUMBER
X
EXISTING DOOR OPENING
View Name 1/8" = 1'-0"
Room name
N
PROJECT
NORTH
1/8" = 1'-0"
0' 8'4' 16'2'
GRAPHIC SCALE
X INTERIOR SIGNAGE TAG
DOOR TAG
E###
DOOR TAG
REFLECTED CEILING KEYNOTE TAGX
ELEVATION INDICATOR- 1
SHEET NUMBER
ELEVATION NUMBER
WOOD
WOOD FINISH
ALUMINUM
STEEL
EARTH
GYPSUM - PLASTER
MASONRY - CONCRETE BLOCK
RIGID INSULATION
BATT INSULATION
PLYWOOD
CONCRETE
EXISTING CONSTRUCTION TO REMAIN
EXISTING CONSTRUCTION TO BE REMOVED
& AND
@ AT
C CENTERLINE
# NUMBER
AB ANCHOR BOLT
ABV ABOVE
ACT ACOUSTIC CEILING TILE
AD AREA DRAIN
ADA AMERICANS WITH
DISABILITIES ACT
ADJ ADJUSTABLE
AFF ABOVE FINISHED FLOOR
AHU AIR HANDLING UNIT
AIA AMERICAN INSTITUTE OF
ARCHITECTS
ALUM ALUMINUM
ALT ALTERNATE
AP ACCESS PANEL
APPROX APPROXIMATE
ARCH ARCHITECTURAL
AT ACOUSTIC TILE
AUTO AUTOMATIC
AVG AVERAGE
BD BOARD
BLDG BUILDING
BLK BLOCK
BM BEAM
BMPR BUMPER
BOT BOTTOM
BRG BEARING
BEL BELOW
BR BUMPER RAIL
BRK BRICK
C CONCRETE
CAB CABINET
CB CATCH BASIN
CEM CEMENT
CCT CUBICLE CURTAIN TRACK
CG CORNER GUARD
CI CAST IRON
CIP CAST IN PLACE
CJ CONTROL JOINT
CT CERAMIC TILE
CLG CEILING
CL CLOSET
COL COLUMN
CONC CONCRETE
CONF CONFERENCE
CONT CONTINUOUS
CPT CARPET
CU CUBIC
DBL DOUBLE
DEMO DEMOLITION
DEPT DEPARTMENT
DET DETAIL
DF DRINKING FOUNTAIN
DIA DIAMETER
DIM DIMENSION
DISP DISPENSER
DN DOWN
DO DOOR OPENING
DOZ DOZEN
DP DAMPPROOFING
DR DOOR
DWG DRAWING
DWGS DRAWINGS
DWR DRAWER
E EAST
EA EXHAUST AIR, EACH
EL ELEVATION
ELEV ELEVATION
ELEC ELECTRICAL
EMER EMERGENCY
ENCL ENCLOSURE
ENGR ENGINEER
EP ELECTRICAL PANELBOARD
EPY EPOXY
EQ EQUAL
EQUIP EQUIPMENT
EWC ELECTRIC WATER COOLER
EWS EYE WASH STATION
EXP EXPANSION
EJ EXPANSION JOINT
EXIST EXISTING
EXT EXTERIOR
FA FIRE ALARM
FB FACE BRICK
FD FLOOR DRAIN
FDC FIRE DEPARTMENT
CONNECTION
FDN FOUNDATION
FE FIRE EXTINGUISHER
FEC FIRE EXTINGUISHER
CABINET
FF FINISH FACE
FHC FIRE HOSE CABINET
FIN FINISH
FLR FLOOR
FLUOR FLUORESCENT
FO __ FACE OF __
FOC FACE OF CONCRETE
FOS FACE OF STUD
FOW FACE OF WALL
FPRF FIREPROOF(ING)
FR FIRE RATING, FRAME
FRMG FRAMING
FS FULL SIZE
FT FOOT OR FEET
FTG FOOTING
FUR FURRING
FUT FUTURE
GC GENERAL CONTRACTOR
GA GAUGE
GAL GALLON
GALV GALVANIZED
GALV STL GALVANIZED STEEL
GB GRAB BAR
GC GENERAL CONTRACTOR
GD GUARD
GL GLASS
GND GROUND
GR GRADE
GWB GYPSUM WALLBOARD
GYP BD GYPSUM WALLBOARD
HB HOSE BIBB
HC HOLLOW CORE
HD HEAD
HDPL HIGH DENSITY PLASTIC LAMINATE
HDWR HARDWARE
HDWD HARDWOOD
HT HEIGHT
HDRL HANDRAIL
HM HOLLOW METAL
HMD HOLLOW METAL DOOR
HMF HOLLOW METAL FRAME
HR HANDRAIL
HO HOLD OPEN
HORIZ HORIZONTAL
HP HIGH POINT
HR HOUR
HVAC HEATING, VENTILATION, AIR
CONDITIONING
IBC INTERNATIONAL BUILDING CODE
ID IDENTIFICATION, INSIDE
DIAMETER / DIMENSION
IN INCH
INCL INCLUDE(D)
INSUL INSULATION
INT INTERIOR
INV INVERT
JAN JANITOR
JST JOIST
JT JOINT
KP KICK PLATE
KO KNOCKOUT
L LENGTH
LAB LABORATORY
LAM LAMINATE
LAV LAVATORY
LBS POUND
LED LIGHT EMITTING DIODE
LF LINEAR FEET
LH LEFT HAND
LIN LINEAR
LIQ LIQUID
LKR LOCKER
LG LONG
LL LEAD LINED
LLV LONG LEG VERTICAL
LP LOW POINT
LRG LARGE
LT LIGHT
LT WT LIGHTWEIGHT
LVR LOUVER
LVT LUXURY VINYL TILE
MAT WALK-OFF CARPET
MATL MATERIAL
MAS MASONRY
MAX MAXIMUM
MECH MECHANICAL
MTL METAL
MFR MANUFACTURER
MH MANHOLE
MIN MINIMUM
MISC MISCELLANEOUS
MO MASONRY OPENING
MP MOP PLATE
MTD MOUNTED
N NORTH
NA NOT APPLICABLE
NEC NATIONAL ELECTRICAL CODE
NEG NEGATIVE
NFC NATIONAL FIRE CODE
NFPA NATIONAL FIRE PROTECTION
ASSOCIATION
NIC NOT IN CONTRACT
NO NUMBER
NOM NOMINAL
NTS NOT TO SCALE
OA OVERALL
OC ON CENTER
OD OUTSIDE DIAMETER / DIMENSION
OFF OFFICE
OH OPPOSITE HAND
OPNG OPENING
OPP OPPOSITE
OH OVERHEAD
OZ OUNCE
P PAINT
PAV PAVING
PC PRECAST CONCRETE
PL PLATE
PLAM PLASTIC LAMINATE
PLAS PLASTER
PLYWD PLYWOOD
PLBG PLUMBING
PMF PREMOLDED FILLER
PR PAIR
PT POINT
PT PORCELAIN TILE
PTN PARTITION
QT QUARRY TILE
R RADIUS, RISER
RA RETURN AIR
RAD RADIUS
RB RESILIENT BASE, RUBBER
BASE
RD ROOF DRAIN
RL ROOF LEADER
REF REFERENCE
REFR REFRIGERATOR
REQ'D REQUIRED
REV REVISION
RFI REQUEST FOR
INFORMATION
RFP REQUEST FOR PROPOSAL
RH RIGHT HAND
RM ROOM
RO ROUGH OPENING
RT RUBBER TILE
S SOUTH
S SOLID SURFACE
SA SUPPLY AIR
SAN SANITARY
SC SOLID CORE
SCHED SCHEDULE
SECT SECTION
SH SPRINKLER HEAD
SHT SHEET
SIM SIMILAR
SM SMOKE
SPEC SPECIFICATION
SPKR SPEAKER
SQ SQUARE
STA STATION
STD STANDARD
STO STORAGE
STL STEEL
SS STAINLESS STEEL
STOR STORAGE
STRUCT STRUCTURAL
SUSP SUSPENDED
SYM SYMMETRICAL
SYS SYSTEM
T TREAD
TEL TELEPHONE
TEMP TEMPERED
T&G TONGUE AND GROOVE
THK THICK
TOC TOP OF CONCRETE
TOP TOP OF PAVEMENT
TOS TOP OF STEEL
TOW TOP OF WALL
TRAN TRANSITION
TV TELEVISION
TYP TYPICAL
UNFIN UNFINISHED
UON UNLESS OTHERWISE
NOTED
VB VAPOR BARRIER
VERT VERTICAL
VCT VINYL COMPOSITION TILE
VIF VERIFY IN FIELD
VTR VET THRU ROOF
W WEST
W/ WITH
WD WOOD
W/O WITHOUT
WP WATERPROOF
WP WALL PROTECTION
WRS WINDOW ROLLER SHADE
WT WEIGHT
WWF WELDED WIRE FRAME
NOTE: ALL ABBREVIATIONS SHOWN MAY NOT BE
USED ON THIS PROJECT. CERTAIN COMMON
ABBREVIATIONS MAY NOT BE SHOWN. SEE
MATERIAL LEGEND FOR INTERIOR FINISH
ABBREVIATIONS.
1. ALL DIMENSIONS OF NEW PARTITIONS/BARRIERS SHALL BE TAKEN TO FACE OF STUD. DIMENSIONS TO EXISTING WORK SHALL BE TAKEN TO
FACE OF FINISH SURFACE.
2. DO NOT SCALE DRAWINGS. DRAWINGS ARE CONCEPTUAL PLANS.
3. THE WORK OF THE CONTRACTOR SHALL INCLUDE ALL LABOR AND MATERIALS FOR ALL TRADES CONCERNED FOR COMPLETING THE PROJECT
IN ACCORDANCE WITH THE DRAWINGS AND SPECIFICATIONS.
4. THE CONTRACTOR SHALL PROCURE, COMPLETE AND APPLY FOR ALL PERMITS AS REQUIRED TO CONSTRUCT THE PROJECT.
5. THE CONTRACTOR SHALL BE FAMILIAR WITH THE CONTRACT DOCUMENTS AND MUST VISIT THE SITE AND BE ACQUAINTED WITH THE
CONDITIONS AFFECTING THE WORK.
6. WORKMANSHIP. ALL WORK TO BE FIRST RATE, HIGH QUALITY, AND ACCOMPLISHED IN A WORKMANLIKE MANNER BY SKILLED CRAFTSMEN
USING ACCEPTED PRACTICES AND METHODS APPROPRIATE TO THE TRADE INVOLVED.
7. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE DAILY CLEANING UP OF THE WORK AREA. THE AREA SHALL BE CLEANED EACH DAY AND TRASH SHALL BE DISPOSED OF AT THE END OF EACH DAY. AT THE END OF THE PROJECT, THE CONTRACTOR SHALL CLEAN THE WORK AREA
THOROUGHLY.
8. ALL WORK SHALL BE GUARANTEED FOR ONE YEAR FROM THE TIME OF ACCEPTANCE BY THE OWNER UNLESS OTHERWISE NOTED IN THE
SPECIFICATIONS.
9. ALL PLUMBING WORK SHALL CONFORM TO THE ADOPTED EDITION OF THE INTERNATIONAL PLUMBING CODE. INSTALL ALL WATER, WASTE AND VENT PIPING IN ACCORDANCE WITH ALL APPLICABLE CODES. REVIEW DRAWINGS AND PROVIDE ALL WORK FOR A COMPLETE AND OPERABLE SYSTEM, INCLUDING ALL INCIDENTALS, REQUIRED BY CODE AGENCIES AND LOCAL GOVERNING BODIES.
IBC - 2018
VA PLUMBING DESIGN GUIDE - 2021
10. PRIOR TO START OF CONSTRUCTION, CONTRACTOR SHALL VERIFY ALL BUILDING CONDITIONS, COORDINATE ALL DIMENSIONS IN FIELD AND
VERIFY ALL LOCATIONS OF UTILITIES IN THE FIELD.
11. ALL HEATING, VENTILATING AND AIR CONDITIONING WORK SHALL CONFORM TO THE ADOPTED EDITION OF THE INTERNATIONAL MECHANICAL AND ENERGY CODES (AS APPLICABLE), STATE CODES, AND ANY REQUIREMENTS OF THE LOCAL AUTHORITIES HAVING JURISDICTION.
IBC - 2018
NFPA 70 - 2020
NFPA 90A - 2021
NFPA 99 - 2021
NFPA 101 - 2021
VA HVAC DESIGN GUIDE - 2020
13. THE COMPLETE ELECTRICAL SYSTEM AND INSTALLATION SHALL COMPLY AND CONFORM TO ALL ADOPTED CODES, REGULATIONS OF THE NATIONAL ELECTRICAL CODE AS WELL AS TO ALL STATE AND LOCAL LAWS, ORDINANCES AND CODES.
IBC - 2018
NFPA 101 - 2021
VA ELECTRICAL DESIGN GUIDE - 2019
VA ELECTRICAL DESIGN MANUAL FOR REPLACEMENT HOSPITALS, CLINICAL ADDITIONS, ENERGY CENTERS, AND LABORATORY
BUILDINGS - 2015
VA LIGHTING DESIGN MANUAL - 2008
VA RADIOLOGY DESIGN MANUAL - 2008
VA PHYSICAL SECURITY DESIGN MANUAL FOR LIFE SAFETY PROTECTED FACILITIES - 2015
14. THE COMPLETE FIRE PROTECTION SYSTEM AND INSTALLATION SHALL COMPLY AND CONFORM TO ALL ADOPTED CODES, REGULATIONS OF THE NATIONAL FIRE PROTECTION CODE AS WELL AS TO ALL STATE AND LOCAL LAWS, ORDINANCES AND CODES.
IBC - 2018
NFPA 101 - 2021
NFPA 13 - 2019
NFPA 72 - 2021
VA FIRE PROTECTION DESIGN GUIDE - 2021
1. SPACES AROUND THE PROJECT AREAS WILL BE OCCUPIED DURING PERFORMANCE OF WORK. IMMEDIATE AREAS OF ALTERATIONS WILL BE VACATED. ALL CONTRACTOR WORK WILL BE PERFORMED DURING NORMAL DAYTIME WORKING HOURS UNLESS INDICATED. ALL TEMPORARY SYSTEM SHUTDOWNS WILL OCCUR DURING 2ND SHIFT OR WEEKENDS AND COORDINATED AND APPROVED BY THE PROJECT COR.
2. BEFORE STARTING WORK WITHIN AN OCCUPIED AREA, THE CONTRACTOR WILL BE RESPONSIBLE TO SET-UP TEMPORARY/PERMANENT CONSTRUCTION/ICRA BARRIERS WITH ANTEROOM AND MAINTAIN NEGATIVE AIR PRESSURE. ALL TEMPORARY CONSTRUCTION BARRIERS OUTSIDE THE INDICATED CONSTRUCTION PHASE AREA WILL BE REMOVED AT THE CONCLUSION OF THE WORK SHIFT. THE CONTRACTOR WILL BE RESPONSIBLE TO CLEAN AND PREPARE THE AREA TO BE OCCUPIED BY MEDICAL CENTER STAFF AND PATIENTS.
3. DIMENSIONS SUPERSEDE DRAWINGS. DO NOT SCALE PLANS. DIMENSIONS ARE TO THE FACE OF EXISTING MATERIALS UNLESS OTHERWISE NOTED. DIMENSIONS AND ELEVATIONS SHALL BE VERIFIED AT THE SITE BEFORE PROCEEDING WITH THE WORK. NOTIFY THE ARCHITECT IMMEDIATELY OF ANY DISCREPANCIES. THE CONTRACTOR SHALL VERIFY ALL EXISTING CONDITIONS, DIMENSIONS, AND MATERIALS REQUIRED FOR THE CONTRACTED WORK. REPORT ALL DISCREPANCIES TO ARCHITECT PRIOR TO FABRICATIONS AND ERECTION.
4. IT IS SOLELY THE CONTRACTOR'S RESPONSIBILITY TO FOLLOW ALL APPLICABLE SAFETY CODES AND REGULATIONS DURING ALL PHASES OF CONSTRUCTION. ALL CONSTRUCTION WORK SHALL BE PERFORMED IN CONTRACTOR'S RESPONSIBILITY TO DETERMINE CONSTRUCTION PROCEDURES AND SEQUENCE AND TO INSURE THE SAFETY OF THE BUILDING AND ITS COMPONENT PARTS DURING CONSTRUCTION SHALL PROVIDE ADEQUATE SHORING AND BRACING DURING DEMOLITION AND CONSTRUCTION TO SUPPORT LOADS. SUCH MATERIAL SHALL BE REMOVED AT THE COMPLETION OF WORK AND SHALL REMAIN THE CONTRACTOR'S PROPERTY AFTER THE COMPLETION OF THE PROJECT.
5. DO NOT CUT AND PATCH STRUCTURAL ELEMENTS IN A MANNER THAT WOULD REDUCE THEIR LOAD CARRYING CAPACITY OR LOAD-DEFLECTION
RATIO.
6. WHERE EXISTING CONSTRUCTION, EQUIPMENT, ETC. IS REQUIRED TO BE REMOVED, RESTORE EXPOSED FINISHES OF CUT AND PATCHED AREAS AND EXTEND FINISH RESTORATION INTO ADJOINING CONSTRUCTION IN A MANNER THAT WILL ELIMINATE EVIDENCE OF PATCHING AND REFINISHING. CUT EXISTING CONSTRUCTION USING METHODS LEAST LIKELY TO DAMAGE ELEMENTS TO BE RETAINED OR ADJOINING CONSTRUCTION. WHERE INDICATED TO REMOVE FINISHES, REMOVE SO TOTALLY, FROM PLANE TO PLANE, TREAT REMAINING SUBSURFACE TO
RECEIVE NEW FINISHES DESIGNATED.
7. WHERE EXISTING CONSTRUCTION, EQUIPMENT, ETC. SHOWN TO BE RELOCATED SHALL BE COORDINATED BY THE CONTRACTOR WITH THE VA PRIOR TO START OF WORK IN EACH AREA. THE VA WILL REMOVE ALL ITEMS OF SALVAGEABLE VALUE, INCLUDING BUT NOT LIMITED TO DOORS, HARDWARE, MOVEABLE EQUIPMENT NOT ALREADY DESIGNATED FOR REINSTALLATION/REUSE, PRIOR TO CONTRACTOR COMMENCING WORK.
8. WHERE EXISTING PARTITIONS HAVE BEEN REMOVED OR NEW SERVICES PENETRATE EXISTING SURFACES, THE OPENINGS SHALL BE PATCHED
TO MATCH THE EXISTING ADJACENT SURFACES FINISH, TEXTURE AND SHEEN.
9. WHERE EXISTING PARTITIONS HAVE BEEN REMOVED OR NEW SERVICES PENETRATE EXISTING SURFACES, THE OPENING SHALL BE PATCHED
TO MATCH THE EXISTING ADJACENT SURFACES FINISH, TEXTURE AND SHEEN.
10. IN GENERAL, WHEREVER SERVICES ARE REMOVED, THE OPENINGS SHALL BE PATCHED TO MATCH THE EXISTING ADJACENT SURFACES FINISH TEXTURE AND SHEEN. WHERE REMOVAL OF EXISTING CONSTRUCTION, PIPING, DUCTWORK AND OTHER ITEMS CREATES OPENINGS IN THE WALLS, FLOORS OR CEILINGS, PATCH OPENINGS IMMEDIATELY WITH THE SAME MATERIALS AS ADJACENT CONSTRUCTION. MAINTAIN THE REQUIRED FIRE RATING. SEE MEP DRAWINGS FOR ADDITIONAL INFORMATION. FILL IN ALL EXISTING OPENINGS THAT ARE NOT TO REMAIN, UNLESS OTHERWISE NOTED. FINISH TO MATCH FINISH OF ADJACENT SURFACE.
11. WHERE CODED NOTE DESIGNATIONS ARE SHOWN AS "TYP" OR "TYPICAL" IT IS INTENDED THAT THE NOTE GENERALLY REFERS TO ALL SIMILAR
ITEMS OR SURFACES.
12. A HAZARDOUS MATERIALS SURVEY WAS CONDUCTED BY THE ARCHITECT OF RECORD. THE RESULTS OF THE SAMPLES TAKEN ARE INCLUDED WITHIN THE CONSTRUCTION DOCUMENTS AND A COPY OF REPORT IS INCLUDED WITH THE SPECIFICATIONS. IT IS THE CONTRACTORS RESPONSIBILITY TO TAKE PROTECTIVE MEASURES FOR ITS WORKERS PRIOR TO THE BEGINNING OF ANY RENOVATION OR DEMOLITION WORK.
13. AFTER COMPLETION OF DEMOLITION, SCHEDULE A WALK-THROUGH WITH THE COR AND ARCHITECT FOR REVIEW OF EXISTING CONDITIONS.
14. PATCH AND FIRE STOP EXISTING ABANDONED PENETRATIONS THROUGH THE CONCRETE FLOORS AND WALLS.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANTS
321 4 5 6 7 8 9 10
C U s e rs \a k a n u s k y \D o c u m e n ts
\2
-U S
D V
A -0
A
R C
H a k a n u s k y V
B N
S Y
.r v t
/2 /2
:2
:1
A M
GI002
GENERAL INFORMATION
11/22/2021 JLH ACELA
BUFFALO VA MEDICAL CENTER
528-19-1082ND FLOOR SPECIAL
PROCEDURES SITE
PREPARATIONS
BID DOCUMENTS (100%)
ARCHITECTURAL SYMBOLS MATERIAL LEGENDARCHITECTURAL ABBREVIATIONS
GENERAL NOTES - NEW CONSTRUCTION
GENERAL NOTES - GENERAL CONDITIONS
Revisions: Date:
043141 Page 2 of 30
200E-4
200E-5
200E-6
218E-3 219-E 201E-1
221-E
201E-2
218-E
201E-3
217-E
ST-42
218E-2
218E-1
217E-2
217E-1
MRI
214E
SIGNAL
ROOM
215-E
EQUIPMENT
ROOM
214E
212-E
212E-1
210E-1
210-E
CONTROL
ROOM
ELECTRICAL
ROOM
213E
204-E
202-E 203-E
203E-1
205-E
206-E
207-EMECH
ROOM
210A-1
QUALITY
CONTROL
210-A
222-A
222A-1
234-A
235-A
236-A
237-A
238-A
238A-2
238A-1
#3
240-A
200A-2
239-A
201-2
204-A
200-A
206-A
207-A
200-E
CT SCAN
ROOM
211A
200E-6
213-E
213E-1
211-E
211E-1
209-E209E-1
205-E
206-E
207-E
208-E
216-A215-A
200A-3
RADIOGRAPHIC
220A
RADIOGRAPHIC
219A
TOILET
219A-1
CONTROL
219A-2
4 5
"A" WING
GENERAL NOTES
A. PARTITIONS SHALL BE TYPE A1 UNLESS NOTED OTHERWISE.
B. REFER TO SPECIFICATIONS AND PARTITION TYPE SCHEDULE FOR ADDITIONAL NOTES.
C. NEW PARTITIONS ARE DIMENSIONED TO FACE OF METAL STUD OR MASONRY UNLESS NOTED
OTHERWISE.
D. EXISTING PARTITIONS ARE DIMENSIONED TO FINISH FACE UNLESS NOTED OTHERWISE.
FIRE RATING LEGEND
SYMBOL
(NUMBER SHOWS OPENING RATING) BARRIER OPENING RATING
CORRIDOR
POSITIVE LATCH DOOR HARDWARE
(EXISTING SMOKE BARRIER)
EXISTING EXISTING
NOTE: FOR SCHEDULED OPENINGS WHERE SMOKE AND FIRE SEPARATIONS
COINCIDE,THE MORE STRINGENT FIRE RATING SHALL APPLY. REFER TO THE
PARTITION SCHEDULE FOR FIRE RESISTIVE REFERENCES.
FIRE EXTINGUISHER
ESM ESM
E90 E90
EXIT LIGHT SIGNAGE
INDICATES COMMON PATH OF TRAVEL TO POINT OF DECISION
INDICATES PATH OF TRAVEL TO POINT OF EXIT
(FROM COMMON PATH OF TRAVEL)
STARTING POINT
GENERAL AREA OF WORK
N
PLAN
NORTH
E90
STAIR
.3"/OCC
CODE MIN:
PROVIDED:
(E)
(18)
36"
42"
8"
C O
M M
O N
P A
T H
7'
STAIR #2
DOOR
.2"/OCC
CODE MIN:
PROVIDED:
(E)
(18)
32"
42"
5"
CORRIDOR
.2"/OCC
CODE MIN:
PROVIDED:
(E)
(18)
44"
96"
5"
151 SF
MECHANICAL
ROOM
156 SF
CONTROL
ROOM
352 SF
SPECIAL
PROCEDURES
PLAN NOTES:
1. SEE ELECTRICAL PLANS FOR EMERGENCY LIGHTS, SMOKE
DETECTORS, ETC...
C O
M M
O N
P A
T H
8'
COMMON PATH 19'-0"
EXISTING AREA
E90
E
STAIR #3STAIR
.3"/OCC
CODE MIN:
PROVIDED:
(E)
(18)
36"
42"
8"
DOOR
.2"/OCC
CODE MIN:
PROVIDED:
(E)
(18)
32"
42"
5"
EXISTING AREA
EXISTING AREA
E90
E90
E90
E90
E
E
STAIR #1
STAIR #42
E90
E90
E
E
STAIR
.3"/OCC
CODE MIN:
PROVIDED:
(E)
(18)
36"
42"
8"
DOOR
.2"/OCC
CODE MIN:
PROVIDED:
(E)
(18)
32"
38"
5"
CORRIDOR
.2"/OCC
CODE MIN:
PROVIDED:
(E)
(18)
44"
100"
5"
STAIR
.3"/OCC
CODE MIN:
PROVIDED:
(E)
(18)
36"
42"
8"
DOOR
.2"/OCC
CODE MIN:
PROVIDED:
(E)
(18)
32"
32"
5"
CORRIDOR
.2"/OCC
CODE MIN:
PROVIDED:
(E)
(18)
44"
96"
5"
E90
ESM
ESM
ESM
P A
T H
O F
T R
A V
E L
T O
S T
A
IR
'-0
P
A T
H O
F T
R A
V E
L T
O S
T A
IR
'-0
E90
E90 E90
ESM
E S
M
E S
M
E90
E90
E90
EXIT CAPACITIES LEGEND
DOORS
DOOR
.2"/OCC
CODE MIN:
PROVIDED:
32"
WIDTH PER OCCUPANT (NFPA T 7.3.3.1)
OCCUPANTS (AREA/OCCUPANCY LOAD FACTOR)
MIN. WIDTH (0.2" X OCCUPANCY)
CODE MIN (18 IBC 1010.1.1)
CLEARANCE PROVIDED
CLEARANCE SHOWN W/ DOOR OPEN 90° BETWEEN STOP & OPEN DOOR FACE
CORRIDORS
WIDTH PER OCCUPANT (NFPA T 7.3.3.1)
OCCUPANTS (AREA/OCCUPANCY LOAD FACTOR)
MIN. WIDTH (0.2" X OCCUPANCY)
CODE MIN (2018 NFPA 39.2.3.2)
CLEARANCE PROVIDED
CLEARANCE SHOWN BETWEEN FACE OF WALLS
STAIRS
WIDTH PER OCCUPANT (NFPA T 7.3.3.1)
OCCUPANTS (AREA/OCCUPANCY LOAD FACTOR)
MIN. WIDTH (0.3" X OCCUPANCY)
CODE MIN (18 IBC 1010.1.1)
CLEARANCE PROVIDED
* 2018 NFPA TABLE 7.2.2.2.1.1(b) EXISTING STAIRS
CORRIDOR
.2"/OCC
CODE MIN:
PROVIDED:
44"
STAIR
.3"/OCC
CODE MIN:
PROVIDED:
36" *
(2021 NFPA 101, TABLE 7.3.1.2 OCCUPANT LOAD FACTOR)
OCCUPANT LOAD FACTORS
SPACE FUNCTION SF/OCCUPANT
AMBULATORY HEALTH CARE 150 GROSS
DESIGN CODE
2021 NFPA 101 LIFE SAFETY CODE
CHAPTER 6: CLASSIFICATION OF OCCUPANCY AND HAZARD OF CONTENTS
6.1.5 HEALTH CARE - EXISTING. CHAPTER 19.
FIRE SUPPRESSION: FULLY SPRINKLERED
CHAPTER 19: EXISTING HEALTH CARE OCCUPANCIES
CONSTRUCTION TYPE LIMITATIONS (TABLE 19.1.6.1)
CONSTRUCTION TYPE: II (222)
FIRE RESISTANCE REQUIREMENTS
PRIMARY STRUCTURE FRAME 2-HOURS (EXISTING)
BEARING WALLS EXTERIOR 2-HOURS (EXISTING)
BEARING WALLS INTERIOR 2-HOURS (EXISTING)
NONBEARING WALLS 0
NONBEARING WALLS INTERIOR 0
FLOOR CONSTRUCTION 2-HOURS (EXISTING)
STAIRWELL EGRESS 2-HOURS (EXISTING)
SECOND FLOOR:
CONTROL ROOM 156 SF (EXISTING)
SPECIAL PROCEDURES 352 SF (EXISTING)
MECHANICAL 151 SF (EXISTING)
19.2.5 ARRANGEMENT OF MEANS OF EGRESS.
19.2.5.3 DEAD-END CORRIDORS: NOT TO EXCEED 30'-0"
19.2.5.7 HEALTH CARE SUITES.
19.2.5.7.3.3 (A) TRAVEL DISTANCE WITHIN A PATIENT CARE NONSLEEPING SUITE TO AN EXIT ACCESS DOOR TO ANOTHER SUITE, AN EXIT ACCESS CORRIDOR DOOR, OR A HORIZONTAL EXIT DOOR FROM THE
SUITE SHALL NOT EXCEED 100'-0".
19.2.5.7.3.3 (B) TRAVEL DISTANCE BETWEEN ANY POINT IN A NONSLEEPING SUITE AND AN EXIT SHALL NOT EXCEED 200'-0" IN A BUILDING PROTECTED THROUGHOUT BY AN APPROVED ELECTRICALLY
SUPERVISED SPRINKLER SYSTEM.
19.3.6.2 CONSTRUCTION OF CORRIDOR WALLS.
19.3.6.2.3 CORRIDOR WALLS SHALL FORM A BARRIER TO LIMIT THE TRANSFER OF SMOKE.
19.3.6.2.4 CORRIDOR WALLS SHALL BE PERMITTED TO TERMINATE AT OR ABOVE THE CEILING, BUT SHALL NOT BE REQUIRED TO EXTEND TO THE DECK ABOVE, WHERE THE CEILING IS CONSTRUCTED TO LIMIT
THE TRANSFER OF SMOKE.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANTS
321 4 5 6 7 8 9 10
C U s e rs \a k a n u s k y \D o c u m e n ts
\2
-U S
D V
A -0
A
R C
H a k a n u s k y V
B N
S Y
.r v t
/2 /2
:2
:2
A M
GI201
2ND FLOOR - LIFE SAFETY PLAN
11/22/2021 JLH ACELA
BUFFALO VA MEDICAL CENTER
528-19-1082ND FLOOR SPECIAL
PROCEDURES SITE
PREPARATIONS
BID DOCUMENTS (100%)
2ND FLOOR KEY PLAN
1/8" = 1'-0"1
SECOND FLOOR LIFE SAFETY PLAN
LIFE SAFETY CODE INFORMATION
Revisions: Date:
043141 Page 3 of 30
ULTRASOUND 2
227A
TOILET
228A-1
MAMMOGRAPHY
228A
MECHANICAL ROOM
226A
STAIR
#2
CONTROL ROOM
224A
ULTRASOUND 1
223A
OFFICE
229A
OFFICE
229A-1
OFFICE
230A
SPECIAL
PROCEDURES
225A
OFFICE
231A
3 421
9 10
CLEAR
5'-0"
T1
T1
T1
TD2
T1
T1
T1
TD1
CLEAR
5'-0"
T1
T1
T1
TD3
GENERAL AREA OF WORK
N
PLAN
NORTH
PRECAUTIONS DURING CONSTRUCTION
1. EXECUTE WORK BY METHODS TO MINIMIZE RAISING DUST FROM CONSTRUCTION OPERATIONS.
2. IMMEDIATELY REPLACE A CEILING TILE DISPLACED FOR VISUAL INSPECTION.
3. PROVIDE ACTIVE MEANS TO PREVENT AIRBORNE DUST FROM DISPERSING INTO ATMOSPHERE.
4. WATER MIST WORK SURFACES TO CONTROL DUST WHILE CUTTING DRY WALL FOR BARRIERS.
5. BLOCK OFF AND SEAL AIR VENTS IN THE CONSTRUCTION AREA.
6. PLACE TWO DUST MATS AT ENTRANCE AND EXIT OF WORK AREA.
7. REMOVE OR ISOLATE HVAC SYSTEM IN AREA WHERE WORK IS BEING DONE TO PREVENT
CONTAMINATION OF DUCT SYSTEM.
8. REMOVE CONSTRUCTION WASTE DAILY.
9. PROVIDE TEMPORARY 1 HR. FIRE BARRIER PARTITIONS AS INDICATED AND SEAL UNUSED DOORS AT PERIMETER OF THE WORK AREA WITH RED CONSTRUCTION SEAM TAPE TO SEAL AREA FROM NON-
WORK AREA BEFORE CONSTRUCTION BEGINS.
10. MAINTAIN NEGATIVE AIR PRESSURE WITHIN WORK SITE UTILIZING HEPA FILTER EQUIPPED AIR FILTRATION UNITS. COORDINATE LOCATION OF WINDOW AND ABOVE FLOOR PENETRATIONS WITH COR.
SPACE SHALL BE CONTINUOUSLY MONITORED. BALL IN THE WALL IS NOT ACCEPTABLE. PATCH FLOOR
PENETRATION AND REPLACE WINDOW GLAZING AFTER CONSTRUCTION AS REQUIRED TO MATCH
EXISTING.
11. CONTAIN CONSTRUCTION WASTE BEFORE TRANSPORT IN TIGHTLY COVERED CONTAINERS OR BY COVERING IN PLASTIC AND SEALING WITH DUCT TAPE. REMOVE WASTE DAILY EITHER AFTER 5 PM AND
BEFORE 7 AM.
12. USE ROUTE AGREED UPON BY THE ICRA TEAM AND COR FOR TRANSPORT OF TRANSPORT CONTAINERS
THROUGH THE FACILITY.
13. SEAL HOLES, PIPES, CONDUITS, AND PUNCTURES AIRTIGHT AND/OR FIRE SEAL AS REQUIRED.
14. CONSTRUCT AN AIRTIGHT ONE-HOUR RATED ANTEROOM AND REQUIRE ALL PERSONNEL TO PASS THROUGH THIS ROOM SO THEY CAN BE VACUUMED USING HEPA VACUUM CLEANER BEFORE LEAVING WORK SITE; OR WEAR PAPER COVERALLS THAT ARE REMOVED EACH TIME THEY LEAVE THE WORK
SITE.
15. ALL PERSONNEL ENTERING WORK SITE ARE REQUIRED TO WEAR SHOE COVERS. SHOE COVERS MUST
BE CHANGED EACH TIME THE WORKER EXITS THE WORK AREA THROUGH THE ANTEROOM.
16. WORK OUTSIDE THE PRIMARY WORK AREA (AREA OF CONTAINMENT) WILL BE PERFORMED WITHIN A FIRE-RATED PLASTIC ENCLOSURE WITH NEGATIVE AIR HEPA FILTER SYSTEM TO CONTROL DUST. A MOBILE ICRA CART (DUST COLLECTION CART) MAY ALSO BE USED. ENCLOSURE TO BE CONSTRUCTED AND REMOVED DAILY AS REQUIRED BY THE COR. CONTRACTOR TO SANITIZE WORK AREA PRIOR TO
REMOVING PLASTIC CONTAINMENT AREA.
EXISTING OR ICRA WALL
EXISTING OR
ICRA DOOR
PROVIDE STICKY WALK-OFF MAT
(TYP. EACH SIDE OF DOOR)
GLAZING PANEL REMOVAL
EXISTING WALL CONSTRUCTION TO REMAIN
EXISTING GLAZING PANEL TO BE REMOVED FROM
EXISTING WINDOW SYSTEM PRIOR TO START OF
ABATEMENT. CONTRACTOR TO STORE GLAZING
PANEL IN A SAFE LOCATION UNTIL WORK IS
COMPLETE AND REPLACE TO IT'S EXISTING
CONDITION. IF DAMAGED, CONTRACTOR WILL
REPLACE TO MATCH EXISTING
EXISTING WINDOW SYSTEM FRAME TO REMAIN-
VERIFY IN FIELD THE WINDOW SYSTEM TYPE
HEPA EXHAUST
EXISTING WALL CONSTRUCTION TO REMAIN
PROVIDE HEPA FILTRATION EXHAUST DUCTING
THROUGH NEW TEMPORARY PLYWOOD PANEL
PROVIDE 3/4" FIRE TREATED PLYWOOD PANEL
WITHIN EXISTING ALUMINUM FRAME
NOTE:
1. GENERAL CONTRACTOR TO LOCATE PER
QUANTITIES REQUIRED.
PROVIDE DUCT SEALING TAPE AROUND
PENETRATION (TYPICAL)
EXTERIORINTERIOR EXTERIOR
INTERIOR
(NEGATIVE SPACE)
EXISTING WINDOW SYSTEM FRAME TO REMAIN-
VERIFY IN FIELD THE WINDOW SYSTEM TYPE
LINE OF FINISHED FLOOR, SEE ROOM FINISH
SCHEDULE FOR FLOOR & BASE TYPE
FACE OF EXISTING WALL
3 5/8" METAL STUDS @ 16" O.C., TYPICAL
(1) LAYER 5/8" TYPE 'X' GYPSUM
BOARD BOTH SIDES
SECTION
PLAN
T1
/8
1-HR RATED
FIRE CAULK IN ACCORDANCE WITH UL 419
ASSEMBLY: UL-U419
STC: 48
NOTE: ANY PENETRATIONS THROUGH PARTITION ARE TO BE FIRE CAULKED
TEMPORARY CONSTRUCTION BARRIER
CONTINUOUS METAL STUD BOTTOM TRACK
SET IN CONTINUOUS BEAD OF SEALANT.
CONTINUOUS 3 1/2" SOUND
ATTENUATION BATTS AS SCHEDULE
CONTINUOUS METAL HORIZONTAL BRIDGING
CHANNEL @ MID HEIGHT, TYPICAL
FIRE CAULK IN ACCORDANCE WITH UL 419
METAL STUD FRAMING W/ 5/8" TYPE 'X'
GYPSUM BOARD, ONE SIDE
TYPE 'X' GYPSUM BOARD BOTH SIDES
RUBBER BASE. SEE FINISH SCHEDULE
BOTH SIDES
LINE OF CEILING SYSTEM, SEE ROOM
FINISH SCHEDULE FOR TYPE & HEIGHT
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANTS
321 4 5 6 7 8 9 10
C U s e rs \a k a n u s k y \D o c u m e n ts
\2
-U S
D V
A -0
A
R C
H a k a n u s k y V
B N
S Y
.r v t
/2 /2
:2
:1
A M
GC101
2ND FLOOR - ICRA CONTROL PLAN
11/22/2021 JLH ACELA
BUFFALO VA MEDICAL CENTER
528-19-1082ND FLOOR SPECIAL
PROCEDURES SITE
PREPARATIONS
BID DOCUMENTS (100%)
1/4" = 1'-0"1
2ND FLOOR ICRA CONTROL PLAN
2ND FLOOR KEY PLAN
ICRA CONTROL POLICY
ICRA KEY NOTES
NUMBER DESCRIPTION
1 HIGH EFFICIENCY PARTICULATE AIR-EQUIPPED (HEPA) FILTRATION MACHINE RATED AT 95% CAPTURE OF 0.3 MICRONS
INCLUDING POLLEN, MOLD SPORES, AND DUST PARTICLES
2 HEAVY DUTY, FLEXIBLE STEEL REINFORCED HEPA EXHAUST, DIRECTLY VENTED TO EXTERIOR. SEE B/GC101 FOR DETAIL
3 REMOVE EXISTING GLAZING, INSTALL PLYWOOD WITH SEALED EXHAUST PORT. SEE DETAIL B/GC101
4 WALK-OFF MAT. SEE SPECIFICATIONS & DETAIL A/GC101
1/2" = 1'-0"A
STICKY WALK-OFF MAT DETAIL
1 1/2" = 1'-0"B
TYPICAL HEPA FILTRATION THROUGH WINDOW DETAIL
DOOR AND FRAME SCHEDULE ICRA
DOOR NO.
DOOR FRAME
FIRE
RATING
HARDWARE
SET (HW) KICK PLATE REMARKS DOOR NO.
SIZE
TYPE MATERIAL TYPE MATERIAL
DETAIL
WIDTH HEIGHT THICKNESS HEAD JAMB SILL
TD1 3'-0" 7'-0" 1 3/4" F WD 1 HM H1 J1 - C HW-3 - - TD1
TD2 3'-0" 7'-0" 1 3/4" F WD 1 HM H1 J1 - C HW-3 - - TD2
TD3 3'-0" 7'-0" 1 3/4" F WD 1 HM H1 J1 - C HW-3 - - TD3
Revisions: Date:
043141 Page 4 of 30
GENERAL AREA OF WORK
N
PLAN
NORTH
ULTRASOUND 2
227A
TOILET
228A-1
MAMMOGRAPHY
228A
MECHANICAL
ROOM
226A
STAIR
#2
CONTROL ROOM
224A
ULTRASOUND 1
223A
OFFICE
229A
OFFICE
229A-1
OFFICE
230A
SPECIAL
PROCEDURES
224A
OFFICE
231A
3 421
9 10
DEMOLISH WALLS AS
REQUIRED TO INSTALL NEW
STRUCTURAL FRAMING
ABOVE.
EXISTING CONSTRUCTION TO REMAIN. PATCH AS
REQUIRED BY THE SPECIFICATIONS WITHIN THE
CONTRACT AREA
EXISTING WALL CONSTRUCTION SHOWN HATCHED TO BE
DEMOLISHED AND REMOVED IN ITS ENTIRETY
EXISTING DOOR TO BE REMOVED. EXISTING FRAME TO REMAIN.
REMOVE AND RE-INSTALL EXISTING HARDWARE UNLESS NOTED
OTHERWISE. PREP AND PAINT EXISTING FRAME FOR NEW PAINT
EXISTING WALL MOUNTED SINK/ LAVATORY TO
BE REMOVED. SEE PLUMBING DRAWINGS
AREA GENERALLY NOT INCLUDED IN CONTRACT
1. REFER TO SPECIFICATIONS SECTION 024119 - SELECTIVE DEMOLITION FOR ADDITIONAL REQUIREMENTS AND INFORMATION.
2. PROJECT SCOPE LINE IS INDICATED FOR GENERAL INTENT ONLY. ADDITIONAL DEMOLITION MAY BE REQUIRED OUTSIDE OF THIS LINE. ARCHITECTURAL DEMOLITION DRAWINGS ARE FOR SCHEMATIC PURPOSES. CONTRACTOR SHALL COORDINATE ALL DEMOLITION WITH THE ENTIRE SET OF CONTRACT DOCUMENTS FOR FULL SCOPE OF
DEMOLITION WORK REQUIRED FOR THE PROJECT.
3. EXISTING CONDITIONS SHOWN ON THESE DRAWINGS ARE NOT GUARANTEED TO BE COMPLETE. THE CONTRACTOR SHALL VERIFY ALL EXISTING CONDITIONS, DIMENSIONS AND MATERIALS REQUIRED FOR THE CONTRACTED WORK. REPORT ALL DISCREPANCIES TO ARCHITECT PRIOR TO FABRICATION, ERECTION AND/OR INSTALLATION.
4. COORDINATE ALL NEW PENETRATIONS AND/OR OPENINGS WITH OTHER ASSOCIATED TRADES.
5. THE OWNER MAY SELECT AND TAG ITEMS FOR DEMOLITION TO BE SALVAGED. THE CONTRACTOR SHALL REMOVE SELECTED ITEMS FROM SCOPE OF WORK AND DELIVER TO
THE OWNER'S LOCATION WITHIN THE EXISTING FACILITY.
6. CONTRACTOR SHALL PROVIDE HEPA FILTERED NEGATIVE AIR MACHINE(S) TO MAINTAIN NEGATIVE PRESSURE TO SCOPE OF WORK AREA ENSURING NO DUST WILL BE TRANSFERRED TO OCCUPIED AREAS. PROVIDE VISUAL PRESSURE MONITORING DEVICE AT DUST PROOF BARRICADE TO CONFIRM PRESSURE.
7. THE FACILITY'S EXISTING SMOKE AND FIRE SUPPRESSION SYSTEM SHALL REMAIN IN OPERATION DURING THE ENTIRE CONSTRUCTION PHASE. COVER FIRE SPRINKLER HEADS
WITH A THIN PAPER BAG TO PROTECT HEADS DURING CONSTRUCTION.
8. ALL DEMOLITION WORK BEING DONE OUTSIDE OF TEMPORARY PARTITIONS IS TO BE APPROPRIATELY SEALED OFF TO PREVENT THE TRANSMISSION OF DUST AND DEBRIS AND MINIMIZE DISRUPTION TO VISITORS, RESIDENTS AND STAFF. COORDINATE LOCATION OF BARRIERS WITH OWNER.
9. REMOVE PARTITIONS INDICATED FROM THE FLOOR TO THE UNDERSIDE OF THE STRUCTURE ABOVE.
10. PREPARE ALL ADJACENT SURFACES TO RECEIVE NEW CONSTRUCTION AND SCHEDULED FINISH. EXISTING WALLS SHOWN TO BE REMOVED SHALL BE DEMOLISHED COMPLETELY. THIS INCLUDES THE REMOVAL OF REINFORCEMENT, SOFFITS, DOORS, WINDOWS, FRAMES AND OVERHEAD BRACING. COORDINATE WITH MECHANICAL AND ELECTRICAL FOR DISCONNECTION AND REMOVAL OF EXISTING UTILITIES AND DEVICES LOCATED WITHIN AREAS SCHEDULED TO BE DEMOLISHED.
11. SOME ITEMS MAY BE INDICATED IN THE DEMOLITION DRAWINGS AND DEMOLITION NOTES WHICH ARE NOT NECESSARILY DEMOLITION WORK BUT ARE INCLUDED TO DESCRIBE THE OVERALL SCOPE OF THE PROJECT AND TO AID IN THE DEMOLITION COORDINATION. THE CONTRACTOR IS RESPONSIBLE FOR ALL WORK REQUIRED TO COMPLETE THE
INTENDED WORK OF THE OVERALL PROJECT.
12. FLOORING DEMOLITION INCLUDES THE REMOVAL OF EXISTING FLOOR FINISHES, INCLUDING VCT, SHEET VINYL, CERAMIC TILE, QUARRY TILE, CARPET AND OTHER FINISHES, GROUTS, MASTICS AND SETTING BEDS COMPLETE TO EXISTING CONCRETE FLOOR SLAB OR OTHER SUBSTRATE READY FOR NEW FLOOR FINISHES. FLOOR PREP SHALL BE
BY THE INSTALLING CONTRACTOR.
13. REMOVE MISCELLANEOUS ITEMS WITHIN LIMITS OF DEMOLITION. COORDINATE WITH OWNER ANY ITEMS TO BE SALVAGED.
14. DEMOLITION OF CEILINGS INCLUDES GRID, TILE, SUPPORTS, SOFFITS AND RELATED ITEMS. COORDINATE WITH ELECTRICAL WORK ON REMOVAL OF LIGHTS, CONDUIT, TIES, SUPPORTS AND RELATED WIRING. COORDINATE WITH MECHANICAL ON REMOVAL OF DIFFUSERS GRILLS, AND RELATED DUCTWORK EQUIPMENT CONTAINED THEREIN.
15. PLUG ABANDONED FLOOR OPENINGS WITH NEW CONCRETE. PLUG SHALL MATCH EXISTING SLAB DEPTH AND BE STRUCTURALLY SOUND TO CARRY FLOOR LOAD OF 100 LBS. /
SQ. FT. UNLESS NOTED OTHERWISE.
16. ALL FIRE RATED ASSEMBLIES (COLUMNS, SHAFTS, WALLS, ETC.) SHALL BE MAINTAINED OR BE RELOCATED / PATCHED. MATCH EXISTING FIRE RATING UNLESS NOTED
OTHERWISE.
17. REMOVE EXISTING DOORS, FRAMES, SIDELIGHTS, ANCHORS, THRESHOLDS AND HARDWARE AS INDICATED WITHIN LIMITS OF CONSTRUCTION. PATCH AND REPAIR WALL AND FLOOR TO MATCH EXISTING. OWNER SHALL HAVE THE RIGHT TO SALVAGE ANY AND ALL DOORS AND HARDWARE. CONTRACTOR SHALL VERIFY DOORS FOR SALVAGE OR
RELOCATION PRIOR TO COMMENCING DEMOLITION.
18. WHERE NEW DOORS ARE INDICATED, CUT OPENINGS IN EXISTING WALL. PREPARE OPENINGS FOR NEW DOOR. PATCH REQUIRED WALLS TO MATCH EXISTING. PROVIDE
LINTELS AS REQUIRED FOR NEW OPENINGS. PREPARE SURFACES FOR SCHEDULED FINISHES.
19. PROTECT EXISTING FINISHED WORK & EQUIPMENT WHICH IS TO REMAIN IN AREAS OF DEMOLITION WORK.
20. AFTER THE REMOVAL OF ICRA WALLS, CLEAN AND PATCH EXISTING WALLS AND CEILINGS EFFECTED BY CONSTRUCTION AND MATCH EXISTING FINISHES.
21. REMOVE ALL PLUMBING FIXTURES AS INDICATED WITHIN THE LIMITS OF CONSTRUCTION. CAP ALL PLUMBING LINES NOT REQUIRED BY NEW CONSTRUCTION. COORDINATE WITH PLUMBING PLANS FOR ADDITIONAL INFORMATION. REMOVE ALL ACCESSORIES ASSOCIATED WITH PLUMBING, INCLUDING PARTITIONS, GRAB BARS, DISPENSERS, RACKS, SHELVING, SINK BASE, DISPOSALS, ETC.
22. ICRA BARRIERS AND NEGATIVE PRESSURE SYSTEM ARE NOT TO BE REMOVED FROM CONSTRUCTION SPACE UNTIL AFTER THE SPACE HAS BEEN THOROUGHLY CLEANED AND UNTIL A NOTICE HAS BEEN RECEIVED FROM THE OWNER THAT AN INSPECTION HAS BEEN COMPLETED AND APPROVED.
CONTROL ROOM
224A
SPECIAL
PROCEDURES
224A
C
D
E
B
B
ULTRASOUND 2
227A
TOILET
228A-1
MAMMOGRAPHY
228A
MECHANICAL
ROOM
226A
STAIR
#2
ULTRASOUND 1
223A
OFFICE
229A
OFFICE
229A-1
OFFICE
230A
OFFICE
231A
A
D
E
EXISTING ACOUSTICAL CEILING TILE SYSTEM TO BE
REMOVED
EXISTING LIGHT FIXTURE(S) TO BE REMOVED. SEE
ELECTRICAL DRAWINGS.
EXISTING MECHANICAL GRILLES TO BE REMOVED.
CONTRACTOR TO MODIFY MECHANICAL SYSTEM AS
REQUIRED. SEE MECHANICAL DRAWINGS
SPRINKLER HEAD: DESIGN INTENT IS TO NOT MODIFY
EXISTING SYSTEM.
EXISTING ACOUSTICAL CEILING TILE SYSTEM TO
REMAIN UNLESS NOTED OTHERWISE.
GENERAL AREA OF WORK NOT INCLUDED IN CONTRACT
EXISTING LIGHT FIXTURE(S) TO REMAIN. SEE
ELECTRICAL DRAWINGS.
EXISTING MECHANICAL GRILLES TO REMAIN. SEE
MECHANICAL DRAWINGS
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANTS
321 4 5 6 7 8 9 10
C U s e rs \a k a n u s k y \D o c u m e n ts
\2
-U S
D V
A -0
A
R C
H a k a n u s k y V
B N
S Y
.r v t
/2 /2
:2
:0
A M
AD101
2ND FLOOR - DEMOLITION PLANS
11/22/2021 JLH ACELA
BUFFALO VA MEDICAL CENTER
528-19-1082ND FLOOR SPECIAL
PROCEDURES SITE
PREPARATIONS
BID DOCUMENTS (100%)
2ND FLOOR KEY PLAN
1/4" = 1'-0"2
2ND FLOOR PLAN - DEMOLITION
DEMOLITION LEGEND - FLOOR PLAN
GENERAL DEMOLITION NOTES
DEMOLITION KEY NOTES - 2ND FLOOR PLAN
NUMBER DESCRIPTION
1 EXISTING GANTRY TO BE REPLACED. REMOVE ASSOCIATED EQUIPMENT, CEILING MOUNTED DEVICES, AND RAIL SYSTEM. PREPARE TO RECEIVE NEW
GANTRY.
2 REMOVE EXISTING FLOOR FINISH AND WALL BASE IN ITS ENTIRETY. PREP CONCRETE DECK AND EXISTING WALLS FOR NEW FINISHES.
3 REMOVE EXISTING LEAD DOOR. EXISTING FRAME TO REMAIN. EXISTING HARDWARE IS TO BE SALVAGED FOR RE-USE UNLESS NOTED OTHERWISE.
PREP EXISTING FRAME FOR NEW PAINT
4 REMOVE EXISTING DOOR. EXISTING FRAME TO REMAIN. EXISTING HARDWARE IS TO BE SALVAGED FOR RE-USE UNLESS NOTED OTHERWISE. PREP
EXISTING FRAME FOR NEW PAINT.
5 REMOVE EXISTING COUNTERTOP AND SUPPORT SHOWN DASHED. VERTICAL SUPPORTS ARE TO BE SALVAGED FOR RE-USE AS REQUIRED. PREP
EXISTING WALLS FOR NEW FINISHES.
6 REMOVE EXISTING SINK. COORDINATE WITH PLUMBING DRAWINGS. PATCH/REPAIR WALLS FOR NEW FINISHES. SEE FINISH SCHEDULE.
7 REMOVE EXISTING WALL SHOWN DASHED. PREP ADJACENT WALLS FOR NEW FINISHES.
8 EXISTING MECHANICAL EQUIPMENT TO REMAIN AND BE PROTECTED DURING DEMOLITION AND CONSTRUCTION. COORDINATE WITH OWNER TO HAVE
HVAC UNIT AND BOM MONITORING TURNED OFF DURING DEMOLITION AND CONSTRUCTION
9 REFER TO ELECTRICAL DRAWINGS FOR EQUIPMENT DEMOLITION INFORMATION
10 EXISTING FLOORING AND WALL BASE ARE TO REMAIN AND BE PROTECTED DURING DEMOLITION AND CONSTRUCTION
11 EXISTING FLOOR DRAIN TO REMAIN, PROTECT FROM CONSTRUCTION DEBRIS.
12 EXISTING WINDOW SILL FINISH IS TO REMAIN AND BE PREPPED TO RECEIVE NEW CLADDING
13 DEMOLISH WALLS AS REQUIRED TO INSTALL NEW STRUCTURAL FRAMING ABOVE.
14 EXISTING WALL MOUNTED MECHANICAL UNIT IS TO BE REMOVED IN ITS ENTIRETY. PREP WALL TO RECEIVE NEW VERTICALLY ORIENTED UNIT
15 EXISTING WINDOW SYSTEM IS TO BE REMOVED AND OPENING IS TO BE PREPPED TO RECEIVE NEW LOUVERED PANEL INSERT. REFER TO NEW WORK
PLANS, ELEVATIONS AND SECTIONS FOR MORE INFORMATION
16 APPROXIMATE LOCATION OF ICRA CONSTRUCTION BARRIER. REFER TO ICRA PLANS FOR MORE INFORMATION
1/4" = 1'-0"1
2ND FLOOR REFLECTED CEILING PLAN - DEMOLITION
DEMOLITION LEGEND - REFLECTED CEILING PLAN
EXISTING FINISH SCHEDULE - SECOND FLOOR
RM
NUMBER RM NAME FLOOR BASE
WALL -
NORTH
WALL -
SOUTH
WALL -
EAST
WALL -
WEST MILLWORK CEILING
224A CONTROL ROOM HETEROGENEOUS
SHEET
HETEROGENEOUS
SHEET
PAINT PAINT PAINT PAINT EXISTING WINDOW
SILLS TO REMAIN
ACOUSTICAL CEILING W/
PAINTED DRYWALL FASCIA
224A SPECIAL
PROCEDURES
HETEROGENEOUS
SHEET
HETEROGENEOUS
SHEET
PAINT PAINT PAINT PAINT EXISTING WINDOW
SILLS TO REMAIN
ACOUSTICAL CEILING W/
PAINTED DRYWALL FASCIA
DEMOLITION KEY NOTES - 2ND FLOOR RCP
NUMBER DESCRIPTION
A NO ARCHITECTURAL WORK IN THIS AREA SHOWN IN SOLID HATCH: EXISTING CEILING, GRID, FIXTURES AND DIFFUSERS ARE TO REMAIN
B EXISTING GANTRY EQUIPMENT RAILS SHOWN DASHED TO BE REMOVED TYPICAL.
C EXISTING UNISTRUT SYSTEM IS TO BE REMOVED
D REMOVE EXISTING CEILING TILES AND GRID SUSPENSION SYSTEM THROUGHOUT ROOM. PREP WALLS AS REQUIRED FOR NEW FINISHES.
E EXISTING GYPSUM WALL BOARD SOFFIT TO REMAIN. PREP FOR NEW FINISHES.
X
Revisions: Date:
043141 Page 5 of 30
S S
S
S S
S
ULTRASOUND 2
227A
TOILET
228A-1
MAMMOGRAPHY
228A
ULTRASOUND 1
223A
OFFICE
229A
OFFICE
229A-1
OFFICE
230A
OFFICE
231A
STAIR
#2
A
B
A
SPECIAL
PROCEDURES
225A
CONTROL
ROOM
224A
MECHANICAL ROOM
226A
C
AT-1
9'-6"
AT-1
9'-4"
D
AE102
TYP.
T Y
P
/2
ULTRASOUND 2
227A
TOILET
228A-1
MAMMOGRAPHY
228A
ULTRASOUND 1
223A
OFFICE
229A
OFFICE
229A-1
OFFICE
230A
OFFICE
231A
STAIR
#2
CONTROL
ROOM
224A
SPECIAL
PROCEDURES
225A
AE102
AE102
AE102
AE102
AE102
2'-6"
MECHANICAL ROOM
226A
5'-11"
224A
225A
226AA
A
B
CG
CG
CG
CG
CG
CONTROL
POINT
AE1028
3 421
9 10
/2
CUTOUT FOR
GROMMET (TYP.)
2"x24" CUTOUT FOR
AIR TRANSFER
3" HIGH S-1 BACKPLASH FOR AIR
TRANSFER AS SHOWN. PROVIDE
STRUCTURAL BACKUP
(PLYWOOD) AS REQUIRED TO
MAKE BACKSPLASH DURABLE.
GENERAL AREA OF WORK
N
PLAN
NORTH
2x2 ACOUSTICAL CEILING TILE
SYSTEM
EXHAUST GRILLE
SPRINKLER HEAD
RETURN AIR GRILLE
SUPPLY AIR GRILLE
S SPEAKER
NEW 2"W RECESSED LINEAR LIGHT
FIXTURE- LENGTH VARIES
AREA GENERALLY NOT
INCLUDED IN CONTRACT
EXISTING CONSTRUCTION TO REMAIN. PATCH AS
REQUIRED FOR NEW FINISHES IF INDICATED ON
FINISH SCHEDULE.
NEW CONSTRUCTION
AREA GENERALLY NOT INCLUDED IN CONTRACT
NEW LAVATORY
NEW MILLWORK TO BE PROVIDED BY
GENERAL CONTRACTOR
CG
INDICATES CORNERGUARD-REFER TO FINISH
PLANS FOR TYPE
1. CONTRACTOR TO VERIFY ALL DIMENSIONS AND CONDITIONS IN THE FIELD PRIOR TO
COMMENCEMENT OF WORK. IF DRAWINGS CONFLICT WITH ACTUAL FIELD CONDITIONS,
CONTACT ARCHITECT PRIOR TO PROCEEDING WITH WORK.
2. REFER TO LIFE SAFETY PLANS FOR RATED WALL LOCATIONS.
3. REFER TO QJ SERIES DRAWINGS FOR FURNITURE AND EQUIPMENT LOCATION COORDINATION.
FURNITURE AND EQUIPMENT ITEMS SHOWN FOR REFERENCE ONLY AND IS NOT PART OF THE
GENERAL CONTRACT. THESE ITEMS WILL BE PROVIDED AND INSTALLED BY OWNER.
CONTRACTOR MAY NEED TO COORDINATE SPECIFIC FIXTURE AND EQUIPMENT
REQUIREMENTS IF NOTED.
4. PROVIDE CONCEALED IN-WALL REINFORCING / BLOCKING FOR ATTACHMENT OF ALL
MILLWORK, CASEWORK, AND / OR ACCESSORIES AS REQUIRED.
5. ALL DIMENSIONS ARE TO THE FACE OF STUD AT NEW CONSTRUCTION UNLESS NOTED
OTHERWISE. VERIFY IN FIELD WITH DESIGNER FINAL LOCATIONS OF ALL LIGHT SWITCHES,
STROBES, FIRE EXTINGUISHER CABINETS, FIRE ALARM PULLS AND OTHER DEVICES ON WALLS.
A LAMINATED GLASS
D DOUBLE GLAZED TEMPERED GLASS
F FIRE RATED GLAZING
G DOOR GASKETS AND DOOR SWEEP
H ELECTRIC HOLD OPEN
L1 LOUVER: 12x12 L2 LOUVER: 18x18 L3 LOUVER: 18x26
LL LEAD LINED
LP LIGHT PROOF LOUVER
M MECHANICAL SEAL FOR LIGHT PROOF & SOUND
RETARDING DOOR
T TEMPERED GLASS
U UNDERCUT 1/2" (19mm)
V LEAD GLASS
W/F WIRED FLAT GLASS
GENERAL NOTE:
1. ALL 'B' LABELED DOORS WILL HAVE A 90 MINUTE RATING.
2. ALL 'C' LABELED DOORS WILL HAVE A 45 MINUTE RATING.
TYPE 'F'
TYPE 1
(EXISTING TO REMAIN)
PREPARE EXISTING DOOR FRAME TO
RECEIVE NEW PAINT, DOOR, AND
RELOCATED HARDWARE
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANTS
321 4 5 6 7 8 9 10
C U s e rs \a k a n u s k y \D o c u m e n ts
\2
-U S
D V
A -0
A
R C
H a k a n u s k y V
B N
S Y
.r v t
/2 /2
:2
:1
A M
AE101
2ND FLOOR - NEW WORK PLANS
11/22/2021 JLH ACELA
BUFFALO VA MEDICAL CENTER
528-19-1082ND FLOOR SPECIAL
PROCEDURES SITE
PREPARATIONS
BID DOCUMENTS (100%)
1/4" = 1'-0"1
2ND FLOOR REFLECTED CEILING PLAN - NEW WORK
1/4" = 1'-0"2
2ND FLOOR PLAN - NEW WORK
2ND FLOOR KEY PLAN
KEY NOTES - FLOOR PLAN
NUMBER DESCRIPTION
1 NEW WALL MOUNTED SINK
2 NEW CONTINUOUS 30" DEEP SOLID SURFACE COUNTER AND METAL SUPPORTS AS REQUIRED
3 NEW GANTRY WITH XT SUSPENSION ABOVE
4 EXISTING MECHANICAL EQUIPMENT TO REMAIN & BE PROTECTED DURING CONSTRUCTION - REFER TO MECHANICAL (M) DRAWINGS
5 OUTLINE OF RAILS ABOVE - REFER TO 'QJ' SERIES DRAWINGS FOR MORE INFORMATION
6 INSTALL NEW VERTICALLY ORIENTED HVAC UNIT. REFER TO MECHANICAL DRAWINGS FOR MORE INFORMATION
7 EXISTING WINDOW SYSTEM IS TO BE REPLACED WITH NEW LOUVERED PANEL SYSTEM. REFER TO ELEVATION AND SECTION FOR MORE
INFORMATION
KEY NOTES - REFLECTED CEILING PLAN
NUMBER DESCRIPTION
A NEW CEILING TILES AND GRID SUSPENSION SYSTEM THROUGHOUT ROOM. PREP WALLS AS REQUIRED FOR NEW FINISHES.
B NEW EQUIPMENT RAILS
C EXISTING CEILING GRID, TILE AND LIGHTING ARE TO REMAIN
D OUTLINE OF UNISTRUT GRID. ACT CEILING SYSTEM TO BE INSTALLED BETWEEN UNITSTRUT RUNS. REFER TO DETAIL
LEGEND - REFLECTED CEILING PLANFLOOR PLAN LEGEND
# X
GENERAL FLOOR PLAN NOTES
DOOR REMARKS
DOOR TYPESDOOR FRAMES - INTERIOR
DOOR AND FRAME SCHEDULE
DOOR FRAME
FIRE
RATING KICK PLATE
HARDWARE
SET REMARKS
DOOR
NUMBERNUMBER
SIZE
TYPE MATERIAL TYPE MATERIAL
DETAILS
WIDTH HEIGHT THICKNESS HEAD JAMB SILL
224A 3'-8" 7'-0" 1 3/4" F LAM WD 1 EXISTING EXISTING EXISTING - - RELOCATED U 224A
225A 3'-10" 7'-0" 1 3/4" F LAM WD 1 EXISTING EXISTING EXISTING - - RELOCATED LL, U 225A
226AA 3'-8" 7'-0" 1 3/4" F LAM WD 1 EXISTING EXISTING EXISTING - - RELOCATED U 226AA
226AB 2'-0" 7'-0" 1 3/4" F LAM WD 1 EXISTING EXISTING EXISTING - - RELOCATED LL 226AB
Revisions: Date:
043141 Page 6 of 30
RE-USE EXISTING WORK
SURFACE BRACKET
EXISTING EXTERIOR WINDOW / WALL
ASSEMBLY BEYOND
AE102
EXISTING IN-WALL HVAC UNIT
(BEHIND NEW REMOVABLE PANELS)
REMOVABLE BENT METAL
BRACKET. SEE 4/AE102
SOLID SURFACE WORKSURFACE (S-1)
POWDER COATED SUPPORT BRACKET,
BASIS OF DESIGN HAFELE 'SPEED BRACE'-
SPACED AS RECOMMENDED BY
MANUFACTURER - TO BE IN BLACK FINISH
NEW 1/2" SOLID SURFACE CLADDING (S-2)
NEW WALL BASE, SEE
FINISHES LEGEND
AE102
POWDER COATED SUPPORT
BRACKET, BASIS OF DESIGN HAFELE
'SPEED BRACE'- SPACED AS
RECOMMENDED BY
MANUFACTURER - TO BE IN BLACK
FINISH
FINISHED END
EXISTING WINDOW / WALL
ASSEMBLY TO REMAIN
OPEN
WALL BASE - REFER TO FINISH PLANS
SOLID SURFACE WORKSURFACE (S-1)
OPEN
BEYOND
SOLID SURFACE COUNTERTOP
(S-1)
CUTOUT FOR GROMMETS AS
REQUIRED. REFER TO PLAN FOR
LOCATION / QUANTITY
POWDER COATED SUPPORT
BRACKET, BASIS OF DESIGN
HAFELE 'SPEED BRACE'- SPACED
AS RECOMMENDED BY
MANUFACTURER - TO BE IN BLACK
FINISH
/2
EXISTING WALL
ACOUSTICAL CEILING GRID WITH
DROP-IN TILE (TYPICAL)
T-BAR
L-ANGLE MOLDING
PARTITION SYSTEM - REFER TO PLANS
GALVANIZED STEEL HANGER
WIRE SUSPENDED FROM JOISTS
TO ACOUSTICAL CEILING GRID
MAINS
SOLID SURFACE COUNTERTOP
(S-1)
2'-6"
CUTOUT FOR AIR TRANSFER.
REFER TO PLAN FOR LOCATION /
QUANTITY.
EXISTING IN-WALL HVAC UNIT- AIR
INTAKE
REMOVABLE BENT METAL PANEL
W/ SIDE RETURNS. TO BE IN
POWDER COATED BLACK FINISH.
ATTACHED WITH MECHANICAL
FASTENERS TO UNDERSIDE OF
NEW WORKSURFACE & EXISTING
HVAC UNIT / EXTERIOR WALL
WALL BASE
EXISTING IN-WALL HVAC UNIT- AIR
SUPPLY
/2
SECOND FLOOR
11'-10"
THIRD FLOOR
24'-2"
AE102
NEW OUTSIDE AIR IN-TAKE LOUVER.
CONTRACTOR TO REMOVE EXISTING
WINDOW SYSTEM AND INSTALL NEW
DUCTWORK AND LOUVER.
REFER TO SECTION AND MECHANICAL
DRAWINGS FOR MORE INFORMATION.
FINISH OF LOUVER TO MATCH EXISTING
EXTERIOR WALL FINISH
ACOUSTICAL CEILING GRID WITH
LAY-IN TILE (TYPICAL)
DOUBLE UNISTRUT
CHANNEL. TO BE FINISHED
ON ALL SIDES TO MATCH ACT
CEILING GRID. SEE
STRUCTURAL DRAWINGS
FOR LAYOUT AND HANGING
CONNECTIONS
ACOUSTICAL CEILING SYSTEM
WALL ANGLE TO BE ALIGN WITH
UNISTRUT
NEW 1/2" SOLID SURFACE CLADDING
(S-2). ADHERE TO EXISTING SILL WITH
PROPER ADHESIVE
EXISTING WINDOW SILL
CONSTRUCTION TO REMAIN
/2
EXISTING WINDOW
EXISTING WALL
SEALANT WITH BACKER ROD
SECOND FLOOR
11'-10"
THIRD FLOOR
24'-2"
EXISTING WINDOW TO BE REPLACED BY
NEW OUTSIDE AIR INTAKE LOUVER.
REFER TO MECHANICAL DRAWINGS FOR
CONNECTED DUCT SIZE, PATHWAY, ETC.
ALUMINUM SILL PAN FLASHING
EXISTING WALL CONSTRUCTION
SEALANT
BIRD SCREEN
PROVIDE CONTINUOUS
SEALANT AT PERIMETER
PROVIDE CONTINUOUS BEAD OF EXTERIOR
GRADE SEALANT AT PERIMETER OF LOUVER
REFER TO MECHANICAL DRAWINGS
FOR EXTENT OF INSULATED BLANK-
OFF PANEL ASSEMBLY
1/2" GYPSUM BOARD OVER 3/4"
PLYWOOD SHEATHING OVER 2"
RIGID INSULATION OVER METAL
BLANK OFF PANEL
EXISTING ELECTRICAL DEVICES,
CONDUIT, UNISTRUTS AND WINDOW
BLANK OFF MATERIAL TO BE
TEMPORARILY REMOVED TO
PERMIT INSTALLATION OF NEW
LOUVER SYSTEM. ITEMS SHALL BE
PUT BACK IN WORKING ORDER.
NEW INSULATED OUTSIDE AIR
INTAKE DUCTING, REFER TO
MECHANICAL PLANS
EXISTING WINDOW BLANK-OFF PANEL TO
RECEIVE PENETRATION TO ALLOW PASSAGE
OF NEW INSULATED OUTSIDE AIR INTAKE
DUCT. VERIFY DUCT SIZE WITH MECHANICAL
PLANS.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANTS
321 4 5 6 7 8 9 10
C U s e rs \a k a n u s k y \D o c u m e n ts
\2
-U S
D V
A -0
A
R C
H a k a n u s k y V
B N
S Y
.r v t
/2 /2
:2
:5
A M
AE102
INTERIOR ELEVATONS, SECTIONS & DETAILS
11/22/2021 JLH ACELA
BUFFALO VA MEDICAL CENTER
528-19-1082ND FLOOR SPECIAL
PROCEDURES SITE
PREPARATIONS
BID DOCUMENTS (100%)
3/8" = 1'-0"1
ELEVATION - CONTROL ROOM 224A - EAST
3/8" = 1'-0"2
ELEVATION - CONTROL ROOM 224A - SOUTH
1" = 1'-0"3
SECTION - WORK SURFACE
3" = 1'-0"5
TYPICAL ACT CEILING DETAIL
1" = 1'-0"4
SECTION - WORK SURFACE
3/8" = 1'-0"8
EXTERIOR ELEVATION - MECHANICAL ROOM 226A
3" = 1'-0"6
UNISTRUT @ ACT CEILING
1 1/2" = 1'-0"7
WINDOW SILL SECTION
3/4" = 1'-0"9
SECTION @ 2ND FLOOR EXTERIOR WALL DUCTWORK PENETRATION
Revisions: Date:
043141 Page 7 of 30
PLAN
NORTH
GENERAL NOTES:
1. EXISTING CONDITIONS HAVE BEEN SHOWN FROM GENERAL SPACE OBSERVATIONS AND
EXISTING DRAWINGS. RESPECTIVE TRADES SHALL CONDUCT A COMPLETE FIELD SURVEY OF
EXISTING CONDITIONS PRIOR TO SUBMISSION OF BID PRICE. NO ADDITIONAL PAYMENT WILL BE
MADE FOR CLAIMS THAT ARISE FROM LACK OF KNOWLEDGE OF EXISTING CONDITIONS.
2. ALL FINISHES SHALL COMPLY WITH AND BE INSTALLED IN ACCORDANCE WITH ALL APPLICABLE
VA SPECIFICATIONS, LOCAL CODES AND ORDINANCES; IBC SECTIONS 803, 804 AND 805.
3. THE CONTRACTOR SHALL GUARANTEE ALL WORK AND MATERIALS FOR A MINIMUM OF TWELVE
(12) MONTHS AFTER THE DATE OF FINAL COMPLETION TO CONTRACTOR UNDER THE CONTRACT.
ANY ITEMS DEEMED TO BE DEFECTIVE SHALL BE REPLACED AT CONTRACTORS SOLE EXPENSE,
BUT AT OWNER'S OPTION AND CONVENIENCE, BE REPAIRED, REPLACED OR RE-PERFORMED.
4. ALL GYPSUM BOARD SOFFITS AND HEADERS WITHIN THE SCOPE LIMIT LINES TO BE PAINTED
SAME AS ADJACENT WALL COLOR UNLESS NOTED OTHERWISE.
5. FINISH DRAWINGS SUPERSEDE ARCHITECTURAL DRAWINGS FOR FINISH MATERIALS, COLORS
AND LOCATIONS ONLY.
6. FINISH SAMPLES SHALL BE SUBMITTED TO COR FOR APPROVAL BEFORE PURCHASING AND
INSTALLATION. PRODUCT SPECIFICATION SUBMITTALS SHALL BE DELIVERED TO THE COR FOR
ANY AND ALL MATERIALS BEFORE INSTALLATION. IF MATERIAL IS INSTALLED WITHOUT A
SUBMITTAL, DEMOLITION OF INSTALLED MATERIAL MAY BE REQUESTED BY VA, AT NO EXPENSE
TO THE VA.
7. FINAL COUNTERTOP GROMMET LOCATIONS TO BE FIELD VERIFIED.
FLOORING NOTES:
1. CONTRACTOR IS TO FIELD VERIFY ALL EXISTING CONDITIONS AND NOTIFY COR OF ANY
DISCREPANCIES.
2. PROVIDE NEW RUBBER BASE AND FLOOR COVERINGS AS SPECIFIED THROUGHOUT.
CONTRACTOR TO PREP FLOORS AS NECESSARY FOR NEW FINISHES.
3. CONTRACTOR TO PROVIDE TEMPORARY PROTECTION ON ALL NEW FLOORING.
4. CONTRACTOR TO CLEAR CAULK AT ALL DOOR FRAMES WHERE NEW RESILIENT FLOORING HAS
BEEN INSTALLED WITHIN SCOPE LIMITS.
5. TRANSITION AND REDUCING STRIPS ARE TO BE INSTALLED AT ALL CHANGES IN FLOOR MATERIAL
AND/OR ELEVATION THAT OCCURS IN AREAS TO BE NEWLY FINISHED. VERIFY WITH COR EACH
CONDITION AND TYPE OF TRANSITION AND/OR REDUCING STRIP TO BE USED PRIOR TO
INSTALLATION. FLOAT FLOOR AS REQUIRED FOR SMOOTH/FLUSH TRANSITION BETWEEN
MATERIAL CHANGES. TRANSITION TO BE INSTALLED AT CENTER OF DOOR.
WALL NOTES:
1. PREP WALLS FOR NEW FINISHES, PATCH AND REPAIR WALLS TO CREATE A SMOOTH UNIFORM
FINISH.
2. CONTRACTOR TO APPLY AT LEAST TWO COATS OF PAINT. EACH COAT TO BE EQUAL TO 1.6 MIL.
APPLY MORE IF NECESSARY TO COVER EXISTING COLOR.
3. CONTRACTOR IS TO PREP WALLS AS NECESSARY FOR NEW WALL BASE.
4. CONTRACTOR SHALL PAINT ALL MISC. METAL ITEMS SUCH AS ELECTRICAL PANEL COVERS,
COUNTERTOP SUPPORT BRACKETS, ELECTRICAL WIRE MOLD, ETC. TO MATCH ADJACENT WALL
COLOR. SEE WALL FINISH SCHEDULE.
SPECIAL
PROCEDURES
225A
CONTROL
ROOM
224A
MATERIAL: WSF-1
1. SEE DRAWING FOR FLOORING PATTERN.
2. UTILIZE WIDEST ROLLS SIZE AVAILABLE TO MINIMIZE SEAMING.
COR TO REVIEW SEAMING DIAGRAM.
MATERIAL: WSF-2
1. SEE DRAWING FOR FLOORING PATTERN.
2. UTILIZE WIDEST ROLLS SIZE AVAILABLE TO MINIMIZE SEAMING.
COR TO REVIEW SEAMING DIAGRAM.
MATERIAL: WSF-3
1. SEE DRAWING FOR FLOORING PATTERN.
2. UTILIZE WIDEST ROLLS SIZE AVAILABLE TO MINIMIZE SEAMING.
COR TO REVIEW SEAMING DIAGRAM.
AREA NOT IN CONTRACT
ULTRASOUND 2
227A
TOILET
228A-1
MAMMOGRAPHY
228A MECHANICAL ROOM
226A
OFFICE
229A
OFFICE
229A-1
OFFICE
230A
OFFICE
231A
STAIR
#2
SPECIAL
PROCEDURES
225A
CONTROL
ROOM
224A
CG-1
CG-1
CG-1
CG-1
CG-2
AI101
C 1
1/8" METAL COVE
STRIP (WSFCAP-1)
PARTITION: REFER TO
PLANS
HETEROGENEOUS SHEET / EPOXY
FLOORING W/ INTEGRAL BASE
STAINLESS STEEL FLOORING TRANSITION
EXISTING VCT FLOOR TILE NEW EPOXY / HETEROGENEOUS
SHEET FLOORING
NOTE: GC TO SELECT PROPER
SIZING. ENSURE SELECTION IS
ADA COMPLIANT.
/8
FEATHER JOINT
COMPOUND BOTH SIDES
5/8" GYP BOARD EACH SIDE
CONTINUOUS ALUMINUM
RETAINER
VINYL COVER
1 1/4" DRYWALL SCREWS
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .