About this file

The document is a Florida Department of Transportation (FDOT) Program Management LAP Certification of Current Capacity form, designed for pre-qualified contractors bidding on FDOT projects. This two-page form requires contractors to certify their current contracting capacity by detailing their existing uncompleted work and ensuring that any new bid does not exceed their maximum capacity rating. The form includes specific instructions for reporting contract status, such as reflecting uncompleted work as of the 15th day of the month preceding the letting date and including all new contracts awarded within five days of the bidding date.

The form provides a detailed "Status of Contracts on Hand" worksheet where contractors must comprehensively list all current projects, including both prime and subcontracts, with columns for total contract amounts, amounts sublet to others, balance of contract, and uncompleted work to be performed as a prime or subcontractor. The form allows contractors to consolidate smaller contracts (individually less than 3% of total and collectively less than 20%) to simplify reporting. While the specific example document shows zero values, the form is designed to help FDOT evaluate a contractor's current workload and capacity to take on additional projects, ensuring contractors do not overextend their resources.

View the file

Other files

File Type Posted
City_Hall_Second,_Third,_and_Fourth_Floor_Flooring_Replacement.pdf PDF
City_Hall_Second,_Third,_and_Fourth_Floor_Flooring_Replacement.pdf PDF
3rd_Floor_City_Hall-Floor_Plan.pdf PDF
4th_Floor-Floor_Plan.pdf PDF
2nd_Floor-Floor_Plan.pdf PDF
3rd_Floor_City_Hall-Floor_Plan.pdf PDF
4th_Floor-Floor_Plan.pdf PDF
2nd_Floor-Floor_Plan.pdf PDF
275-030-11-DBE_BID_PACKAGE_INFORMATION.pdf PDF
375-030-30-TRUTH_IN_NEGOTIATION_CERTIFICATION.pdf PDF
375-030-33-DISCLOSE_OF_LOBBY_ACTIVITIES.pdf PDF
FHWA-1273_(10_23)_.pdf PDF
575-060-13-NON-COLLUSION_DECLARATION_AND_COMPLIANCE_WITH_49_CFR_29.pdf PDF
SRF_SupplementaryConditions_Construction_Contract_(August_2022).pdf PDF
SRF_SupplementaryConditions_EM_Contract_(August_2022).pdf PDF
2_CFR_Part_200_app_II_(up_to_date_as_of_4-28-2025).pdf PDF
375-030-31_Affidavit_Regarding_Labor_and_Services.docx DOCX document
375-030-32-CERTIFICATION_REGARDING_DEBAREMENT,_SUSPENSION,_INELIGIBILITY..._.pdf PDF
375-040-84-LAP_PROFESSIONAL_SERVICES_TERMS.pdf PDF
SRF_SupplementaryConditions_Construction_Contract_(August_2022).pdf PDF
w37503050_v001.docm DOCM document
w37503083_(3).docx DOCX document
2_CFR_Part_200_app_II_(up_to_date_as_of_4-28-2025).pdf PDF
375-030-30-TRUTH_IN_NEGOTIATION_CERTIFICATION.pdf PDF
375-030-31_Affidavit_Regarding_Labor_and_Services.docx DOCX document
375-030-34-DISCLOSURE_OF_LOBBYING_ACTIVITIES.pdf PDF
Checklist_Solicitation.xlsx XLSX spreadsheet
375-030-34-DISCLOSURE_OF_LOBBYING_ACTIVITIES.pdf PDF
575-060-13-NON-COLLUSION_DECLARATION_AND_COMPLIANCE_WITH_49_CFR_29.pdf PDF
Checklist_Solicitation.xlsx XLSX spreadsheet
Notice_of_Award.docx DOCX document
370-040-24-MBE_PLANNED_UTILIZATION.pdf PDF
375-030-32-CERTIFICATION_REGARDING_DEBAREMENT,_SUSPENSION,_INELIGIBILITY..._.pdf PDF
375-030-33-DISCLOSE_OF_LOBBY_ACTIVITIES.pdf PDF
525-010-46-LAP_CERTIFICATION_OF_CURRENT_CAPACITY.pdf PDF
BABA_Form.pdf PDF
FHWA-1273_(10_23)_.pdf PDF
w37503050_v001.docm DOCM document
370-040-24-MBE_PLANNED_UTILIZATION.pdf PDF
BABA_Form.pdf PDF
SRF_SupplementaryConditions_EM_Contract_(August_2022).pdf PDF
275-030-11-DBE_BID_PACKAGE_INFORMATION.pdf PDF
375-040-84-LAP_PROFESSIONAL_SERVICES_TERMS.pdf PDF
Notice_of_Award.docx DOCX document
w37503083_(3).docx DOCX document
Show all 45

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

525-010-46

09/20

STATE OF FLOR DA DEPARTMENT OF TRANSPORTATION

PROGRAM MANAGEMENT LAP CERTIFICATION OF CURRENT CAPACITY

CONFIDENTIAL per Ch 337.14(1) F.S.

Fill in your FDOT Vendor Number For bids to be received on

(Letting Date) VF

(Only applicable to FDOT pre-qualified contractors)

CERTIFICATE

I hereby certify that the amount of any proposal submitted by this bidder for the above letting does not exceed the amount of the Firm’s CURRENT CAPACITY (maximum capacity rating less total uncompleted work).

The total uncompleted work as shown on the “Status of Contracts on Hand” report (page 2) $

I further certify that the “Status of Contracts on Hand” report (page 2) was prepared as follows:

1. If the letting is before the 25th day of the month, the certificate and report reflect the uncompleted work as of the 15th day of the month, last preceding the month of the letting.

2. If the letting is after the 25th day of the month, the certificate and report reflects the uncompleted work in progress as of the 15th day of the month of the letting.

3. All new contracts (and subcontracts) awarded earlier than five days before the letting date are included in the report and charged against our total rating.

I certify that the information above is correct. NAME OF FIRM

Sworn to and subscribed this of , 20 day By:

Title

525-010-46

PROGRAM MANAGEMENT

STATUS OF CONTRACTS ON HAND 09/20

(Furnish complete information about all your contracts, whether prime or subcontracts;

whether in progress or awarded, but not yet begun; and regardless of whom contracted with.)

1 2 3 4 5 6

PROJECTS

OWNER, LOCATION AND DESCRIPTION

CONTRACT (OR

SUBCONTRACT)

AMOUNT

AMOUNT

SUBLET

TO OTHERS

BALANCE OF

CONTRACT

AMOUNT

UNCOMPLETED AMOUNT TO BE DONE

BY YOU

AS PRIME

CONTRACTOR

AS

SUBCONTRACTOR

NOTE: Columns 2 and 3 to show total contract (or subcontract) amounts. Column 4 to be difference between columns 2 and 3. Amount in columns 5 or 6 to be uncompleted portion of amount in column 4. All amounts to be shown to nearest $100. The Contractor may consolidate and list as a single item all contracts which, individually, do not exceed 3% of total, and which, in the aggregate, amount to less than 20% of the total.

TOTALS $0.00 $0.00

TOTAL UNCOMPLETED WORK ON

HAND TO BE DONE BY YOU

(TOTAL COLUMNS 5 AND 6)

$0.00