IPD St Louis Shear SOW 5 20 25.docx

DOCX document 31 KB Posted

Attached to
52000QR250020316 USCG IPD ST. LOUIS SHEAR
Solicitation number
52000QR250020316
Issued by

About this file

This is a Statement of Work (SOW) for a metal working shear for the U.S. Coast Guard's Industrial Production Detachment (IPD) in St. Louis, Missouri. The solicitation seeks a guillotine-style metal shear with specific technical requirements, including a cutting capacity of 1/2" x 10' mild steel plate and 1/4" x 10' stainless plate, machine dimensions of 159" L x 92" W x 100" H, and a 20 H.P. minimum motor rating. Optional features include pneumatic rear sheet supports, squaring arms, and an angle protractor.

The procurement is a total small business set-aside under solicitation number 52000QR250020316, with a need-by date of August 15, 2025. Vendors must submit quotes by July 25, 2025, at 9 AM Eastern Time, including a cost breakdown, unit cost, and other details. Quotes should be emailed to Timothy Ford and Karla Balint of the U.S. Coast Guard Surface Force Logistics Center. The contract will be awarded on a firm-fixed price basis to the responsible contractor offering the best value, considering price, specifications, past performance, and quality. Vendors must be registered in SAM.gov and provide a minimum one-year manufacturer's warranty.

View the file

Other files

File Type Posted
Smart Matrix SAP CM FFP.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

STATEMENT OF WORK

Metal Working Shear for IPD St. Louis

1.1 Background

The Coast Guard is seeking to procure a ½-10 metal shear. The shear will be used in many day-to-day metal fabrications throughout the welding shop. The shear will be used for all metal plate fabrication requirements required by the Industrial Production Detachment St. Louis, MO (IPD STL).

1.2 Scope

The manufacturer shall furnish, deliver, and assemble one metal working shear Part # SH-120500-HD-Hyd. or equivalent. The shear must be able to cut up to and including ½”X 10’ steel plate. The shear shall meet the following guidelines:

1. Guillotine style shear with cutting capacity of 1/2” X 10’mild steel plate & 1/4”x 10’ stainless plate

2. Machine size for shop placement: 159” L x 92” W x 100” H

3. Sight glass on oil tank for level checking

4. Overload protection

5. 3-point roller guide system

6. CNC blade gap adjustment

7. CNC Rake Angle Adjustment

8. Leuze Light Curtain/Photocell Switch

9. 3 Front Sheet Supports

10. Back gauge driven by AC Motor w/Ball Screw and Linear Rod Guides

11. Motor Rating = 20H.P minimum.

The shear shall include the following optional features:

12. Pneumatic Rear Sheet Supports for Maximum of 5/16” Plate Thickness Only

13. 48” Back gauge Travel

14. 10’Squaring Arm

15. 6.5’ Squaring Arm

16. Angle Protractor

17. Back catch system

2 Copies of Operator, Service, and Parts Manuals.

The vendor shall provide a minimum warranty of one year from date of delivery.

2. REQUIREMENTS

2.1 General

The Shear shall be an industrial grade production model consisting of coordinated components and certified by the manufacturer. The model shall have been in production for a minimum of three years and have a minimum one-year manufacturer’s warranty.

Minimal Warranty shall be typed and signed by the manufacturer and be for a minimum of one year from the date of acceptance by the Government.

2.2 Capacity

The Shear shall have the capability rating of ½” X 10’ steel plate. The rated capacity and the date of Manufacture of the Shear shall be permanently affixed in an obvious/visible location.

2.3 Dimension and Construction

The Shear shall be constructed in and built to operate in adherence to all local, state, and federal regulations. The manufacturer shall ensure the application of all references in section 2.6 of this Statement of Work.

2.4 Spare Parts

Manufacturers shall have readily available all necessary parts, special fluids, and materials to complete planned maintenance for a minimum of 10 years. Parts shall be delivered to the Work Supervisor, Industrial Production Detachment St. Louis, MO when ordered.

2.5 Delivery Location

Location USCG IPD St. Louis, MO (IPD STL)

The U.S. Coast Guard IPD STL is located at 100 Arsenal St, Bldg17 St. Louis, MO 63118. Arrangements for delivery and installation shall be made with the IPD Work Supervisor at (314) 771-6044 ext. 2103 or Work Leader Mike Howton at (314) 771-6044 ext. 2125. Delivery times shall be between 7:00 AM to 2:00 PM local time, Monday through Friday inclusive. Unloading as well as assembly of the items from the delivery vehicle shall be the responsibility of the vendor.

2.6 References

The Shear shall be in accordance with the standards and specifications of the referenced technical organizations for the construction methods, materials, applications, and environment as applicable. These shall include but not be limited to:

a. ISO Standards.

b. American National Standards Institute (ANSI).

c. National Electrical Manufacturers Association (NEMA).

d. All applicable OSHA standards.

2.7 Submittals and Approvals

a. Catalog cuts, general arrangement drawings and other information shall be submitted by the manufacturer as required herein and as necessary to secure approval of the equipment.

1. Shear schematics and specifications
2. Warranty

b. Submit three (2) copies of general arrangement drawings, catalog cuts and other printed information for the Shear.

c. Paint procedures and process including Quality Control measures.

d. Submittals shall be delivered to the Government Contracting Officer within seven

(7) Calendar days after the award of the contract.

3. ACCEPTANCE

3.1 On-site Testing, Training, and Operations and Maintenance Manuals

a. The Shear shall be operated through a minimum of three complete cycles of each function, in which the Shear can perform. If any part, subsystem, or system fails during testing, the defective equipment shall be replaced and retested at no additional cost to the Government.

b. Two original copies of the Manufacturer’s Operations, Maintenance and Parts Manual shall be provided to the on-site Government Point of Contact on the training day of the delivery location. Each manual shall have annotated the actual catalog/model number of the components provided and/or associated with the Shear. Manuals shall include manufacturer’s part number, source of supply, general arrangement, and electrical and hydraulic schematics. Maintenance information shall include a schedule/checklist for daily, weekly, monthly, quarterly, semi-annual, and annual Preventative Maintenance procedures. A list of maintenance instructions to include applicable tools and fluids must also be provided.

c. One original copy of the Manufacturer’s Operations, Maintenance, and Parts Manual shall be provided to the Industrial Operations Division - Compliance Branch, Equipment Management Specialist at 300 E Main ST Suite 800, Norfolk, VA 23510 Attention: Mr. Norman Fortin

4. PERIOD OF PERFORMANCE

The need by date is 15AUG2025.

4.1 Contracting Officer’s Representative

a. COR information will be provided at the time of the award.

File details come from the government source that posted it. Updated .