IPD Mobile SOW Bandsaw and Press Brake 5 16 25.docx

DOCX document 31 KB Posted

Attached to
Baileigh Dual Mitering Bandsaw and Baileigh 30 TON 2 Axis Press Brake
Solicitation number
52000QR250019450
Issued by

About this file

This is a Statement of Work (SOW) for the U.S. Coast Guard Surface Force Logistics Center seeking to procure a Baileigh Dual Mitering Bandsaw (part # BS-20M-DM-13) and a 30 TON 2 Axis Press Brake (part # BP-3305CNC-33TON) for ATON Bouy parts fabrication. The equipment specifications include detailed technical requirements such as input power (220V/3-Phase), specific capacity measurements, hydraulic descent control, included tooling, and a one-year warranty. The delivery location is IPD Mobile in Mobile, Alabama, with delivery times restricted to 7:00 AM to 2:30 PM, Monday through Thursday.

The solicitation (Number 52000QR250019450) is a total small business set-aside using simplified acquisition procedures, with quotes due by June 10, 2025 at 10:00 AM EST. Vendors must be registered in SAM.gov and submit proposals on company letterhead including cost breakdown, labor cost, extended price, total price, payment terms, and company UEI. The award will be made on a firm-fixed price basis to the most advantageous offer considering price, specifications, past performance, and quality, with the period of performance ending on July 3, 2025.

View the file

Other files

File Type Posted
19450 FAR CLAUSE 52.212-5.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

STATEMENT OF WORK

Baileigh Dual Mitering Bandsaw and Baileigh 30 TON 2 Axis Press Brake SFLC-IOD Operations and Business Branch (OBB)

1. GENERAL

1.1 Background

The Coast Guard is seeking to procure a Baileigh Dual Mitering Bandsaw and a 30 TON 2 Axis Press Brake or equivalent. Both the Baileigh Dual Mitering Bandsaw and a 30 TON 2 Axis Press Brake shall be used to fabricate ATON Bouy parts.

1.2 Scope

The manufacturer shall supply and deliver a Baileigh Dual Mitering Bandsaw part # BS-20M-DM-13 or equivalent and a 30 TON 2 Axis Press Brake Part # BP-3305CNC-33TON or equivalent. If a site visit is needed, coordinate all visits with Chad Shaw, (228) 239-7425, email: Chad.h.shaw@uscg.mil.

1.2.1 The Dual Mitering Bandsaw part # BS-20M-DM-13 shall include the following options/accessories:

· Part #: BA9-1001292

· Blade Guide: Carbide/ Roller

· Bending Speed (SFPM): 60-306 Inverter Driven

· Capacity Round: 13”X12”X8.5”

· Capacity Square: 13”X12”X8.5”

· Descent Control: Hydraulic

· Drive: Inverter Direct

· Input Power: 220V/3-Phase/60Hz

· Model #: BS20M-DM

· Motor: 3hp

· Shipping Dimensions (LXWXH) (in.): 90X36X67

· Warranty: 1-Year

· Weight (Lbs.): 2180

1.2.2 The 30 TON 2 Axis Press Brake part # BP-3305CNC-33TON shall include the following options/accessories:

· Part #: BA9-1020680

· Approach Speed: 3.5”/sec

· Bending Speed: .394”/sec

· Distance between Housings: 51.25

· Distance from table to ram: 13.325”

· Distance per stroke (in./Sec): 3.15

· Included Tooling: 78degree Gooseneck & Multi-Vee Die (5/16”, .39”, .47”,5/8”,.94”, 1-1/4”, 2”)

· Input Power: 220V/3-Pahse

· Model #: BP-3305CNC

· Shipping Dimensions (LXWXH) (in.): 91X56X87

· Throat Depth (In.): 8”

· Warranty: 1-Year

*******Two copies of Operator, Service, and Parts Manuals.

*******The vendor shall provide a minimum warranty for one (1) full year.

2. REQUIREMENTS

2.1 Delivery Location and POC:

Location IPD Mobile

The U.S. Coast Guard IPD Mobile is located at 1500 15th Street, Mobile, AL. 36615. Arrangements for delivery shall be made with the IPF General Foreman Ms. Jolene Scarlett (504) 253-4761 or the IPD Supervisor Chad Shaw cell (228) 239-7456. Delivery times shall be between 7:00 AM to 2:30 PM local time, Monday through Thursday inclusive.

2.4 References

a. ISO Standards.

b. American National Standards Institute (ANSI).

c. National Electrical Manufacturers Association (NEMA).

d. All applicable OSHA standards.

2.5 Submittals and Approvals

Catalog cuts, general arrangement drawings and other information shall be submitted by the manufacturer as required herein and as necessary to secure approval of the equipment.

3. PERIOD OF PERFORMANCE

The period of performance due is 7/3/2025.

3.1 Contracting Officer’s Representative

a. COR information will be provided at the time of the award.

File details come from the government source that posted it. Updated .