This document is a Statement of Work (SOW) for the renewal of a hatch cover on the United States Coast Guard Cutter (USCGC) FORWARD. The hatch cover is severely corroded and needs to be replaced to maintain watertight integrity. The SOW provides details on the specific hatch cover required, referencing the relevant technical manual and drawing.

The period of performance is 64 weeks, with the primary place of performance at the USCGC FORWARD located in Portsmouth, Virginia. The Contracting Officer Technical Representative (COR) is LT. Claire Gilliland. The government has issued Solicitation Number 52000QR240006606 for this requirement, which is a firm-fixed price contract using simplified acquisition procedures. Interested offerors are required to submit quotes by August 5, 2024, and the award will be made to the offeror providing the best value to the government, considering factors such as price, past performance, and quality.

View the file

Other files

File Type Posted
905-WMEC_167_1_1_-_P.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Statement of Work (SOW) For Hatch Cover, Renew on USCGC FORWARD

1. Background and Current Observed Issues CGC FORWARD RQAWT 01-24-01 Hatch Cover is severely corroded and needs replacement. Hatch cover is not a stocked item and needs to be manufactured in accordance with Coast Guard DWG 905-WMEC_167_1_1_-_ P. There will be a loss of watertight integrity if not replaced.

System information: LIST OF HATCHES item 21, 01-24-1, Compartment Anchor windlass room & Bosn workshop, RQAWT, 24x24 coaming height 12inch. This is just for the cover for hatch 01-24-01 as per the attached drawing.

2. REFERENCES

Technical Manual: LIST OF HATCHES item 21, 01-24-1, Compartment Anchor windlass room & Bosn workshop, RQAWT, 24x24 coaming height 12inch. This is just for the cover for hatch 01-24-01 as per the attached drawing.

3. REQUIREMENTS

4. PERIOD OF PERFORMANCE

a. FWD is in port and planning for tech services for the primary date.

i. Primary: Estimated Lead time is 64 Weeks.

ii.

5. PLACE OF PERFORMANCE

The primary place of performance shall be at CGC FORWARD located at below address:

CGC FORWARD

4000 Coast Guard Blvd Portsmouth, Va. 23703

Contracting Officer Technical Representative (COR):

Attention: LT. Claire Gilliland – EO Ship: 757.647.4891 Email: Claire.A.Gilliland@uscg.mil

File details come from the government source that posted it. Updated .