About this file

This is a Scope of Work (SOW) document for commercial services to repair the fuel system of USCGC Maple (Asset 22355), a Coast Guard Cutter. The work is located at 2301 E Fort Macon Road, Atlantic Beach, NC 28512, with a period of performance from October 25, 2026 through November 15, 2026. The primary work item involves replacing the high-pressure fuel pump, feed pump, fuel banjo, banjo gasket, fuel O-ring, and injectors due to water contamination; cleaning the fuel cooler and lines; and polishing the fuel. The engine serial number is A1186212, and the fault code that prompted the repair is MID:128 PID 164 FMI 1 (low fuel rail pressure). The unit point of contact is MKC Rand Willette (813-997-6886, Rand.a.willette@uscg.mil).

The contractor must provide all labor, materials, equipment, and supervision necessary to complete the work and comply with all applicable USCG policies, manufacturer specifications, and regulatory requirements. Only OEM parts are permitted unless otherwise approved. The contractor must conduct operational testing upon completion and demonstrate proper functionality to a USCG representative. If additional discrepancies are discovered outside the defined scope, the contractor must immediately notify the government and submit a written Condition Found Report with a cost estimate and schedule impact before performing any unauthorized work. Required deliverables include an itemized invoice, service report, parts list with serial numbers, and warranty documentation. The contractor must ensure proper disposal of hazardous materials and comply with all federal, state, and local environmental and safety regulations.

View the file

Other files

File Type Posted
Solicitation 52000PR270000400.docx DOCX document
22355_SOW.docx DOCX document
Solicitation 52000PR270000400.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SCOPE OF WORK (SOW)

1. General Information Unit: USCGC Maple Asset Type: CB-L Hull Number:22355 Location of Work: 2301 E Fort Macon Rd. Atlantic Beach, NC. 28512 Period of Performance Dates: 10/25/26-11/15/26 Unit POC: MKC Rand Willette/813-997-6886/Rand.a.willette@uscg.mil

2. Background While underway the 22355 received a code for low fuel rail pressure, Code MID:128 PID 164 FMI 1. Engine SN A1186212.

3. Scope of Work Requirements

3.1 Contractor Responsibilities:

- Provide all labor, materials, equipment, and supervision necessary to complete the work described.

- Comply with all applicable USCG policies, manufacturer specifications, and regulatory requirements.

3.2 Specific Work Items:

Work Item 1 –

- Replace high pressure fuel pump, feed pump, fuel banjo, banjo gasket, fuel O-ring and injectors due to water contamination. Clean fuel cooler, and lines. Polish fuel.

4. Condition Found Report (CFR) Requirement If additional discrepancies, deficiencies, or required repairs are identified that are outside the defined Scope of Work, the contractor shall:

- Immediately notify the Unit POC.

- Submit a written Condition Found Report (CFR) detailing:

• Description of discrepancy

• Recommended corrective action

• Parts and labor breakdown

• Cost estimate

• Impact to schedule

No additional work outside the approved Scope of Work shall be performed without written authorization from the Government.

Unauthorized work will not be reimbursed.

5. Materials & Parts

- OEM parts required unless otherwise approved.

- Provide part numbers and specifications.

- All materials shall meet manufacturer and USCG standards.

6. Testing & Acceptance

- Conduct operational testing upon completion.

- Demonstrate proper functionality to USCG representative.

- Provide written service report and warranty documentation.

- Work considered complete upon Government acceptance.

7. Deliverables

- Itemized invoice

- Service report

- Parts list (with serial numbers if applicable)

- Warranty documentation (if applicable)

8. Environmental & Safety Compliance

- Proper disposal of hazardous materials.

- Spill prevention measures required.

- Compliance with all federal, state, and local regulations.